Está en la página 1de 2

Federal Register / Vol. 71, No.

116 / Friday, June 16, 2006 / Notices 34933

Office of Information and Regulatory conduct or sponsor the collection of agency.’’ The EPA, by the very nature of
Affairs, Office of Management and information while this submission is its mandate, serves very large and
Budget (OMB), Attention: Desk Officer pending at OMB. An Agency may not diverse groups that receive or are in
for EPA, 725 17th Street, NW., conduct or sponsor, and a person is not some way affected by EPA services. Past
Washington, DC 20503. required to respond to, a collection of EPA customer groups targeted for
FOR FURTHER INFORMATION CONTACT: information, unless it displays a customer satisfaction surveys include
Patricia Bonner, Office of currently valid OMB control number. individual citizens, industry/business,
Environmental Policy Innovation (MC The OMB control numbers for EPA’s states/other governments, and Web
1807T), Environmental Protection regulations in title 40 of the CFR, after users. Because several customer groups
Agency, 1200 Pennsylvania Ave., NW., appearing in the Federal Register when use the same services, a survey may
Washington, DC 20460; telephone approved, are listed in 40 CFR part 9, reach more than one of the designated
number: 202–566–2204; fax number: are displayed either by publication in customer categories. (The code standard
202–566–2200; e-mail address: the Federal Register or by other industrial code (SIC) for ‘‘General
bonner.patricia@epa.gov. appropriate means, such as on the Public’’ is 99.)
related collection instrument or form, if Estimated Number of Respondents:
SUPPLEMENTARY INFORMATION: EPA has applicable. The display of OMB control 18,735.
submitted the following ICR to OMB for numbers in certain EPA regulations is Frequency of Response: On occasion.
review and approval according to the consolidated in 40 CFR part 9. Estimated Total Annual Hour Burden:
procedures prescribed in 5 CFR 1320.12. Abstract: EPA uses voluntary surveys 1,671.
On February 6, 2006 (71 FR 6070), EPA to learn how satisfied EPA customers Estimated Total Annual Cost: $8,466,
sought comments on this ICR pursuant are with our services, and how we can includes $0 annualized capital or O&M
to 5 CFR 1320.8(d). EPA received no improve services, products and costs.
comments. Any additional comments on processes. EPA surveys individuals who Changes in the Estimates: There is a
this ICR should be submitted to EPA use services or could have. During the decrease of 1,295 hours in the total
and OMB within 30 days of this notice. next three years, EPA plans up to 72
EPA has established a public docket estimated burden currently identified in
surveys, and will use results to target/ the OMB Inventory of Approved ICR
for this ICR under Docket ID No. EPA– measure service delivery improvements.
HQ–OA–2006–0074, which is available Burdens. This decrease is in large part
By seeking renewal of the generic due to greater use of online survey tools.
for online viewing at http:// clearance for customer surveys, EPA
www.regulations.gov, or in person will have the flexibility to gather the Dated: June 9, 2006.
viewing at the OEI Docket in the EPA views of our customers to better Oscar Morales,
Docket Center (EPA/DC), EPA West, determine the extent to which our Director, Collection Strategies Division.
Room B102, 1301 Constitution Ave., services, products and processes satisfy [FR Doc. E6–9466 Filed 6–15–06; 8:45 am]
NW., Washington, DC. The EPA/DC their needs or need to be improved. The BILLING CODE 6560–50–P
Public Reading Room is open from 8 generic clearance will speed the review
a.m. to 4:30 p.m., Monday through and approval of customer surveys that
Friday, excluding legal holidays. The solicit opinions from EPA customers on ENVIRONMENTAL PROTECTION
telephone number for the Reading Room a voluntary basis, and do not involve AGENCY
is 202–566–1744, and the telephone ‘‘fact-finding’’ for the purposes of
number for the OEI Docket is 202–566– regulatory development or enforcement. [ER–FRL–6676–4]
1752. Burden Statement: The annual public
Use EPA’s electronic docket and reporting and recordkeeping burden for Environmental Impact Statements and
comment system at http:// this collection of information is Regulations; Availability of EPA
www.regulations.gov, to submit or view estimated to average 5.4 minutes per Comments
public comments, access the index response. Burden means the total time,
listing of the contents of the docket, and effort, or financial resources expended Availability of EPA comments
to access those documents in the docket by persons to generate, maintain, retain, prepared pursuant to the Environmental
that are available electronically. Once in or disclose or provide information to or Review Process (ERP), under section
the system, select ‘‘docket search,’’ then for a Federal agency. This includes the 309 of the Clean Air Act and section
key in the docket ID number identified time needed to review instructions; 102(2)(c) of the National Environmental
above. Please note that EPA’s policy is develop, acquire, install, and utilize Policy Act as amended. Requests for
that public comments, whether technology and systems for the purposes copies of EPA comments can be directed
submitted electronically or in paper, of collecting, validating, and verifying to the Office of Federal Activities at
will be made available for public information, processing and 202–564–7167. An explanation of the
viewing at http://www.regulations.gov maintaining information, and disclosing ratings assigned to draft environmental
as EPA receives them and without and providing information; adjust the impact statements (EISs) was published
change, unless the comment contains existing ways to comply with any in FR dated April 7, 2006 (71 FR 17845).
copyrighted material, CBI, or other previously applicable instructions and Draft EISs
information whose public disclosure is requirements which have subsequently
restricted by statute. For further changed; train personnel to be able to EIS No. 20050549, ERP No. D–BLM–
information about the electronic docket, respond to a collection of information; K65296–AZ, Aqua Fria National
go to http://www.regulations.gov. search data sources; complete and Monument and Bradshaw-
Title: Voluntary Customer Satisfaction review the collection of information; Harquahala, Proposed Resource
Surveys. and transmit or otherwise disclose the Management Plan, Implementation,
wwhite on PROD1PC61 with NOTICES

ICR numbers: EPA ICR No. 1711.05, information. Yavapai County, AZ.
OMB Control No. 2090–0019. Respondents/Affected Entities: The Summary: EPA expressed
ICR status: This ICR is scheduled to Executive Order describes a customer as environmental concerns about impacts
expire on June 30, 2006. Under OMB ‘‘ * * * an individual or entity who is to riparian resources and air quality,
regulations, the Agency may continue to directly served by a department or and recommended additional

VerDate Aug<31>2005 18:25 Jun 15, 2006 Jkt 208001 PO 00000 Frm 00064 Fmt 4703 Sfmt 4703 E:\FR\FM\16JNN1.SGM 16JNN1
34934 Federal Register / Vol. 71, No. 116 / Friday, June 16, 2006 / Notices

protections for these resources be EIS No. 20060128, ERP No. F–FHW– Updated Information, Manage
included in the Final EIS. Rating EC2. J40167–UT, Brown Park Road Project, Vegetation Conditions and the
EIS No. 20060066, ERP No. D–CGD– Reconstruction (Paving) and Partial Transportation System, Idaho
G11047–00, Beacon Port Deepwater Re-Alignment from Red Creek to Panhandle National Forests, St. Joe
Port License Application, Colorado State Line, Diamond Ranger District, Benewah, Latah and
Construction and Operation, Mountain Resource Management Plan Shoshone Counties, ID , Comment
Deepwater Port and Offshore Pipeline, Amendment (BLM), U.S. Army COE Period Ends: July 31, 2006, Contact:
U.S. COE Section 404 and 10 Permits, Section 404 Permit, Daggett County, Peter Ratcliffe 208–245–2531.
Gulf of Mexico, San Patricio County, UT. EIS No. 20060237, Draft EIS, AFS, AK,
TX. Summary: EPA does not object to the Traitors Cove Timber Sale Project,
proposed project. Timber Harvest and Road
Summary: EPA expressed Construction, Implementation,
environmental objections to the open EIS No. 20060153, ERP No. F–FHW–
Revillagigedo Island, Ketchikan-Misty
rack re-gasification system due to D40317–VA, Capital Beltway Study,
Fiords Ranger District, Tongrass
adverse environmental impacts to Gulf Transportation Improvement to the
National Forest, AK, Comment Period
waters and habitat. EPA believes that 14–Mile Section of Capital Beltway
Ends: July 31, 2006, Contact: Rob
these impacts can be corrected by the (I–495) between the I–95/I–395/I–495
Reeck 907–228–4114.
project modifications or other feasible Interchange and the American Legion EIS No. 20060238, Draft EIS, NRS, 00,
technology, and requested additional Bridge, Fairfax County, VA. West Tarkio Creek Watershed Plan,
information to evaluate and resolve the Summary: EPA continues to have Construction of a Multiple-Purpose
outstanding issues. Rating EO2. environmental concern about the Structure for Rural Water Supply,
EIS No. 20060117, ERP No. D–FHW– proposed project, particularly regarding Recreational Opportunities and
G40188–LA, I–49 South Wax Lake potential noise issues as well as the lack Agricultural Pollution Control, Page,
Outlet to Berwick Route US–90, of public involvement in the Montgomery and Fremont Counties,
Transportation Improvements, implementation of a High Occupancy IA and Atchison County, MO,
Funding and Right-of-Way Toll (HOT) lane concept. Comment Period Ends: July 31, 2006,
Acquisition, St. Mary Parish, LA. EIS No. 20060159, ERP No. F–NPS– Contact: David Beck 515–284–4135.
L61229–AK, Denali National Park and EIS No. 20060239, Draft EIS, NPS, WA,
Summary: EPA does not object to the
Preserve, Draft South Denali Olympic National Park General
proposed project. Rating LO.
Implementation Plan, Matanuska- Management Plan, Implementation,
EIS No. 20060119, ERP No. D–FHW– Susitna Borough, AK. Clallam, Grays Harbor, Jefferson and
D40335–VA, Harrisonburg Southeast Summary: EPA does not object to the Mason Counties, WA, Comment
Connector Location Study, proposed project. Period Ends: September 15, 2006,
Transportation Improvements from Contact: Nancy Hendricks 360–565–
U.S. Route 11 to U.S. Route 33, EIS No. 20060190, ERP No. F–AFS–
F65054–MI, Ottawa National Forest, 3008.
Funding and U.S. Army COE Section EIS No. 20060240, Final Supplement,
404 Permit, City of Harrisonburg, Proposed Land and Resource
Management Plan, Forest Plan AFS, ID, West Gold Creek Project,
Rockingham County, VA. Updated Information, Forest
Revision, Implementation, Baraga,
Summary: EPA expressed Gogebic, Houghton, Iron, Marquette Management Activities Plan,
environmental concerns about the and Ontonagan Counties, MI. Implementation, Idaho Panhandle
proposed project, primarily regarding National Forests, Sandpoints Ranger
Summary: EPA’s previous issues have
potential impacts to historic resources District, Bonner County, ID, Wait
been resolved; therefore, EPA does not
and impacts arising from induced Period Ends: July 17, 2006, Contact:
object to the proposed action.
growth in the study area. Rating EC2. Albert Helgengerg 208–265–6643.
Dated: June 13, 2006. EIS No. 20060241, Draft EIS, AFS, WA,
EIS No. 20060126, Erp No. Ds–Noa–
K91012–00, Bottomfish and Seamount Robert W. Hargrove, Olympic National Forest, Beyond
Groundfish Fisheries of the Western Director, NEPA Compliance Division, Office Prevention: Site-Specific Invasive
Pacific Region, Approval for Measures of Federal Activities. Plant Treatment Project,
to End Bottomfish Overfishing in the [FR Doc. E6–9459 Filed 6–15–06; 8:45 am] Implementation, Clallam, Grays
Hawaii Archipelago, HI, GU and AS. BILLING CODE 6560–50–P Harbor, Jefferson and Mason Counties,
WA, Comment Period Ends: July 31,
Summary: EPA expressed 2006, Contact: Joan Ziegltrum 360–
environmental concern about ENVIRONMENTAL PROTECTION 956–2320.
uncertainties of project alternatives due AGENCY EIS No. 20060242, Draft EIS, FHW, WI,
to a lack of data, and recommended Tier 1—DEIS—United States Highway
adaptive management and a more [ER–6676–3]
8 Project, Construction from Wis 35
conservative mortality reduction target (N) to USH 53, Funding and Right-of-
be established. Rating EC2. Environmental Impacts Statements;
Notice of Availability Way Permit, Polk and Barron
Final EISs Counties, WI, Comment Period Ends:
Responsible Agency: Office of Federal August 11, 2006, Contact: Peter M.
EIS No. 20060099, ERP No. F–AFS– Activities, General Information (202) Garcia 608–829–7513.
J65428–CO, Vail Valley Forest Health 564–7167 or http://www.epa.gov/ EIS No. 20060243, Final Supplement,
Project, Landscape-Scale Vegetation compliance/nepa/. FHW, 00, MN–36/WI–64 St. Croix
Management and Fuels Reduction, Weekly receipt of Environmental Impact River Crossing Project, Construction a
wwhite on PROD1PC61 with NOTICES

White River National Forest, Holy Statements new Crossing between the Cities of
Cross Ranger District, Eagle County, Filed June 5, 2006 Through June 9, 2006 Stillwater and Oak Park Heights,
CO. Pursuant to 40 CFR 1506.9. Washington County, MN and the
Summary: No formal comment letter EIS No. 20060236, Draft Supplement, town of St. Joseph in St. Croix
was sent to the preparing agency. AFS, ID, Hidden Cedar Project, County, WI, Wait Period Ends: July

VerDate Aug<31>2005 18:25 Jun 15, 2006 Jkt 208001 PO 00000 Frm 00065 Fmt 4703 Sfmt 4703 E:\FR\FM\16JNN1.SGM 16JNN1

También podría gustarte