Está en la página 1de 2

Federal Register / Vol. 72, No.

27 / Friday, February 9, 2007 / Notices 6235

Regulations. These are referred to as the with that identified in the ICR currently may be claimed or determined to be
‘‘Part 71 Federal Operating Permit approved by OMB. This increase in part Confidential Business Information (CBI).
Regulations,’’ which are the subject of 70 burden for sources and permitting DATES: Access to the confidential data
the second ICR addressed in this notice. authorities is an adjustment due to will occur no sooner than February 16,
The part 71 program is being changes in burden estimates, primarily 2007.
implemented for sources located in an increase in permit renewal activities. FOR FURTHER INFORMATION CONTACT: For
Indian country, Outer Continental Shelf These changes in burden are not general information contact: Colby
sources, and in areas that do not have program changes, as no federal Lintner, Regulatory Coordinator,
part 70 programs. mandates, including the part 70 and Environmental Assistance Division
In implementing title V of the Act and part 71 regulations, have changed in any (7408M), Office of Pollution Prevention
EPA’s part 70 operating permits way that would affect these ICRs since and Toxics, Environmental Protection
regulations, State and local permitting the last ICR updates. Agency, 1200 Pennsylvania Ave., NW.,
agencies must develop programs and For the part 71 program, there is a Washington, DC 20460–0001; telephone
submit them to EPA for approval decrease of 22 thousand hours in the number: (202) 554–1404; e-mail address:
(section 502(d)), and sources subject to total estimated annual burden compared TSCA-Hotline–epa.gov.
the program must develop operating with that identified in the ICR currently For technical information contact:
permit applications and submit them to approved by OMB. This burden Pam Moseley, Information Management
the permitting authority within 1 year reduction is also an adjustment, due to Division (7407M), Office of Pollution
after program approval (section 503). changes in assumptions, primarily due Prevention and Toxics, Environmental
Permitting authorities will then issue to a reduction in expected EPA Protection Agency, 1200 Pennsylvania
permits (section 503(c)) and thereafter oversight activities for delegated part 71 Ave., NW., Washington, DC 20460–
enforce, revise, and renew those permits programs. 0001; telephone number: (202) 564–
at no more than 5–year intervals 8956; fax number: (202) 564–8955; e-
(section 502(d)). Permit applications What Is the Next Step in the Process for
mail address: pamela.moseley–epa.gov.
and proposed permits will be provided This ICR?
SUPPLEMENTARY INFORMATION:
to, and are subject to review by, EPA The EPA will consider the comments
(section 505(a)). All information received and amend the ICRs as I. General Information
submitted by a source and the issued appropriate. The final ICR packages will A. Does this Notice Apply to Me?
permit shall also be available for public then be submitted to OMB for review
review except for confidential This action is directed to the public
and approval pursuant to 5 CFR
information which will be protected in general. This action may, however, be
1320.12. At that time, EPA will issue
from disclosure (section 503(e)). Sources of interest to those persons who are or
another Federal Register notice
will semi-annually submit compliance may be required to conduct testing of
pursuant to 5 CFR 1320.5(a)(1)(iv) to
monitoring reports to the permitting chemical substances under TSCA. Since
announce the submission of the ICRs to
authorities (section 504(a)). The EPA other entities may also be interested, the
OMB and the opportunity to submit
has the responsibility to oversee Agency has not attempted to describe all
additional comments to OMB. If you
implementation of the program and to the specific entities that may be affected
have any questions about these ICRs or
administer a Federal operating permits by this action. If you have any questions
the approval process, please contact the
program in the event a program is not regarding the applicability of this action
technical person listed under FOR
approved for a State (section 502(d)(3)) to a particular entity, consult the
FURTHER INFORMATION CONTACT.
or if EPA determines the permitting technical person listed under FOR
authority is not adequately Dated: January 31, 2007. FURTHER INFORMATION CONTACT.
administering its approved program Jenny Noonan Edmonds,
B. How Can I Get Copies of this
(section 502(i)(4)). The activities to carry Acting Director, Office of Air Quality Planning
and Standards.
Document and Other Related
out these tasks are considered Information?
mandatory and necessary for [FR Doc. E7–2180 Filed 2–8–07; 8:45 am]
implementation of title V and the proper BILLING CODE 6560–50–P
1. Docket. EPA established a docket
operation of the operating permits for this action under docket
program. This notice provides updated identification (ID) number EPA–HQ–
burden estimates from previously ENVIRONMENTAL PROTECTION OPPT–2003–0004. All documents in the
approved ICRs. AGENCY docket are listed in the docket’s index
Burden Statement: The annual public available at http://www.regulations.gov.
[EPA–HQ–OPPT–2003–0004; FRL–8114–7] Although listed in the index, some
reporting and recordkeeping burden for
the part 70 collection of information is information is not publicly available,
Access to Confidential Business
estimated to average 248 hours per e.g., CBI or other information whose
Information by Logistics Management
permitted source, and the annual disclosure is restricted by statute.
Institute
burden for permitting authorities to Certain other material, such as
administer a part 70 program is AGENCY: Environmental Protection copyrighted material, will be publicly
estimated to average 10,179 hours. The Agency (EPA). available only in hard copy. Publicly
annual public reporting and ACTION: Notice. available docket materials are available
recordkeeping burden for the part 71 electronically at http://
collection of information is estimated to SUMMARY: EPA has authorized Systems www.regulations.gov, or, if only
average 221 hours per permitted source. Research Applications (SRA) available in hard copy, at the OPPT
Corporation’s subcontractor, Logistics Docket. The OPPT Docket is located in
jlentini on PROD1PC65 with NOTICES

Are There Changes in the Estimates Management Institute (LMI) of McLean, the EPA Docket Center (EPA/DC) at Rm.
From the Last Approval? VA, to access information which has 3334, EPA West Bldg., 1301
There is an increase of 206 thousand been submitted to EPA under all Constitution Ave., NW., Washington,
hours in the part 70 total estimated sections of the Toxic Substances Control DC. The EPA/DC Public Reading Room
respondent annual burden compared Act (TSCA). Some of the information hours of operation are 8:30 a.m. to 4:30

VerDate Aug<31>2005 21:06 Feb 08, 2007 Jkt 211001 PO 00000 Frm 00042 Fmt 4703 Sfmt 4703 E:\FR\FM\09FEN1.SGM 09FEN1
6236 Federal Register / Vol. 72, No. 27 / Friday, February 9, 2007 / Notices

p.m.,Monday through Friday, excluding Dated: January 31, 2007. Use Plan Amendment, Right-of-Way
Federal holidays. The telephone number Todd S. Holderman, Grant, Temporary Use Permits and
of the EPA/DC Public Reading Room is Acting Director, Information Management U.S. Army COE Section 10 and 404
(202) 566-1744, and the telephone Division, Office of Pollution Prevention and Permits, La Paz County, AZ and
number for the OPPT Docket is (202) Toxics. Riverside and Imperial Counties, CA.
566-0280. Docket visitors are required to [FR Doc. E7–2110 Filed 2–8–07; 8:45 am] Summary: EPA expressed
show photographic identification, pass BILLING CODE 6560–50–S environmental concerns about indirect
through a metal detector, and sign the impacts on air quality and water quality,
EPA visitor log. All visitor bags are and recommended that the FEIS discuss
processed through an X-ray machine ENVIRONMENTAL PROTECTION appropriate mitigation measures.Rating
and subject to search. Visitors will be AGENCY EC2.
provided an EPA/DC badge that must be EIS No. 20060452, ERP No. D–AFS–
[ER–FRL–6683–9]
visible at all times in the building and L65527–WA, Natapoc Ridge
returned upon departure. Environmental Impact Statements and Restoration Project, To Improve Forest
2. Electronic access. You may access Regulations; Availability of EPA Health and Sustainability, and
this Federal Register document Comments ReduceWildfire and Hazardous Fuels,
electronically through the EPA Internet
Wenatchee River Ranger District,
under the ‘‘Federal Register’’ listings at Availability of EPA comments
Okanogan—Wenatchee
http://www.epa.gov/fedrgstr. prepared pursuant to the Environmental
NationalForest, Chelan County, WA.
Review Process (ERP), under section
II. What Action is the Agency Taking? Summary: EPA requested further
309 of the Clean Air Act and Section
Under EPA contract number EP–W– 102(2)(c) of the National Environmental clarification of several points, but
05–024, and dependent task orders, Policy Act as amended. Requests for expressed lack of objections with the
subcontractor LMI of 2000 Corporate copies of EPA comments can be directed preferred alternative. Rating LO.
Ridge, McLean, VA, will assist SRA and to the Office of Federal Activities at EIS No. 20060493, ERP No. D–IBR–
the Office of Pollution Prevention and 202–564–7167. K36146–CA, Folsom Dam Safety and
Toxics (OPPT) in implementing OPPT’s An explanation of the ratings assigned Flood Damage Reduction Project,
Target Information Architecture, which to draft environmental impact Addressing Hydrologic, Seismic,
involves enterprise architecture statements (EISs) was published in FR Static, and Flood Management Issues,
documentation, development, dated April 7, 2006 (71 FR 17845). Sacramento, El Dorado and Placer
requirements analysis, design, testing, Counties, CA.
change management, and updates to the Draft EISs Summary: EPA expressed
information management systems that EIS No. 20060235, ERP No. D–CGD– environmental concerns about potential
store TSCA CBI data. B03015–MA, Neputune Liquefied adverse effects on air quality and
In accordance with 40 CFR 2.306(j), Natural Gas (LNG), Construction and recommended implementation of
EPA has determined that under EPA Operation, Deepwater Port mitigation measures to reduce impacts.
contract number EP–W–05–024, LMI LicenseApplication, (Docket Number EPA requested the General Conformity
will require access to CBI submitted to USCG–2004–22611) Massachusetts Determination be included in the FEIS
EPA under all sections of TSCA to Bay, Gloucester and Boston, MA. and requested notification and receipt of
perform successfully the duties Summary: EPA expressed future project-level environmental
specified under the contract. LMI environmental concerns about impacts documentation. Rating EC2.
personnel will be given access to to air and water quality and to marine EIS No. 20060500, ERP No. D–AFS–
information submitted to EPA under all organisms, and offered suggestions K65322–CA, Little Doe and Low
sections of TSCA. Some of the regarding measures to avoid, minimize Gulch Timber Sale Project, Proposes
information may be claimed or and mitigate for unavoidable impacts. to Harvest Commercial Timber, Six
determined to be CBI. Rating EC2. Rivers National Forest, Mad River
EPA is issuing this notice to inform
EIS No. 20060342, ERP No. D–FHW– Ranger District, Trinity County, CA.
all submitters of information under all
sections of TSCA that EPA may provide L65520–WA, WA–520 Bridge Summary: EPA expressed
LMI access to these CBI materials on a Replacement and HOV Project, environmental concerns about impacts
need-to-know basis only. All access to Replace WA–520 Portage Bay and to wildlife habitat, including habitat for
TSCA CBI under this contract will take Evergreen Point Bridges and Improve the federally threatened northern
place at EPA Headquarters. Roadway between I–5 in Seattle and spotted owl, and the potential for the
LMI will be authorized access to Bellevue Way or 108th Avenue proposed action to spread noxious
TSCA CBI at EPA Headquarters under Northeast on the Eastside, U.S. Coast weeds into the project area. Rating EC1.
the EPA TSCA CBI Protection Manual. Guard Permit and U.S. Army COE EIS No. 20060505, ERP No. D–NOA–
Clearance for access to TSCA CBI Section 10 and 404 Permits, King E86004–00, South Atlantic Snapper
under this contract may continue until County, WA. Grouper Fishery , Amendment 14 to
April 14, 2010, unless such access is Summary: EPA expressed Establish Eight Marine Protected
extended. environmental concerns about impacts Areas in Federal Waters,
LMI personnel will be required to sign to endangered species, and aquatic Implementation, South
nondisclosure agreements and will be resources, and indirect and cumulative AtlanticRegion.
briefed on appropriate security impacts. Rating EC2. Summary: EPA supports Amendment
procedures before they are permitted EIS No. 20060392, ERP No. D–FRC– 14 and the concept of MPAs as
jlentini on PROD1PC65 with NOTICES

access to TSCA CBI. K03029–00, North Baja Pipeline protected fish havens to restore given
Expansion Project, Docket Nos. CP06– species and their habitat. Rating LO.
List of Subjects 61–000 and CP01–23–000, EIS No. 20060460, ERP No. DB–FHW–
Environmental protection, Construction and Operation of a B40029–VT, Southern Connector/
Confidential Business Information. Natural Gas Pipeline System, Land Champlain Parkway Project (MEGC–

VerDate Aug<31>2005 21:06 Feb 08, 2007 Jkt 211001 PO 00000 Frm 00043 Fmt 4703 Sfmt 4703 E:\FR\FM\09FEN1.SGM 09FEN1

También podría gustarte