33484 Federal Register / Vol. 72, No.

116 / Monday, June 18, 2007 / Notices

section 205 of the FPA, 16 USC, 824d Description: DQE Holdings LLC DEPARTMENT OF ENERGY
and to Part 35 of FERC’s Regulations. submit a FERC Form 65 B Waiver.
Filed Date: 06/04/2007. Filed Date: 06/04/2007. Federal Energy Regulatory
Accession Number: 20070606–0179. Accession Number: 20070604–5052. Commission
Comment Date: 5 p.m. Eastern Time Comment Date: 5 p.m. Eastern Time
[ FERC Docket Nos. CP06–61–000, –001,
on Monday, June 25, 2007. on Monday, June 25, 2007. –002 and CP01–23–003; CA State
Docket Numbers: ER07–1010–000. Any person desiring to intervene or to Clearinghouse No. 2006081127; BLM
Applicants: Sumas Cogeneration Co protest in any of the above proceedings Reference No. CACA–42662]
LP. must file in accordance with Rules 211
Description: Sumas Cogeneration and 214 of the Commission’s Rules of The California State Lands
Company, LP’s application for order Practice and Procedure (18 CFR 385.211 Commission, and the Bureau of Land
accepting market-based rate tariff, and 385.214) on or before 5 p.m. Eastern Management; North Baja Pipeline,
granting waivers and blanket authority. time on the specified comment date. It LLC; Notice of Availability/Completion
Filed Date: 06/04/2007. is not necessary to separately intervene of the Final Environmental Impact
Accession Number: 20070606–0178. again in a subdocket related to a Statement/Report and Proposed Land
Comment Date: 5 p.m. Eastern Time compliance filing if you have previously Use Plan Amendment for the Proposed
on Monday, June 25, 2007. intervened in the same docket. Protests North Baja Pipeline Expansion Project
will be considered by the Commission
Docket Numbers: ER07–1011–000. June 8, 2007.
in determining the appropriate action to
Applicants: UGI Utilities, Inc. The environmental staffs of the
be taken, but will not serve to make
Description: UGI Utilities, Inc submits Federal Energy Regulatory Commission
protestants parties to the proceeding.
the corrected Annual Update which was (FERC or Commission), the California
Anyone filing a motion to intervene or
originally submitted on 5/31/07 with State Lands Commission (CSLC), and
protest must serve a copy of that
detailed calculations conducted through the Bureau of Land Management (BLM)
document on the Applicant. In reference
its cost-of-service formula rate etc. (collectively referred to as the Agency
to filings initiating a new proceeding,
Filed Date: 05/31/2007. Staffs) have prepared the final
Accession Number: 20070606–0081. interventions or protests submitted on
or before the comment deadline need environmental impact statement/
Comment Date: 5 p.m. Eastern Time environmental impact report and
on Thursday, June 21, 2007. not be served on persons other than the
Applicant. proposed land use plan amendment
Docket Numbers: ER07–1012–000. The Commission encourages (final EIS/EIR/plan amendment) to
Applicants: UGI Utilities, Inc. electronic submission of protests and address North Baja Pipeline, LLC’s
Description: UGI Utilities, Inc submits interventions in lieu of paper, using the (North Baja) proposed expansion of its
First Revised Sheet 309B et al. to PJM FERC Online links at http:// natural gas pipeline system.
Open Access Transmission Tariff etc. www.ferc.gov. To facilitate electronic The final EIS/EIR/plan amendment
Filed Date: 05/31/2007. service, persons with Internet access was prepared as required by the
Accession Number: 20070606–0193. who will eFile a document and/or be National Environmental Policy Act
Comment Date: 5 p.m. Eastern Time listed as a contact for an intervenor (NEPA), the California Environmental
on Thursday, June 21, 2007. must create and validate an Quality Act, and the Federal Land
Docket Numbers: ER07–1014–000. eRegistration account using the Policy and Management Act. The
Applicants: NSTAR Electric eRegistration link. Select the eFiling purpose of the document is to inform
Company. link to log on and submit the the public and the permitting agencies
Description: NSTAR Electric Co intervention or protests. about the potential adverse and
submits its informational filing Persons unable to file electronically beneficial environmental impacts of the
containing the true-up billings under should submit an original and 14 copies proposed North Baja Pipeline Expansion
their Local Service Schedules etc. of the intervention or protest to the Project (Project or proposed Project) and
Filed Date: 06/01/2007. Federal Energy Regulatory Commission, its alternatives, and recommend
Accession Number: 20070606–0189. 888 First St., NE., Washington, DC mitigation measures that would reduce
Comment Date: 5 p.m. Eastern Time 20426. the significant adverse impacts to the
on Friday, June 22, 2007. The filings in the above proceedings maximum extent possible, and, where
Take notice that the Commission are accessible in the Commission’s feasible, to a less than significant level.
received the following foreign utility eLibrary system by clicking on the The Agency Staffs have concluded that
company status filings: appropriate link in the above list. They if the Project is constructed and
Docket Numbers: FC07–51–000. are also available for review in the operated in accordance with applicable
Applicants: CMS Enterprises Commission’s Public Reference Room in laws and regulations, North Baja’s
Company. Washington, DC. There is an proposed mitigation, and the Agency
Description: CMS Enterprises eSubscription link on the Web site that Staffs’ additional mitigation measures, it
Company notification of Self- enables subscribers to receive e-mail would be an environmentally acceptable
Certification of Foreign Utility Company notification when a document is added action.
Status of Jamaica Private Power Co. Ltd to a subscribed dockets(s). For The FERC is the lead Federal agency
and Private Power Operators Ltd. assistance with any FERC Online and will use the document to consider
Filed Date: 06/05/2007. service, please e-mail the environmental impacts that could
Accession Number: 20070605–5026. FERCOnlineSupport@ferc.gov or call result if it issues North Baja a Certificate
Comment Date: 5 p.m. Eastern Time (866) 208–3676 (toll free). For TTY, call of Public Convenience and Necessity
on Tuesday, June 26, 2007. (202) 502–8659. and a Presidential Permit amendment
jlentini on PROD1PC65 with NOTICES

Take notice that the Commission under sections 7 and 3, respectively, of


received the following public utility Kimberly D. Bose, the Natural Gas Act. The CSLC is the
holding company filings: Secretary. lead State agency and will use the
Docket Numbers: PH07–18–000. [FR Doc. E7–11656 Filed 6–15–07; 8:45 am] document to consider North Baja’s
Applicants: DQE Holdings LLC. BILLING CODE 6717–01–P application to amend its existing right-

VerDate Aug<31>2005 18:19 Jun 15, 2007 Jkt 211001 PO 00000 Frm 00040 Fmt 4703 Sfmt 4703 E:\FR\FM\18JNN1.SGM 18JNN1
Federal Register / Vol. 72, No. 116 / Monday, June 18, 2007 / Notices 33485

of-way lease across the State’s Sovereign Arizona. In addition to the new volumes connect with the existing A-Line and
and School Lands in conjunction with from the LNG terminals, North Baja proposed B-Line in Riverside County;
the environmental impacts that could would continue to offer southbound gas • One tap where the IID Lateral
result from any part of the Project in transportation service for several would connect with the proposed B-
California. existing shippers. Line in Imperial County;
The BLM is participating as a The final EIS/EIR/plan amendment • Four pig 3 launchers;
cooperating agency in the preparation of addresses the potential environmental • Five pig receivers;
the document because the Project would effects of the construction and operation • Nine remote manual valves with
cross Federal land under the of the following facilities proposed by automatic shutdown capability on the
jurisdiction of the Palm Springs-South North Baja: B-Line, adjacent to the existing A-Line
Coast, El Centro, and Yuma Field • Up to 79.8 miles of pipeline loop 1 valve sites; and
Offices. The Bureau of Reclamation (B-Line) adjacent to North Baja’s • Four remote manual valves with
(BOR) is also a cooperating agency in existing pipeline (A-Line) consisting of automatic shutdown capability on the
the preparation of the document 11.7 miles of 42-inch-diameter pipeline IID Lateral.
because lands administered by the BOR extending from the existing Ehrenberg The final EIS/EIR/plan amendment
would be crossed by the Project. Under Compressor Station at milepost (MP) 0.0 has been placed in the public files of the
section 185(f) of the Mineral Leasing Act in La Paz County, Arizona to the FERC and the CSLC and is available for
of 1920, the BLM has the authority to existing Rannells Trap at MP 11.7 in public inspection at:
issue Right-of-Way Grants for all Riverside County, California, and 68.1 Federal Regulatory Energy Commission,
affected Federal lands. The final EIS/ miles of 48-inch-diameter pipeline Public Reference Room, 888 First St.,
EIR/plan amendment will be used by extending from Rannells Trap to an NE., Room 2A, Washington, DC
the BLM to consider whether to amend interconnection at the U.S.-Mexico 20426, (202) 208–1371.
North Baja’s existing Right-of-Way Grant border at MP 79.8 in Imperial County, California State Lands Commission, 100
and issue Temporary Use Permits for California; Howe Avenue, Suite 100 South,
the installation of approximately 67.4 • 2.1 miles of 36-inch-diameter Sacramento, CA 95825, (916) 574–
miles of pipeline and ancillary facilities pipeline lateral 2 (Arrowhead Extension) 1938.
across Federal lands managed by the extending from the proposed B-Line at The final EIS/EIR/plan amendment is
BLM, the BOR, and the U.S. Fish and MP 7.4 to Southern California Gas also available for viewing on the FERC
Wildlife Service (FWS). The final EIS/ Company’s (SoCalGas) existing Blythe and CSLC Web sites at the Internet
EIR/plan amendment will also be used Compressor Station in Riverside addresses below:
by the BLM to consider amending the County; http://www.ferc.gov
California Desert Conservation Area • 45.7 miles of 16-inch-diameter http://www.slc.ca.gov.
Plan (as amended), which would be pipeline lateral (Imperial Irrigation
A limited number of copies of the
necessary for pipeline construction District [IID] Lateral) extending from MP
final EIS/EIR/plan amendment are
outside of designated utility corridors, 74.5 of the B-Line near the existing
available from the FERC’s Public
as well as amending the Yuma District Ogilby Meter Station to the existing IID
Reference Room identified above. These
Resource Management Plan, which El Centro Generating Station in Imperial
copies may be requested in hard copy or
would be necessary for pipeline County;
• Modifications at the existing as .pdf files on a CD that can be read by
construction across the Milpitas Wash a computer with a CD-ROM drive. In
Special Management Area. Ehrenberg Compressor Station in LaPaz
County and the existing Ogilby Meter addition, copies of the final EIS/EIR/
The BLM proposes to adopt the final plan amendment have been mailed to
EIS/EIR/plan amendment per Title 40 Station in Imperial County to allow
northbound flow of natural gas; Federal, State, and local government
Code of Federal Regulations (CFR) agencies; elected officials; Native
§ 1506.3 to meet its responsibilities • Metering modifications inside the
existing El Paso Natural Gas Company American tribes; affected landowners;
under NEPA and its planning local libraries and newspapers;
regulations per Title 43 CFR Part 1610. (El Paso) Meter Station at the Ehrenberg
Compressor Station site to allow LNG- intervenors to the FERC’s proceeding;
The BLM will present separate Records
source gas to be delivered into the El and other interested parties. Hard copies
of Decision for the Right-of-Way Grant
Paso system; of the final EIS/EIR/plan amendment
and the plan amendments for the North
Baja Pipeline Expansion Project after the • One meter station (Blythe- can be viewed at the following libraries
Arrowhead Meter Station) at SoCalGas’ in the Project area:
issuance of the final EIS/EIR/plan
amendment. The concurrence or non- existing Blythe Compressor Station in Yuma County Library District, 350 3rd
concurrence of the BOR and the FWS Riverside County to measure gas Avenue, Yuma, AZ 85364.
would be considered in the BLM’s delivery from the North Baja system to Palo Verde Valley Library, 125 W.
decision. SoCalGas; Chanslorway, Blythe, CA 92225.
The existing North Baja system is • One meter station (El Centro Meter El Centro Public Library, 539 State
currently certificated by the FERC to Station) at the IID’s existing El Centro Street, El Centro, CA 92243.
transport 512,500 dekatherms per day Generating Station in Imperial County Hemet Public Library, 510 E. Florida
(Dthd) (500 million standard cubic feet to measure gas delivery from the North Avenue, Hemet, CA 92543.
per day [MMscfd]) of natural gas in a Baja system to the IID; Imperial Public Library, 200 W. 9th
southbound direction. Once completed, • Two taps and crossover piping Street, Imperial, CA 92251.
where the Arrowhead Extension would City of Rancho Mirage Public Library,
the expanded system would be capable
42–520 Bob Hope Drive, Rancho
of transporting up to 2,932,000 Dthd 1 A loop is a segment of pipeline that is usually
Mirage, CA 92270.
(2,753 MMscfd) of natural gas from installed adjacent to an existing pipeline and Glen Avon Library, 9244 Galena Street,
jlentini on PROD1PC65 with NOTICES

planned liquefied natural gas (LNG) connected to it at both ends. The loop allows more
Riverside, CA 92509.
storage and vaporization terminals gas to be moved through the system.
2 A lateral pipeline typically takes gas from the
located on the Baja California coast in main system to deliver it to a customer, local 3 A pig is an internal tool that can be used to
Mexico in a northbound direction for distribution system, or another interstate clean and dry a pipeline and/or to inspect it for
delivery to customers in California and transmission system. damage or corrosion.

VerDate Aug<31>2005 18:19 Jun 15, 2007 Jkt 211001 PO 00000 Frm 00041 Fmt 4703 Sfmt 4703 E:\FR\FM\18JNN1.SGM 18JNN1
33486 Federal Register / Vol. 72, No. 116 / Monday, June 18, 2007 / Notices

Palo Verde District Library, 701 Silver or wish to testify, please contact Tom addressed in subsequent notices
Spur Road, Rollins Hills Estates, CA Filler at the number above. published in the Federal Register.
90274. Kimberly D. Bose, DATES: Comments must be received on
Additional information about the Secretary.
or before September 17, 2007.
Project is available from the FERC’s ADDRESSES: Submit your comments,
[FR Doc. E7–11647 Filed 6–15–07; 8:45 am]
Office of External Affairs at 1–866–208– identified by docket identification (ID)
BILLING CODE 6717–01–P
FERC or on the FERC Internet Web site number EPA–HQ–OPPT–2004–0109, by
(http://www.ferc.gov) using the eLibrary one of the following methods.
• Federal eRulemaking Portal: http://
link. Click on the eLibrary link, click on ENVIRONMENTAL PROTECTION www.regulations.gov. Follow the on-line
‘‘General Search,’’ and enter the docket AGENCY instructions for submitting comments.
number excluding the last three digits in • Mail: Document Control Office
the Docket Number field. Be sure you [EPA–HQ–OPPT–2004–0109; FRL–8129–3] (7407M), Office of Pollution Prevention
have selected an appropriate date range. and Toxics (OPPT), Environmental
For assistance, please contact FERC Draft List of Initial Pesticide Active
Ingredients and Pesticide Inerts to be Protection Agency, 1200 Pennsylvania
Online Support at Ave., NW., Washington, DC 20460–
FERCOnlineSupport@ferc.gov or toll Considered for Screening under the
Federal Food, Drug, and Cosmetic Act 0001.
free at 1–866–208–3676, or for TTY, • Hand Delivery: OPPT Document
contact (202) 502–8659. The eLibrary AGENCY: Environmental Protection Control Office (DCO), EPA East Bldg.,
link on the FERC Internet Web site also Agency (EPA). Rm. 6428, 1201 Constitution Ave., NW.,
provides access to the texts of formal ACTION: Notice. Washington, DC. Attention: Docket ID
documents issued by the FERC, such as number EPA–HQ–OPPT–2004–0109.
orders, notices, and rule makings. SUMMARY: Section 408(p) of the Federal The DCO is open from 8 a.m. to 4 p.m.,
In addition, the FERC now offers a Food, Drug, and Cosmetic Act (FFDCA) Monday through Friday, excluding legal
directs EPA to develop a chemical holidays. The telephone number for the
free service called eSubscription that
screening program using appropriate DCO is (202) 564–8930. Such deliveries
allows you to keep track of all formal
validated test systems and other are only accepted during the DCO’s
issuances and submittals in specific scientifically relevant information to normal hours of operation, and special
dockets. This can reduce the amount of determine whether certain substances arrangements should be made for
time you spend researching proceedings may have hormonal effects. In deliveries of boxed information.
by automatically providing you with September 2005, EPA published its Instructions: Direct your comments to
notification of these filings, document approach for selecting the initial list of docket ID number EPA–HQ–OPPT–
summaries, and direct links to the chemicals for which testing will be 2004–0109. EPA’s policy is that all
documents. To register for this service, required under the Endocrine Disruptor comments received will be included in
go to the eSubscription link on the Screening Program (EDSP). This the docket without change and may be
FERC Internet Web site. document presents the draft list of the made available on-line at http://
Information concerning the first group of chemicals that will be www.regulations.gov, including any
involvement of the CSLC in the EIS/EIR screened in the Agency’s EDSP. The personal information provided, unless
process may be obtained from Tom draft list was produced using the the comment includes information
Filler, Project Manager, at (916) 574– approach described in the September claimed to be Confidential Business
1938, or on the CSLC Internet website 2005 notice, and includes chemicals Information (CBI) or other information
at http://www.slc.ca.gov. that the Agency, in its discretion, has whose disclosure is restricted by statute.
decided should be tested first, based Do not submit information that you
Information concerning the proposed upon exposure potential. This list consider to be CBI or otherwise
land use plan amendment and the should not be construed as a list of protected through regulations.gov or e-
involvement of the BLM in the EIS/EIR known or likely endocrine disruptors. mail. The regulations.gov website is an
and plan amendment process may be Nothing in the approach for generating ‘‘anonymous access’’ system, which
obtained from Lynda Kastoll, Project the initial list provides a basis to infer means EPA will not know your identity
Manager, at (760) 337–4421. The U.S. that by simply being on this list these or contact information unless you
Environmental Protection Agency’s chemicals are suspected to interfere provide it in the body of your comment.
publication of the Notice of with the endocrine systems of humans If you send an e-mail comment directly
Availability/Completion of the final or other species, and it would be to EPA without going through
EIS/EIR/plan amendment in the Federal inappropriate to do so. The first group regulations.gov, your e-mail address
Register initiates a 30-day protest period of chemicals identified for testing will be automatically captured and
on the plan amendment. Instructions for includes pesticide active ingredients included as part of the comment that is
filing a protest can be found in section and High Production Volume (HPV) placed in the docket and made available
1.7.7 of the final EIS/EIR/plan chemicals used as pesticide inerts. After on the Internet. If you submit an
amendment. considering comments on this draft list electronic comment, EPA recommends
of chemicals, EPA will issue a second that you include your name and other
The CSLC is expected to consider Federal Register notice containing the contact information in the body of your
certification of the final EIS/EIR/plan final list of chemicals. This document comment and with any disk or CD-ROM
amendment and act on North Baja’s does not describe other aspects of the you submit. If EPA cannot read your
application at a regularly scheduled EDSP such as the administrative comment due to technical difficulties
jlentini on PROD1PC65 with NOTICES

meeting in mid-2007. Interested parties procedures EPA will use to require and cannot contact you for clarification,
will be notified of the date, time, and testing, the validated tests and battery EPA may not be able to consider your
location of the meeting. If you have any that will be included in the EDSP, or the comment. Electronic files should avoid
questions regarding the CSLC hearing, timeframe for requiring the testing or the use of special characters, any form
receiving the data. These topics will be of encryption, and be free of any defects

VerDate Aug<31>2005 18:19 Jun 15, 2007 Jkt 211001 PO 00000 Frm 00042 Fmt 4703 Sfmt 4703 E:\FR\FM\18JNN1.SGM 18JNN1