Está en la página 1de 2

71888 Federal Register / Vol. 72, No.

243 / Wednesday, December 19, 2007 / Notices

(866) 208–3676 (toll free). For TTY, call on the Commission’s Web site under the last three digits in the docket number
(202) 502–8659. ‘‘e-Filing’’ link. The Commission field to access the document. For
strongly encourages electronic filings. assistance, call toll-free 1–866–208–
Nathaniel J. Davis, Sr.,
Please include the project number (P– 3676 or e-mail
Deputy Secretary. 13059–000) on any comments or FERCOnlineSupport@ferc.gov. For TTY,
[FR Doc. E7–24593 Filed 12–18–07; 8:45 am] motions filed. call (202) 502–8659. A copy is also
BILLING CODE 6717–01–P The Commission’s Rules of Practice available for inspection and
and Procedure require all intervenors reproduction at the address in item g
filing documents with the Commission above.
DEPARTMENT OF ENERGY to serve a copy of that document on l. Individuals desiring to be included
each person in the official service list on the Commission’s mailing list should
Federal Energy Regulatory for the project. Further, if an intervenor so indicate by writing to the Secretary
Commission files comments or documents with the of the Commission.
[Project No. 13059–000] Commission relating to the merits of an m. Competing Preliminary Permit:
issue that may affect the responsibilities Anyone desiring to file a competing
Pacific Gas and Electric Company; of a particular resource agency, they application for preliminary permit for a
Notice of Application Accepted for must also serve a copy of the document proposed project must submit the
Filing and Soliciting Comments, on that resource agency. competing application itself, or a notice
Protests, and Motions To Intervene j. Description of Existing Facilities of intent to file such an application, to
and Proposed Project: The existing Pit 4 the Commission on or before the
December 12, 2007. Dam is the second dam downstream, of specified comment date for the
Take notice that the following the Pit 3, 4 & 5 Project (FERC No. 233) particular application (see 18 CFR 4.36).
hydroelectric application has been filed and it impounds Pit 4 Reservoir. The Pit Submission of a timely notice of intent
with the Commission and is available 4 Dam has a concrete gravity overflow allows an interested person to file the
for public inspection: section 213 feet long with a maximum competing preliminary permit
a. Type of Application: Preliminary height of 108 feet. The Pit 4 Dam was application no later than 30 days after
Permit. completed in 1927, and was re- the specified comment date for the
b. Project No.: 13059–000. authorized in 2007 for continued particular application. A competing
c. Date filed: November 2, 2007. operation under terms of the new preliminary permit application must
d. Applicant: Pacific Gas and Electric hydropower license issued for Project conform with 18 CFR 4.30 and 4.36.
Company. No. 233 (120 FERC ¶ 62,001). The n. Competing Development
e. Name and Location of Project: The existing reservoir at Pit 4 has a surface Application: Any qualified development
proposed Pit 4 Dam Streamflow area of 105 acres and a storage capacity applicant desiring to file a competing
Incremental Generation Project would of 1,970 acre-feet at a reservoir elevation development application must submit to
be located downstream of the right of 2,422.5 feet NGVD. No changes are the Commission, on or before a
abutment of the existing Pit 4 Dam, proposed to this reservoir. specified comment date for the
which is a project work under the The proposed Project is planned to be particular application, either a
license for the Pit 3,4,5 Hydroelectric located entirely within the existing competing development application or a
Project No. 233, on the Pit River in Project boundary for PG&E’s Pit 4 Dam notice of intent to file such an
Shasta County, California. The project site. The features of the proposed application. Submission of a timely
occupies a total of approximately 750 Project will be located on federal lands notice of intent to file a development
acres of federal lands administered by administered by the USFS. application allows an interested person
the U.S. Forest Service (USFS). The Pit The proposed project would consist of to file the competing application no
3,4,5 Hydroelectric Project No. 233 is a powerhouse containing one 2.2- later than 120 days after the specified
licensed to Pacific Gas and Electric megawatt turbine/generator unit to be comment date for the particular
Company (PG&E). constructed on the right bank, application. A competing license
f. Filed Pursuant to: Federal Power downstream of the right abutment of the application must conform with 18 CFR
Act, 16 U.S.C. 791(a)–825(r). existing Pit 4 Dam. The proposed 4.30 and 4.36.
g. Applicant contact: Mr. Randal S. project will be run-of-river; the required o. Notice of Intent: A notice of intent
Livingston, Vice President—Power minimum instream flow downstream of must specify the exact name, business
Generation, Pacific Gas and Electric Pit 4 Dam will be passed through the address, and telephone number of the
Company, 245 Market Street, MS N11E, proposed powerhouse without change prospective applicant, and must include
P.O. Box 770000, San Francisco, CA in volume or timing. The existing access an unequivocal statement of intent to
94177–0001, (415) 973–6950. road in the downstream spoil pile will submit, if such an application may be
h. FERC Contact: Tom Papsidero, be used to access the new powerhouse. filed, either a preliminary permit
(202) 502–6002. The average annual generation at the application or a development
i. Deadline for filing comments, proposed project would be 13 gigawatt- application (specify which type of
protests, and motions to intervene: 60 hours. The proposed project would application). A notice of intent must be
days from the issuance date of this connect to an existing PG&E 12-kV line served on the applicant(s) named in this
notice. located just to the north of the Pit 4 Dam public notice.
All documents (original and eight site. p. Proposed Scope of Studies under
copies) should be filed with: Kimberly k. Location of Applications: A copy of Permit: A preliminary permit, if issued,
D. Bose, Secretary, Federal Energy the application is available for does not authorize construction. The
mstockstill on PROD1PC66 with NOTICES

Regulatory Commission, 888 First inspection and reproduction at the term of the proposed preliminary permit
Street, NE., Washington, DC 20426. Commission in the Public Reference would be 36 months. The work
Comments, protests and interventions Room or may be viewed on the proposed under the preliminary permit
may be filed electronically via the Commission’s Web site at http:// would include economic analysis,
Internet in lieu of paper; see 18 CFR www.ferc.gov using the ‘‘eLibrary’’ link. preparation of preliminary engineering
385.2001(a)(1)(iii) and the instructions Enter the docket number excluding the plans, and a study of environmental

VerDate Aug<31>2005 21:40 Dec 18, 2007 Jkt 214001 PO 00000 Frm 00018 Fmt 4703 Sfmt 4703 E:\FR\FM\19DEN1.SGM 19DEN1
Federal Register / Vol. 72, No. 243 / Wednesday, December 19, 2007 / Notices 71889

impacts. Based on the results of these DEPARTMENT OF ENERGY Filed Date: 12/11/2007.
studies, the Applicant would decide Accession Number: 20071212–0195.
whether to proceed with the preparation Federal Energy Regulatory Comment Date: 5 p.m. Eastern Time
of a development application to Commission on Wednesday, December 26, 2007.
construct and operate the project. Docket Numbers: RP99–301–188.
Combined Notice of Filings #1
q. Comments, Protests, or Motions to Applicants: ANR Pipeline Company.
Intervene: Anyone may submit December 13, 2007. Description: ANR Pipeline Co submits
comments, a protest, or a motion to Take notice that the Commission has Rate Schedule FSS negotiated rate
intervene in accordance with the received the following Natural Gas service agreement and Rate Schedule
requirements of Rules of Practice and Pipeline Rate and Refund Report filings: FTS–1 negotiated rate service agreement
Docket Numbers: RP99–301–182. with ConocoPhillips Co.
Procedure, 18 CFR 385.210, 385.211,
Applicants: ANR Pipeline Company. Filed Date: 12/11/2007.
385.214. In determining the appropriate
Description: ANR Pipeline Co submits Accession Number: 20071212–0196.
action to take, the Commission will Comment Date: 5 p.m. Eastern Time
consider all protests or other comments Rate Schedules FSS negotiated rate
agreement with Chevron USA, Inc. on Wednesday, December 26, 2007.
filed, but only those who file a motion
Filed Date: 12/11/2007. Docket Numbers: RP08–114–000.
to intervene in accordance with the Accession Number: 20071212–0190. Applicants: Hardy Storage Company,
Commission’s Rules may become a Comment Date: 5 p.m. Eastern Time LLC.
party to the proceeding. Any comments, on Wednesday, December 26, 2007. Description: Hardy Storage Company,
protests, or motions to intervene must Docket Numbers: RP99–301–183. LLC submits its First revised Sheet 196
be received on or before the specified Applicants: ANR Pipeline Company. to FERC Gas Tariff, Original Volume 1,
comment date for the particular Description: ANR Pipeline Co submits to be effective 1/10/08 under RP08–114.
application. Rate Schedule FSS negotiated rate Filed Date: 12/11/2007.
r. Filing and Service of Responsive service agreement with Chevron USA, Accession Number: 20071212–0186.
Documents: Any filings must bear in all Inc (Contract 113355), to be effective 11/ Comment Date: 5 p.m. Eastern Time
capital letters the title ‘‘COMMENTS’’, 1/08. on Wednesday, December 26, 2007.
‘‘NOTICE OF INTENT TO FILE Filed Date: 12/11/2007. Docket Numbers: RP08–115–000.
COMPETING APPLICATION’’, Accession Number: 20071212–0191. Applicants: Central Kentucky
‘‘COMPETING APPLICATION’’, Comment Date: 5 p.m. Eastern Time Transmission Company
‘‘PROTEST’’, or ‘‘MOTION TO on Wednesday, December 26, 2007. Description: Central Kentucky
INTERVENE’’, as applicable, and the Docket Numbers: RP99–301–184. Transmission Co submits its First
Project Number of the particular Applicants: ANR Pipeline Company. Revised Sheet 271, to FERC Gas Tariff,
Description: ANR Pipeline Co submits Original Volume 1, proposed to be
application to which the filing refers.
Rate Schedule FSS negotiated rate effective 1/10/08 .
Any of the above-named documents
service agreement and Rate Schedule Filed Date: 12/11/2007.
must be filed by providing the original FTS–1 negotiated rate service
and the number of copies provided by Accession Number: 20071212–0187.
agreement. Comment Date: 5 p.m. Eastern Time
the Commission’s regulations to: The Filed Date: 12/11/2007.
Secretary, Federal Energy Regulatory on Wednesday, December 26, 2007.
Accession Number: 20071212–0192.
Commission, 888 First Street, NE., Comment Date: 5 p.m. Eastern Time Docket Numbers: RP08–116–000.
Washington, DC 20426. An additional on Wednesday, December 26, 2007. Applicants: Crossroads Pipeline
copy must be sent to Director, Division Company.
Docket Numbers: RP99–301–185. Description: Crossroads Pipeline
of Hydropower Administration and Applicants: ANR Pipeline Company.
Compliance, Federal Energy Regulatory Company submits its First Revised
Description: ANR Pipeline Co submits
Commission, at the above-mentioned Sheet 484, to FERC Gas Tariff, Original
Rate Schedule FSS negotiated rate
Volume 1, proposed to be effective 1/10/
address. A copy of any notice of intent, service agreement and Rate Schedule
08.
competing application or motion to FTS–1 negotiated rate service agreement
Filed Date: 12/11/2007.
intervene must also be served upon each with Oneok Energy Services Co, LP.
Filed Date: 12/11/2007. Accession Number: 20071212–0188.
representative of the Applicant Comment Date: 5 p.m. Eastern Time
specified in the particular application. Accession Number: 20071212–0193.
Comment Date: 5 p.m. Eastern Time on Wednesday, December 26, 2007.
s. Agency Comments: Federal, State, on Wednesday, December 26, 2007. Docket Numbers: RP08–117–000.
and local agencies are invited to file Applicants: Columbia Gulf
Docket Numbers: RP99–301–186.
comments on the described application. Applicants: ANR Pipeline Company. Transmission Company.
A copy of the application may be Description: ANR Pipeline Co submits Description: Columbia Gulf
obtained by agencies directly from the Rate Schedule FSS negotiated rate Transmission Co submits its Second
Applicant. If an agency does not file service agreement with CIMA Energy, Revised Sheet 287, to FERC Gas Tariff,
comments within the time specified for LTD. Second Revised Volume 1, proposed to
filing comments, it will be presumed to Filed Date: 12/11/2007. be effective 1/10/08.
have no comments. One copy of an Accession Number: 20071212–0194. Filed Date: 12/11/2007.
agency’s comments must also be sent to Comment Date: 5 p.m. Eastern Time Accession Number: 20071212–0189.
the Applicant’s representatives. on Wednesday, December 26, 2007. Comment Date: 5 p.m. Eastern Time
mstockstill on PROD1PC66 with NOTICES

Docket Numbers: RP99–301–187. on Wednesday, December 26, 2007.


Kimberly D. Bose,
Applicants: ANR Pipeline Company. Any person desiring to intervene or to
Secretary. Description: ANR Pipeline Co submits protest in any of the above proceedings
[FR Doc. E7–24553 Filed 12–18–07; 8:45 am] Rate Schedule FSS negotiated rate must file in accordance with Rules 211
BILLING CODE 6717–01–P service agreement (Contract 113328) and 214 of the Commission’s Rules of
with Occidental Energy Marketing, Inc. Practice and Procedure (18 CFR 385.211

VerDate Aug<31>2005 21:40 Dec 18, 2007 Jkt 214001 PO 00000 Frm 00019 Fmt 4703 Sfmt 4703 E:\FR\FM\19DEN1.SGM 19DEN1