Está en la página 1de 1

12474 Federal Register / Vol. 73, No.

46 / Friday, March 7, 2008 / Notices

NRC’s unrestricted release criteria November 1, 2007 (ADAMS The Subcommittee will discuss the
specified in 10 CFR 20.1402. Because Accession No. ML073610425); Hope Creek Generating station extended
the proposed action will not 3. Regulatory Guide 1.86, ‘‘Termination power uprate application. The
significantly impact the quality of the of Operating Licenses for Reactors;’’ Subcommittee will hear presentations
human environment, the NRC staff 4. Title 10 Code of Federal Regulations, by and hold discussions with
concludes that the proposed action is Part 20, Subpart E, ‘‘Radiological representatives of the NRC staff, the
the preferred alternative. Criteria for License Termination;’’ PSEG Nuclear, LLC (the licensee, PSEG),
5. Title 10 Code of Federal Regulations, their contractors (General Electric and
Agencies and Persons Consulted
Part 51, ‘‘Environmental Protection Continuum Dynamics) and other
NRC provided a draft of this Regulations for Domestic Licensing interested persons regarding this matter.
Environmental Assessment to the New and Related Regulatory Functions;’’ The Subcommittee will gather
Jersey Department of Environmental 6. NUREG–1496, ‘‘Generic information, analyze relevant issues and
Protection, Bureau of Environmental Environmental Impact Statement in facts, and formulate proposed positions
Radiation, for review on January 28, Support of Rulemaking on and actions, as appropriate, for
2008. On February 26, 2008, the Bureau Radiological Criteria for License deliberation by the full Committee.
of Environmental Radiation responded Termination of NRC-Licensed Members of the public desiring to
by e-mail. The State agreed with the Nuclear Facilities;’’ provide oral statements and/or written
conclusions of the EA. 7. NUREG–1757, ‘‘Consolidated NMSS comments should notify the Designated
The NRC staff has determined that the Federal Officer, Ms. Zena Abdullahi
Decommissioning Guidance.’’
proposed action is of a procedural (Telephone: 301–415–8716) 5 days prior
nature, and will not affect listed species If you do not have access to ADAMS,
to the meeting, if possible, so that
or critical habitat. Therefore, no further or if there are problems in accessing the
appropriate arrangements can be made.
consultation is required under Section 7 documents located in ADAMS, contact
Electronic recordings will be permitted
of the Endangered Species Act. The the NRC Public Document Room (PDR)
only during those portions of the
NRC staff has also determined that the Reference staff at 1–800–397–4209, 301–
meeting that are open to the public.
proposed action is not the type of 415–4737, or by e-mail to pdr@nrc.gov.
Detailed procedures for the conduct of
activity that has the potential to cause These documents may also be viewed
and participation in ACRS meetings
effects on historic properties. Therefore, electronically on the public computers
were published in the Federal Register
no further consultation is required located at the NRC’s PDR, O 1 F21, One
on September 26, 2007 (72 FR 54695).
under Section 106 of the National White Flint North, 11555 Rockville Further information regarding this
Historic Preservation Act. Pike, Rockville, MD 20852. The PDR meeting can be obtained by contacting
reproduction contractor will copy the Designated Federal Official between
III. Finding of No Significant Impact documents for a fee. 8:45 a.m. and 5:30 p.m. (ET). Persons
The NRC staff has prepared this EA in Dated at Lisle, Illinois, this 29th day of planning to attend this meeting are
support of the proposed action. On the February 2008. urged to contact the above named
basis of this EA, the NRC finds that For the Nuclear Regulatory Commission, individual at least two working days
there are no significant environmental Patrick L. Louden, prior to the meeting to be advised of any
impacts from the proposed action, and potential changes to the agenda.
Chief, Decommissioning Branch, Division of
that preparation of an environmental Nuclear Materials Safety, Region III.
impact statement is not warranted. Dated: February 27, 2008.
[FR Doc. E8–4559 Filed 3–6–08; 8:45 am] Cayetano Santos,
Accordingly, the NRC has determined
BILLING CODE 7590–01–P Chief, Reactor Safety Branch, ACRS.
that a Finding of No Significant Impact
is appropriate. [FR Doc. E8–4508 Filed 3–6–08; 8:45 am]
BILLING CODE 7590–01–P
IV. Further Information NUCLEAR REGULATORY
Documents related to this action, COMMISSION
including the application for license Advisory Committee on Reactor NUCLEAR REGULATORY
amendment and supporting Safeguards (ACRS); Subcommittee COMMISSION
documentation, are available Meeting on Power Uprates (Hope
electronically at the NRC’s Electronic Advisory Committee on Reactor
Creek); Notice of Meeting Safeguards (ACRS); Subcommittee
Reading Room at http://www.nrc.gov/
reading-rm/adams.html. From this site, The ACRS Subcommittee on Power Meeting on Thermal-Hydraulic
you can access the NRC’s Agencywide Uprates will hold a meeting on March Phenomena; Notice of Meeting
Document Access and Management 20–21, 2008, at 11545 Rockville Pike, The ACRS Subcommittee on Thermal-
System (ADAMS), which provides text Rockville, Maryland, Room T–2B3. Hydraulic Phenomena will hold a
and image files of NRC’s public The meeting will be open to public meeting on March 19, 2008 at 11545
documents. The documents related to attendance, with the exception of Rockville Pike, Rockville, Maryland,
this action are listed below, along with portions that may be closed to discuss Room T–3B45.
their ADAMS accession numbers. proprietary information pursuant to 5 The entire meeting will be open to
1. E. Lynn McGuire, Department of U.S.C. 552b(c)4 for presentations public attendance. The agenda for the
Veterans Affairs, letter to Cassandra covering information that is proprietary subject meeting shall be as follows:
Frazier, U.S. Nuclear Regulatory to PPL Hope Creek, LLC or its Wednesday, March 19, 2008—8:30
Commission, Region III, dated contractors such as General Electric and a.m. until 6 p.m.
August 6, 2007 (ADAMS Accession Continuum Dynamics. The Subcommittee will review the
sroberts on PROD1PC70 with NOTICES

No. ML072210004); The agenda for the subject meeting staff’s draft safety evaluation regarding
2. Thomas Huston, Department of shall be as follows: Topical Report WCAP–16793–NP,
Veterans Affairs, E-mail to William Thursday, March 20–Friday, March ‘‘Evaluation of Long Term Cooling
Snell, U.S. Nuclear Regulatory 21, 2008–8:30 a.m. until the conclusion Considering Particulate, Fibrous, and
Commission, Region III, dated of business. Chemical Debris in the Recirculating

VerDate Aug<31>2005 18:46 Mar 06, 2008 Jkt 214001 PO 00000 Frm 00108 Fmt 4703 Sfmt 4703 E:\FR\FM\07MRN1.SGM 07MRN1

También podría gustarte