The Data Center and its infrastructure should be built on a turnkey basis meeting the standards
of Tier-III as per TIA-942. Essentially, but not limited to, the Scope of Work shall include
design, supply, installation, testing, commissioning and handing over with one year warranty the
Data Center with necessary infrastructure like the: interior jobs with painting, precision air
conditioning system, fire detection & supression, power, UPS & DG, electrical, lighting, network
cabling, multilayer physical security using biometric/smart card, etc. based on access control, IP
surveillance, water leakage & detection, rodent repellent, and other incidental and necessary
components required to complete Tier-III Data Center specifications in all aspects. Further, the
solutions should be proposed to establish very effective and efficient infrastructure monitoring &
management systems/practices to ensure Tier-III reliability, availability, Quality of Services and
security of information system.
While the high-level scope of work has been outlined, Bidders are requested to prepare exact
BOM required based on the total area provided in the RFP.
IV.
Design Considerations
The Data Center should be capable to provide an uptime of 99.982%. It has to be compliant to a Tier-III
standards as per TIA-942. The design should be scalable to offer scalability over a minimum period
of 7 years and capable to house up to many nos. of 42U server racks (132 nos. if only racks) and
cages. Key considerations should be taken in to build for redundancy, scalability, modularity,
possibility of isolation and maintainability. The entire Data Center should be designed on the two
floors clearly demarcated as per the architecture designs of Ground and First floors. All partitions
should be constructed with fire-rated particle board and glass which will increase the aesthetic look.
All doors should be 2 hours fire-rated glass. Necessary measures should be taken for making the
Page 2 of 10
3
4
5
6
7
8
9
10
V.
Partitions
Doors
Thermal insulation on floor
Raised flooring
POP and paints
Ramp
Electrical Works
i.
Power distribution system with LT panel
ii.
Cabling & wiring through cable tray
iii.
Lighting system
iv.
DG system
v.
UPS system
vi.
Earth
Insulation Work
The floor shall be heat-insulated or coated with a heat insulating
material to avoid condensation on floors below and above to reduce
heat transfer to the server/network rooms. Insulation should be done
with minimum 9 mm thick self-adhesive aluminum foil face nitrite
rubber. The ceiling and floor should be coated with epoxy paint.
1.2.
1.3.
Partitioning Work
Fireproof aluminum composite panel with 8mm thick fire-rated
particle board in bottom half and upper half with toughened glass of
size 8mm thick with 2 hours minimum fire-rated for partition
between server room, monitoring room and help Desk area on first
floor room, and control room and viewing room on the ground
floor. All gaps should be filled with rubber runner.
1.4.
Doors
All doors should be 12mm thick glass with fireproof aluminum
composite panel and 2 hours fire-rated. The doors should be
completed with all accessories.
Door 1: Entrance to server farm area. Size: 3.5 ft. x 7 ft. for both the
floors.
Door 2: Control room door. Size: 3 ft. x 7 ft. on the ground floor.
Page 4 of 10
2.
1.5.
Painting
It should be anti-dust. The existing surfaces should be cleaned with
scratched before the application of punning material. After drying,
the smoothening should be done rubbing with sandpaper. Upon the
smoothened surface, one coat of primer and two coats of fire-rated
paint of high-quality make and shade should be applied.
1.6.
Ramp
The ramp is of concrete (cement) and it will have to be finished
with corrugated rubber mat at server farm entrance of both the
floors. Size of each ramp is 4x5 ft. with an elevation angle of 17.
UPS System
There should be at least 400KVA UPS system in Parallel Redundant
System (PRS) N+1 mode with backup (with SMF batteries) to cater to
99.984% reliability to feed power 30 nos. of server racks initially. In future,
it is projected to require 3x400KVA with the same reliability with SMF
battery bank connected in PRS N+1 mode that should be able to supply
800KVA power. Under PRS mode, all UPS should cater equal percentage
of power i.e. if one fails; other(s) will supply 100% of the load. The
monitoring of UPS enabled with SNMP card will be done through a LAN
network.
4.
5.
Cooling Solution
The precision air conditioning should be installed by considering the
following design, scope and requirement.
i.
Design Considerations
There should be fully redundant microprocessor-based digitalscrolled Precision Air Conditioning (PAC) system. Cool air feed
should be bottom-charged or downward-flow type using the raised
floor as supply plenum using perforated aluminum tiles for airflow
distribution. The return airflow should be through false ceiling to
cater to the natural upward moment of hot air. Cooling should be
done by the Precision Air Conditioning system only. PAC should
be capable of providing sensible cooling capacities at design
ambient temperature & humidity with adequate airflow. As per the
requirement, there would be around 130 racks. The PAC should be
integrated with the BMS for effective monitoring.
PAC system should cool the server rooms and other rooms on the
basis of available rooms size and estimated load. 5 nos. of 30 TR
floor discharge type PAC can be considered for each floor of Data
Center. Out of five units, four units should be active while one can
be in standby mode to provide redundancy.
ii.
Scope Considerations
This shall include:
Connecting the indoor unit with the main electrical point.
Connecting indoor and outdoor units mechanically (with
18G hard Gauge copper piping).
Connecting indoor and outdoor unit electrically.
Page 6 of 10
6.
iii.
iv.
7.
8.
Design
The system should automatically discharge suppression agent after
getting signal from the fire alarm panel. System can be designed
with:
a. Agent cylinder 120 ltr. capacity
b. NOVAC1230 clean agent
iii.
9.
10.
Surveillance System
The system should an IP surveillance system to monitor the entire Data
Center infrastructure and should be designed with:
a. IP based colour dome fixed lens camera
b. Indoor type HD PTZ camera
Page 9 of 10
12.
13.