Documentos de Académico
Documentos de Profesional
Documentos de Cultura
N of workers:
Activity risk level:
Lakheri
Date of Evaluation
20-09-2006
Made by: Safety Deptt.
Health and
1
Wellness Issues
Version April 2003
61%
Occupational
0
Rehabilitation
31%
Safe Working
1
Procedures
62%
Induction and
4
Training
89%
Roles,
Responsibilities
1
and
Accountabilities
54%
Incident
1
Investigation
and
Corrective Action
Hazardous Work
1
Activities
7%
Inspection and
1
Testing
69%
65%
Management of
0
Changes
Procurement
1
Design
1
Safety
34%
93%
Industrial Hygiene
1
and Monitoring
43%
Hazard
1
Identification
and
Risk Assessment
Employee
4
Communication
and Involvement
100%
Planned
1
Inspections
Information and
1
Reporting
81%
2
Legal Obligations
Management
4
Commitment
and
Planning
Roles,
Responsibilities
1
and
Accountabilities
75%
59%
54%
60%
78%
94%
nagement
4
mitment
and
Planning
Status
1
1
1
1
2
4
4
1
1
4
1
1
1
1
4
0
1
0
1
Total
% Achievement
Average % Achievement
Development
Maximum
Achievement
8
6
72
41
29
19
20
12
6
4
23
21
20
18
26
16
24
11
10
10
22
17
18
12
8
6
16
5
8
8
10
5
20
11
10
0
8
5
358
225
Implementation
Maximum
Achievement
12
9
110
67
36
15
20
12
10
9
25
24
16
14
28
19
20
8
10
10
32
27
12
7
6
4
24
9
10
9
10
1
20
11
10
1
20
13
431
63.0
269
62.5
62.7
Detailed Requirements
Possible
Score
Actual
Score
2
2
2
1.2
1.6
1.8
1.2
years old
Personnel will have been clearly
informed, in writing, of their health and safety
responsibilities
1.2
1.5
1.5
Summary:
Development %
Implementing %
Result
73
77
1
1
1
Notes
Responsibilty
Available
The total functional area is divided and the responsibilities &
accountabilities fixed for all management staff. Further this is to be
spread upto the bottom level employee.
This exists for the management staff through review of KPIs and also
through various forums of management. In case of other employees
this is done through their Heads. Action is being taken for any serious
lapse on safety aspects by anybody.
Available
Available for management staff. Further safety policy clearly mentions
the commitment of an employee. Still specific responsibilities to be
given in writing to all employees.
Safety performance is addressed in performance monitoring & review
system of management staff. To be done for other levels of
employees.
Positive & negative targets are fixed and reviewed for all
management staff.
8
12
6
9
Detailed Requirements
Development
Possible
Score
Actual
Score
Possible
Score
Actual
Score
DETAILS
Prior to establishing work permit systems, each site
should undertake and document a review of its
activities to identify those high risk work permits which
should be in place. Although some permits are
expected to be common to all sites, additional
permitting requirements may be specific to individual
sites.
Implementation
Description
Detailed Requirements
DETAILS
As a minimum, the site must ensure that the topics
listed in the adjacent column are addressed.
Implementation
Possible
Score
Actual
Score
Description
Detailed Requirements
Development
2.3 STATEMENT OF REQUIREMENT
A Safe working in confined space
A confined space may be defined as an enclosed or
procedure has been developed for the site.
partially enclosed space which:
This procedure should be consistent with
(a) is at atmospheric pressure during occupancy
(b)
internationally recognised confined space
is not intended or designed primarily as a place of work
standards
(c)
may have restricted means of entry and exit (d) may:
The confined space procedure must
DETAILS
Implementation
Personnel responsible for issuing confined
Description
Detailed Requirements
Possible
Score
Actual
Score
Possible
Score
Actual
Score
DETAILS
As a
minimum, the site must ensure that the topics listed in
the adjacent column are addressed.
Implementation
Personnel responsible for issuing ignition
Description
Detailed Requirements
Development
Possible
Score
Actual
Score
DETAILS
As a
minimum, the site must ensure that the topics listed in
the adjacent column are addressed.
Implementation
Evidence of excavation / digging permits in
Description
Detailed Requirements
Development
A formal written high voltage work permit
DETAILS
As a minimum, the site must ensure that the
topics listed in the adjacent column are addressed.
Possible
Score
Actual
Score
Implementation
Evidence of high voltage permits in use
(confirm application)
Personnel responsible for issuing high
voltage permits have been trained regarding the
operation of the permit system and their
responsibility for issuing work permits
Refresher training has been provided bi-
Description
Detailed Requirements
Development
2.7 STATEMENT OF REQUIREMENT
A documented work permit system or safe
One of the main causes of fatalities at industrial work
work system has been developed for
sites is falls from heights. Therefore, the site must
circumstances where a person could fall 2.4
have in place a system for managing work at heights
metres or more to the ground or a lower
and this system may include the requirements for issue
structure
of work permits.
A training and retraining programme has
DETAILS
As a minimum, the system for managing working
at heights should incorporate:-
Implementation
Personnel responsible for supervising
Possible
Score
Actual
Score
hazardous materials
An authorised officer has been appointed at
the site to oversee the management of these
hazardous materials
Description
Detailed Requirements
Development
DETAILS
As a
minimum, the site must ensure that the topics listed in
the adjacent column are
Implementation
Personnel responsible for supervising those
Possible
Score
Actual
Score
Description
Detailed Requirements
Development
DETAILS
As a
minimum, the site must ensure that the topics listed in
the adjacent column are addressed.
developed for:
receival of explosives
storage
of explosives
and operation of magazines
management of magazine inventory
design
loading
dealing
with misfires
dealing with emergencies involving
explosives
It is noted that all of these procedures are expected
to be documented
Implementation
Site procedures are up-to-date with
respect to changes in legislation and standards
legislation requirements
Personnel are aware of site procedures
Training has been provided for persons
involved in storage and handling of explosives
4
2
3
1
bi-annual basis
Suitable emergency response systems are
Summary:
Development %
Implementing %
Result
56
61
1
1
1
Notes
DM /AM Safety
DM /AM Safety
Notes
DM / AM E&I
DM / AM E&I
DM / AM E&I
System in place
Available
DM / AM E&I
In place
DM / AM E&I
Persons are authorized by their designation, To be given in writing to
authorized persons
DM / AM E&I
Training has been given. Re-trainings to be organized more frequently
DM / AM E&I
Conducted less frequently. To be conducted bi-annually
DM/AM safety
Notes
Procedure in place
Not done
Training programme has been given for work permit systems. Module
to be specifically made with regard to Confined spaces entry.
Not done
Available
Notes
Hot work permit is available and the areas are generally mentioned.
Areas list to be more specifically made.
Notes
Available
Training programme is made for work permit systems. Module to be
specifically made with regard to excavation
Training programme is made for work permit systems. Module to be
specifically made with regard to excavation
In place
In place
Training programme is given for work permit systems. To be
specifically given with regard to excavation
In place
Notes
Available
Available
Training has been given on work permit systems. To be specifically
given with regard to high voltage work
Available
Notes
To be further studied
Notes
Not available
Not available
Not available
Not available
Not available
Not available
Not available
Not available
Notes
In place
Available
Available
In place
Available
Yes
Conducted. Frequency to be increased
72
41
110
67
Detailed Requirements
Development
Systems should be in place to ensure that
Possible
Score
Actual
Score
2
2
2
2
0
0
0
0
Possible
Score
Actual
Score
Up to
5
HAZOP
What if? analysis
Failure mode and effect analysis
Fault tree analysis
Event tree analysis.
It is expected that a multi-disciplinary team will
undertake the risk assessment and a formal report
issued.
addressed
Description
Detailed Requirements
Development
Operating procedures address the following:
initial start up
normal operation
temporary operations
emergency operations, including
DETAILS
Written operating procedures assist operations
personnel to manage safety by setting standards
against which operational practices can be measured.
Operating procedures should provide clear instructions
for safe operation of the facility, which is consistent with
the hazard identification and process safety information
available.
emergency shutdown
normal shutdown
start up following a shutdown or
turnaround
suitable format
Personnel trained in content of operating
procedures
Possible
Score
Actual
Score
Possible
Score
Actual
Score
deviation
OHS systems to be used and their
function
Operating procedures also address the following as
required:
properties of, and hazards presented
Implementation
Operating procedures available at point of
use
Description
Detailed Requirements
Development
A system has been developed for
Implementation
Evidence of reviews and updates is
available
Description
Detailed Requirements
Development
DETAILS
Modern safety management legislation specifies the
need for a risk-based approach to managing safety in
the workplace. This approach requires that hazards
are identified, risks are analysed and strategies put in
place for effectively managing and monitoring those
risks.
(2 points
each)
2
2
2
2
2
0
2
2
10
Implementation
The Audit will seek evidence of:-Hazard identification
-Risk assessment
-Implementation of risk controls
-Review of effectiveness of risk
controls
Reference will be made to the categories in section
5.2 of the Handbook
Evidence will also be sought of application
of
-Literacy and language
-Drug and alcohol
-Fitness for duty
-First aid facilities
Summary:
Development %
Implementing %
Result
(2 points
each)
2
2
2
2
2
0
2
2
66
42
1
1
1
Notes
Responsibilty
Department Head
Not specified
Risk assessment is done, But not done with the help of special
techniques
Department Head
Not used. To be studied
Not available
Not available
Not available
Not available
Notes
Available
Available
Special training to be coducted
Notes
In place
Available
Notes
Yes
No
Yes
Yes
To be done after studying the various sections
In place
Yes
Yes
29
19
36
15
Detailed Requirements
Possible
Score
Actual
Score
20
12
20
12
DETAILS
Therefore, there is an expectation that there is a
programme of hazard identification activities in place
whereby workers inspect areas of the workplace and
identify hazards. This form of hazard identification is
likely to occur by use of registers or check lists.
Associated with this is
the parallel requirement for a system for dealing with
the problems so identified.
Summary:
Implementation
Evidence will be sought of inspection
Development %
Implementing %
Result
60
60
1
1
1
Notes
Department Head
In practice. To be undertaken more frequently
20
12
20
12
Detailed Requirements
Possible
Score
Actual
Score
Implementation
DETAILS
Systems should be in place to ensure that:-
Summary:
Development %
Implementing %
Result
67
90
1
2
2
Notes
Responsibility
Department Head
Process to be documents
Department Head
Available. But to be documented
Department Head
Available. But to be documented
Available
Wherever possible
Available
Available
10
Detailed Requirements
Possible
Score
Actual
Score
Development
1
1
1
1
objectives
Must declare managements commitment
and determination for achievement of health and
safety objectives
Possible
Score
Actual
Score
Up to 5
1
1
1
1
1
1
1
1
1
Possible
Score
Actual
Score
The Policy
Should be a formal document
Be dated and signed by the current Chief
DETAILS
To assist in
ensuring management commitment (at all levels) to
health and safety, a current Health and Safety Policy
should exist.
Implementation
Description
Detailed Requirements
Development
A process should be in place to ensure
Implementation
DETAILS
The nature of resources required to effectively
manage safety will vary from site to site. However, a
consideration of the following issues is considered to
be important.
experts
Provision of competent staff
Provision of effective communication
systems
Description
Detailed Requirements
Development
It is expected that each site will have in
DETAILS
Safety Management is not simply a matter of
identifying and dealing with specific safety problems at
a given time. Effective safety management addresses
site safety problems by means of a continuous
improvement methodology.
Implementation
The Safety Plan should address the following:Establishment objectives and targets
Establishment of performance indicators
Identification of hazards and
assessment/control of risks
Linkage to requirements of legislation and
legal compliance
Linkage to incidents that have previously
occurred
Description
Detailed Requirements
Development
A formal system should be in place to
Up to 5
1
1
1
1
1
1
Possible
Score
Actual
Score
Implementation
DETAILS
The organisations management should, at regular,
intervals conduct a review of health and safety
management to ensure its continued suitability and
effectiveness in satisfying the organisations safety
Description
Detailed Requirements
Development
Potential emergency situations (both on
Up to 5
5
1
1
1
1
Possible
Score
Actual
Score
particular situations
DETAILS
An Emergency Plan should address:
Emergency contact
2
2
2
2
Implementation
The audit will seek to determine whether
the emergency plan is a controlled document,
and whether it is has been updated as required
There should be a documented
Summary:
Development %
Implementing %
Result
91
96
2
2
4
Notes
Available
Available
Available
Available
Available
Available
Available
Notes
Notes
In place
Available
Available
Available
Available
Available
Notes
Available
Available
Available
Available
Notes
Available
Available
Available
In place
Available
Available
23
21
25
24
Detailed Requirements
Possible
Score
Actual
Score
Development
2
Up to 5
1
1
1
1
1
1
1
Possible
Score
Actual
Score
DETAILS
A formal training strategy needs to be in place,
based upon a training needs analysis. This training
needs analysis should include consideration of health
and safety training requirements.
Description
Implementation
Provision of training by appropriate
competent personnel
Use of suitable training facilities
Maintaining training records
Detailed Requirements
DETAILS
Senior management and supervisors provide the
opportunity at a site for supporting the safety process
and intervening where problems are identified.
Therefore, it is important that management and
supervisors are skilled in relation to key safety issues,
e.g. legal requirements, structure of health and safety
management systems.
Implementation
The following evidence will b sought:Provision of training by appropriate
competent personnel
Use of suitable training facilities
Maintaining training records
Evaluation of training sessions to ensure
comprehension and retention
Regular review of training programme
up to 5
1
1
1
1
1
1
1
Description
Detailed Requirements
Development
An induction programme has been developed
addressing, as a minimum:Site layout
Possible
Score
9
up to 10
10
1
1
2
2
2
1
0
0
2
2
2
2
2
0
DETAILS
Irrespective of the general knowledge possessed by
any individual or group of persons regarding safety, it is
important that there is a formal induction programme in
place for dealing with personnel new to the site or a
particular area of the site.
Actual
Score
Implementation
The audit will review the application of the
induction programme for
New employees
Contractors
Visitors
Summary:
Development %
Implementing %
Result
90
88
2
2
4
Notes
Responsibilty
Manager HRA
Available
Considered
Available
Available
Available
Available
Available
Notes
Available
Available
Available
Available
Available
Manager HRA
Notes
Addressed
Addressed
Available
Available
Available
Red card reporting details addressed
To be included in induction trainings
To be detailed in induction trainings
Available
Available
System to be developed for training of visitors
20
18
16
14
Detailed Requirements
Development
Formal documented procedures should
Possible
Score
Actual
Score
1
1
1
1
1
1
1
1
1
1
1
0
Possible
Score
Actual
Score
Possible
Score
Actual
Score
Implementation
The audit will seek evidence of:Hazard reporting
Incident reporting
Incident investigation
Development of corrective actions
Implementation of corrective actions
Managers and supervisors trained in
Description
Detailed Requirements
Development
Documented procedures should have been
Implementation
Results of incident investigations are
Description
Detailed Requirements
Development
Documented procedures should be in place for
reporting:Injuries
Up to
10
Illnesses
Disease
Damage
Near misses
Hazards
Defects
Substandard practices
Substandard conditions
Implementation
The audit will review reporting of safety
6
1
0
1
0
1
1
0
1
1
Up
10
Possible
Score
Actual
Score
Description
Detailed Requirements
Development
Review and analysis of data may reveal useful
trends. Processes should be developed for
analysing data in relation to:
Injuries
Up to
10
Incidents
Near misses
Damage
Substandard practices
Substandard conditions
Hazards
Illness
Disease
Compensation claims
Implementation
The audit will review analysis of safety
Up to
10
6
1
1
1
0
1
1
0
0
1
0
6
Summary:
Development %
Implementing %
Result
62
68
1
1
1
Notes
Responsibility
DM /AM Safety
Available
Notes
System in place
Notes
Available
To be made
Available
To be made
Available
Available
To be made
Available
Available
Available
Notes
Available
To be made
Available
To be made
Available
Available
To be made
Available
Available
Available
26
16
28
19
Detailed Requirements
Development
The site must be able to demonstrate that
Possible
Score
Actual
Score
Implementation
The audit will review personal
(2 points
per issue
as
required,
up to 10)
2
2
2
2
2
1
0
0
Up 10
10
Possible
Score
Actual
Score
Description
Detailed Requirements
noise
silica dust
asbestos
(2 points
per issue
as
required,
up to 10)
2
2
2
2
2
0
Implementation
The audit will review health monitoring
2
2
Up to 10
10
Summary:
Development %
Implementing %
Result
46
40
1
1
1
Notes
Responsibility
Availabe
Depart Head
In practice
SPM measurement is done, crystalline silica to be done
Not done. To be done
Not done. To be done
Not done. To be done
Monitoring is done for stacks and ambient air. Hygiene checks are
carried out in the departments. Personal monitoring to be done.
AM Environment
Notes
Audiometry done
Lung function and Chest -X -ray done
No special monitoring done. To begin
24
11
20
Detailed Requirements
Development
Because management of safety is not the
responsibility of a single person, it is essential that
effective communication and consultation with
respect to safety matters occurs within the
workplace. This may occur through the following
mechanisms.
Safety committees.
Possible
Score
(2 points
per issue
as
required,
up to 10)
10
Actual
Score
10
1.8
1.8
1
1.8
1.8
1.8
Implementation
The following topics will be reviewed:
Existence of safety committee.
Frequency of safety committee meetings.
Circulation of Safety Committee Minutes
Occurrence of toolbox meetings.
Mechanism for communicating safety
(2 points/
issue as
required,
up to 10)
10
10
2
2
1.6
1.6
1.8
concerns to management.
Dispute resolution procedures.
Summary:
Development %
Implementing %
Result
100
100
2
2
4
Notes
In place
Every month
Minutes circulated to all members. Further can be communicated to
all employees
Once in a week/ fortnight. To be done more frequent
Red card reporting in place for reporting of unsafe actions/ conditions.
Safety committee meetings (both central & sub) conducted.
Available. To be further strenthened in relation to safety lapses.
10
10
10
10
Detailed Requirements
Possible
Score
Actual
Score
1.5
1.8
1.5
1.8
1.6
(2 points/
issue as
required,
up to 10)
9.5
documentation
ensuring documents critical to health
and safety carry an identification of their status,
authorisation, date of issue and date of
modification
health and safety documentation is
Implementation
Records are required to demonstrate the
10
records is maintained.
2
1
0.5
1.5
1
2
1
0.5
1.8
(1 points/
issue as
required,
up to 10)
10
9.2
0.8
0.8
0.8
0.8
0.8
0
0.4
0.8
0.8
0.8
0.8
0.8
0.8
0
0
Description
Detailed Requirements
Development
Suitable process / mechanical design
Possible
Score
Actual
Score
1.4
1.8
1.6
0.5
1.8
(1 point/
issue as
required,
up to 10)
limits
-safety related consequences of
process
-detailed equipment drawings and
diagrams.
-Electrical drawings / area
classification
-Design of ventilation systems
-Description of shutdown and interlock
systems
Summary:
Development %
Implementing %
Result
1
1
1
0.6
0.8
0.8
0.5
0.6
0.6
0.2
1
1
0.4
0.8
79
84
1
1
1
Notes
Available
Available
Available with Maintenance, inspection, planning & scheduling deptt
Available
Available in the section where permit is used
Availble (both internal & external)
Available
SOT reports, safety surveys, red card reports etc. available
Maintained
Available
Available
Available
Available
To be included
Available
To be included
Risk management to be included with hazard identification
Available
Available
Available
Available
Available
Available
To be included
To be included
Notes
To be reviewed
Available
22
17.3
32
26.8
Detailed Requirements
Possible
Score
Actual
Score
Development
2
2
1.8
0.4
2
2
1.8
1.5
0.8
risk assessment
Communication of results of task analysis
1.4
0.5
Possible
Score
Actual
Score
Implementation
The audit will seek evidence of standard work
practices for non-operational areas. The origin and
applicability will also be reviewed.
outputs
Description
Detailed Requirements
1.8
0.2
1.8
1.6
2
2
1.6
1.5
Summary:
Development %
Implementing %
Result
65
58
1
1
1
Notes
Notes
Available
Available
18
11.7
12
Detailed Requirements
Possible
Score
Actual
Score
Development
1.8
equipment
Identification of key safety functions, e.g.
Trips, alarms, development and documentation
of maintenance work procedures and practices
1.8
2
2
1.5
1.8
0.8
Implementation
Evidence of inspections
Quality control procedures to ensure that
Summary:
Development %
Implementing %
Result
70
68
1
1
1
Notes
5.6
4.1
Detailed Requirements
Possible
Score
Actual
Score
Development
2
2
1
1
competent
design is based upon relevant Standards
specified
adequate resources are provided in
relation to design
Implementation
The audit will seek to determine the mechanisms
by which safety is addressed in facility and process
design
within legislation
risk management activities are included in
the design process
Safety risks can be managed in a number of ways.
There is a hierarchy of risk controls whereby some
controls are preferable to others. Effective design
should consider each of the elements of the
hierarchy and, where practicable, and incorporate
the most important.
The hierarchy is:
elimination
substitution
separation/isolation
administration
personal protective equipment.
The audit will seek to demonstrate that the
hierarchy of risk controls has been included in
design considerations.
Description
Detailed Requirements
Development
It is important that there are documented
processes for the review of the development of a
design, so that emerging safety issues can be
identified and modifications made to the design to
address those issues. A design review should
include, where appropriate, consideration of:
Possible
Score
Actual
Score
2
2
1
2
Possible
Score
Actual
Score
manufacture
construction
commissioning
operations
maintenance
disposal
decommissioning
rehabilitation.
Design verification and validation should occur
prior to commissioning.
Implementation
The audit will seek evidence of:Occurrence of design reviews
Consideration of safety in design reviews
Follow through of recommendations
Description
Detailed Requirements
Implementation
The audit will seek evidence of:
Hazard identification
2
2
0
0
Summary:
Development %
Implementing %
Result
31
38
1
1
1
Notes
Notes
Not applicable
Not applicable
Not applicable
Not applicable
Notes
Not applicable
Not applicable
Not applicable
16
24
Detailed Requirements
Development
Possible
Score
Actual
Score
1.8
1.4
1.4
Possible
Score
Actual
Score
2
2
2
2
internal audits
development of an internal auditor training
course
a system for management review of the
health and safety programme
Implementation
It is expected that suitable supporting
Description
Detailed Requirements
Development
In order to support an effective and robust health
and safety management system, the following
should be in place:a structured system and schedule for
external audits
Implementation
The audit will seek evidence of:External system audits
Actions from audits addressed
Summary:
Development %
98
Implementing %
Result
88
2
4
Notes
Available
Available
Safety & health plan is being reviewed annually.
Available
Notes
Available
Available
Available
7.8
10
8.8
Detailed Requirements
Possible
Score
Actual
Score
Development
A rehabilitation scheme has been developed
consistent with the requirements of any local
Workers Compensation Legislation or other similar
requirements / practices.
2
1
2
2
2
0.2
0
2
10
Implementation
The audit will review the application and
effectiveness of the rehabilitation programme
Summary:
Development %
Implementing %
Result
52
10
1
0
0
Notes
10
5.2
10
B17: Procurement
Description
Detailed Requirements
Possible
Score
(2 points/
issue as
required,
up to 6)
4.2
0.2
2
1
1
Up to 10
10
Possible
Score
Actual
Score
Actual
Score
Implementation
The audit will seek to confirm application
Description
Detailed Requirements
(2 points
per issue
as
required,
up to 10
points)
performance
-Contractor inductions
-Assessment of competency of
contractor personnel
-Contractor provision of safety
equipment
-Audits of contractors
Implementation
The audit will seek evidence of
0.4
2
Up to 10
10
1
5
Summary:
Development %
Implementing %
Result
53
55
1
1
1
Notes
Notes
System to be made
Done. But to be strictly followed
System to be made
In place. But requires review
System to be made
20
10.6
20
11
Detailed Requirements
Development
Possible
Score
Actual
Score
2
2
0
0
2
2
0
0.2
0.2
10
safety implications
suitable risk controls are implemented
changes are communicated to affected
personnel
changes are made to associated
documentation
Implementation
The Audit will seek evidence of:
A management of change procedure in
action
Summary:
Development %
Implementing %
Result
4
10
0
0
0
Notes
System to be developed
System to be developed
System to be developed
System to be developed
System to be developed
10
0.4
10
Detailed Requirements
Possible
Score
Actual
Score
1.5
employees
Implementation
Topics to be reviewed should include:
Identification of CSR requirements
Existence of an Employee Assistance
(2 points/
issue as
required)
2
2
1
1
2
2
2
2
1
1
1
1
2
2
2
2
1
2
2
2
abuse)
Communicable diseases
Other general health and lifestyle issues
Quality of life (work/family balance)
The need for, and existence of, an offsite
emergency plan.
Summary:
Development %
Implementing %
Result
56
65
1
1
1
Notes
4.5
20
13