Documentos de Académico
Documentos de Profesional
Documentos de Cultura
ALCHEMY
Remarques : Cette procdure est tire de la documentation
lectronique, il a t rajout tous les cadres rouges (textes en franais
et images).
If the BIOS needs updating it will also be necessary to have the following
file:
Iroot_os-bup.gz_BIOS Upgrade File
Before connecting any of the cables it is important to ensure the laptop
has IP address assigned to it. This is only an issue if the laptop has never
been connected to a network before. If is has not you should look under
Control Panel -> Network and dialup Settings -> local Area Connection ->
Properties -> Internet Protocol (TCP / IP) Your Control Panel -> Network ->
TCP / IP Your network Card depending on which operating system you are
using.
If not specified then you should enter an IP Address such as
192.168.0.2.
NOTE:
If using an older operating system you may be asked to reboot at this
stage.
If you use DHCP and have connected to a network previously there will be
no need to change the current setting.
It is important to perform the following steps prior to attempting an
Ailrtboot:
1. Ensure that the network controller is powered down.
2. Remove the network controller ethernet cable so it is not connected
to the local network.
3. Connect the special crossover ethernet cable from the laptop
network port to the network controller network port.
4. Connect the null modem serial cable from the laptop serial port to
the network controller serial port.
5. Start the AlternateBoot Application.
6. Power on the network controller.
1/16
7.
2/16
===============================
ALTERNATE BOOT Ver 4.0
===============================
System ID => Xerox Denali v1.00
BIOS ID => American Megatreats Inc. 0701 03/04/2004
Board ID => Celestica Denali P 2 CMY123432000378
uP ID => AMD mobile and Duron (tm) 00800 MHz
Main Revision => 4.1.0
===============================
MAIN MENU
===============================
1. Continue Boot-Up
2. PWS Boot
3. Diagnostic Menu
4. Reboot System
===============================
Selection:(1) = >
Select the option:
Option 1, will perform a normal boot
from the network controller hard disk.
Option 2, is used to perform the
AltBoot process. Move onto AltBoot -Etape2
Option 3, will allow you to run simple diagnostics see AltBoot Process Diagnostic Menu.
Option 4, is used to reboot the network controller if you decide not to
AltBoot.
Press key 2 and continue to Etape 2.
3/16
4/16
You should now see Download Request appear in the status bar at the
bottom left. A file open window will then appear. You should enter the
Filename box or use the browse button to select the Linux Kernel file.
Select Open button. The transfer progress dialog will be displayed.
The Progress Bar will display how far it is through the transfer. You can
cancel the transfer at any time by pressing the Cancel button. If the
download fails or you press Cancel button you will need to choose Options
-> Reset Terminal and start again from the AltBoot Hardware and Software.
5/16
6/16
Scroll to the folder (for example Ess) and double click on the folder
and leave open.
Select OK
7/16
Once that is done there will be some initial start up steps (such as
uncompromising utilities) before the next menus appear in the Terminal
Window.
Received packet from 192.168.1.50.
Bringing up loopback interface
Hostname: XRX_ 00E0EC129472
IP Address: 192.168.1.51
Netmask: 255.255.252.0
Broadcast: 13.210.240.27
Are these correct (y / n)?
Note: Make sure that the Received packet line appeared and that the IP
address of the Network Controller is set one digit out from the address that
the packet was received from. You should just be able to press y at the
prompt and continue, but if the valid netmask is not set you may need
press n and change it to something such as the value above.
Entering y will take you to AltBoot Process - Etape 4
Entering n will abort the AltBoot Process
Press y button and then press the Enter button.
If an error occurs you will be required to return to the start of the
procedure.
8/16
Press the 5 key and press the Enter key to continue with the AltBoot
Process
9/16
10/16
Press the y key and press the Enter key and continue to AltBoot
Process - Etape 5.
11/16
12/16
It is possible that there may be more that one file in this list. Ensure that
the correct image file is selected. If no files are returned then the wrong
directory has been setup and you will be required to close the application
and restart the process from cable connections. When the file is selected
the partitions will be created. When this has happened the Disk Image
transfer will take place. A windows progress dialog will be displayed on the
screen while the transfer is occurring. If the transfer fails for any reason it
should be possible to press the Cancel button on the progress dialog to
abandon it.
The file will now be unpacked and installed. This will take several
minutes but it is VERY important that the Network Controller is
NOT powered down during this stage.
14/16
Once the files are installed the following messages will appear:
Dismounting ESS disk
***************************************************************************
**************************
The machine will now be rebooted
***************************************************************************
********************************
Au message The
machine will now
be rebooted ,
tapez Y pour
continuer
Press the y key and then press the Enter key to proceed.
You should now wait while the network controller reboots. Rebooting will
take several minutes and at certain points there will be no indication that
the network controller will reboot again during the middle of the process. It
should eventually startup and display the following message indicating
that it is now working properly.
*********************************************************************
**************************ESS System is OPERATIONAL*******************
*********************************************************************