MANUFACTURING EXECUTION

Finished
Goods stock

Plant Activity
10000

10000

Raw
Consumption
5000
Cost
Elem
ent

Assembly painting
engineering

Areas of
responsibilities

Who does the


work?

Activity
Types

Cost
Center

Work
Center

Raw Stock
5000

Routing

contain the list the sequence of steps


for producing a material, that is:
Operations,
Operation Sequences
Usage
Time elements
Work Centers.
Component allocations

Basic data
Default values
Cost center
Capacities
Scheduling
HR assignment

BOM

FI
Variances
settled

Material

Sales Info
Syst

Controlling
Profitable
Analisys

CO-PA

SOP
Product
Group

Sales &
Operation
Planning
Product
Group

Disaggregation
and transfer to

Availability Check: Checks for:

MD04: Stock/Req.list: info current status of stocks


MRP list: info latest plann run

Demand
Management

(from Rout+BOM or manually)


E
(inhouse
production)

MRP

MPS

(Admin of Ind Req.)

Material
Requirements
Planning

Planned
Orders

Sales Order
(Created in
SD)

Items

= Customer
Ind. Req.

F
(Externally
procured)

Order Creation Options:


Without BOM Routing
With BOM Routing
With Routing
With Planned Order

Planned
Orders
Purchase
Requisition

Release

If a BOM is changed after a Pln Order is created but before is converted into
a Prod. Order: BOM is not re-read and the Prod. Order uses the old BOM

Items

Manual Forecast

Forcasting = Warehouse
Req. = Planned Ind. Req.

-Material components
-Capacities
-PRTs

Header +
Items

Schedule
Lines

Purchase
Order
Only in the opening
period

Elements of a Prod. Order:


Order Header
Settlement rule
Costs
Operations
Operation sequences
Material components
PRTs
Trigger points
Documents links

CO

Releasing orders: levels


_Individual operation
_Whole order
_Several orders together

Mvt 101

Goods
Receipt

Production Order

1
OP
Items
OP

C.O.T
Items

Costs debited
to Prod.Order

Cost Object Controlling (COC):


Order settlement:
_Debits the stock account
_Credits the order
Order related
.flexible production environment
.flexible product range
.Cost mgt of ind. production lots
.if controlling is required for each order
.High setup costs
.Manufacture o co-products

Goods
Issue

Status Prod. Order:


CRTD

MM

FI

CO

Product related

Production Order: GI - Goods Issue Posting:


Is executed for a consumption of a material component for a prod. order.
List the application modules that integrate with Manufacturing Execution:
Inventory Management
Quality Management
FI - Financial Accounting
CO -Controlling
SD - Sales and Distribution
Order
PS -Project Systems
HCM -Human Capital Management

MM - Material document: describe the g. movt. from the MM (stock) point of view.
FI - Accounting document: describes the goods movt. from the FI point of view.
CO - Cost accounting document: serve various cost analysis purposes
_ Account affected:
.Consumption is debited
.Raw material Stock is credited
. NON Finished goods stock, Plant activity
Q + $ (value) in Material master data is updated
Reservations is Reduced (for planned withdrawal)
Determination of actual costs (evaluation) and update of order
When you display the material document, you can branch to the other documents
GI doc. can be printed.
The GI posting is controlled via a movement type 261.

Production Order: GR - Goods Receipt Posting


Realizes the stock receipt of a product produced using a production order.
MM - Material document:
FI - Accounting document:
CO - Cost accounting document: serve various cost analysis purposes
_ Account affected:
.Finished good stock is debited
.Plant activity is credited
. NON consump, raw mat.

When you display the material document, you can branch to the other doc.
GR doc. can be printed
Delivery quantity in an order is Updated
lant activity is Updated
Evaluation of the receipt
Credit to order
The GR posting is controlled via a movement type 101.