CHO/2012/DFHD/193 : PROVISION FOR HOOK-UP, COMMISSIONING AND

TOPSIDE MAJOR MAINTENANCE SERVICES FOR 2013-2017


DFHD/2014/042A/001 : PROVISION FOR HUC WORK
FOR TOPSIDE MODIFICATION FOR SKO PIPELINE
REJUVENATION PROJECT PL 381/210

Work Order No
& Title

JOBCARD ID NO

GENERAL
JOB DESCRIPTION

WORK CATEGORY

Erect scaffolds for removal of spool at Line 150-D-008-1101 (TP-007/008) &


new spools installation

SYS NO
DISCIPLINE
SCHEDULE

XXX

SYS DESC

N/A

SCAFFOLDING

LOCATION

SUMP

SISO

Offshore

Prefabrication

Hook-Up

Hook-Up

Demolition

Commissioning

Decommissioning

SIPROD
SIPCOM
Pre Shutdown

WORK
PHASE

Early Start

Late Start

Actual Start

Plan Duration

Early Finish

Late Finish

Actual Finish

Actual Duration

Shutdown

Post Shutdown
Percent
Weight

HEALTH, SAFETY & ENVIRONMENT (HSE)


PERSONNEL PROTECTIVE EQUIPMENT

PERMIT TO WORK

JOB SAFETY ANALYSIS

Standart PPE

Body Harness

Personal H2S Monitor

Cold Work

Lifting

Hearing Protection

Chemical Protection

Others (specify below)

Hot Work

Radiation

Work Vest

Breathing Apparatus

_____________________

Electrical

QUALITY

TEST
REQUIREMENT

VI

UT

Hydrotest

Valve Leak Test

Cable Tests

Calibration

Function Test / Test Run

RT

MPI

Reinstatement

RV Pop Test

Tubing Leak Test

Loopcheck

Others

MANPOWER RESOURCES

TASK
NO
1

OPS MODE

Onshore

TASK DESCRIPTION

WORK VOLUME

TRADE

Tools / Equipments Preparation

PLAN MHRS

Unit

Total

Unit

Total

RG

PAX

1.00

0.55

0.55

RS

PAX

2.00

0.90

1.80

Erect scaffolds for removal of spool at Line 150-D-008-1101 (TP-007/008) & new spools
installation

RS

M2

1.50

1.42

2.13

Tools / Equipments & Scaffold Handling

RS

M2

2.13

1.50

3.20

Housekeeping

RS

PAX

2.00

0.9

1.80

RG

PAX

1.00

0.825

0.83

DIRECT MANHOURS SUMMARY

Contractor
Personnel
Third Party
Personnel

RS

PF

PWL

SF

SWL

FW

MW

IT

IF

ELE

BP

RG

8.928

1.375

NDT

PT

BT

IS

CC

VR

WH

Total, Direct Manhours


Special Services
Requirement
SCAFF-001

Job Constraints /
Hold Points
Page 1 of 54

TOOL & EQUIPMENT RESOURCES

Item No

Unit

Utility Requirements

Qty

Description

Utility Air

Instrument Air

MESC No

Material Type Codes P = Project Material

Qty

Potable Water

Description

Power

VAC

Others __________

Description

T = Temporary (construction) Material

Type

Unit

C = Consumable Material S = Commissioning Spares

REFERENCE DRAWINGS & DOCUMENTS


Dwg / Doc No

Service / Firewater

Unit

MATERIALS

Item No

Item No

Rev

Drawing / Document Title

NOTES

JOBCARD
APPROVAL
Name
Designation

CONTRACTOR
Prepared By
Muhd Hasril Rahaman
Piping Engineer

Reviewed By

Agreed By

PCSB
Approved by

Workpack Team Leader

Project Manager

HUC Engineer

Signature
Date
SCAFF-001

Page 2 of 54

JOBCARD
APPROVAL
Name
Designation

CONTRACTOR

PCSB

Presented By

Verified By

Confirmed By

Accepted By

Foreman / Supervisor

Construction Superintendent

Discipline Inspector

HUC Engineer

Signature
Date

SCAFF-001

Page 3 of 54

SISO
SIPROD
SIPCOM
Pre Shutdown
Shutdown
Post Shutdown

JOB SAFETY ANALYSIS

Function Test / Test Run


Others

ACT
MHRS

ECT MANHOURS SUMMARY


Total
10.30
Total
0.00
10.30

SCAFF-001

Page 4 of 54

Description

Others ___________

Qty

S = Commissioning Spares
Drawing / Document Title

PCSB
Approved by
HUC Engineer

SCAFF-001

Page 5 of 54

PCSB
Accepted By
HUC Engineer

SCAFF-001

Page 6 of 54

CHO/2012/DFHD/193 : PROVISION FOR HOOK-UP, COMMISSIONING AND


TOPSIDE MAJOR MAINTENANCE SERVICES FOR 2013-2017
DFHD/2014/042A/001 : PROVISION FOR HUC WORK
FOR TOPSIDE MODIFICATION FOR SKO PIPELINE
REJUVENATION PROJECT PL 381/210

Work Order No
& Title

JOBCARD ID NO

GENERAL
JOB DESCRIPTION

WORK CATEGORY

Erect scaffolds for removal of spool at Line 250-PL-101-6101X (TP-003/004) &


new spools installation

SYS NO
DISCIPLINE
SCHEDULE

SISO

Onshore

Offshore

Prefabrication

Hook-Up

SIPROD
SIPCOM
Pre Shutdown

WORK
PHASE

XXX

SYS DESC

N/A

Hook-Up

Demolition

SCAFFOLDING

LOCATION

CD

Commissioning

Decommissioning

Early Start

Late Start

Actual Start

Plan Duration

Early Finish

Late Finish

Actual Finish

Actual Duration

Shutdown

Post Shutdown
Percent
Weight

HEALTH, SAFETY & ENVIRONMENT (HSE)


PERSONNEL PROTECTIVE EQUIPMENT

PERMIT TO WORK

JOB SAFETY ANALYSIS

Standart PPE

Body Harness

Personal H2S Monitor

Cold Work

Lifting

Hearing Protection

Chemical Protection

Others (specify below)

Hot Work

Radiation

Work Vest

Breathing Apparatus

_____________________

Electrical

QUALITY

TEST
REQUIREMENT

VI

UT

Hydrotest

Valve Leak Test

Cable Tests

Calibration

Function Test / Test Run

RT

MPI

Reinstatement

RV Pop Test

Tubing Leak Test

Loopcheck

Others

MANPOWER RESOURCES

TASK
NO
1

OPS MODE

TASK DESCRIPTION

WORK VOLUME

TRADE

Tools / Equipments Preparation

PLAN MHRS

Unit

Total

Unit

Total

RG

PAX

2.00

0.55

1.10

RS

PAX

4.00

0.90

3.60

Erect scaffolds for removal of spool at Line 250-PL-101-6101X (TP-003/004) & new spools
installation

RS

M2

10.00

1.42

14.21

Tools / Equipments & Scaffold Handling

RS

M2

14.21

1.50

21.31

Housekeeping

RS

PAX

4.00

0.9

3.60

RG

PAX

1.00

0.825

0.83

DIRECT MANHOURS SUMMARY

Contractor
Personnel
Third Party
Personnel

RS

PF

PWL

SF

SWL

FW

MW

IT

IF

ELE

BP

RG

42.72

1.925

NDT

PT

BT

IS

CC

VR

WH

Total, Direct Manhours


Special Services
Requirement
SCAFF-002

Job Constraints /
Hold Points
Page 7 of 54

TOOL & EQUIPMENT RESOURCES

Item No

Unit

Utility Requirements

Qty

Description

Utility Air

Instrument Air

MESC No

Material Type Codes P = Project Material

Qty

Potable Water

Description

Power

VAC

Others __________

Description

T = Temporary (construction) Material

Type

Unit

C = Consumable Material S = Commissioning Spares

REFERENCE DRAWINGS & DOCUMENTS


Dwg / Doc No

Service / Firewater

Unit

MATERIALS

Item No

Item No

Rev

Drawing / Document Title

NOTES

JOBCARD
APPROVAL
Name
Designation

CONTRACTOR
Prepared By
Muhd Hasril Rahaman
Piping Engineer

Reviewed By

Agreed By

PCSB
Approved by

Workpack Team Leader

Project Manager

HUC Engineer

Signature
Date
SCAFF-002

Page 8 of 54

JOBCARD
APPROVAL
Name
Designation

CONTRACTOR

PCSB

Presented By

Verified By

Confirmed By

Accepted By

Foreman / Supervisor

Construction Superintendent

Discipline Inspector

HUC Engineer

Signature
Date

SCAFF-002

Page 9 of 54

SISO
SIPROD
SIPCOM
Pre Shutdown
Shutdown
Post Shutdown

JOB SAFETY ANALYSIS

Function Test / Test Run


Others

ACT
MHRS

ECT MANHOURS SUMMARY


Total
44.65
Total
0.00
44.65

SCAFF-002

Page 10 of 54

Description

Others ___________

Qty

S = Commissioning Spares
Drawing / Document Title

PCSB
Approved by
HUC Engineer

SCAFF-002

Page 11 of 54

PCSB
Accepted By
HUC Engineer

SCAFF-002

Page 12 of 54

CHO/2012/DFHD/193 : PROVISION FOR HOOK-UP, COMMISSIONING AND


TOPSIDE MAJOR MAINTENANCE SERVICES FOR 2013-2017
DFHD/2014/042A/001 : PROVISION FOR HUC WORK
FOR TOPSIDE MODIFICATION FOR SKO PIPELINE
REJUVENATION PROJECT PL 381/210

Work Order No
& Title

JOBCARD ID NO

GENERAL
JOB DESCRIPTION

WORK CATEGORY

Erect scaffolds for removal of spool at Line 200-PL-011-1101X (TP-011/012) &


new spools installation

SYS NO
DISCIPLINE
SCHEDULE

SISO

Onshore

Offshore

Prefabrication

Hook-Up

SIPROD
SIPCOM
Pre Shutdown

WORK
PHASE

XXX

SYS DESC

N/A

Hook-Up

Demolition

SCAFFOLDING

LOCATION

MD

Commissioning

Decommissioning

Early Start

Late Start

Actual Start

Plan Duration

Early Finish

Late Finish

Actual Finish

Actual Duration

Shutdown

Post Shutdown
Percent
Weight

HEALTH, SAFETY & ENVIRONMENT (HSE)


PERSONNEL PROTECTIVE EQUIPMENT

PERMIT TO WORK

JOB SAFETY ANALYSIS

Standart PPE

Body Harness

Personal H2S Monitor

Cold Work

Lifting

Hearing Protection

Chemical Protection

Others (specify below)

Hot Work

Radiation

Work Vest

Breathing Apparatus

_____________________

Electrical

QUALITY

TEST
REQUIREMENT

VI

UT

Hydrotest

Valve Leak Test

Cable Tests

Calibration

Function Test / Test Run

RT

MPI

Reinstatement

RV Pop Test

Tubing Leak Test

Loopcheck

Others

MANPOWER RESOURCES

TASK
NO
1

OPS MODE

TASK DESCRIPTION

WORK VOLUME

TRADE

Tools / Equipments Preparation

PLAN MHRS

Unit

Total

Unit

Total

RG

PAX

2.00

0.55

1.10

RS

PAX

3.00

0.90

2.70

Erect scaffolds for removal of spool at Line 200-PL-011-1101X (TP-011/012) & new spools
installation

RS

M2

4.00

1.42

5.68

Tools / Equipments & Scaffold Handling

RS

M2

5.68

1.50

8.52

Housekeeping

RS

PAX

3.00

0.9

2.70

RG

PAX

1.00

0.825

0.83

DIRECT MANHOURS SUMMARY

Contractor
Personnel
Third Party
Personnel

RS

PF

PWL

SF

SWL

FW

MW

IT

IF

ELE

BP

RG

19.608

1.925

NDT

PT

BT

IS

CC

VR

WH

Total, Direct Manhours


Special Services
Requirement
SCAFF-003

Job Constraints /
Hold Points
Page 13 of 54

TOOL & EQUIPMENT RESOURCES

Item No

Unit

Utility Requirements

Qty

Description

Utility Air

Instrument Air

MESC No

Material Type Codes P = Project Material

Qty

Potable Water

Description

Power

VAC

Others __________

Description

T = Temporary (construction) Material

Type

Unit

C = Consumable Material S = Commissioning Spares

REFERENCE DRAWINGS & DOCUMENTS


Dwg / Doc No

Service / Firewater

Unit

MATERIALS

Item No

Item No

Rev

Drawing / Document Title

NOTES

JOBCARD
APPROVAL
Name
Designation

CONTRACTOR
Prepared By
Muhd Hasril Rahaman
Piping Engineer

Reviewed By

Agreed By

PCSB
Approved by

Workpack Team Leader

Project Manager

HUC Engineer

Signature
Date
SCAFF-003

Page 14 of 54

JOBCARD
APPROVAL
Name
Designation

CONTRACTOR

PCSB

Presented By

Verified By

Confirmed By

Accepted By

Foreman / Supervisor

Construction Superintendent

Discipline Inspector

HUC Engineer

Signature
Date

SCAFF-003

Page 15 of 54

SISO
SIPROD
SIPCOM
Pre Shutdown
Shutdown
Post Shutdown

JOB SAFETY ANALYSIS

Function Test / Test Run


Others

ACT
MHRS

ECT MANHOURS SUMMARY


Total
21.53
Total
0.00
21.53

SCAFF-003

Page 16 of 54

Description

Others ___________

Qty

S = Commissioning Spares
Drawing / Document Title

PCSB
Approved by
HUC Engineer

SCAFF-003

Page 17 of 54

PCSB
Accepted By
HUC Engineer

SCAFF-003

Page 18 of 54

CHO/2012/DFHD/193 : PROVISION FOR HOOK-UP, COMMISSIONING AND


TOPSIDE MAJOR MAINTENANCE SERVICES FOR 2013-2017
DFHD/2014/042A/001 : PROVISION FOR HUC WORK
FOR TOPSIDE MODIFICATION FOR SKO PIPELINE
REJUVENATION PROJECT PL 381/210

Work Order No
& Title

JOBCARD ID NO

GENERAL
JOB DESCRIPTION

WORK CATEGORY

Erect scaffolds for removal of spool at Line 50-V-002-1101 (TP-001/002) & new
spools installation

SYS NO
DISCIPLINE
SCHEDULE

SISO

Onshore

Offshore

Prefabrication

Hook-Up

SIPROD
SIPCOM
Pre Shutdown

WORK
PHASE

XXX

SYS DESC

N/A

Hook-Up

Demolition

SCAFFOLDING

LOCATION

CD

Commissioning

Decommissioning

Early Start

Late Start

Actual Start

Plan Duration

Early Finish

Late Finish

Actual Finish

Actual Duration

Shutdown

Post Shutdown
Percent
Weight

HEALTH, SAFETY & ENVIRONMENT (HSE)


PERSONNEL PROTECTIVE EQUIPMENT

PERMIT TO WORK

JOB SAFETY ANALYSIS

Standart PPE

Body Harness

Personal H2S Monitor

Cold Work

Lifting

Hearing Protection

Chemical Protection

Others (specify below)

Hot Work

Radiation

Work Vest

Breathing Apparatus

_____________________

Electrical

QUALITY

TEST
REQUIREMENT

VI

UT

Hydrotest

Valve Leak Test

Cable Tests

Calibration

Function Test / Test Run

RT

MPI

Reinstatement

RV Pop Test

Tubing Leak Test

Loopcheck

Others

MANPOWER RESOURCES

TASK
NO
1

OPS MODE

TASK DESCRIPTION

WORK VOLUME

TRADE

Tools / Equipments Preparation

PLAN MHRS

Unit

Total

Unit

Total

RG

PAX

1.00

0.55

0.55

RS

PAX

3.00

0.90

2.70

Erect scaffolds for removal of spool at Line 50-V-002-1101 (TP-001/002) & new spools
installation

RS

M2

2.50

1.62

4.04

Tools / Equipments & Scaffold Handling

RS

M2

4.04

1.50

6.06

Housekeeping

RS

PAX

3.00

0.9

2.70

RG

PAX

1.00

0.825

0.83

DIRECT MANHOURS SUMMARY

Contractor
Personnel
Third Party
Personnel

RS

PF

PWL

SF

SWL

FW

MW

IT

IF

ELE

BP

RG

15.495

1.375

NDT

PT

BT

IS

CC

VR

WH

Total, Direct Manhours


Special Services
Requirement
SCAFF-004

Job Constraints /
Hold Points
Page 19 of 54

TOOL & EQUIPMENT RESOURCES

Item No

Unit

Utility Requirements

Qty

Description

Utility Air

Instrument Air

MESC No

Material Type Codes P = Project Material

Qty

Potable Water

Description

Power

VAC

Others __________

Description

T = Temporary (construction) Material

Type

Unit

C = Consumable Material S = Commissioning Spares

REFERENCE DRAWINGS & DOCUMENTS


Dwg / Doc No

Service / Firewater

Unit

MATERIALS

Item No

Item No

Rev

Drawing / Document Title

NOTES

JOBCARD
APPROVAL
Name
Designation

CONTRACTOR
Prepared By
Muhd Hasril Rahaman
Piping Engineer

Reviewed By

Agreed By

PCSB
Approved by

Workpack Team Leader

Project Manager

HUC Engineer

Signature
Date
SCAFF-004

Page 20 of 54

JOBCARD
APPROVAL
Name
Designation

CONTRACTOR

PCSB

Presented By

Verified By

Confirmed By

Accepted By

Foreman / Supervisor

Construction Superintendent

Discipline Inspector

HUC Engineer

Signature
Date

SCAFF-004

Page 21 of 54

SISO
SIPROD
SIPCOM
Pre Shutdown
Shutdown
Post Shutdown

JOB SAFETY ANALYSIS

Function Test / Test Run


Others

ACT
MHRS

ECT MANHOURS SUMMARY


Total
16.87
Total
0.00
16.87

SCAFF-004

Page 22 of 54

Description

Others ___________

Qty

S = Commissioning Spares
Drawing / Document Title

PCSB
Approved by
HUC Engineer

SCAFF-004

Page 23 of 54

PCSB
Accepted By
HUC Engineer

SCAFF-004

Page 24 of 54

CHO/2012/DFHD/193 : PROVISION FOR HOOK-UP, COMMISSIONING AND


TOPSIDE MAJOR MAINTENANCE SERVICES FOR 2013-2017
DFHD/2014/042A/001 : PROVISION FOR HUC WORK
FOR TOPSIDE MODIFICATION FOR SKO PIPELINE
REJUVENATION PROJECT PL 381/210

Work Order No
& Title

JOBCARD ID NO

GENERAL
JOB DESCRIPTION

WORK CATEGORY

Erect scaffolds for removal of spool at Line 80-DD-001-11430 (TP-013/014) &


new spools installation

SYS NO
DISCIPLINE
SCHEDULE

SISO

Onshore

Offshore

Prefabrication

Hook-Up

SIPROD
SIPCOM
Pre Shutdown

WORK
PHASE

XXX

SYS DESC

N/A

Hook-Up

Demolition

SCAFFOLDING

LOCATION

CD

Commissioning

Decommissioning

Early Start

Late Start

Actual Start

Plan Duration

Early Finish

Late Finish

Actual Finish

Actual Duration

Shutdown

Post Shutdown
Percent
Weight

HEALTH, SAFETY & ENVIRONMENT (HSE)


PERSONNEL PROTECTIVE EQUIPMENT

PERMIT TO WORK

JOB SAFETY ANALYSIS

Standart PPE

Body Harness

Personal H2S Monitor

Cold Work

Lifting

Hearing Protection

Chemical Protection

Others (specify below)

Hot Work

Radiation

Work Vest

Breathing Apparatus

_____________________

Electrical

QUALITY

TEST
REQUIREMENT

VI

UT

Hydrotest

Valve Leak Test

Cable Tests

Calibration

Function Test / Test Run

RT

MPI

Reinstatement

RV Pop Test

Tubing Leak Test

Loopcheck

Others

MANPOWER RESOURCES

TASK
NO
1

OPS MODE

TASK DESCRIPTION

WORK VOLUME

TRADE

Tools / Equipments Preparation

PLAN MHRS

Unit

Total

Unit

Total

RG

PAX

1.00

0.55

0.55

RS

PAX

3.00

0.90

2.70

Erect scaffolds for removal of spool at Line 80-DD-001-11430 (TP-013/014) & new spools
installation

RS

M2

3.00

1.62

4.85

Tools / Equipments & Scaffold Handling

RS

M2

4.85

1.50

7.27

Housekeeping

RS

PAX

3.00

0.9

2.70

RG

PAX

1.00

0.825

0.83

DIRECT MANHOURS SUMMARY

Contractor
Personnel
Third Party
Personnel

RS

PF

PWL

SF

SWL

FW

MW

IT

IF

ELE

BP

RG

17.514

1.375

NDT

PT

BT

IS

CC

VR

WH

Total, Direct Manhours


Special Services
Requirement
SCAFF-005

Job Constraints /
Hold Points
Page 25 of 54

TOOL & EQUIPMENT RESOURCES

Item No

Unit

Utility Requirements

Qty

Description

Utility Air

Instrument Air

MESC No

Material Type Codes P = Project Material

Qty

Potable Water

Description

Power

VAC

Others __________

Description

T = Temporary (construction) Material

Type

Unit

C = Consumable Material S = Commissioning Spares

REFERENCE DRAWINGS & DOCUMENTS


Dwg / Doc No

Service / Firewater

Unit

MATERIALS

Item No

Item No

Rev

Drawing / Document Title

NOTES

JOBCARD
APPROVAL
Name
Designation

CONTRACTOR
Prepared By
Muhd Hasril Rahaman
Piping Engineer

Reviewed By

Agreed By

PCSB
Approved by

Workpack Team Leader

Project Manager

HUC Engineer

Signature
Date
SCAFF-005

Page 26 of 54

JOBCARD
APPROVAL
Name
Designation

CONTRACTOR

PCSB

Presented By

Verified By

Confirmed By

Accepted By

Foreman / Supervisor

Construction Superintendent

Discipline Inspector

HUC Engineer

Signature
Date

SCAFF-005

Page 27 of 54

SISO
SIPROD
SIPCOM
Pre Shutdown
Shutdown
Post Shutdown

JOB SAFETY ANALYSIS

Function Test / Test Run


Others

ACT
MHRS

ECT MANHOURS SUMMARY


Total
18.89
Total
0.00
18.89

SCAFF-005

Page 28 of 54

Description

Others ___________

Qty

S = Commissioning Spares
Drawing / Document Title

PCSB
Approved by
HUC Engineer

SCAFF-005

Page 29 of 54

PCSB
Accepted By
HUC Engineer

SCAFF-005

Page 30 of 54

CHO/2012/DFHD/193 : PROVISION FOR HOOK-UP, COMMISSIONING AND


TOPSIDE MAJOR MAINTENANCE SERVICES FOR 2013-2017
DFHD/2014/042A/001 : PROVISION FOR HUC WORK
FOR TOPSIDE MODIFICATION FOR SKO PIPELINE
REJUVENATION PROJECT PL 381/210

Work Order No
& Title

JOBCARD ID NO

GENERAL
JOB DESCRIPTION

WORK CATEGORY

Erect scaffolds for removal of spool at Line 80-D-007-1101X (TP015/016/017/020) & new spools installation

SYS NO
DISCIPLINE
SCHEDULE

SISO

Onshore

Offshore

Prefabrication

Hook-Up

SIPROD
SIPCOM
Pre Shutdown

WORK
PHASE

XXX

SYS DESC

N/A

Hook-Up

Demolition

SCAFFOLDING

LOCATION

CD

Commissioning

Decommissioning

Early Start

Late Start

Actual Start

Plan Duration

Early Finish

Late Finish

Actual Finish

Actual Duration

Shutdown

Post Shutdown
Percent
Weight

HEALTH, SAFETY & ENVIRONMENT (HSE)


PERSONNEL PROTECTIVE EQUIPMENT

PERMIT TO WORK

JOB SAFETY ANALYSIS

Standart PPE

Body Harness

Personal H2S Monitor

Cold Work

Lifting

Hearing Protection

Chemical Protection

Others (specify below)

Hot Work

Radiation

Work Vest

Breathing Apparatus

_____________________

Electrical

QUALITY

TEST
REQUIREMENT

VI

UT

Hydrotest

Valve Leak Test

Cable Tests

Calibration

Function Test / Test Run

RT

MPI

Reinstatement

RV Pop Test

Tubing Leak Test

Loopcheck

Others

MANPOWER RESOURCES

TASK
NO
1

OPS MODE

TASK DESCRIPTION

WORK VOLUME

TRADE

Tools / Equipments Preparation

PLAN MHRS

Unit

Total

Unit

Total

RG

PAX

2.00

0.55

1.10

RS

PAX

3.00

0.90

2.70

Erect scaffolds for removal of spool at Line 80-D-007-1101X (TP-015/016/017/020) & new spools
installation

RS

M2

4.00

1.62

6.46

Tools / Equipments & Scaffold Handling

RS

M2

6.46

1.50

9.69

Housekeeping

RS

PAX

3.00

0.9

2.70

RG

PAX

1.00

0.825

0.83

DIRECT MANHOURS SUMMARY

Contractor
Personnel
Third Party
Personnel

RS

PF

PWL

SF

SWL

FW

MW

IT

IF

ELE

BP

RG

21.552

1.925

NDT

PT

BT

IS

CC

VR

WH

Total, Direct Manhours


Special Services
Requirement
SCAFF-006

Job Constraints /
Hold Points
Page 31 of 54

TOOL & EQUIPMENT RESOURCES

Item No

Unit

Utility Requirements

Qty

Description

Utility Air

Instrument Air

MESC No

Material Type Codes P = Project Material

Qty

Potable Water

Description

Power

VAC

Others __________

Description

T = Temporary (construction) Material

Type

Unit

C = Consumable Material S = Commissioning Spares

REFERENCE DRAWINGS & DOCUMENTS


Dwg / Doc No

Service / Firewater

Unit

MATERIALS

Item No

Item No

Rev

Drawing / Document Title

NOTES

JOBCARD
APPROVAL
Name
Designation

CONTRACTOR
Prepared By
Muhd Hasril Rahaman
Piping Engineer

Reviewed By

Agreed By

PCSB
Approved by

Workpack Team Leader

Project Manager

HUC Engineer

Signature
Date
SCAFF-006

Page 32 of 54

JOBCARD
APPROVAL
Name
Designation

CONTRACTOR

PCSB

Presented By

Verified By

Confirmed By

Accepted By

Foreman / Supervisor

Construction Superintendent

Discipline Inspector

HUC Engineer

Signature
Date

SCAFF-006

Page 33 of 54

SISO
SIPROD
SIPCOM
Pre Shutdown
Shutdown
Post Shutdown

JOB SAFETY ANALYSIS

Function Test / Test Run


Others

ACT
MHRS

ECT MANHOURS SUMMARY


Total
23.48
Total
0.00
23.48

SCAFF-006

Page 34 of 54

Description

Others ___________

Qty

S = Commissioning Spares
Drawing / Document Title

PCSB
Approved by
HUC Engineer

SCAFF-006

Page 35 of 54

PCSB
Accepted By
HUC Engineer

SCAFF-006

Page 36 of 54

CHO/2012/DFHD/193 : PROVISION FOR HOOK-UP, COMMISSIONING AND


TOPSIDE MAJOR MAINTENANCE SERVICES FOR 2013-2017
DFHD/2014/042A/001 : PROVISION FOR HUC WORK
FOR TOPSIDE MODIFICATION FOR SKO PIPELINE
REJUVENATION PROJECT PL 381/210

Work Order No
& Title

JOBCARD ID NO

GENERAL
JOB DESCRIPTION

WORK CATEGORY

Erect scaffolds for removal of spool at Line 150-BD-004-1101X (TP-005/006) &


new spools installation

SYS NO
DISCIPLINE
SCHEDULE

XXX

SYS DESC

N/A

SCAFFOLDING

LOCATION

SUMP

SISO

Offshore

Prefabrication

Hook-Up

Hook-Up

Demolition

Commissioning

Decommissioning

SIPROD
SIPCOM
Pre Shutdown

WORK
PHASE

Early Start

Late Start

Actual Start

Plan Duration

Early Finish

Late Finish

Actual Finish

Actual Duration

Shutdown

Post Shutdown
Percent
Weight

HEALTH, SAFETY & ENVIRONMENT (HSE)


PERSONNEL PROTECTIVE EQUIPMENT

PERMIT TO WORK

JOB SAFETY ANALYSIS

Standart PPE

Body Harness

Personal H2S Monitor

Cold Work

Lifting

Hearing Protection

Chemical Protection

Others (specify below)

Hot Work

Radiation

Work Vest

Breathing Apparatus

_____________________

Electrical

QUALITY

TEST
REQUIREMENT

VI

UT

Hydrotest

Valve Leak Test

Cable Tests

Calibration

Function Test / Test Run

RT

MPI

Reinstatement

RV Pop Test

Tubing Leak Test

Loopcheck

Others

MANPOWER RESOURCES

TASK
NO
1

OPS MODE

Onshore

TASK DESCRIPTION

WORK VOLUME

TRADE

Tools / Equipments Preparation

PLAN MHRS

Unit

Total

Unit

Total

RG

PAX

2.00

0.55

1.10

RS

PAX

3.00

0.90

2.70

Erect scaffolds for removal of spool at Line 150-BD-004-1101X (TP-005/006) & new spools
installation

RS

M2

3.50

1.42

4.97

Tools / Equipments & Scaffold Handling

RS

M2

4.97

1.50

7.46

Housekeeping

RS

PAX

3.00

0.9

2.70

RG

PAX

1.00

0.825

0.83

DIRECT MANHOURS SUMMARY

Contractor
Personnel
Third Party
Personnel

RS

PF

PWL

SF

SWL

FW

MW

IT

IF

ELE

BP

RG

17.832

1.925

NDT

PT

BT

IS

CC

VR

WH

Total, Direct Manhours


Special Services
Requirement
SCAFF-007

Job Constraints /
Hold Points
Page 37 of 54

TOOL & EQUIPMENT RESOURCES

Item No

Unit

Utility Requirements

Qty

Description

Utility Air

Instrument Air

MESC No

Material Type Codes P = Project Material

Qty

Potable Water

Description

Power

VAC

Others __________

Description

T = Temporary (construction) Material

Type

Unit

C = Consumable Material S = Commissioning Spares

REFERENCE DRAWINGS & DOCUMENTS


Dwg / Doc No

Service / Firewater

Unit

MATERIALS

Item No

Item No

Rev

Drawing / Document Title

NOTES

JOBCARD
APPROVAL
Name
Designation

CONTRACTOR
Prepared By
Muhd Hasril Rahaman
Piping Engineer

Reviewed By

Agreed By

PCSB
Approved by

Workpack Team Leader

Project Manager

HUC Engineer

Signature
Date
SCAFF-007

Page 38 of 54

JOBCARD
APPROVAL
Name
Designation

CONTRACTOR

PCSB

Presented By

Verified By

Confirmed By

Accepted By

Foreman / Supervisor

Construction Superintendent

Discipline Inspector

HUC Engineer

Signature
Date

SCAFF-007

Page 39 of 54

SISO
SIPROD
SIPCOM
Pre Shutdown
Shutdown
Post Shutdown

JOB SAFETY ANALYSIS

Function Test / Test Run


Others

ACT
MHRS

ECT MANHOURS SUMMARY


Total
19.76
Total
0.00
19.76

SCAFF-007

Page 40 of 54

Description

Others ___________

Qty

S = Commissioning Spares
Drawing / Document Title

PCSB
Approved by
HUC Engineer

SCAFF-007

Page 41 of 54

PCSB
Accepted By
HUC Engineer

SCAFF-007

Page 42 of 54

CHO/2012/DFHD/193 : PROVISION FOR HOOK-UP, COMMISSIONING AND


TOPSIDE MAJOR MAINTENANCE SERVICES FOR 2013-2017
DFHD/2014/042A/001 : PROVISION FOR HUC WORK
FOR TOPSIDE MODIFICATION FOR SKO PIPELINE
REJUVENATION PROJECT PL 381/210

Work Order No
& Title

JOBCARD ID NO

GENERAL
JOB DESCRIPTION

WORK CATEGORY

Erect scaffolds for removal of spool at Line 50-IA-1003-1808/13411 (TP009/010) & new spools installation

SYS NO
DISCIPLINE
SCHEDULE

SISO

Onshore

Offshore

Prefabrication

Hook-Up

SIPROD
SIPCOM
Pre Shutdown

WORK
PHASE

XXX

SYS DESC

N/A

Hook-Up

Demolition

SCAFFOLDING

LOCATION

CD

Commissioning

Decommissioning

Early Start

Late Start

Actual Start

Plan Duration

Early Finish

Late Finish

Actual Finish

Actual Duration

Shutdown

Post Shutdown
Percent
Weight

HEALTH, SAFETY & ENVIRONMENT (HSE)


PERSONNEL PROTECTIVE EQUIPMENT

PERMIT TO WORK

JOB SAFETY ANALYSIS

Standart PPE

Body Harness

Personal H2S Monitor

Cold Work

Lifting

Hearing Protection

Chemical Protection

Others (specify below)

Hot Work

Radiation

Work Vest

Breathing Apparatus

_____________________

Electrical

QUALITY

TEST
REQUIREMENT

VI

UT

Hydrotest

Valve Leak Test

Cable Tests

Calibration

Function Test / Test Run

RT

MPI

Reinstatement

RV Pop Test

Tubing Leak Test

Loopcheck

Others

MANPOWER RESOURCES

TASK
NO
1

OPS MODE

TASK DESCRIPTION

WORK VOLUME

TRADE

Tools / Equipments Preparation

PLAN MHRS

Unit

Total

Unit

Total

RG

PAX

1.00

0.55

0.55

RS

PAX

2.00

0.90

1.80

Erect scaffolds for removal of spool at Line 50-IA-1003-1808/13411 (TP-009/010) & new spools
installation

RS

M2

2.00

1.42

2.84

Tools / Equipments & Scaffold Handling

RS

M2

2.84

1.50

4.26

Housekeeping

RS

PAX

2.00

0.9

1.80

RG

PAX

1.00

0.825

0.83

DIRECT MANHOURS SUMMARY

Contractor
Personnel
Third Party
Personnel

RS

PF

PWL

SF

SWL

FW

MW

IT

IF

ELE

BP

RG

10.704

1.375

NDT

PT

BT

IS

CC

VR

WH

Total, Direct Manhours


Special Services
Requirement
SCAFF-008

Job Constraints /
Hold Points
Page 43 of 54

TOOL & EQUIPMENT RESOURCES

Item No

Unit

Utility Requirements

Qty

Description

Utility Air

Instrument Air

MESC No

Material Type Codes P = Project Material

Qty

Potable Water

Description

Power

VAC

Others __________

Description

T = Temporary (construction) Material

Type

Unit

C = Consumable Material S = Commissioning Spares

REFERENCE DRAWINGS & DOCUMENTS


Dwg / Doc No

Service / Firewater

Unit

MATERIALS

Item No

Item No

Rev

Drawing / Document Title

NOTES

JOBCARD
APPROVAL
Name
Designation

CONTRACTOR
Prepared By
Muhd Hasril Rahaman
Piping Engineer

Reviewed By

Agreed By

PCSB
Approved by

Workpack Team Leader

Project Manager

HUC Engineer

Signature
Date
SCAFF-008

Page 44 of 54

JOBCARD
APPROVAL
Name
Designation

CONTRACTOR

PCSB

Presented By

Verified By

Confirmed By

Accepted By

Foreman / Supervisor

Construction Superintendent

Discipline Inspector

HUC Engineer

Signature
Date

SCAFF-008

Page 45 of 54

SISO
SIPROD
SIPCOM
Pre Shutdown
Shutdown
Post Shutdown

JOB SAFETY ANALYSIS

Function Test / Test Run


Others

ACT
MHRS

ECT MANHOURS SUMMARY


Total
12.08
Total
0.00
12.08

SCAFF-008

Page 46 of 54

Description

Others ___________

Qty

S = Commissioning Spares
Drawing / Document Title

PCSB
Approved by
HUC Engineer

SCAFF-008

Page 47 of 54

PCSB
Accepted By
HUC Engineer

SCAFF-008

Page 48 of 54

CHO/2012/DFHD/193 : PROVISION FOR HOOK-UP, COMMISSIONING AND


TOPSIDE MAJOR MAINTENANCE SERVICES FOR 2013-2017
DFHD/2014/042A/001 : PROVISION FOR HUC WORK
FOR TOPSIDE MODIFICATION FOR SKO PIPELINE
REJUVENATION PROJECT PL 381/210

Work Order No
& Title

JOBCARD ID NO

GENERAL
JOB DESCRIPTION

WORK CATEGORY

Erect scaffolds for removal of spool at Line 50-P-13512-11432 (TP-021/022) &


new spools installation

SYS NO
DISCIPLINE
SCHEDULE

XXX

SYS DESC

N/A

SCAFFOLDING

LOCATION

SUMP

SISO

Offshore

Prefabrication

Hook-Up

Hook-Up

Demolition

Commissioning

Decommissioning

SIPROD
SIPCOM
Pre Shutdown

WORK
PHASE

Early Start

Late Start

Actual Start

Plan Duration

Early Finish

Late Finish

Actual Finish

Actual Duration

Shutdown

Post Shutdown
Percent
Weight

HEALTH, SAFETY & ENVIRONMENT (HSE)


PERSONNEL PROTECTIVE EQUIPMENT

PERMIT TO WORK

JOB SAFETY ANALYSIS

Standart PPE

Body Harness

Personal H2S Monitor

Cold Work

Lifting

Hearing Protection

Chemical Protection

Others (specify below)

Hot Work

Radiation

Work Vest

Breathing Apparatus

_____________________

Electrical

QUALITY

TEST
REQUIREMENT

VI

UT

Hydrotest

Valve Leak Test

Cable Tests

Calibration

Function Test / Test Run

RT

MPI

Reinstatement

RV Pop Test

Tubing Leak Test

Loopcheck

Others

MANPOWER RESOURCES

TASK
NO
1

OPS MODE

Onshore

TASK DESCRIPTION

WORK VOLUME

TRADE

Tools / Equipments Preparation

PLAN MHRS

Unit

Total

Unit

Total

RG

PAX

1.00

0.55

0.55

RS

PAX

2.00

0.90

1.80

Erect scaffolds for removal of spool at Line 50-P-13512-11432 (TP-021/022) & new spools
installation

RS

M2

2.00

1.42

2.84

Tools / Equipments & Scaffold Handling

RS

M2

2.84

1.50

4.26

Housekeeping

RS

PAX

2.00

0.9

1.80

RG

PAX

1.00

0.825

0.83

DIRECT MANHOURS SUMMARY

Contractor
Personnel
Third Party
Personnel

RS

PF

PWL

SF

SWL

FW

MW

IT

IF

ELE

BP

RG

10.704

1.375

NDT

PT

BT

IS

CC

VR

WH

Total, Direct Manhours


Special Services
Requirement
SCAFF-009

Job Constraints /
Hold Points
Page 49 of 54

TOOL & EQUIPMENT RESOURCES

Item No

Unit

Utility Requirements

Qty

Description

Utility Air

Instrument Air

MESC No

Material Type Codes P = Project Material

Qty

Potable Water

Description

Power

VAC

Others __________

Description

T = Temporary (construction) Material

Type

Unit

C = Consumable Material S = Commissioning Spares

REFERENCE DRAWINGS & DOCUMENTS


Dwg / Doc No

Service / Firewater

Unit

MATERIALS

Item No

Item No

Rev

Drawing / Document Title

NOTES

JOBCARD
APPROVAL
Name
Designation

CONTRACTOR
Prepared By
Muhd Hasril Rahaman
Piping Engineer

Reviewed By

Agreed By

PCSB
Approved by

Workpack Team Leader

Project Manager

HUC Engineer

Signature
Date
SCAFF-009

Page 50 of 54

JOBCARD
APPROVAL
Name
Designation

CONTRACTOR

PCSB

Presented By

Verified By

Confirmed By

Accepted By

Foreman / Supervisor

Construction Superintendent

Discipline Inspector

HUC Engineer

Signature
Date

SCAFF-009

Page 51 of 54

SISO
SIPROD
SIPCOM
Pre Shutdown
Shutdown
Post Shutdown

JOB SAFETY ANALYSIS

Function Test / Test Run


Others

ACT
MHRS

ECT MANHOURS SUMMARY


Total
12.08
Total
0.00
12.08

SCAFF-009

Page 52 of 54

Description

Others ___________

Qty

S = Commissioning Spares
Drawing / Document Title

PCSB
Approved by
HUC Engineer

SCAFF-009

Page 53 of 54

PCSB
Accepted By
HUC Engineer

SCAFF-009

Page 54 of 54