850 [kg]
1215 [kg]
4200 [kg]
260 [kg]
3200 [kg]
9725 [kg]
Factor
1.20
1.60
1.60
Vertical Impact
Elemento
Monorail Cranes (Powered)
Cab Operated or Remotely
Operated Bridge Cranes
(Powered)
%
25%
25%
10%
0%
Vertical Impact = 25 %
Vertical Impact = 2.61 [tf]
Vertical Impact = 3.99 [tf]
Side Thrust
ASCE 7: The lateral force on the crane runways beam with electrically power trolleys shall be calculated as
20% of the sum of the rated capacity of the crane and the weight of the hoist and trolley.
The lateral force shall be assumed to act horizontaly at the tracction surface on a runway beam, in either
direction perprndicular to the beam, and shall be distributed with due regard to the lateral stiffness of the
runway beam and supporting structure.
Side Thrust = 20 %
Side Thrust = 3.41 [tf]
Side Thrust = 5.46 [tf]
-> Servicio
-> Mayorada
Seismic Loads
ASCE 7: The empty weight of the component should be considered in the seismic mass.
The Designer should carefully evaluate the location of the crane.
Limit
L/400
00000 Rep.
0-2000000 Rep.
hall be calculated as
ey.
ay beam, in either
eral stiffness of the