Está en la página 1de 5

PROJECT : SM LIGHT RESIDENCES

LOCATION : BONI AVE. EDSA MANDALUYONG CITY


SUBJECT : PRODUCTIVITY RATE
SCOPE OF WORK : INTERIOR PAINTING OF UNITS
FINISH : SEMI-GLOSS (2 COATS)
PROCEDURE
1. SURFACE PREPARATION
- Putty Works
- Sanding
2. PRIMER
- Application of Flat Latex
- Spot putty and reapply Flat Latex
3. FIRST COAT
- Application of Semi-Gloss
4. FINAL COAT
- Application of Semi-Gloss

PAINTING TO MASONRY WALL


FLOOR : 17TH FLOOR
UNIT NO. : 18
AREA :
2

46.9 m
2
8.86 m

UNIT
CR

55.76 m
DATE
6-Nov
7-Nov
7-Nov
7-Nov
8-Nov
8-Nov
8-Nov
8-Nov

MANPOWER
Painter
Painter
Painter
Painter
Painter
Painter
Painter
Painter

ACTIVITY
Surface Preparation - Putty Works
Surface Preparation - Putty Works
Surface Preparation - Sanding
Primer - Application of Flat Latex
Primer - Application of Flat Latex
Primer - Spot Putty & Reapply Flat Latex
1st Coat - Application of Semigloss
Final Coat - Application of Semigloss
TOTAL
PRODUCTIVITY (Man-hr/m2)

MANHOUR
5
7.5
5
1
3.25
6.75
4.75
4.5

37.75 Man-Hrs
0.6770

FLOOR : 17TH FLOOR


UNIT NO. : 19
AREA :
UNIT

2
46.9 m
2
8.86 m
2
55.76 m

CR

DATE

MANPOWER

ACTIVITY

Man-Hrs
Man-Hrs
Man-Hrs
Man-Hrs
Man-Hrs
Man-Hrs
Man-Hrs
Man-Hrs

MANHOUR

6-Nov
7-Nov
7-Nov
7-Nov
8-Nov
8-Nov
8-Nov
8-Nov

Painter
Painter
Painter
Painter
Painter
Painter
Painter
Painter

Surface Preparation - Putty Works


Surface Preparation - Putty Works
Surface Preparation - Sanding
Primer - Application of Flat Latex
Primer - Application of Flat Latex
Primer - Spot Putty & Reapply Flat Latex
1st Coat - Application of Semigloss
Final Coat - Application of Semigloss

5
7.5
5
1
4.25
6.75
3.75
4.5

TOTAL
2

PRODUCTIVITY (Man-hr/m )

Man-Hrs
Man-Hrs
Man-Hrs
Man-Hrs
Man-Hrs
Man-Hrs
Man-Hrs
Man-Hrs

37.75 Man-Hrs
0.6770

PAINTING TO MASONRY WALL


FLOOR : 17TH FLOOR
UNIT NO. : 37-38
AREA :
2
93.8 m

UNIT

2
17.72 m
2
111.52 m

CR

DATE
7-Nov
8-Nov
8-Nov
9-Nov

MANPOWER
Painter
Painter
Painter
Painter

ACTIVITY
Surface Preparation - Putty Works
Surface Preparation - Sanding
Primer - Application of Flat Latex
Primer - Application of Flat Latex

MANHOUR
22
8.5
4
3

Man-Hrs
Man-Hrs
Man-Hrs
Man-Hrs

10-Nov Painter

Primer - Spot Putty & Reapply Flat Latex

5.5 Man-Hrs

10-Nov Painter
13-Nov Painter

1st Coat - Application of Semigloss


Final Coat - Application of Semigloss

6 Man-Hrs
12 Man-Hrs

TOTAL
PRODUCTIVITY (Man-hr/m2)

61 Man-Hrs
0.5470

PAINTING TO MASONRY WALL


FLOOR : 8TH FLOOR
UNIT NO. : 21-22
AREA :
2
93.8 m
2
17.72 m

UNIT
CR

2
111.52 m

DATE
7-Nov
8-Nov
8-Nov
9-Nov

MANPOWER
Painter
Painter
Painter
Painter

10-Nov Painter

ACTIVITY
Surface Preparation - Putty Works
Surface Preparation - Putty Works
Surface Preparation - Sanding
Primer - Application of Flat Latex
Primer - Spot Putty & Reapply Flat Latex

MANHOUR
14
10
7.5
6

Man-Hrs
Man-Hrs
Man-Hrs
Man-Hrs

13 Man-Hrs

10-Nov Painter
Painter

1st Coat - Application of Semigloss


Final Coat - Application of Semigloss

6 Man-Hrs
12 Man-Hrs

TOTAL
PRODUCTIVITY (Man-hr/m2)

68.5 Man-Hrs
0.6142

AVERAGE PRODUCTIVITY (Man-hr/m2)

0.6288

FINISH : FLAT FINISH


PROCEDURE
1. SURFACE PREPARATION
- Putty Works
- Sanding
2. PRIMER
- Application of Flat Latex
- Spot putty and reapply Flat Latex
3. FINAL COAT
- Final application of flat latex
PAINTING TO CONCRETE CEILING
FLOOR : 17TH FLOOR
UNIT NO. : 18
AREA :
2
12.8 m
2
12.8 m

UNIT

DATE
6-Nov
7-Nov
7-Nov
8-Nov
7-Nov
8-Nov
8-Nov

MANPOWER
Painter
Painter
Painter
Painter
Painter
Painter
Painter

ACTIVITY
Surface Preparation - Putty Works
Surface Preparation - Putty Works
Surface Preparation - Sanding
Primer - Application of Flat Latex
Primer - Application of Flat Latex
Primer - Spot Putty & Reapply Flat Latex
Final Coat - Application of flat latex
TOTAL
PRODUCTIVITY (Man-hr/m2)

MANHOUR
3
3
2
0.75
1
0.5
1.25

Man-Hrs
Man-Hrs
Man-Hrs
Man-Hrs
Man-Hrs
Man-Hrs
Man-Hrs

11.5 Man-Hrs
0.8984

FLOOR : 17TH FLOOR


UNIT NO. : 19
AREA :
UNIT

2
12.8 m
2
12.8 m

DATE
6-Nov
7-Nov
7-Nov

MANPOWER
ACTIVITY
Painter 1
Surface Preparation - Putty Works
Painter 1
Surface Preparation - Putty Works
Painter 1
Surface Preparation - Sanding

MANHOUR
3 Man-Hrs
3 Man-Hrs
2 Man-Hrs

7-Nov
8-Nov
8-Nov
8-Nov

Painter 1
Painter 2
Painter 1
Painter 1

Primer - Application of Flat Latex


Primer - Application of Flat Latex
Primer - Spot Putty & Reapply Flat Latex
Final Coat - Application of flat latex

1
0.75
0.5
1.25

TOTAL
2

PRODUCTIVITY (Man-hr/m )

Man-Hrs
Man-Hrs
Man-Hrs
Man-Hrs

11.5 Man-Hrs
0.8984

FLOOR : 17TH FLOOR


UNIT NO. : 37-38
AREA :
2

25.6 m
2
25.6 m

UNIT

DATE
7-Nov
8-Nov
9-Nov
9-Nov
10-Nov

MANPOWER
Painter 1
Painter 1
Painter 1
Painter 1
Painter 1

ACTIVITY
Surface Preparation - Putty Works
Surface Preparation - Sanding
Primer - Application of Flat Latex
Primer - Spot Putty & Reapply Flat Latex
Final Coat - Application of flat latex

MANHOUR
5.5
6
2.5
2.5
3

TOTAL
PRODUCTIVITY (Man-hr/m2)

Man-Hrs
Man-Hrs
Man-Hrs
Man-Hrs
Man-Hrs

19.5 Man-Hrs
0.7617

FLOOR : 8TH FLOOR


UNIT NO. : 21-22
AREA :
UNIT

DATE
7-Nov
8-Nov
9-Nov
9-Nov
10-Nov

2
25.6 m
2
25.6 m

MANPOWER
Painter 1
Painter 1
Painter 1
Painter 1
Painter 1

ACTIVITY
Surface Preparation - Putty Works
Surface Preparation - Sanding
Primer - Application of Flat Latex
Primer - Spot Putty & Reapply Flat Latex
Final Coat - Application of flat latex

MANHOUR
9
4
2.5
2.5
3

TOTAL
2

Man-Hrs
Man-Hrs
Man-Hrs
Man-Hrs
Man-Hrs

21 Man-Hrs

PRODUCTIVITY (Man-hr/m )

0.8203

AVERAGE PRODUCTIVITY (Man-hr/m2)

0.8447

5
6
7
8
9
10
11

210 972.625
105 69.47321 0.330825
1
43.69
2
2
3
4
5