French Standard NFC 17-102 requires that every ESE lightning conductor first undergo a series
of high-voltage laboratory tests to determine the gain in triggering time in comparison to a
simple rod. The value obtained-referred to a 7
7T - equals the average trigger time over a run of
100 electrical discharges in the laboratory, minus a 35% safety margin. These figures are then
used to calculate each conductor's protection area according to the standardized formula.
Protection
Level I :
D = 20 m
Protection
Level Il :
D = 30 m
Protection
Level Ill :
D = 45 m
Protection
Level IV :
D = 60 m
h (m)
S 6.60
S 4.50
S 3.40
TS 3.40
TS 2.25
2
31
27
23
23
17
3
47
41
35
35
24
4
63
55
46
46
34
5
79
68
58
58
42
10
79
69
59
59
44
h (m)
S 6.60
S 4.50
S 3.40
TS 3.40
TS 2.25
2
34
30
26
26
19
3
52
45
39
39
29
4
68
60
52
52
39
5
86
76
65
65
49
10
88
77
67
67
51
h (m)
S 6.60
S 4.50
S 3.40
TS 3.40
TS 2.25
2
39
34
30
30
23
3
58
52
45
45
34
4
78
69
60
60
46
5
97
86
75
75
57
10
99
88
77
77
61
h (m)
S 6.60
S 4.50
S 3.40
TS 3.40
TS 2.25
2
43
38
33
33
26
3
64
57
50
50
39
4
85
76
67
67
52
5
107
95
84
84
65
10
109
98
87
87
69
Prevectron 2
R
Millenium
Controlled ESE System
NF C 17-102 compliant
Tested at CPRI, Bangalore
Tested in Real Conditions
IGHTNING
ONDUCTORS
A R LY
TREAMER
MISSION
IGHTNING
ONDUCTORS
A R LY
TREAMER
MISSION
IGHTNING
ONDUCTORS
4
5
7
8
development.
The latest PREVECTRON 2 series provides optimal
9
10
11
12
13
14
15
Operation
16
l
l
A R LY
TREAMER
MISSION
IGHTNING
ONDUCTORS
l
l
oltage
both high-v e thousands
in
t
u
o
d
ie
ed from th
f tests carr
e variety o the experience gain velop a complete
th
,
rs
e
e
in
eng
to de
, and
INDELEC's lightning conditions rld, have allowed us
f
o
s
l
il
k
s
The
wo
life
s and realaround the
nefits.
laboratorie ON 2 installations ng a host of key be
R
ri
T
e
of PREVEC tning conductors off
PROJECT
h
OR EACH
lig
F
f
o
S
N
e
g
IO
n
T
ra
LU
fits
Key bene
D SO
EA, ETC)
STOMIZE
CTION AR
RING CU
E
E
T
F
F
O
O
R
P
E
G
IRED
DEL RAN
TS, REQU
l 5-MO
NSTRAIN
O
C
IC
T
E
(ASTH
TION;
NS
S OPERA
CONDITIO
ONOMOU
T
U
A
LY
L
CLIMATIC
E
M
l FU
TRIKES
E
R
T
HTNING S
N IN EX
E
IG
L
V
E
E
S
L
Y,
IP
IT
L
BI
SITY RISE
ND MULT
AL RELIA
LD INTEN
WITHSTA
IE
l TOT
F
O
L
T
A
E
E
L
IC
B
E SIT
IGN A
ELECTR
ER TO TH
UST DES
IVE WHEN
NO DANG
VEN, ROB
S
T
MES ACT
N
O
E
DELEC,
C
S
l PRO
E
E
B
PED BY IN
ON 2 PR
R ONLY
O
R
O
L
T
T
E
C
C
V
E
E
U
V
D
D
E
N
IALLY
HE PR
N TESTER
TNING CO
LS SPEC
LIKELY), T
l LIGH
EVECTRO
SING TOO
R
CHARGE
U
P
IS
E
D
D
C
N
N
A
G
A
R
IN
NTE
INTEN
(LIGHTN
RIKE COU
ION & MA
STALLAT
WARE, ST
T
IN
F
D
O
R
S
A
N
W
R
LATIO
AIGHTFO
N CALCU
EQUEST
l STR
ROTECTIO
BLE ON R
P
A
G
IL
A
IN
V
D
A
U
INCL
ULTS
REQUEST
TEST RES
THE
RATORY
ABLE ON
O
IL
B
A
A
V
L
A
E
TIP AND
S
T
G
-VOL
REPOR
EEN THE
IC
W
T
IF
l HIGH
E
T
B
N
Y
IE
INUIT
& SC
AL CONT
RESULTS
ELECTRIC
IFE TEST
L
-L
L
L
U
A
F
E
R
O
T
l
ANKS
RE TIP TH
E CAPTU
F
A
884).
-S
A
R
ATE #116
l ULT
(CERTIFIC
INT
S
O
S
P
E
C
H
T
O
R
R
EA
TURING P
0 MANUFAC
0
0
-2
1
TENANCE
0
0
9
FOR MAIN
l ISO
E
L
B
A
IL
A
X AV
TEST BO
VECTRON
l PRE