Está en la página 1de 6

WEB-BASED

Team member:
1. Vincent Lorenzo (12304007)
2. Mario Theja (12304010)
3. Stephen Raharja (12304011)
4. Reza Putra Santoso (12304015)
5. Eka Denyaz (12304017)

2015

Web-Based Attendance Tracking System

2015

WEB-BASED ATTENDANCE TRACKING SYSTEM

SETUP DEVELOPMENT ENVIRONMENT


JAVA EE
SQL
HTML
JQUERY
SPRINT
ID

Story / Task
1

1
0

1
0

Website Interface
Make a Simple Design Website

Basic Functions
Create simple function for Login and
Logout
Checking sick leave employee
Create Day Off Function for employee

Implementing
ID

Story / Task

Include break time hours schedule


Save break time into the database
Check the break time from database
record

Overtime
Save overtime into the database
Show the overtime to the superior

Web-Based Attendance Tracking System

2015

Implementing Inactivity Tracking


ID

Story / Task
1

1
0

Inactivity Tracking
Show notifications

ROADMAP
Website
Interfac
e
Login

Inactivit
y
Tracking

Break
Time
Overtim
e

Automat
ic Salary
Calculati
on

Log out
Sick
Leave
Day Off

V3

Version

Function

V1

Login and Log out


Sick Leave
Day Off

V2

Break Time
Overtime

V3

Inactivity Tracking

V4

Automatic Salary Calculation

Web-Based Attendance Tracking System

2015

DOD

US

Iteration

Field Release

Source Code and test script submitted to source control


tool

CI compilation successfully, CI and regression test pass

Acceptance criteria met, test case associated with the US


pass.

Test cases reviewed at least by one another person, test


case execution result updated

All critical and major issues detected in code review


closed.

Static code analysis should be done where necessary, no


new Critical and major issue reported

Any Open Source change must be noted,

API, design, architecture documentation updated if


applicable

Any public API change must be documented

Last CI compilation successfully, CI and regression test


pass

No Critical bug open in case of customer delivery unless


with agreement of PO

Issue detected by Open source check closed in case of


customer delivery

Sprint test plan executed; Regression, stress, abnormal


conditions and system tests should be included when
appropriate

Enough USs fully groomed for next sprint

Sprint review/demo completed

Sprint retrospective meeting done and action points


documented

Release Notes published

API, guide documented

The software is base-lined and released

Release build stored in security space (GIT, CC, space


with backup etc.)

Web-Based Attendance Tracking System

2015

Release test plan executed, customer scenario testing


taken into account
if relevant

Zero Major and Critical bugs open

Security check completed, security risk managed and


closed

Web-Based Attendance Tracking System

También podría gustarte