Está en la página 1de 39

ROADWAY

PRODUCTION RATE
UNIT LOW AVE

5/16/2011

GENERAL
MOBILIZATION

DAYS

MOBILIZE / MOT / EROSION CONTROL


ADVANCED WARNING PANELS
BARRICADES
REMOVABLE PAV'T MARKINGS
TEMP IMPACT ATTENUATORS
TEMPORARY BARRIER WALLS
TEMPORARY CURB
TEMPORARY PAV'T
TEMPORARY RPM'S
TEMPORARY STRIPING
VARIABLE MESSAGE SIGNS
WORK ZONE SIGNS

WKS
EA
EA
LF
EA
LF
LF
SY
EA
MI
EA
EA

15

MOT
1

2
15
500
18500
20
450
900
440
500
4
10
30

EROSION CONTROL
FILTER FABRIC
FLOATING TUBIDITY BARRIER
HAY BALES
ROCKBAGS/SAND BAGS
SILT FENCE
SOIL TRACKING DEVICE
TURBIDITY BARRIER

SY
LF
TON
EA
LF
EA
LF

2,500
3
750

1,500

1,500

2,500
20,000
1

CLEARING & GRUBBING


MAILBOXES
REMOVE EXISTING CONCRETE PAV'T
REMOVE SIDEWALK
REWORK SHOULDERS
SHOULDER
C&G

EA
SY
SY
SY
Mi
Ac

EARTHWORK
BACKFILL AROUND STRUCT.
EXCAVATION - TRUCK HAUL
< 100,000
100,000 - 300,000
> 300,000
EXCAVATION - BORROW
EXCAVATION - REGULAR
EXCAVATION - SUBSOIL
EMBANKMENT

CY

50

CY
CY
CY

900

100

3,800

SEE CHART

SHOULDER GRADING

MI

0.5

20
50
5
5

50
100

DRAINAGE
ADJUST MANHOLE
CONCRETE BOX CULVERTS
CONCRETE BOX CULVERTS (PRECAST)
CONCRETE CLASS I (Culvert)
CONCRETE CLASS I (Endwalls)
CONCRETE ENDWALLS
DESILT PIPE
DESILT, CLEAN & SEAL JNT
DITCH PAVING
DRAINCRETE
GUNITE
INLET
JACK & BORE
JUNCTION BOX
MANHOLES
MISC. CONCRETE
MITERED END SECTIONS
PARTIAL MANHOLE
PIPE INSTALLATION < 5' deep
PIPE INSTALLATION > 5' deep
RIPRAP
STORM SEWERS, (Manholes & Inlet)
TEMPORARY PIPE(Slope Drain)
TRENCH DRAIN (Special)
VALVE BOX, ADJUST
WINGWALLS

EA
CY
LF
CY
CY
CY
LF
LF
SY
LF
CF
EA
LF
EA
EA
CY
EA
EA
LF
LF
TN
LF
LF
LF
EA
SF

65

1,000
30
200
1,500
130

20

13

200
100
100

50
300

100
100

150

ROADWORK
BASE
CONCRETE BARRIER WALL
CONCRETE CURB & GUTTER
CONCRETE PAVING
DIAMOND GRINDING CONC
MILLING
MILLING ASPHALT
MISC ASPHALT PAVEMENT
RUBBLIZATION
RUMBLE STRIP GRINDING
STABILIZE ROADBED
STABLIZATION
TEMPORARY PAV'T
TEXTURED PAVEMENT
TRAFFIC SEPERATOR
TURNOUT CONSTRUCTION

LF
LF
SY
SY
SY
SY
TN
SY
MI
SY
SY
SY
SY
LF
SY

SEE CHART
200
300
400
600
5,000
2,000

1,400
1,400

8,000
60
7,000
5
1,500
1,600
150
800
200

GUARDRAIL
REMOVE EXISTING
FURNISH & INSTALL
END ANCHORS

LF
LF
EA

200

HANDRAIL & BICYCLE RAILING

LF

100

< 10,000
> 10,000
GATES

LF
LF
EA

500

EA
EA
LF
SY
EA
LF
NM
SY
SF
LF
GM
NM
SF
LF
LF
SY
EA
GM
NM
MI
MI
LF
LF
LF
LF
LF
LF
NM
GM
LF

500
25

2,000
1,000
8

RAILING
FENCE
1,200
10

PAVEMENT MARKING
DELINEATOR TUBULAR (Flexible)
DIRECTIONAL ARROWS
GUIDE LINES (Thermo)(White)
ISLAND NOSE PAINT
MESSAGES
MISC. STRIPE
PAINTED PAV'T MARKINGS (Final Surface)
REFLECTIVE PAINT (Island Nose)
REMOVE EXIST THERMO (White/Black)(Other)
REMOVE EXIST THERMO (White/Black)(Solid)
REMOVE EXIST THERMO (White/Black/Blue)(Skip)
REMOVE EXIST THERMO (White/Black/Blue)(Solid)(6")
REMOVE EXIST THERMO (Yellow)(Other)
REMOVE EXIST THERMO (Yellow)(Skip)
REMOVE EXIST THERMO (Yellow)(Solid)
REMOVE EXISTING THERMO
RPM's (0 - 5,000)
STRIPING SKIP
STRIPING SOLID
THERMOPLASTIC STRIPING
TRAFFIC STRIPE
TRAFFIC STRIPE SKIP (Thermo)(White/Black/Blue)
TRAFFIC STRIPE SKIP (Yellow)
TRAFFIC STRIPE SOLID (Paint)(White)(24")
TRAFFIC STRIPE SOLID (Paint)(White/Black)
TRAFFIC STRIPE SOLID (Two Component)(Yellow)(18")
TRAFFIC STRIPE SOLID (Yellow)(18")
TRAFFIC STRIPE SOLID (Yellow)(6")
TRAFFIC STRIPE SKIP (Standard)(White)(6")
TRAFFIC STRIPE SKIP (White)(6")

2,000
2,000

2,000
2,000
2,000
500

SIGNALIZATION
DIRECTIONAL BORE < 6"
DIRECTIONAL BORE 6" to < 12" (3- 1 Innerduct)

LF
LF

400
400

750
2,000
55
30
3,000
7
30
2,400
4,800
7
7
4,800
2,400
2,400
350
750
7
7
6.7
7
2,000
2,000
2,000
2,000
2,000
2,000
7
7
2,000

DIRECTIONAL BORE 6" to < 12" (4- 1 Innerduct)


JACK & BORE CASING DIAMETER (<6")
JACK & BORE CASING DIAMETER (6" to <12")
CONDUIT ABOVE GROUND < 3"
CONDUIT F & I ABOVE GROUND 3"
CONDUIT UNDERGROUND 1 RGS"
CONDUIT UNDERGROUND 4" 3- 1" Innerduct)
CONDUIT UNDERGROUND 4- 1 "
CONDUIT UNDERGROUND 2"
CONDUIT (F & I UNDERGROUND)(PVC SCH 40)(2")
CONDUIT UNDERGROUND 3"
CONDUIT UNDERGROUND 4"
CONDUIT UNDERGROUND 4" RGS
CONDUIT UNDER PAV'T 2" HDPE
CONDUIT UNDER PAV'T (3- 1 Innerduct)
CONDUIT UNDER PAV'T (4- 1 Innerduct)
CONDUCTORS (F&I)(Insulated)(No. 6)
CABLE SIGNAL
SPAN WIRE ASSEMBLY
CABLE INTERCONNECT (1-25 PR)
PULL BOXES
PULL & JUNCTION BOXES
PULL & JUNCTION BOXES (Fiber Optic-Pull Box)
PULL BOXES (Special)
PULL BOXES (Roadside)
SURGE PROTECTOR (Pole Base)
LIGHTNING PROTECTION SYSTEM (F&I)(Surge Suppresion)
LIGHTNING PROTECTION
SYSTEM
(F&I)(Point Discharge)
ELCTRICAL
POWER SERVICE
(Underground-Purchased
by
Contractor from Pwr. Co.)
ELECTRICAL POWER SERVICE WIRE (F&I)
ELECT PWR SRV WIRE DISCONNECT (POLE)(Cabinet)
PRESTRESSED CONC. POLES (Type N-11)(Dir. Burial)
STEEL STRAIN POLE (F&I)(NS-IX)(36')
STEEL STRAIN POLE (F&I)(NS-IX)(38')
MAST ARM (F&I/Reduced
(F&I/HL)(SingleLoading)(Single
w/Luminare)(1st
Arm
BxLuminare)(1st
Arm
w/o
Arm C5)
MAST
ARM (F&I/Reduced Loading)(Single Arm w/o Luminare)(1st
Arm C6)
MAST ARM (F&I/Reduced Loading)
MAST ARM (F&I)(Double Arm)
SIGNAL TRAFFIC
SIGNAL, POLE & DET (Pedestrian)(Complete)
DETECTOR CABINET
DETECTOR CABINET(Type II) (Pay Item 668-32)
DETECTOR CABINET(Type III) (Pay Item 668-33)
DETECTOR CABINET(Type V) (Pay Item 668-35)
DETECTOR CABINET(Type VI) (Pay Item 668-36)
SYSTEM COMM. (Multi-pair Cable)
SYSTEM COMM. (Fiber Optic Cable SM)
SYSTEM COMM. (FOC, 6-Count SM)

LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
PI
PI
LF
EA
EA
EA
EA
EA
EA
EA
AS
LF
EA
EA
EA
EA
EA
EA
EA
EA
EA
AS
AS
EA
EA
EA
EA
EA
LF
LF
LF

400
50
50
500
500
500
500
500
500
500
500
500
500
500
500
500
500

1,000
10
10
5
10
10
10
1
500

5
5
2,000
8
15

2
1,000
2
2

0.5
0.5
0.5
0.5
0.5
0.5
0.5
10
2
3
3
1
1
0.2
1,000
1,000
1,000

SYSTEM COMM. (FOC, 24-Count SM)


SYSTEM COMM. (FOC, 48-Count SM)
SYSTEM COMM. (FOC, 72-Count SM)
CCTV Equipt. (Install)(Camera Assembly)
CONTROLLER ASSEMBLY ACTUATED SS F&I Nema Pre(None)
CONTROLLER ASSEMBLY ACTUATED SS Modify Nema Preempt
CONTROLLER ASSEMBLY (Cabinet Assembly, Less Foundation)
SIGN (Internal Illuminated)
LUMINARE (F&I)(Roadway)(Special)
TMS Vehicle Sensor (Class II)(Type I)
TMS Vehicle Sensor (Class II)(Type I)(1/2 Ln)
TMS Inductive Loop Assembly (2 Loops per Lane)
TMS Cabinet (F&I)(Type III)(Pedestal)(2 Backplane)
SIGNALS PER INTERSECTION
ELECTRICAL POWER SERVICE
SIGNAL HEADS
POLES
LIGHTING POLE (Complete)
REMOVE EXISTING SPAN WIRE
REMOVE EXISTING SIGNAL EQUIPT.
REMOVE EXISTING SIGNAL INTERCONNECT (Cable)
MAST ARM (SINGLE)
MASTARM (DOUBLE)
TRAFFIC SIGNALS
PEDESTRIAN SIGNALS
CUT LOOP DETECTORS
LOOP ASSEMBLIES
PEDESTRIAN DETECTORS
SIGN PANELS

LF
LF
LF
EA
AS
AS
AS
EA
EA
EA
EA
AS
EA
DAYS
AS
EA
EA
EA
EA
EA
LF
EA
EA
AS
AS
AS
AS
EA
EA

1,000
1,000
1,000
2
2
1
2
4
0.5
4
4
4
3
15
3
10
10
0.5
20
8
1,000

4
3
8
10
6
6
8
6

LIGHTING
CONDUCTORS
MISC. CONCRETE
UNDERGROUND CONDUIT
PULL & JUNCTION BOXES
POLES
HIGHWAY STANDARD

LF
CY
LF
EA
EA
EA

750
15
750
8
10
5

DELINEATORS
DIRECTIONAL BORE
MILTIPOST REMOVAL
MULITPOST (F & I)
OBJECT MARKER
OVERHEAD SIGNS
RELOCATE SIGN PANELS
REMOVE SIGN PANELS
SIGN PANELS

EA
LF
AS
AS
EA
SF
EA
EA
EA

10
600
15.0
10.0
10.0

SIGNING

0.2
10
12
15.0

SIGN INSTALL (Existing Breakaway Supports)(Single Post)


SINGLE POST SIGN
SINGLE POST SIGN RELOCATE
SINGLE POST SIGN REMOVAL
LARGE SIGNS
SMALL SIGNS
DRILLSHAFT BASE

AS
AS
AS
AS
EA
EA
EA

ASPHALT
2" SIDEWALK
Hot-In Place 1.5 "
ARMI Layer
Micro-Surfacing
SUPERPAVE ASPH CONC (Structural)
FRICTION COURSE

SY
SY
SY
SY

4
15
10
30
0.2
10

20
0.5

SEE CHART
800
6,000
7,040
20,000
SEE CHART
SEE CHART

CONCRETE
ADA RAMPS

EA

0.5

BARRIER WALL
BLOCK SOUND WALLS
BOX CULVERT
BREAK, COMPACT PAVEM'T
CURB & GUTTER
DITCH PAVEMENT
PAVING
SIDEWALK
SLAB REPLACEMENT

LF
SF
CY
SY
LF
SY
SY
SY
SY

200
400
20
400

5,000
600
200
5,000
300
130

LANDSCAPING
PLANTS (Small)
PLANTS (Large)
SEEDLINGS (Trees & Shrubs)
1 GAL
3 GAL
7 GAL
SCRUB - 30 GAL
DIRECTIONAL BORE
FINISH SOIL LAYER (LANDSCAPING OPERATIONS)
FENCING (Type B(5.1 -6.0) (With Vinyl Coating)
FENCING GATE (Type B (Double 6.1 -12.0') Opening
ARTIFICIAL COVERING
SODDING
SEEDING
PERFORMANCE TURF

EA
EA
EA
EA
EA
EA
EA
LF
CY
LF
EA
SY
SY
SY
SY

30
15
800
400
200
100
30
600
1,500
2
1,500
1,500

500
3

23,500
1,500

PERFORMANCE SOD
PLASTIC EROSION MAT,(TURF REINFORCED, TYPE 3)
PATTERNED/TEXTURED PAVEMENT (Asphalt)
PAVERS, Architectural (Roadway)

SY
SY
SY
SY

1,500
1,500
150
150

GRASSING
SEED & MULCH
SOD
FINISH SOIL LAYER (TOPSOIL)

MISC CONSTRUCTION

SY
SY
SY

23,500
1,500
15,000

PRODUCTION RATES
HIGH

COMMENTS

3,000
750

500
400
3,000
5
600

25
600
3,500

10

200

7,500

SEE CHART

Use low if there are a lot of utilities


or large trees. Maximum 20 days.

6
80
150
10
10
15

6
24" Diameter
6
4
15
6
400
200
400
400
400
8
200

SEE CHART
400
800

8,000

1,800
60

District 7
1,500

400

3,500

1,000
50

55
4,800
9,600

9,600
4,800
4,800
1,000

800
800

800
400
400
1,000
1,000
1,000
1,000
1,000
1,000
1,000
1,000
1,000
1,000
1,000
1,000
1,000
2,500

2,500
20
20
10
20
20
20
4
2,500

0.7
0.7
Add 7 Days for Conc. Cure

20
5
5
6
4
4
0.5
5,000
10,000
10,000

10,000
10,000
10,000
5
5
3
5
8
2
12
12
12
6

1,500

Less than 12"

0.7

12.0

0.7
30

SEE CHART

25,000 20-25 Lbs/S.Y.


SEE CHART
SEE CHART

3 components are footing, stem &


barrier
Examples: variable height median
barrier,
rigidvariable
shoulder
barrier,
Examples:
height
median
rigid C&G
barrier
and barrier,
rigid retaining
barrier,
rigid
shoulder
barrier
rigid
C&G barrier and rigid retaining
barrier
80
800

1,192

1,000
500

Less than 12"


5,000
5
5,000
5,000
23,500

5,000
5,000
250
200

2,200

BRIDGE

PRODUCTION RATE
UNIT LOW
AVE
HIGH

MOBILIZE MARINE - BARGE & CRANE


DAYS

60

COFFERDAMS
SY

100

200

300

CATHODIC PROTECT (Jackets)


EA

1.5

CY
CY

250
500

DREDGEING
DRAG LINE
PUMP

DEMOLITION
BRIDGE
FENDER SYSTEM
SAW CUT DECK - 1" DEEP
BRIDGE RAIL
DECK & HANDRAIL
PARAPET
TIMBER BRIDGE

SF
LF
LF
LF
SY
LF
SY

270

30
60
40

375
50
550
50
35
115
50

GRINDING
River Gravel Agg.
Limestone Agg.

SY
SY

2,600
4,000

SF
SF

600
215

HYDRO BLAST BRIDGE DECK


2.5" DEEP
3.5" DEEP

ACROW BRIDGE

600

40
180
60

AVERAGE ACRO BRIDGE

LF

30

EA
LF
LF

200

0.8
300
7

400

EA
SF
SHTS/day
LF

640
32

15
2,000
40
200

4,000
48

PILES
TEST PILES 24" - 30"
PRODUCTION PILES
PILE JACKETS 18" - 24"

SHEET PILING
CONCRETE PILE - 5 ft x 20 ft
SHEET STEEL PILING
SHEET STEEL PILING
STEEL PILE LENGTH - 40 ft

DRILLED SHAFT
? WHAT SIZE ?
60" x 130 ft'
74" x 40 ft

LF
EA
EA

200

300
0.2
0.5

400

CY

10

11

30

CY
CY
LF
LF

4
10

12
30

250

8
20
150
425

600

CY
LF

6
80

11
120

14
160

BOX CULVERT

SUBSTRUCTURE
COLUMNS / CAPS / BENTS
FOOTINGS
STEEL BEAMS
PRECAST BEAMS

SUPERSTRUCTURE
BRIDGE DECK
BARRIER WALL

BRIDGE FLOOR GROOVING


SY

APPROACH SLABS

3,000

CY

15

EXPANSION JOINTS
CLEANING & RESEALING
MECHANICAL
SAW CUT/EPOXY/ANCHOR

LF
LF
LANE

3,000

3,500
35
1

50

100

SF
LF
MI
LF
MI
SY
CY
SY
LF

0
0
0
0
555
24
0
30

7,000
5,280
1
1,478
0.14
1,500
60
500
50

TON

10.5

LF
LF

150
250

200

250
600

LF

80

160

200

LF

150

225

300

COMPRESSION SEAL REPLACEMENT


Compression Seal Replacement

LF

150

CLEAN & SEAL CONCRETE DECK


Cleaning & Resealing Joints
Cleaning & Resealing Joints
Cleaning & Sealing Random Cracks
Cleaning & Sealing Random Cracks
Grinding Concrete Pavement
Concrete Pav't Slab Replacement
Concrete Paving Plain (9")
Bridge Approach Expansion Joint

10,560
2
1,478
0.28
2,700
94
80

ERECT STRUCTURAL STEEL

BEAM ERECTION
STEEL
PRECAST

TRAFFIC RAIL BARRIER

HANDRAILS - BRIDGE

WALLS
RETAINING
BARRIER WALL

SF
LF

BARRIER WALL w/3 components


MSE WALL
NOISE BARRIER WALL
WINGWALLS

LF
LF
SF
SF

ERECT TIMBER FENDER SYSTEM

SF
DAYS

350
5

SF
TN
SF
SF
per Leaf
SF
TN

2,500
20
2,000
2,000
20
2,000
9

SF
SF
SF
SF
SF

60
28
235
1,500
1,500

TON
TON

750
185

PER BENT

100

100

150
200

55
750
2,000
150

PAINTING
ANTI-GRAFFITI COAT
STEEL
BRIDGE PAINTING
CLASS 5 APPLICATION
SMALL BASCULE
STEEL GIRDERS
STEEL GIRDERS

PAINT REMOVAL
DRY BLASTING
POWER TOOLED
WATER BLASTING
SANDBLASTING
STEEL GIRDER-SANDBLASTING

RIP RAP
DUMPED
PLACED

200

200

PLACED
SAND BAG
Gabion mats & baskets
Gabion mats & baskets

CY
SY
SY
CY

40
20

EA
EA

10
0.2

MTH
MTH
MTH

75
120
850
45

1,300
80

SIGNS
HIGHWAY
OVERHEAD

30
0.7

TOLL PLAZAS
RAMP
MID SIZE
MAINLINE

8
12
18

Comments

Allow approx. 7 days for initial setup of substructure

3 components are footing, stem & barrier


Examples: variable height median barrier, rigid shoulder
barrier, rigid C&G barrier and rigid retaining barrier

w/Containment System(Bascule Open)


w/Containment System
w/Containment System

No-Containment, System Prep.for paint


w/Containment System

PROCUREMENT

UNIT

AMOUNT

ALUMINUM HANDRAIL

WKS

2-6

BUILDING PERMIT

DAYS

45

DAYS
DAYS
DAYS

30
60
90

RESURFACING - SUPERPAVE
< 20,000 TONS
20,000 - 60,000 TONS
> 60,000 TONS

HIGHWAY LIGHTING

DAYS
CONVERT MERCURY TO Na DAYS

120-150
90

PILES

WKS

3-5

FIBERGLASS PILE JACKETS

DAYS

45

PUMP STATION

WKS

12

DAYS
DAYS

90
150

SIGN TRUSS

DAYS

150

SIGNS

DAYS

60

STEEL BEAMS

MTHS

IMPACT ATTENUATOR (G.R.E.A.T.DAYS

30

UTILITY STEEL POLES - MAJOR MTHS

SIGNALS
CONCRETE STRAIN POLES
STEEL MAST ARMS

UTILITIES

PRODUCTION RATE
UNIT LOW
AVE
HIGH

ADJUST MANHOLE COVERS

EA

WATERMAIN

LF

RAILROAD X-ing 5 Lanes

LF

4
75

100
3

150

EARTHWORK
DAYS

CUBIC YARDS

0
10
15
19
23
30
37
43
47
50
52
54.5
57
63.5
68
70
72
76
80
84
88
91
95
98
102
106
110

0
5,000
10,000
15,000
20,000
30,000
40,000
50,000
60,000
70,000
80,000
90,000
100,000
150,000
200,000
240,000
300,000
400,000
500,000
600,000
700,000
800,000
900,000
1,000,000
1,100,000
1,200,000
1,300,000

EARTHWORK
110

100

90

80

70

60

DAYS
50

40

30

20

10

0
0

100,000

200,000

300,000

400,000

500,000

600,000

700,000

CUBIC YARDS

800,000

900,000

1,000,000

CUBIC YARDS

900,000

1,000,000

1,100,000

1,200,000

1,300,000

BASE
WORK DAYS

SQUARE YARDS

0.0
8.0
9.4
11.0
11.3
12.0
14.0
16.0
20.0
22.0
26.0
80.0

0
8,000
10,000
13,000
14,000
15,000
20,000
26,000
42,000
50,000
64,000
260,000

BASE
80.0

70.0

60.0

50.0

WORK DAYS
40.0

30.0

20.0

10.0

0.0
0

50,000

100,000

150,000

SQUARE YARDS

200,000

0,000

250,000

300,000

SUPERPAVE
WORK DAYS

TONS

0.0
3.0
4.5
5.7
6.3
7.0
73.5

0
500
1,000
1,500
2,000
2,500
65,000

SUPERPAVE
80.0

70.0

60.0

50.0

WORK DAYS
40.0

30.0

20.0

10.0

0.0
0

5,000

10,000

15,000

20,000

25,000

30,000

35,000

TONS

40,000

45,000

50,000

55,000

ASPHALT TONNAGE CONVERSION CHART


1/2"
5/8"
3/4"
1"
1 1/4"
1 1/2"
1 3/4"
2"
2 1/4"
2 1/2"
2 3/4"

= 0.0250 x SY
= 0.0313 x SY
= 0.0375 x SY
= 0.0500 x SY
= 0.0625 x SY
= 0.0750 x SY
= 0.0875 x SY
= 0.1000 x SY
= 0.1125 x SY
= 0.1250 x SY
= 0.1375 x SY

3"
3 1/2"
4"
4 1/2"
5"
6"
7"
8"
9"
9 1/2"

= 0.1500 x SY
= 0.1750 x SY
= 0.2000 x SY
= 0.2250 x SY
= 0.2500 x SY
= 0.3000 x SY
= 0.3500 x SY
= 0.4000 x SY
= 0.4500 x SY
= 0.4750 x SY

55,000

60,000

65,000