Mosaic
Testing Guidelines
Consolidation/Infill sites
Contents
1.
2.
Document History................................................................................................................ 3
1.1
Document Location........................................................................................................ 3
1.2
Revision History............................................................................................................. 3
Purpose................................................................................................................................ 4
2.1
Changes......................................................................................................................... 4
3.
Changes to Spectrums......................................................................................................... 5
4.
4.2
4.3
4.4
5.
6.
7.
8.
Summary............................................................................................................................. 9
1. Document History
1.1
Document Location
TBC
1.2
Revision History
Revision Date:
Date;
28/10/2011
18/11/2011
Summary of Changes;
1st Draft
2nd Draft i) Inclusion of ASC in SRL tests ii) New limit
line introduced iii) Extension of Markers to cover full
900 band width iv) Inclusion of Markers on UMTS SRL
tests v) Additional tests incorporated in Guidelines
Version 2 Reduction of Tests to be carried
24/04/2012
24/04/2012
24/04/2012
08/05/2012
Changes Marked;
New Document
Changes to
Spectrum
Tests to be carried
out
Tests to be carried
out
Version 3 i) Introduction of Air Cavity Combiners into Tests to be carried
Tests to be carried out ii) Additional examples included out
Examples
Version 4 Labelling convention Change
Plot/Documentatio
n Labelling
Convention
Version 4.1 Typo changed on 900 Uplinks Band
Changes to
Spectrum
31/05/2012
12/06/2012
14/06/2013
06/01/2015
Throughout
Document
Section 1.
Section 4.2
Section 5
(Examples of 4.2)
Section 2.1.1
Section 3 Table 3
Section 3.0
Throughout
Document
06/01/2015
Section 2.1
06/01/2015
Section 3.0
Section 4.4
2. Purpose
The purpose of this document is to highlight minor changes and streamline the testing
procedure for all Consolidation/Infill sites been built across each Operators Network. This
revised testing guideline will cover the required spectrums that each Operator uses. And
capture the same information previously delivered using each operator respective Testing
Specification.
2.1 Changes
Test engineers should revert back to the guidelines provided by each operator as both Testing
Specifications are very similar for the tests being carried out on sites going forward. However,
some changes have been made to System tests going forward and are as follows;
2.1.1 The ASC/WTMA will not be included in the SRL testing for Meteor Only with
the inclusion of all markers as per the uplink and downlink bands below in
Table 2. For sites that have cavity combiners as part of the system separate
SRL tests are required for both O2, and MMC and H3GI given the uplink &
downlink frequencies o indicatedn below in table 3.
2.1.2 Limits are defined in new MOSAIC rigging test sheet.The limit for Meteor
Only SRL test on UMTS will now be 15.5dB the value determined within the
Downlink (Tx) band only is required.
2.1.3 The limit for all other SRL tests across the full bandwidth spectrums will now
be 14dB
2.1.4 The labelling convention for all stored plots and documentation are to be
A, B, C convention.
3. Changes to Spectrums
3.1
When setting up the Site Master for testing whichever band in question simply extend
the lower and higher limits to take in all threeboth operators spectrum as shown in Table 1
below.
LTE 800 MHz
UMTS
Table 1
For the full system test i.e. SRL simply extend the Markers on both the Uplink and
Downlink bands for LTE 800, U/GSM 900, LTE/GSM 1800 as shown in Table 2 below.
*For SRL tests on the LTE/GSM 1800, separate tests are to be carried out showing the
specific uplink and downlink bands assigned to each operator
For UMTS, theThe ASC/WTMA will notw be included in the SRL test with the inclusions of
markers 1, 2, 3 & 4 as per the uplink and downlink bands also in Table 2 below.
Uplink (Rx)
Downlink (Tx)
*LTE/GSM 1800MHz
(THREE ONLY)
*LTE/GSM 1800 MHz
(O2 ONLY)
*LTE/GSM 1800 MHz
(MMC ONLY)
UMTS
Use the specific ports assigned for tests through the 900 ports of cavity combiners for
both O2 and MMC and H3GIas these are operator band specific assigned frequencies.
4.2
PRE-SRL
System Return Loss to Antenna (ASC/WTMA
included (MMC Only) for UMTS systems)
not
Once all works is carried out 1 SRL sweep of each Antenna line System is sufficient
to determine the status of the system. See below the test to be carried out when
this is the case.
SRL
System Return Loss to Antenna (ASC/WTMA not
included (MMC Only) for UMTS systems)
*When testing through the 900 ports of a Cavity Combiner separate SRL test for
both O2, and MMC and H3GI will be required. Markers must be set as per the values
on Table 21 above to each operators specific Uplink and Downlink band. Then
marker 5 peaked between 1 & 2, marker 6 peaked between 3 & 4. Markers for H3GI
and peak to be added. These additional test are only required when testing
900cavity combiners. See below the test to be carried out when this is the case.
*SRLO2
System Return Loss to Antenna (900 System with
Cavity Combiners) (Ref; Table 2)
*SRLMMC
System Return Loss to Antenna (900 System with
Cavity Combiners) (Ref; Table 2)
4.3
When the feeders on a system are re-terminated the following system tests should
be carried out prior to work on the system
PRE-SRL
System Return
included (MMC Only) for UMTS systems)
Loss
to
Antenna
(ASC/WTMA
not
Once all works is carried out the following tests must be carried out
MFRLL*
*This test is only required when antenna works is been carried out on
site in conjunction with the re-termination on the feeder at ground
level.
SRL
System Return Loss to Antenna (ASC/WTMA not
included (MMC Only) for UMTS systems)
4.4
When carrying out new Three installations following system tests should be carried out
post installation. All data captured in the tests below will allow full completion of the Rigging
Acceptance Document which will replace the previous VC4 form.
DTFL
MFSC
To get loss of main feeder only, calculated tail losses will be added in
spreadsheet
SRLBYP
If no antenna works is been carried out then 2 tests per cable, per technology
(900/1800/UMTS) 1 pre-test, 1 post-works test total 2 tests per cable (12 tests for
single technology, 24 tests for dual-band and 36 tests for tri-band) are to be carried
out.
Example for point 4.4
Where troubleshooting is required because of poor test results make sure to eliminate
the possibility of Vodafone antennas in close proximity or adjacent to installed
antennas. Each operators spectrum would need to be specifically tested and not across
the full bandwidth spectrum which includes Vodafones spectrum (Excludes LTE 800
spectrum).
8. Summary
Always investigate if test results are borderline, even marginal passes. All new
systems should clearly pass, if not then theres something wrong.
instructions
~ End of Document ~
should
be
forwarded
to