Kiln

Date

From

To

Duration

4G1FN01
4G1TD01FNJ01

06:00
06:00
06:00
06:00
06:00
06:00
06:00
06:00
06:00
06:00
06:00
06:00
06:00
06:00
06:00
06:00
06:00
06:00
06:00
06:00
06:00
06:00
06:00
06:00
06:00
06:00
06:00
06:00
06:00
06:00
06:00
06:00
06:00
06:00
06:00
06:00
06:00
06:00
06:00
06:00
06:00
06:00
06:00
06:00
06:00
06:00
06:00
06:00
06:00
06:00
06:00
00:30
03:10
08:00
10:10
06:45
19:35

06:00
06:00
06:00
06:00
06:00
06:00
06:00
06:00
06:00
06:00
06:00
06:00
06:00
06:00
06:00
06:00
06:00
06:00
06:00
06:00
06:00
06:00
06:00
06:00
06:00
06:00
06:00
06:00
06:00
06:00
06:00
06:00
06:00
06:00
06:00
06:00
06:00
06:00
06:00
06:00
06:00
06:00
06:00
06:00
14:04
06:00
06:00
06:00
06:00
06:00
10:30
03:05
04:55
08:08
14:44
07:00
22:40

24.00
24.00
24.00
24.00
24.00
24.00
24.00
24.00
24.00
24.00
24.00
24.00
24.00
24.00
24.00
24.00
24.00
24.00
24.00
24.00
24.00
24.00
24.00
24.00
24.00
24.00
24.00
24.00
24.00
24.00
24.00
24.00
24.00
24.00
24.00
24.00
24.00
24.00
24.00
24.00
24.00
24.00
24.00
24.00
8.07
24.00
24.00
24.00
24.00
24.00
4.50
2.58
1.75
0.13
4.57
0.25
3.08

16-Sep-13 SEW Drive

4C1.RF01.XFC01

09:20

10:05

0.75

13-Oct-13 Rotary feeder

4C1.RF02.DRV01

15:50

16:50

1.00

11-Dec-13 SEW Drive

4C1.RF01.XFC01

18:07

18:25

0.30

16:08

16:30

0.37

10:50
05:10
06:00
06:50
00:30
06:40

12:15
06:00
14:30
07:10
01:05
06:55

1.42
0.83
8.50
0.33
0.58
0.25

15:00

15:20

0.33

24-Sep-13
06-Oct-13
18-Jan-14
19-Jan-14
20-Jan-14
21-Jan-14
22-Jan-14
23-Jan-14
24-Jan-14
25-Jan-14
26-Jan-14
27-Jan-14
28-Jan-14
29-Jan-14
30-Jan-14
31-Jan-14
01-Feb-14
02-Feb-14
03-Feb-14
04-Feb-14
05-Feb-14
06-Feb-14
07-Feb-14
08-Feb-14
09-Feb-14
10-Feb-14
11-Feb-14
12-Feb-14
13-Feb-14
14-Feb-14
15-Feb-14
16-Feb-14
17-Feb-14
18-Feb-14
19-Feb-14
20-Feb-14
21-Feb-14
22-Feb-14
23-Feb-14
24-Feb-14
19-Apr-14
20-Apr-14
21-Apr-14
22-Apr-14
23-Apr-14
11-Jun-14
12-Jun-14
13-Jun-14
14-Jun-14
15-Jun-14
16-Jun-14
14-Jul-13
14-Jul-13
15-Jul-13
15-Jul-13
16-Jul-13
09-Aug-13

Equipment name

PC Schenk
ID Fan
coal schencks
coal schencks
ID Fan #. 1
TAD Sealing air fan

Equipment number

4G1.FN02

14-Dec-13
25-Dec-13
05-Jan-14
06-Jan-14
16-Jan-14
16-Jan-14
28-Mar-14

Claciner Coal blower ventilation fan


Clinker Crusher Hydraulic Roller # 2
Clinker Crusher Hydraulic Roller # 2
EP Fan
Cooler Fan #4
Cooler roller crusher# 1

10-May-14 ID Fan

CW1RB01JST01-M2001

4E1.FN01.XFC01
4R1.FN04.DRV01

4G1.FN02

10-May-14 ID Fan

4G1.FN02

18:50

20:00

1.17

25-May-14
25-May-14
17-Jun-14
17-Jun-14
29-Jul-13
02-Aug-13
21-Aug-13
16-Sep-13
07-Oct-13
11-Oct-13
12-Oct-13
31-Oct-13
18-Nov-13
01-Dec-13
18-Dec-13
19-Dec-13
12-Mar-14
17-Mar-14
14-Apr-14
05-May-14
05-May-14
10-May-14
10-May-14
13-May-14
14-May-14
15-May-14
18-May-14
18-May-14
19-May-14
28-May-14
03-Jun-14
04-Jun-14
04-Jun-14
19-Jun-14
01-Jul-13
02-Jul-13
03-Jul-13
04-Jul-13
05-Jul-13
06-Jul-13
07-Jul-13
08-Jul-13
09-Jul-13
10-Jul-13
11-Jul-13
12-Jul-13
13-Jul-13
19-Jul-13
19-Jul-13
19-Jul-13
21-Jul-13
25-Jul-13
13-Aug-13
15-Aug-13
23-Aug-13
24-Aug-13
07-Oct-13
07-Oct-13
08-Oct-13
10-Oct-13
11-Oct-13
11-Oct-13
12-Oct-13
21-Oct-13
18-Dec-13
26-Feb-14
01-Jun-14
08-Jun-14
10-Jun-14
19-Jul-13
20-Jul-13
04-Aug-13
22-Sep-13
23-Sep-13
25-Sep-13
26-Sep-13
27-Sep-13
28-Sep-13
29-Sep-13
30-Sep-13

Apron Conveyor
Apron Conveyor
ID Fan
ID Fan
RPC Breaker
Coal Mill Intel damper
Cooler Grates
Kiln Feed B/E
PC Coal Schenck
PC Coal Schenck
Raw mill EP Fan
Primary Air Fan
Air Slide Fan
'Kiln Feed B/E
'Kiln Feed B/E
Clinker Apron Conveyor
Slide Gate
GCT Analyzer
Main Schenck
Main Schenck
Main Schenck
Kiln Feed Gate # 2
Main Schenck
Main Schenck
auxiliary&its lubrication group
auxiliary&its lubrication group
auxiliary&its lubrication group
auxiliary&its lubrication group
auxiliary&its lubrication group
Main Coal Schenck
Main Coal Schenck
Main Coal Schenck
Main Coal Schenck
Feed Schenck
Raw mill two
Raw mill two
Raw mill two
Raw mill two
Raw mill two
Raw mill two
Raw mill two
Raw mill two
Raw mill two
Raw mill two
Raw mill two
Raw mill two
Raw mill two
Kiln feed blower
Cooler EP Screw Coneyor
ID Fan
Kiln feed blower
ID Fan
Bucket Elevator

4T1.AY01
4T1.AY01
4G1.FN01
4G1.FN01

Kiln Feed Rotary


Kiln Feed Rotary

4C1.RF01.XFC02
4C1.RF01.XFC02

Rotary feeder

4C1.RF02.DRV01

Kiln feed B/E


ID Fan
Kiln feed B/E

4C1BE01
4G1.FN01.XFC01
4C1.BE01

Main Coal Schenck


PC coal schenck
PC coal schenck

CW2.DC01.HZG01

00:25
07:20
00:30
00:52
12:30
23:25
20:55
06:15
15:00
10:35
08:30
06:20
09:48
10:55
21:44
02:35
20:30
12:45
11:35
06:20
07:30
15:30
23:40
18:35
15:50
20:50
04:45
05:37
06:00
06:00
23:48
06:10
19:05
22:25
06:00
06:00
06:00
06:00
06:00
06:00
06:00
06:00
06:00
06:00
06:00
06:00
06:00
19:05
22:10
05:10
16:50
06:26
07:21
14:35
22:50
06:00
11:30
12:53
09:20
06:15
06:30
08:35
12:50
18:02
11:33
03:45
16:25
20:15
09:45
03:20
19:45
06:00
15:10
06:00
06:00
06:00
06:00
06:00
06:00
06:00

01:00
07:35
00:40
01:46
13:10
01:37
03:00
09:00
15:18
11:30
12:00
10:50
11:05
11:20
00:25
03:20
21:15
13:20
17:40
06:30
13:45
17:00
03:40
20:15
16:15
22:10
05:22
06:00
19:00
09:25
01:48
09:58
02:12
00:15
06:00
06:00
06:00
06:00
06:00
06:00
06:00
06:00
06:00
06:00
06:00
06:00
20:00
22:10
01:10
05:32
17:30
07:40
07:33
15:15
06:00
18:25
12:50
13:15
12:00
06:25
08:13
10:28
13:05
19:20
12:25
04:36
19:00
22:00
10:55
03:38
20:40
07:20
06:00
06:00
06:00
06:00
06:00
06:00
06:00
06:00

0.58
0.25
0.17
0.90
0.67
2.20
6.08
2.75
0.30
0.92
3.50
4.50
1.28
0.42
2.68
0.75
0.75
0.58
6.08
0.17
6.25
1.50
4.00
1.67
0.42
1.33
0.62
0.38
13.00
3.42
2.00
3.80
7.12
1.83
24.00
24.00
24.00
24.00
24.00
24.00
24.00
24.00
24.00
24.00
24.00
24.00
14.00
3.08
3.00
0.37
0.67
1.23
0.20
0.67
7.17
12.42
1.33
0.37
2.67
0.17
1.72
1.88
0.25
1.30
0.87
0.85
2.58
1.75
1.17
0.30
0.92
1.33
14.83
24.00
24.00
24.00
24.00
24.00
24.00
24.00

Calciner Schenck

CR1SF04
4C1.BE01

4K1.BU01
4C1.TC02.FNJ01
4C1.BE01
4C1.BE01
4T1.AY01.DRV01
4C1FG02.FGJ01
4G1.GA04
CW2DC01HZG01
CW2DC01HZG01
CW2DC01HZG01
CW2DC01HZG01
CW2DC01HZG01
N24-421.XMF55
N24-421.XMF55
N24-421.XMF55
N24-421.XMF55
N24-421.XMF55
CW2DC01HZG01
CW2DC01HZG01
CW2DC01HZG01
CW2DC01HZG01
4C1.CD01
3F1.RM01
3F1.RM02
3F1.RM03
3F1.RM04
3F1.RM05
3F1.RM06
3F1.RM07
3F1.RM08
3F1.RM09
3F1.RM10
3F1.RM11
3F1.RM12
3F1.RM13
3K1.RB01
4S1.SC01
4G1.FN01
3K1.RB03
4G1.FN02
4C1.BE01

01-Oct-13
02-Oct-13
03-Oct-13
04-Oct-13
05-Oct-13
07-Oct-13
10-Oct-13
11-Oct-13 Kiln feed Bucket Elevator
18-Nov-13 Kiln Feed Gate
17-Jan-14
28-Mar-14
05-Apr-14
17-Apr-14
23-Apr-14 SEW Drive Rotary Feeder
23-Apr-14
06-May-14 ID Fan # 2
15-May-14 Kiln Feed Bucket Elevator
18-Jun-14 Main Burner
13-May-14
25-Jul-13
15-Aug-13
18-Aug-13
29-Aug-13
08-Sep-13
19-Sep-13
29-Nov-13
09-Jan-14
28-Feb-14
01-Mar-14
10-Mar-14
29-Mar-14
31-Mar-14
29-Apr-14
10-May-14
16-May-14
29-May-14
30-May-14
06-Jun-14
19-Jun-14
13-Jul-13
14-Jul-13
09-Oct-13 Cooler Grate # 1
25-Feb-14
26-Feb-14
10-Apr-14 ID Fans
05-May-14 MB & PC schencks
16-Jun-14
17-Jun-14
Kiln Stoppage Time:
Total Stoppage Time:
Print Date:

4C1.BE01
4C1.DD01.JST01

4C1.RF01.XFC01
4G1.FN02
4C1.BE01

06:00
06:00
06:00
06:00
06:00
06:00
19:40
01:10
11:30
03:45
08:00
07:00
09:20
16:25
18:30
17:35
11:25
15:05
20:15
09:25
10:45
17:06
01:50
09:10
12:30
11:40
14:00
16:03
13:58
19:10
12:00
14:00
12:25
23:15
11:55
22:12
16:01
18:30
21:05
20:00
06:00
04:10
06:00
06:00
03:00
14:25
10:30
06:00

09-Jul-2014

06:00
06:00
06:00
06:00
06:00
11:20
20:00
04:10
15:58
06:00
16:20
10:10
09:30
18:01
20:00
17:45
11:50
15:25
20:45
10:26
14:30
17:51
02:40
09:20
13:20
12:30
15:00
19:38
15:37
21:31
13:27
14:55
12:45
23:35
12:55
00:33
17:00
20:05
21:20
06:00
00:10
04:30
06:00
02:19
03:05
15:40
06:00
00:26

24.00
24.00
24.00
24.00
24.00
5.33
0.33
3.00
4.47
2.25
8.33
3.17
0.17
1.60
1.50
0.17
0.42
0.33
0.50
1.02
3.75
0.75
0.83
0.17
0.83
0.83
1.00
3.58
1.65
2.35
1.45
0.92
0.33
0.33
1.00
2.35
0.98
1.58
0.25
10.00
18.17
0.33
24.00
20.32
0.08
1.25
19.50
18.43
2,122.33
2,122.33

Reason

Department

Update

Planned Stoppage.
Break down
Planned Stoppage.
Break down
Planned Stoppage.
Break down
Planned Stoppage.
Break down
Planned Stoppage.
Break down
Planned Stoppage.
Break down
Planned Stoppage.
Break down
Planned Stoppage.
Break down
Planned Stoppage.
Break down
Planned Stoppage.
Break down
Planned Stoppage.
Break down
Planned Stoppage.
Break down
Planned Stoppage.
Break down
Planned Stoppage.
Break down
Planned Stoppage.
Break down
Planned Stoppage.
Break down
Planned Stoppage.
Break down
Planned Stoppage.
Break down
Planned Stoppage.
Break down
Planned Stoppage.
Break down
Planned Stoppage.
Break down
Planned Stoppage.
Break down
Planned Stoppage.
Break down
Planned Stoppage.
Break down
Planned Stoppage.
Break down
Planned Stoppage.
Break down
Planned Stoppage.
Break down
Planned Stoppage.
Break down
Planned Stoppage.
Break down
Planned Stoppage.
Break down
Planned Stoppage.
Break down
Planned Stoppage.
Break down
Planned Stoppage.
Break down
Planned Stoppage.
Break down
Planned Stoppage.
Break down
Planned Stoppage.
Break down
Planned Stoppage.
Break down
Planned Stoppage.
Break down
Planned Stoppage.
Break down
Planned Stoppage.
Break down
Kiln stopped due to Raw Mill internal inspection of cracked Table Segment.
Break down
Kiln stopped due to Raw Mill internal inspection of cracked Table Segment.
Break down
Kiln stopped due to Raw Mill internal inspection of cracked Table Segment.
Break down
Kiln stopped due to Raw Mill internal inspection of cracked Table Segment.
Break down
Kiln stopped due to Raw Mill internal inspection of cracked Table Segment.
Break down
Planned Stoppage.
Break down
Planned Stoppage.
Break down
Planned Stoppage.
Break down
Planned Stoppage.
Break down
Planned Stoppage.
Break down
Planned Stoppage.
Break down
PC Schenk was not running physically, on inspection its rotor motor connection found rever Electrical
ID Fan "4G1.FN02" tripped due to "Not Available" alarm, its module replaced.
Electrical
Both coal schencks tripped due to "Controller Off" alarm.
Electrical
Both coal schencks tripped due to "Controller Off" alarm, Module replaced by Elect.
Electrical
ID Fan #. 1 "4G1FN01" tripped due to "DC over voltage alarm".
Electrical
TAD Sealing air fan "4G1TD01FNJ01" tripped due to its "thermal load high" alarm, on ins Electrical
Kiln feed tripped due to "Power fault alarm" at SEW Drive "4C1.RF01.XFC01".

Electrical

Rotary feeder "4C1.RF02.DRV01" tripped on high load, its module replaced by Elect.

Electrical

Kiln feed tripped due to "Power fault alarm" at SEW Drive "4C1.RF01.XFC01".

Electrical

Kiln Main Drives tripped due to emergency stop at its transformer.

Electrical

It was taking high current on


rotary load. Power fault alarm
is configured on overload.

It was taking high current on


rotary load. Power fault alarm
is configured on overload.
Emergency stop switch was
checked and found ok.. This
type of stoppage should not
belong to any department.

Kiln tripped due to Claciner Coal blower ventilation fan (CW1RB01JST01-M2001) becomesElectrical
Clinker Crusher Hydraulic Roller # 2 tripped due to "Not Ready" alarm, module replaced. Electrical
Clinker Crusher Hydraulic Roller # 2 tripped due to "Not Ready" alarm, stoppage prolong due
Electrical
EP Fan "4E1.FN01.XFC01" tripped due to "Stall Fault alarm".
Electrical
Cooler Fan #4 "4R1.FN04.DRV01" trip due to "Trip Failure alarm".
Electrical
Cooler roller crusher# 1 not ready (module replacement).
Electrical

ID Fan "4G1.FN02" tripped due to "Not Available" alarm.

Electrical

There are two types of


emergencies at ID fan i-e
fundamental and main. By
pressing fundamental
emergency switch it will show
not available alarm in CCR.
This stoppage also should not
belong to any department
because it was observed by
shift engineers that
emergencies were often
pressed by contractor labour
persons

ID Fan "4G1.FN02" tripped due to "Not Available" alarm.

Electrical

Apron Conveyor "4T1.AY01" tripped due to "Local Stop Failure Alarm".


Electrical
Apron Conveyor "4T1.AY01" tripped due to "Local Stop Failure Alarm".
Electrical
ID Fan "4G1.FN01" tripped due to "Fault See Extended Info alarm".
Electrical
ID Fan "4G1.FN01" tripped due to "Fault See Extended Info alarm".
Electrical
RPC Breaker tripped due to which Raw Meal extraction slides power off.
Instrumentation & Control
Fine Coal bins low level (Due to Coal Mill stoppage as Mill Intel damper "CR1SF04" magnetInstrumentation & Control
Cooler Grates tripped due to "24 Voltage Disturbed" alarm, Supply found dead.
Instrumentation & Control
Kiln Feed B/E "4C1.BE01" tripped due to "Speed Switch Alarm", sensor replaced by new oInstrumentation & Control
PC Coal Schenck tripped due to "Contactor Fault" alarm.
Instrumentation & Control
PC Schenck was not running, its bin slide gate open limits stuck.
Instrumentation & Control
Raw mill EP Fan tripped due to "High Vibration" ,sensor found damaged.
Instrumentation & Control
Primary Air Fan "4K1.BU01" run signal missed from failsafe panel.
Instrumentation & Control
Air Slide Fan "4C1.TC02.FNJ01" tripped due "Contactor Fault Alarm".
Instrumentation & Control
Bucket Elevater "4C1.BE01" tripped due to "Speed Switch alarm", false indication.
Instrumentation & Control
Kiln Feed B/E "4C1.BE01" tripped due to "Speed Switch Alarm", sensor replaced by new oInstrumentation & Control
Clinker Apron Conveyor "4T1.AY01.DRV01" tripped due to "Run Failure Alarm"
Instrumentation & Control
"Position Error Alarm" at Slide Gate "4C1FG02.FGJ01"
Instrumentation & Control
Instrument work on GCT Analyzer "4G1.GA04".
Instrumentation & Control
Main Schenck tripped due to "Disocont fault alarm", sensor interchanged with PC Schenck. Instrumentation & Control
Main Schenck tripped due to "Disocont fault" alarm.
Instrumentation & Control
Main Schenck "CW2DC01HZG01"tripped due to "speed min" alarm, sensor interchanged wit
Instrumentation & Control
Kiln feed tripped due to feed fluctuation on both gates, Kiln Feed Gate # 2 card replaced. Instrumentation & Control
Main Coal Schenck "CW2.DC01.HZG01" tripped due to "Speed Minimum" alarm.
Instrumentation & Control
Main Coal Schenck "CW2.DC01.HZG01" tripped due to "Speed Minimum" alarm.
Instrumentation & Control
Kiln feed tripped due to "(N24-421.XMF55)MNSIS M link Field Bus Failure Alarm" due toInstrumentation
w
& Control
Kiln feed tripped due to "(N24-421.XMF55)MNSIS M link Field Bus Failure Alarm" due toInstrumentation
w
& Control
Kiln feed tripped due to "(N24-421.XMF55)MNSIS M link Field Bus Failure Alarm" due toInstrumentation
w
& Control
Kiln feed tripped due to "(N24-421.XMF55)MNSIS M link Field Bus Failure Alarm" due toInstrumentation
w
& Control
Kiln feed tripped due to "(N24-421.XMF55)MNSIS M link Field Bus Failure Alarm" due toInstrumentation
w
& Control
Main Coal Schenck "CW2.DC01.HZG01" tripped due to "Speed Minimum" alarm.
Instrumentation & Control
Main Coal Schenck "CW2.DC01.HZG01" tripped due to "Speed Minimum" alarm.
Instrumentation & Control
Main Coal Schenck "CW2.DC01.HZG01" tripped due to "Speed Minimum" alarm.
Instrumentation & Control
Main Coal Schenck "CW2.DC01.HZG01" tripped due to "Speed Minimum" alarm.
Instrumentation & Control
Feed Schenck "4C1.CD01" tripped due to "Communication Error alarm", stoppage prolongeInstrumentation & Control
Kiln stopped due to Raw mill two table segments cracked.
Mechanical
Kiln stopped due to Raw mill two table segments cracked.
Mechanical
Kiln stopped due to Raw mill two table segments cracked.
Mechanical
Kiln stopped due to Raw mill two table segments cracked.
Mechanical
Kiln stopped due to Raw mill two table segments cracked.
Mechanical
Kiln stopped due to Raw mill two table segments cracked.
Mechanical
Kiln stopped due to Raw mill two table segments cracked.
Mechanical
Kiln stopped due to Raw mill two table segments cracked.
Mechanical
Kiln stopped due to Raw mill two table segments cracked.
Mechanical
Kiln stopped due to Raw mill two table segments cracked.
Mechanical
Kiln stopped due to Raw mill two table segments cracked.
Mechanical
Kiln stopped due to Raw mill two table segments cracked.
Mechanical
Kiln stopped due to Raw mill two table segments cracked.
Mechanical
Kiln feed blower "3K1.RB01" V-Belts damaged.
Mechanical
Cooler EP Screw Coneyor "4S1.SC01" tripped, on inspection its one screw found damaged Mechanical
ID Fan "4G1.FN01" tripped due to high vibration
Mechanical
Kiln feed blower "3K1.RB03" V-Belts damaged.
Mechanical
ID Fan "4G1.FN02" tripped on high vibration, stoppage prolonged due to Mechanical work Mechanical
Bucket Elevator "4C1.BE01" drift switch operated.
Mechanical
Kiln feed tripped due to Pre-heater outlet temperature high during adjustment of manual feedMechanical
Due to Coal Mill stoppage (Fine coal bins low level).
Mechanical
Due to Coal Mill stoppage (Fine coal bins low level).
Mechanical
Kiln Feed Rotary "4C1.RF01.XFC02" tripped due to overload.
Mechanical
Kiln Feed Rotary "4C1.RF01.XFC02" tripped due to overload.
Mechanical
Material spillage from Kiln inlet seal, Mechanical work on inlet jack seal.
Mechanical
Rotary feeder "4C1.RF02.DRV01" tripped on high load.
Mechanical
PC Schenck tripped due to "Disocont Fault" alarm,on inspection, its rotor chain link damag Mechanical
PC Schenck tripped due to "Disocont Fault" alarm,on inspection, its rotor chain link damag Mechanical
Kiln feed B/E "4C1BE01" tripped due to drift switch alarm,adjusted by mech.
Mechanical
ID Fan "4G1.FN01.XFC01" tripped due to high vibration, feed delayed due to coal bin low lMechanical
Kiln feed B/E "4C1.BE01" tripped due to "Speed Switch Alarm", grease done by MechanicaMechanical
Stopped due to preheater top RDF side chute expansion joint damaged
Mechanical
Main Coal Schenck "CW2.DC01.HZG01" tripped due to "Speed Minimum" alarm, Measuring
Mechanical
PC coal schenck tripped on speed minimum alarm, it's measuring wheel pully belt replaced. Mechanical
PC Coal Schenck tripped on "Speed Minimum Alarm".
Mechanical
MB tripped due to "High CO", sudden Load variation (Amperes) in Main Burner Blower. Others
Due to coal mill stoppage.
Others
Calciner Schenck tripped due to "High CO", sudden load variation (Amperes) in Main BurnOthers
Planned Shutdown.
Others
Planned Shutdown.
Others
Planned Shutdown.
Others
Planned Shutdown.
Others
Planned Shutdown.
Others
Planned Shutdown.
Others
Planned Shutdown.
Others
Planned Shutdown.
Others

There are two types of


emergencies at ID fan i-e
fundamental and main. By
pressing fundamental
emergency switch it will show
not available alarm in CCR.
This stoppage also should not
belong to any department
because it was observed by
shift engineers that
emergencies were often
pressed by contractor labour
persons

Planned Shutdown.
Others
Planned Shutdown.
Others
Planned Shutdown.
Others
Planned Shutdown.
Others
Planned Shutdown.
Others
Planned Shutdown.
Others
MB tripped due to "High CO", sudden Load variation (Amperes) in Main Burner Blower. Others
Kiln feed Bucket Elevator "4C1.BE01" tripped due to "Speed Switch Alarm" (heavy rain). DOthers
Kiln Feed Gate "4C1.DD01.JST01" stuck, concrete pieces found.
Others
Due to Raw Mill Stoppage.
Others
Due to coal mill stoppage.
Others
Cooler Dropping Chute chocked, big coating piece found.
Others
MB tripped due to "High CO", sudden Load variation (Amperes) in Main Burner Blower. Others
Kiln feed tripped due to "Power fault alarm" at SEW Drive Rotary Feeder "4C1.RF01.XFC Others
MB tripped due to "High Co", sudden load Variation (Amperes) in Main Burner Blower.
Others
Local stop at ID Fan # 2, "4G1.FN02".
Others
Kiln feed tripped due to Local Stop at Kiln Feed Bucket Elevator "4C1.BE01".
Others
MB tripped due to "High CO", sudden Load variation (Amperes) in Main Burner Blower. Others
Change over From Wartsila to wapda
Power Failure - Power Plant
Wapda Power Failure.
Power Failure - Wapda
Change over from Wartsila to Wapda + Coal Mill & Raw Mill internal inspection.
Power Failure - Wapda
Wapda Power Failure.
Power Failure - Wapda
Wapda Power Failure.
Power Failure - Wapda
WAPDA power fluctuation
Power Failure - Wapda
Wapda Power Failure.
Power Failure - Wapda
Wapda Power Failure.
Power Failure - Wapda
Wapda Power Failure.
Power Failure - Wapda
Wapda Power Failure.
Power Failure - Wapda
Wapda Power Failure.
Power Failure - Wapda
Wapda Power Failure.
Power Failure - Wapda
Power Supply change over from Line-I to Line-II.
Power Failure - Wapda
Power supply change over from WAPDA to Wartsila.
Power Failure - Wapda
WAPDA power fluctuation
Power Failure - Wapda
Wapda power fluctuation.
Power Failure - Wapda
Wapda Power Failure.
Power Failure - Wapda
Wapda Power Failure.
Power Failure - Wapda
WAPDA power fluctuation
Power Failure - Wapda
Wapda Power Failure.
Power Failure - Wapda
WAPDA power fluctuation
Power Failure - Wapda
Kiln preheating
Production
Kiln preheating
Production
Cooler Grate # 1 temperature high.
Production
Kiln preheating
Production
Kiln preheating
Production
ID Fans pressure become high.
Production
MB & PC schencks tripped due to "high CO" alarm at GCT gas analyzer.
Production
Kiln preheating
Production
Kiln preheating
Production