Materia: Manejo Integral de la Produccin

Tema:

Seleccin de Sistemas de Elevacin Artificial

Profesor:

Julio Shiratori

Buenos Aires, Mayo 2013


Escuela de Postgrado Especializacin en Produccin de Petrleo y Gas

Optimization Loops

Reservoir
management
optimization

Slow loop
(months/
years)

Daily
production
optimization

Fast loop
(days)

Real-time
optimization

V. fast loop
(minutes)

Benefit:

Benefit:

Benefit:

Optimized
reservoir
development

Optimized
asset
utilization

Optimized
equipment
utilization

Escuela de Postgrado Especializacin en Produccin de Petrleo y Gas

Value of Real-Time Production Optimization


Power Costs

Repair Frequency

Cost per Barrel


or Mcf

Production

Escuela de Postgrado Especializacin en Produccin de Petrleo y Gas

Chemical Costs

Integrated Solution
Corporate
Management

Field
Operations

Engineeri
ng

Gas\Flowing
Wells
Application
Server

Plunger Lift
Wells
ESP
Wells

Beam
Wells

Producti
on
Facilities

Gas Lift
Wells

Injection
Wells

PCP
Wells

Escuela de Postgrado Especializacin en Produccin de Petrleo y Gas

Test
Facilities

SPE Technical Paper presentado en el:


SPE -ATW Opportunities in Mature Oil Fields:
Technical and Economics Challenges
Section: Integrated Production Optimization

"Selection of Artificial Lift Systems"


Julio Shiratori
Lima, Peru 24th August 2006
Escuela de Postgrado Especializacin en Produccin de Petrleo y Gas

Artificial Lift Trends


Integrated Capabilities,Technologies and Resources
Right Combination of Engineering,

Manufacturing and Application Expertise


Solve Reservoir Production Problems
Technology Mandate to Optimize Reservoir Productivity
Development of Intelligent Well Systems
Automatization, Asset Management

Escuela de Postgrado Especializacin en Produccin de Petrleo y Gas

Tendencias Extraccion Artificial


Integrar Capacidades,Tecnologias y Recursos
Correcta combinacion de: Ingenieria, fabricacion y la

aplicacion por expertos


Solucionar los Problemas de la Produccion del

Reservorio
El mandato de la Tecnologia es Optimizar la Productividad

del Reservorio
Desarrollo de Pozos con Sistemas Inteligentes
Automatization, Gerenciamiento de los Activos
Escuela de Postgrado Especializacin en Produccin de Petrleo y Gas

Production Optimization with


Exceptional Economic Value
Technology-Driven Cost Reductions
Enhanced Recovery of Maturing Field

- Increased Rates
- Increased Ultimate Reservoir Recovery
Integrated Solutions and Technologies

- Eliminates Redundancy and Cost


- Most Effective and Efficient Application of
Technology
- Economic Modeling Availability

Escuela de Postgrado Especializacin en Produccin de Petrleo y Gas

Artificial Lift Systems

Electric
Submersible
Pumping
(ESP)

Plunger
Lift

Reciprocating
Rod Lift

Gas
Lift

Hydraulic
Lift

Escuela de Postgrado Especializacin en Produccin de Petrleo y Gas

Progressing
Cavity
Pumping
(PCP)

Reciprocating Rod
Lift
System Limitations
Sucker Rod
Tubing Anchor/
Catcher

Potential for Tubing and Rod Wear


Sucker Rod
Pump
Assembly

Gas-Oil Ratios
Most Systems Limited to Ability of

Rods to Handle Loads - Volume


Decreases As Depth Increases
Environmental and Aesthetic Concerns

Escuela de Postgrado Especializacin en Produccin de Petrleo y Gas

Motor Control
Vent Box

Produced
Hydrocarbons Out
Production
Tubing

Electric Submersible
Pumping System
Limitations

Pump

Available Electric Power


Limited Adaptability to Major

Flat Cable
Extension
Seal Section

Changes in Reservoir
Difficult to Repair In the Field
Free Gas and/or Abrasives
High Viscosity

Motor

Higher Pulling and repair Costs

Escuela de Postgrado Especializacin en Produccin de Petrleo y Gas

Progressing Cavity Pumping


System Limitations

Vertical
Electric Wellhead
Drive

Casing

Limited Depth Capability


Temperature

Production Tubing

Sensitivity to Produced Fluids

Sucker Rod

Low Volumetric Efficiencies in


Sucker Rod Coupling

High-Gas Environments

Tubing Collar

Stator
Rotor

Potential for Tubing and Rod

Coupling Wear
Requires Constant Fluid Level

above Pump
Tubing Collar

Escuela de Tag
Postgrado
Bar Sub Especializacin en Produccin de Petrleo y Gas

Injection
Gas In

Produced
Hydrocarbons
Out

Side Pocket
Mandrel with
Gas Lift Valve

Gas Lift
System Limitations
Needs High-Pressure Gas Well or

Compressor

Side Pocket
Mandrel with
Gas Lift Valve

One Well Leases May Be

Uneconomical
Side Pocket
Mandrel with
Gas Lift Valve

Completion
Fluid
Single Production
Packer

Fluid Viscosity
Bottom hole Pressure
High Back-Pressure

Escuela de Postgrado Especializacin en Produccin de Petrleo y Gas

Lubricator
Catcher
Solar Panel
Controller
Motor Valve

Orifice Control
Valves

Plunger Lift
System Limitations

Dual T Pad
Plunger

Specific GLRs to Drive System


Low Volume Potential (200 BPD)
Bumper
Spring

Solids
Requires Surveillance to Optimize

Escuela de Postgrado Especializacin en Produccin de Petrleo y Gas

Hydraulic Piston
Lift System
Limitations

Surface Power
Fluid Package

Production
Casing

Solids
Packer Nose

High Pressure
Power Fluid

Bottom Hole
Assembly

Requires Specific Bottom Hole

Assemblies
Medium Volume Potential

(50 - 1000 BPD)


Piston or Jet
Free Pump

Require Service Facilities


Free Gas

Standing Valve

Requires High-Pressure

Surface Line
Escuela de Postgrado Especializacin en Produccin de Petrleo y Gas

Hydraulic Jet Lift


System Limitations

Surface Power
Fluid Package

Production
Casing

Producing Rate Relative to


Packer Nose

High Pressure
Power Fluid

Bottom hole Pressure


Some Require Specific Bottom hole

Bottom Hole
Assembly

Assemblies
Piston or Jet
Free Pump

Lower Horsepower Efficiency


High-Pressure Surface Line

Standing Valve

Requirements

Escuela de Postgrado Especializacin en Produccin de Petrleo y Gas

Production Enhancement
Wellsite Logic and Control
Data gathering,
Data communication, Real-time wellsite control
Intelligent Well Technology
Wireless, non-reciprocating system for
cyclical steam injection well
Cableless Telemetry System (CaTS)
Optical Sensing Systems (downhole)
Integral P/T & Flowmeter
Seismic Systems (permanent)
Asset Management
Well Optimization Software (real-time)
Real-time monitoring
Desktop control
Artificial lift analysis
System design
Escuela de Postgrado Especializacin en Produccin de Petrleo y Gas

Escuela de Postgrado Especializacin en Produccin de Petrleo y Gas

5 Steps to
Artificial Lift Optimization
1.

Project Scope

2.

Elimination Process

3.

Systems Analysis

4.

Final Selection

5.

Follow-Up Analysis

Escuela de Postgrado Especializacin en Produccin de Petrleo y Gas

1.

Selection Process
Project Scope

General Operator Requirements


Data Collection & Confirmation

Well Information
Production & Fluid Information
Desired Production Rate
System Details (Existing Lift System)

Escuela de Postgrado Especializacin en Produccin de Petrleo y Gas

2.

Selection Process
Elimination Process

Easy Eliminations
More Detailed Reviews
Applicable Systems

Escuela de Postgrado Especializacin en Produccin de Petrleo y Gas

2.

Elimination Process
Rod Lift

Progressing
Cavity

Gas Lift

Plunger
Lift

Hydraulic
Piston

Hydraulic
Jet

Electric
Submersible

100 16,000 TVD

2,000 6,000 TVD

5,000 15,000 TVD

8,000 19,000 TVD

7,500 17,000 TVD

5,000 15,000 TVD

1,00015,000 TVD

5 - 5000
BPD

5 - 4,500
BPD

200 - 30,000
BPD

1 - 5 BPD

50 - 4,000
BPD

300 - >15,000
BPD

200 - 30,000
BPD

100 550 F

75-250 F

100 400 F

120 500 F

100 500 F

100 500 F

100 400 F

Corrosion
Handling

Good to
Excellent

Fair

Good to
Excellent

Excellent

Good

Excellent

Good

Gas
Handling

Fair to
Good

Good

Excellent

Excellent

Fair

Good

Poor to
Fair

Solids
Handling

Fair to
Good

Excellent

Good

Poor to
Fair

Poor

Good

Poor
to Fair

Fluid
Gravity

>8 API

<35 API

>15 API

GLR Required 300 SCF/BBL/


1000 Depth

>8 API

>8 API

>10 API

Workover or
Pulling Rig
Gas or
Electric

Workover or
Pulling Rig
Gas or
Electric

Hydraulic or
Wireline
Multicylinder
or Electric

Hydraulic or
Wireline
Multicylinder
or Electric

Workover or
Pulling Rig
Electric
Motor

Limited

Good

Excellent

N/A

Good

Excellent

Excellent

45% - 60%

40% - 70%

10% - 30%

N/A

45% - 55%

10% - 30%

35% - 60%

Operating
Depth
Operating
Volume (Typical)
Operating
Temperature

Servicing
Prime Mover
Offshore
Application
Overall System
Efficiency

Wellhead
Wireline or
Workover Rig Catcher or Wireline
Wells Natural
Compressor
Energy

Escuela de Postgrado Especializacin en Produccin de Petrleo y Gas

2.

Elimination Process

High
Volume
Hydraulic
Jet Pumps,
Electric
Submersible
Pumping
and Gas Lift

Barrels per Day

35,000

30,000

Gas Lift

ESP
25,000

20,000

15,000

Hydraulic
Jet Pump
10,000

16,000

15,000

14,000

13,000

12,000

11,000

10,000

9,000

8,000

7,000

6,000

5,000

4,000

3,000

2,000

1,000

5,000

Lift Depth

Escuela de Postgrado Especializacin en Produccin de Petrleo y Gas

Elimination Process

Lower
Volume
Reciprocating
Hydraulic
Pumps,
PC Pumps,
Rod Pumps &
Plunger Lift

Barrels per Day

2.

4,500

4,000
3,500
3,000

2,500
2,000

Recip. Hydraulic
1,500

Recip. Rod Pump


1,000

PC Pumps
500

Lift Depth

Escuela de Postgrado Especializacin en Produccin de Petrleo y Gas

16,000

15,000

14,000

13,000

12,000

11,000

10,000

9,000

8,000

7,000

6,000

5,000

4,000

3,000

2,000

1,000

Plunger Lift

3.

Selection Process
Systems Analysis
Type Lift

Programs

Reciprocating Rod Lift

Nabla, Rod Star, S Rod, Cs


Beam

PCP

C-Fer

Gas Lift

Pipesim, WellFlo, Prosper

Hydraulic

Pipesim, Prosper, Jet 4.1,


Super H, Pump Evaluation

ESP

Pipesim, Prosper, WellFlo,


SubPump

Escuela de Postgrado Especializacin en Produccin de Petrleo y Gas

4.

Selection Process
Final Selection

Proposal for viable forms of lift


Economic evaluation model

- Capital expenditure
- Operating expenses
- Comprehensive analysis
What equipment is available?

- Customer
- Supplier

Escuela de Postgrado Especializacin en Produccin de Petrleo y Gas

4.

Final Selection

CAPEX / OPEX SUMMARY*


Cost Category

Rod
Lift

PCP

Gas
Lift

Plunger
Lift

Hydr.
Piston

CAPEX
Installation Cost
Energy Cost Per
Month
Failure Frequency
Equipment Repair
$/Failure
Well Service Cost
$/Failure
OPEX
Annual Total $

Escuela de Postgrado Especializacin en Produccin de Petrleo y Gas

Hydr.
Jet

ESP

4.

Final Selection
Economic Analysis INPUT SECTION
Lease operating expenses ________ $ / month / well Fluid disposal costs_________ $ / bbl water
Energy input cost
________ $ / kW-hr, or $ / Mscf, etc

CLIENT INPUT

Oil price _____ $ / bbl; Gas price _____ $ / Mscf;


Oil / Gas Price Increase / Decrease ____ % /
yr;
Inflation Rate _____ % / yr;
Discount Rate for Present Value _______ % / yr;
Reservoir decline rate / type ___________________ % / yr / Exponential / Hyperbolic / Straight Line
Initial Oil Rate _____ BOPD; Initial Water Rate ____ BWPD; Initial Gas Rate ________ Mscf / day;
Well abandonment flow rate ____ BFPD, or Well abandonment Oil flow rate _____ BOPD, or
Well abandonment water cut value _____ %. Well water cut increase rate ____ % / yr,
if not linear, is it exponential or other rate of change _______________________;
Workover cost to pull existing pump _______________ $;
Workover cost to pull existing tubing _______________ $;
Working Interest ________ %;
Net Revenue Interest ____ %;
Severance Tax Rate Oil ___ % - Gas _____ %;
Ad Valorem Tax Rate __________ %;

Escuela de Postgrado Especializacin en Produccin de Petrleo y Gas

4.

Final Selection

Economic Analysis Predicted Performance Data Selection

PREDICTED PERFORMANCE DATA

Failure Frequency of downhole components proposed,

in producer well environment

______ days;

Failure Frequency of surface components proposed , in producer well environment


days;

______

Avg. cost of parts & labor for avg. repair of downhole components in producer environment
$;

______

Avg. cost of parts & labor for avg. repair of surface components in producer environment

______ $;

Avg. downtime to repair / replace downhole parts and return well to producing

______ hrs;

Avg. downtime to repair / replace surface parts and return well to producing

______ hrs;

Equipment cost for full ALS system proposed ( gas lift / hydraulic / rod pump / PCP / ESP )

______ $

Installation cost for full ALS system proposed


Future Workover cost estimates for ALS system proposed

______ $
______ $

Weatherford does not warrant the results of any economic evaluation, the results are dependent on
the data provided by the client and Weatherford has made no attempt to verify the accuracy of this
data.

Escuela de Postgrado Especializacin en Produccin de Petrleo y Gas

Selection Process
5.

Follow-Up Analysis

Did System Meet Expectations?


Continuous Process of Evaluation

and Follow-Up on Failure Rates,


Confirm Costs, etc.

Escuela de Postgrado Especializacin en Produccin de Petrleo y Gas

Production Economics
1.

Factors to consider when choosing


Optimum Lift System

Electricity Availability & Cost $ .00/kwh


Gas Availability / Considerations

Fuel
Gas Lift
Pipeline Access

Pipeline Pressure
Compression Requirements

Escuela de Postgrado Especializacin en Produccin de Petrleo y Gas

Production Economics
1.

Factors to consider when choosing


Optimum Lift System

Operating as Availability / Considerations


Chemicals
Failure Frequency & Cost for Rods, Tubing & Pumps
Salt Water Disposal
Compression / Dehydartation

Pumping Unit Repair & Maintenance


ESP or PCP Failure Cost
Valve Repair & Wireline Cost for Gaslift
Repair & Maintenance Cost for Surface & Subsurface

Components of Hydraulic Lift


Escuela de Postgrado Especializacin en Produccin de Petrleo y Gas

Production Economics
1.

Factors to consider when choosing


Optimum Lift System

Operating as Availability / Considerations


Sand, Scale, H2O, CO2, Oil Gravity, GOR, Wellbore
Deviation, Temperature, Operation Depth, Fluid Volumes
System Efficiencies both Mechanical and Energy
Consumption
Service Rig Availability Mob And Demob
Logistic and Surface Limitations Associated With Inland
Water Fields and Offshore Platforms
Availability of Service and Support
Environmental Considerations
Escuela de Postgrado Especializacin en Produccin de Petrleo y Gas

Production Economics
1.

Commercial Options

Well Testing

Rental
Leasing

Purchase / Exchange
Integrated Solutions

Escuela de Postgrado Especializacin en Produccin de Petrleo y Gas

Production Economics
1.

Commercial Options

Integrated Solutions
Non-traditional Funding Such as Payment from
Incremental Production or Reduced Operating
Expenses
Field Management of Artificial Lift
Turnkey Installations
Performance Based Contracts

Escuela de Postgrado Especializacin en Produccin de Petrleo y Gas

Additional
Information

Escuela de Postgrado Especializacin en Produccin de Petrleo y Gas

Rod Lift System Application


Considerations
Typical Range

Sucker Rod

Operating
Depth

100 - 11,000 TVD

16,000 TVD

Operating
Volume

5 - 1500 BPD

5000 BPD

Operating
Temperature

100 - 350 F

550 F

0 - 20 Landed
Pump

0 - 90 Landed
Pump <15/100
Build Angle

Wellbore
Deviation

Tubing Anchor/
Catcher

Corrosion Handling

Sucker Rod
Pump
Assembly

Good to Excellent
w/ Upgraded Materials

Gas Handling

Fair to Good

Solids Handling

Fair to Good

Fluid Gravity
Servicing
Prime Mover Type
*Special
Analysis
Required

Maximum*

>8 API
Workover or Pulling Rig
Gas or Electric

Offshore Application
System Efficiency

Escuela de Postgrado Especializacin en Produccin de Petrleo y Gas

Limited
45%-60%

Electric Submersible Systems Application


Considerations
Typical Range
Motor Control
Vent Box
Produced
Hydrocarbons Out

Operating
Depth

1,000 - 10,000 TVD

Operating
Volume

200 - 20,000 BPD

30,000 BPD

100 - 275 F

400 F

Operating
Temperature
Production
Tubing

Wellbore
Deviation

10

Corrosion Handling

Seal Section

Good

Gas Handling

Poor to Fair

Solids Handling

Poor to Fair

Fluid Gravity

Servicing
Prime Mover Type
Motor
*Special
Analysis
Required

15,000 TVD

0 - 90 Pump
Placement <10 Build
Angle

Pump

Flat Cable
Extension

Maximum*

>10 API

Workover or Pulling Rig


Electric Motor

Offshore Application

Excellent

System Efficiency

35%-60%

Escuela de Postgrado Especializacin en Produccin de Petrleo y Gas

Progressing Cavity System Application


Considerations
Typical Range
Operating
Depth

2,000 --4,500 TVD

Operating
Volume

Vertical
Electric Wellhead
Drive

4,500 BPD

75 -150 F

250 F

N/A

0 - 90 Landed
Pump <15/100
Build Angle

Casing

Wellbore
Deviation

Production Tubing

Corrosion Handling

Fair

Gas Handling

Sucker Rod Coupling

6,000 TVD

5 - 2,200 BPD

Operating
Temperature

Sucker Rod

Maximum*

Good

Solids Handling

Excellent

Fluid Gravity

<35 API

Tubing Collar

Servicing

Stator
Rotor

*Special
Analysis
Required

Workover or Pulling Rig

Prime Mover Type

Gas or Electric

Offshore Application

Good (ES/PCP)

System Efficiency

Tubing Collar

Escuela de Postgrado
Especializacin en Produccin de Petrleo y Gas
Tag Bar Sub

40%-70%

Gas Lift System Application


Considerations
Injection
Gas In

Produced
Hydrocarbons
Out

Typical Range

Maximum*

Operating
Depth

5,000 -10,000 TVD

15,000 TVD

Operating
Volume

100 - 10,000 BPD

30,000 BPD

100 - 250 F

400 F

0- 50

70
Short to
Medium
Radius

Operating
Temperature
Wellbore
Deviation

Side Pocket
Mandrel with
Gas Lift Valve

Corrosion Handling

Side Pocket
Mandrel with
Gas Lift Valve

Gas Handling

Excellent

Solids Handling

Side Pocket
Mandrel with
Gas Lift Valve

Fluid Gravity
Servicing

Single
Production
Packer

Good to Excellent with


Upgraded Materials

Completion
Fluid

Good

Best in >15 API


Wireline or Workover Rig

Prime Mover Type


*Special
Analysis
Required

Compressor

Offshore Application

Excellent

System Efficiency

10% - 30%

Escuela de Postgrado Especializacin en Produccin de Petrleo y Gas

Plunger Lift System Application


Considerations
Lubricator
Catcher
Solar Panel
Controller
Motor Valve

Orifice
Control
Valves

Typical Range

Maximum*

Operating
Depth

8,000 TVD

19,000 TVD

Operating
Volume

1-5 BPD

200 BPD

120 F

500 F

N/A

80

Operating
Temperature
Dual T Pad
Plunger

Bumper
Spring

Wellbore
Deviation
Corrosion Handling

Excellent

Gas Handling

Excellent

Solids Handling

Poor to Fair

GLR Required

300 SCF/BBL/1000 Depth

Servicing

Wellhead Catcher or Wireline

Prime Mover Type


Offshore Application

Wells Natural Energy


N/A at this time

System Efficiency

Escuela de Postgrado Especializacin en Produccin de Petrleo y Gas

N/A

Hydraulic Piston Lift Application


Considerations
Typical Range

Surface Power
Fluid Package

Production
Casing

Packer Nose

Maximum*

Operating
Depth

7,500 - 10,000 TVD

17,000 TVD

Operating
Volume

50 - 500 BPD

4,000 BPD

Operating
Temperature

100 - 250 F

500 F

0 - 20
Landed Pump

0 - 90 Pump
Placement <15/100
Build Angle

Wellbore
Deviation
High Pressure
Power Fluid

Corrosion Handling

Bottom Hole
Assembly

Piston or Jet
Free Pump

Good

Gas Handling

Fair

Solids Handling

Poor

Fluid Gravity
Servicing
Prime Mover Type

Standing Valve
*Special
Analysis
Required

>8 API
Hydraulic or Wireline
Multi-Cylinder or Electric

Offshore Application
System Efficiency

Escuela de Postgrado Especializacin en Produccin de Petrleo y Gas

Good
40%-50%

Hydraulic Jet Lift Application


Considerations
Typical Range

Surface Power
Fluid Package

Production
Casing

Packer Nose

Operating
Depth

5,000 - 10,000 TVD

15,000 TVD

Operating
Volume

300 - 1,000 BPD

>15,000 BPD

Operating
Temperature

100 - 250 F

500 F

Wellbore
Deviation

0 - 20
Hole Angle

0 - 90 Pump
Placement <24/100
Build Angle

High Pressure
Power Fluid

Corrosion Handling

Bottom Hole
Assembly

Piston or Jet
Free Pump

Excellent

Gas Handling

Good

Solids Handling

Good

Fluid Gravity
Servicing
Prime Mover Type

Standing Valve
*Special
Analysis
Required

Maximum*

>8 API
Hydraulic or Wireline
Multi-Cylinder or Electric

Offshore Application

Excellent

System Efficiency

10%-30%

Escuela de Postgrado Especializacin en Produccin de Petrleo y Gas

También podría gustarte