MAURITIUS
constructed Phase 1 of the Port Louis Ring Road during the Defects Liability Period.
The Contract for the construction of Phase 1 of the Port Louis Ring Road was
awarded to Joint Venture Rehm Grinaker Colas in November 2009 for a
Contract Amount of Rs 1,159,766,870.57. The Employer is the Road
Development Authority of Mauritius. Arab Consulting Engineers Moharram
Bakhoum Egypt (ACE) was appointed for the review of design and supervision
of the Port Louis Ring Road- Lot 1 from Montebello to Guibies. The Form of
Contract used is the FIDIC Red Book.
The project was completed in January 2013 with a construction period of 36
months including approved extension of time.
The works were practically completed on 31 January 2013 with a defects liability
period of one year.
1
The road goes through Guibies Valley over a length of about 700m long. The
construction in this area consists of very high fill varying from 0m to 20m.
Within this section of 700m where there is a reinforced earth structure designed by
the Contractor, part of the road has collapsed over a length of about 75m (see
photographs at the end). In January 2014, ACE effected site visits with the contractor
and noted early signs of distresses along the stretch of the road. The reinforced earth
wall area affected is about 2000 m2 representing about 1.5% of the total such
structure constructed elsewhere in the project. The contractor has submitted their
findings on the causes of the collapse and proposed remedial actions to ACE on July
2014. ACE has submitted a report on the causes of the collapse .
4
of reconstruction;
Propose additional or alternative measures, if so required, in consultation
with the Consultant or otherwise.
(b)
(c)
necessary;
(d) Assist the Ministry in advising Government on the suitability of the design and
method of reconstruction proposed by the Contractor and approved by the
Engineer;
(e) Submission of an inception report within 7 days after the commencement of
the assignment;
(f) Submission of preliminary report within 14 days after the commencement of
the assignment;
(g) Submission of a final report at the end of the assignment.
The services of the consultants are expected to be completed within thirty (30)
days from the effective date of the commencement of the contract .
2
10 Expressions of Interest, together with the dully filled in Application Forms, in original
and 2 copies in a sealed envelope must be addressed to :
The Supervising Officer,
Ministry of Public Infrastructure, NDU, Land Transport and Shipping,
Public Infrastructure Division,
2nd Floor, Ex DWC Site
Quay Street
Port Louis,
Mauritius
and deposited in the Tender Box situated
2nd Floor, Ex DWC Site
Quay Street
Port Louis,
Mauritius.
up to 13.00 hrs (local time) on Wednesday 21 January 2015 at latest.
3
11
The Expression of Interest will be opened on the same day at13.15 hours (local time)
in the Conference Room Ministry of Public Infrastructure, NDU, Land Transport
and Shipping in the presence of Applicants/Applicants representatives who choose
to attend.
8 December 2014
FORM F-1
FORMAT OF CURRICULUM VITAE (CV) FOR CONSULTANT
Name of Consultant:__________________________________________
Address of Consultant:________________________________________
Telephone__________________________________________________
Fax _______________________________________________________
Email_____________
Profession:__________________________________________________
Date of Birth:________________________________________________
Nationality:_________________________________________________
Membership in Professional bodies:______________________________
Key Qualifications:
[Give an outline of experience and training most pertinent to tasks on assignment. Describe
degree of responsibility held on relevant previous assignments and give dates and locations.
Use about half a page.]
Education:
4
FORM F- 2
ASSIGNMENTS OF SIMILAR NATURE SUCCESSFULLY COMPLETED (during
the last 5 years)
1. Outline of recent experience on assignments of similar nature:
Sl.No
Name of
assignment
Name
of
Project
Owner or
Sponsoring
agency
Cost of
Project
Date of
Commencement
Date of
Completion
Was
assignment
satisfactorily
completed
Note: Please attach certificates from the employer by way of documentary proof. (Issued by the Officer of rank
not below that of Divisional Manager or equivalent.)
Date: Day/Month/Year
[Signature of Consultant]
Full name of Consultant:______________________________________