Documentos de Académico
Documentos de Profesional
Documentos de Cultura
GUIDE:
SANTOSH AULUCK
BASHAUBI DAS GUPTA
STUDIO CO-ORDINATOR
M.L. BAHRI
RAILWAY LINE
From :
karkardooma
Anand vihar
kaushambi
Kashmiri gate
35 min (11 km)
Preet vihar
Nirman vihar
PRIVATE
VEHICLE
30
BUSES,
60
ANALYSIS
OTHER
10
READING
overview
Facilities
Drinking water taps and coolers
Separate toilet facilities of Ladies
and Gents
First Aid facilities for 24 hours
Police Post, Bank and Post Office
Sitting chairs lights and fans
facility on every platform with the
automatic generate system.
Cloak
Room, Porter, PCO/STD/ISD, Parking
and Taxi Scooter Tonga Stand.
Cabins for distribution of tickets.
Office Accommodation to the
transporters
Public Addresses System
Shops/counters/trolleys have
been allotted for all general items
such as
tee, juice, fruits, eatables, Newspapers
, magazines etc.
FUTURE PROSPECTS
In the proposed plans for Anand Vihar transit hub the main spine
which connects all three together is foot over bridge.
The shown capacity at various points is as follows
METRO ENTRY/EXIT
1 : 2000 people approx. per hour
2: 2000 people approx. per hour
MAIN ENTRY/EXIT
3400 person approx. per hour
I.S.B.T TO METRO /RAILWAY
3000 people approx. per hour
ISBT TO RAILWAY
3500 people approx. per hour
ROADWAYS
Delhi Transport Corporation (DTC) operates the world's largest fleet of CNG-powered buses.
FUTURE REQUIREMENT ?
There is a requirement for 11,000
public transport buses in Delhi
and, as per an agreement between
DTC and DIMTS, both are mandated
to run 5,500 buses each in the city.
While DTC currently operates
around 5,000 buses, DIMTS has only
1,157 cluster buses, or 4,343 less
than the required 5,500 as per the
commitment.
READING:
ISSUES: ANALYSIS
Bus movement
Bus stop
Anand vihar
railway terminal
EXIT
The shade created by metro track over the bus
stop on gazipur road, creates a comfortable hub
for people on the divider hence,the majority of
people go there and wait for buses.
UPRSTC
bus stand
Pacific mall
ENTRY
Anand vihar I.S.B.T.
buses - movement
180
160
140
120
100
80
60
40
20
0
Tractor
0%
Truck
2%
Slow Vehicles
18%
Two Wheeler
25%
Bus
6%
Auto
12%
TO DILSHAD GARDEN
TO PATPARGANJ
Car/Jeep
37%
Taxi
0%
Origin-Destination Count by Mode
( FOR 15 min Duration) At 12:00 pm
1
STUDY AREA :
ANAD VIHAR JUNCTION
FROM
FROM
FROM
TO
TO
TO
DILSHAD IP EXTENTION GHAZIABAD GHAZIABAD DILSHAD IP EXTENTION
GARDEN
GARDEN
BUSES
19
20
15
10
13
11
4 WHEELERS
66
160
110
35
52
40
2 WHEELERS
61
110
140
35
71
41
AUTORICKSHAWS
32
55
30
45
46
48
RICKSHAWS / CYCLES
20
25
40
11
26
TRUCKS
11
10
TEMPOS
10
10
present situation
PEAK HOUR
PEAK HOUR
METRO
RAILWAYS
ANAND VIHAR METRO STATION
ADMINISTRATIVE CONTROL : DELHI METRO
RAIL CORPORATION
BRANCH LINE : BLUE
UNDER PHASE III, ANAND VIHAR WILL
BECOME AN INTERCHANGE STATION WITH
THE INNER RING ROAD LINE. FROM
HERE, PASSENGERS WILL FIND EASIER
CONNECTION TO OTHER LINES AS WELL AS
PLACES SUCH AS YAMUNA VIHAR AND
MUKUNDPUR WHICH CURRENTLY DO NOT
HAVE METRO ACCESS.
ANALYSIS
Phase 2 Development
number of platforms will be increased to 7 in
total
terminal will have a capacity to handle over 3
lakh passengers and as many as 270 trains daily.
linking of this terminal with the original
Anand Vihar station.
Anand vihar
railway terminal
EXIT
At present it is the only Catchment
area which provides entry/exit to
the people coming from halt
line, terminal and metro
2
Free space near metro used as parking of vehicles
PACIFIC MALL
ENTRY
Anand vihar I.S.B.T.
3
rail and metro movement
Busy routes
Less busy routes
Least busy routes
1
Multiple functions at bay area
Like shops,ticketing,waiting etc leads the space to
excessive crowd
2
Pedestrian count at anand vihar
junction (12 hr) source : uttipec
2010
2117
1904
2142
3
pedestrian movement
Auto stand
Rickshaw stand
Auto movement
Rickshaw movement
1
2
2
1
5
4
4
stands
overall proposal
G
PLANS SHOWING CONNECTIONS AT
VARIOUS LEVELS
-1
-2
overall proposal
October 2006
Clearance of the site for construction of Anand
Vihar Terminal Phase 1.
January 2008
Anand Vihar
Metro station
and Railway
Terminals
Phase 1
construction
started.
Present (2014)
January 2010
Development
Anand Vihar Railway Station Phase-II
is under construction which will be
having 7 number of platforms
including the existing 3 platforms in
the Phase-I of the project. Anand
Vihar Halt (ANVR) will also be
integrated with ANVT according to
the proposed design.
Daily time cycle has a major interchange differences during morning and evening due to office people and college
students. Rest of the day the activity of the people is continuous and uniform throughout the whole day
MORNING 6AM 11AM
DECREASING INTENSITY OF PEOPLE
FROM ANVR
TO
METRO, BUS
ETC.
FROM AUTO
TO
METRO, BUS
ETC.
FROM METRO
TO BUS, AUTO
ETC.
FROM BUS
TO METRO.
TO ANVT
(COLLECTIVELY
FROM ALL) .
huge number of
passengers
interchange from
local train to either
mode of transport i.e.
bus or metro
because people
towards Delhi from
Ghaziabad to go to
office/college.
other main mode of
transportation from
Ghaziabad side to
Delhi is sharing auto.
then people are
usually disperse to
buses and metros.
FROM
METRO TO
BUS ETC.
FROM BUS
TO
METRO, ETC.
FROM AUTO
TO
METRO, BUS
ETC.
TO ANVT
(COLLECTIVELY
FROM ALL) .
TO ANVR
FROM
METRO, BUS
ETC.
TO AUTO
FROM
METRO, BUS
ETC.
FROM METRO
TO AUTO, BUS
ETC.
TO METRO
FROM
AUTO, BUS
ETC.
TO ANVT
FROM
METRO, BUS
ETC.
people interchange
from metro/bus/railway
terminal to local train to
get back their home.
interchange between
other modes is uniform.
TO METRO
FROM
AUTO, BUS
ETC.
TO ISBT
FROM
AUTO, METR
O ETC.
FROM AUTO
TO
METRO, BUS
ETC.
TO ANVT
FROM
METRO, BUS
ETC.
CONTINUITY / CHANGES
With daily changing time cycle, there is still a continuity in everyday routine
Bus