Está en la página 1de 79

Estudio de Pre Inversin a Nivel de Perfil del Proyecto:

ADECUACION DEL PROYECTO ORIGINALCHINECAS AL ESQUEMA REESTRUCTURADO.

HIDROLOGIA Y CLIMATOLOGIA

Estudio de Pre Inversin a Nivel de Perfil del Proyecto:


ADECUACION DEL PROYECTO ORIGINALCHINECAS AL ESQUEMA REESTRUCTURADO.

Contenido

Introduccin........................................................................................................................3

1.1 Generalidades

1.2 AlcancedelEstudio

Climatologa........................................................................................................................4
2.1.

Informacin............................................................................................................4

2.2.

AnlisisdelaInformacinMeteorolgica.......................................................12

2.3 Apreciacionesycomentarios
2.4.

16

ClasificacindelClima.......................................................................................17

2.4.1 Criteriosdeclasificacin.....................................................................................18
2.4.2 ClasificacinclimticadelasCuencas.............................................................19
3

Hidrologa..........................................................................................................................22

3.1 Hidrografa

22

3.1.1 CuencadelroSanta............................................................................................22
3.1.2 CuencadelroNepea........................................................................................23
3.1.3 CuencadelroCasmaSechn.............................................................................24
3.2 Anlisisdedescargasmediasmensuales

25

3.2.1 Anlisisdeconsistencia......................................................................................27
3.2.2 Anlisisgrfico.....................................................................................................27
3.2.3 AnlisisdeDobleMasa.......................................................................................27
3.2.4 Anlisisestadstico..............................................................................................30
3.2.5 Completadoyextensindelainformacin.....................................................30
3.3 Anlisisdepersistencia

31

3.4 AnlisisdemximasavenidasdelroSanta

34

3.4.1 Anlisisdeconsistenciadeloscaudalesmximos.........................................35
3.4.2 Caudalesmximosinstantneos.......................................................................37
3.4.3 AnlisisProbabilstico.........................................................................................38
3.5 MximasavenidasenlaquebradadeCascajal

39

3.5.1 Precipitaciones.....................................................................................................39
3.5.2 Escorrentas...........................................................................................................42

ANEXO: HIDROLOGIA Y CLIMATOLOGIA

Pg. 2

Estudio de Pre Inversin a Nivel de Perfil del Proyecto:


ADECUACION DEL PROYECTO ORIGINALCHINECAS AL ESQUEMA REESTRUCTURADO.

1 Introduccin
1.1 Generalidades
El presente informe es el resultado de la revisin y el anlisis de la informacin referente
a la situacin climtica e hidrolgica de la zona de estudio comprendida desde la
bocatoma del Proyecto Chavimochic en la cota 412 msnm en la margen izquierda en el ro
Santa siguiendo aguas abajo por la margen izquierda de este ro y continuando
longitudinalmente aguas abajo por el Canal Chinecas en sus mrgenes izquierda y
derecha hasta los valles de Sechn y Casma pasando por el valle de Nepea aguas
debajo de la zona de San Jacinto.

1.2 Alcance del Estudio


El alcance del estudio comprende la evaluacin a de diagnstico de los diferentes
parmetros hidrometeorolgicos de las estaciones en el mbito de la zona de estudio y
zonas vecinas, en lo referente a climatologa comprende:
(1)

Visita de las Estaciones y estado de las Estaciones Meteorolgicas

(2)

El anlisis de la informacin de temperaturas, evapotranspiracin potencial,


precipitaciones, radiacin solar, humedad relativa y velocidad de viento

(3)

Clasificacin de climas utilizando como base el sistema de clasificacin del Dr.


Warren Thornthwaite.

(4)

Evaluacin de los climas identificados desde el punto de vista de su implicancia


en el desarrollo agropecuario

Para el caso de hidrologa comprende la identificacin y cuantificacin de los recursos


hdricos superficiales con que cuenta el Proyecto Chinecas y comprende las tareas
siguientes:
(1)

Descripcin hidrogrfica de las cuencas,

(2)

Recopilacin de la informacin hidrometeorolgica de los estudios anteriores, as


como la del Senamhi y la de la Administracin Tcnica del Distrito de Riego
(hoy desaparecida).

(3)

Visita a las estaciones de los ros Santa, Lacramarca, Nepea, Sechn y Casma
para apreciar su estado actual de conservacin y operacin, as como de los
equipos, validez de la seccin de control, el resultado ser tener un conocimiento
sobre la confiabilidad de los datos y una propuesta de mejora.

(4)

Anlisis de consistencia de precipitaciones y caudales, identificando los posibles


fenmenos de no homogeneidad e inconsistencia de datos que puedan reflejar
saltos y tendencias en las series de tiempo, analizar los histogramas y as como
el de doble masa y estadsticos de las series.

ANEXO: HIDROLOGIA Y CLIMATOLOGIA

Pg. 3

Estudio de Pre Inversin a Nivel de Perfil del Proyecto:


ADECUACION DEL PROYECTO ORIGINALCHINECAS AL ESQUEMA REESTRUCTURADO.

(5)

Rellenos de datos perdidos y extensin de datos de precipitaciones y caudales de


las estaciones estudiadas.

(6)

Evaluacin pluviomtrica e hidromtrica en base a registros histricos


homogneos y consistentes de precipitacin y gastos, se determinar el rgimen
de lluvias y caudales a nivel de las cuencas de los tres rios Santa, Nepea, Casma
y Sechn, elaboracin de planos de isoyetas, curvas de duracion y curvas de
utilizacin y otros .

2 Climatologa
Este diagnstico se ha trabajado con la informacin existente sobre la base utilizada para
el estudio Plan de Gestin de la Oferta de Agua en la Cuenca de Gestin Santa
desarrollado por el Instituto Nacional de Desarrollo - INADE en Octubre del ao 2002,
dentro del Programa Nacional de Gestin el Agua, donde la parte climatolgica contiene
la informacin recopilada y procesada para sus fines de las diferentes estaciones
existentes de las cuencas de los ros Santa Nepea, Casma y Sechn, que estaban operando
a dicha fecha as como la histrica de las estaciones que haban dejado de operar. Para
nuestro caso se ha analizado tal informacin as como la recopilada de estudios anteriores
(Inrena: Demanda de agua para el valle de Casma; PSI: Proyectos de riego tecnificado en
la zona de Casma) y la adquirida en el Senamhi de la estacin de Buenavista en el valle de
Casma, que es la nica que viene operando; las dems estaciones han dejado de operar
ya hace bastante tiempo.
El objetivo de la climatologa, ha sido establecer los parmetros climticos de inters para
el estudio en funcin a informacin meteorolgica disponible; y las ms representativas
corresponde a San Jacinto, La Rinconada y Buena Vista, adems de otras las cuales sirven
para analizar el comportamiento a nivel regional de la zona de estudio. En cuadros
presenta la relacin de estaciones meteorolgicas consideradas as como grficos y mapas
que se han elaborado durante la evaluacin.

2.1.

Informacin

Para los fines del presente estudio las estaciones que se han tomaron para trabajar fueron
principalmente las correspondientes a:
i) En la cuenca del ro Santa, las Estaciones Santa, Rinconada, Corpac y Puerto todas
de tipo Climatolgica Ordinaria (CO);
ii) En la cuenca del ro Nepea, la Estacin San Jacinto de tipo CO y,
iii) En la cuenca del ro Casma, la Estacin de Buenavista del tipo CO.
El Proyecto Especial Chinecas tiene una Estacin en su campamento de Tancay en el valle
de Santa con una estacin automtica; tambin, a manera de conocimiento, fuera de la
zona de estudio se tiene la Estacin de Pariacoto.

ANEXO: HIDROLOGIA Y CLIMATOLOGIA

Pg. 4

Estudio de Pre Inversin a Nivel de Perfil del Proyecto:


ADECUACION DEL PROYECTO ORIGINALCHINECAS AL ESQUEMA REESTRUCTURADO.

Para la interpretacin de demandas, no se consider la informacin de la Estacin Puerto,


debido que esta tiene valores con influencia marina refrescante que pueden hacer variar
la interpretacin para un anlisis agronmico, as como las estaciones de Corpac, Santa y
otras que contaban informacin de muy pocos aos y poco significativa.
Las estaciones pluviomtricas en el rea de la zona de estudio dejaron de operar hace
mucho tiempo y la informacin existente es solo de las estaciones CO antes citadas; la
precipitacin en el rea de la zona de estudio es minima, por las caractersticas climticas
de la costa del Per, debido al efecto de la corriente fra llamada corriente Peruana o de
Humbolt, y la cordillera de los andes que originan una zona desrtica de escasa
pluviosidad a lo largo de toda la costa Peruana. A manera de confirmacin la isoyeta de
precipitacin de los 100 mm est por encima de los 600 msnm; cota que se encuentra muy
por encima de la zona de estudio; la precipitacin que origina la escorrenta en los ros de
estudio, se originan por encima de los 2 000 msnm y en los lmites con la cuenca del ro
Santa.
En este sentido, la informacin que se presenta es la recopilada por el Estudio realizado
por el INADE antes sealado y que prcticamente da un marco referencial claro del
diagnstico actual sobre la situacin climtica, toda vez que no se han presentado
fenmenos extraordinarios en este periodo y podemos inferir que no hay cambios
climticos en este lapso; por lo que, la informacin presentada en el estudio del INADE
tiene vigencia para el presente diagnstico.
En los Cuadros 1 a 4 que siguen, se presenta la informacin correspondiente a los
diferentes parmetros evaluados para los valles involucrados.

ANEXO: HIDROLOGIA Y CLIMATOLOGIA

Pg. 5

Estudio de Pre Inversin a Nivel de Perfil del Proyecto:


ADECUACION DEL PROYECTO ORIGINALCHINECAS AL ESQUEMA REESTRUCTURADO.

Cuadro N 1: Inventario de las Estaciones Meteorolgicas ubicadas en cuencas Santa Lacramarca, Nepea y Casma-Sechn
Nombre

Tipo

Ubicacin geogrfica

Cuenca

Fin

Aos

8 48 36 77 51 00 1386 Ancash Huaylas

Huallanca

1952

2001

49

Regular

Alt

Condicin

Observ.

Hidroelectrica

PTS

Chimbote
(Corpac)

PLU Santa

9 7 48

78 31 12

20

Ancash Chimbote

Buenos
Aires

1961

2001

40

Desierto S / I

Santa

CO

Santa

8 59 00 78 37 00

30

Ancash Santa

Santa

1964

1970

Regular

Paralizada. Paralizada.

La Rinconada

CO

Santa

8 53 30 78 34 00

80

Ancash Santa

Santa

1955

1961

Regular

Paralizada. Paralizada.

Puerto
Chimbote

CO

Lacramarca

9 05 00 78 35 00

Ancash Santa

Chimbote

1954

1960

Regular

Paralizada. Paralizada.

San Jacinto

CO

Nepea

9 9 00

283 Ancash Santa

Nepea

1956

1963

Regular

Paralizada. paralizada

Poctao

CO

Casma

9 32 00 78 03 00

500 Ancash Casma

Yautn

1957

1960

Regular

Paralizada. Paralizada.

419 Ancash Casma

Buena
vista

Buenavista

CO

Santa

Calidad
Global

Inicio

Long

Prov

Codigo
Senamhi

Dist

Lat

Dpto

Casma

78 17 00

9 25 48 78 12 00

1966

2008

34

S/ I

0435/DRE
Desierto Operativa
-04

Operativa

FUENTE: Servicio Nacional de Meteorologa e Hidrologa: Informacin 2008.


Ex ONERN: Inventario, Evaluacin y uso Racional de los Recursos Naturales de la Costa, 1972
Estudio de la Gestin del Agua para la cuenca del Santa, proyecto Especial Chinecas 200

ANEXO: HIDROLOGIA Y CLIMATOLOGIA

Pg. 6

Estudio de Pre Inversin a Nivel de Perfil del Proyecto:


ADECUACION DEL PROYECTO ORIGINALCHINECAS AL ESQUEMA REESTRUCTURADO.

Cuadro N 2: Estaciones meteorolgicas de la zona de Estudio: Cuencas Santa-Lacramarca. Promedios de los periodos evaluados
Elementos
Meteorolgicos
TEMP. PMME
TEMP. PM
TEMP. pmme
PRECIP.TMME
PRECIP.TPM
PRECIP. TMME
HUM.RELAT. PM
EVAP. TMME
EVAP. TPM
EVAP. TMME
TEMP. PMME
TEMP. PM
TEMP.pmme
PRECIP.TMME
PRECIP.TPM
PRECIP.tmme
HUM.RELAT.PMME
Hum.Relat.PM
Hum.Relat.PMME
Horas Sol TMME
Horas Sol PM
Horas Sol PMME

Perodo
de
Registro

Unidad
de
Medida

C
1965-69
mm.
%
1966-69

mm.

mm.
1956-60

ANEXO: HIDROLOGIA Y CLIMATOLOGIA

Horas

Ene

Feb

30.4
23
15.5
0
0
0
80
120.2
96.3
73.4

33.3
23.8
16.5
1.5
0.3
0
79
117.6
88.7
62.9

31.3
24.4
17.1
2.1
0.6
0
91
69
47
297
259
232

32.6
25.7
18.3
1.9
0.4
0
90
70
47
238
209
193

Mar

Abr

May

Jun

Estacin de Santa
33
32.1
30.4
28
24.4
23.2
21.3
19.8
16.6
13.6
12.6
12.2
0
0
0
0
0
0
0
0
0
0
0
0
80
80
81
82
131.4 100.5
93.3
86.9
93.6
71.7
69.8
63.2
75.3
48.3
56.3
46.7
Estacin de la Rinconada
32.5
32.4
30.9
28
26.3
24.8
22.9
21
18.8
17
15.7
15
1.1
0.8
0.3
1.1
0.4
0.2
0.6
0.3
0
0
0
0
93
93
93
93
70
72
74
77
47
48
49
53
275
242
237
267
238
223
198
178
204
206
173
117

Jul

Ago

Sep

Oct

Nov

Dic

24.7
18.7
11.9
0
0
0
83
85.6
57.2
41.9

26.8
18.7
12.4
0
0
0
83
73.8
64.6
41.1

26.4
19.4
13.4
0
0
0
81
93
70.1
36.2

27
19.7
13.6
0
0
0
79
87.7
76.9
49.2

27.9
20.4
13.6
0
0
0
81
85.7
75.1
59.8

30.1
21.6
13.7
0
0
0
81
86.7
82.9
75.7

26.6
20
13.3
4.8
1
0
93
79
59
193
173
132

26
19.4
12.8
4.1
1.2
0
93
77
58
182
146
109

25.3
19.7
14.1
0.4
0.2
0
93
75
54
209
187
166

27.1
20.6
14.4
0
0
0
91
73
51
252
212
173

27
21.1
15.5
0.6
0.1
0
91
72
48
260
231
197

29.3
23
16.7
1
0.2
0
90
69
47
296
255
207

Prom.

Anual

21.2

0.3
81
910.6

22.4

5.2

73

2 509

Pg. 7

Estudio de Pre Inversin a Nivel de Perfil del Proyecto:


ADECUACION DEL PROYECTO ORIGINALCHINECAS AL ESQUEMA REESTRUCTURADO.

Elementos
Meteorolgicos

Perodo
de
Registro

Evap. TMME
Evap.TPM
Evap. TMME
Temp. PMME
Temp. PM
Temp.PMME
Precip.TMME
Precip.TPM
Precip. TMME
Temp. PM
Precip.TMME
Precip.TPM
Precip.TMME
Hum.Relat. PM
Vientos: Direc. Vel.
Temp. PMME
Temp. PM
Temp.pmme
Precip.TMME
Precip.TPM
Precip.tmme
Hum.Relat.PMME

Unidad
de
Medida
mm.

1954-65

1945-69

mm.

1965-69

1962-69

mm

1965-69
1962-69

%
S

1955-58

1955-58

mm

ANEXO: HIDROLOGIA Y CLIMATOLOGIA

Ene

Feb

108
98
84

118
101
84

31.9
24.5
19.5
90.9
32
0.5

32.4
24.7
19.6
69.1
36.6
8.6

23
25
3.1
0
73
31

23.5
48
7.1
0
76
28

25.9
21.4
16.6
6.6
3
1
94

26.6
22.9
17.4
3.4
1.4
0.2
94

Mar

Abr

May

Jun

Jul

114
108
96
87
72
103
98
79
62
56
78
72
51
36
39
Estacin Hidroelctrica
32.2
32.8
33.3
31.9
31.6
24.6
25
24.9
24.3
24.1
20.5
19.9
19
18.6
17.8
89.9
41.9
7.3
1.8
4.3
39
16.6
1.2
0.3
0.2
14.7
0
0
0
0
Estacin de Chimbote Corpac
24
22.4
20.9
19.5
18.5
17
8
0
0
1.6
2.6
1.4
0
0
0.2
0
0
0
0
0
74
77
77
75
76
30
30
25
24
25
Estacin de Puerto Chimbote
26.5
25.9
25.4
24.5
23.6
22.7
21.2
20.8
19.1
18.8
18
16.7
15.6
15.7
15.3
5.7
1.9
3
1.6
14.3
2.9
1
0.9
0.4
3.8
0.8
0
0
0
0
95
92
95
97
94

Ago

Sep

Oct

Nov

Dic

84
58
39

75
62
45

81
71
63

96
81
66

105
95
72

32.9
24.8
19.1
4.8
0.6
0

33.2
25.2
19.4
13
2.8
0

32.1
25
19
44.7
14.1
0

32.7
24.8
19.3
68.4
13.9
0

33.3
24.5
18.5
40.1
17.1
0

18.4
0
0
0
78
25

18.4
0.1
0
0
78
29

19.1
0
0
0
77
28

20.1
3
0.4
0
76
29

21.9
0
0
0
75
30

22.6
17.7
14.8
4.5
2.9
0
94

19.7
17.1
14.8
3.7
2.5
0.1
94

20.8
17.5
14.9
5.8
2.7
0.6
91

21.8
18.4
15.4
0
0
0
90

24.2
22.2
16.3
1.5
0.7
0
92

Prom.

Anual

964

24.7

174.4

20.8
14.8
76
0 a 28
24
20
16
22.2
94

Pg. 8

Estudio de Pre Inversin a Nivel de Perfil del Proyecto:


ADECUACION DEL PROYECTO ORIGINALCHINECAS AL ESQUEMA REESTRUCTURADO.

Elementos
Meteorolgicos
Hum.Relat. PM
Hum.Relat. PMME
Horas Sol. PM
Nub.PMME
Nub.PM
Nub.pmme

Perodo
de
Registro

Unidad
de
Medida

1955-58
1955-57

Horas

1955-58

Ene

Feb

Mar

Abr

May

Jun

Jul

Ago

Sep

Oct

Nov

Dic

Prom.

81
67
199
6
5
4

82
68
173
6
5
5

82
68
187
5
5
4

83
73
162
6
5
4

84
70
155
6
5
4

84
74
98
6
6
6

84
73
92
7
6
5

86
78
96
8
7
6

87
80
107
6
6
6

85
79
143
6
6
5

83
73
195
5
4
4

81
63
213
5
5
4

84
72

Anual

1840
6
5
5

Cuadro N 3: Estaciones meteorolgicas de la zona de Estudio: Cuenca del ro Nepea. Promedios de los periodos evaluados
Elementos
Meteorolgicos

Perodo
de
Registro

Unidad
de
Medida

Ene

Feb

Mar

Abr

31.6

31.7

30.9

29.5

23.9

25

24.4

Temp.PMME

16.1

19.1

Precip.TMME

10.9

May

Jun

Jul

Ago

Sep

Oct

Nov

Dic

Prom.

28.3

24.4

24.4

24.3

25.6

25.9

27

29.5

27.8

22.4

20.6

18.8

18.4

18.2

18.2

19.3

19.6

21.3

20.8

18.5

16.3

14.7

12.7

13.3

13

12.4

12.8

12.6

12.9

14.5

3.5

5.2

5.2

1.3

1.1

0.8

1.3

0.6

4.1

4.2

2.2

1.2

0.1

0.5

0.4

0.2

0.2

0.4

0.8

Anual

Estacin de San Jacinto


Temp. PMME
Temp. PM

Precip.TPM

1956-61

1956-63

Precip.TMME

ANEXO: HIDROLOGIA Y CLIMATOLOGIA

mm

11.2

Pg. 9

Estudio de Pre Inversin a Nivel de Perfil del Proyecto:


ADECUACION DEL PROYECTO ORIGINALCHINECAS AL ESQUEMA REESTRUCTURADO.

Elementos
Meteorolgicos

Perodo
de
Registro

Unidad
de
Medida

Ene

Feb

Mar

Abr

May

Jun

Jul

Ago

Sep

Oct

Nov

Dic

Prom.

91

91

91

90

91

90

90

90

91

90

90

91

91

64

65

67

67

70

71

71

69

68

66

65

65

67

Hum.Relat. PMME

38

38

40

40

47

47

50

47

46

43

40

40

43

Horas Sol TMME

260

215

242

264

253

246

188

198

224

234

288

281

Hum.Relat. PMME
Hum.Relat. PM

Horas Sol PM

218

168

189

221

202

179

455

179

194

228

250

241

177

126

167

189

143

138

96

164

139

220

201

190

Nub.PMME

Evap. TMME

101.4

91

90

75

54

48

42.2

43.9

51

58.5

68.4

84.4

83.7

77.2

80.3

65.9

50.2

38.2

38.2

39.1

44.6

53.9

64.1

77.7

71.2

59

72.1

54.2

48

32.6

31

32.9

35.1

44

60

73.5

1956-61

Horas

Horas Sol PMME


Nub.PMME
Nub.PM

Evap.TPM

octavos

1958-62

Evap.TMME

ANEXO: HIDROLOGIA Y CLIMATOLOGIA

mm

Anual

2424

713.4

Pg. 10

Estudio de Pre Inversin a Nivel de Perfil del Proyecto:


ADECUACION DEL PROYECTO ORIGINALCHINECAS AL ESQUEMA REESTRUCTURADO.

Cuadro N 4: Estaciones meteorolgicas de la zona de Estudio: Cuenca del ro Casma. Promedios de los periodos evaluados
Elementos
Meteorolgicos

Perodo de
Registro

Unidad
de
Medida

Ene

Feb

Mar

Abr

May

Jun

Jul

Ago

Sep

Oct

Nov

Dic

Promedio Total
Anual
Anual

Estacin de Buena Vista


Temp. PM

25

25.9

25.8

24.3

21.8

19.4

18.5

19.1

20

20.5

21.1

23.2

22.1

31.3

32.2

32

30.4

27.7

25.5

24.5

24.8

25.8

26.8

27.8

29.6

28.2

Temp.PMME

18.9

19.6

19

16.6

14.1

12.6

12.4

13.5

13.5

13.9

13.9

15.9

15.3

Evap.TMME

5.9

10.7

0.5

0.1

0.1

1.9

2.8

0.1

0.5

74.3

72.6

72.7

75.9

81.5

81.1

80.8

79.3

77.8

74.5

74.5

88

77.75

octavos

mm

164

154

177

153

115

82.9

81.8

96.1

96.8

112

116

148

Temp PMME

Evap.TPM

1967-2008

1966-69

mm

Evap.tmme
Hum..Relat.PM
Nub.PMME

1967-2008

Horas Sol.TPM

5.3

1496

Estacin Hacienda Poctao


Temp. PMME
Temp. PM

1954-60

Temp.PMME
Hum.Relat.PMME
Hum.Relat.PM

1958-60

Hum.Relat. PMME

ANEXO: HIDROLOGIA Y CLIMATOLOGIA

33.5

35.5

38.8

36.1

33.4

31

30.1

32.4

31.7

31.2

33.9

32.5

33.3

25.2

26.8

27.7

26.2

23.6

21.8

20.8

21.2

21.6

21.8

22.6

23.4

23.6

17.7

19.7

18.9

14.6

13.8

12.3

11.5

10.5

11.2

12.5

12.8

14.7

14.2

93

92

93

95

96

95

97

97

97

97

96

94

95

65

70

62

62

63

63

63

65

64

63

65

64

64

43

42

27

25

26

24

21

22

25

26

28

31

28

Pg. 11

Estudio de Pre Inversin a Nivel de Perfil del Proyecto:


ADECUACION DEL PROYECTO ORIGINALCHINECAS AL ESQUEMA REESTRUCTURADO.

2.2.

Anlisis de la Informacin Meteorolgica

2.2.1. Temperatura
En la cuenca del Santa para la zona de estudio, el mximo oscila entre 26.3 en marzo y
el mnimo en Agosto de 18.4. Para las Cuencas de Nepea oscila entre 25 en Febrero
y 18.2 en Agosto, para la cuenca de Casma-Sechn, oscila 25.9 para el mes de Febrero
y la mnima 18.5 en Julio.
Se puede observar que los diferenciales de temperatura para todas las cuencas son de
casi 10C, informacin para tener en consideracin para la planificacin de los periodos
vegetativos de los cultivos

Figura N 1: Temperatura media mensual. Cuencas Santa, Nepea y Casma

2.2.2. Humedad Relativa


Para la Humedad Relativa, la Cuenca del Santa oscila la mxima entre 69 % y 83 %
para Enero y Agosto respectivamente. Para la Cuenca de Nepea esta oscilacin es
entre 64% y 71% para Enero y Julio , y en Casma-Sechn 80% en Febrero y 94% en
Julio .

ANEXO: HIDROLOGIA Y CLIMATOLOGIA

Pg. 12

Estudio de Pre Inversin a Nivel de Perfil del Proyecto:


ADECUACION DEL PROYECTO ORIGINALCHINECAS AL ESQUEMA REESTRUCTURADO.

Figura N 2: Humedad Relativa, promedio mensual

2.2.3. Evaporacin
La Evaporacin total anual que se tiene para la cuenca del ro Santa es de 964 mmm,
para la cuencas de Nepea y Casma son 713 mm y 1 496 mm respectivamente, las
variaciones a nivel mensual se presentan en el grfico adjunto

Figura N 3: Evaporacin, promedio mensual

2.2.4. Horas de Sol


La informacin sobre Insolacin u Horas de Sol, se tiene para las cuencas de Santa y
Nepea, alcanzando un total anual de 2 509 horas para la zona de la cuenca del Santa
y 2 424 horas en la zona de la cuenca de Nepea, las variaciones mensuales se pueden
apreciar en el grfico adjunto.

ANEXO: HIDROLOGIA Y CLIMATOLOGIA

Pg. 13

Estudio de Pre Inversin a Nivel de Perfil del Proyecto:


ADECUACION DEL PROYECTO ORIGINALCHINECAS AL ESQUEMA REESTRUCTURADO.

Figura N 4: Horas de sol

2.2.5. Precipitacin
La precipitacin en la zona de estudio es muy baja, propia de la zona costera del Per
de escasa precipitacin y la existente es producto de los espordicos periodos del
fenmeno del nio que ocurren, un caso notorio son las precipitaciones que se
presentan en entre Julio y octubre en la estacin del Puerto, pero ste es un fenmeno
local, producto de la cercana al ocano pero sin significado para la agricultura. Se
presenta en el Apndice un mapa tomado del Estudio de gestin del agua del INADE,
donde la isoyeta de precipitacin de 100 mm esta sobre la cota 600 msnm fuera del rea
del presente estudio.

Figura N 5: Precipitacin promedio

ANEXO: HIDROLOGIA Y CLIMATOLOGIA

Pg. 14

Estudio de Pre Inversin a Nivel de Perfil del Proyecto:


ADECUACION DEL PROYECTO ORIGINALCHINECAS AL ESQUEMA REESTRUCTURADO.

2.2.6. Velocidad del Viento


La informacin de Vientos es prcticamente nula, la existente es la que existe en la
estacin Buenavista, lo rescatable de esta informacin es la direccin de viento que
predominantemente es; Sur y Sur Oeste, producto de los vientos alisios, sobre la
velocidad por ser una zona muy plana y abierta los valores oscilan entre 1 a 7 m/s
dependiendo de la hora de observacin siendo predominante mayor entre las 12 y 15
horas.

2.2.7. Evapotranspiracin Potencial


La evapotranspiracin potencial es uno de los factores ms importantes que
intervienen en el balance hidrolgico, ya sea que ste se analice a nivel de cuenca,
regin o proyecto; siendo este ltimo el que realmente interesa para efectos del clculo
de la demanda de agua de los cultivos.
La evapotranspiracin potencial ha sido calculada con el programa de FAO (1992)
CROPWAT versin 4.2 que calcula la Evapotranspiracin para los cultivos para los
requerimientos de irrigacin por el mtodo de Penman-Monteith. En los Cuadros N 5
al N 7 se presentan los resultados obtenidos.
Cuadro N 5: Valores medios de Parmetros meteorolgicos y
determinacin de ETPo (Crop Wap) Estacin Rinconada

ANEXO: HIDROLOGIA Y CLIMATOLOGIA

Pg. 15

Estudio de Pre Inversin a Nivel de Perfil del Proyecto:


ADECUACION DEL PROYECTO ORIGINALCHINECAS AL ESQUEMA REESTRUCTURADO.

Cuadro N 6: Valores medios de Parmetros meteorolgicos y


determinacin de ETPo (Crop Wap) Estacin San Jacinto

Cuadro N 7: Valores medios de Parmetros meteorolgicos y


determinacin de ETPo(Crop Wap) Estacin Buenavista

2.3 Apreciaciones y comentarios

De todas las sealadas en este Anexo, actualmente slo opera la Estacin


Meteorolgica de Bellavista, en el valle de Casma. Existen otras fuera del rea
de estudio que se presentan a manera de apreciacin y comentario como son la
de Tangay en el valle de Santa ( en el rea experimental del Proyecto Especial
Chinecas) y Pariacoto en la zona alta de Casma (2 000 msnm)

La Estacin de Bellavista, posee una caseta meteorolgica, pluvimetro y veleta;


en la caseta hay higrgrafo y termmetros de mxima y mnima y un
evapormetro de tipo Pich, en unos de sus lados (Este) hay una casa de adobe,
cuya existencia no es pertinente para una buena obtencin de datos.

ANEXO: HIDROLOGIA Y CLIMATOLOGIA

Pg. 16

Estudio de Pre Inversin a Nivel de Perfil del Proyecto:


ADECUACION DEL PROYECTO ORIGINALCHINECAS AL ESQUEMA REESTRUCTURADO.

La Estacin Tangay es una estacin nueva en el Valle de Lacramarca, tiene


equipos automticos, registrador de temperatura, evapotranspiracin, horas de
sol, precipitacin y de humedad .

Otra estacin meteorolgica es la de Pariacoto en la parte alta del Valle de


Casma, que posee caseta meteorolgica, tanque de evaporacin y pluvimetro,
adems esta bien protegida.

2.4.

Clasificacin del Clima

Como se sabe el clima de una localidad o regin est determinado por la influencia de
un conjunto de elementos y factores que actan simultneamente, produciendo
variadas situaciones ambientales, por lo que es casi imposible que dos lugares tengan
idntico clima. De esta manera el ilimitado nmero de climas que existen sobre la tierra
demanda una agrupacin entre tipos y clases.

ANEXO: HIDROLOGIA Y CLIMATOLOGIA

Pg. 17

Estudio de Pre Inversin a Nivel de Perfil del Proyecto:


ADECUACION DEL PROYECTO ORIGINALCHINECAS AL ESQUEMA REESTRUCTURADO.

La clasificacin climtica consiste en un agrupamiento de valores de los elementos


climticos segn ciertos lmites o divisiones y rara vez se pueden definir una regin
climtica con un solo elemento.
Los diversos climas existentes en las Cuencas Santa, Lacramarca, Nepea y Casma se
ha tomado la informacin del SENAMHI (1988) que los ha clasificado, segn el
sistema de clasificacin de Warren Thornthwaite, que a su vez ha sido fue tomado
para los estudios de Gestin del Agua desarrollados por el INADE en el ao 2002.

2.4.1 Criterios de clasificacin


Segn ste sistema, los climas se identifican relacionando los parmetros
meteorolgicos de temperatura, precipitacin y humedad relativa; adems de la altitud
latitud, Cordillera de los Andes, La corriente fra Martima Peruana, el Anticicln del
Pacfico Sur y la Continentalidad.
(1)

Criterio 1 : Magnitud de la precipitacin


Precipitacin efectiva mm
> 128
64 a 127
32 a 63
16 a 31
< 16

(2)

A
B
C
D
E

Vegetacin
Caracterstica
Selva
Bosque
Pastizal
Estepa
Desierto

Criterio 2: Caracterstica de la distribucin de la precipitacin pluvial en el ao


Smbolo
r
i
p
V
O
d

(3)

Muy lluvioso
Lluvioso
Semi seco
Semi rido
rido

Smbolo

Significado
Precipitacin abundante
Con invierno seco
Con primavera seco
Con verano seco
Con otoo seco
Deficiencia de precipitacin en todas las estaciones del ao

Criterio 3 : Temperatura Eficiente


Valores del ndice
Anual (I)
>128
101 - 127
80 - 100
64 - 79

Caractersticas del
clima

Smbolo

Clido
Semi clido
Templado
Semi frio

A
B1
B2
B3

ANEXO: HIDROLOGIA Y CLIMATOLOGIA

Zonas
tropical
Mesotermal

Pg. 18

Estudio de Pre Inversin a Nivel de Perfil del Proyecto:


ADECUACION DEL PROYECTO ORIGINALCHINECAS AL ESQUEMA REESTRUCTURADO.

32 - 63
16 31
30 - 15
0

(4)

Frio
Semi frgido
Frigido
Polar

C
D
E
F

Microtermal
Hielo perpetuo

Criterio 4: Humedad Relativa


Valores medios
anuales (%)
25 44
45 64
65 84
85 - 100

Caractersticas del
clima

Smbolo

Muy seco
Seco
Hmedo
Muy hmedo

H1
H2
H3
H4

(5)

Otros criterios: Latitud, altitud, Cordillera de los Andes, la corriente fra


martima peruana, el anticicln del Pacfico Sur, la continentalidad.

(6)

Los climas encontrados en las cuencas Santa-Lacramarca, Nepea y Casma se


muestran en el Cuadro N 8. Los detalles de la variacin espacial de los climas
se muestran el mapa climtico del Apndice Climatologa

2.4.2 Clasificacin climtica de las Cuencas


Cuadro N 8: Clasificacin climtica de las Cuencas Santa, Nepea y Casma
Smbolo

Altitud
(m s.n.m )

Caractersticas

E (d)
B 1 H3

rido sin precipitacin


semiclido-hmedo.

en

el

ao,

E (d)
A 1 H2

rido sin precipitacin en el ao clidoseco.

C (o , i, p)
Semi seco, con otoo invierno.
C H 3
Primavera seco, microtermal hmedo.
C (i) C H3
Semi seco, invierno seco, fro hmedo.
C(o, i, p)
Semi seco, con otoo- invierno-Primavera,
B 3 H3
seco, microtermal templado, hmedo.
C ( o, i. p )
6 . Semi seco, con otoo- invierno-Primavera
B2 H3
seco, microtermal templado, hmedo.
B (i)
Lluvioso con invierno seco, clima polar,
hielo perpetuo seco.
F H2
Fuente: SENAMHI (1 988) Clasificacin Climtica del Per.

0 - 2 000

Parte de
cordillera
Baja

2 000 - 3 000

Semi-Baja

3 000 - 4 000

Media

> 4 000
2 300

1 700
> 3 500 < 8 000

Cordillera Negra
Huaraz
Carhuaz
Cordillera Blanca

De acuerdo al Mapa Climtico podemos establecer que el clima en el rea es clasificado


como rido sin precipitaciones en el ao, semicalido-hmedo. Esta zona climtica se
encuentra comprendida entre 0 - 2 000 msnm, denominada como zona baja, en esta
zona se encuentran ubicados los centros poblados, las reas bajo riego, las
organizaciones de usuarios, la infraestructura hidrulica mayor de riego y menor de
riego, desarrollo y planteamiento de los proyectos especiales como CHAVIMOCHIC y

ANEXO: HIDROLOGIA Y CLIMATOLOGIA

Pg. 19

Estudio de Pre Inversin a Nivel de Perfil del Proyecto:


ADECUACION DEL PROYECTO ORIGINALCHINECAS AL ESQUEMA REESTRUCTURADO.

CHINECAS, y adems se desarrolla la mayor parte de la agricultura bajo riego, a pesar


de las condiciones climticas.
Conforme al Mapa Ecolgico del Apndice, y de acuerdo al Inventario, Evaluacin y
Uso Racional de los Recursos Naturales de la Costa para las cuencas de los ro Santa,
Lacramarca y Nepea, elaborados por la Oficina de Evaluacin de Recursos Naturales
(ONERN), en el mbito de estudio se han identificado las siguientes zonas de vida:
desierto Pre-Montano (d-PM) y matorral desrtico Pre-Montano (md-PM). Un resumen
de su caracterizacin que ayudar a comprender el clima en la zona de estudio y su
relacin con la agricultura es el siguiente:
Desierto Pre-Montano (d-PM): Esta formacin ecolgica se encuentra ubicada en la
parte baja de la cuenca, entre el litoral y los 600 m.s.n.m. El medio ambiente se
caracteriza por un clima extremadamente rido con temperaturas semi-clidas, las
precipitaciones son prcticamente nulas y muy escasas, oscilando entre 17 mm., en el
sector del valle agrcola y 100 mm sobre el nivel altitudinal superior de la formacin,
con temperaturas medias del orden de los 18C a 22C, correspondiente al sector del
valle y la parte alta de la formacin respectivamente.
Morfolgicamente, se caracteriza por presentar dos sectores bien definidos: un plano a
ligeramente ondulado, que comprende el valle agrcola y las pampas eriazas factibles
de riego, y el otro, ondulado a semi-accidentado, que corresponde al sector de pampas
y colinas sin factibilidad de riego, aunque ciertas reas aledaas a los ros y/o
quebradas afluentes presenta alguna actividad agrcola.
El rea no presenta problemas para la agricultura diversificada, en cambio, en lo que
respecta a las lluvias, es sumamente crtica, por cuanto la escasez casi total de
precipitaciones no permite actividad agrcola salvo las zonas irrigadas.
Matorral desrtico Pre-Montano (md-PM): Esta formacin ecolgica se extiende desde
el nivel superior de la formacin desierto Pre-Montano, hasta una altura que vara
entre 1 800 y 2 000 m.s.n.m., el medioambiente se caracteriza por un clima de tipo rido
y semi-clido, es decir, con precipitacin pluviales bajas del orden de los 180 mm.,
promedio anual, variando entre 100 mm., en el nivel altitudinal inferior y 250 mm., en
el nivel superior y con temperaturas del orden de los 20 C promedio anual,
morfolgicamente, la formacin presenta dos reas bien definidas: una, constituida por
las montaas ridas y fuertemente accidentadas que ocupan la mayor extensin de la
formacin, y la otra, conformada por el rea agrcola de quebradas y piedemonte, cuyo
relieve es mayormente semi-accidentado.
As mismo, la ONERN defini que la Cobertura Vegetal , en la zona de Ancash en las
zonas alto andinas como Planicies esteras y estribas andinas sin vegetacin;
informacin que se aprecia en el mapa de Ecologa que se adjunta a este Anexo.

ANEXO: HIDROLOGIA Y CLIMATOLOGIA

Pg. 20

Estudio de Pre Inversin a Nivel de Perfil del Proyecto:


ADECUACION DEL PROYECTO ORIGINALCHINECAS AL ESQUEMA REESTRUCTURADO.

rido sin precipitaciones en el ao, clido-seco, comprendida esta zona


climtica entre los 2000 3000 msnm; denominada como zona semi baja, se
desarrolla una agricultura bajo riego, se ubican mayormente las comunidades
campesinas
Semi-seco, con otoo invierno, primavera seco, microtermal hmedo, se le
denomina como zona media, se desarrolla una agricultura bajo riego en secano.
Semi-seco, invierno seco, fro, hmedo, esta zona climtica se encuentra por
encima de los 4 000 msnm; en la parte de la cordillera negra
Lluvioso con invierno seco, clima polar, hielo perpetuo seco, zona climtica por
encima de los 3500 msnm; abarca mayormente la cordillera blanca.

ANEXO: HIDROLOGIA Y CLIMATOLOGIA

Pg. 21

Estudio de Pre Inversin a Nivel de Perfil del Proyecto:


ADECUACION DEL PROYECTO ORIGINALCHINECAS AL ESQUEMA REESTRUCTURADO.

3 Hidrologa
Losrecursoshdricossuperficialesplausiblesdeserutilizadosparalaimplementacin
delProyectoCHINECAS,estndadasporlasdescargassuperficialesdelosrosSanta,
Lacramarca,NepeayCasma.
LaInformacinhidrolgica,seadjuntaenelApndice,quecomprendelainformacin
histricadelosrosSanta,Nepea,Casma,Sechin,ascomoladelosrosViryMoche
del departamento de La Libertad para complementar y fortalecer el anlisis de la
informacin Hidrolgica de los ros del Departamento de Ancash, As mismo se
incluyen los hidrogramas histricos y a manera de visin general se muestran en la
descripcindelacpiterespectivo.

3.1 Hidrografa
3.1.1 Cuenca del ro Santa
LimitaporelnorteconpartedelasCuencasdeChao,Vir,MocheyCrisnejas;porel
SurconpartedelacuencaLacramarca,PativilcayFortaleza,porelEsteconlalneade
cumbresdelaCordilleraBlancaqueconstituyeladivisoriadelasaguasconlacuenca
del Maran, y por el oeste con las cuencas Nepea, Casma, Huarmey y el ocano
Pacfico.
LacuencadelroSantatienesusnacientesenelnevadodelHuascarn,a6768msnm,
ydesembocaenelmarluegoderecorrer294Km.Laaltitudmediaesde2100msnmy
la pendiente promedio de 1.4%, que se hace ms pronunciada en el sector
comprendidoentrelasdesembocadurasdelasquebradasCedrosyQuitaracsa(Can
delPato),dondealcanzael4%.
Las descargas del ro Santa, son actualmente medidas en la estacin Condorcerro,
situadaaproximadamentea4KmaguasarribadelaBocatoma412msnmdelProyecto
CHAVIMOCHIC.Delosregistrosdisponibles,quesepresentanenelApndiceluego
delanlisiscorrespondiente,analizadosestadsticamente,arrojadescargasanualesde
3078y2549millonesdem(MMC)parapersistenciasde75%y90%,respectivamente,
distribuidosconformeseapreciaenlaFiguraN6.

ANEXO: HIDROLOGIA Y CLIMATOLOGIA

Pg. 22

Estudio de Pre Inversin a Nivel de Perfil del Proyecto:


ADECUACION DEL PROYECTO ORIGINALCHINECAS AL ESQUEMA REESTRUCTURADO.

225
200

Santa

75%

90%

Caudal (m 3 /s)

175
150
125
100
75
50
25
0
Ene

Feb

Mar

Abr

May

Jun

Jul

Ago

Sep

Oct

Nov

Dic

Anual

Figura N 6: Descargas medias del ro Santa al 75% y 90% de persistencia.

Cabe sealar que, en virtud a lo establecido en el D.S. N 003-2009-AG del o8 de


febrero de 2009, los recursos hdricos del ro Santa son compartidos con el Proyecto
Especial CHAVIMOCHIC por lo que dicho dispositivo dispone reservar por dos aos
al Proyecto Especial CHINECAS, para fines agrcolas y poblacionales, un volumen de 1
287.62 MMC distribuido mensualmente como se indica en el Cuadro N 9.
Cuadro N 9: Volmenes mensuales del ro Santa asignados al Proyecto
Ene

Feb

Mar

Abr

May

Jun

Jul

Ago

Set

Oct

Nov

Dic

156.38

179.08

200.45

196.23

89.75

66.06

52.89

49.36

51.62

74.58

80.78

90.44

El ro Lacramarca contribuye con aportes poco significativos al Proyecto, pues no


llegan a representar ni el 1% de la masa que ofrece el ro Santa.

3.1.2 Cuenca del ro Nepea


Por el Norte, limita con la cuenca del ro Lacramarca, al Sur con la Cuenca del ro
Casma, al Este con la Cuenca del ro Santa, y por el Oeste con el Ocano Pacfico.
El ro Nepea nace en las alturas de la laguna de Chupicocha, a 4 600 msnm, tiene una
longitud mxima de recorrido desde sus nacientes de 73,5 Km, presentando pendiente
promedio del 6%, la cual se hace ms fuerte en el tramo de la parte alta comprendido
entre la laguna Mataracocha y Colcap, donde la pendiente alcanza aproximadamente
22%. Su altura media es de 1 400 msnm.
En la Figura N 7 se muestran las descargas promedio mensuales del ro Nepea,
registradas en la estacin San Jacinto, para persistencia de caudales al 75% y 90%, que
reflejan masas anuales de 22 y 9 MMC respectivamente. Como puede apreciarse, se
trata de recursos pequeos, significativos slo durante los meses de avenidas cuando
se concentra el 90% de la masa anual producida por la cuenca. La informacin
detallada es presentada en el Apndice correspondiente.

ANEXO: HIDROLOGIA Y CLIMATOLOGIA

Pg. 23

Estudio de Pre Inversin a Nivel de Perfil del Proyecto:


ADECUACION DEL PROYECTO ORIGINALCHINECAS AL ESQUEMA REESTRUCTURADO.

3.5

Nepea

75%

90%

3.0

Caudal (m 3 /s)

2.5
2.0
1.5
1.0
0.5
0.0
Ene

Feb

Mar

Abr

May

Jun

Jul

Ago

Sep

Oct

Nov

Dic

Anual

Figura N 7: Descargas medias del ro Nepea al 75% y 90% de persistencia

3.1.3 Cuenca del ro Casma Sechn


Geogrficamente limita por el Norte y Noroeste con la cuenca del ro Nepea por el
Sur con la cuenca del ro Culebras, por el Oeste con el Ocano Pacifico y por el Este con
la Cuenca del Santa.
La cuenca del ro Casma Sechn, tiene una altitud mxima de 4 862 msnm, una altitud
media de 2 000 msnm y desemboca en el mar.
El ro Casma nace en las alturas de la Cordillera Negra con el nombre de ro Pira,
manteniendo esta denominacin hasta la zona de Chacchn; desde este lugar hasta el
pueblo de Pariacoto adopta el nombre de Chacchn, de ah adopta el nombre de ro
Grande hasta la confluencia con el ro Yautn. A partir de Yautn hasta el Ocano
Pacfico adopta el nombre de Casma. La longitud total es de 100 Km, con una
pendiente promedia de 4%. El ro Sechn, afluente del ro Casma, tiene una longitud
de 70 Km y una pendiente promedio de 5%.
Las descargas reguladas estacionalmente del ro Casma pueden resultar un aporte
interesante para el Proyecto, tal como puede inferirse de la Figura N 8, cuyos registros
de caudales en la estacin Tutuma arrojan descargas anuales de 119 y 76 MMC al 75%
y 90%.

ANEXO: HIDROLOGIA Y CLIMATOLOGIA

Pg. 24

Estudio de Pre Inversin a Nivel de Perfil del Proyecto:


ADECUACION DEL PROYECTO ORIGINALCHINECAS AL ESQUEMA REESTRUCTURADO.

Figura N 8: Descargas medias del ro Casma al 75% y 90% de persistencia

3.2 Anlisis de descargas medias mensuales


El tratamiento de la informacin hidromtrica ha consistido evaluar el parmetro de
descargas en el mbito de estudio de la cuenca del ro Santa, sin embargo, el anlisis se
ha efectuado a nivel de las cuencas de los ros Sechn, Casma Nepea, Santa, Vir y
Moche, recopilndose la informacin de descargas medias mensuales, las cuales se
presentan en el Cuadro N 10, indicndose su ubicacin poltica y geogrfica, perodo
de registro. La Informacin existente a nivel mensual y diaria fue obtenida en el
Inrena y en el Proyecto Especial Chavimochic.
Se ha evaluado la consistencia de la informacin descargas medias mensuales,
identificando posibles fenmenos de no homogeneidad e inconsistencia de los datos,
que puede reflejarse como saltos y/o tendencias en las series de tiempo histricas,
para lo cual se ha empleado el procedimiento de anlisis de hidrogramas anuales y
mensuales, anlisis de doble masa y anlisis estadstico.
La informacin hidromtrica correspondi a los registros histricos de los ros Santa,
Nepea, Sechn, Casma, mostrada en el Apndice 1, que fue sometida a un anlisis de
consistencia.
Para efectos de anlisis, se ha establecido dos periodos de anlisis, el cual estuvo en
funcin al periodo de registro existente, el primero grupo conformado por las
estaciones de los ros Nepea, Casma y Sechn (periodo 1973-2001), y el segundo grupo
conformado por los ros Santa (1956-2008), Vir y Moche (1978-2007).

ANEXO: HIDROLOGIA Y CLIMATOLOGIA

Pg. 25

Estudio de Pre Inversin a Nivel de Perfil del Proyecto:


ADECUACION DEL PROYECTO ORIGINALCHINECAS AL ESQUEMA REESTRUCTURADO.

Cuadro N 10: Estaciones Hidromtricas consideradas en estudio de la zona de estudio


Nombre

Cuenca.

Ro
Santa

Area
km2

Ubicacin Geogrfica
Lat

Long

10 413

83940

781500

Alt

Coordenadas UTM

Dpto

Prov

Dist

Inicio

Fin

Duracin

Este

Norte

450

802689.66

9041508.95

Ancash

Santa

Santa

1956

2008

52

1929

2008

79

1968

1972

Condorcerro

Santa

San Jacinto

Nepea Nepea

1 431

90936

781500

300

802278.44

8986291.85

Ancash

Santa

Moro

Puente Carretera

Casma

Casma

1 768

92848

781800

60

796506.88

8950916.66

Ancash

Casma

Casma

Hacienda Poctao

Casma

Grande

1 004

93144

780148

520

826140.92

8945262.48

Ancash

Casma

Yautn

Puente Carretera

Casma

Sechin

928

92512

781312

105

805353.25

8957488.48

Ancash

Casma

Buena vista

Sector Tutuma

Casma

Casma

607

92530

781312

200

805348.84

8956935.06

Ancash

Casma

Buenavista

1960

1999

40

Puente Quillo

Casma

Sechin

432

91959

780748

410

815327.04

8967032.74

Ancash

Casma

Buenavista

1960

1999

40

ANEXO: HIDROLOGIA Y CLIMATOLOGIA

Pg. 26

Estudio de Pre Inversin a Nivel de Perfil del Proyecto:


ADECUACION DEL PROYECTO ORIGINALCHINECAS AL ESQUEMA REESTRUCTURADO.

3.2.1 Anlisis de consistencia


Consisti en detectar posibles inconsistencias y no homogeneidades, previa evaluacin
de las series histricas para obtener registros ms confiables y de menor riesgo, cuyo
procedimiento consiste en el anlisis grfico, doble masa y estadstico. No se
encontraron datos que pudieran estar fuera de los mrgenes de la serie existente.

3.2.2 Anlisis grfico


Se elaboraron hidrogramas a nivel mensual y anual a fin analizar posibles saltos o
tendencias durante el periodo de registro de la informacin, as como para detectar y
eliminar valores extremadamente altos o bajos que no reflejen el comportamiento de la
variable a nivel regional en el periodo de registro.
Los hidrogramas se usaron tambin con la finalidad de establecer el perodo de registro
ms confiable en cada serie, es decir estos fueron comparados simultneamente con la
finalidad de visualizar si tenan un comportamiento similar.

3.2.3 Anlisis de Doble Masa


Con la finalidad de evaluar la consistencia de la informacin de descargas medias
mensuales registradas en las estaciones San Jacinto (Nepea), Sector Tutuma (Casma),
Puente Quillo (Sechn) y Condorcerro (Santa), se elaboraron los diagramas de doble
masa con la finalidad de identificar posibles errores sistemticos que se pueden
mostrar como bruscos cambios de pendiente en el diagrama.
As para efectuar el anlisis de doble masa, se opt por agruparlas teniendo en
consideracin similitud altitudinal, cuencas con rgimen hidrolgico similar y periodo
de registro concurrente. De esta manera se formaron dos grupos; el primero con las
Estaciones San Jacinto, Sector Tutuma y Puente Quillo y, el segundo, con las Estaciones
Condorcerro, Huacapongo y Quirihuac
En los Cuadros N 11 y 12 se muestran los anlisis y en las Figuras N 9 y 10 los
diagramas de doble masa elaborados. La visualizacin de estos diagramas muestra una
tendencia recta en las estaciones del segundo grupo mientras que en el primer grupo, si
bien la tendencia es hacia una lnea recta los quiebres no son significativos en razn a
que las descargas son significativas en los aos donde se presenta el fenmeno El Nio,
(FEN) optndose el criterio de mantener la serie histrica tal como se presenta pues su
influencia no es significativa en el desarrollo del estudio, toda vez que se utilizar la
serie de descargas medias mensuales del ro Santa.

ANEXO: HIDROLOGIA Y CLIMATOLOGIA

Pg. 27

Estudio de Pre Inversin a Nivel de Perfil del Proyecto:


ADECUACION DEL PROYECTO ORIGINALCHINECAS AL ESQUEMA REESTRUCTURADO.

Cuadro N 11: Anlisis de doble masa de las descargas medias, m/s.


Perodo 1973 - 2001
Ao

San Jacinto

Tutuma

Puente Quillo

Acumulada

Anual Acum. Anual Acum. Anual Acum. Anual Acum.


1
1973
3.4
3.4
6.7
6.7
0.7
0.7
3.6
3.6
2
1974
2.7
6.1
4.6
11.3
1.4
2.1
2.9
6.5
3
1975
2.9
9.1
6.7
18.1
2.0
4.1
3.9
10.4
4
1976
0.9
9.9
7.6
25.7
2.0
6.1
3.5
13.9
5
1977
1.7
11.6
6.8
32.4
2.0
8.0
3.5
17.4
6
1978
0.2
11.8
2.2
34.7
0.5
8.5
1.0
18.3
7
1979
1.8
13.6
4.3
38.9
1.2
9.8
2.4
20.8
8
1980
0.6
14.1
2.9
41.8
0.7
10.5
1.4
22.1
9
1981
2.2
16.3
6.1
47.9
1.5
12.0
3.3
25.4
10 1982
1.3
17.6
3.8
51.7
0.6
12.7
1.9
27.3
11 1983
17.2
34.7
9.8
61.5
4.0
16.7
10.3
37.7
12 1984
8.5
43.2
8.4
69.9
2.8
19.5
6.5
44.2
13 1985
0.6
43.8
4.4
74.3
1.1
20.6
2.0
46.2
14 1986
1.9
45.7
4.5
78.8
1.0
21.6
2.5
48.7
15 1987
2.8
48.5
3.3
82.1
1.0
22.6
2.4
51.1
16 1988
1.3
49.9
5.7
87.8
1.5
24.1
2.8
53.9
17 1989
4.1
53.9
9.1
96.9
1.7
25.8
5.0
58.9
18 1990
1.2
55.2
2.5
99.4
0.3
26.1
1.3
60.2
19 1991
1.6
56.8
1.8
101.2
0.2
26.3
1.2
61.4
20 1992
0.3
57.1
0.5
101.7
0.2
26.5
0.4
61.8
21 1993
1.6
58.7
8.5
110.2
1.8
28.4
4.0
65.8
22 1994
5.8
64.5
10.1
120.3
2.6
31.0
6.2
71.9
23 1995
0.9
65.4
2.4
122.8
0.5
31.5
1.3
73.2
24 1996
3.9
69.3
13.3
136.0
3.0
34.6
6.7
80.0
25 1997
1.0
70.3
2.9
138.9
0.8
35.3
1.6
81.5
26 1998
17.9
88.2
22.4
161.3
5.5
40.9
15.2
96.8
27 1999
6.4
94.6
7.0
168.3
2.7
43.5
5.3
102.1
28 2000
6.7
101.3
9.2
177.5
1.9
45.4
5.9
108.1
29 2001
7.9
109.2
6.0
183.6
2.7
48.1
5.5
113.6
Nota: La Estacin San Jacinto corresponde al ro Nepea, Tutuma al ro Casma y Puente
Quillo al Ro Sechn

ANEXO: HIDROLOGIA Y CLIMATOLOGIA

Pg. 28

Estudio de Pre Inversin a Nivel de Perfil del Proyecto:


ADECUACION DEL PROYECTO ORIGINALCHINECAS AL ESQUEMA REESTRUCTURADO.

Figura N 9: Diagrama de doble masa entre el promedio acumulado de las tres Estaciones del
Grupo 1 y cada una de ellas
Cuadro N 12: Anlisis de doble masa de las descargas medias, m/s. Perodo 1978 - 2007
Ao
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24

1978
1979
1980
1981
1982
1983
1984
1985
1986
1987
1988
1989
1990
1991
1992
1993
1994
1995
1996
1997
1998
1999
2000
2001

Condorcerro
Anual Acumul.
107.1
107.1
144.0
251.1
110.9
362.0
163.7
525.7
146.6
672.3
168.1
840.3
211.5
1 051.8
92.1
1 143.9
113.2
1 257.1
135.4
1 392.5
130.0
1 522.5
144.8
1 667.3
85.6
1 752.9
100.8
1 853.7
62.6
1 916.3
227.8
2 144.1
161.8
2 306.0
104.6
2 410.6
140.9
2 551.5
97.5
2 648.9
210.4
2 859.3
149.9
3 009.2
129.8
3 139.0
174.2
3 313.3

Huacapongo
Anual Acumul.
0.2
0.2
2.0
2.3
0.9
3.1
6.1
9.3
1.0
10.3
6.9
17.2
4.8
22.0
0.6
22.6
1.9
24.5
3.1
27.5
2.7
30.2
3.6
33.8
0.5
34.3
0.6
34.9
0.3
35.2
2.9
38.1
3.3
41.5
0.9
42.3
2.8
45.1
2.2
47.3
24.1
71.4
3.3
74.7
2.4
77.1
5.2
82.3

ANEXO: HIDROLOGIA Y CLIMATOLOGIA

Quirihuac
Estacin Acumulada
Anual Acumul. Promedio Acumul.
1.4
1.4
36.2
36.2
3.9
5.3
50.0
86.2
3.1
8.4
38.3
124.5
7.9
16.3
59.2
183.8
4.1
20.4
50.6
234.3
14.6
35.0
63.2
297.5
9.7
44.7
75.3
372.8
2.5
47.2
31.7
404.6
5.7
52.8
40.3
444.8
6.1
58.9
48.2
493.0
6.9
65.9
46.5
539.5
8.9
74.8
52.4
592.0
2.3
77.1
29.5
621.4
3.0
80.1
34.8
656.2
2.2
82.2
21.7
677.9
9.4
91.7
80.1
758.0
11.2
102.9
58.8
816.8
3.8
106.7
36.5
853.2
7.2
113.9
50.3
903.5
4.5
118.4
34.7
938.2
44.3
162.7
92.9
1 031.1
16.3
179.0
56.5
1 087.6
11.5
190.6
47.9
1 135.6
20.4
210.9
66.6
1 202.2

Pg. 29

Estudio de Pre Inversin a Nivel de Perfil del Proyecto:


ADECUACION DEL PROYECTO ORIGINALCHINECAS AL ESQUEMA REESTRUCTURADO.

Condorcerro
Huacapongo
Quirihuac
Estacin Acumulada
Anual Acumul. Anual Acumul. Anual Acumul. Promedio Acumul.
25
2002
144.5
3 457.8
3.4
85.7
10.5
221.4
52.8
1 255.0
26
2003
114.1
3 571.9
1.5
87.1
4.7
226.1
40.1
1 295.0
27
2004
95.7
3 667.6
1.4
88.6
4.2
230.3
33.8
1 328.8
28
2005
108.5
3 776.1
1.7
90.3
3.9
234.2
38.0
1 366.9
29
2006
128.6
3 904.8
3.9
94.2
7.3
241.5
46.6
1 413.5
30
2007
142.8
4 047.5
3.8
98.0
7.5
249.0
51.4
1 464.8
Nota: La Estacin Condorcerro corresponde al ro Santa, Huacapongo al ro Vir y Puente Quirihuac al ro
Moche
Ao

Figura N 10: Diagrama de doble masa entre el promedio acumulado de las tres Estaciones del
Grupo 2 y cada una de ellas

3.2.4 Anlisis estadstico


No fue necesario efectuar anlisis estadstico alguno, dada consistencia de los datos
verificados a nivel anual, mensual y mediante el diagrama de doble masa; tampoco se
evidenciaron tendencias en las series histricas, que requieran ser corregidas.

3.2.5 Completado y extensin de la informacin


Para contar con series de un periodo comn y de suficiente longitud muestral, en la
zona de estudio, se realizo el completado y la extensin de los registros descargas
medias mensuales, para ello se utiliz el software HEC4 desarrollado por el Centro de
Ingeniera Hidrolgica (HEC) del Cuerpo de Ingenieros de los Estados Unidos
(USACE), de aplicacin en el rea de hidrologa y de amplia difusin.

ANEXO: HIDROLOGIA Y CLIMATOLOGIA

Pg. 30

Estudio de Pre Inversin a Nivel de Perfil del Proyecto:


ADECUACION DEL PROYECTO ORIGINALCHINECAS AL ESQUEMA REESTRUCTURADO.

De esta manera se obtuvieron series homogneas y completas para el periodo 19602008, de las descargas medias mensuales para las estaciones San Jacinto (Nepea),
Sector Tutuma (Casma), Puente Quillo (Sechin), Huacapongo (Vir) y Quirihuac
(Moche). Ver Apndice 2
Para la estacin hidromtrica del ro Santa, se ha mantenido el periodo de registro de la
estacin Condorcerro (1956-2008), cuyos datos provienen del Proyecto Especial
Chavimochic.

3.3 Anlisis de persistencia


La disponibilidad hdrica para el ro Santa a niveles de persistencia se ha empleado la
formula de Weibull para determinar la frecuencia emprica de ocurrencia de los
caudales al 50%, 75% y 95% persistencia en el tiempo, optndose por este mtodo
debido a que no se trata de extrapolar valores fuera del rango de frecuencias de los
valores observados.
El empleo de la frecuencia media conduce a la ecuacin general, denominada frmula
de Weibull, cuya representacin es:

p=

i
n +1

donde i es el orden del evento, siendo i = 1 para el primer valor y n es el nmero de


aos del registro.
Al calcular la probabilidad emprica para las observaciones de la muestra, estamos ms
cerca del comportamiento real del rgimen fluvial del ro Santa. En el Apndice 3, se
presenta el anlisis de frecuencia de caudales promedio diarios para los ros
involucrados en el estudio y en las Figuras 11, 12 y 13 la representacin grfica de los
mismos.

ANEXO: HIDROLOGIA Y CLIMATOLOGIA

Pg. 31

Estudio de Pre Inversin a Nivel de Perfil del Proyecto:


ADECUACION DEL PROYECTO ORIGINALCHINECAS AL ESQUEMA REESTRUCTURADO.

Figura N 11: Curva de duracin de caudales promedio diarios ro Santa en Condorcerro

Figura N 12: Curva de duracin de caudales promedio diarios ro Nepea en San Jacinto

ANEXO: HIDROLOGIA Y CLIMATOLOGIA

Pg. 32

Estudio de Pre Inversin a Nivel de Perfil del Proyecto:


ADECUACION DEL PROYECTO ORIGINALCHINECAS AL ESQUEMA REESTRUCTURADO.

Figura N 13; Curva de duracin de caudales promedio diarios ro Casma en Poctao, 1961 - 2005

ANEXO: HIDROLOGIA Y CLIMATOLOGIA

Pg. 33

Estudio de Pre Inversin a Nivel de Perfil del Proyecto:


ADECUACION DEL PROYECTO ORIGINALCHINECAS AL ESQUEMA REESTRUCTURADO.

3.4 Anlisis de mximas avenidas del ro Santa


EldiseodelasestructurasdelabocatomasobreelroSantaestreferidoalaavenida
mximaparaundeterminadoperododeretorno.Lainformacinexistentealrespecto
proviene de los Anuarios Hidrolgicos publicados por Electroper (ELP) para el
perodo 1958 a 1999 y el Proyecto Chavimochic desde 1978 a la actualidad, la misma
quesepresentaenelCuadrosiguiente:
CuadroN13:Registrosdemximasavenidasm3/s
Ao

Electroper
Diario Instantneo

Ao

ProyectoChavimochic
Diario Instantneo

1958

408

618

1978

337

1959

787

888

1979

931

1960

753

1205

1980

370

1961

881

1650

1981

781

1982

718

864

1170

1983

796
1225

1962
1963
1966

396

482

1984

1967

805

925

1985

396

1968

349

403

1986

463

1969

598

922

1987

505

1973

644

1115

1988

485

1974

490

897

1989

593

1975

861

1129

1990

229

1977

1019

1991

840

1978

302

422

1992

205

1993

1250

380

1994

684

836

1995

366

424

1979

627

1980

344

1981

600

1982

553

1996

730

875

1983

571

1997

450

500

1984

743

1998

935

1123

1985

468

1999

1032

1287
1202

1986

559

2000

637

1987

532

2001

765

963

1988

577

2002

508

645

1989

600

2003

470

533

1990

283

2004

295

351

1991

712

2005

385

400

1992

155

2006

827

880

1993

763

2007

603

750

1994

854

2008

422

469

1995

445

1996

731

1997

450

1998

935

1999

1032

ANEXO: HIDROLOGIA Y CLIMATOLOGIA

Pg. 34

Estudio de Pre Inversin a Nivel de Perfil del Proyecto:


ADECUACION DEL PROYECTO ORIGINALCHINECAS AL ESQUEMA REESTRUCTURADO.

3.4.1 Anlisis de consistencia de los caudales mximos


El anlisis de consistencia permite verificar la posibilidad de fusionar los registros
presentados en el acpite anterior en uno solo, de manera de contar con una serie mas
extensa de caudales. Para tal efecto, se correlaciona el caudal mximo promedio diario
con el caudal mximo promedio mensual de ambos registros.
1 200
y = 1.5398x + 101.05
R = 0.7138

Mximo diario m/s

1 000

800

600

400

200

0
0

100

200

300

400

500

600

700

Promedio mensual m/s

Figura N 14: Caudales mximo diario y promedio mensual, 1958-1999 (ELP)

Conforme se aprecia en la Figura existe una buena correlacin de los caudales


reportados por ELP para el perodo 1958-1999, con un coeficiente de correlacin de
0.7138 ; sin embargo, como la informacin del Proyecto Chavimochic abarca desde
1978 en adelante, considerando los datos desde dicha fecha se obtiene la Figura , donde
el coeficiente de correlacin mejora a 0.8132.
En caso de emplear la informacin procedente del Proyecto CHAVIMOCHIC, el
coeficiente de correlacin que se obtiene es de 0.8596, ver Figura, lo que indica un
mejor ajuste que la de ELP.

ANEXO: HIDROLOGIA Y CLIMATOLOGIA

Pg. 35

Estudio de Pre Inversin a Nivel de Perfil del Proyecto:


ADECUACION DEL PROYECTO ORIGINALCHINECAS AL ESQUEMA REESTRUCTURADO.

1 200
y = 1.4489x + 107.87
R = 0.8132

Mximo diario m/s

1 000

800

600

400

200

0
0

100

200

300

400

500

600

700

Promedio mensual m/s

Figura N 15: Caudales mximo diario y promedio mensual, 1978-1999 (ELP)

1 400
y = 1.6673x + 54.392
R = 0.8596

1 200

Mximo diario m/s

1 000

800

600

400

200

0
0

100

200

300

400

500

600

700

800

Promedio mensual m/s

Figura N 16: Caudales mximo diario y promedio mensual, 1978-2008 (Chavimochic)

Consecuentemente, se conformar una serie con datos de ELP hasta 1977 y de


Chavimochic hasta el ao 2008.

ANEXO: HIDROLOGIA Y CLIMATOLOGIA

Pg. 36

Estudio de Pre Inversin a Nivel de Perfil del Proyecto:


ADECUACION DEL PROYECTO ORIGINALCHINECAS AL ESQUEMA REESTRUCTURADO.

3.4.2 Caudales mximos instantneos


Comparando los caudales mximos diarios con los instantneos registrados, se obtiene
la Figura , con un coeficiente de correlacin de 0.8522 que refleja un buen grado de
correlacin entre ambos parmetros. La frmula resultante es:

Qi = 0,7053Qd1, 0962
Donde Qi es caudal instantneo y Qd el caudal mximo diario.

1 800
1 600

y = 0.7053x 1.0962
R = 0.8522

Mximo instantneo m/s

1 400
1 200
1 000
800
600
400
200
0
0

200

400

600

800

1,000

1,200

Mximo diario m/s

Figura N 17: Caudal instantneo vs caudal mximo diario.

Los caudales instantneos histricos y calculados, para fines de diseo son


presentados en el Cuadro 13.

ANEXO: HIDROLOGIA Y CLIMATOLOGIA

Pg. 37

Estudio de Pre Inversin a Nivel de Perfil del Proyecto:


ADECUACION DEL PROYECTO ORIGINALCHINECAS AL ESQUEMA REESTRUCTURADO.

CuadroN14CaudalesinstantneosenCondorcerro,m/s
Ao

Instantneo

Ao

Instantneo

Ao

Instantneo

1958

618

1980

481

1995

424

1959

888

1981

1050

1996

875

1960

1205

1982

963

1997

500

1961

1650

1983

1071

1998

1123

1963

1170

1984

1664

1999

1287

1966

482

1985

517

2000

1202

1967

925

1986

610

2001

963

1968

403

1987

668

2002

645

1969

922

1988

640

2003

533

1973

1115

1989

790

2004

351

1974

897

1990

286

2005

400

1975

1129

1991

1131

2006

880

1977

1379

1992

253

2007

750

1978

435

1993

1699

2008

469

1979

1257

1994

836

3.4.3 Anlisis Probabilstico


La muestra de caudales instantneos presentados en el Cuadro anterior fue evaluada
en base al programa HYFRAN (Hydrological Frequency Analysis), desarrollado al
InstitutoNacionaldeInvestigacinCientficaAgua,TierrayMedioambiente(INRS
ETE) de la Universidad de Qubec, que permite el anlisis estadstico de eventos
extremosydemaneramsgeneralelanlisisestadsticodeseriededatos.
Se emplearon las siguientes distribuciones probabilsticas: Halphen Tipo A, Gumbel,
Gamma, Pearson Tipo 3 y Halphen Tipo B, que se presentan en Anexo. La
comparacin de resultados obtenidos, para un perodo de retorno de 100 aos, se
presentaenelCuadroacontinuacin.

ANEXO: HIDROLOGIA Y CLIMATOLOGIA

Pg. 38

Estudio de Pre Inversin a Nivel de Perfil del Proyecto:


ADECUACION DEL PROYECTO ORIGINALCHINECAS AL ESQUEMA REESTRUCTURADO.

Cuadro N 15: Comparacin de resultados, T=100 aos

Es de observar que no existe una diferencia considerable en los resultados obtenidos


para los diferentes criterios por lo que es razonable aceptar el promedio de ellos, que
arroja un caudal mximo instantneo de 2 028 m/s.

3.5 Mximas avenidas en la quebrada de Cascajal


Interesa para el dimensionamiento del aliviadero de la presa Cascajal, los hidrogramas
de las avenidas con perodo de retorno de 10 000 aos (decamilenaria) y de la mxima
probable.
Ante la falta de informacin existente, se ha procedido a utilizar un modelo
precipitacin-escorrenta a partir del anlisis estadstico de la informacin de
precipitacin mxima en 24 horas registrado en la estacin Santa.

3.5.1 Precipitaciones
Con la informacin de la estacin de Santa correspondiente al periodo del ao 1964 al
2008 sobre las precipitaciones mximas en 24 horas, se analiz la informacin y se
verifico su consistencia, obtenindose a la serie siguiente:

ANEXO: HIDROLOGIA Y CLIMATOLOGIA

Pg. 39

Estudio de Pre Inversin a Nivel de Perfil del Proyecto:


ADECUACION DEL PROYECTO ORIGINALCHINECAS AL ESQUEMA REESTRUCTURADO.

Cuadro N 16 Precipitaciones mximas en la Estacin Pluviomtrica Santa (mm)


Cdigo Estacin: N 845310 (SPEO)
Latitud: 9.16
Longitud: 78.51
Ao
1964
1965
1966
1967
1968
1969
1973
1974
1975
1976
1977
1978
1979
1980
1981
1982
1983
1984
1985
1986
1987
1988
1989
1990
1991
1992
1993
1994
1995
1996
1997
1998
1999
2000
2001
2002
2003
2004
2007
2008

Precipitacin total
mensual
0.0
0.0
0.0
0.0
0.0
0.0
0.3
4.0
3.0
2.3
2.0
0.0
2.0
9.9
1.0
2.0
9.9
4.5
3.0
0.0
0.0
1.8
3.0
0.0
1.0
0.0
0.0
20.0
0.0
5.0
2.0
2.0
0.0
0.0
5.8
0.0
0.0
0.0
0.0
0.0

Precipitacin Mxima
en 24 horas
0.0
0.0
0.0
0.0
0.0
0.0
0.3
4.0
3.0
2.3
2.0
0.0
2.0
9.9
1.0
2.0
9.9
3.0
3.0
0.0
0.0
0.7
3.0
0.0
1.0
0.0
0.0
20.0
0.0
5.0
2.0
1.0
0.0
0.0
5.8
0.0
0.0
0.0
0.0
0.0

Mes

mar
abr
ene
dic
feb
mar
ene
abr
dic
ene
feb
feb

ene
ene
dic

ene
mar
dic
mar

feb

N
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40

Con la serie de precipitacin mostrada, se realiz el anlisis estadstico para las


distribuciones de Gumbel, Gamma, Pearson III y Halphen aplicndose el programa
ANEXO: HIDROLOGIA Y CLIMATOLOGIA

Pg. 40

Estudio de Pre Inversin a Nivel de Perfil del Proyecto:


ADECUACION DEL PROYECTO ORIGINALCHINECAS AL ESQUEMA REESTRUCTURADO.

HYFRAN PLUS; adoptndose la de Gumbel, con ciertas reservas, obtenindose los


siguientes resultados:
Cuadro N 17: Resultados del anlisis estadstico

ANEXO: HIDROLOGIA Y CLIMATOLOGIA

Pg. 41

Estudio de Pre Inversin a Nivel de Perfil del Proyecto:


ADECUACION DEL PROYECTO ORIGINALCHINECAS AL ESQUEMA REESTRUCTURADO.

De los resultados obtenidos se infiere que la precipitacin maxima para una frecuencia
de 10 000 aos de periodo de retorno (Tr), es de 15 mm para 24 horas. Considerando
que en el ao 1994 ocurri una precipitacin de 20 mm, sta seria la precitacin a
cosiderarse para esta frecuencia; la Precipitacin Maxima Probable (PMP), que es la
maxima precipitacin que puede ocurrir, sera de 30 mm.

3.5.2 Escorrentas
Se aplic en modelo meteorolgico propuesto por del SCS tanto para la evaluacin de
las prdidas como para la transformacin del hidrograma unitario. La precipitacin
mxima en 24 horas, fue repartida considerando la distribucin tpica de las lluvias
asociadas al fenmeno del Nio registradas en las estaciones pluviogrficas del norte
de la costa peruana.
Los resultados obtenidos, para la avenida decamilenaria y mxima probable,, con la
aplicacin del programa HMS del HEC, se muestran en los cuadros de a continuacin:

Figura N 18 Hidrograma de la avenida decamilenaria

ANEXO: HIDROLOGIA Y CLIMATOLOGIA

Pg. 42

Estudio de Pre Inversin a Nivel de Perfil del Proyecto:


ADECUACION DEL PROYECTO ORIGINALCHINECAS AL ESQUEMA REESTRUCTURADO.

Figura N 19 Hidrograma de la avenida mxima probable (PMF)

ANEXO: HIDROLOGIA Y CLIMATOLOGIA

Pg. 43

Estudio de Pre Inversin a Nivel de Perfil del Proyecto:


ADECUACION DEL PROYECTO ORIGINALCHINECAS AL ESQUEMA REESTRUCTURADO.

Apndice 1
Descargas medias mensuales histricas

ANEXO: HIDROLOGIA Y CLIMATOLOGIA

Estudio de Pre Inversin a Nivel de Perfil del Proyecto:


ADECUACION DEL PROYECTO ORIGINALCHINECAS AL ESQUEMA REESTRUCTURADO.

Cuadro N 1: Descargas medias mensuales histricas, m/s. Est. San Jacinto, ro Nepea
Ao

Ene

Feb

Mar

Abr

May

Jun

Jul

Ago

Set

Oct

Nov

Dic

1960

1.47

4.26

7.57

2.33

0.58

0.46

0.41

0.35

0.24

0.20

0.17

0.13

1.51

1961

7.34

5.28

8.30

8.73

0.72

0.62

0.54

0.43

0.32

0.24

0.19

1.89

2.88

1962

6.08

10.82

17.87

5.67

1.09

0.75

0.65

0.52

0.43

0.34

0.25

0.22

3.72

1963

0.32

2.44

9.41

7.38

0.80

0.39

0.36

0.34

0.21

0.20

0.18

1.62

1.97

1964

0.30

3.25

6.42

4.32

0.90

0.50

0.43

0.35

0.27

0.19

0.27

0.19

1.45

1965

0.29

1.02

8.86

3.07

0.67

0.23

0.24

0.20

0.18

0.15

0.14

0.16

1.27

1966

3.61

2.24

2.73

0.33

0.32

0.26

0.26

0.25

0.14

0.37

0.10

0.07

0.89

1967

2.59

18.73

12.86

2.62

0.64

0.24

0.37

0.24

0.14

0.64

0.19

0.16

3.28

Prom.

1968

0.18

0.13

0.63

0.34

0.10

0.07

0.06

0.06

0.04

0.04

0.04

0.04

0.14

1969

0.04

0.10

2.06

1.58

0.08

0.05

0.05

0.05

0.05

0.04

0.04

2.23

0.53

1970

13.77

0.15

1.44

1.74

2.10

0.60

0.59

0.39

0.27

0.32

0.79

0.67

1.90

1971

0.53

2.41

12.84

7.98

3.82

1.98

1.40

1.35

0.81

0.19

0.26

2.65

3.02

1972

3.85

5.22

31.68

9.37

2.53

1.14

0.76

0.60

0.36

0.30

0.37

3.82

5.00

1973

10.27

2.25

11.81

9.90

1.84

0.61

0.65

0.61

0.45

0.88

0.61

0.84

3.39

1974

6.84

11.79

10.00

1.79

0.71

0.53

0.50

0.44

0.07

0.04

0.04

0.03

2.73

1975

0.59

1.82

27.87

2.55

0.93

0.42

0.30

0.21

0.20

0.15

0.10

0.10

2.94

1976

1.26

2.55

3.97

1.57

0.36

0.12

0.10

0.10

0.10

0.10

0.10

0.05

0.86

1977

0.44

10.28

5.68

2.40

0.53

0.21

0.15

0.12

0.08

0.08

0.08

0.08

1.68

1978

0.08

0.55

0.68

0.23

0.03

0.03

0.03

0.04

0.04

0.04

0.02

0.03

0.15

1979

0.03

1.12

17.03

3.33

0.10

0.08

0.05

0.05

0.05

0.05

0.05

0.05

1.83

1980

0.03

0.03

2.65

0.19

0.02

0.01

0.02

0.03

0.03

0.89

0.68

2.20

0.56

1981

0.79

16.33

6.54

1.05

0.21

0.19

0.16

0.15

0.11

0.06

0.13

0.17

2.16

1982

1.90

8.27

0.72

0.56

0.05

0.03

0.03

0.03

0.03

0.03

0.99

2.79

1.29

1983

15.41

9.57

71.65

72.77

21.30

8.73

2.77

0.64

0.28

0.24

0.14

2.42

17.16

1984

2.63

42.81

33.48

9.97

6.55

1.18

0.28

0.12

0.05

2.00

0.22

2.23

8.46

1985

0.05

2.60

3.61

0.58

0.06

0.05

0.05

0.05

0.05

0.05

0.05

0.05

0.60

1986

0.54

4.71

7.89

5.87

1.90

0.93

0.59

0.29

0.17

0.10

0.10

0.13

1.94

1987

8.77

11.07

11.93

0.66

0.37

0.18

0.14

0.11

0.09

0.08

0.07

0.06

2.79

1988

1.21

9.01

1.81

3.00

0.34

0.14

0.07

0.05

0.04

0.04

0.03

0.03

1.31

1.16

0.75

2.55

1.14

0.85

1989
1990

2.82

3.01

1.04

0.40

0.04

0.02

0.01

0.01

0.00

3.15

2.92

1.54

1.25

1991

0.78

0.78

2.10

7.79

6.08

1.60

0.07

0.06

0.06

0.06

0.06

0.06

1.63

0.01

0.07

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.01

1.50

2.19

1992
1993

0.39

4.57

3.89

0.98

1994

4.52

11.71

22.48

19.10

9.58

0.32

1995

1.09

3.93

1.58

2.05

0.43

0.01

1996

3.94

10.47

13.81

14.70

1997

0.26

1.89

0.50

0.50

1998

23.45

66.97

80.86

1999

4.77

39.82

2000

2.24

2001

12.45

2002

0.95

8.48

Media

3.63

9.04

13.45

6.81

2.32

0.83

0.43

0.29

0.18

0.36

0.35

1.12

D.Est.

5.03

13.01

17.44

11.95

3.96

1.48

0.53

0.32

0.19

0.66

0.54

1.64

0.04

0.03

0.00

0.00

0.00

0.26

0.74

0.47

0.23

0.14

0.16

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.10

8.73

1.00

29.13

6.53

3.97

1.44

0.89

0.47

0.25

0.31

0.35

17.88

14.73

6.50

4.02

2.26

1.47

0.95

0.12

0.00

0.00

1.90

6.38

18.22

33.37

11.90

10.66

2.33

0.50

0.20

0.32

0.28

0.32

0.40

6.73

19.16

37.10

14.23

3.63

1.43

0.50

0.41

0.33

0.21

1.14

4.04

7.89

1.22

ANEXO: HIDROLOGIA Y CLIMATOLOGIA

3.25

Estudio de Pre Inversin a Nivel de Perfil del Proyecto:


ADECUACION DEL PROYECTO ORIGINALCHINECAS AL ESQUEMA REESTRUCTURADO.

Cuadro N 2: Descargas medias mensuales histricas, m/s. Estacin Puente Quillo, ro Sechn
Ao
1973
1974
1975
1976
1977
1978
1979
1980
1981
1982
1983
1984
1985
1986
1987
1988
1989
1990
1991
1992
1993
1994
1995
1996
1997
1998
1999
2000
2001
2002
Media
D.Est.

Ene
2.14
3.97
0.57
1.24
0.60
0.63
0.00
0.26
1.54
0.00
5.08
0.68
0.39
2.73
2.58
1.74
0.40
0.41
0.00
0.00
0.45
3.61
0.68
3.66
0.00
10.18
2.70
0.68
5.60
0.69
1.77
2.24

Feb
Mar
0.32
2.22
4.41
3.40
1.49
8.19
4.59
9.83
7.71
6.76
2.08
1.66
0.54
8.09
0.11
0.02
7.24
7.07
2.23
0.83
3.58 14.31
12.53 10.36
4.41
3.18
2.02
1.55
2.84
2.28

Abr
1.75
1.45
2.65
4.13
4.38
0.94
5.03
1.65
1.47
1.99
20.60
3.73
2.46
3.23

May
0.42
0.76
3.85
1.74
1.63
0.45
0.51
0.67
0.68
1.80
2.31
1.36
1.14
0.34

Jun
0.09
0.60
3.11
0.88
0.71
0.14
0.22
0.02
0.37
0.18
0.88
1.34
0.54
0.50
0.00

0.76
0.00
0.00
0.00
1.59
8.89
1.74
7.10
2.43
24.00
15.45
6.83
5.46
3.05
4.60
5.32

8.47
0.00
0.00
0.94
3.73
7.00
1.36
12.00
0.33
5.15
3.62
3.13
5.77

1.79
0.00
0.00
0.24
0.54
3.65
0.53
1.60
0.35
1.92
2.53
2.50
2.01

3.96
4.29

1.31
1.06

8.55
0.60
1.92
1.50
10.24
6.16
1.45
11.35
0.58
20.16
5.47
5.58
8.45
4.38
5.73
4.76

0.00
0.00
0.00
0.00
0.10
1.39
0.01
0.55
0.00
1.00
0.60
1.08
0.54

Jul
0.00
0.64
1.71
0.69
0.42
0.05
0.15
0.00
0.16
0.08
0.43
0.77
0.33
0.20
0.00
0.00
0.00
0.00
0.00
0.00
0.08
0.22
0.00
0.09
0.00
0.80
0.45
0.19
0.43

Ago
0.10
0.53
1.01
0.20
0.33
0.01
0.00
0.00
0.05
0.00
0.31
0.35
0.19
0.05
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.09
0.00
0.40
0.18
0.10
0.21

Set
0.17
0.30
0.32
0.20
0.33
0.00
0.00
0.00
0.00
0.00
0.25
0.22
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.51
0.00
0.10
0.18

Oct
0.41
0.19
0.58
0.20
0.23
0.00
0.00
1.67
0.00
0.10
0.08
0.24
0.08
0.00
0.00
0.00
0.00
0.76
0.00
0.00
0.44
0.00
0.00
0.00
0.00
0.56
0.21
0.20
0.20

0.53
0.66

0.27
0.38

0.14
0.22

0.09
0.14

0.21
0.35

Nov
0.43
0.07
0.17
0.20
0.21
0.00
0.00
2.01
0.00
0.51
0.06
0.12
0.00
0.02
0.00
0.00
0.00
1.71
0.43
0.00
0.23
0.00
0.24
0.12
0.10
0.33
0.06
0.20
1.48
1.56
0.34
0.56

Dic
0.71
0.03
0.10
0.20
0.22
0.00
0.00
1.91
0.00
1.06
0.89
0.41
0.39
0.48
0.00
0.16

Prom.
0.73
1.36
1.98
2.01
1.96
0.50
1.21

0.11
0.10
0.00
4.55
0.65
0.45
0.00
5.46
1.13
0.64
1.87
1.89
0.63
0.83
1.30

0.30
0.20
0.22
1.83
2.63
0.54
3.05
0.77
5.51
2.66
1.87
2.69

1.55
0.64
4.02
2.75
1.11
0.99

1.72

Cuadro N 3: Descargas medias mensuales histricas, m/s. Estacin Tutuma, ro Casma


Ao

Ene

Feb

Mar

Abr

May

Jun

1973

10.87

10.07

18.35

14.50

3.47

1.09

0.00

0.21

1974

17.21

16.82

12.29

4.65

0.99

0.74

0.90

0.69

1975

5.04

9.58

32.19

14.50

9.92

4.27

1.75

1.04

0.83

0.57

0.48

0.58

6.73

1976

8.12

15.45

28.06

20.87

3.84

4.25

2.94

2.35

2.22

1.34

1.02

0.80

7.60

1977

3.99

21.88

26.71

17.67

4.10

1.62

1.05

0.87

0.42

0.42

0.51

1.99

6.77

1978

2.16

7.62

8.32

5.13

1.66

0.75

0.61

0.30

0.04

0.00

0.08

0.30

2.25

1979

0.07

6.68

24.39

16.97

1.87

0.52

0.43

0.14

0.00

0.00

0.00

0.00

4.26

1980

1.03

0.36

1.62

7.00

0.00

0.00

0.00

0.00

0.00

8.55

4.99

10.76

2.86

1981

5.23

24.89

18.99

7.83

3.84

3.75

3.72

2.60

0.45

0.00

1.09

0.74

6.09

ANEXO: HIDROLOGIA Y CLIMATOLOGIA

Jul

Ago

Set

Oct

Nov

Dic

Prom.

0.89

4.88

4.77

11.34

6.70

0.57

0.39

0.25

0.11

4.63

Estudio de Pre Inversin a Nivel de Perfil del Proyecto:


ADECUACION DEL PROYECTO ORIGINALCHINECAS AL ESQUEMA REESTRUCTURADO.

Ao

Ene

Feb

Mar

Abr

May

Jun

Jul

Ago

Set

Oct

Nov

Dic

Prom.

1982

4.36

9.21

3.71

5.87

3.87

2.09

0.31

0.02

0.00

0.40

4.79

11.44

3.84

1983

15.35

9.15

27.18

40.07

8.15

6.19

3.93

2.29

0.75

0.57

0.51

3.09

9.77

1984

4.66

25.26

25.41

13.65

8.43

5.65

4.59

2.61

0.68

0.65

0.66

8.22

8.37

1985

4.57

8.29

10.36

8.58

7.98

6.00

4.29

2.09

0.07

0.15

0.00

0.85

4.43

1986

10.25

7.46

8.24

14.02

5.91

3.22

2.30

0.58

0.03

0.00

0.03

1.62

4.47

1987

10.71

9.40

10.06

4.28

1.72

0.00

0.00

0.00

0.00

0.00

0.39

3.32

1988

7.55

0.40

0.00

0.00

0.00

0.00

2.12

1989

7.55

30.69

3.95

1.41

0.55

2.81

1.35

0.00

1990

1.63

1991

0.06

1992

0.10

24.13

16.50

11.15

1.44

6.21

1.21

0.12

0.05

0.00

0.00

2.61

6.87

4.34

1.13

13.62

2.58

2.09

0.80

0.29

0.00

0.00

0.00

0.57

0.99

1.84

0.37

2.99

1.92

0.90

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.52

1993

0.87

6.93

35.68

19.00

4.39

0.27

0.46

0.10

0.00

6.23

9.47

18.42

8.48

1994

12.55

33.43

24.13

32.10

12.29

4.43

0.89

0.02

0.10

0.08

0.37

0.97

10.11

1995

3.45

6.89

6.32

5.80

1.75

0.37

0.00

0.00

0.00

0.00

2.12

2.58

2.44

1996

15.97

26.14

53.23

46.77

9.29

3.87

2.76

0.84

0.26

0.01

0.32

0.00

13.29

1997

0.75

8.34

3.71

0.81

1.09

0.52

0.00

0.00

0.00

0.00

0.07

19.32

2.88

1998

77.91

91.29

68.03

14.38

4.27

2.62

2.00

1.22

0.56

2.44

0.78

2.73

22.35

1999

6.69

36.98

11.47

9.62

9.50

3.35

2.00

1.11

0.40

0.43

0.39

1.92

6.99

2000

5.29

25.00

40.05

16.77

11.66

5.03

1.14

0.54

0.26

0.75

0.30

4.19

9.25

2001

12.15

9.68

18.90

14.27

4.27

1.00

0.93

0.50

1.01

1.12

4.13

4.53

6.04

2002

2.94

12.33

24.19

6.12

2.88

Media

8.64

16.30

20.29

13.82

5.22

2.38

1.44

0.74

0.35

1.19

1.73

3.91

13.99
D.Est.
Fuente: Inrena

17.64

15.41

11.16

3.67

2.03

1.50

0.88

0.48

2.08

2.51

5.27

6.40

Cuadro N 4: Descargas medias mensuales histricas, m/s. Estacin Condorcerro, ro


Santa
Ao
1956
1957
1958
1959
1960
1961
1962
1963
1964
1965
1966
1967
1968
1969
1970

Ene
166.1
116.7
137.0
132.2
194.3
233.2
253.6
154.0
196.5
115.4
235.3
185.5
136.7
111.1
254.8

Feb
216.1
139.5
195.3
137.2
243.2
197.4
241.3
291.7
252.7
126.7
208.4
168.3
143.4
137.8
171.6

Mar
356.3
295.3
290.0
336.4
319.0
390.2
515.4
471.7
312.2
415.5
176.7
449.4
180.3
212.7
184.5

Abr
366.0
538.8
239.9
252.8
315.0
313.1
370.2
290.6
277.7
223.6
124.5
173.3
109.0
216.2
224.5

May
105.7
135.1
80.7
83.6
117.8
114.7
106.3
100.8
118.8
97.2
90.0
96.0
63.1
100.0
77.5

ANEXO: HIDROLOGIA Y CLIMATOLOGIA

Jun
64.4
95.9
58.3
62.0
68.1
82.1
72.6
53.5
61.6
50.3
57.4
60.5
46.6
68.6
59.5

Jul
45.2
59.8
47.9
48.6
49.6
42.0
56.3
42.3
65.4
42.1
53.5
49.8
33.2
51.7
48.1

Ago
45.9
53.5
48.4
50.6
49.0
40.0
53.9
42.0
47.7
44.8
52.0
47.5
37.4
49.5
52.8

Set
46.1
63.0
76.0
50.7
48.3
55.8
67.7
48.8
44.4
34.2
57.3
49.3
50.3
53.2
66.3

Oct
71.5
87.0
96.0
91.6
61.2
61.1
59.7
63.6
73.9
95.0
115.7
116.6
82.4
85.9
104.4

Nov
66.9
66.9
108.9
95.1
97.2
166.9
81.4
130.2
103.6
99.0
125.8
102.4
94.8
106.3
164.9

Dic
74.6
119.7
124.4
191.8
102.4
288.0
87.4
237.5
144.1
140.0
124.4
110.1
100.0
150.5
285.7

Prom.
135.39
147.60
125.22
127.71
138.74
165.37
163.82
160.54
141.54
123.66
118.42
134.05
89.78
111.95
141.20

Estudio de Pre Inversin a Nivel de Perfil del Proyecto:


ADECUACION DEL PROYECTO ORIGINALCHINECAS AL ESQUEMA REESTRUCTURADO.

Ao
Ene
Feb
1971
345.0 294.4
1972
172.5 262.4
1973
220.6 295.9
1974
298.9 224.8
1975
228.8 235.4
1976
232.6 305.0
1977
159.7 424.4
1978
122.1 223.2
1979
125.8 248.5
1980
128.8 142.3
1981
159.4 477.1
1982
175.8 350.2
1983
341.4 202.6
1984
137.4 711.0
1985
142.5 158.5
1986
174.3 165.6
1987
301.6 292.7
1988
254.4 314.4
1989
203.2 339.4
1990
133.2 131.3
1991
120.5 143.8
1992
92.1
76.2
1993
105.1 324.4
1994
369.1 471.8
1995
141.9 151.9
1996
220.0 309.7
1997
103.6 192.2
1998
390.4 522.3
1999
163.1 508.9
2000
110.1 332.3
2001
367.9 307.3
2002
154.3 202.8
2003
165.1 221.2
2004
104.5 167.2
2005
148.4 162.4
2006
129.6 221.9
2007
218.3 196.8
2008
182.3 284.8
2009
183.5 280.4
Media 183.4 276.1
D.Est. 84.1 138.9
Fuente: P.E. Chavimochic

Mar
811.2
511.8
403.2
412.7
377.6
352.1
297.8
173.9
505.3
129.5
394.0
190.0
386.1
600.0
172.5
198.2
215.4
191.0
345.2
116.6
354.0
131.2
740.3
391.2
228.0
357.4
135.6
617.3
315.5
333.4
500.9
383.8
258.2
138.0
294.2
392.9
321.0
316.9
317.0
317.0
153.9

Abr
483.2
548.1
415.4
254.0
324.6
166.3
186.7
140.7
231.3
130.0
177.7
192.8
330.8
346.4
174.5
269.2
159.1
243.2
312.7
88.7
134.7
108.8
616.4
262.5
230.1
313.3
73.2
342.1
209.7
231.6
227.1
283.6
190.3
123.9
179.2
374.6
330.6
225.8
231.0
233.9
106.3

May
126.1
96.5
158.9
100.0
97.7
73.9
93.8
113.9
102.1
72.2
86.7
97.7
153.5
171.3
83.5
105.9
113.7
124.0
106.0
52.0
90.0
59.1
170.3
50.0
77.8
103.2
57.9
142.2
119.0
146.0
78.0
95.0
85.1
66.4
78.2
98.7
117.0
100.0

Jun
89.7
51.7
84.5
76.4
71.7
63.3
68.7
64.1
63.1
64.7
66.9
65.5
89.5
93.5
46.7
54.6
55.2
62.2
61.3
48.0
49.2
38.5
62.0
44.9
46.7
54.5
39.4
70.0
63.0
63.3
56.6
55.5
56.3
44.8
54.3
63.9
59.7
58.4

Jul
59.7
67.8
69.0
57.9
52.5
48.4
52.0
53.2
51.6
50.7
54.7
48.9
63.8
58.6
35.3
40.8
46.3
46.1
39.9
38.8
38.8
30.5
43.8
48.0
38.7
42.7
37.6
52.3
45.0
43.8
47.8
51.0
46.9
36.4
48.3
47.1
46.0
45.8

Ago
53.4
60.2
61.3
52.4
51.9
43.7
53.2
42.8
50.6
54.1
47.6
43.0
53.4
45.0
34.4
38.2
41.4
41.4
33.8
38.4
38.6
29.7
38.8
40.6
41.1
41.8
37.6
50.4
43.6
43.8
44.5
41.2
44.3
34.9
45.9
43.0
56.2
55.8

Set
61.0
60.6
72.0
68.2
66.8
46.2
53.9
65.9
61.7
72.4
44.4
48.7
54.0
45.1
52.2
39.7
48.9
48.5
37.4
37.8
39.3
29.2
57.6
45.5
43.0
41.2
48.5
50.2
55.9
45.5
49.8
41.9
42.5
33.9
47.3
43.0
47.4
47.4

Oct
84.6
70.8
131.7
98.0
95.0
68.2
66.7
66.8
73.9
108.7
89.6
107.1
70.5
106.7
53.2
57.0
62.4
61.8
100.5
84.7
54.2
48.1
96.2
44.6
47.3
63.6
52.5
97.8
60.2
53.1
57.4
73.7
63.1
81.9
62.6
43.0
71.4
70.4

Nov
66.9
93.5
164.8
229.8
161.0
75.5
113.7
100.2
100.8
138.9
171.0
181.8
94.3
78.8
62.7
83.0
114.3
85.7
90.5
143.4
61.6
47.6
202.9
70.6
94.8
73.2
112.3
106.3
66.3
61.2
173.0
166.6
60.8
149.2
65.5
43.0
105.6
103.5

Dic
64.8
134.6
233.0
431.3
276.8
85.9
127.0
118.4
113.3
238.6
195.0
257.1
176.9
144.0
89.8
131.6
173.6
87.8
67.3
114.3
85.3
60.1
275.9
103.2
114.4
69.7
279.1
83.3
148.4
93.7
180.7
185.1
135.4
167.7
115.8
43.0
143.1
139.6

100.5
32.1

58.6
12.0

45.8
7.1

43.1
6.5

47.3
9.0

70.4
19.6

103.5
42.8

139.7
62.0

ANEXO: HIDROLOGIA Y CLIMATOLOGIA

Prom.
211.65
177.54
192.52
192.04
169.98
130.11
141.47
107.11
144.01
110.90
163.69
146.55
168.06
211.50
92.14
113.17
135.37
130.04
144.78
85.59
100.83
62.59
227.81
161.83
104.64
140.86
97.45
210.39
149.89
129.83
174.24
144.55
114.09
95.72
108.50
128.65
142.76
135.88
252.96
138.64

Estudio de Pre Inversin a Nivel de Perfil del Proyecto:


ADECUACION DEL PROYECTO ORIGINALCHINECAS AL ESQUEMA REESTRUCTURADO.

Cuadro N 5: Descargas medias mensuales histricas, m/s. Estacin Huacapongo, ro Vir


Ao

Ene

Feb

Mar

Abr

May

Jun

Jul

Ago

Set

Oct

Nov

Dic

Prom.

1960

5.63

7.64

16.78

5.97

1.58

0.27

0.08

0.05

0.06

0.09

0.21

0.28

3.22

1961

4.90

3.44

9.39

6.87

2.44

0.52

0.15

0.06

0.06

0.06

0.07

0.48

2.37

1962

7.01

12.56

28.17

14.57

1.81

0.31

0.14

0.08

0.06

0.05

0.10

0.05

5.41

1963

0.31

0.21

14.17

22.35

1.83

0.13

0.06

0.05

0.02

0.02

0.04

3.86

3.59

1964

3.31

7.84

9.26

9.96

2.61

0.28

0.19

0.25

0.20

0.36

1.81

0.33

3.03

1965

0.43

1.13

22.27

11.57

0.83

0.22

0.16

0.03

0.11

0.30

0.38

0.61

3.17

1966

3.72

1.90

1.70

1.12

1.02

0.22

0.11

0.05

0.04

0.99

0.73

0.11

0.98

1967

3.83

30.33

11.21

1.72

1.06

0.38

0.31

0.12

0.03

3.10

0.94

0.32

4.45

1968

0.44

0.37

2.62

1.78

0.06

0.06

0.03

0.03

0.03

0.38

1.05

0.31

0.59

1969

0.19

1.44

10.09

9.42

0.46

0.18

0.04

0.03

0.02

0.12

0.16

5.61

2.31

1970

27.81

1.72

2.39

8.78

8.98

1.50

0.47

0.21

0.23

0.64

0.77

4.11

4.80

1971

1.72

8.29

24.89

13.61

1.51

0.55

0.42

0.37

0.30

0.73

0.53

4.15

4.76

1972

8.12

11.63

66.30

18.20

2.30

1.20

0.41

0.37

0.16

0.12

0.22

2.91

9.33

1973

10.42

4.93

10.71

18.74

1.94

1.32

1.34

0.80

0.57

1.03

1.40

1.13

4.53

1974

4.15

3.05

3.86

1.73

0.81

0.56

0.43

0.23

0.26

0.47

0.19

0.10

1.32

1975

2.71

9.15

51.06

19.51

2.80

2.04

0.67

0.34

0.42

1.31

0.47

0.18

7.56

1976

3.76

4.69

6.85

2.07

0.75

0.61

0.33

0.20

0.12

0.04

0.03

0.03

1.62

1977

1.61

22.80

17.09

5.73

0.43

0.41

0.22

0.11

0.04

0.03

0.03

0.50

4.08

1978

0.12

0.59

0.41

0.46

0.84

0.08

0.03

0.02

0.02

0.02

0.11

0.06

0.23

1979

0.23

3.15

15.26

4.40

0.71

0.39

0.11

0.04

0.07

0.04

0.01

0.01

2.03

1980

0.10

0.04

0.11

0.18

0.01

0.01

0.01

0.01

0.01

1.20

2.21

6.61

0.87

1981

0.99

25.61

37.87

6.00

0.54

0.09

0.04

0.03

0.01

0.70

1.29

1982

0.37

3.61

1.69

1.67

0.74

0.17

0.11

0.28

0.04

0.65

1.26

1.91

1.04

1983

15.56

1.47

22.39

35.27

4.51

1.36

0.21

0.08

0.06

0.69

0.09

1.34

6.92

1984

0.54

29.57

13.58

2.51

6.11

1.29

0.56

0.14

0.06

0.37

0.31

2.26

4.78

1985

0.97

0.31

1.41

2.51

0.74

0.23

0.13

0.06

0.11

0.20

0.05

0.16

0.57

1986

2.97

1.60

1.80

10.18

3.71

0.29

0.09

0.04

0.02

0.01

0.22

2.09

1.92

1987

15.29

14.57

4.53

1.27

0.62

0.05

0.02

0.02

0.02

0.01

0.17

0.05

3.05

1988

4.32

13.40

3.99

7.41

1.67

0.31

0.05

0.01

0.01

0.13

0.25

0.28

2.65

1989

3.18

20.71

8.03

8.43

1.41

0.15

0.07

0.04

0.03

0.85

0.31

0.02

3.60

1990

0.88

0.90

0.39

0.17

0.07

0.10

0.09

0.06

0.04

0.36

1.72

1.08

0.49

1991

0.14

0.70

3.01

1.39

1.30

0.11

0.05

0.05

0.04

0.05

0.31

0.42

0.63

1992

0.14

0.07

1.24

0.81

0.34

0.27

0.06

0.03

0.03

0.24

0.27

0.04

0.30

1993

1.05

6.71

9.10

8.64

1.75

0.38

0.19

0.05

0.29

0.98

2.86

3.09

2.92

1994

6.37

9.29

14.78

4.97

2.39

0.66

0.29

0.16

0.11

0.05

0.21

0.74

3.33

1995

1.26

2.02

0.95

3.10

0.46

0.17

0.13

0.13

0.08

0.20

0.86

1.07

0.87

1996

4.97

10.46

9.24

5.02

1.20

0.70

0.39

0.20

0.13

0.27

0.44

0.28

2.77

1997

0.16

3.03

2.89

0.74

1.94

0.34

0.17

0.12

0.11

0.17

1.94

14.87

2.21

1998

62.76

53.94

137.87

24.10

5.77

1.63

0.51

0.27

0.27

0.70

0.85

0.28

24.08

ANEXO: HIDROLOGIA Y CLIMATOLOGIA

Estudio de Pre Inversin a Nivel de Perfil del Proyecto:


ADECUACION DEL PROYECTO ORIGINALCHINECAS AL ESQUEMA REESTRUCTURADO.

Ao

Ene

Feb

Mar

Abr

May

Jun

Jul

Ago

Set

Oct

Nov

Dic

Prom.

1999

0.98

2000

0.49

19.23

9.00

4.68

3.59

1.29

0.18

0.07

0.02

0.00

0.00

0.22

3.27

5.75

12.70

5.00

4.45

0.09

0.05

0.03

0.00

0.00

0.00

0.77

2.45

2001

11.96

10.36

22.11

11.44

1.22

0.87

0.41

0.18

0.01

0.00

0.93

2.64

5.18

2002

0.61

5.86

19.13

7.77

0.84

0.10

0.06

0.01

0.00

0.00

2.99

3.08

3.37

2003

1.52

2.86

5.32

6.61

1.13

0.35

0.10

0.00

0.00

0.00

0.00

0.00

1.49

2004

0.00

2.20

0.38

0.00

0.10

0.00

0.00

0.00

0.00

2.62

3.60

2005

2.11

2.20

9.11

4.81

0.42

0.11

0.01

0.00

0.00

0.00

0.00

2006

0.53

7.08

23.66

11.89

0.35

0.14

0.07

0.00

0.00

0.00

0.21

3.02

3.91

2007

8.31

7.54

12.64

11.35

5.26

0.53

0.15

0.04

0.00

0.00

0.28

0.00

3.84

2008

4.93

13.79

9.49

Media

4.98

8.42

14.88

7.68

1.82

0.48

0.21

0.12

0.09

0.36

0.65

1.62

D.Est.
9.89
Fuente: Inrena

10.30

22.10

7.26

1.85

0.49

0.23

0.14

0.12

0.54

0.79

2.52

9.40
3.59

Cuadro N 6: Descargas medias mensuales histricas, m/s. Estacin Quirihuac, ro Moche


Ao
1960
1961
1962
1963
1964
1965
1966
1967
1968
1969

Ene
7.73
9.26
15.64
0.42
9.82
1.70
30.30
22.05
0.69
0.61

Feb
18.06
5.09
31.86
0.64
16.56
3.40
10.21
95.27
1.11
4.63

Mar
30.75
18.34
68.24
24.63
38.83
37.02
11.46
49.42
7.76
27.65

Abr
15.83
16.11
52.63
28.43
59.12
20.59
9.95
13.09
4.80
29.96

May
3.91
7.59
7.43
6.58
10.80
6.83
5.95
5.94
0.51
3.80

Jun
0.90
2.23
2.32
0.80
1.89
1.33
0.89
1.43
0.24
1.89

Jul
0.33
0.51
0.76
0.35
1.02
0.59
0.38
0.81
0.14
0.45

Ago
0.22
0.15
0.37
0.18
0.85
0.32
0.19
0.35
0.11
0.17

Set
0.48
0.09
0.25
0.07
0.68
0.44
0.19
0.24
0.24
0.13

Oct
0.76
0.18
0.26
0.28
2.55
1.66
3.00
3.42
2.17
0.78

Nov
0.66
1.00
1.07
1.44
6.69
3.37
3.95
1.21
1.58
3.73

Dic
1.11
3.19
0.28
7.24
0.86
3.02
0.85
0.74
0.82
12.64

Prom.
6.73
5.31
15.09
5.92
12.47
6.69
6.44
16.16
1.68
7.20

1970
1971
1972
1973
1974
1975
1976
1977
1978
1979
1980
1981

28.18
4.70
9.78
15.57
10.49
7.55
5.64
8.75
0.64
1.63
0.18
2.40

4.37
10.10
8.99
8.60
16.51
17.89
10.19
53.55
1.14
7.17
0.21
41.92

7.99
54.59
46.13
28.25
15.52
59.95
29.05
23.01
2.27
23.08
1.16
27.91

24.12
29.14
26.05
60.87
12.35
30.77
13.61
11.26
4.41
9.87
2.69
7.52

18.06
5.48
6.49
32.75
3.69
9.27
6.27
3.57
5.33
3.05
0.29
2.49

3.52
2.00
3.12
5.62
1.61
4.13
3.26
1.38
0.50
1.04
0.10
0.61

0.96
1.09
1.02
3.93
0.92
1.20
0.85
0.68
0.15
0.25
0.07
0.38

0.59
1.06
0.59
1.47
0.39
0.90
0.44
0.55
0.07
0.16
0.06
0.22

0.87
1.29
0.34
1.97
0.45
3.44
0.38
0.33
0.24
0.35
0.03
0.13

3.90
4.00
0.62
4.34
2.16
8.65
0.20
0.41
0.17
0.19
3.05
0.97

5.75
2.35
0.91
6.11
0.87
4.62
0.16
0.32
0.72
0.16
5.96
2.48

10.44
4.71
4.82
5.18
1.08
0.99
0.38
1.98
0.63
0.13
23.82
7.87

9.06
10.04
9.07
14.56
5.50
12.45
5.87
8.82
1.36
3.92
3.14
7.91

1982
1983
1984
1985
1986

2.47
23.47
3.04
2.86
13.84

8.41
9.45
42.12
3.38
7.77

4.72
55.29
26.59
6.97
8.68

11.77
49.06
9.02
7.47
23.29

4.14
16.83
12.03
3.21
6.72

0.97
8.74
6.71
1.09
1.18

0.41
2.00
2.54
0.34
0.43

0.28
0.95
1.27
0.24
0.25

0.10
0.87
0.93
1.27
0.28

2.17
1.60
1.74
1.12
0.33

3.23
1.02
3.13
0.33
1.26

10.28
6.40
6.69
1.49
4.04

4.08
14.64
9.65
2.48
5.67

ANEXO: HIDROLOGIA Y CLIMATOLOGIA

Estudio de Pre Inversin a Nivel de Perfil del Proyecto:


ADECUACION DEL PROYECTO ORIGINALCHINECAS AL ESQUEMA REESTRUCTURADO.

Ao
1987
1988
1989
1990
1991
1992
1993
1994
1995
1996
1997
1998

Ene
19.23
9.27
10.95
0.47
1.82
1.81
0.71
19.24
3.76
8.05
0.24
63.56

1999
7.88
2000
4.19
2001
23.37
2002
2.84
2003
5.53
2004
0.86
2005
5.05
2006
1.76
2007
12.11
2008
5.72
Media 9.14
D.Est. 11.13
Fuente: Inrena

Feb
Mar
21.40
9.96
17.93
9.21
27.19 22.02
3.48
5.41
4.42
12.19
0.57
7.10
15.54 28.28
31.91 26.76
6.20
7.68
19.81 20.73
6.24
4.33
121.14 228.87

Abr
11.72
24.35
27.34
2.34
7.36
9.83
26.51
25.48
11.27
19.31
3.33
58.38

May
5.79
11.77
7.88
1.39
6.34
4.96
12.75
14.51
4.51
9.64
2.77
35.74

Jun
0.80
2.83
1.25
0.62
0.90
1.04
3.46
5.52
1.87
3.78
0.32
11.40

Jul
0.51
0.87
0.66
0.23
0.37
0.16
1.10
2.95
0.90
1.45
0.17
3.27

Ago
0.37
0.29
0.45
0.12
0.21
0.09
0.54
1.05
0.63
0.41
0.12
1.57

Set
0.28
0.19
0.36
0.11
0.10
0.06
0.77
0.90
0.20
0.23
0.11
1.65

Oct
0.28
1.42
6.01
1.40
0.22
0.10
3.77
0.35
0.86
1.03
0.10
2.42

Nov
1.67
3.21
2.41
6.96
0.88
0.13
12.26
1.37
4.05
1.91
2.14
2.23

Dic
1.03
1.87
0.53
4.87
1.15
0.05
7.63
4.33
4.23
0.27
33.96
1.08

Prom.
6.09
6.93
8.92
2.28
3.00
2.16
9.44
11.20
3.85
7.22
4.48
44.28

88.21
19.04
29.97
10.21
12.32
8.17
5.67
16.16
12.16
19.78
19.10
24.49

25.28
41.28
55.97
36.68
15.29
7.20
14.25
24.00
29.45
29.26
22.24
15.89

26.88
25.57
13.74
6.08
6.54
2.58
1.53
2.23
10.18

7.63
3.85
7.08
4.25
2.21
0.61
0.21
0.84
0.89

4.41
3.05
2.63
2.35
0.77
0.10
0.09
0.12
0.15

1.68
1.64
1.92
0.95
0.45
0.07
0.08
0.10
0.09

3.79
1.21
2.82
10.57
0.21
0.06
0.06
0.09
0.07

6.55
1.54
2.95
1.74
0.16
2.08
0.06
0.08
0.15

3.67
0.27
10.76
5.84
0.14
6.23
0.06
0.53
2.88

3.35
2.72
8.61
7.55
1.20
10.43
0.52
5.76
1.29

16.34
11.54
20.36
10.46
4.68
4.21
3.90
7.30
7.48

8.59
7.83

2.52
2.47

1.02
1.07

0.53
0.49

0.83
1.66

1.75
1.87

2.79
2.72

4.67
6.17

8.50

16.77
34.14
84.51
36.51
11.37
12.18
19.24
35.89
20.30
29.28
28.94
34.35

ANEXO: HIDROLOGIA Y CLIMATOLOGIA

Estudio de Pre Inversin a Nivel de Perfil del Proyecto:


ADECUACION DEL PROYECTO ORIGINALCHINECAS AL ESQUEMA REESTRUCTURADO.

Apndice 2
Descargas medias mensuales extendidas

ANEXO: HIDROLOGIA Y CLIMATOLOGIA

Estudio de Pre Inversin a Nivel de Perfil del Proyecto:


ADECUACION DEL PROYECTO ORIGINALCHINECAS AL ESQUEMA REESTRUCTURADO.

Cuadro N 1: Descargas medias mensuales extendidas ro Nepea, m/s. Estacin San Jacinto
Ao
1960
1961
1962
1963
1964
1965
1966
1967
1968
1969
1970
1971
1972
1973
1974
1975
1976
1977
1978
1979
1980
1981
1982
1983
1984
1985
1986
1987
1988
1989
1990
1991
1992
1993
1994
1995
1996
1997
1998
1999
2000
2001
2002
2003
2004
2005

Ene
1.47
7.34
6.08
0.32
0.30
0.29
3.61
2.59
0.18
0.04
13.77
0.53
3.85
10.27
6.84
0.59
1.26
0.44
0.08
0.03
0.03
0.79
1.90
15.41
2.63
0.05
0.54
8.77
1.21
1.60
2.82
0.78
0.20
0.39
4.52
1.09
3.94
0.26
23.45
4.77
2.24
12.45
0.95
0.60
0.10
2.00

Feb
4.26
5.28
10.82
2.44
3.25
1.02
2.24
18.73
0.13
0.10
0.15
2.41
5.22
2.25
11.79
1.82
2.55
10.28
0.55
1.12
0.03
16.33
8.27
9.57
42.81
2.60
4.71
11.07
9.01
5.00
3.01
0.78
0.01
4.57
11.71
3.93
10.47
1.89
66.97
39.82
18.22
19.16
8.48
2.50
9.80
9.80

Mar
7.57
8.30
17.87
9.41
6.42
8.86
2.73
12.86
0.63
2.06
1.44
12.84
31.68
11.81
10.00
27.87
3.97
5.68
0.68
17.03
2.65
6.54
0.72
71.65
33.48
3.61
7.89
11.93
1.81
2.70
1.04
2.10
0.07
3.89
22.48
1.58
13.81
0.50
80.86
14.73
33.37
37.10
19.00
1.10
5.90
23.20

Abr May Jun


2.33 0.58 0.46
8.73 0.72 0.62
5.67 1.09 0.75
7.38 0.80 0.39
4.32 0.90 0.50
3.07 0.67 0.23
0.33 0.32 0.26
2.62 0.64 0.24
0.34 0.10 0.07
1.58 0.08 0.05
1.74 2.10 0.60
7.98 3.82 1.98
9.37 2.53 1.14
9.90 1.84 0.61
1.79 0.71 0.53
2.55 0.93 0.42
1.57 0.36 0.12
2.40 0.53 0.21
0.23 0.03 0.03
3.33 0.10 0.08
0.19 0.02 0.01
1.05 0.21 0.19
0.56 0.05 0.03
72.77 21.30 8.73
9.97 6.55 1.18
0.58 0.06 0.05
5.87 1.90 0.93
0.66 0.37 0.18
3.00 0.34 0.14
0.70 1.60 0.10
0.40 0.04 0.02
7.79 6.08 1.60
0.00 0.00 0.00
0.98 0.20 0.20
19.10 9.58 0.32
2.05 0.43 0.01
14.70 7.20 0.47
0.50 0.00 0.00
29.13 6.53 3.97
6.50 4.02 2.26
11.90 10.66 2.33
14.23 3.63 1.43
13.50 1.20 0.30
2.60 0.20 0.10
0.20 0.00 0.00
11.50 0.50 0.20

ANEXO: HIDROLOGIA Y CLIMATOLOGIA

Jul
0.41
0.54
0.65
0.36
0.43
0.24
0.26
0.37
0.06
0.05
0.59
1.40
0.76
0.65
0.50
0.30
0.10
0.15
0.03
0.05
0.02
0.16
0.03
2.77
0.28
0.05
0.59
0.14
0.07
0.10
0.01
0.07
0.00
0.20
0.20
0.00
0.23
0.00
1.44
1.47
0.50
0.50
0.20
0.00
0.00
0.10

Ago
0.35
0.43
0.52
0.34
0.35
0.20
0.25
0.24
0.06
0.05
0.39
1.35
0.60
0.61
0.44
0.21
0.10
0.12
0.04
0.05
0.03
0.15
0.03
0.64
0.12
0.05
0.29
0.11
0.05
1.16
0.01
0.06
0.00
0.40
0.04
0.00
0.14
0.00
0.89
0.95
0.20
0.41
0.20
0.00
0.00
0.00

Set
0.24
0.32
0.43
0.21
0.27
0.18
0.14
0.14
0.04
0.05
0.27
0.81
0.36
0.45
0.07
0.20
0.10
0.08
0.04
0.05
0.03
0.11
0.03
0.28
0.05
0.05
0.17
0.09
0.04
0.75
0.00
0.06
0.00
0.20
0.03
0.00
0.16
0.00
0.47
0.12
0.32
0.33
0.10
0.00
0.00
0.10

Oct
0.20
0.24
0.34
0.20
0.19
0.15
0.37
0.64
0.04
0.04
0.32
0.19
0.30
0.88
0.04
0.15
0.10
0.08
0.04
0.05
0.89
0.06
0.03
0.24
2.00
0.05
0.10
0.08
0.04
2.55
3.15
0.06
0.00
0.90
0.10
0.00
0.00
0.00
0.25
0.00
0.28
0.21
0.20
0.00
0.10
0.00

Nov
0.17
0.19
0.25
0.18
0.27
0.14
0.10
0.19
0.04
0.04
0.79
0.26
0.37
0.61
0.04
0.10
0.10
0.08
0.02
0.05
0.68
0.13
0.99
0.14
0.22
0.05
0.10
0.07
0.03
1.14
2.92
0.06
0.00
1.50
0.20
0.26
0.00
0.10
0.31
0.00
0.32
1.14
0.20
0.00
0.10
0.00

Dic Prom.
0.13 1.51
1.89 2.88
0.22 3.72
1.62 1.97
0.19 1.45
0.16 1.27
0.07 0.89
0.16 3.28
0.04 0.14
2.23 0.53
0.67 1.90
2.65 3.02
3.82 5.00
0.84 3.39
0.03 2.73
0.10 2.94
0.05 0.86
0.08 1.68
0.03 0.15
0.05 1.83
2.20 0.56
0.17 2.16
2.79 1.29
2.42 17.16
2.23 8.46
0.05 0.60
0.13 1.94
0.06 2.79
0.03 1.31
0.85 1.52
1.54 1.25
0.06 1.63
0.00 0.02
2.19 1.30
2.90 5.93
0.74 0.84
0.00 4.26
8.73 1.00
0.35 17.88
1.90 6.38
0.40 6.73
4.04 7.89
1.22 3.80
0.20 0.61
1.70 1.49
0.10 3.96

Estudio de Pre Inversin a Nivel de Perfil del Proyecto:


ADECUACION DEL PROYECTO ORIGINALCHINECAS AL ESQUEMA REESTRUCTURADO.

Ao
2006
2007
2008
Media
D. Est.
Inrena

Ene
0.30
3.30
0.80
3.22
4.77

Feb
4.30
6.40
13.00
8.79
12.19

Mar
20.70
3.80
21.10
13.24
16.51

Abr
4.90
2.00
8.20
6.59
11.27

May
0.50
1.30
2.70
2.16
3.78

Jun
0.10
0.60
0.70
0.72
1.40

Jul
0.20
0.90
0.40
0.38
0.50

Ago
0.10
0.40
0.60
0.28
0.31

Set
0.00
0.50
0.30
0.18
0.19

Oct
0.00
0.10
0.20
0.33
0.63

Nov
0.10
0.30
0.10
0.31
0.50

Dic Prom.
0.60 2.65
0.00 1.63
0.00 4.01
1.07 3.11
1.58

Extendido

Cuadro N 2: Descargas medias mensuales extendidas ro Sechn, m/s. Estacin Puente Quillo
Ao
1960
1961
1962
1963
1964
1965
1966
1967
1968
1969
1970
1971
1972
1973
1974
1975
1976
1977
1978
1979
1980
1981
1982
1983
1984
1985
1986
1987
1988
1989
1990
1991
1992
1993
1994
1995
1996

Ene
Feb
1.30 3.30
0.40 3.20
7.00 3.90
0.30 0.20
2.90 0.50
0.10 0.90
2.70 3.60
1.00 9.10
0.20 0.50
0.20 0.10
17.40 1.10
2.90 1.40
2.70 3.90
2.14 0.32
3.97 4.41
0.57 1.49
1.24 4.59
0.60 7.71
0.63 2.08
0.00 0.54
0.26 0.11
1.54 7.24
0.00 2.23
5.08 3.58
0.68 12.53
0.39 4.41
2.73 2.02
2.58 2.84
1.74 1.50
0.40 0.76
0.41 0.00
0.00 0.00
0.00 0.00
0.45 1.59
3.61 8.89
0.68 1.74
3.66 7.10

Mar
Abr May
8.60 8.80 1.90
5.60 5.00 0.10
9.50 1.00 0.80
4.60 4.20 0.00
6.30 1.20 1.40
8.00 6.80 0.90
7.50 1.50 2.00
7.70 6.30 3.10
2.00 2.10 2.00
6.40 0.10 1.50
0.80 3.10 3.40
10.20 8.20 3.00
15.00 2.00 1.00
2.22 1.75 0.42
3.40 1.45 0.76
8.19 2.65 3.85
9.83 4.13 1.74
6.76 4.38 1.63
1.66 0.94 0.45
8.09 5.03 0.51
0.02 1.65 0.00
7.07 1.47 0.67
0.83 1.99 0.68
14.31 20.60 1.80
10.36 3.73 2.31
3.18 2.46 1.36
1.55 3.23 1.14
2.28 6.60 0.34
1.20 3.20 0.10
8.55 8.47 1.79
0.60 0.00 0.00
1.92 0.00 0.00
1.50 0.94 0.24
10.24 3.73 0.54
6.16 7.00 3.65
1.45 1.36 0.53
11.35 12.00 1.60

ANEXO: HIDROLOGIA Y CLIMATOLOGIA

Jun
0.80
0.00
0.10
0.00
0.70
0.20
0.40
0.50
0.40
0.40
2.90
1.50
0.50
0.09
0.60
3.11
0.88
0.71
0.14
0.22
0.02
0.37
0.18
0.88
1.34
0.54
0.50
0.00
0.00
0.00
0.00
0.00
0.00
0.10
1.39
0.01
0.55

Jul Ago
0.40 0.10
0.00 0.00
0.10 0.10
0.00 0.00
0.10 0.20
0.30 0.10
0.30 0.10
0.10 0.00
0.10 0.10
0.10 0.00
3.30 0.20
0.90 0.20
0.30 0.20
0.00 0.10
0.64 0.53
1.71 1.01
0.69 0.20
0.42 0.33
0.05 0.01
0.15 0.00
0.00 0.00
0.16 0.05
0.08 0.00
0.43 0.31
0.77 0.35
0.33 0.19
0.20 0.05
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.08 0.00
0.22 0.00
0.00 0.00
0.09 0.09

Set Oct Nov


0.00 0.00 0.00
0.00 0.00 0.00
0.10 0.00 0.10
0.00 0.10 0.00
0.00 0.50 0.60
0.00 0.60 0.20
0.00 0.20 0.10
0.30 1.30 0.30
0.10 0.10 0.30
0.00 0.00 0.00
0.00 2.40 0.40
0.10 0.10 0.40
0.00 0.00 0.40
0.17 0.41 0.43
0.30 0.19 0.07
0.32 0.58 0.17
0.20 0.20 0.20
0.33 0.23 0.21
0.00 0.00 0.00
0.00 0.00 0.00
0.00 1.67 2.01
0.00 0.00 0.00
0.00 0.10 0.51
0.25 0.08 0.06
0.22 0.24 0.12
0.00 0.08 0.00
0.00 0.00 0.02
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.76 1.71
0.00 0.00 0.43
0.00 0.00 0.00
0.00 0.44 0.23
0.00 0.00 0.00
0.00 0.00 0.24
0.00 0.00 0.12

Dic Prom.
0.00
2.10
2.10
1.37
0.10
1.90
2.00
0.95
0.20
1.22
0.20
1.53
0.00
1.53
0.00
2.48
0.30
0.68
1.60
0.87
0.90
2.99
0.40
2.44
3.60
2.47
0.71
0.73
0.03
1.36
0.10
1.98
0.20
2.01
0.22
1.96
0.00
0.50
0.00
1.21
1.91
0.64
0.00
1.55
1.06
0.64
0.89
4.02
0.41
2.75
0.39
1.11
0.48
0.99
0.00
1.22
0.16
0.66
0.00
1.66
0.11
0.30
0.10
0.20
0.00
0.22
4.55
1.83
0.65
2.63
0.45
0.54
0.00
3.05

Estudio de Pre Inversin a Nivel de Perfil del Proyecto:


ADECUACION DEL PROYECTO ORIGINALCHINECAS AL ESQUEMA REESTRUCTURADO.

Ao
1997
1998
1999
2000
2001
2002
2003
2004
2005
2006
2007
2008
Media
D. Est.

Ene
Feb
0.00 2.43
10.18 24.00
2.70 15.45
0.68 6.83
5.60 5.46
0.69 3.05
0.40 0.50
0.00 4.60
2.10 1.80
0.10 4.40
4.60 0.90
2.00 6.10
2.07 3.77
3.05 4.44

Inrena

Extendido

Mar
Abr May
0.58 0.33 0.35
20.16 5.15 1.92
5.47 3.62 2.53
5.58 3.13 2.50
8.45 5.77 2.01
4.38 6.00 1.30
3.60 1.10 2.10
6.30 1.00 0.10
5.50 3.00 3.00
8.00 9.50 0.40
4.50 9.10 0.70
12.40 10.20 3.10
6.12 4.22 1.37
4.29 3.82 1.08

Jun
0.00
1.00
0.60
1.08
0.54
0.20
0.50
0.00
0.40
0.00
0.20
3.00
0.56
0.74

Jul Ago
0.00 0.00
0.80 0.40
0.45 0.18
0.19 0.10
0.43 0.21
0.00 0.10
0.10 0.00
0.00 0.00
0.10 0.00
0.00 0.00
0.10 0.00
1.10 0.00
0.31 0.11
0.55 0.18

Set Oct Nov


0.00 0.00 0.10
0.51 0.56 0.33
0.00 0.21 0.06
0.10 0.20 0.20
0.18 0.20 1.48
0.00 0.00 1.56
0.00 0.00 0.00
0.00 0.10 0.10
0.00 0.00 0.00
0.00 0.10 0.10
0.00 0.00 0.20
0.00 0.00 0.30
0.06 0.24 0.28
0.12 0.46 0.46

Dic Prom.
5.46
0.77
1.13
5.51
0.64
2.66
1.87
1.87
1.89
2.69
0.63
1.49
0.00
0.69
1.30
1.13
0.00
1.33
0.50
1.93
0.10
1.70
0.50
3.23
0.77
1.66
1.16

Cuadro N 3: Descargas medias mensuales extendidas ro Casma, m/s. Estacin Tutuma


Ao
1960
1961
1962
1963
1964
1965
1966
1967
1968
1969
1970
1971
1972
1973
1974
1975
1976
1977
1978
1979
1980
1981
1982
1983
1984
1985
1986
1987

Ene
12.4
28.7
15.4
3.1
21.3
3.9
16.4
5.6
0.3
0.4
60.4
12.2
19.9
10.87
17.21
5.04
8.12
3.99
2.16
0.07
1.03
5.23
4.36
15.35
4.66
4.57
10.25
10.71

Feb
31.2
15.9
5.3
0.4
16.4
6.4
20.1
9.8
2
1.2
27.9
11.5
18.1
10.07
16.82
9.58
15.45
21.88
7.62
6.68
0.36
24.89
9.21
9.15
25.26
8.29
7.46
9.40

Mar
37.1
16.5
38.3
14.1
14.1
28.7
16.2
17
16
28.2
4.6
37.2
61.7
18.35
12.29
32.19
28.06
26.71
8.32
24.39
1.62
18.99
3.71
27.18
25.41
10.36
8.24
10.06

Abr May
27
4.7
8.6
1.8
18.7
2.6
12.6
2.7
11.5
8.9
15.8
3.9
9.2
8.1
27.1
7.7
10.1
9.1
8.7
4.6
2.2 10.6
30.8
9.1
19.9
3.6
14.50 3.47
4.65 0.99
14.50 9.92
20.87 3.84
17.67 4.10
5.13 1.66
16.97 1.87
7.00 0.00
7.83 3.84
5.87 3.87
40.07 8.15
13.65 8.43
8.58 7.98
14.02 5.91
16.00 4.28

ANEXO: HIDROLOGIA Y CLIMATOLOGIA

Jun
2.2
2
1.4
0
5.9
2.7
1.9
2.1
1.2
0.9
5.3
7.4
0.9
1.09
0.74
4.27
4.25
1.62
0.75
0.52
0.00
3.75
2.09
6.19
5.65
6.00
3.22
1.72

Jul Ago
3.5
3.9
2.7
0.4
1.4
0.4
0.2
0.1
3
1.4
5.3
3.3
1.3
0.5
0.2
0.1
0.2
0.2
1.1
0.1
6.6
2.4
2.9
5.4
0.1
0.9
0.00 0.21
0.90 0.69
1.75 1.04
2.94 2.35
1.05 0.87
0.61 0.30
0.43 0.14
0.00 0.00
3.72 2.60
0.31 0.02
3.93 2.29
4.59 2.61
4.29 2.09
2.30 0.58
0.00 0.00

Set
0.3
0.1
0.1
0
0.4
0.5
0.1
0.5
0.2
0
0.5
0.6
0.4
0.89
0.57
0.83
2.22
0.42
0.04
0.00
0.00
0.45
0.00
0.75
0.68
0.07
0.03
0.00

Oct
0.1
0.1
0.1
0.9
0.5
2.9
0.2
0.9
0.3
0
5
0.3
0
4.88
0.39
0.57
1.34
0.42
0.00
0.00
8.55
0.00
0.40
0.57
0.65
0.15
0.00
0.00

Nov
1.2
0.2
1
0.6
7.2
2.6
0.4
1.7
2
0.1
0.4
2.4
0.4
4.77
0.25
0.48
1.02
0.51
0.08
0.00
4.99
1.09
4.79
0.51
0.66
0.00
0.03
0.00

Dic Prom.
0.4 10.33
6.3
6.94
0.2
7.08
4.9
3.30
0.8
7.62
4.8
6.73
0.1
6.21
0.3
6.08
0.2
3.48
7.1
4.37
5.1 10.92
2.4 10.18
10.9 11.40
11.34
6.70
0.11
4.63
0.58
6.73
0.80
7.60
1.99
6.77
0.30
2.25
0.00
4.26
10.76
2.86
0.74
6.09
11.44
3.84
3.09
9.77
8.22
8.37
0.85
4.43
1.62
4.47
0.39
4.38

Estudio de Pre Inversin a Nivel de Perfil del Proyecto:


ADECUACION DEL PROYECTO ORIGINALCHINECAS AL ESQUEMA REESTRUCTURADO.

Ao
1988
1989
1990
1991
1992
1993
1994
1995
1996
1997
1998
1999
2000
2001
2002
2003
2004
2005
2006
2007
2008
Media
D. Est.
Inrena

Ene
7.55
7.55
1.63
0.06
0.10
0.87
12.55
3.45
15.97
0.75
77.91
6.69
5.29
12.15
2.94
6.30
0.10
3.60
3.60
12.40
13.80
10.18
14.02

Feb
9.70
30.69
1.44
1.13
0.37
6.93
33.43
6.89
26.14
8.34
91.29
36.98
25.00
9.68
12.33
16.90
5.10
1.40
8.80
6.40
18.00
14.39
14.74

Mar
5.50
24.13
6.21
13.62
2.99
35.68
24.13
6.32
53.23
3.71
68.03
11.47
40.05
18.90
24.19
26.60
20.90
17.00
21.30
17.80
36.50
21.71
14.59

Abr
11.30
16.50
1.21
2.58
1.92
19.00
32.10
5.80
46.77
0.81
14.38
9.62
16.77
14.27
19.60
8.40
12.10
6.10
13.60
12.40
35.20
14.49
9.94

May
0.30
11.15
0.50
2.09
0.90
4.39
12.29
1.75
9.29
1.09
4.27
9.50
11.66
4.27
6.20
7.10
0.00
9.50
6.90
3.50
8.70
5.33
3.48

Jun
0.00
5.90
0.12
0.80
0.00
0.27
4.43
0.37
3.87
0.52
2.62
3.35
5.03
1.00
1.20
1.30
0.10
1.90
0.20
2.70
1.70
2.31
2.03

Jul Ago
0.40 0.00
3.95 1.41
0.05 0.00
0.29 0.00
0.00 0.00
0.46 0.10
0.89 0.02
0.00 0.00
2.76 0.84
0.00 0.00
2.00 1.22
2.00 1.11
1.14 0.54
0.93 0.50
1.60 1.00
0.30 0.00
0.00 0.00
0.80 0.20
0.40 0.00
1.00 0.30
3.90 1.20
1.60 0.88
1.65 1.17

Set
0.00
0.55
0.00
0.00
0.00
0.00
0.10
0.00
0.26
0.00
0.56
0.40
0.26
1.01
0.10
0.00
0.00
0.00
0.00
0.00
0.00
0.28
0.40

Oct
0.00
2.81
2.61
0.00
0.00
6.23
0.08
0.00
0.01
0.00
2.44
0.43
0.75
1.12
0.20
0.00
0.40
0.10
0.00
0.10
1.30
0.98
1.78

Nov
0.00
1.35
6.87
0.57
0.00
9.47
0.37
2.12
0.32
0.07
0.78
0.39
0.30
4.13
6.12
0.00
0.10
0.00
0.20
8.30
2.60
1.70
2.42

Dic Prom.
2.12
3.07
0.00
8.83
4.34
2.08
0.99
1.84
0.00
0.52
18.42
8.48
0.97 10.11
2.58
2.44
0.00 13.29
19.32
2.88
2.73 22.35
1.92
6.99
4.19
9.25
4.53
6.04
2.88
6.53
0.10
5.58
6.70
3.79
0.10
3.39
2.30
4.78
0.50
5.45
1.30 10.35
3.50
6.45
4.57

Extendido

Cuadro N 4: Descargas medias mensuales extendidas ro Vir, m/s. Estacin Huacapongo


Ao
1960
1961
1962
1963
1964
1965
1966
1967
1968
1969
1970
1971
1972
1973
1974
1975
1976
1977
1978

Ene
5.63
4.90
7.01
0.31
3.31
0.43
3.72
3.83
0.44
0.19
27.81
1.72
8.12
10.42
4.15
2.71
3.76
1.61
0.12

Feb
7.64
3.44
12.56
0.21
7.84
1.13
1.90
30.33
0.37
1.44
1.72
8.29
11.63
4.93
3.05
9.15
4.69
22.80
0.59

Mar
16.78
9.39
28.17
14.17
9.26
22.27
1.70
11.21
2.62
10.09
2.39
24.89
66.30
10.71
3.86
51.06
6.85
17.09
0.41

Abr May Jun Jul Ago Set Oct Nov


5.97 1.58 0.27 0.08 0.05 0.06 0.09 0.21
6.87 2.44 0.52 0.15 0.06 0.06 0.06 0.07
14.57 1.81 0.31 0.14 0.08 0.06 0.05 0.10
22.35 1.83 0.13 0.06 0.05 0.02 0.02 0.04
9.96 2.61 0.28 0.19 0.25 0.20 0.36 1.81
11.57 0.83 0.22 0.16 0.03 0.11 0.30 0.38
1.12 1.02 0.22 0.11 0.05 0.04 0.99 0.73
1.72 1.06 0.38 0.31 0.12 0.03 3.10 0.94
1.78 0.06 0.06 0.03 0.03 0.03 0.38 1.05
9.42 0.46 0.18 0.04 0.03 0.02 0.12 0.16
8.78 8.98 1.50 0.47 0.21 0.23 0.64 0.77
13.61 1.51 0.55 0.42 0.37 0.30 0.73 0.53
18.20 2.30 1.20 0.41 0.37 0.16 0.12 0.22
18.74 1.94 1.32 1.34 0.80 0.57 1.03 1.40
1.73 0.81 0.56 0.43 0.23 0.26 0.47 0.19
19.51 2.80 2.04 0.67 0.34 0.42 1.31 0.47
2.07 0.75 0.61 0.33 0.20 0.12 0.04 0.03
5.73 0.43 0.41 0.22 0.11 0.04 0.03 0.03
0.46 0.84 0.08 0.03 0.02 0.02 0.02 0.11

ANEXO: HIDROLOGIA Y CLIMATOLOGIA

Dic Prom.
0.28
3.22
0.48
2.37
0.05
5.41
3.86
3.59
0.33
3.03
0.61
3.17
0.11
0.98
0.32
4.45
0.31
0.59
5.61
2.31
4.11
4.80
4.15
4.76
2.91
9.33
1.13
4.53
0.10
1.32
0.18
7.56
0.03
1.62
0.50
4.08
0.06
0.23

Estudio de Pre Inversin a Nivel de Perfil del Proyecto:


ADECUACION DEL PROYECTO ORIGINALCHINECAS AL ESQUEMA REESTRUCTURADO.

Ao
1979
1980
1981
1982
1983
1984
1985
1986
1987
1988
1989
1990
1991
1992
1993
1994
1995
1996
1997
1998
1999
2000
2001
2002
2003
2004
2005
2006
2007
2008
Media
D. Est.

Ene
0.23
0.10
0.99
0.37
15.56
0.54
0.97
2.97
15.29
4.32
3.18
0.88
0.14
0.14
1.05
6.37
1.26
4.97
0.16
62.76
0.98
0.49
11.96
0.61
1.52
0.00
2.11
0.53
8.31
4.93
4.98
9.89

Chavimochic

Feb
3.15
0.04
25.61
3.61
1.47
29.57
0.31
1.60
14.57
13.40
20.71
0.90
0.70
0.07
6.71
9.29
2.02
10.46
3.03
53.94
19.23
5.75
10.36
5.86
2.86
3.10
2.20
7.08
7.54
4.30
8.23
10.21

Mar
15.26
0.11
37.87
1.69
22.39
13.58
1.41
1.80
4.53
3.99
8.03
0.39
3.01
1.24
9.10
14.78
0.95
9.24
2.89
137.87
9.00
12.70
22.11
19.13
5.32
2.20
9.11
23.66
12.64
13.79
14.88
22.10

Abr May Jun Jul Ago Set Oct Nov Dic Prom.
4.40 0.71 0.39 0.11 0.04 0.07 0.04 0.01 0.01
2.03
0.18 0.01 0.01 0.01 0.01 0.01 1.20 2.21 6.61
0.87
6.00 0.54 0.09 0.04 0.03 0.01 0.00 0.70 1.29
6.10
1.67 0.74 0.17 0.11 0.28 0.04 0.65 1.26 1.91
1.04
35.27 4.51 1.36 0.21 0.08 0.06 0.69 0.09 1.34
6.92
2.51 6.11 1.29 0.56 0.14 0.06 0.37 0.31 2.26
4.78
2.51 0.74 0.23 0.13 0.06 0.11 0.20 0.05 0.16
0.57
10.18 3.71 0.29 0.09 0.04 0.02 0.01 0.22 2.09
1.92
1.27 0.62 0.05 0.02 0.02 0.02 0.01 0.17 0.05
3.05
7.41 1.67 0.31 0.05 0.01 0.01 0.13 0.25 0.28
2.65
8.43 1.41 0.15 0.07 0.04 0.03 0.85 0.31 0.02
3.60
0.17 0.07 0.10 0.09 0.06 0.04 0.36 1.72 1.08
0.49
1.39 1.30 0.11 0.05 0.05 0.04 0.05 0.31 0.42
0.63
0.81 0.34 0.27 0.06 0.03 0.03 0.24 0.27 0.04
0.30
8.64 1.75 0.38 0.19 0.05 0.29 0.98 2.86 3.09
2.92
4.97 2.39 0.66 0.29 0.16 0.11 0.05 0.21 0.74
3.33
3.10 0.46 0.17 0.13 0.13 0.08 0.20 0.86 1.07
0.87
5.02 1.20 0.70 0.39 0.20 0.13 0.27 0.44 0.28
2.77
0.74 1.94 0.34 0.17 0.12 0.11 0.17 1.94 14.87
2.21
24.10 5.77 1.63 0.51 0.27 0.27 0.70 0.85 0.28 24.08
4.68 3.59 1.29 0.18 0.07 0.02 0.00 0.00 0.22
3.27
5.00 4.45 0.09 0.05 0.03 0.00 0.00 0.00 0.77
2.45
11.44 1.22 0.87 0.41 0.18 0.01 0.00 0.93 2.64
5.18
7.77 0.84 0.10 0.06 0.01 0.00 0.00 2.99 3.08
3.37
6.61 1.13 0.35 0.10 0.00 0.00 0.00 0.00 0.00
1.49
0.38 0.00 0.10 0.00 0.00 0.00 0.00 2.62 3.60
1.00
4.81 0.42 0.11 0.01 0.00 0.00 0.00 0.00 0.30
1.59
11.89 0.35 0.14 0.07 0.00 0.00 0.00 0.21 3.02
3.91
11.35 5.26 0.53 0.15 0.04 0.00 0.00 0.28 0.00
3.84
9.49 3.50 0.30 0.10 0.00 0.10 0.60 0.60 0.70
3.20
7.68 1.85 0.48 0.20 0.11 0.09 0.36 0.65 1.58
3.42
7.26 1.84 0.49 0.23 0.14 0.12 0.54 0.79 2.51

Extendido

ANEXO: HIDROLOGIA Y CLIMATOLOGIA

Estudio de Pre Inversin a Nivel de Perfil del Proyecto:


ADECUACION DEL PROYECTO ORIGINALCHINECAS AL ESQUEMA REESTRUCTURADO.

Cuadro N 5: Descargas medias mensuales extendidas ro Moche, m/s. Estacin Quirihuac


Ao
1960
1961
1962
1963
1964
1965
1966
1967
1968
1969
1970
1971
1972
1973
1974
1975
1976
1977
1978
1979
1980
1981
1982
1983
1984
1985
1986
1987
1988
1989
1990
1991
1992
1993
1994
1995
1996
1997
1998
1999
2000
2001
2002
2003
2004
2005

Ene
Feb
7.73 18.06
9.26
5.09
15.64 31.86
0.42
0.64
9.82 16.56
1.70
3.40
30.30 10.21
22.05 95.27
0.69
1.11
0.61
4.63
28.18
4.37
4.70 10.10
9.78
8.99
15.57
8.60
10.49 16.51
7.55 17.89
5.64 10.19
8.75 53.55
0.64
1.14
1.63
7.17
0.18
0.21
2.40 41.92
2.47
8.41
23.47
9.45
3.04 42.12
2.86
3.38
13.84
7.77
19.23 21.40
9.27 17.93
10.95 27.19
0.47
3.48
1.82
4.42
1.81
0.57
0.71 15.54
19.24 31.91
3.76
6.20
8.05 19.81
0.24
6.24
63.56 121.14
7.88 88.21
4.19 19.04
23.37 29.97
2.84 10.21
5.53 12.32
0.86
8.17
5.05
5.67

Mar
30.75
18.34
68.24
24.63
38.83
37.02
11.46
49.42
7.76
27.65
7.99
54.59
46.13
28.25
15.52
59.95
29.05
23.01
2.27
23.08
1.16
27.91
4.72
55.29
26.59
6.97
8.68
9.96
9.21
22.02
5.41
12.19
7.10
28.28
26.76
7.68
20.73
4.33
228.87
16.77
34.14
84.51
36.51
11.37
12.18
19.24

Abr
15.83
16.11
52.63
28.43
59.12
20.59
9.95
13.09
4.80
29.96
24.12
29.14
26.05
60.87
12.35
30.77
13.61
11.26
4.41
9.87
2.69
7.52
11.77
49.06
9.02
7.47
23.29
11.72
24.35
27.34
2.34
7.36
9.83
26.51
25.48
11.27
19.31
3.33
58.38
25.28
41.28
55.97
36.68
15.29
7.20
14.25

May
Jun Jul
3.91 0.90 0.33
7.59 2.23 0.51
7.43 2.32 0.76
6.58 0.80 0.35
10.80 1.89 1.02
6.83 1.33 0.59
5.95 0.89 0.38
5.94 1.43 0.81
0.51 0.24 0.14
3.80 1.89 0.45
18.06 3.52 0.96
5.48 2.00 1.09
6.49 3.12 1.02
32.75 5.62 3.93
3.69 1.61 0.92
9.27 4.13 1.20
6.27 3.26 0.85
3.57 1.38 0.68
5.33 0.50 0.15
3.05 1.04 0.25
0.29 0.10 0.07
2.49 0.61 0.38
4.14 0.97 0.41
16.83 8.74 2.00
12.03 6.71 2.54
3.21 1.09 0.34
6.72 1.18 0.43
5.79 0.80 0.51
11.77 2.83 0.87
7.88 1.25 0.66
1.39 0.62 0.23
6.34 0.90 0.37
4.96 1.04 0.16
12.75 3.46 1.10
14.51 5.52 2.95
4.51 1.87 0.90
9.64 3.78 1.45
2.77 0.32 0.17
35.74 11.40 3.27
26.88 7.63 4.41
25.57 3.85 3.05
13.74 7.08 2.63
6.08 4.25 2.35
6.54 2.21 0.77
2.58 0.61 0.10
1.53 0.21 0.09

ANEXO: HIDROLOGIA Y CLIMATOLOGIA

Ago
Set
0.22 0.48
0.15 0.09
0.37 0.25
0.18 0.07
0.85 0.68
0.32 0.44
0.19 0.19
0.35 0.24
0.11 0.24
0.17 0.13
0.59 0.87
1.06 1.29
0.59 0.34
1.47 1.97
0.39 0.45
0.90 3.44
0.44 0.38
0.55 0.33
0.07 0.24
0.16 0.35
0.06 0.03
0.22 0.13
0.28 0.10
0.95 0.87
1.27 0.93
0.24 1.27
0.25 0.28
0.37 0.28
0.29 0.19
0.45 0.36
0.12 0.11
0.21 0.10
0.09 0.06
0.54 0.77
1.05 0.90
0.63 0.20
0.41 0.23
0.12 0.11
1.57 1.65
1.68 3.79
1.64 1.21
1.92 2.82
0.95 10.57
0.45 0.21
0.07 0.06
0.08 0.06

Oct Nov
0.76 0.66
0.18 1.00
0.26 1.07
0.28 1.44
2.55 6.69
1.66 3.37
3.00 3.95
3.42 1.21
2.17 1.58
0.78 3.73
3.90 5.75
4.00 2.35
0.62 0.91
4.34 6.11
2.16 0.87
8.65 4.62
0.20 0.16
0.41 0.32
0.17 0.72
0.19 0.16
3.05 5.96
0.97 2.48
2.17 3.23
1.60 1.02
1.74 3.13
1.12 0.33
0.33 1.26
0.28 1.67
1.42 3.21
6.01 2.41
1.40 6.96
0.22 0.88
0.10 0.13
3.77 12.26
0.35 1.37
0.86 4.05
1.03 1.91
0.10 2.14
2.42 2.23
6.55 3.67
1.54 0.27
2.95 10.76
1.74 5.84
0.16 0.14
2.08 6.23
0.06 0.06

Dic
1.11
3.19
0.28
7.24
0.86
3.02
0.85
0.74
0.82
12.64
10.44
4.71
4.82
5.18
1.08
0.99
0.38
1.98
0.63
0.13
23.82
7.87
10.28
6.40
6.69
1.49
4.04
1.03
1.87
0.53
4.87
1.15
0.05
7.63
4.33
4.23
0.27
33.96
1.08
3.35
2.72
8.61
7.55
1.20
10.43
0.52

Prom.
6.73
5.31
15.09
5.92
12.47
6.69
6.44
16.16
1.68
7.20
9.06
10.04
9.07
14.56
5.50
12.45
5.87
8.82
1.36
3.92
3.14
7.91
4.08
14.64
9.65
2.48
5.67
6.09
6.93
8.92
2.28
3.00
2.16
9.44
11.20
3.85
7.22
4.48
44.28
16.34
11.54
20.36
10.46
4.68
4.21
3.90

Estudio de Pre Inversin a Nivel de Perfil del Proyecto:


ADECUACION DEL PROYECTO ORIGINALCHINECAS AL ESQUEMA REESTRUCTURADO.

Ao
2006
2007
2008
Media
D. Est.

Ene
1.76
12.11
5.72
9.14
11.13

Chavimochic

Feb
16.16
12.16
19.78
19.10
24.49

Mar
35.89
20.30
29.28
28.94
34.35

Abr May
24.00 2.23
29.45 10.18
29.26 14.40
22.24 8.71
15.89 7.79

Extendido

ANEXO: HIDROLOGIA Y CLIMATOLOGIA

Jun
0.84
0.89
3.50
2.54
2.45

Jul
0.12
0.15
1.00
1.02
1.06

Ago
0.10
0.09
0.50
0.52
0.49

Set
0.09
0.07
0.80
0.83
1.65

Oct
0.08
0.15
1.10
1.74
1.86

Nov
0.53
2.88
0.70
2.74
2.71

Dic
5.76
1.29
0.70
4.59
6.13

Prom.
7.30
7.48
8.90
8.51

Estudio de Pre Inversin a Nivel de Perfil del Proyecto:


ADECUACION DEL PROYECTO ORIGINALCHINECAS AL ESQUEMA REESTRUCTURADO.

Apndice 3
Anlisis de frecuencias

ANEXO: HIDROLOGIA Y CLIMATOLOGIA

Estudio de Pre Inversin a Nivel de Perfil del Proyecto:


ADECUACION DEL PROYECTO ORIGINALCHINECAS AL ESQUEMA REESTRUCTURADO.

Cuadro N 1: Anlisis de frecuencias - Descargas medias mensuales ro Santa, m/s. Est.


Condorcerro
Orden
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44

Ene

Feb

Mar

Abr

May

390.4
369.1
367.9
345.0
341.4
301.6
298.9
254.8
254.4
253.6
235.3
233.2
232.6
228.8
220.6
220.0
218.3
203.2
196.5
194.3
185.5
182.3
175.8
174.3
172.5
166.1
165.1
163.1
159.7
159.4
154.3
154.0
148.4
142.5
141.9
137.4
137.0
136.7
133.2
132.2
129.6
128.8
125.8
122.1

711.0
522.3
508.9
477.1
471.8
424.4
350.2
339.4
332.3
324.4
314.4
309.7
307.3
305.0
295.9
294.4
292.7
291.7
284.8
262.4
252.7
248.5
243.2
241.3
235.4
224.8
223.2
221.9
221.2
216.1
208.4
202.8
202.6
197.4
196.8
195.3
192.2
171.6
168.3
167.2
165.6
162.4
158.5
151.9

811.2
740.3
617.3
600.0
515.4
511.8
505.3
500.9
471.7
449.4
415.5
412.7
403.2
394.0
392.9
391.2
390.2
386.1
383.8
377.6
357.4
356.3
354.0
352.1
345.2
336.4
333.4
321.0
319.0
316.9
315.5
312.2
297.8
295.3
294.2
290.0
258.2
228.0
215.4
212.7
198.2
191.0
190.0
184.5

616.4
548.1
538.8
483.2
415.4
374.6
370.2
366.0
346.4
342.1
330.8
330.6
324.6
315.0
313.3
313.1
312.7
290.6
283.6
277.7
269.2
262.5
254.0
252.8
243.2
239.9
231.6
231.3
230.1
227.1
225.8
224.5
223.6
216.2
209.7
192.8
190.3
186.7
179.2
177.7
174.5
173.3
166.3
159.1

171.3
170.3
158.9
153.5
146.0
142.2
135.1
126.1
124.0
119.0
118.8
117.8
117.0
114.7
113.9
113.7
106.3
106.0
105.9
105.7
103.2
102.1
100.8
100.0
100.0
100.0
98.7
97.7
97.7
97.2
96.5
96.0
95.0
93.8
90.0
90.0
86.7
85.1
83.6
83.5
80.7
78.2
78.0
77.8

ANEXO: HIDROLOGIA Y CLIMATOLOGIA

Jun
95.9
93.5
89.7
89.5
84.5
82.1
76.4
72.6
71.7
70.0
68.7
68.6
68.1
66.9
65.5
64.7
64.4
64.1
63.9
63.3
63.3
63.1
63.0
62.2
62.0
62.0
61.6
61.3
60.5
59.7
59.5
58.4
58.3
57.4
56.6
56.3
55.5
55.2
54.6
54.5
54.3
53.5
51.7
50.3

Jul
69.0
67.8
65.4
63.8
59.8
59.7
58.6
57.9
56.3
54.7
53.5
53.2
52.5
52.3
52.0
51.7
51.6
51.0
50.7
49.8
49.6
48.9
48.6
48.4
48.3
48.1
48.0
47.9
47.8
47.1
46.9
46.3
46.1
46.0
45.8
45.2
45.0
43.8
43.8
42.7
42.3
42.1
42.0
40.8

Ago
61.3
60.2
56.2
55.8
54.1
53.9
53.5
53.4
53.4
53.2
52.8
52.4
52.0
51.9
50.6
50.6
50.4
49.5
49.0
48.4
47.7
47.6
47.5
45.9
45.9
45.0
44.8
44.5
44.3
43.8
43.7
43.6
43.0
43.0
42.8
42.0
41.8
41.4
41.4
41.2
41.1
40.6
40.0
38.8

Set
76.0
72.4
72.0
68.2
67.7
66.8
66.3
65.9
63.0
61.7
61.0
60.6
57.6
57.3
55.9
55.8
54.0
53.9
53.2
52.2
50.7
50.3
50.2
49.8
49.3
48.9
48.8
48.7
48.5
48.5
48.3
47.4
47.4
47.3
46.2
46.1
45.5
45.5
45.1
44.4
44.4
43.0
43.0
42.5

Oct

Nov

Dic

131.7
116.6
115.7
108.7
107.1
106.7
104.4
100.5
98.0
97.8
96.2
96.0
95.0
95.0
91.6
89.6
87.0
85.9
84.7
84.6
82.4
81.9
73.9
73.9
73.7
71.5
71.4
70.8
70.5
70.4
68.2
66.8
66.7
63.6
63.6
63.1
62.6
62.4
61.8
61.2
61.1
60.2
59.7
57.4

229.8
202.9
181.8
173.0
171.0
166.9
166.6
164.9
164.8
161.0
149.2
143.4
138.9
130.2
125.8
114.3
113.7
112.3
108.9
106.3
106.3
105.6
103.6
103.5
102.4
100.8
100.2
99.0
97.2
95.1
94.8
94.8
94.3
93.5
90.5
85.7
83.0
81.4
78.8
75.5
73.2
70.6
66.9
66.9

431.3
288.0
285.7
279.1
276.8
275.9
257.1
238.6
237.5
233.0
195.0
191.8
185.1
180.7
176.9
173.6
167.7
150.5
148.4
144.1
144.0
143.1
140.0
139.6
135.4
134.6
131.6
127.0
124.4
124.4
119.7
118.4
115.8
114.4
114.3
113.3
110.1
103.2
102.4
100.0
93.7
89.8
87.8
87.4

Prob
(%)
1.85
3.70
5.56
7.41
9.26
11.11
12.96
14.81
16.67
18.52
20.37
22.22
24.07
25.93
27.78
29.63
31.48
33.33
35.19
37.04
38.89
40.74
42.59
44.44
46.30
48.15
50.00
51.85
53.70
55.56
57.41
59.26
61.11
62.96
64.81
66.67
68.52
70.37
72.22
74.07
75.93
77.78
79.63
81.48

Estudio de Pre Inversin a Nivel de Perfil del Proyecto:


ADECUACION DEL PROYECTO ORIGINALCHINECAS AL ESQUEMA REESTRUCTURADO.

Orden

Ene

Feb

Mar

Abr

May

45
46
47
48
49
50
51
52
53
Media
50%
75%
95%

120.5
116.7
115.4
111.1
110.1
105.1
104.5
103.6
92.1
188.0
165.1
130.9
104.3

143.8
143.4
142.3
139.5
137.8
137.2
131.3
126.7
76.2
254.1
223.2
166.4
129.9

180.3
176.7
173.9
172.5
138.0
135.6
131.2
129.5
116.6
337.7
333.4
205.4
130.7

140.7 77.5
134.7 73.9
130.0 72.2
124.5 66.4
123.9 63.1
109.0 59.1
108.8 57.9
88.7 52.0
73.2 50.0
257.9 101.0
231.6 98.7
176.1 82.1
102.7 56.2

Jun

Jul

49.2
48.0
46.7
46.7
46.6
44.9
44.8
39.4
38.5
62.0
61.6
54.4
43.2

Ago

39.9
38.8
38.8
38.7
37.6
36.4
35.3
33.2
30.5
48.3
48.0
42.5
34.6

Set

38.6
38.4
38.2
37.6
37.4
34.9
34.4
33.8
29.7
45.8
44.8
41.1
34.2

Oct

41.9
41.2
39.7
39.3
37.8
37.4
34.2
33.9
29.2
51.1
48.8
44.4
34.1

Nov

Dic

57.0 66.9 85.9


54.2 66.3 85.3
53.2 65.5 83.3
53.1 62.7 74.6
52.5 61.6 69.7
48.1 61.2 67.3
47.3 60.8 64.8
44.6 47.6 60.1
43.0 43.0 43.0
76.7 108.0 150.3
71.4 100.2 131.6
61.1 74.4 96.9
46.5 56.8 63.4

Prob
(%)
83.33
85.19
87.04
88.89
90.74
92.59
94.44
96.30
98.15

Cuadro N 2: Anlisis de frecuencia de descargas medias rio Nepea, m/s. Est. San Jacinto
Ao

Ene

Feb

Mar

Abr

May

Jun

Jul

1998
1983
1984
2001
2000
1999
1994
1972
1996
2008
2005
2002
1962
1973
1967
1971
1975
1961
1987
1974
2006
1981
1963
1986
1970
1979
1977
2007

23.45
15.41
2.63
12.45
2.24
4.77
4.52
3.85
3.94
0.80
2.00
0.95
6.08
10.27
2.59
0.53
0.59
7.34
8.77
6.84
0.30
0.79
0.32
0.54
13.77
0.03
0.44
3.30

66.97
9.57
42.81
19.16
18.22
39.82
11.71
5.22
10.47
13.00
9.80
8.48
10.82
2.25
18.73
2.41
1.82
5.28
11.07
11.79
4.30
16.33
2.44
4.71
0.15
1.12
10.28
6.40

80.86
71.65
33.48
37.10
33.37
14.73
22.48
31.68
13.81
21.10
23.20
19.00
17.87
11.81
12.86
12.84
27.87
8.30
11.93
10.00
20.70
6.54
9.41
7.89
1.44
17.03
5.68
3.80

29.13
72.77
9.97
14.23
11.90
6.50
19.10
9.37
14.70
8.20
11.50
13.50
5.67
9.90
2.62
7.98
2.55
8.73
0.66
1.79
4.90
1.05
7.38
5.87
1.74
3.33
2.40
2.00

6.53
21.30
6.55
3.63
10.66
4.02
9.58
2.53
7.20
2.70
0.50
1.20
1.09
1.84
0.64
3.82
0.93
0.72
0.37
0.71
0.50
0.21
0.80
1.90
2.10
0.10
0.53
1.30

3.97
8.73
1.18
1.43
2.33
2.26
0.32
1.14
0.47
0.70
0.20
0.30
0.75
0.61
0.24
1.98
0.42
0.62
0.18
0.53
0.10
0.19
0.39
0.93
0.60
0.08
0.21
0.60

1.44
2.77
0.28
0.50
0.50
1.47
0.20
0.76
0.23
0.40
0.10
0.20
0.65
0.65
0.37
1.40
0.30
0.54
0.14
0.50
0.20
0.16
0.36
0.59
0.59
0.05
0.15
0.90

ANEXO: HIDROLOGIA Y CLIMATOLOGIA

Ago
0.89
0.64
0.12
0.41
0.20
0.95
0.04
0.60
0.14
0.60
0.00
0.20
0.52
0.61
0.24
1.35
0.21
0.43
0.11
0.44
0.10
0.15
0.34
0.29
0.39
0.05
0.12
0.40

Set

Oct

0.47
0.28
0.05
0.33
0.32
0.12
0.03
0.36
0.16
0.30
0.10
0.10
0.43
0.45
0.14
0.81
0.20
0.32
0.09
0.07
0.00
0.11
0.21
0.17
0.27
0.05
0.08
0.50

0.25
0.24
2.00
0.21
0.28
0.00
0.10
0.30
0.00
0.20
0.00
0.20
0.34
0.88
0.64
0.19
0.15
0.24
0.08
0.04
0.00
0.06
0.20
0.10
0.32
0.05
0.08
0.10

Nov

Dic

Prom.

0.31
0.14
0.22
1.14
0.32
0.00
0.20
0.37
0.00
0.10
0.00
0.20
0.25
0.61
0.19
0.26
0.10
0.19
0.07
0.04
0.10
0.13
0.18
0.10
0.79
0.05
0.08
0.30

0.35
2.42
2.23
4.04
0.40
1.90
2.90
3.82
0.00
0.00
0.10
1.22
0.22
0.84
0.16
2.65
0.10
1.89
0.06
0.03
0.60
0.17
1.62
0.13
0.67
0.05
0.08
0.00

17.88
17.16
8.46
7.89
6.73
6.38
5.93
5.00
4.26
4.01
3.96
3.80
3.72
3.39
3.28
3.02
2.94
2.88
2.79
2.73
2.65
2.16
1.97
1.94
1.90
1.83
1.68
1.63

Prob.
%
2.00
4.00
6.00
8.00
10.00
12.00
14.00
16.00
18.00
20.00
22.00
24.00
26.00
28.00
30.00
32.00
34.00
36.00
38.00
40.00
42.00
44.00
46.00
48.00
50.00
52.00
54.00
56.00

Estudio de Pre Inversin a Nivel de Perfil del Proyecto:


ADECUACION DEL PROYECTO ORIGINALCHINECAS AL ESQUEMA REESTRUCTURADO.

Ao
1991
1989
1960
2004
1964
1988
1993
1982
1965
1990
1997
1966
1976
1995
2003
1985
1980
1969
1978
1968
1992

Ene

Feb

0.78
1.60
1.47
0.10
0.30
1.21
0.39
1.90
0.29
2.82
0.26
3.61
1.26
1.09
0.60
0.05
0.03
0.04
0.08
0.18
0.20

Mar

0.78
5.00
4.26
9.80
3.25
9.01
4.57
8.27
1.02
3.01
1.89
2.24
2.55
3.93
2.50
2.60
0.03
0.10
0.55
0.13
0.01

Abr

2.10
2.70
7.57
5.90
6.42
1.81
3.89
0.72
8.86
1.04
0.50
2.73
3.97
1.58
1.10
3.61
2.65
2.06
0.68
0.63
0.07

May

7.79
0.70
2.33
0.20
4.32
3.00
0.98
0.56
3.07
0.40
0.50
0.33
1.57
2.05
2.60
0.58
0.19
1.58
0.23
0.34
0.00

6.08
1.60
0.58
0.00
0.90
0.34
0.20
0.05
0.67
0.04
0.00
0.32
0.36
0.43
0.20
0.06
0.02
0.08
0.03
0.10
0.00

Jun

Jul

1.60
0.10
0.46
0.00
0.50
0.14
0.20
0.03
0.23
0.02
0.00
0.26
0.12
0.01
0.10
0.05
0.01
0.05
0.03
0.07
0.00

0.07
0.10
0.41
0.00
0.43
0.07
0.20
0.03
0.24
0.01
0.00
0.26
0.10
0.00
0.00
0.05
0.02
0.05
0.03
0.06
0.00

Ago
0.06
1.16
0.35
0.00
0.35
0.05
0.40
0.03
0.20
0.01
0.00
0.25
0.10
0.00
0.00
0.05
0.03
0.05
0.04
0.06
0.00

Set

Oct

0.06
0.75
0.24
0.00
0.27
0.04
0.20
0.03
0.18
0.00
0.00
0.14
0.10
0.00
0.00
0.05
0.03
0.05
0.04
0.04
0.00

0.06
2.55
0.20
0.10
0.19
0.04
0.90
0.03
0.15
3.15
0.00
0.37
0.10
0.00
0.00
0.05
0.89
0.04
0.04
0.04
0.00

Nov

Dic

Prom.

0.06
1.14
0.17
0.10
0.27
0.03
1.50
0.99
0.14
2.92
0.10
0.10
0.10
0.26
0.00
0.05
0.68
0.04
0.02
0.04
0.00

0.06
0.85
0.13
1.70
0.19
0.03
2.19
2.79
0.16
1.54
8.73
0.07
0.05
0.74
0.20
0.05
2.20
2.23
0.03
0.04
0.00

1.63
1.52
1.51
1.49
1.45
1.31
1.30
1.29
1.27
1.25
1.00
0.89
0.86
0.84
0.61
0.60
0.56
0.53
0.15
0.14
0.02

Prob.
%
58.00
60.00
62.00
64.00
66.00
68.00
70.00
72.00
74.00
76.00
78.00
80.00
82.00
84.00
86.00
88.00
90.00
92.00
94.00
96.00
98.00

Cuadro N 3: Anlisis de frecuencia de descargas medias rio Sechn, m/s.


Ao

Ene

Feb

Mar

Abr

May

Jun

Jul

Ago

Set

Oct

Nov

Dic

Media

1,998
1,983
2,008
1,996
1,970
1,984
2,001
1,999
1,994
1,967
1,972
1,971
1,960
1,976
1,975
1,977
2,006
1,962
2,000
1,993

10.18
5.08
2.00
3.66
17.40
0.68
5.60
2.70
3.61
1.00
2.70
2.90
1.30
1.24
0.57
0.60
0.10
7.00
0.68
0.45

24.00
3.58
6.10
7.10
1.10
12.53
5.46
15.45
8.89
9.10
3.90
1.40
3.30
4.59
1.49
7.71
4.40
3.90
6.83
1.59

20.16
14.31
12.40
11.35
0.80
10.36
8.45
5.47
6.16
7.70
15.00
10.20
8.60
9.83
8.19
6.76
8.00
9.50
5.58
10.24

5.15
20.60
10.20
12.00
3.10
3.73
5.77
3.62
7.00
6.30
2.00
8.20
8.80
4.13
2.65
4.38
9.50
1.00
3.13
3.73

1.92
1.80
3.10
1.60
3.40
2.31
2.01
2.53
3.65
3.10
1.00
3.00
1.90
1.74
3.85
1.63
0.40
0.80
2.50
0.54

1.00
0.88
3.00
0.55
2.90
1.34
0.54
0.60
1.39
0.50
0.50
1.50
0.80
0.88
3.11
0.71
0.00
0.10
1.08
0.10

0.80
0.43
1.10
0.09
3.30
0.77
0.43
0.45
0.22
0.10
0.30
0.90
0.40
0.69
1.71
0.42
0.00
0.10
0.19
0.08

0.40
0.31
0.00
0.09
0.20
0.35
0.21
0.18
0.00
0.00
0.20
0.20
0.10
0.20
1.01
0.33
0.00
0.10
0.10
0.00

0.51
0.25
0.00
0.00
0.00
0.22
0.18
0.00
0.00
0.30
0.00
0.10
0.00
0.20
0.32
0.33
0.00
0.10
0.10
0.00

0.56
0.08
0.00
0.00
2.40
0.24
0.20
0.21
0.00
1.30
0.00
0.10
0.00
0.20
0.58
0.23
0.10
0.00
0.20
0.44

0.33
0.06
0.30
0.12
0.40
0.12
1.48
0.06
0.00
0.30
0.40
0.40
0.00
0.20
0.17
0.21
0.10
0.10
0.20
0.23

1.13
0.89
0.50
0.00
0.90
0.41
1.89
0.64
0.65
0.00
3.60
0.40
0.00
0.20
0.10
0.22
0.50
0.10
1.87
4.55

5.51
4.02
3.23
3.05
2.99
2.75
2.69
2.66
2.63
2.48
2.47
2.44
2.10
2.01
1.98
1.96
1.93
1.90
1.87
1.83

ANEXO: HIDROLOGIA Y CLIMATOLOGIA

Prob.
%
1.00
2.00
3.00
8.00
10.00
12.00
14.00
16.00
18.00
20.00
22.00
24.00
26.00
28.00
30.00
32.00
34.00
36.00
38.00
40.00

Estudio de Pre Inversin a Nivel de Perfil del Proyecto:


ADECUACION DEL PROYECTO ORIGINALCHINECAS AL ESQUEMA REESTRUCTURADO.

Ao
2,007
1,989
1,981
1,966
1,965
2,002
1,961
1,974
2,005
1,987
1,964
1,979
2,004
1,985
1,986
1,963
1,969
1,997
1,973
2,003
1,968
1,988
1,982
1,980
1,995
1,978
1,990
1,992
1,991

Ene
4.60
0.40
1.54
2.70
0.10
0.69
0.40
3.97
2.10
2.58
2.90
0.00
0.00
0.39
2.73
0.30
0.20
0.00
2.14
0.40
0.20
1.74
0.00
0.26
0.68
0.63
0.41
0.00
0.00

Feb
0.90
0.76
7.24
3.60
0.90
3.05
3.20
4.41
1.80
2.84
0.50
0.54
4.60
4.41
2.02
0.20
0.10
2.43
0.32
0.50
0.50
1.50
2.23
0.11
1.74
2.08
0.00
0.00
0.00

Mar
4.50
8.55
7.07
7.50
8.00
4.38
5.60
3.40
5.50
2.28
6.30
8.09
6.30
3.18
1.55
4.60
6.40
0.58
2.22
3.60
2.00
1.20
0.83
0.02
1.45
1.66
0.60
1.50
1.92

Abr
9.10
8.47
1.47
1.50
6.80
6.00
5.00
1.45
3.00
6.60
1.20
5.03
1.00
2.46
3.23
4.20
0.10
0.33
1.75
1.10
2.10
3.20
1.99
1.65
1.36
0.94
0.00
0.94
0.00

May

Jun

Jul

Ago

Set

Oct

Nov

Dic

Media

0.70
1.79
0.67
2.00
0.90
1.30
0.10
0.76
3.00
0.34
1.40
0.51
0.10
1.36
1.14
0.00
1.50
0.35
0.42
2.10
2.00
0.10
0.68
0.00
0.53
0.45
0.00
0.24
0.00

0.20
0.00
0.37
0.40
0.20
0.20
0.00
0.60
0.40
0.00
0.70
0.22
0.00
0.54
0.50
0.00
0.40
0.00
0.09
0.50
0.40
0.00
0.18
0.02
0.01
0.14
0.00
0.00
0.00

0.10
0.00
0.16
0.30
0.30
0.00
0.00
0.64
0.10
0.00
0.10
0.15
0.00
0.33
0.20
0.00
0.10
0.00
0.00
0.10
0.10
0.00
0.08
0.00
0.00
0.05
0.00
0.00
0.00

0.00
0.00
0.05
0.10
0.10
0.10
0.00
0.53
0.00
0.00
0.20
0.00
0.00
0.19
0.05
0.00
0.00
0.00
0.10
0.00
0.10
0.00
0.00
0.00
0.00
0.01
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.30
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.17
0.00
0.10
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.20
0.60
0.00
0.00
0.19
0.00
0.00
0.50
0.00
0.10
0.08
0.00
0.10
0.00
0.00
0.41
0.00
0.10
0.00
0.10
1.67
0.00
0.00
0.76
0.00
0.00

0.20
0.00
0.00
0.10
0.20
1.56
0.00
0.07
0.00
0.00
0.60
0.00
0.10
0.00
0.02
0.00
0.00
0.10
0.43
0.00
0.30
0.00
0.51
2.01
0.24
0.00
1.71
0.00
0.43

0.10
0.00
0.00
0.00
0.20
0.63
2.10
0.03
0.00
0.00
0.20
0.00
1.30
0.39
0.48
2.00
1.60
5.46
0.71
0.00
0.30
0.16
1.06
1.91
0.45
0.00
0.11
0.00
0.10

1.70
1.66
1.55
1.53
1.53
1.49
1.37
1.36
1.33
1.22
1.22
1.21
1.13
1.11
0.99
0.95
0.87
0.77
0.73
0.69
0.68
0.66
0.64
0.64
0.54
0.50
0.30
0.22
0.20

Prob.
%
42.00
44.00
46.00
48.00
50.00
52.00
54.00
56.00
58.00
60.00
62.00
64.00
66.00
68.00
70.00
72.00
74.00
76.00
78.00
80.00
82.00
84.00
86.00
88.00
90.00
92.00
94.00
96.00
98.00

Cuadro N 4: Anlisis de frecuencia de descargas medias rio Casma, m/s.


Ao

Ene

Feb

Mar

Abr

May

Jun

Jul

1,998
1,996
1,972
1,970
2,008
1,960
1,971
1,994
1,983
2,000
1,989
1,993

77.91
15.97
19.90
60.40
13.80
12.40
12.20
12.55
15.35
5.29
7.55
0.87

91.29
26.14
18.10
27.90
18.00
31.20
11.50
33.43
9.15
25.00
30.69
6.93

68.03
53.23
61.70
4.60
36.50
37.10
37.20
24.13
27.18
40.05
24.13
35.68

14.38
46.77
19.90
2.20
35.20
27.00
30.80
32.10
40.07
16.77
16.50
19.00

4.27
9.29
3.60
10.60
8.70
4.70
9.10
12.29
8.15
11.66
11.15
4.39

2.62
3.87
0.90
5.30
1.70
2.20
7.40
4.43
6.19
5.03
5.90
0.27

2.00
2.76
0.10
6.60
3.90
3.50
2.90
0.89
3.93
1.14
3.95
0.46

ANEXO: HIDROLOGIA Y CLIMATOLOGIA

Ago
1.22
0.84
0.90
2.40
1.20
3.90
5.40
0.02
2.29
0.54
1.41
0.10

Set

Oct

0.56
0.26
0.40
0.50
0.00
0.30
0.60
0.10
0.75
0.26
0.55
0.00

2.44
0.01
0.00
5.00
1.30
0.10
0.30
0.08
0.57
0.75
2.81
6.23

Nov

Dic

0.78 2.73
0.32 0.00
0.40 10.90
0.40 5.10
2.60 1.30
1.20 0.40
2.40 2.40
0.37 0.97
0.51 3.09
0.30 4.19
1.35 0.00
9.47 18.42

Media
22.35
13.29
11.40
10.92
10.35
10.33
10.18
10.11
9.77
9.25
8.83
8.48

Prob.
%
2.00
4.00
6.00
8.00
10.00
12.00
14.00
16.00
18.00
20.00
22.00
24.00

Estudio de Pre Inversin a Nivel de Perfil del Proyecto:


ADECUACION DEL PROYECTO ORIGINALCHINECAS AL ESQUEMA REESTRUCTURADO.

Ao

Ene

Feb

Mar

Abr

May

Jun

Jul

Ago

Set

Oct

Nov

Dic

Media

1,984
1,964
1,976
1,962
1,999
1,961
1,977
1,965
1,975
1,973
2,002
1,966
1,981
1,967
2,001
2,003
2,007
2,006
1,974
1,986
1,985
1,987
1,969
1,979
1,982
2,004
1,968
2,005
1,963
1,988
1,997
1,980
1,995
1,978
1,990
1,991
1,992

4.66
21.30
8.12
15.40
6.69
28.70
3.99
3.90
5.04
10.87
2.94
16.40
5.23
5.60
12.15
6.30
12.40
3.60
17.21
10.25
4.57
10.71
0.40
0.07
4.36
0.10
0.30
3.60
3.10
7.55
0.75
1.03
3.45
2.16
1.63
0.06
0.10

25.26
16.40
15.45
5.30
36.98
15.90
21.88
6.40
9.58
10.07
12.33
20.10
24.89
9.80
9.68
16.90
6.40
8.80
16.82
7.46
8.29
9.40
1.20
6.68
9.21
5.10
2.00
1.40
0.40
9.70
8.34
0.36
6.89
7.62
1.44
1.13
0.37

25.41
14.10
28.06
38.30
11.47
16.50
26.71
28.70
32.19
18.35
24.19
16.20
18.99
17.00
18.90
26.60
17.80
21.30
12.29
8.24
10.36
10.06
28.20
24.39
3.71
20.90
16.00
17.00
14.10
5.50
3.71
1.62
6.32
8.32
6.21
13.62
2.99

13.65
11.50
20.87
18.70
9.62
8.60
17.67
15.80
14.50
14.50
19.60
9.20
7.83
27.10
14.27
8.40
12.40
13.60
4.65
14.02
8.58
16.00
8.70
16.97
5.87
12.10
10.10
6.10
12.60
11.30
0.81
7.00
5.80
5.13
1.21
2.58
1.92

8.43
8.90
3.84
2.60
9.50
1.80
4.10
3.90
9.92
3.47
6.20
8.10
3.84
7.70
4.27
7.10
3.50
6.90
0.99
5.91
7.98
4.28
4.60
1.87
3.87
0.00
9.10
9.50
2.70
0.30
1.09
0.00
1.75
1.66
0.50
2.09
0.90

5.65
5.90
4.25
1.40
3.35
2.00
1.62
2.70
4.27
1.09
1.20
1.90
3.75
2.10
1.00
1.30
2.70
0.20
0.74
3.22
6.00
1.72
0.90
0.52
2.09
0.10
1.20
1.90
0.00
0.00
0.52
0.00
0.37
0.75
0.12
0.80
0.00

4.59
3.00
2.94
1.40
2.00
2.70
1.05
5.30
1.75
0.00
1.60
1.30
3.72
0.20
0.93
0.30
1.00
0.40
0.90
2.30
4.29
0.00
1.10
0.43
0.31
0.00
0.20
0.80
0.20
0.40
0.00
0.00
0.00
0.61
0.05
0.29
0.00

2.61
1.40
2.35
0.40
1.11
0.40
0.87
3.30
1.04
0.21
1.00
0.50
2.60
0.10
0.50
0.00
0.30
0.00
0.69
0.58
2.09
0.00
0.10
0.14
0.02
0.00
0.20
0.20
0.10
0.00
0.00
0.00
0.00
0.30
0.00
0.00
0.00

0.68
0.40
2.22
0.10
0.40
0.10
0.42
0.50
0.83
0.89
0.10
0.10
0.45
0.50
1.01
0.00
0.00
0.00
0.57
0.03
0.07
0.00
0.00
0.00
0.00
0.00
0.20
0.00
0.00
0.00
0.00
0.00
0.00
0.04
0.00
0.00
0.00

0.65
0.50
1.34
0.10
0.43
0.10
0.42
2.90
0.57
4.88
0.20
0.20
0.00
0.90
1.12
0.00
0.10
0.00
0.39
0.00
0.15
0.00
0.00
0.00
0.40
0.40
0.30
0.10
0.90
0.00
0.00
8.55
0.00
0.00
2.61
0.00
0.00

0.66
7.20
1.02
1.00
0.39
0.20
0.51
2.60
0.48
4.77
6.12
0.40
1.09
1.70
4.13
0.00
8.30
0.20
0.25
0.03
0.00
0.00
0.10
0.00
4.79
0.10
2.00
0.00
0.60
0.00
0.07
4.99
2.12
0.08
6.87
0.57
0.00

8.22
0.80
0.80
0.20
1.92
6.30
1.99
4.80
0.58
11.34
2.88
0.10
0.74
0.30
4.53
0.10
0.50
2.30
0.11
1.62
0.85
0.39
7.10
0.00
11.44
6.70
0.20
0.10
4.90
2.12
19.32
10.76
2.58
0.30
4.34
0.99
0.00

8.37
7.62
7.60
7.08
6.99
6.94
6.77
6.73
6.73
6.70
6.53
6.21
6.09
6.08
6.04
5.58
5.45
4.78
4.63
4.47
4.43
4.38
4.37
4.26
3.84
3.79
3.48
3.39
3.30
3.07
2.88
2.86
2.44
2.25
2.08
1.84
0.52

ANEXO: HIDROLOGIA Y CLIMATOLOGIA

Prob.
%
26.00
28.00
30.00
32.00
34.00
36.00
38.00
40.00
42.00
44.00
46.00
48.00
50.00
52.00
54.00
56.00
58.00
60.00
62.00
64.00
66.00
68.00
70.00
72.00
74.00
76.00
78.00
80.00
82.00
84.00
86.00
88.00
90.00
92.00
94.00
96.00
98.00

Estudio de Pre Inversin a Nivel de Perfil del Proyecto:


ADECUACION DEL PROYECTO ORIGINALCHINECAS AL ESQUEMA REESTRUCTURADO.

Apndice 4
Descargas mximas anuales

ANEXO: HIDROLOGIA Y CLIMATOLOGIA

Estudio de Pre Inversin a Nivel de Perfil del Proyecto:


ADECUACION DEL PROYECTO ORIGINALCHINECAS AL ESQUEMA REESTRUCTURADO.

Cuadro N 1: Descarga mxima anual ro Santa, m/s


Ao
1978
1979
1980
1981
1982
1983
1984
1985
1986
1987
1988
1989

Mx
337.3
931.1
369.8
780.8
718.1
796.1
1225.1
396.0
463.3
505.1
485.3
592.6

Ao
1990
1991
1992
1993
1994
1995
1996
1997
1998
1999
2000
2001

Mx
228.9
840.4
204.6
1250.0
684.0
366.4
730.2
450.0
398.0
1032.0
637.0
764.8

Ao
2002
2003
2004
2005
2006
2007
2008
Promedio
Desv. Stdard
C. Variacin
Mximo
Mnimo

Mx
507.5
470.1
295.2
384.7
826.7
602.9
433.8
603.48
268.61
0.45
1,250.00
204.63

Cuadro N 2: Descarga mxima anual ro Nepea, m/s


Ao
1960
1961
1962
1963
1964
1965
1966
1967
1969
1970
1971
1972
1973
1974
1975
1976
1977
1978

Mx
5.5
7.5
6.5
18.0
0.5
30.0
0.6
50.0
6.0
10.0
30.0
70.0
12.0
15.0
15.0
35.0
20.0
3.2

Ao
1979
1980
1981
1982
1983
1984
1985
1986
1987
1988
1989
1990
1991
1992
1993
1994
1995
1996

Mx
19.2
9.3
18.5
7.8
60.0
27.0
10.0
15.6
6.6
14.0
20.0
4.0
4.2
10.0
40.0
18.0
3.0
20.0

Ao
1997
1998
1999
2000
2001
2002
2003
2004
2006
2007
2008
Promedio
Desv. Stdard
C. Variacin
Mximo
Mnimo

Mx
10.0
40.0
40.0
15.0
13.0
8.0
5.0
6.1
8.0
5.0
15.2
17.18
15.41
0.90
70.00
0.50

Cuadro N 3: Descarga mxima anual ro Casma, m/s


Ao
1960
1961
1962
1963
1964
1965
1966
1967

Mx
75.0
135.0
70.0
70.0
30.0
78.0
13.0
65.0

Ao
1977
1978
1979
1980
1981
1982
1983
1984

ANEXO: HIDROLOGIA Y CLIMATOLOGIA

Mx
40.0
19.3
84.5
33.4
43.6
32.0
80.0
47.0

Ao
1994
1995
1996
1997
1998
1999
2000
2001

Mx
80.0
15.0
100.0
60.0
210.0
88.0
120.0
65.0

Estudio de Pre Inversin a Nivel de Perfil del Proyecto:


ADECUACION DEL PROYECTO ORIGINALCHINECAS AL ESQUEMA REESTRUCTURADO.

Ao
1968
1969
1970
1971
1972
1973
1974
1975
1976

Mx
25.0
20.0
120.0
105.0
140.0
50.0
50.0
50.0
60.0

Ao
1985
1986
1987
1988
1989
1990
1991
1992
1993

Mx
25.8
33.9
22.5
20.0
34.0
13.0
40.0
7.0
80.0

Ao
2002
2003
2004

Mx
48.0
29.0
14.1

Promedio
Desv. Stdard
C. Variacin
Mximo
Mnimo

58.69
41.30
0.70
140.00
13.00

Cuadro N 4: Descarga mxima anual ro Sechn, m/s


Ao
1960
1961
1962
1963
1964
1965
1966
1967
1968
1969
1970
1971
1972
1973
1974

Mx
21.0
40.0
43.0
24.0
12.0
17.0
11.0
80.0
2.7
12.0
60.0
40.0
160.0
40.0
50.0

Ao
1975
1976
1977
1978
1979
1980
1981
1982
1983
1984
1985
1986
1987
1988
1989

ANEXO: HIDROLOGIA Y CLIMATOLOGIA

Mx
50.0
10.0
22.0
3.5
50.0
15.0
34.5
21.0
150.0
80.0
8.0
12.0
35.0
15.0
4.3

Ao
1990
1991
1992
1993
1994
1995
1996
1997
1998
1999
2000
Promedio
Desv. Stdard
C. Variacin
Mximo
Mnimo

Mx
5.0
10.2
1.2
15.0
29.0
9.0
36.0
40.0
232.5
125.0
67.0
41.29
48.20
1.17
232.50
1.20

Estudio de Pre Inversin a Nivel de Perfil del Proyecto:


ADECUACION DEL PROYECTO ORIGINALCHINECAS AL ESQUEMA REESTRUCTURADO.

Cuadro N 5: Anlisis de frecuencias de descargas mximas anuales, m/s. Ro Santa


YEAR
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31

DATA
337.3
931.1
369.8
780.8
718.1
796.1
1225.1
396
463.3
505.1
485.3
592.6
228.9
840.4
204.6
1250
684
366.4
730.2
450
398
1032
637
764.8
507.5
470.1
295.2
384.7
826.7
602.9
433.8

ORDERED
1250
1225.1
1032
931.1
840.4
826.7
796.1
780.8
764.8
730.2
718.1
684
637
602.9
592.6
507.5
505.1
485.3
470.1
463.3
450
433.8
398
396
384.7
369.8
366.4
337.3
295.2
228.9
204.6

ANEXO: HIDROLOGIA Y CLIMATOLOGIA

RANK
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31

PROB.
0.02
0.05
0.08
0.12
0.15
0.18
0.21
0.24
0.28
0.31
0.34
0.37
0.40
0.44
0.47
0.50
0.53
0.56
0.60
0.63
0.66
0.69
0.72
0.76
0.79
0.82
0.85
0.89
0.92
0.95
0.98

RET. PERIOD
52.0
19.5
12.0
8.7
6.8
5.6
4.7
4.1
3.6
3.3
2.9
2.7
2.5
2.3
2.1
2.0
1.9
1.8
1.7
1.6
1.5
1.4
1.4
1.3
1.3
1.2
1.2
1.1
1.1
1.1
1.0

Estudio de Pre Inversin a Nivel de Perfil del Proyecto:


ADECUACION DEL PROYECTO ORIGINALCHINECAS AL ESQUEMA REESTRUCTURADO.

Cuadro N 6: Anlisis de frecuencias de descargas mximas anuales, m/s. Ro Casma


YEAR
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45

DATA
75
135
70
70
30
78
13
65
25
20
120
105
140
50
50
50
60
40
19.3
84.5
33.4
43.6
32
80.8
47
25.8
33.9
22.5
20
34
13
40
7
80
80
15
100
60
210
88
120
65
48
29
14.1

ORDERED
210
140
135
120
120
105
100
88
84.5
80.8
80
80
78
75
70
70
65
65
60
60
50
50
50
48
47
43.6
40
40
34
33.9
33.4
32
30
29
25.8
25
22.5
20
20
19.3
15
14.1
13
13
7

ANEXO: HIDROLOGIA Y CLIMATOLOGIA

RANK
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45

PROB.
0.01
0.04
0.06
0.08
0.10
0.12
0.15
0.17
0.19
0.21
0.24
0.26
0.28
0.30
0.32
0.35
0.37
0.39
0.41
0.43
0.46
0.48
0.50
0.52
0.54
0.57
0.59
0.61
0.63
0.66
0.68
0.70
0.72
0.74
0.77
0.79
0.81
0.83
0.85
0.88
0.90
0.92
0.94
0.97
0.99

RET. PERIOD
75.3
28.3
17.4
12.6
9.8
8.1
6.8
5.9
5.3
4.7
4.3
3.9
3.6
3.3
3.1
2.9
2.7
2.6
2.4
2.3
2.2
2.1
2.0
1.9
1.8
1.8
1.7
1.6
1.6
1.5
1.5
1.4
1.4
1.3
1.3
1.3
1.2
1.2
1.2
1.1
1.1
1.1
1.1
1.0
1.0

Estudio de Pre Inversin a Nivel de Perfil del Proyecto:


ADECUACION DEL PROYECTO ORIGINALCHINECAS AL ESQUEMA REESTRUCTURADO.

Cuadro N 7: Anlisis de frecuencias de descargas mximas anuales, m/s. Ro Sechn


YEAR
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46

DATA
5.5
7.5
6.5
18
0.5
30
0.6
50
6
10
30
70
12
15
15
35
20
3.2
19.2
9.3
18.5
7.8
60
27
10
15.6
6.6
14
20
4
4.2
10
40
18
3
20
10
40
40
15
13
8
5
6.1
8
5

ORDERED
70
60
50
40
40
40
35
30
30
27
20
20
20
19.2
18.5
18
18
15.6
15.2
15
15
15
14
13
12
10
10
10
10
9.3
8
8
7.8
7.5
6.6
6.5
6.1
6
5.5
5
5
4.2
4
3.2
3
0.6

ANEXO: HIDROLOGIA Y CLIMATOLOGIA

RANK
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46

PROB.
0.013
0.034
0.055
0.076
0.097
0.119
0.14
0.161
0.182
0.203
0.225
0.246
0.267
0.288
0.309
0.331
0.352
0.373
0.394
0.415
0.436
0.458
0.479
0.5
0.521
0.542
0.564
0.585
0.606
0.627
0.648
0.669
0.691
0.712
0.733
0.754
0.775
0.797
0.818
0.839
0.86
0.881
0.903
0.924
0.945
0.966

RET. PERIOD
78.7
29.5
18.2
13.1
10.3
8.4
7.2
6.2
5.5
4.9
4.5
4.1
3.7
3.5
3.2
3.0
2.8
2.7
2.5
2.4
2.3
2.2
2.1
2.0
1.9
1.8
1.8
1.7
1.7
1.6
1.5
1.5
1.4
1.4
1.4
1.3
1.3
1.3
1.2
1.2
1.2
1.1
1.1
1.1
1.1
1.0

Estudio de Pre Inversin a Nivel de Perfil del Proyecto:


ADECUACION DEL PROYECTO ORIGINALCHINECAS AL ESQUEMA REESTRUCTURADO.

Cuadro N 8: Anlisis de frecuencias de descargas mximas anuales, m/s. Ro Nepea


YEAR
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41

DATA
21
40
43
24
12
17
11
80
2.7
12
60
40
160
40
50
50
10
22
3.5
50
15
34.5
21
150
80
8
12
35
15
4.3
5
10.2
1.2
15
29
9
36
40
232.5
125
67

ORDERED
232.5
160
150
125
80
80
67
60
50
50
50
43
40
40
40
40
36
35
34.5
29
24
22
21
21
17
15
15
15
12
12
12
11
10.2
10
9
8
5
4.3
3.5
2.7
1.2

ANEXO: HIDROLOGIA Y CLIMATOLOGIA

RANK
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41

PROB.
0.015
0.039
0.063
0.087
0.112
0.136
0.160
0.184
0.209
0.233
0.257
0.282
0.306
0.330
0.354
0.379
0.403
0.427
0.451
0.476
0.500
0.524
0.549
0.573
0.597
0.621
0.646
0.670
0.694
0.718
0.743
0.767
0.791
0.816
0.840
0.864
0.888
0.913
0.937
0.961
0.985

RET. PERIOD
68.7
25.8
15.8
11.4
9.0
7.4
6.2
5.4
4.8
4.3
3.9
3.6
3.3
3.0
2.8
2.6
2.5
2.3
2.2
2.1
2.0
1.9
1.8
1.7
1.7
1.6
1.5
1.5
1.4
1.4
1.3
1.3
1.3
1.2
1.2
1.2
1.1
1.1
1.1
1.0
1.0

Estudio de Pre Inversin a Nivel de Perfil del Proyecto:


ADECUACION DEL PROYECTO ORIGINALCHINECAS AL ESQUEMA REESTRUCTURADO.

Cuadro N 9: Parmetros de distribucin de frecuencias caudales mximos anuales - Rio Santa


SAMPLE STATISTICS
MEAN =
603.
S.D. = 268.6
SAMPLE STATISTICS (LOGS)
MEAN = 6.3065
S.D. = .4529
SAMPLE MIN =

205.

C.S. =
C.S. =

SAMPLE MAX = 1250.

PARAMETERS FOR GUMBEL I

A = .004828

PARAMETERS FOR LOGNORMAL

.7984

M = 6.3065

C.K. =

-.1617

C.K. =

3.5352
2.9671

N = 31
U=

482.

S = .4529

PARAMETERS FOR THREE PARAMETER LOGNORMAL

A=

-43.

M = 6.3889

S = .4168

STATISTICS OF LOG(X-A)
MEAN = 6.3889
S.D. = .4168
C.S. = -.0784
C.K. = 2.8928
PARAMETERS FOR LOG PEARSON III BY MOMENTS A = -.0366 B = .1530E+03
LOG(M) =11.9088
M = .1486E+06
PARAMETERS FOR LOG PEARSON III BY MAXIMUM LIKELIHOOD A = -.0584 B = .5846E+02
LOG(M) = 9.7209 M = .1666E+05
DISTRIBUTION STATISTICS

MEAN = 6.3065

S.D. = .4466

C.S. = -.2616

Cuadro N 10: Parmetros de distribucin de frecuencias caudales mximos anuales Rio


Casma
SAMPLE STATISTICS
MEAN =
59.
S.D. =
41.3
C.S. = 1.4249
C.K. = 6.0565
SAMPLE STATISTICS (LOGS)
MEAN = 3.8261
S.D. = .7451
C.S. = -.3465
C.K. = 2.9454
SAMPLE MIN =
7. SAMPLE MAX = 210. N = 45
PARAMETERS FOR GUMBEL I A = .034809 U =
41.
PARAMETERS FOR LOGNORMAL M = 3.8261 S = .7451
PARAMETERS FOR THREE PARAMETER LOGNORMAL A =
-5. M = 3.9544 S = .6527
STATISTICS OF LOG(X-A)
MEAN = 3.9544
S.D. = .6527
C.S. = -.1449
C.K. = 2.7135
PARAMETERS FOR LOG PEARSON III BY MOMENTS A = -.1291 B = .3331E+02 LOG(M) = 8.1264
M = .3383E+04
PARAMETERS FOR LOG PEARSON III BY MAXIMUM LIKELIHOOD A = -.1788 B = .1717E+02
LOG(M) = 6.8955 M = .9878E+03
DISTRIBUTION STATISTICS MEAN = 3.8261 S.D. = .7408 C.S. = -.4827

ANEXO: HIDROLOGIA Y CLIMATOLOGIA

Estudio de Pre Inversin a Nivel de Perfil del Proyecto:


ADECUACION DEL PROYECTO ORIGINALCHINECAS AL ESQUEMA REESTRUCTURADO.

Cuadro N 11 : Parmetros de distribucin de frecuencias caudales mximos anuales Rio


Sechn
SAMPLE STATISTICS
MEAN =
17.
S.D. =
15.4
C.S. = 1.6909
C.K. = 6.0306
SAMPLE STATISTICS (LOGS)
MEAN = 2.4410
S.D. = 1.0119
C.S. = -.9119
C.K. = 5.1235
SAMPLE MIN =
1. SAMPLE MAX = 70. N = 47
PARAMETERS FOR GUMBEL I A = .105239 U =
11.
PARAMETERS FOR LOGNORMAL M = 2.4410 S = 1.0119
PARAMETERS FOR THREE PARAMETER LOGNORMAL A =
-2. M = 2.6769
STATISTICS OF LOG(X-A)
MEAN = 2.6769
S.D. = .7618
C.S. = -.0415
C.K. = 3.1128

S = .7618

PARAMETERS FOR LOG PEARSON III BY MOMENTS A = -.4614 B = .4810E+01 LOG(M) = 4.6603
M = .1057E+03
PARAMETERS FOR LOG PEARSON III BY MAXIMUM LIKELIHOOD A = -.3437 B = .8360E+01
LOG(M) = 5.3147 M = .2033E+03
DISTRIBUTION STATISTICS MEAN = 2.4410 S.D. = .9939 C.S. = -.6917

ANEXO: HIDROLOGIA Y CLIMATOLOGIA

Estudio de Pre Inversin a Nivel de Perfil del Proyecto:


ADECUACION DEL PROYECTO ORIGINALCHINECAS AL ESQUEMA REESTRUCTURADO.

Apndice 5
Mapas

ANEXO: HIDROLOGIA Y CLIMATOLOGIA

Estudio de Pre Inversin a Nivel de Perfil del Proyecto:


ADECUACION DEL PROYECTO ORIGINALCHINECAS AL ESQUEMA REESTRUCTURADO.

ANEXO: HIDROLOGIA Y CLIMATOLOGIA

Estudio de Pre Inversin a Nivel de Perfil del Proyecto:


ADECUACION DEL PROYECTO ORIGINALCHINECAS AL ESQUEMA REESTRUCTURADO.

ANEXO: HIDROLOGIA Y CLIMATOLOGIA

Estudio de Pre Inversin a Nivel de Perfil del Proyecto:


ADECUACION DEL PROYECTO ORIGINALCHINECAS AL ESQUEMA REESTRUCTURADO.

ANEXO: HIDROLOGIA Y CLIMATOLOGIA

Estudio de Pre Inversin a Nivel de Perfil del Proyecto:


ADECUACION DEL PROYECTO ORIGINALCHINECAS AL ESQUEMA REESTRUCTURADO.

Bibliografa
1. Plan de Gestin de la Oferta de Agua en la Cuenca de Gestin Santa Instituto
Nacional de Desarrollo - INADE en Octubre del ao 2002.
2. Programa de Formalizacin de los derechos de agua PROFODUA, Fase 2,
Propuesta de asignaciones de agua superficial, valle de Casma INFORME
FINAL- 2006. INRENA, Ministerio de Agricultura.
3.

Software CropWat 4, FAO (1992) , clculo de la Evapotranspiracin por el


mtodo de Penman-Monteith.

4. Proyectos de Riego Tecnificado en el valle de Casma para el Shock de


Inversiones, Programa Subsectorial de Irrigaciones PSI Ministerio de
Agricultura 2007.
5. Inventario Evaluacin y uso Racional de los Recursos Naturales de la Costa,
1972, Oficina Nacional de Evaluacin de Recursos Naturales ONERN.
6. SENAMHI(1 988) Clasificacin Climtica del Per.
7. D.S. N 003-2009-AG del o8 de febrero de 2009.
8. Software HEC4 desarrollado por el Centro de Ingeniera Hidrolgica (HEC) del
Cuerpo de Ingenieros de los Estados Unidos (USACE) para la Completacin y
extensin de los registros descargas medias mensuales.
9. KITE, Frequency and Risk Analysis in Hydrology.Water Resources Publications
For Collins, Colorado USA.
10. Software, FLFREQ, para el anlisis de frecuencias de las distribuciones:
Gumbel Tipo I, Log-Normal III parmetros y Log-Pearson Tipo III.
11. Servicio Nacional de Meteorologa e Hidrologa SENAMHI, Oficina de atencin
al pblico para recopilar informacin de la zona de estudios.
12. Autoridad Nacional del Agua ANA, obtencin de informacin diaria y
mensual de descargas de los ros Nepea, Sechin, Casma, Viru, y Moche.
13. Anuarios hidrolgicos publicaciones de Electro Peru, periodo 1958 1999.
14. Proyecto Chavimichic, informacin de descargas diarias
Condorcerro 1978 a 2008.

ANEXO: HIDROLOGIA Y CLIMATOLOGIA

de la estacin

También podría gustarte