Está en la página 1de 305

The PMP application is a project in itself.

Ultimately the application is completed online but it is quite l


organize your information before you sit down to complete the application online. This spreadsheet is
experience meets the requirements, and give you a preview of what the application process is like.
There are 5 main worksheets in this workbook and 15 worksheets for you different projects.
1. Instructions - This is where you are now. It tells you how to use this workbook.

2. Project Domains - This is simply a list of typical project tasks that are organized by the 5 proj
application requires you to break down the hours you have spent on your projects into these 5 p

3. Screen Shots - These are actual screen shots of what the application looks like on the pmi.org
have to input will come from the Project Worksheets (P1,P2, P3, etc...)

4. Education - On this worksheet you will fill in your education attained which will automatically s
requirements needed based on your level of education.

5. Experience Summary - This worksheet is a summary of all of your projects and shows a runn
from the individual Project Worksheets (P1,P2, P3, etc...). The Qualification Summary at the
many you have listed, and how many you still need.

P. Project Worksheets - These worksheets are where you will list each of your projects and all o
sheets you will enter the total hours that you spent on the project and then enter the estimated
here will be carried over to the Experience Summary sheet.

PMP Application Assistant v6.2

Instructions

pleted online but it is quite lengthy and requires a lot of information so it is extremely helpful to gather and
online. This spreadsheet is designed help you organize your information, make sure your project
pplication process is like.

different projects.
is workbook.

are organized by the 5 project management process groups . You need to be aware of these because the
your projects into these 5 process groups.

on looks like on the pmi.org website so you can see what lies ahead. Most of the information that you will

d which will automatically set up the formulas in the Experience Summary worksheet for the

projects and shows a running total of your project hours and months. The information here is pulled over
Qualification Summary at the top of this worksheet shows the amount of hours and months required, how

ch of your projects and all of the information that you will need for each of them. At the bottom of these
nd then enter the estimated percentage of that time spent in each of the five domains. The hours input

n Assistant v6.2

Instructions

l to gather and

e because the
that you will

is pulled over
equired, how

om of these
ours input

Project Domains

This is simply a list of typical project tasks and where they fall in the 5 project management domains

Initiating

Planning

Conduct project selection methods

Gather and document requirements

Develop the project charter

Identify key project team members

Identify key stakeholders

Define roles and responsibilities

Define the scope of the project

Create the work breakdown structure

Evaluate the feasibility of new products or Develop a communication plan


services
Review the charter with key stakeholders
to confirm project scope, risks, issues,
assumptions and constraints

Develop the cost, schedule, resource,


quality and procurement plans

Identify and document high level risks,


assumptions and constraints

Obtain project plan approval from the


customer
Decompose tasks
Divide and prioritize tasks
Develop project schedules
Estimate costs
Allocate budget
Identify and document project risks
Evaluate project risks
Define risk strategies
Develop contingency plans
Develop the risk management plan
Meet vendors
Product evaluations
Prepare RFPs, RFQs
Conduct a kick off meeting
Develop the change management plan

all in the 5 project management domains. You need to be aware of these because the application requires you to break

Executing

Monitoring & Controlling

Manage the resource allocation

Report performance

Execute tasks defined in the project plan

Compile change requests

Implement a quality management plan

Perform quality control audits

Implement approved changes

Perform earned value analysis

Gather, maintain, and approve timesheets Verify the scope of the project
Provide coaching and training to team
members

Ensure the project deliverables conform to


quality standards established in the
project quality plan

Implement approved actions and


workarounds

Track schedule, cost, quality, risk, etc.

Obtain project resources

Monitor the status of identified risks

Conduct team building activities

Identify any new risks

Evaluate resumes

Take corrective actions

Interview candidates

Update the risk response plan

use the application requires you to break

Closing
Obtain final acceptance for the project
Identify and document lessons learned
Update project records and documents
Archive project records and documents
Obtain financial, legal and administrative
project closure
Release project resources and provide
performance feedback

Create and distribute final project report


Measure customer satisfaction

Screen Shots

These are actual screen shots of what the application looks like on the pmi.org website so you can see
from the Project Worksheets (P1, P2, P3,etc...)

1. Login Screen

3. Contact Email

5. Attained Education

7. Eligibility Worksheet

9. Add/Edit Organization Details

11. Add/Edit Project Domain Hours

13. Project Summary

15. Optional Information

17. Application Agreement

.org website so you can see what lies ahead. Most of the information that you will have to input will come

2. Contact Address

4. Contact Phone Number

6. PMP Requirements Overview

8. Add/Edit Project Specific Information

10. Add/Edit Organization Contact

12. Add/Edit Project Summary

14. Add/Edit PM Education

16. Name on Certificate

18. Review Progress and Submit

nput will come

Education
Attained Education
* Highest level of education attained:

Bachelor Degree

* Year degree awarded:

2005

* School/University:

ANDHRA UNIVERSITY

* Address:

Karachettu Road

or global equivalency

AU North Campus

* City
State/Province

VISAKHAPATNAM
ANDHRA PRADESH
530003

Zip/Postal Code
* Country:

INDIA

* Field of Study:

Engineering

Project Management Education


* Course Title
* Institution Name:
* Course Start Date:

(i.e. 12/11/2014)

* Course End Date:

(i.e. 12/11/2014)

* Hours:

36

or global equivalency

. 12/11/2014)

. 12/11/2014)

<--- Your highest level of education attained will determine whether you
need to document 4,500 hours of project management experience or 7,500
hours.
Also, it will determine whether you need 36 months of project management
experience or 60 months.
This option will set up the rest of the formulas in this workbook to monitor
your documentation to these levels.

Bachelor Degree
Project Months Required:
Project Hours Required:

36
4,500

Experience Summary
QUALIFICATION SUMMARY
PM Experience Months:
PM Experience Hours:
PM Education Hours:

Required

Qualified

Still Need

36

71

4,500
35

8,795
36

0
0

Tab
Hyperlinks
Project 01
Project 02
Project 03
Project 04
Project 05
Project 06
Project 07
Project 08
Project 09
Project 10
Project 11
Project 12
Project 13
Project 14
Project 15

Project Title

Start

Through

Totals: May, 2006


Oct, 2013
9MW Co-Gen Power Plant Automation
May, 2006
Feb, 2007
Automation of MgCl2 Handling unit in Titanium Spong
Plant
Mar, 2007
Nov, 2007
Facilities Management System for Seagate International
Substrate
Dec, 2007
Jan,plant
2009
Integrated Hospital Energy Management System(IHEMS)
Feb, 2010
Aug, 2012
REPLACEMENT OF LOCAL CONTROL SYSTEMS FOR
ECS
AT 48 MRT
Sep,
2012
Oct, STATIONS
2013

Months

Actual

71
10
9
14
31
14
0
0
0
0
0
0
0
0
0
0

12/1/2006
12/31/2014
If you have found this spreadsheet to be helpful, please stop by our Free Resources
While you are there, feel free to LIKE, TWEET, or +1

12/11/2014
Application Submission Date
Enter the date that you intend to submit your application to PMI
Expected Month of Application to PMI:
Expected Year of Application to PMI:

Planning

Executing

Monitor/
Control

Closing

8,795
1,068
960
1,539
3,648
1,580
0
0
0
0
0
0
0
0
0
0

71
3
9
14
31
14
0
0
0
0
0
0
0
0
0
0

8,795
1,068
960
1,539
3,648
1,580
0
0
0
0
0
0
0
0
0
0

558
75
77
92
219
95
0
0
0
0
0
0
0
0
0
0

3,074
374
326
523
1,313
537
0
0
0
0
0
0
0
0
0
0

2,385
267
250
431
1,058
379
0
0
0
0
0
0
0
0
0
0

1,986
246
230
369
730
411
0
0
0
0
0
0
0
0
0
0

793
107
77
123
328
158
0
0
0
0
0
0
0
0
0
0

by our Free Resources page on our website and leave us a nice comment.
o LIKE, TWEET, or +1 the page. Thanks! :)

Dec/2006
Jan/2007
Feb/2007
Mar/2007
Apr/2007

Initiating

Earliest Year All

Hours

Domain Hours

Months

Qualified
Total Hours

Actual

This date is the only thin


All of your project inf
Project Work

May/2007
Jun/2007
Jul/2007
Aug/2007
Sep/2007
Oct/2007
Nov/2007
Dec/2007
Jan/2008
Feb/2008
Mar/2008
Apr/2008
May/2008
Jun/2008
Jul/2008
Aug/2008
Sep/2008
Oct/2008
Nov/2008
Dec/2008
Jan/2009
Feb/2009
Mar/2009
Apr/2009
May/2009
Jun/2009
Jul/2009
Aug/2009
Sep/2009
Oct/2009
Nov/2009
Dec/2009
Jan/2010
Feb/2010
Mar/2010
Apr/2010
May/2010

This date is the only thing you need to fill out on this sheet.
All of your project info is to be input on the individual
Project Worksheets (P1, P2, P3, etc)
Earliest Year Allowed
Six Years Ago
Five Years Ago
Four Years Ago

Jun/2010
Jul/2010
Aug/2010
Sep/2010
Oct/2010
Nov/2010
Dec/2010
Jan/2011
Feb/2011
Mar/2011
Apr/2011
May/2011
Jun/2011
Jul/2011
Aug/2011
Sep/2011
Oct/2011
Nov/2011
Dec/2011
Jan/2012
Feb/2012
Mar/2012
Apr/2012
May/2012
Jun/2012
Jul/2012
Aug/2012
Sep/2012
Oct/2012
Nov/2012
Dec/2012
Jan/2013
Feb/2013
Mar/2013
Apr/2013
May/2013
Jun/2013

Four Years Ago


Three Years Ago
Two Years Ago
One Year Ago

Jul/2013
Aug/2013
Sep/2013
Oct/2013
Nov/2013
Dec/2013
Jan/2014
Feb/2014
Mar/2014
Apr/2014
May/2014
Jun/2014
Jul/2014
Aug/2014
Sep/2014
Oct/2014
Nov/2014
Dec/2014
Jan/2015
Feb/2015
Mar/2015
Apr/2015
May/2015
Jun/2015
Jul/2015
Aug/2015
Sep/2015
Oct/2015
Nov/2015
Dec/2015

One Year Ago


Current Year
Next Year

Project 1
Project Specific Information

* Project Title:

9MW Co-Gen Power Plant Automation

* Project Started:

5 (May)

2006

* Through:

2 (Feb)

2007

* Project Role:

Project Contributor

* Primary Industry:

Engineering

Earlier than 8 years ago!

Organization Details

* Job Title:

Project Engineer

* Organization Name:

Schneider Electric India Pvt Ltd

* Organization Address:

401, 4th Floor


Ashoka Bhoopal Chambers
Sardar Patel Road

* City:
State/Province/Territory:

Secunderabad
Andhra Pradesh
500003

Zip/Postal Code:

* Country:

INDIA

Project Summary

* In the space provided below, please summarize the project management tasks that you managed for this
project. Please ensure that your description is between 350 and 550 characters.

Project descriptions should consist of the following:


A brief, one-sentence project objective
Project deliverables summarized by domain (initiating, planning, executing, etc)
A brief, one-sentence project outcome
Project descriptions should be a high level summary of the tasks you led and directed on the project (e.g.
Initiating: develop project charter etc.; Planning: Scope definition etc.; and so on). Project management
experience is required in each of the process areas when all projects are totaled, but not on each project.

Implementation of PLC based Control system for Automation of 9MW Co-Gen Power Plant.Identify
key stakeholders, High level risks and assumptions.Create WBS,Define and record project details
with stakeholders.Execute tasks defined in project plan , Implement Quality Management
Plan.Monitor Risks,verify the scope of the project.Formalize final acceptance for project , Archive
and retain project records , measure customer statisfaction at end of project.System presents the
real time data from boilers and turbines to analyze the logics and downloads app setpoints changes
in PID controllers.
Total characters will be shown when you press "Enter".

Back to EXPERIENCE SUMMARY Sheet


Organization's Phone Number

on

an 8 years ago!

Country Code:

91

Area/State/City Code:

40

* Phone Number:

39404000

Extension:

Organization Contact

* Contact Name:

Srinivas Tata

* Contact Relationship:

Project Manager

* Contact E-mail:

sriniva.tata@in.schneider-electric.co.in

Contact's Phone Number

Country Code:
Area/State/City Code:

* Phone Number:
500003

ks that you managed for this


ers.

Extension:

Enter your total qualified hours for this project


Enter % of hours for each domain
Domain

ng, etc)

directed on the project (e.g.


o on). Project management
led, but not on each project.

Co-Gen Power Plant.Identify


e and record project details
Quality Management
ptance for project , Archive
project.System presents the
wnloads app setpoints changes
592 Characters

Percentage

Initiating

7%

Planning

35%

Executing

25%

Monitor & Control

23%

Closing

10%
100%

Back to EXPERIENCE SUMMARY Sheet

schneider-electric.co.in

1068

h domain
Hours

74.76
373.8
267
245.64
106.8

Project 2
Project Specific Information

* Project Title:

Automation of MgCl2 Handling unit in Titanium Spong Plant

* Project Started:

3 (Mar)

2007

* Through:

11 (Nov)

2007

* Project Role:

Project Contributor

* Primary Industry:

Manufacturing

Organization Details

* Job Title:

Project Engineer

* Organization Name:

Schneider Electric India Pvt Ltd

* Organization Address:

401, 4th Floor


Ashoka Bhoopal Chambers
Sardar Patel Road

* City:
State/Province/Territory:

Secunderabad
Andhra Pradesh
500003

Zip/Postal Code:

* Country:

INDIA

Project Summary

* In the space provided below, please summarize the project management tasks that you managed for this
project. Please ensure that your description is between 350 and 550 characters.

Project descriptions should consist of the following:


A brief, one-sentence project objective
Project deliverables summarized by domain (initiating, planning, executing, etc)
A brief, one-sentence project outcome
Project descriptions should be a high level summary of the tasks you led and directed on the project (e.g.
Initiating: develop project charter etc.; Planning: Scope definition etc.; and so on). Project management
experience is required in each of the process areas when all projects are totaled, but not on each project.

PLC & SCADA based automation for Mgcl2 handling unit in Titanium Plant.Develop project
charter,Identify and document high level risks.Create WBS,meet vendors.Execute tasks defined in
project management plan,implement approved changes.Verify the scope of the project,take
corrective actions,Ensure project deliverables conforms to quality standards as per the quality
management plan.Identify and document lessons learnt,create and distribute final project
report.This automation program will eliminate the drawbacks of the existing system and also
increases the efficiency of the titanium sponge unit.
Total characters will be shown when you press "Enter".

Back to EXPERIENCE SUMMARY Sheet


Organization's Phone Number

in Titanium Spong Plant

Country Code:

91

Area/State/City Code:

40

* Phone Number:

39404000

Extension:

Organization Contact

* Contact Name:

Srinivas Tata

* Contact Relationship:

Project Manager

* Contact E-mail:

sriniva.tata@in.schneider-electric.co.in

Contact's Phone Number

Country Code:
Area/State/City Code:

* Phone Number:
500003

ks that you managed for this


ers.

Extension:

Enter your total qualified hours for this project


Enter % of hours for each domain
Domain

ng, etc)

directed on the project (e.g.


o on). Project management
led, but not on each project.

Plant.Develop project
dors.Execute tasks defined in
ope of the project,take
ndards as per the quality
stribute final project
xisting system and also
601 Characters

Percentage

Initiating

8%

Planning

34%

Executing

26%

Monitor & Control

24%

Closing

8%
100%

Back to EXPERIENCE SUMMARY Sheet

schneider-electric.co.in

960

h domain
Hours

76.8
326.4
249.6
230.4
76.8

Project 3
Project Specific Information

* Project Title:

Facilities Management System for Seagate International Substrate p

* Project Started:

12 (Dec)

2007

* Through:

1 (Jan)

2009

* Project Role:

Project Leader

* Primary Industry:

Engineering

Organization Details

* Job Title:

System Engineer

* Organization Name:

C.N.A Group Ltd

* Organization Address:

28 Kaki Bukit Crescent


Kaki Bukit Techpark 1

* City:

Singapore

State/Province/Territory:

416259

Zip/Postal Code:

* Country:

Singapore

Project Summary

* In the space provided below, please summarize the project management tasks that you managed for this
project. Please ensure that your description is between 350 and 550 characters.

Project descriptions should consist of the following:


A brief, one-sentence project objective
Project deliverables summarized by domain (initiating, planning, executing, etc)
A brief, one-sentence project outcome
Project descriptions should be a high level summary of the tasks you led and directed on the project (e.g.
Initiating: develop project charter etc.; Planning: Scope definition etc.; and so on). Project management
experience is required in each of the process areas when all projects are totaled, but not on each project.

The Facilities Management System (FMS) controls and monitors the Central Utilities for Chilled
Water, Process Cooling Water, Hot Water, Clean Room, M+E services etc.Define the scope ,Identify
and dcoument high level risks,assumptions,constraints.Gather and document requirements,create
WBS ,Decompose , divide and prioritize tasks.Execute tasks defined in the project management
plan,Implement approved changes.Verify the scope ,track schedule.Identify and document lessons
learnt, create and distribute final project report.
Total characters will be shown when you press "Enter".

Back to EXPERIENCE SUMMARY Sheet


Organization's Phone Number

eagate International Substrate plant


Country Code:

65

Area/State/City Code:

* Phone Number:

6511 0082

Extension:

Organization Contact

* Contact Name:

Rajendran

* Contact Relationship:

Project Manager

* Contact E-mail:

rajan@cna.com.sg

Contact's Phone Number

65

Country Code:
Area/State/City Code:

* Phone Number:
416259

ks that you managed for this


ers.

6511 0082
102

Extension:

Enter your total qualified hours for this project


Enter % of hours for each domain
Domain

ng, etc)

directed on the project (e.g.


o on). Project management
led, but not on each project.

Central Utilities for Chilled


etc.Define the scope ,Identify
ocument requirements,create
n the project management
dentify and document lessons

525 Characters

Percentage

Initiating

6%

Planning

34%

Executing

28%

Monitor & Control

24%

Closing

8%
100%

Back to EXPERIENCE SUMMARY Sheet

sg

1539

h domain
Hours

92.34
523.26
430.92
369.36
123.12

Project 4
Project Specific Information

* Project Title:

Integrated Hospital Energy Management System(IHEMS)

* Project Started:

2 (Feb)

2010

* Through:

8 (Aug)

2012

* Project Role:

Project Leader

* Primary Industry:

Healthcare

Organization Details

* Job Title:

Senior System Engineer

* Organization Name:

C.N.A Group Ltd

* Organization Address:

28 Kaki Bukit Crescent


Kaki Bukit Techpark 1

* City:

Singapore

State/Province/Territory:

416259

Zip/Postal Code:

* Country:

Singpore

Project Summary

* In the space provided below, please summarize the project management tasks that you managed for this
project. Please ensure that your description is between 350 and 550 characters.

Project descriptions should consist of the following:


A brief, one-sentence project objective
Project deliverables summarized by domain (initiating, planning, executing, etc)
A brief, one-sentence project outcome
Project descriptions should be a high level summary of the tasks you led and directed on the project (e.g.
Initiating: develop project charter etc.; Planning: Scope definition etc.; and so on). Project management
experience is required in each of the process areas when all projects are totaled, but not on each project.

The IHEMS Integrated Solution for KTP Hospital provides the infrastructure for multiple applications
to be integrated into a common platform for data exchange and collaboration. Identify key
stakeholders & analysis ,Define the scope, Identify high level risks, etc.Identify key project team
members, roles , Create WBS , Obtain stakeholder's project plan approval.Execute tasks defined in
project plan,Execute tasks defined in project plan,Implement Quality Management plan.Measure
project performance,Monitor risks.Formalize final acceptance for project,Archive & retain project
records.This integrated approach helps KTPH improve patient care and comfort, streamline
Total characters will be shown when you press "Enter".

Back to EXPERIENCE SUMMARY Sheet


Organization's Phone Number

ment System(IHEMS)

65

Country Code:
Area/State/City Code:

* Phone Number:

6511 0082

Extension:

Organization Contact

* Contact Name:

Robinson

* Contact Relationship:

Project Manager

* Contact E-mail:

robin@cna.com.sg

Contact's Phone Number

Country Code:

65

Area/State/City Code:

65

* Phone Number:
416259

ks that you managed for this


ers.

96825484

Extension:

Enter your total qualified hours for this project


Enter % of hours for each domain
Domain

ng, etc)

directed on the project (e.g.


o on). Project management
led, but not on each project.

ucture for multiple applications


boration. Identify key
c.Identify key project team
roval.Execute tasks defined in
Management plan.Measure
ect,Archive & retain project
d comfort, streamline
732 Characters

Percentage

Initiating

6%

Planning

36%

Executing

29%

Monitor & Control

20%

Closing

9%
100%

Back to EXPERIENCE SUMMARY Sheet

sg

3648

h domain
Hours

218.88
1313.28
1057.92
729.6
328.32

Project 5
Project Specific Information

* Project Title:

REPLACEMENT OF LOCAL CONTROL SYSTEMS FOR ECS AT 48 MRT ST

* Project Started:

9 (Sep)

2012

* Through:

10 (Oct)

2013

* Project Role:

Project Leader

* Primary Industry:

Engineering

Organization Details

* Job Title:

Senior System Engineer

* Organization Name:

C.N.A Engineering Pvt Ltd

* Organization Address:

Unit 7, GINSERV, JSS Campus, CA Site no. 1


H.A.L. 3rd Stage,
Kodihalli

* City:
State/Province/Territory:

Bangalore
Karnataka
560008

Zip/Postal Code:

* Country:

India

Project Summary

* In the space provided below, please summarize the project management tasks that you managed for this
project. Please ensure that your description is between 350 and 550 characters.

Project descriptions should consist of the following:


A brief, one-sentence project objective
Project deliverables summarized by domain (initiating, planning, executing, etc)
A brief, one-sentence project outcome
Project descriptions should be a high level summary of the tasks you led and directed on the project (e.g.
Initiating: develop project charter etc.; Planning: Scope definition etc.; and so on). Project management
experience is required in each of the process areas when all projects are totaled, but not on each project.

Design, supply, install, testing and Commissioning of Environmental Control System (ECS) and
Building Management System (BMS) for 7 stations.Identify key stakeholders & analysis.Create WBS
,Develop Change Management Plan.Manage resouce allocation,Execute tasks defined in project
plan,Communicate with stakeholders & team,Mitigate project risks.Measure project
performance,Ensure deliverable conform to quality standards.Formalize final acceptance for
project,Idenitfy, document, communicate lessons learned.
Total characters will be shown when you press "Enter".

Back to EXPERIENCE SUMMARY Sheet


Organization's Phone Number

SYSTEMS FOR ECS AT 48 MRT STATIONS


Country Code:

91

Area/State/City Code:

* Phone Number:

80
25214096

Extension:

Organization Contact

te no. 1

* Contact Name:

Ramesh

* Contact Relationship:

Technical Manager

* Contact E-mail:

ramesh@cnaindia.com

Contact's Phone Number

Country Code:

91

Area/State/City Code:

80

* Phone Number:
560008

ks that you managed for this


ers.

9972124821

Extension:

Enter your total qualified hours for this project


Enter % of hours for each domain
Domain

ng, etc)

directed on the project (e.g.


o on). Project management
led, but not on each project.

Control System (ECS) and


holders & analysis.Create WBS
te tasks defined in project
easure project
ze final acceptance for

508 Characters

Percentage

Initiating

6%

Planning

34%

Executing

24%

Monitor & Control

26%

Closing

10%
100%

Back to EXPERIENCE SUMMARY Sheet

ger

a.com

1580

h domain
Hours

94.8
537.2
379.2
410.8
158

Project 6
Project Specific Information

* Project Title:
* Project Started:
* Through:
* Project Role:

-- select --

* Primary Industry:

-- select --

Organization Details

* Job Title:
* Organization Name:
* Organization Address:

* City:
State/Province/Territory:
Zip/Postal Code:

* Country:
Project Summary

* In the space provided below, please summarize the project management tasks that you managed for this
project. Please ensure that your description is between 350 and 550 characters.

Project descriptions should consist of the following:


A brief, one-sentence project objective
Project deliverables summarized by domain (initiating, planning, executing, etc)
A brief, one-sentence project outcome
Project descriptions should be a high level summary of the tasks you led and directed on the project (e.g.
Initiating: develop project charter etc.; Planning: Scope definition etc.; and so on). Project management
experience is required in each of the process areas when all projects are totaled, but not on each project.

Total characters will be shown when you press "Enter".

Back to EXPERIENCE SUMMARY Sheet


Organization's Phone Number

Country Code:
Area/State/City Code:

* Phone Number:
Extension:

Organization Contact

* Contact Name:
* Contact Relationship:
* Contact E-mail:
Contact's Phone Number

Country Code:
Area/State/City Code:

* Phone Number:
Extension:

ks that you managed for this


ers.

Enter your total qualified hours for this project


Enter % of hours for each domain
Domain

Percentage

Initiating

ng, etc)

Planning

directed on the project (e.g.


o on). Project management
led, but not on each project.

Executing
Monitor & Control
Closing
0%

0 Characters

Back to EXPERIENCE SUMMARY Sheet

s project

h domain
Hours

0
0
0
0
0

Project 7
Project Specific Information

* Project Title:
* Project Started:
* Through:
* Project Role:

-- select --

* Primary Industry:

-- select --

Organization Details

* Job Title:
* Organization Name:
* Organization Address:

* City:
State/Province/Territory:
Zip/Postal Code:

* Country:
Project Summary

* In the space provided below, please summarize the project management tasks that you managed for this
project. Please ensure that your description is between 350 and 550 characters.

Project descriptions should consist of the following:


A brief, one-sentence project objective
Project deliverables summarized by domain (initiating, planning, executing, etc)
A brief, one-sentence project outcome
Project descriptions should be a high level summary of the tasks you led and directed on the project (e.g.
Initiating: develop project charter etc.; Planning: Scope definition etc.; and so on). Project management
experience is required in each of the process areas when all projects are totaled, but not on each project.

Total characters will be shown when you press "Enter".

Back to EXPERIENCE SUMMARY Sheet


Organization's Phone Number

Country Code:
Area/State/City Code:

* Phone Number:
Extension:

Organization Contact

* Contact Name:
* Contact Relationship:
* Contact E-mail:
Contact's Phone Number

Country Code:
Area/State/City Code:

* Phone Number:
Extension:

ks that you managed for this


ers.

Enter your total qualified hours for this project


Enter % of hours for each domain
Domain

Percentage

Initiating

ng, etc)

Planning

directed on the project (e.g.


o on). Project management
led, but not on each project.

Executing
Monitor & Control
Closing
0%

0 Characters

Back to EXPERIENCE SUMMARY Sheet

s project

h domain
Hours

0
0
0
0
0

Project 8
Project Specific Information

* Project Title:
* Project Started:
* Through:
* Project Role:

-- select --

* Primary Industry:

-- select --

Organization Details

* Job Title:
* Organization Name:
* Organization Address:

* City:
State/Province/Territory:
Zip/Postal Code:

* Country:
Project Summary

* In the space provided below, please summarize the project management tasks that you managed for this
project. Please ensure that your description is between 350 and 550 characters.

Project descriptions should consist of the following:


A brief, one-sentence project objective
Project deliverables summarized by domain (initiating, planning, executing, etc)
A brief, one-sentence project outcome
Project descriptions should be a high level summary of the tasks you led and directed on the project (e.g.
Initiating: develop project charter etc.; Planning: Scope definition etc.; and so on). Project management
experience is required in each of the process areas when all projects are totaled, but not on each project.

Total characters will be shown when you press "Enter".

Back to EXPERIENCE SUMMARY Sheet


Organization's Phone Number

Country Code:
Area/State/City Code:

* Phone Number:
Extension:

Organization Contact

* Contact Name:
* Contact Relationship:
* Contact E-mail:
Contact's Phone Number

Country Code:
Area/State/City Code:

* Phone Number:
Extension:

ks that you managed for this


ers.

Enter your total qualified hours for this project


Enter % of hours for each domain
Domain

Percentage

Initiating

ng, etc)

Planning

directed on the project (e.g.


o on). Project management
led, but not on each project.

Executing
Monitor & Control
Closing
0%

0 Characters

Back to EXPERIENCE SUMMARY Sheet

s project

h domain
Hours

0
0
0
0
0

Project 9
Project Specific Information

* Project Title:
* Project Started:
* Through:
* Project Role:

-- select --

* Primary Industry:

-- select --

Organization Details

* Job Title:
* Organization Name:
* Organization Address:

* City:
State/Province/Territory:
Zip/Postal Code:

* Country:
Project Summary

* In the space provided below, please summarize the project management tasks that you managed for this
project. Please ensure that your description is between 350 and 550 characters.

Project descriptions should consist of the following:


A brief, one-sentence project objective
Project deliverables summarized by domain (initiating, planning, executing, etc)
A brief, one-sentence project outcome
Project descriptions should be a high level summary of the tasks you led and directed on the project (e.g.
Initiating: develop project charter etc.; Planning: Scope definition etc.; and so on). Project management
experience is required in each of the process areas when all projects are totaled, but not on each project.

Total characters will be shown when you press "Enter".

Back to EXPERIENCE SUMMARY Sheet


Organization's Phone Number

Country Code:
Area/State/City Code:

* Phone Number:
Extension:

Organization Contact

* Contact Name:
* Contact Relationship:
* Contact E-mail:
Contact's Phone Number

Country Code:
Area/State/City Code:

* Phone Number:
Extension:

ks that you managed for this


ers.

Enter your total qualified hours for this project


Enter % of hours for each domain
Domain

Percentage

Initiating

ng, etc)

Planning

directed on the project (e.g.


o on). Project management
led, but not on each project.

Executing
Monitor & Control
Closing
0%

0 Characters

Back to EXPERIENCE SUMMARY Sheet

s project

h domain
Hours

0
0
0
0
0

Project 10
Project Specific Information

* Project Title:
* Project Started:
* Through:
* Project Role:

-- select --

* Primary Industry:

-- select --

Organization Details

* Job Title:
* Organization Name:
* Organization Address:

* City:
State/Province/Territory:
Zip/Postal Code:

* Country:
Project Summary

* In the space provided below, please summarize the project management tasks that you managed for this
project. Please ensure that your description is between 350 and 550 characters.

Project descriptions should consist of the following:


A brief, one-sentence project objective
Project deliverables summarized by domain (initiating, planning, executing, etc)
A brief, one-sentence project outcome
Project descriptions should be a high level summary of the tasks you led and directed on the project (e.g.
Initiating: develop project charter etc.; Planning: Scope definition etc.; and so on). Project management
experience is required in each of the process areas when all projects are totaled, but not on each project.

Total characters will be shown when you press "Enter".

Back to EXPERIENCE SUMMARY Sheet


Organization's Phone Number

Country Code:
Area/State/City Code:

* Phone Number:
Extension:

Organization Contact

* Contact Name:
* Contact Relationship:
* Contact E-mail:
Contact's Phone Number

Country Code:
Area/State/City Code:

* Phone Number:
Extension:

ks that you managed for this


ers.

Enter your total qualified hours for this project


Enter % of hours for each domain
Domain

Percentage

Initiating

ng, etc)

Planning

directed on the project (e.g.


o on). Project management
led, but not on each project.

Executing
Monitor & Control
Closing
0%

0 Characters

Back to EXPERIENCE SUMMARY Sheet

s project

h domain
Hours

0
0
0
0
0

Project 11
Project Specific Information

* Project Title:
* Project Started:
* Through:
* Project Role:

-- select --

* Primary Industry:

-- select --

Organization Details

* Job Title:
* Organization Name:
* Organization Address:

* City:
State/Province/Territory:
Zip/Postal Code:

* Country:
Project Summary

* In the space provided below, please summarize the project management tasks that you managed for this
project. Please ensure that your description is between 350 and 550 characters.

Project descriptions should consist of the following:


A brief, one-sentence project objective
Project deliverables summarized by domain (initiating, planning, executing, etc)
A brief, one-sentence project outcome
Project descriptions should be a high level summary of the tasks you led and directed on the project (e.g.
Initiating: develop project charter etc.; Planning: Scope definition etc.; and so on). Project management
experience is required in each of the process areas when all projects are totaled, but not on each project.

Total characters will be shown when you press "Enter".

Back to EXPERIENCE SUMMARY Sheet


Organization's Phone Number

Country Code:
Area/State/City Code:

* Phone Number:
Extension:

Organization Contact

* Contact Name:
* Contact Relationship:
* Contact E-mail:
Contact's Phone Number

Country Code:
Area/State/City Code:

* Phone Number:
Extension:

ks that you managed for this


ers.

Enter your total qualified hours for this project


Enter % of hours for each domain
Domain

Percentage

Initiating

ng, etc)

Planning

directed on the project (e.g.


o on). Project management
led, but not on each project.

Executing
Monitor & Control
Closing
0%

0 Characters

Back to EXPERIENCE SUMMARY Sheet

s project

h domain
Hours

0
0
0
0
0

Project 12
Project Specific Information

* Project Title:
* Project Started:
* Through:
* Project Role:

-- select --

* Primary Industry:

-- select --

Organization Details

* Job Title:
* Organization Name:
* Organization Address:

* City:
State/Province/Territory:
Zip/Postal Code:

* Country:
Project Summary

* In the space provided below, please summarize the project management tasks that you managed for this
project. Please ensure that your description is between 350 and 550 characters.

Project descriptions should consist of the following:


A brief, one-sentence project objective
Project deliverables summarized by domain (initiating, planning, executing, etc)
A brief, one-sentence project outcome
Project descriptions should be a high level summary of the tasks you led and directed on the project (e.g.
Initiating: develop project charter etc.; Planning: Scope definition etc.; and so on). Project management
experience is required in each of the process areas when all projects are totaled, but not on each project.

Total characters will be shown when you press "Enter".

Back to EXPERIENCE SUMMARY Sheet


Organization's Phone Number

Country Code:
Area/State/City Code:

* Phone Number:
Extension:

Organization Contact

* Contact Name:
* Contact Relationship:
* Contact E-mail:
Contact's Phone Number

Country Code:
Area/State/City Code:

* Phone Number:
Extension:

ks that you managed for this


ers.

Enter your total qualified hours for this project


Enter % of hours for each domain
Domain

Percentage

Initiating

ng, etc)

Planning

directed on the project (e.g.


o on). Project management
led, but not on each project.

Executing
Monitor & Control
Closing
0%

0 Characters

Back to EXPERIENCE SUMMARY Sheet

s project

h domain
Hours

0
0
0
0
0

Project 13
Project Specific Information

* Project Title:
* Project Started:
* Through:
* Project Role:

-- select --

* Primary Industry:

-- select --

Organization Details

* Job Title:
* Organization Name:
* Organization Address:

* City:
State/Province/Territory:
Zip/Postal Code:

* Country:
Project Summary

* In the space provided below, please summarize the project management tasks that you managed for this
project. Please ensure that your description is between 350 and 550 characters.

Project descriptions should consist of the following:


A brief, one-sentence project objective
Project deliverables summarized by domain (initiating, planning, executing, etc)
A brief, one-sentence project outcome
Project descriptions should be a high level summary of the tasks you led and directed on the project (e.g.
Initiating: develop project charter etc.; Planning: Scope definition etc.; and so on). Project management
experience is required in each of the process areas when all projects are totaled, but not on each project.

Total characters will be shown when you press "Enter".

Back to EXPERIENCE SUMMARY Sheet


Organization's Phone Number

Country Code:
Area/State/City Code:

* Phone Number:
Extension:

Organization Contact

* Contact Name:
* Contact Relationship:
* Contact E-mail:
Contact's Phone Number

Country Code:
Area/State/City Code:

* Phone Number:
Extension:

ks that you managed for this


ers.

Enter your total qualified hours for this project


Enter % of hours for each domain
Domain

Percentage

Initiating

ng, etc)

Planning

directed on the project (e.g.


o on). Project management
led, but not on each project.

Executing
Monitor & Control
Closing
0%

0 Characters

Back to EXPERIENCE SUMMARY Sheet

s project

h domain
Hours

0
0
0
0
0

Project 14
Project Specific Information

* Project Title:
* Project Started:
* Through:
* Project Role:

-- select --

* Primary Industry:

-- select --

Organization Details

* Job Title:
* Organization Name:
* Organization Address:

* City:
State/Province/Territory:
Zip/Postal Code:

* Country:
Project Summary

* In the space provided below, please summarize the project management tasks that you managed for this
project. Please ensure that your description is between 350 and 550 characters.

Project descriptions should consist of the following:


A brief, one-sentence project objective
Project deliverables summarized by domain (initiating, planning, executing, etc)
A brief, one-sentence project outcome
Project descriptions should be a high level summary of the tasks you led and directed on the project (e.g.
Initiating: develop project charter etc.; Planning: Scope definition etc.; and so on). Project management
experience is required in each of the process areas when all projects are totaled, but not on each project.

Total characters will be shown when you press "Enter".

Back to EXPERIENCE SUMMARY Sheet


Organization's Phone Number

Country Code:
Area/State/City Code:

* Phone Number:
Extension:

Organization Contact

* Contact Name:
* Contact Relationship:
* Contact E-mail:
Contact's Phone Number

Country Code:
Area/State/City Code:

* Phone Number:
Extension:

ks that you managed for this


ers.

Enter your total qualified hours for this project


Enter % of hours for each domain
Domain

Percentage

Initiating

ng, etc)

Planning

directed on the project (e.g.


o on). Project management
led, but not on each project.

Executing
Monitor & Control
Closing
0%

0 Characters

Back to EXPERIENCE SUMMARY Sheet

s project

h domain
Hours

0
0
0
0
0

Project 15
Project Specific Information

* Project Title:
* Project Started:
* Through:
* Project Role:

-- select --

* Primary Industry:

-- select --

Organization Details

* Job Title:
* Organization Name:
* Organization Address:

* City:
State/Province/Territory:
Zip/Postal Code:

* Country:
Project Summary

* In the space provided below, please summarize the project management tasks that you managed for this
project. Please ensure that your description is between 350 and 550 characters.

Project descriptions should consist of the following:


A brief, one-sentence project objective
Project deliverables summarized by domain (initiating, planning, executing, etc)
A brief, one-sentence project outcome
Project descriptions should be a high level summary of the tasks you led and directed on the project (e.g.
Initiating: develop project charter etc.; Planning: Scope definition etc.; and so on). Project management
experience is required in each of the process areas when all projects are totaled, but not on each project.

Total characters will be shown when you press "Enter".

Back to EXPERIENCE SUMMARY Sheet


Organization's Phone Number

Country Code:
Area/State/City Code:

* Phone Number:
Extension:

Organization Contact

* Contact Name:
* Contact Relationship:
* Contact E-mail:
Contact's Phone Number

Country Code:
Area/State/City Code:

* Phone Number:
Extension:

ks that you managed for this


ers.

Enter your total qualified hours for this project


Enter % of hours for each domain
Domain

Percentage

Initiating

ng, etc)

Planning

directed on the project (e.g.


o on). Project management
led, but not on each project.

Executing
Monitor & Control
Closing
0%

0 Characters

Back to EXPERIENCE SUMMARY Sheet

s project

h domain
Hours

0
0
0
0
0

También podría gustarte