Objective
After completing this module, the participant will be able to:
Theory/Practical:
Install Element Manager to their PC
Use the tool Element Manager
Commission Flexi EDGE BTS with Element Manager
Explain the concept of file-based commissioning
Show how legal and illegal system configurations are detected in Element
Manager
List the elements to be checked when verifying the Flexi EDGE BTS is transmitting
On-Air
Demonstrate checking, listing and reporting all Flexi EDGE BTS alarms or contrary
On-Air indications
Carry out a GSM/EDGE test call (network permitting)

Soc Classification level


2
Nokia Siemens Networks

Flexi EDGE BTS Installation and Commissioning / July 2008

Contents
Focus
New Features in Flexi EDGE BTS Manager
Changes from Ultrasite BTS Manager, HW Configurator and E1/T1 Manager
Topics
General overview
Connectivity
Log files
Customer v Developer version
Commissioning
Remote Troubleshooting
Assumptions
Familiarity with Ultrasite tools
CX BTS Manager
HW Configurator
E1/T1 Manager
Basic familiarity with Flexi EDGE BTS hardware units
Soc Classification level
3
Nokia Siemens Networks

Flexi EDGE BTS Installation and Commissioning / July 2008

Flexi EDGE BTS Manager Overview


Main Windows

Logical BTS
view

Properties/Events

Navigation bar

Alarms view
Soc Classification level
4
Nokia Siemens Networks

Connection
Flexi EDGE BTS Installation and Commissioning / July 2008
feedback

Flexi EDGE BTS Manager Overview


New Features

Flexi-EDGE supports most of the features of CX BTS Manager.


The following slides describe the new or changed functionality.

Soc Classification level


5
Nokia Siemens Networks

Flexi EDGE BTS Installation and Commissioning / July 2008

Flexi EDGE BTS Manager Overview


Improved Commissioning
Remote recommissioning
Minimum requirement is an OMUSIG link
File based commissioning (SCF)
Complete SCF
All parameters for that site in a single file
"One-click" commissioning
Template (EasyWizard) SCF
EasyWizard product is available for Ultrasite
Allows commissioning by an inexperienced user
Only site specifics need to be entered (eg BCF ID, serial numbers, ...)
Trials have shown that a secretary can commission the site with no training
"Partial SCF"
An incomplete file that needs to be completed by the commissioner
Provides full flexibility but requires a more competent commissioner
Required for those sites that do not have standard configurations
"Fallback"
When connected to a commissioned site the existing SCF is uploaded
If there are problems with the new configuration the old configuration can be restored

Soc Classification level


6
Nokia Siemens Networks

Flexi EDGE BTS Installation and Commissioning / July 2008

Flexi EDGE BTS Manager Overview


Autodetected RF Cabling

Standard configurations do not need RF cabling to be defined


by the commissioner
Exception: Antenna cabling cannot be autodetected still
must be manually entered
No need for "HW Configurator"-type tool
Cabling may still be defined manually for configurations not in
the list of standard configurations (list to be supplied in
material)
MHA and VSWR settings entered in commissioning wizard

Soc Classification level


7
Nokia Siemens Networks

Flexi EDGE BTS Installation and Commissioning / July 2008

Flexi EDGE BTS Manager Overview


Integrated transmission management

Seamless E1 and E1/T1 management


Separate application for Microwave links
Microwave payload appears as virtual E1 lines
Consolidated alarm list
BTS and transmission alarms shown in a single list

Soc Classification level


8
Nokia Siemens Networks

Flexi EDGE BTS Installation and Commissioning / July 2008

Flexi EDGE BTS Manager Overview


Ethernet local connectivity

Faster connection speed


Ethernet port standard on all recent laptops
Serial ports being phased out; Ultrasite BTS Manager
connection may require a USB-Serial converter
Faster SW download speed

Soc Classification level


9
Nokia Siemens Networks

Flexi EDGE BTS Installation and Commissioning / July 2008

Flexi EDGE BTS Manager Overview


User Interface improvements
Task based user interface
Reduced number of "pop-ups means less
interruption
Immediate feedback in case of user error
User can learn from mistakes
Aligned with look and feel of Flexi-WCDMA
BTS Manager
Easy transition from CX BTS Manager
Common terms used
Menu names and content similar
Object actions not hidden behind
right-mouse click

Soc Classification level


10
Nokia Siemens Networks

Flexi EDGE BTS Installation and Commissioning / July 2008

Flexi EDGE BTS Manager Connectivity


Local
Connect via LMP on ESMA
BTS Connection settings
IP Address: 192.168.255.131
Port: 27500
Not changeable by customer
Lab setup IP Address may be
different
Recommended laptop settings (customer)
IP Address: 192.168.255.130
Subnet Mask: 255.255.255.128
Default Gateway: 192.168.255.129
Personal Firewall may need to allow
access to local network
eg ZoneAlarm
Personal Firewall needs to allow local SW
download
Incoming TCP port 27501

Soc Classification level


11
Nokia Siemens Networks

Flexi EDGE BTS Installation and Commissioning / July 2008

Flexi EDGE BTS Manager Connectivity


Remote

Same connectivity as Ultrasite


via Netact
requires operational OMUSIG link

GCS database as Ultrasite


Connection Tool as Ultrasite

Soc Classification level


12
Nokia Siemens Networks

Flexi EDGE BTS Installation and Commissioning / July 2008

Flexi EDGE BTS Manager Connectivity


MIV
Management Interface Version (MIV)
Version of interface between BTS Manager and BTS
Minor mismatch some features may not be available
Major mismatch should only download BTS SW

Soc Classification level


13
Nokia Siemens Networks

Flexi EDGE BTS Installation and Commissioning / July 2008

Flexi EDGE BTS Manager Log Files


Site Information Report (1/3)

Comprehensive dump of site parameters investigate offsite


RX Cabling
Host info
Antenna Cabling
HW Versions
EAC Inputs
SW Versions
EAC Outputs
Alarms Report
BTS_CONF_DATA
Diagnostic Reports
RSSI
Q1 Devices
Raw Alarms
Traffic Trace
Object Properties
HW Unit Properties
SCF
Passive Units
TX Cabling
Soc Classification level
14
Nokia Siemens Networks

Flexi EDGE BTS Installation and Commissioning / July 2008

Flexi EDGE BTS Manager Log Files


Site Information Report (2/3)
Viewing SIR in Excel 2003
Load .xml file
Select Use the XML Source task pane
Drag entries in the XML map onto sheet

(continued)
Soc Classification level
15
Nokia Siemens Networks

Flexi EDGE BTS Installation and Commissioning / July 2008

Flexi EDGE BTS Manager Log Files


Site Information Report (3/3)
Select Data->XML->Refresh XML Data

Soc Classification level


16
Nokia Siemens Networks

Flexi EDGE BTS Installation and Commissioning / July 2008

Flexi EDGE BTS Manager Log Files


SCF

Sent to the BTS during commissioning


Can be uploaded locally and remotely anytime*
Generated dynamically when uploaded to BTS Manager always up-todate
Updates via Q1 (runtime Transmission) are included in uploaded SCF
Partial SCFs can be used as commissioning templates
Not intended to be manually edited SCF editor is Commissioning
Wizard
Example SCF supplied with course material
*Remote upload requires a remote link and therefore a commissioned BTS
Soc Classification level
17
Nokia Siemens Networks

Flexi EDGE BTS Installation and Commissioning / July 2008

Flexi EDGE BTS Manager Log Files


Object Properties
BTS Manager

Internet Explorer

Excel 2003
Soc Classification level
18
Nokia Siemens Networks

Flexi EDGE BTS Installation and Commissioning / July 2008

Flexi EDGE BTS Manager Log Files


Commissioning Report (1/4)
Created by the BTS
In Ultrasite it is created by the BTS
Manager
Can be uploaded locally and remotely
at any time
Updates after commissioning
2hr tracing of EAC inputs
Changes to transmission settings
eg EDAP change from BSC

Soc Classification level


19
Nokia Siemens Networks

Flexi EDGE BTS Installation and Commissioning / July 2008

Flexi EDGE BTS Manager Log Files


Commissioning Report (2/4)

Contents
Executive Summary
Oldest entries first!

***************************************************************************
***************************************************************************
***************************************************************************
***************************************************************************
EXECUTIVE
EXECUTIVESUMMARY
SUMMARY
***************************************************************************
***************************************************************************
***************************************************************************
***************************************************************************
BTS
BTSCommissioning
CommissioningReport
Report
Monday,
Jan
22,
2007
Monday, Jan 22, 200715:17:35
15:17:35
***************************************************************************
***************************************************************************
Commissioning
Commissioningphase
phaseofofSCF
SCF: :FULL
FULL
Commissioning
CommissioningResult
Result : :SUCCESSFUL
SUCCESSFUL
Commissioning
test
timer
expired
Commissioning test timer expired
***************************************************************************
***************************************************************************
BTS
BTSUndo
UndoCommissioning
CommissioningReport
Report
Wednesday,
Wednesday,Jan
Jan24,
24,2007
200709:35:46
09:35:46
***************************************************************************
***************************************************************************
Undo
UndoCommissioning
Commissioningtype:
type: ERASE
ERASEBYPASS
BYPASS
***************************************************************************
***************************************************************************

Newest entry

BTS
BTSCommissioning
CommissioningReport
Report
Monday,
Feb
05,
2007
Monday, Feb 05, 200711:52:24
11:52:24
***************************************************************************
***************************************************************************
Commissioning
Commissioningphase
phaseofofSCF
SCF: :FULL
FULL
Commissioning
CommissioningResult
Result : :PARTIALLY
PARTIALLYFAILED
FAILED
Power
Cable
Test
failure
for
TRX
boxes
Power Cable Test failure for TRX boxes
***************************************************************************
***************************************************************************
***************************************************************************
***************************************************************************

Soc Classification level


20
Nokia Siemens Networks

Flexi EDGE BTS Installation and Commissioning / July 2008

Flexi EDGE BTS Manager Log Files


Commissioning Report (3/4)
Details
Cabling Status Report
BTS Logical Configuration

BTS Site Information

Sector Configuration

Usability Status in TRXs


Fast Tuning Status

BTS HW Versions

BTS SW Versions

Abis Test Results

TRX Test Results

BTS Alarms Test

Soc Classification level


21
Nokia Siemens Networks

External TREs in Q1 Port


Cabling Details
Antenna Info
Diversity Usage
LIF Settings
Synchronisation
Abis Termination
Cross Connections
EAC Input Line Status
EAC Output Line Status
Cabling Status Report

Flexi EDGE BTS Installation and Commissioning / July 2008

Flexi EDGE BTS Manager Log Files


Commissioning Report (4/4)

Commissioning Report Structure Overview


Oldest summary

***************************************************************************
***************************************************************************
***************************************************************************
***************************************************************************
EXECUTIVE
SUMMARY
EXECUTIVE SUMMARY
***************************************************************************
***************************************************************************
***************************************************************************
BTS***************************************************************************
Commissioning Report
BTS Commissioning
Report
Monday,
Jan 22, 2007 15:17:35
Monday, Jan 22, 2007 15:17:35
***************************************************************************

Newest summary

***************************************************************************
Commissioning
phase of SCF : FULL
Commissioning phase of SCF : FULL
Commissioning Result
: SUCCESSFUL
Commissioning
: SUCCESSFUL
Commissioning
testResult
timer expired
Commissioning test timer expired
***************************************************************************
BTS***************************************************************************
Undo Commissioning Report
BTS UndoJan
Commissioning
Report
Wednesday,
24, 2007 09:35:46
Wednesday, Jan 24, 2007 09:35:46
***************************************************************************
***************************************************************************
Undo
Commissioning type: ERASE BYPASS
Undo Commissioning type: ERASE BYPASS

Oldest details

BTS SW Versions
BTS SW Versions
===============
===============
File Name

Version

File Name
Version 1.1.62
Running Package
BTS_1001.062
Running Package BTS_1001.062
1.1.62
File Name
Version
Name
Version
Active packageFileBTS_1001.062
1.1.62
Active package
BTS_1001.062
SM1_1000.062
1.0.62 1.1.62
SM1_1000.062 1.0.62
1.0.62
SM2_1000.062
SM2_1000.062 1.0.62
1.0.62
SM3_1000.062
SM3_1000.062 1.0.62
1.0.62
SM4_1000.062
SM4_1000.062 1.0.62
1.0.62
SM5_1000.062
SM5_1000.062 1.0.62
1.0.62
SM6_1000.062
SM6_1000.062
1.0.62
SM7_1000.062
1.0.62
SM7_1000.062 1.0.62
1.0.62
TM1_1000.062
TM1_1000.062 1.0.62
1.0.62
RM1_1000.062
RM1_1000.062 1.1.62
1.0.62
CFG_1001.062
CFG_1001.062

1.1.62

File Name
Version
File Name
Standby package
********.*** Version
0.0.0
Standby package ********.***
0.0.0
***************************************************************************
***************************************************************************

Newest details

Abis Test Results


Abis Test Results
=================
=================
Object
TS FER
BER
Transmission EDAP TS EDAP START Test Status
Object TS FER Delay
BER
Transmission
EDAP TS EDAP START Test Status
BIT
Delay
BIT
TRX3 0 0.00000000 0.00000000
Not Measured
NA
NA
OK
TRX3
0 0.00000000
0.00000000
MeasuredNA NA NA NA
TRX3
1 0.00000000
0.00000000
NotNot
Measured
TRX3
1 0.00000000
0.00000000
MeasuredNA NA NA NA
TRX3
2 0.00000000
0.00000000
NotNot
Measured
TRX3
2 0.00000000
0.00000000
MeasuredNA NA NA NA
TRX3
3 0.00000000
0.00000000
NotNot
Measured
TRX3
3 0.00000000
0.00000000
MeasuredNA NA NA NA
TRX3
4 0.00000000
0.00000000
NotNot
Measured
TRX3 4 0.00000000 0.00000000 Not Measured

Soc Classification level


22
Nokia Siemens Networks

Flexi EDGE BTS Installation and Commissioning / July 2008

NA

NA

OK OK
OK OK
OK OK
OK OK
OK

Flexi EDGE BTS Manager Commissioning


Overview
Commissioning Wizard has two parts
1.
Collect parameters via Wizard screens to
construct an SCF
2.
Send SCF to BTS and monitor progress
Existing SCF automatically uploaded from BTS*

*SCF upload from


uncommissioned BTS
is coming in pre-3

Less SCF provides lots of flexibility in commissioning process


Experience
needed

More
Soc Classification level
23
Nokia Siemens Networks

One-Click commissioning load complete SCF, send to


BTS
EasyWizard commissioning based on predefined
templates, enter site specifics
File-based commissioning load a partial SCF with some
parameters, enter the rest
Completely manual enter all commissioning parameters via
wizard
screens
Flexi EDGE BTS Installation and Commissioning / July 2008

More
Preparation
needed

Less

Flexi EDGE BTS Manager Commissioning


Offline
Offline commissioning = SCF editor
Supports the online commissioning scenarios
EasyWizard Hardware template
EasyWizard Transmission template
Complete, site-specific SCF
Partial SCF
Any SCF can be based on an SCF uploaded from an operational BTS

Soc Classification level


24
Nokia Siemens Networks

Flexi EDGE BTS Installation and Commissioning / July 2008

Flexi EDGE BTS Manager Commissioning


Undo
Undo commissioning puts BTS in uncommissioned state
Undo not available remotely
remove traffic bypass capacity
If checked, all transmission settings are removed affects other BTSs in
chained configurations
If not checked only these transmission settings are removed:
Abis allocations
Abis protections

Downstream traffic affected

Soc Classification level


25
Nokia Siemens Networks

Downstream traffic not affected

Flexi EDGE BTS Installation and Commissioning / July 2008

Flexi EDGE BTS Manager Commissioning


EasyWizard
HW Template contains all but site specific parameters (.epb)
Transmission template contains ALL transmission parameters (.ept)
Commissioner cannot change transmission parameters
During commisioning, Commisioner can only enter:

Site info: BCF Id, Site Name, Location, etc


Antenna settings: MHA type, VSWR limits, etc
Battery backup settings: type, installation date, etc
Passive unit Serial Numbers and Product IDs

Transmission settings cannot be changed by the Commissioner

Soc Classification level


26
Nokia Siemens Networks

Flexi EDGE BTS Installation and Commissioning / July 2008

Flexi EDGE BTS Manager Commissioning


Modifying Settings
Settings of an already commissioned BTS can be changed
BTS Manager calculates if
recommissioning is needed
recommissioning requires a BCF reset
Recommissioning triggered by:
Tranmission PIU type changed
Interface type changed, eg E1 to T1
RF cabling detection type changes from autodetected to manual or viceversa
BCF is not in supervisory or configuring when SCF sent*
Automatic upload of SCF from BTS fails
Uploaded SCF is needed to determine the changes, if there is no
uploaded SCF then BTS Manager has to send all parameters again recommissioning
*This restriction may be lifted in the final customer release
Soc Classification level
27
Nokia Siemens Networks

Flexi EDGE BTS Installation and Commissioning / July 2008

Flexi EDGE BTS Manager Commissioning


Remote Connection
Remote connection requires operational OMUSIG
BTS must be in commissioned state
Changes to BCF ID or OMUSIG location will result in loss of remote link
BSC changes needed to re-establish connection
If BCF ID changed then remote connection parameters need to be changed
Warning given in each case
Undo commissioning not available
Considered too risky
Can only be recovered by site visit

Soc Classification level


28
Nokia Siemens Networks

Flexi EDGE BTS Installation and Commissioning / July 2008

Flexi EDGE BTS Manager Commissioning


Microwave
FlexiHub Manager used to configure microwave parameters
Microwave capacity appears as virtual E1 lines (upto 16)
Virtual E1 lines configured just like real E1 lines
Microwave link must be operational before SCF is sent to BTS for success
FlexiHub Manager can be launched from Flexi EDGE BTS Manager

Soc Classification level


29
Nokia Siemens Networks

Flexi EDGE BTS Installation and Commissioning / July 2008

Flexi EDGE BTS Manager Commissioning


Progress & Failures
Progress lights
Ongoing blue
Finished green
Failed red
Commissioning result
Success
Partial failure

Some TRXs missing vs Logical configuration


Abis Loop test failure on TCH
Abis Loop test failure on EDAP
TRX test failure
RF cabling autodetect alarms
VSWR alarm
Some capacity missing for TRXs
Logical config parameters mismatch with HW (wrong band)
HW mismatch between detected units

Failure
OMUSIG not found BTS waiting for LAPD
BCF ID mismatch with BSC (restriction may be removed in final release)
No TRX present (if BSC configuration contains at least one TRX)
Soc Classification level
30
Nokia Siemens Networks

Flexi EDGE BTS Installation and Commissioning / July 2008

Flexi EDGE BTS Manager Remote Troubleshooting


Limitations
All features are supported in remote case, except the following:
Reset into local mode (BTS Control->Disable Abis) this would need a
local visit to reset back into a BSC connected state
RTC tuning can only be done without BSC connection
Undo Commissioning - considered too risky
TRX tests that require external hardware

Soc Classification level


31
Nokia Siemens Networks

Flexi EDGE BTS Installation and Commissioning / July 2008

Flexi EDGE BTS Manager Power Control


Output of each power
connector can be
controlled
Needed for live adding/
removing units
Under BTS control
Intelligent Shutdown
operates
Under User control
Intelligent Shutdown
commands are ignored
User is informed if they connect to a BTS with power outputs not under BTS
control
In remote connection, only option is to give control back to BTS

Soc Classification level


32
Nokia Siemens Networks

Flexi EDGE BTS Installation and Commissioning / July 2008

También podría gustarte