Pardhan Mantri Gram Sadak Yojna ( PMGSY)


Action taken statement on the pending reports of NQM of the Solan Distt. for the month September 2010.
NQM J.S. Kocher
Date of inspection 22.09.2010.
Sr. Name
No of
. Block

Name
work

of Paragraph of reports on which action is required. Parawise action taken

Sr. No. Action required


& Para
1 2
3
4
5
6
1 Nalagarh Link road 1(a)
Not satisfactory. Shoulder need to be
shoulders has been
to village
maintained by removing the thick growth of maintained by removing
Dharampur
grass.
growth of grass and shrubs
Package No.- HP-11-04 2(a)

3(a)

5(a)

6 (a)

No rain cuts observed. Shoulder need to be


dressed to restore the camber for proper
drainage of surface water.
Not satisfactory. Premix carpet is completely
worn out and need renewal coat after repair
of few potholes. No other defects are
observed.
Main informatory board need to be repaired.
Routine maintenance in above respect need
to be carried out.
Km. stones need to be repaired and panited

Whether If no col No. 6 Remarks/ verification


action is
specify the
by S.Q.M.
completed date when the
action will
complete
Y/N
7
yes

8
NA

Shoulders has been dressed


and lowered down

yes

NA

Pot holes have been filledup


and required renewal coat
has been done.

yes

NA

Repainting done

Yes

NA

Km stone repaired and


painted.

Yes

NA

State Quality Monitor

FORMAT -III
Pardhan Mantri Gram Sadak Yojna ( PMGSY)
Action taken statement on the pending reports of NQM of the Solan Distt. for the month September 2010.
NQM J.S. Kocher
Date of inspection 22.09.2010.
Sr. Name
No of
. Block

Name of
work

Paragraph of reports on which action is required. Parawise action taken

Sr. No. Action required


& Para
1 2
3
4
5
1 Nalagarh Baddi to
1(a)
Not satisfactory. Shoulder are covered with
Sheetalpur
grass and shrubs which has resulted in raised
road
shoulders causing drainage problem.
Package No.- HP-11-04 2(a)
No rain cuts observed.

6
shoulders has been
maintained by removing
growth of grass and shrubs
Shoulders has been lowered
down

Whether If no col No. 6 Remarks/ verification


action is
specify the
by S.Q.M.
completed date when the
action will
complete
Y/N
7
yes

8
NA

yes

NA

5(a)

Main informatory board is missing and need New board erected and
to be repaired. Routine maintenance in
painting done
above respect need to be carried out.

Yes

NA

6 (a)

Km. stones need to be repainted. 200 mtr.


Km stone repainted and 200
Stone not fixed, since there was no provision mtr. Stones fixed and
in DPR.
painted.

Yes

NA

State Quality Monitor

FORMAT -III
Pardhan Mantri Gram Sadak Yojna ( PMGSY)
Action taken statement on the pending reports of NQM of the Solan Distt. for the month September 2010.
NQM J.S. Kocher
Date of inspection 22.09.2010.
Sr. Name
No of
. Block

Name
work

of Paragraph of reports on which action is required. Parawise action taken

Sr. No. Action required


& Para
1 2
3
4
5
1 Nalagarh Kunjal
1(a)
Not satisfactory. Shoulder are full of growth
Dassomaja
which has raised the level of shoulder and is
ra road
causing drainage problem.
Package No.- HP-11-05 2(a)
No rain cuts observed. Shoulder need to be
dressed to drainage of surface water.
Surface of road is good. However due to
recent rains, some rain damages are noticed
at several places which needs to be repaired.
Due to raised shoulders surface water is
flowing over the road and is damaging the
edges. Few potholes developed and need to
be repaired.
4 (a)
Culverts/Causeway
are fuctional. Unlined
drains are chocked with growth of grass and
need to be made functional.

Whether If no col No. 6 Remarks/ verification


action is
specify the
by S.Q.M.
completed date when the
action will
complete
Y/N

6
shoulders has been
maintained by removing
growth of grass and shrubs
Shoulders has been dressed
and lowered down
Pot holes have been filledup
and shoulders trimmed to
required level.

7
yes

8
NA

yes

NA

yes

NA

The drains made functional


by removing grass and
muck.

yes

NA

5(a)

6 (a)

Main informatory board is missing and need


to be repaired. Routine maintenance in
above respect need to be carried out.
Km. stones need to be repainted. 200 mtr.
Stone are not existing.

New board erected and


painting done

Yes

NA

Km stone repainted and 200


mtr. Stones fixed and
painted.

Yes

NA

State Quality Monitor

State Quality Monitor

FORMAT -III
Pardhan Mantri Gram Sadak Yojna ( PMGSY)
Action taken statement on the pending reports of NQM of the Solan Distt. for the month September 2010.
NQM J.S. Kocher
Date of inspection 22.09.2010.
Sr. Name
No of
. Block

Name
work

of Paragraph of reports on which action is required. Parawise action taken

Sr. No. Action required


& Para
1 2
3
4
5
1 Nalagarh Kunjal
1(a)
Not satisfactory. Shoulder are full of growth
Dassomaja
which has raised the level of shoulder and is
ra road
causing drainage problem.
Package No.- HP-11-05 2(a)
No rain cuts observed. Shoulder need to be
dressed to drainage of surface water.
Surface of road is good. However due to
recent rains, some rain damages are noticed
at several places which needs to be repaired.
Due to raised shoulders surface water is
flowing over the road and is damaging the
edges. Few potholes developed and need to
be repaired.
4 (a)
Culverts/Causeway are fuctional. Unlined
drains are chocked with growth of grass and
need to be made functional.

Whether If no col No. 6 Remarks/ verification


action is
specify the
by S.Q.M.
completed date when the
action will
complete
Y/N

6
shoulders has been
maintained by removing
growth of grass and shrubs
Shoulders has been dressed
and lowered down
Pot holes have been filledup
and shoulders trimmed to
required level.

7
yes

8
NA

yes

NA

yes

NA

The drains made functional


by removing grass and
muck.

yes

NA

5(a)

6 (a)

Main informatory board is missing and need


to be repaired. Routine maintenance in
above respect need to be carried out.
Km. stones need to be repainted. 200 mtr.
Stone are not existing.

New board erected and


painting done

Yes

NA

Km stone repainted and 200


mtr. Stones fixed and
painted.

Yes

NA

State Quality Monitor

FORMAT -III
Pardhan Mantri Gram Sadak Yojna ( PMGSY)
Action taken statement on the pending reports of NQM of the Solan Distt. for the month September 2010.
NQM J.S. Kocher
Date of inspection 22.09.2010.
Sr. Name of Name
of Paragraph of reports on Parawise action taken
Whether If no col No.
No. Block
work
which action is required.
action is 6 specify the
complete date when
d
the action
will complete
Sr.
Y/N
No. &
Action required
Para
1 2
3
4
5
6
7
8
1 Nalagarh Link road to 1(a)
Not satisfactory.
shoulders has been
yes
NA
village
Shoulder need to be maintained by removing
Dharampur
maintained by
growth of grass and
removing the thick
shrubs
growth
grass.
2(a)
No
rain of
cuts
observed. Shoulders
has
been
yes
NA
Shoulder need to be dressed and lowered
dressed to restore the down
3(a)
Not satisfactory.
Pot holes have been
yes
NA
Premix carpet is
filledup and required
completely worn out renewal coat has been
5(a)
Main informatory
Repainting done
Yes
NA
board need to be
repaired. Routine
maintenance
in above
6 (a) Km.
stones need
to be Km stone repaired and
Yes
NA
repaired and panited painted.

FORMAT -III
Pardhan Mantri Gram Sadak Yojna ( PMGSY)
Action taken statement on the pending reports of NQM of the Solan Distt. for the month April 2014.
NQM
Date of inspection
Sr. Name of Name
of Paragraph of reports on Parawise action taken
Whether If no col No.
No. Block
work
which action is required.
action is 6 specify the
complete date when
d
the action
will complete
Sr.
Action required
Y/N

2
3
1 Nalagarh Link road to
village Sauri
km. 0/0 to
2/250
Package HP-11-71
No.

No. &
Para
4
5
6
1 (13) The main board be
Main and citizen board
fixed at once and
written and fixed at site.
citizen board painted
and written again.

yes

NA

State Quality Monitor

FORMAT -III
Pardhan Mantri Gram Sadak Yojna ( PMGSY)
Action taken statement on the pending reports of NQM of the Solan Distt. for the month September 2010.
NQM J.S. Kocher
Date of inspection 22.09.2010.
Sr. Name of Name
of Paragraph of reports on Parawise action taken
Whether If no col No.
No. Block
work
which action is required.
action is 6 specify the
complete date when
d
the action
will complete
Sr.
Action required
No. &
1 2
3
4
5
1 Nalagarh Kunjal
1(a)
Not satisfactory.
Dassomajara
Shoulder are full of
road
growth which has
raised the level of
shoulder and is
causing drainage
problem.
2(a)
No rain cuts observed.
Shoulder need to be
dressed to drainage of
surface water.

Y/N
6
shoulders has been
maintained by removing
growth of grass and
shrubs

7
yes

8
NA

Shoulders
has
been
dressed and lowered
down

yes

NA

3(a)

4 (a)

5(a)

6 (a)

Surface of road is
good. However due to
recent rains, some
rain damages are
noticed at several
places which needs to
be repaired. Due to
raised shoulders
surface water is
flowing over the road
and is damaging the
edges. Few potholes
developed and need
to be repaired.
Culverts/Causeway
are fuctional. Unlined
drains are chocked
with growth of grass
and need to be made
functional.
Main informatory
board is missing and
need to be repaired.
Routine maintenance
in above respect need
to be carried out.

Pot holes have been


filledup and shoulders
trimmed to required
level.

yes

NA

The
drains
made
functional by removing
grass and muck.

yes

NA

New board erected and


painting done

Yes

NA

Yes

NA

Km. stones need to be Km stone repainted and


repainted. 200 mtr.
200 mtr. Stones fixed and
Stone are not existing. painted.

FORMAT -III
Pardhan Mantri Gram Sadak Yojna ( PMGSY)
Action taken statement on the pending reports of NQM of the Solan Distt. for the month April 2014.
SQM U. N. Sharma
Date of inspection 28/04/14
Sr. Name of Name
of Paragraph of reports on
Parawise action taken Whether If no col No.
No. Block
work
which action is required.
action is 6 specify the
complete date when
d
the action
Sr. No.
will complete
Y/N
& Para
Action required
1

2
3
1 Nalagarh Link road to
village Sauri
km. 0/0 to
2/250

4
1

5
6
The
BM's
be The Bench marks @4 per
established @4nos per km has been established,
KM as per norms.C/L C/L of C.W. referenced
of C.W. referenced with marker pegs provided
during laying of G-II & Gwith marker pegs.

Yes

NA

yes

NA

III layer. The photographs


in support of Bench Marks
established are enclosed.

Package HP-11-71
No.

13(a)

Main/citizen
The main informatary
informatery boards be Board
and
Citizen
provided immidiately. information Board has
been fixed at site.The
photographs in support of
observations are enclosed.

he month September 2010.


tion 22.09.2010.
Remarks/ verification by
S.Q.M.

State Quality Monitor

r the month April 2014.


tion
Remarks/ verification by
S.Q.M.

te Quality Monitor

he month September 2010.


tion 22.09.2010.
Remarks/ verification by
S.Q.M.

r the month April 2014.


ection 28/04/14
Remarks/ verification by
S.Q.M.

State Quality Monitor