Preamble
Effective Implementation of TEQIP-II was explained in Project Implementation
Plan (PIP) document of TEQIP-II by National Project Implementation Unit (NPIU).
Table19: Permissible and Nonpermissible Expenditure for Government Funded and
Aided Institutions and Private Unaided Participating in SubComponent 1.2: Scalingup
Postgraduate Education, Research & Development and Innovation gave details about
what is permissible and what is not permissible under TEQIP-II under total 19 different
categories (from PIP-Page 109-114) (Appendix-A). Initially it was informed that
expenses are permissible only as per this table and we need approval of State Project
Facilitation Unit (SPFU) and National Project Implementation Unit (NPIU). There was
some confusion because the Expenses (Financial Status & Financial Monitoring Reports,
FMR) and Budget Planning was asked under 9 activities as per Table No.17 (Page 93 of
PIP) Indicative Categorywise Funding for Key Activities per Project Institution Selected
under SubComponent 1.2 (Appendix-A). There was confusion about some activities on
how to match these nine activities from Table 17 with 19 activities given in Table 19.
Also there were some activities which were not covered in both these tables but they
were in accordance with objectives of TEQIP-II.
When all these queries were raised with NPIU in the meeting during September 26
& 27, 2012 at Delhi, it was told that permissible activities given in Table 19 are only
indicatives and each Institute can form its own policies for all the activities except
Procurement and Foreign Visits for which approval from SPFU and NPIU is necessary.
For all other activities Institutes have full freedom and they can follow their own policies.
So to form the policies Fusion of Table 17 and 19 is carried out and given in the Table
A of this document. More than 95% guidelines are kept same as given in PIP. Only
some missing activities are added and some small changes are made. Based on this Table,
detail guidelines are prepared and circulated among all faculty members. Suggestions are
incorporated. Now these policy guidelines will be available with all TEQIP Officials and
it will be also available on Institute website to have transparency in the implementation of
TEQIP-II activities. However, these policies are not hard and fast depending upon
different situation during the implementation TEQIP Project these policies will keep
improving and evolving.
In the meeting at Walchand College of Engineering, Sangli on June 28, 2013 SPFU
announced NPIU decision about giving permission of approval to respective BoG for
Foreign Travel, re-appropriation of Funds, Policy changes, providing seed money for
research proposals, and recruiting temporary faculty in place of faculty gone to other
Institute for qualification up-gradation and showing his salary under Incremental
Operating Cost (IOC) (Appendix-F). All these issues are covered while preparing this
document of Institutes Policies for Effective Implementation of TEQIP Project.
2

INDEX
Content
1

Infrastructure Improvements for Teaching, Training and Learning through


1.a

1.b

Procurement of Coursespecific Software (Updating of learning resources)

10

1.c

Modernization and Strengthening of Libraries (and increasing access to


knowledge resources)

10

Minor Civil Works (Refurbishment)

11

Providing Teaching and Research Assistantships (for significantly increasing


enrolment in existing and new Masters and Doctoral programs in engineering
disciplines)

11

2.a

TEQIP Scholarships

11

2.b

Developing Research Interest among UG Students

12

Enhancement of R.& D. and Institutional Consultancy Activities

13

3.a

Enhancement of R.& D. and Consultancy

13

3.b

Organizing National and International Conferences

14

3.c

Seed Money for Research Projects

15

Faculty and Staff Development for Improved Competence

15

4.a

Faculty Qualification Up gradation

15

4.b

Subject Knowledge and Research Competence Up-gradation of Faculty (as


planned through TNA)

16

4.c

Resource Sharing through Collaborative Arrangements

17

4.d

Organizing Subject-area
Workshops, Seminars

4.e
5

Procurement of New Equipment and Furniture (Establishment of new


laboratories for new and existing PG programs, faculty research, etc.)

1.d
2

Page
No.s

Continuing

Education

Training

Programs,

Training of Technical Support Staff

18
19

Enhanced Interaction with Industry

19

5.a

Increase in Industry-Institute Interaction

19

5.b

Placement Activities for Students

21

Institutional Management Capacity Enhancement


6.a
6.b

22

Training of Institution Officials and Senior Faculty and Orientation of BoG


Members

22

Study Tours

22
3

23
7

Implementation of Institutional Reforms


7.a

Curriculum Reforms

7.b

Accreditation

23
24
24

Academic Support for Weak Students


24
8.a

Support to Academically Weak Students

8.b

Psychological Services and Support for Needy Students.

8.c

Support for Students to Improve their Employability

26
26
28

Incremental Operating Cost

Appendix A: Tables for guidelines for Implementation of TEQIP-II

30

Appendix B: Guidelines for International travel

39

Appendix C: Rules for TA/DA for travel in India for TEQIP Activity

41

Appendix D: List of TEQIP Nodal Officers and various Committees

43

Appendix E: Minutes of the Meeting NPIU with SPFU

49

Appendix F: Various Formats for Submitting Proposals and Bills

50

LIST OF TABLES
Table
A
1
2
3
4
5
6
7
8
9

Title
Page
College of Engineering, Pune Policy Guidelines
5
The details of Budget for Procurement of Equipment and Furniture
11
The details of Amount, Criteria of Teaching and Research Assistantships
12
Developing Research Interest among UG Students
The details of Budget for Enhancement of R.& D. and Consultancy
14
Organizing National and International Conferences
The details of Budget for Faculty and Staff Development
18
The details of Budget for Enhanced Interaction with Industry
21
The details of Budget for Institutional Management Capacity Enhancement 22
The details of Budget for Implementation of Institutional Reforms
23
The details of Budget for Academic Support for Weak Students
27
The details of Budget for Incremental Operating Cost
29

Table-A: College of Engineering, Pune Revised Policy Guidelines


Budget Allocation and Permissible Expenditure for
Government Funded and Aided Institutions and Private Unaided Participating in
SubComponent 1.2: Scalingup Postgraduate Education, Research & Development and Innovation
(Rs. In Lakh)
Total
S.
Activities
Permissible Expenditure
Allocation
No.
1 Infrastructure improvements for teaching, training and learning through:
1
(i) Establishment of
562.50 a) New equipment and furniture for (Rs. 562.50 L):
new laboratories
establishing new PG laboratories for existing programs
for new and
establishing laboratories for new PG programs in emerging areas of
existing PG
Engineering and Technology
programs, faculty
Faculty research and institutional consultancy work
research, etc.
Campuswide networking of academic and administrative buildings, hostels
and faculty residences, and enhancing internet facilities
(ii) Procurement of
0.00
furniture
(ii) Updating of
b) Coursespecific Software (Rs. 25.00 L)
25.00
learning
resources
(iii) Modernization
c) Modernization and Strengthening of Libraries (Rs. 40.00 L):
40.00
and strengthening
Procurement of print and digitized books, ejournals
of libraries and
Expenditure for digitization of library books
increasing access
Establishment of CD bank
to knowledge
Membership of INDEST AICTE etc.
resources
(iv) Refurbishment
d) Civil Works2 for (Rs. 0.00 L):
0.00
(Minor Civil
refurbishment of existing structures/ spaces to create new laboratories for PG
Works)
programs and research
reducing environment degradation & complying with EMF (AppendixIII)

Providing Teaching
and Research
Assistantships for
significantly
increasing enrolment
in existing and new
Masters and Doctoral
programs in
Engineering
disciplines

250.00

Enhancement of R.&
D. and institutional
consultancy activities

20.00

a) TEQIP Scholarships (Rs. 240.00 L):


1. Teaching and Research Assistanceships3 for Masters and Doctoral students
in engineering disciplines who are not getting any other Scholarships or
those who are not sponsored by any company.
2. Foreign fellowships not exceeding 3 months for Doctoral candidates in
engg disciplines subject to BoG approval on case to case basis
b) Developing research interest among UG students (Rs. 10.00 L)
Fiscal incentive to students that voluntarily associate with industry oriented
R&D projects and Travel cost of students that associate with an industry for
about 34 weeks during vacations to continue work on R&D projects.
Registration Fees for UG/PG students attending National Conferences for
presenting Research Paper or Attending a STTP useful for Research.
Inviting expert Lecturers from Research Institutes to contents other than
Syllabus related to research topics.
a) Enhancement of R.& D. and Consultancy (Rs. 3.00 L)
1. securing sponsored projects and consultancy assignments
2. publication of research papers in peer reviewed journals
3. commercialization of research products
4. patenting of research products
5. Travel cost, hospitality and honorarium paid to Consultant for
participation in R & D and for delivering Expert lectures

b) Organizing National and International Conferences (Rs. 12.00 L)


Hospitality to participants
Venue and logistic arrangements
Replication of printed training materials
Publication of proceedings
Travel, boarding & lodging for invited experts
c) Seed Money for Research Projects (Rs. 5.00 L)
Seed money for good innovative projects for equipment and
consumables (not for Laptop, PC or any gazette)

Faculty and Staff


development for
improved
competence based on
TNA

162.50

a) Faculty Qualification Up gradation (Rs. 15.00 L)


1. Fees charged for course work and use of research facilities; and
consumables by the institution where faculty is enrolled for qualification
up gradation either through fulltime or parttime or by sandwich scheme.
2. Consumables, if faculty is registered for qualification up-gradation on
fulltime or parttime basis within the parent Institution
b) Subject knowledge and research competence up-gradation of Faculty
as planned through TNA (Rs. 85.00 L)
Course fee; travel expenses, boarding and lodging, and sundry
expenses/allowances as per applicable norms and rules when faculty is
deputed outstation to another institution (within India or abroad) for the
duration of the course, travel time and the time permitted by the BoG (for
travel abroad) Director (for National Travel) for visits to
institutions/organizations of interest and relevance to the faculty
Course fee and local travel expenses as per applicable norms and rules when
faculty attends a course instation but at an institution other than the parent
institution
c) Resource sharing through collaborative arrangements (Rs. 5.00 L)
Travel expenses; boarding, lodging, and sundry expenses/allowances for
faculty visiting institutions and industries within India to develop and
implement joint projects with well-defined deliverables.
Hospitality, local travel, for Faculties visiting from other institutes to COEP
for guidance and collaboration
d) Organizing subject area Continuing Education Training Programs,
Workshops, seminars as per norms decided by the BoG. (Rs. 40.00 L)
Hospitality to participants
Venue and logistic arrangements
Replication of printed training materials
Publication of proceedings
Travel, boarding & lodging for invited experts
Honorarium for delivering lectures and training in CEPs.
e) Training of Technical Support Staff (Rs. 7.50 L)
Course fee; travel expenses; boarding, lodging, and sundry expenses as per
applicable norms and rules when the technical support staff is deputed
outstation to another organization within India and travel time
Course fee and local travel expenses as per applicable norms and rules when
training is attended instation but at an institution other than the parent
institution
f) Group Training Arranged for Faculty/Staff (Rs. 10.00 L)
Fees for participants, transport, food, etc. for the training programs arranged
by the Institute in collaboration with Industry or some outsourced party.

Enhanced interaction
with industry

20.00

a) Increasing Industry-Institute-Interaction (Rs. 8.00 L)


Travel cost, hospitality and honorarium paid to industry personnel for
participation in curriculum development/revision/restructure, student
assessment and institutional bodies, and for delivering expert lectures
Expenditure for increasing III
b) Placement Activities for Students (Rs. 12.00 L)
Expenditure towards inviting industries (excluding travel cost and lodging
boarding) for campus interviews and hospitality during campus interviews
Arranging tutoring by industry experts to prepare students for on and
offcampus job interviews

Institutional
management capacity
enhancement

20.00

a) Training of Institution Officials and Senior Faculty and Orientation of


BoG Members (Rs. 12.00 L)
1. Course fee; travel expenses, boarding and lodging, and sundry
expenses/allowances as per applicable norms and rules when deputed
outstation to another institution (within India or abroad) for the duration of
the course, travel time and the time permitted by the BoG (for travel
abroad)/ Director (for National Travel) for visits to institutions/
organizations of interest and relevance to the faculty in the vicinity of the
location of training
2. Trainers fee and overheads; and sundry expenditure if training programs
organized within the parent institution.
3. Travel costs, boarding and lodging expenditure and sitting fee to Board
members; sundry expenses on organizing Orientation program.
b) Study Tours (Rs. 8.00 L):
Travel expenses, boarding and lodging, and sundry expenses/allowances as
per applicable norms and rules when deputed for study tour within India or
abroad for the duration of the tour and travel time.

Implementation of
Institutional reforms

60.00

a) Curricular Reforms (Rs. 5.00 L):


o Travel cost, hospitality and honorarium paid to industry personnel for
participation in curriculum development/revision/restructure & reforms;
o Sundry expenditure on holding meetings of the concerned committees.
b) Accreditation: Accreditation fee to NBA/NAAC (Rs. 55.00 L)

Academic support for


weak students

20.00

a) Support to Academically Weak Students (Rs. 7.00 L)


b) Psychological Services and Support for Needy Students (Rs. 1.00 L)
c) Support for Students to Improve their Employability (Rs. 12.00 L)
Honorarium to faculty and staff for taking bridge courses, remedial teaching
classes and skill development training and TA, DA to outside experts for
specialized training in soft components including communication
presentation skills

Incremental
Operating Cost4

70.00

a) Expenditure on (Rs. 50.00 L):


BoG and other Committee Meetings
TA & DA for faculty and staff attending workshops, Meetings and training
in the World Bank procedures as organized/arranged by the NPIU and
SPFUs
Accommodation, Travel & Hospitality of Resource Persons coming for
faulty recruitment
Occasional hiring of vehicles for project related work only
Salaries of additional fulltime regular and contract faculty and staff
appointed against posts created under the Project

b) Inhouse maintenance of existing and new equipment (Rs. 10.00 L)


o Maintenance of equipment including computers and related devices and
assets provided under the Project through Annual Maintenance Contracts
Office operation including stationery, postage, electronic communication,
telephone, electricity, water, etc.
c) Consultancy Services(Rs. 5.00 L) engaged for technical assistance related
to:
o procurement of Civil Works and equipment, pedagogical training,
mentoring, handholding for Project implementation as required by weak
institutions, external financial auditing
Contract fee for outsourced services
d) Procurement related expenses (Rs. 5.00 L):
o Advertisement, related stationary, photography, video shooting, and
hospitality charges.

TOTAL

1250.00

1.

Expenditure for procurement of any equipment and furniture will not be admissible if procured with co-financing from
any other source. Total equipment procurement should be limited to about 50% of the institutions Project allocation.
Institute from within its own resources shall provide for refurbishments of existing/new PG laboratories as well as
adequate furniture for the same during the implementation phase of TEQIP-II

2.

Expenditure for any Civil Work activity will not be admissible if undertaken with co-financing from any other source. It
should be generally limited to about 3% of institutions Project allocation.

3.

The amounts of Teaching and Research Assistance-ships will be governed by the norms as prescribed by the
UGC/AICTE or the State Governments or by the respective Board of Governors.

4.

Additional operating cost if required will be borne by the institute.

DETAIL INSTITUTE POLICIES FOR TEQIP IMPLEMENTATION


1 Infrastructure Improvements for Teaching, Training and Learning through
1.a

Procurement of New Equipment and Furniture (Establishment of new laboratories


for new and existing PG programs, faculty research, etc.)
(562.50 Lakhs)

With following Procurement Objectives:


1. Elevating the facilities available for research and development at the institute to
international repute.
2. Enhancing the laboratories towards the successful transformation into the Center of
excellence.
3. Encouraging the post graduate students, Ph.D. scholars and the faculties to produce the
world class outcomes from the research and development activities in the form of patents
and research papers.
4. Establishing the research culture in the institute for collaborative working of various
departments by offering them equal opportunity to form the interdisciplinary groups.
5. Effectively executing the procurement policy in tune with the Guidelines of World Bank
and associated government bodies for more transparent and fair procedure.
Institute has decided following policy for the selection of Procurement Items:
1. Goods i.e. equipment / software shall be selected on the basis of its direct use for the
research and development activities of the department and in tune with the various
curricular activities.
2. The equipment shall be used for the Post graduate students and the PhD students
registered at College of Engineering Pune as an Academic center and / or Research
Center.
3. It should be of the latest version / model so that its useful working period can be more
as expected by the end user of the respective department.
4. The equipment/ software shall be procured from the suppliers of reputed history and
offering the best deals without compromising the quality of the supplies. It will be
procured with prefixed timelines, using PMSS software specially designed for the
management system of procurement, to execute the project / procedure effectively
without any types of academic or economic losses.
Procedure followed for selection / finalization of the item for Procurement under TEQIP II is:
1. Discussions on following factors at the department level finalizations
A. Selecting the thrust area of development by observing the trend of the technology
development in the Industrial sector
B. Selecting the required items / goods / software which are necessarily required for
more beneficiaries.
C. Selecting sustainable set-up for maximum effective working period.
2. Discussions on following factors before finalization at the Institute level
A. Need of the equipment for research and development at cutting edge technology to
produce outcome directly useful for technical society.
9

B. Use of the equipment for bringing various departments together for interdisciplinary
and collaborative activities.
C. More emphasis on the procurement of equipment, software, etc by utilizing all the
allotted fund, with deletion of civil works and furniture procurements.
The Procurement list was finalized in following Stages:
(i). Obtaining the list of requirements from various departments after completion of
meticulous selection and comprehensive discussions at department level.
(ii).Finalizing the listed item at Institute level with discussions on
a) Avoiding repetitive purchases
b) Prioritizing the underdevelopment sectors of technology
c) Balanced and equal opportunity based selection with due consideration of equal
growth of the entire department.
(iii). Finalization in the Board of Governance meeting with scrupulous screening and
methodical selection in tune with Institutes Goal and Objectives.
1.b

Procurement of Coursespecific Software (Updating of learning resources)(25.00


Lakhs)

Continuous updating of Learning Resources (Books, CDs and Software) and procuring the same
is part of the improvement to be brought about in the teaching learning process. Course specific
software to improve teaching learning process may be procured, as required. The faculty needs to
be encouraged and trained to use modern equipment and coursespecific software.
1.c

Modernization and Strengthening of Libraries (and increasing access to


knowledge Resources) (40.00 Lakhs)

Modernization and strengthening of libraries and increasing access to knowledge resources:


Libraries, which are part of every institution, promote selflearning and also support the teaching
learning processes. There is a widespread need to keep the libraries open to the maximum extent.
There are institutions where libraries are kept open for 24 hours a day throughout the week.
Modernization of libraries could include conversion to Digital Libraries, which would occupy
lesser space and make space available for other activities. The institutions can also become
member of Indian National Digital Library in Engineering Sciences and Technology Consortium
(INDESTAICTE Consortium). Purchase of books should be through CDs to the extent possible.
Even old books, which are available in CDs, should be located and purchased. There needs to be
a CD Bank with proper identification and accessibility. The library could be reorganized with
adequate computers and connectivity to hostels, Departments through Campuswide Networking.
Subscription to the latest eJournals could be made. The IDP should clearly indicate the actions
that are proposed to be taken for Modernization of Libraries including the cost involved. The
project institutions are required to avail essentially the benefit of the existing Information and
Communication Technology (ICT) scheme of MHRD under National Mission on Education.
Various course specific software, e-books and E journals are considered with priority for the
procurement under Library purchases. The process will be carried out through PMSS. The
approval of SPFU and NPIU is already taken for the purchase of course specific software and
digitalization and modernization of the library.
10

1.d

Minor Civil Works (Refurbishment)(0.00 Lakhs)

It was decided at the Institute level that the funds available for Minor Civil Works
(Refurbishment) will be used for some other more useful purpose such Faculty and Staff
Development for Improved Competence activity. The institute will support the funds required for
Minor Civil Works (Refurbishment) from its own pool of funds.

S. Activities
No.

Total
Allocation
Rs. Lakh

Table-1: The details of Budget for Procurement of Equipment and Furniture

1 Infrastructure improvements for teaching, training and learning:


(i).

Equipment Procurement for new and existing PG programs,

(ii). Updating of learning resources

562.50
25.00

(iii). Procurement of furniture*

0.00

(iv). Modernization of libraries

40.00

(v). Refurbishment (Minor Civil Works)*

0.00

2 Providing Teaching and Research Assistantships (for significantly increasing


enrolment in existing and new Masters and Doctoral programs in engineering
disciplines) (250.00 Lakhs)
2.a

TEQIP Scholarships

The aim is to attract students to Masters and Doctoral programmes by providing Assistantships.
Scalingup of programmes will be done either by strengthening the existing programmes or by
introducing new programmes.
It is expected that, will on an average use at least 50 Masters Teaching Assistantships to
nonGATE qualified students and 30 PhD Research Assistantships during the Project duration
(in addition to the scholarships already available to the GATE qualified Masters students and
under QIP scheme). Candidates sponsored by Industry will be allowed to be enrolled in all PG
programmes. It is decided to utilize maximum up to 20% of the total Institutional project outlay
for giving assistantships to Masters and Doctoral students. The students receiving assistantships
will be required to devote 810 hours per week for teaching or research, as the case may be.
Outstanding candidates enrolled for PhD, in select cases, could be sent abroad for paper reading
in conferences, and exposure / interaction with eminent research laboratories for three months.
Starting of new AICTE approved PG programmes in emerging areas of Engineering and
Technology will be supported under the Project.
The policy already framed and document published, communicated to stakeholders by e-mail, on
website, through office order paper copy circulation. The office order includes detail policy for
selection of students, amount, and methodology used for the disbursement of the scholarship to
the PG and PhD students.
11

2.b

Developing Research Interest among UG Students

Financial incentive to the UG/PG/PhD students that voluntarily associate with industry
oriented R&D projects:
In such case, the industry should come forward with the intent and interest to involve UG/PG
students in their R&D projects OR concerned faculty from department should take lead in
identifying industry, and liaise with the concerned industry personnel in defining problem. The
duration of the project and its feasibility of being considered as Mini/Full length
project/dissertation shall be decided by the faculty guide/mentor from the department. The type
of support may involve a maximum fund of Rs. 5000/- for a UG team project OR Rs. 10000/for a PG individual project. A miscellaneous funding of up to Rs. 2000/- may be provided to
incumbents (i.e. students, industry and departmental guides) to meet assorted expenses. In all
such cases, the proposal shall be jointly articulated by students, industry and departmental
guide. The proposal shall be approved by TEQIP Academic nodal officer, and funds released
thereafter by TEQIP finance officer, on submission of bill of expenses. The outcome expected
may be in terms of prototype development, publications in a focused reputed conference,
placement of concerned student/s in the associated industry.

Table-2: The details of Amount, Criteria of Teaching and Research Assistantships (Rs.240
Lakhs):
S.N. Degree

Amount Eligibility
Rs./m
M.Tech.
8000
UG Distinction, CGPA 7.5 for Open and
1
CGPA 6.5 Reserve
Ph.D
18000 PG First Class, Satisfactory progress
2
Nearly 50% Open and 50% Reserve Category

Responsibility
UG Practical Load
8 Hrs/Week
UG Theory 1 Subject

2.b Developing Research Interest among UG Students (Rs.10 Lakhs)


Amount, Rs. Lakh

S.N.
1
2
3

Activity
Incentives to UG students to take Industry R. & D. Project
Financial Assistance for students for attending National/
International Conference or STTP in India
Inviting Expert Lectures to develop research interest

Budget
4.00
4.00
2.00

Registration Fees for UG/PG/PhD Students attending National/International Conferences


within India for presenting Research Paper:
Publishing papers, by faculty and students, in focused, reviewed and refereed
national/international conferences is the signature of result oriented research in an academic
organization. Involvement of students of any level-UG/PG/PhD, in this publication activity is
growing consistently from past few years. Whereas, the well-defined policies of financial
support, in this regard, are in existence and execution for faculty, post autonomy, it is proposed
to have a limited financial support of Rs. 10000/- for a student to present his/her research work
for oral and Rs. 5000/- for poster presentation, in a conference held within India, towards
12

meeting the registration fees and travel expenses. Maximum TWO student authors per paper
may be supported through this scheme. The proposal along with copy of paper accepted for
publication, e-mail/letter of acceptance, duly recommended by Guide and HoD, will be
approved by TEQIP Academic Nodal officer and funds be released by TEQIP Finance officer.

3 Enhancement of R.& D. and Institutional Consultancy Activities (20.00 Lakhs)


3.a

Enhancement of R.& D. and Consultancy (Rs. 3.00 Lakh)

Securing Sponsored Projects and Consultancy assignments from Industry or R&D


organizations: Sponsored research projects and Consultancy assignments from either industry
or R&D organizations such as ISRO, DRDO, ARAI, BARC-BRNS etc. in the name of faculty
not only adds to the credentials of the concerned member, but also proves beneficial to the
cross disciplinary teams of like-minded and like-domain teachers and included students.
Executing such projects and assignments builds confidence among stakeholders, in addition to
revenue earning and in turn improves quality of education and research. The acquisition of
projects may involve certain incidental costs such as travel expenses of team members towards
visits, hospitality expenses for holding meetings with industry personnel, conducting
literature/reference reviews or field surveys etc. The proposals initiated by the faculty,
endorsed by HoD, channelized through and approved by Dean-R&D, will be financially
enabled by TEQIP finance officer up to the limit of Rs. 25000/- per project, on submission of
bill of expenses. The budget allocation for this head would be Rs. 3.00 lakhs spanning the
duration of TEQIP-II.
Publication of research papers in peer reviewed journals: With the percolation of research
culture from faculty to students at all levels, the institute is in the phase of encouraging quality
publications in peer reviewed journals by any concerned member, at national/international
level. When publishing in such journals is many times free of charge, the free limit prompts the
page limit for the work to be published. Any additional page may involve incurring some
charges. The incumbent (faculty or student, individual or team) will be paid at actual on caseto-case basis upon submission of proposal, accompanied by paper. The submission would take
place through HoD, approved by Dean-R&D and financially enabled by TEQIP finance officer,
on submission of bill of expenses. The budget allocation to this head will be Rs. 2.00 lakhs
spanning the duration of TEQIP-II.
Commercialization of research products and Patenting of research findings: The fruitful
research is expected to conclude at development of technology or prototype product/service
that finds application in real life. For the mature researchers, Commercialization of research
products and Patenting of research findings, are natural extensions of his/her work, beyond
cited publications. To encourage researchers for this cause, a financial support of up to Rs.
50000/- per project will be provided to encompass charges of legal consultants, advertisements
for originality claims and other incidental charges. The proposal shall be initiated by concerned
faculty or student team, endorsed by HoD, approved by Dean-R&D and financially enabled by
TEQIP finance officer, on submission of bill of expenses. The budget allocation to this head
will be Rs. 5.00 lakhs spanning the duration of TEQIP-II.

13

Travel cost, hospitality and honorarium paid to Consultant for participation in R & D and
for delivering Expert lectures:
The researcher teams with sponsored projects or consultancy assignment in hand may require
technical help/advise from external expertise for accomplishment of project. Such consultants
would be paid honorarium and eligible to receive travel expenses and hospitality, on case-tocase basis. The proposal shall be initiated by concerned faculty or student team, endorsed by
HoD, approved by Dean-R&D and financially enabled by TEQIP finance officer, on
submission of bill of expenses. The budget allocation to this head will be Rs. 2.00 lakhs
spanning the duration of TEQIP-II.
Table-3: The details of Budget for Enhancement of R.& D. and Consultancy
Amount, Rs. Lakh

SN
3.a

Activity

Details

Enhancement of R.& D. and Consultancy

Amount
3.00

securing sponsored Projects and Travel expenses towards visits, hospitality 0.50
consultancy assignments
expenses for holding meetings, conducting
literature/reference reviews or field surveys etc.
(Max. Rs. 25000/- per project)

Publication of research papers For exceeding page limits or colour photos etc., 0.50
in peer reviewed journals
Max. up to Rs. 20000/- per paper

Commercialization of research Max. up to Rs. 50000/- per Project/Patent. Joint 1.50


products and Patenting of IPR.
research findings

Travel cost, hospitality and for participation in R & D and for delivering 0.50
honorarium paid to Consultant
Expert lectures
Organizing National and International Conferences
12.00

3.b
1

3.c
1

Organizing
National
International Conferences

and Max. Rs 2.00 lakhs for National Conference 12.00


(Adv. Rs. 50,000/-) and Rs. 5.00 lakhs for
International Conference (Adv. Rs.1,00,000/-)

Seed Money for Research Projects

Seed Money for Research


Projects
3.b

5.00
Seed money (Max. Rs 2.00 lakhs) for good 5.00
innovative projects for equipment and
consumables (not for Laptop, PC or any gazette)

Organizing National and International Conferences (Rs. 12.00 Lakh)

Seed funding for Organizing National and International Conferences: Being the oldest and
therefore parental, all departments in the institute are always privileged to organize
contemporary theme based national/international conferences/symposia/workshops with
regular frequency. Such events prove to be immensely beneficial to learners/researchers in the
region and render further visibility to the host department at national/global level. The proposal
14

in this regard, initiated by organizing team from the department, shall be scrutinized by DeanR&D and TEQIP coordinator. A funding to the maximum limit of Rs 2.00 lakhs for national
conference and Rs. 5.00 lakhs for international conference will be provided by TEQIP-II, in
installments, with the expectation that organizers would meet further conference budget
through sponsorships, registrations and exhibition stalls. The advance of Rs. 50,000/- and Rs.
1,00,000/- may be given as seed money to be used for Hospitality to participants, Venue and
logistic arrangements, Replication of printed training materials, Publication of proceedings,
Travel, boarding & lodging for invited experts. The fund releasing authority will be TEQIP
finance officer, and the budget allocation to this head will be Rs. 12.00 lakhs spanning the
duration of TEQIP-II.
3.c

Seed Money for Research Projects (Rs. 5.00 Lakh)

In order to encourage experimental innovative Research Projects from PG and PhD students
Seed money for good innovative projects for equipment and consumables (not for Laptop, PC or
any gazette) can be provided through TEQIP Funding. Duration of project can be one year for
PG project and 2 years for PhD project. Proposals can be individual/ interdisciplinary/
collaborative with industry/ Associated with PG/PhD programmes undergoing within the
institute. Research outcomes should be in terms of publications in conferences and journals.
Product design, patents, IRG by way of Industrial Consultancy and/or Continuing Education
Programs and need to be clearly specified. Non-admissible expenditure: Laptop/ Tablets/
Mobiles/ Computer/ Other electronic personal gadgets, Salary component and hospitality. The
responsibility of project completion and submission of the expenditure details will be with
project guide faculty. Every month Rs. 25,000 will be given as an advance against the sanctioned
seed money amount. Any further cash advances will be given after the submission of bills of
earlier cash advance. The following process shall be followed for sanctioning the seed funding
for research activities in the various departments of the institute under TEQIP phase II.
1. The research proposals in the prescribed format (in-line with AICTE-RPS) will be invited
from faculty in the institute at the beginning of new academic year.
2. Guidelines shall be circulated to the faculty to enable them to prepare feasible research
proposal that can be completed in the stipulated time span as proposed in the project
proposal.
3. The applicant of the proposal shall be asked to present the proposal before the committee if
required.
4. The research proposals received shall be scrutinized by college level committee consisting of
Director, Dean RD/QA, Dean Academics and an expert in the relevant field of activity and
funding amount will be sanctioned. Seed funding to an extent of Rs. 2 lakhs per project is
allowed.
5. The committee shall recommend the proposal to TEQIP office for further necessary action.

4 Faculty and Staff Development for Improved Competence (162.50 Lakhs)


4.a

Faculty Qualification Up gradation (Rs. 15.00 Lakh)

Financial Support to Faculty for Qualification Up-gradation: In alignment with the prioritized
goal of the institute, all the non-PhD teachers have to pursue their research to acquire PhD
degree from reputed institutes across country under encouraging schemes such as QIP, External
15

registrations. Also, some motivated faculty members are interested to proceed for Post-doc
research at elite universities abroad. Such teachers are eligible to receive limited support in terms
of Fees charged for course work and use of research facilities at the research place where he/she
has enrolled for qualification up gradation, Expenses towards thesis writing and publication of
related research papers, Consumables, if faculty is registered for qualification up-gradation on
fulltime or parttime basis within the parent institution. The proposal will be scrutinized by
TEQIP coordinator and TEQIP Academic Nodal Officer, on case to case basis and financially
facilitated by TEQIP finance officer, on submission of bill of expenses.
4.b

Subject Knowledge and Research Competence Up-gradation of Faculty (as planned


through TNA) (Rs. 85.00 Lakh)

As technology is continuously changing, the faculty and support staff is needed keep themselves
updated every year. Otherwise they will find themselves outdated in front of the new generation
students. Also when these students join industry they are not able to meet the expectations of the
industry. Therefore, Up-gradation of Faculty and support staff is necessary in the Subject
Knowledge and Research Competence and to improve the quality of education. An important
component of the project is Faculty and Staff development which is further categorized asI. Faculty/ Staff development program (FDP) - which encompasses the training program/
conference / workshop / seminar/ symposium, a faculty or staff attends outside COEP at national
or international level.
The following procedure may please be mandatorily followed to avail the TEQIP-FDP/CEP
facility.
For FDP Within India:
1. The aspirant should prepare a proposal (Annexure-I for Training and Annexure-II for
Attending Conferences) for the program he/she wishes to attend along with details such
as Justification of attendance, benefits to individual, department and institute, Venue,
Dates and Duration, Financial estimate including Registration Fees, Travel, DA etc.
2. The concerned HoD should recommend and forward the proposal (two copies) to Nodal
Officer - FDP, after verifying the need of attendance against recent TNA.
3. The aspirant may proceed for drawing advance amount towards registration fees, travel
charges only, with an endorsement from Nodal Officer Finance.
4. After attending the event, the faculty/staff should submit a detailed report comprising of
copy of attendance certificate, registration receipt in original and all other relevant
receipts towards settling the advance amount, strictly within 15 days after returning from
the FDP program. The format of the settlement of advance (Annexure-III) is attached
herewith which should be filled in mandatorily to reimburse the balance DA amount.
Two copies of this set of documents should be submitted, one each, with DD- Office and
Accounts Manager.
For FDP Outside India:
1. The aspirant should prepare a proposal (Annexure-I for Training and Annexure-II for
Attending Conferences) for the program he/she wishes to attend along with details such
as Justification of attendance, benefits to individual, department and institute, Venue,
Dates and Duration, Financial estimate including Registration Fees, Travel, DA etc.
16

2. The concerned HoD should recommend and forward the proposal (two copies) to TEQIP
Academic Nodal Officer, after verifying the need of attendance against recent TNA. The
proposal needs approval from BoG - COEP, SPFU - DTE and NPIU - New Delhi. The
forwarding of proposal to this channel will be initiated by Academic Nodal Officer.
3. After receiving approval, the aspirant may proceed for drawing advance amount towards
registration fees, travel and visa charges only, with an endorsement from TEQIP Finance
Nodal Officer. NOC for visa shall be issued by DD office.
4. After attending the event, the faculty/staff should submit a detailed report comprising of
copy of attendance certificate, registration receipt in original and all other relevant
receipts towards settling the advance amount, strictly within 15 days after returning from
the FDP program. The format of the settlement of advance (Annexure-III) is attached
herewith which should be filled in mandatorily to reimburse the balance DA amount.
Two copies of this set of documents should be submitted, one each, with DD-Office and
Accounts Manager.
Common Note (for FDP in or outside India and CEP):

In case a faculty member decides not to attend/conduct the program due to any reason,
advance drawn shall be returned immediately, failing which the amount shall be recovered
with interest, prevailing.
The rules of Travelling and Dearness Allowance are as per Office Order No.:
COEP/DDOff/2012/2100 dated 27th April 2012.

With regards to availing TEQIP FDP-CEP facility, following resolutions were made in HoDs
meeting held on 13th August 2012:
1. A teacher is entitled to avail funds for International visit only TWICE throughout TEQIP
project duration (Dec 2011 to Dec 2014). The institute norms for availing the same for
once in THREE years shall continue, additionally.
2. A teacher is entitled to avail funds for National event TWICE in academic year (July-N
to June-N+1) throughout TEQIP project duration (Dec 2011 to Dec 2014). The institute
norms for availing the same once in a year shall continue, additionally.
4.c

Resource Sharing through Collaborative Arrangements (Rs. 5.00 Lakh)

The Project encourages institutions to establish MoUs with neighbouring institutions and
Industries on viable collaborative/consultancy projects with specific timeframes and
welldefined outputs. The projects may be coordinated jointly by faculty member(s) from
institutions as well as personnel from the Industries. A welldefined and transparent revenue
sharing mechanism needs to be evolved and implemented to motivate faculty members to
increasingly participate in such activities. The Project encourages participating institutions to
share their resources like faculty and staff, computer centres, major lab/workshop equipment and
libraries, and engaging experts from the Industries for shortterm and/or on parttime basis.
In order to increase the quality of education and the ranking of the Institute as it necessary for the
faculty members to visit various other Research Institutes of higher ranking and compare
working culture with that with our Institute. Exposure to other good Institutes also gives
motivation to faculty members to work harder. Collaborations with National and International
Institutes of high repute for student and faculty exchange, joint research projects etc. help the
17

institute to increase its standard. Therefore, faculty members involved in the joint research
programs and further faculty exchange opportunities visiting other Institutes for collaborative
arrangements can visit other Institutes. Or other faculty members coming to COE, Pune the
expenses related with travel expenses; boarding, lodging, and sundry expenses/allowances for
faculty visiting institutions and industries within India to develop and implement joint projects
with well-defined deliverables can be made from TEQIP funding through this category. However
it is necessary to take the approval of Head of the department TEQIP Coordinator, Nodal
Officers Academic and Finance, Director. In case of Study tour in the foreign country it is
necessary to take approval of BoG and then from SPFU and NPIU on the proposal as per the
guidelines for International Travel given in the Appendix - B.
Table-4: The details of Budget for Faculty and Staff Development
Amount, Rs. Lakh

SN Activity

Details

a Faculty Qualification To acquire higher qualification (PG, PhD, Post Doc.) for
Up gradation
faculty or staff: Tuition Fee, Hostel Fees, Research
Publication, Thesis writing, etc.
b Subject Knowledge Attending Training Program or Conference in India or
and Research
Abroad; Travel, Registration Fees, DA, VISA etc. As per
Competence UpNPIU/Institute Norms. One National in One Academic year
gradation of Faculty (July to June), One International in TEQIP-II program, in
addition to Institutional norms.
Boarding, lodging, and sundry expenses/allowances for
c Resource Sharing
through
faculty visiting other institute or faculty from other institute
Collaborative
visiting COEP under collaborations.
Arrangements
d Organizing Subject- Training program/ conference / workshop / seminar/
area CEPs,
symposium organized at a department of COEP as per
Workshops,
Institute/NPIU Policy. 15% Institute participants
Seminars
e Training of Technical Attending Training Program in India: Travel, Registration
Support Staff
Fees, DA, etc.
f

4.d

Group Training
Arranged for
Faculty/Staff

Fees for participants, transport, food, etc. for the training


programs arranged by the Institute in collaboration with
Industry or some outsourced party.

Amount
15.00

85.00

5.00

40.00

7.50
10.00

Organizing Subject-area Continuing Education Training Programs, Workshops,


Seminars (Rs. 40.00 Lakh)

Continuing Education Program (CEP) - which encompasses training program/ conference /


workshop / seminar/ symposium organized at a department of COEP and coordinated by a
particular faculty, for External Participants. Such CEPs should have maximum 15% of
participant strength from COEP, if required.

18

1. Faculty member or a team desirous of organizing a CEP course should submit a proposal
(Appendix-F) in prescribed format (two copies), attached herewith, and recommended
by HoD to Nodal Officer CEP, TEQIP.
2. Upon assessment of proposals by Nodal Officer CEP and Academic, the coordinator
may proceed for drawing an advance amount as seed money, limited to honorarium and
hospitality of external resource persons, with endorsement of Finance Nodal Officer.
Stationary is to be ordered from cooperative society-COEP
3. After successful conduction of the course, the coordinator should prepare a detailed
report comprising of participants list, resource persons, consolidated feedback etc. The
format of the settlement of advance (Appendix-F) is attached herewith which should be
filled in mandatorily to reimburse the balance amount, strictly within 15 days or before
31st March of the financial year, whichever happens early. Two copies of this set of
documents should be submitted, one each, with DD- Office and Accounts Manager.
4.e

Training of Technical Support Staff (Rs. 7.50 Lakh)

Similar to Faculty, the Support of Staff of the department is also needed to keep updated to
handle new equipment, learn computational skills; Office and Library Staff is needed to upgrade
themselves with new related software. Head of the Department should prepare Training Need
Analysis (TNA) after discussion with their support staff; forward the proposals to Nodal Officer
Academic along with budget for the same. After approval the support staff can attend the training
program, by taking advance in group. After return the departmental TEQIP coordinator should
settle the bill for the Class III/IV staff as per the format attached herewith in Appendix F.

5 Enhanced Interaction with Industry (20.00 Lakhs)


5.a

Increase in Industry-Institute Interaction (Rs. 8.00 Lakh):

The Purpose of Industry Institute interaction cell in the Engineering Colleges is to share the
knowledge between industry and institute to equip the students coming out of the institute to
cater the needs of the industry with regard to the skill competence and the trained man power. An
effective industry- institute relation would help to benefit to industry and institute by way of
sharing knowledge, training needs of the institute, Project guidance and Placement of students
and problem solving in the industries through consultations. So each institution should set up an
Industry- Institute Interaction (I.I.I.) cell of their own to have effective communication with the
industries that would develop a perennial growth between the two in terms of technology up
gradation, awareness. The MoU signed by the institute with industry would help to bridge the
gap between the two organizations to shoulder the tasks and perform well to achieve the intended
purposes. The I. I. I. cell of the department can coordinate the entire activities of the Institutions
throughout the state and to act as the linkage with the government for the better governance of
the activities.
Main objectives of the Industry-Institute Interaction is to integrate industrial training and other
inputs from the industry with the teaching learning processes, interaction is necessary as it
develops students' awareness on job functions in the industry, attitudes to adapt to industrial
environment, proper practical and relevant knowledge, skills and competencies in preparation to
becoming self-employed. Industry expectations are also echoed through sound interaction,
particularly the requirements from new recruits who are expected to be orientated to industrial
19

disciplines, job descriptions within the workplace with industrial practices. Mutual benefit is
derived from the shared expertise and experiences between the industry and the institute. In
addition, operating within the framework of a specific cooperative program is an essential
outcome of having both industries and institute agree on specific skills training for some specific
jobs. There are different forms of Industry-Institute linkages that have been in vogue in our
country. The different forms are (i) Problem Solving Interaction (ii) Curriculum developments
and teaching and learning system (iii) Scholarship and placement (iv) Industrial Tour and Study
Visits (v) Faculty and Staff exchange (vi) Industrial apprenticeships (vii) Incubation center (viii)
Evaluation system.
The implementation of these collaborative efforts can be undertaken by the I-I-I Cell, in which
members of the industry are involved actively. The activities which are envisaged for improving
collaboration with industry provide an interface for developing an important stake in the
institutional reforms, research and human resource development and will also allow them to
fulfill corporate social responsibility.
The activities of the action plan for improving collaboration with industry are listed below:

Nomination of Industry experts on institutional bodies like Board of Management,


Academic Board and Board of Studies.
Encouraging experts from industry to visit institute to deliver lectures on industrial
practices, recent trends and experiences
Participation of experts from industry in curriculum development and restructuring.
Collaborative research projects and field studies by faculty and industry experts
Tutoring by Industry experts for Campus Interview Preparation
Visits of faculty to industry for study and discussions or delivering lectures on subjects of
mutual interest
Memoranda of Understanding between the Institute and industries to bring the two sides
strategically closer
Joint M. Tech Program with Industry
Deputing institute faculty for Faculty Development Programs in industries
Development of Laboratories in niche areas by industries at the Institute
Instituting Scholarships/fellowships and Awards by industries for students and faculty
Practical training of students in industries

Travel cost, hospitality and honorarium paid to industry personnel for participation in curriculum
development /revision / restructure, student assessment and institutional bodies, and for
delivering expert lectures; Expenditure for increasing III; Expenditure towards inviting
industries (excluding travel cost and lodging boarding) for campus interviews and hospitality
during campus interviews, etc. will be covered through TEQIP Funds. Proposal will be initiated
by Training Placement Officer in consultation with I.I.I. cell. Approvals will be done by TEQIP
Academic nodal officer, and funds released thereafter by TEQIP finance officer, on submission
of bill of expenses.
Student Internships or Projects in Industry: Travel cost of students (UG/PG/PhD) that associate
with an industry for about 34 weeks during vacations to engage in R&D projects, industrial inplant training, internships or B. Tech. and M. Tech. Projects and Dissertation work in industries
20

under joint guidance of the faculty and experts from industry. Many industries keep on
approaching T & P cell of the institute and/or departments for offering summer internship that
may comprise exposing students to industrial ambience, on-floor training, mini-projects, relevant
surveys etc. Whereas, established industries do offer stipends for this short duration, the genuine
small scale companies may not provide any fiscal help. In such cases, upon recommendation by
HoD and T&P officer, a limited support may be provided up to Rs. 2000/- towards one-time or
lump sum travel cost of incumbent (students or guide). Approvals will be done by TEQIP
Academic nodal officer, and funds released thereafter by TEQIP finance officer, on submission
of bill of expenses and certificate regarding successful completion of internship or Project.
Table-5: Details of Budget for Enhanced Interaction with Industry
Amount, Rs. Lakh

SN

Activity

Details

5.a Increasing Industry Institute Interaction


1

5.b
1

5.b

Industry involvement in Academic BOS,


Examinations, Student Internships,
Industrial Expert Lectures, Collaborative
Research Projects, Faculty visits to
industry, practical training in industry, etc.

8.00
Travel cost, hospitality and
honorarium paid to industry
personnel or faculty.

Placement Activities for Students

On- and Off Campus Placement


Activities

Amount

Expenditure towards inviting industries (excluding


travel cost and lodging boarding), hospitality and
consumables during campus interviews.

8.00

12.00
12.00

Placement Activities for Students (Rs. 12.00 Lakh):

One of the majour Key Point Indicator to measure the performance of any Institute is Placement
of the students in reputed industries with high salary. To achieve this Institute is having a
separate Training and Placement Cell. All activities detailed in 5.a are aimed to increase the
placement of students. The Placement cell has to organize the Campus Recruitment Programs
by inviting various industries to the college for UG and PG students of different branches. When
companies visit the Institute the placement cell needs to provide hospitality and all needed
support to industry personnel during recruitment process which includes written tests, group
discussions, online tests, and interviews, etc. The necessary expenditure required for this process
can be used from TEQIP Funds so as to increase the placement of students. The placement cell
should submit the expenditure bills related with this activity in the given format every month
along with details of companies visited and students placed in every month. These bills will be
checked by the Training and Placement Officer, TEQIP Coordinator and then processed through
Nodal officer finance and director to Accounts office.

21

6. Institutional Management Capacity Enhancement (20.00 Lakhs)


6.a

Management Training of Institution Officials, Senior Faculty and Orientation of


BoG Members (Rs. 12.00 Lakh)

Post Autonomy, the institute has evolved its own organizational structure and hierarchy. Starting
from the apex body, the Board of Governors, that comprises of eminent personalities from
academia and industry, the in-house functionaries such as Director, Deputy Director, Deans and
Heads of various departments are putting in their best efforts to bring excellence in all facets of
institute functioning and create the global impact of the institute. Setting and communicating the
Vision, Mission and Goals of the institute down to every stakeholder of the institute and
motivating them to be partner in this journey is the task, in which all these respectable and senior
persons are always engaged. This leadership team in turn may need to attend some tailor made
management development programs, symposia, workshops on say, time and crisis management,
training need analysis, administrative and academic reforms, Managing Information systems, to
name a few, at national institutes of repute such as IIMs or renowned convention centers. Also
visits to world class universities and campuses abroad may result in widening the horizon of
vision to take the institute to the next level. NPIU/SPFU may also announce and offer some
management capacity building programs from time to time. The financial sponsorship for all such
programs arranged for these visionaries and functionaries will be made available as per the
announcements. The proposals initiated by any Head, Dean or Deputy Director, in this regards,
will be scrutinized by Director on case to case basis and may encompass orientation programs for
BoG members, senior in-house leadership, visits to reputed organizations/universities across
globe etc. The financial facilitation will be done by TEQIP finance officer, for items such as
Course fees, trainers fees and overheads, travel expenses, boarding and lodging, and sundry
expenses/allowances as per applicable norms and rules when deputed outstation to another
institution (within India or abroad) for the duration of the course, or for visits to institutions/
organizations of interest and relevance in the vicinity of the location of training, expenses for
Study Tours within India or abroad at actual for the duration of the tour and travel time. For
Visits abroad for training the guidelines for International Travel needs to be followed
(Appendix-B & F)
Table-6: The details of Budget for Institutional Management Capacity Enhancement (Rs.
20.00 Lakh):
Amount, Rs. Lakh

SN
1

Activity
Management Training, symposia,
workshops of Institution Officials,
Senior Faculty and Orientation of
BoG Members
Study Tours within India or abroad

6.b

Details
Amount
BoG Members, Director, Deputy
12.00
Director, Deans and Heads: Registration
Fees, Travel cost, DA and honorarium
paid to industry personnel or faculty.
International for foreign visits.
8.00

Study Tours (Rs. 8.00 Lakh)

In order to increase the quality of education and the ranking of the Institute as it necessary for the
senior faculty members to visit various other Research Institutes of higher ranking and compare
22

working culture with that with our Institute. Exposure to World Ranking Institutes also gives
vision for making Institutional Reforms. Collaborations with National and International Institutes
of high repute for student and faculty exchange, joint research projects etc. help the institute to
increase its standard. Therefore, senior faculty members are encouraged to increase the
interaction with highly reputed Institutes. Travel expenses, boarding and lodging, and sundry
expenses/allowances as per applicable norms and rules when deputed for study tour within India
or abroad for the duration of the tour and travel time can be provided through TEQIP Funds.
However, before going for such study tour it is necessary to prepare detail proposal as per the
format given in the Appendix given clearly the details about nature, Objectives and expected
outcomes of the study tour. Take the approval of Head of the department TEQIP Coordinator,
Nodal Officers Academic and Finance, Director. In case of Study tour in the foreign country it is
necessary to take approval of BoG and then from SPFU and NPIU on the proposal as per the
guidelines for International Travel given in the Appendix-B & F.

7. Implementation of Institutional Reforms (60.00 Lakhs)


7.a

Curriculum Reforms (Rs. 5.00 Lakh):

The Technology and Industrial requirements keep continuously changing, hence old syllabus, old
books becomes obsolete over the period of time. It is therefore becomes necessary to update the
curriculum regularly so that quality of the students of the Institute improves to face cutting edge
technology. Keeping this in mind The Institute has formed Departmental curriculum
development committees for UG and PG programs. These committees also include industrial
representation. Meetings are held every year to discuss the changes required in the curriculum
and also discuss result analysis after very semester examination. Travel cost, hospitality and
honorarium
paid
to
industry
personnel
for
participation
in
curriculum
development/revision/restructure & reforms; Sundry expenditure on holding meetings of the
concerned committees can be met through this funds. Each Head of the department can prepare
the bill and submit it to Nodal Officer Academic after his approval Nodal Officer Finance will
clear the Bill.
Table-7: The details of Budget for Implementation of Institutional Reforms (Rs. 60.00
Lakh):
Amount, Rs. Lakh

SN Activity

Details

Amount

Curriculum
Reforms

Departmental curriculum development committees for UG and 5.00


PG programs (DUPC & DPPC). Travel cost, hospitality and
honorarium paid to industry personnel for participation in
curriculum development/ revision/restructure & reforms; Sundry
expenditure on holding meetings

Accreditation An application fee for NBA/NAAC for all UG and PG programs 55.00

23

7.b

Accreditation (Rs. 55.00 Lakh)

Accreditation of the Institute is essential and compulsory requirement for the eligibility of
TEQIP. An application fee for NBA/NAAC for all UG and PG programs is a considerable
amount. In order to encourage the Institute to apply for Accreditation of all UG and PG program,
the Application fees can be met from TEQIP Funds. Deputy Director of the Institute will initiate
and submit the bill along with receipts of the fees. Director of the Institute will clear the Bill.

8. Academic Support for Weak Students (20.00 Lakhs)


The key activities under the aegis of the Finishing School will be:
a) Conducting remedial teaching throughout academic sessions for improving transition rate
and pass rate of students,
b) Conducting specialized soft skills and professional skills development training during
semesterbreaks and vacations (preferably starting from 5th Semester onwards) for
increasing employability,
c) Conducting high intensity training (of at least 4weeks duration) for development of soft
and professional skills in the students that graduate but fail to secure any employment, and
d) Organizing campus interviews and making other efforts to secure employment for graduate
engineers that complete the training under activity (c) above.
With a view to meet the immediate trained human resource requirements of the IT & ITES/Core
industries, it is proposed to set up training programs for engineering students at UG/PG level,
who are academically weak. It is observed that some students find difficulty in completing the
engineering education due to following problems:
The objectives of this activity is
To identify academically, psychologically and communication wise weak students and
support them to overcome their weakness.
ii. Provide the necessary help to these students to overcome their weakness.
iii. To enhance the employability of engineering students and to cater to the needs of the
industry.
i.

8.a

Support to Academically Weak Students (Rs. 7.00 Lakh)

Summer Term courses for Academically Weak Needy Students (Rs. 5.00 Lakh)
Need and importance of program
Students who are weak and are unable to cope up teachingin regular semester, needs extra
semester to cover up their lost credits. The objective of this Activity is that the student should not
loose important year of their education in life. They also should not feel they are inferior as
compared to others. The students having less capacity are allowed to take their studies at slower
speed. Summer Term is the concept of supplementary semester for weak students.
Methodology (With reference from COEP B.Tech Regulations)
1. Departments shall have the flexibility to conduct supplementary semesters during summer
months, as per the Academic Calendar. Such a semester shall be offered on the

24

2.

3.

4.

5.

recommendation of DUPC and with the approval of the Dean, Academic Affairs. A student
shall be allowed to register for a maximum of 12 credits in a supplementary semester.
The supplementary semester shall be utilized primarily to facilitate the failed students to
attend the courses in which they have failed and not for launching any new courses for
credit. However, a Department shall be free to arrange any Add-On courses for its
students during this semester.
The academic activity in the supplementary semester shall be at double the rate as
compared to a normal semester; e.g., 1 credit of course work shall require two hours/week
in the class room, so that the contact hours are maintained the same as in a normal
semester. It shall also be necessary to fulfill the requirements of CIE and SEE for all the
courses like in a normal semester.
Courses planned for the supplementary semester shall be announced by the Dean,
Academic Affairs in each year, well before the conclusion of the even semester. Students
intending to avail of this facility shall have to register for the courses offered by paying the
prescribed fees within the stipulated time.
It shall be the responsibility of the Department to plan in advance the faculty and nonteaching staff requirements to conduct the supplementary semester and take necessary steps
including the institutional approvals for organizing the same. Since this program needs
experts in concern field we can appoint some experts from our mathematics and physic
department as extra load.

Budget
The teaching faculty will stay in the college during their vacation period and teach extra to the
needy students during the summer term. Honorarium to faculty and staff involved will be given
as per the norms decided at the institute level. These norms are given at the end in the Appendix.
Maximum budget of Rs. 5.00 Lakh are proposed for this Activity during the period of TEQIP
program.
Students Weak in Mathematics and Physics basic courses (Rs. 2.00 Lakh)
Need and importance of program: The students in college of engineering Pune are coming from
different schools and social sectors. The students are also coming from Diploma colleges to get
direct admissions in respective B.Tech courses. They get admission directly in second year.
They generally take their diploma courses after tenth standard. Such students mostly have
mathematics and physics subjects as their main weakness. We can arrange special coaching
separately in the said subjects for these students so that they become compatible and comfortable
with higher mathematics and physics as it get applied to other courses of their branches.
Methodology: This program is proposed in following phases:
1. In the initial stage identification of various students needed to be trained in said
subject is to be performed.
2. Then lecture series covering very basic fundamental of the subjects will commence
3. The course teaching will also include detailing and teaching the subject from application
point of view.
Since this program needs experts in concern field we can appoint some external experts or
faculty from our mathematics and physic department as extra load. A spate time table will be
prepared for these students with mutual convenience of teaching faculty and students.
25

Budget: Honorarium to faculty and staff Per session (of two hours) - Rs. 2000/- It will also
include hospitality, stationary and incidental expenses for organization of these activities. The
amount will be given through TEQIP Funding under support weaker student on submission of
bill of expenses through TEQIP coordinator; Nodal Officers, Academic and Finance. Maximum
budget of Rs. 2.00 Lakh are proposed for this Activity.
8.b

Psychological Services and Support for Needy Students (Rs. 1.00 Lakh)

Need and importance of program: Number of students trying for admission at College of
Engineering, Pune is day-by-day increasing due to very high competition. However, it has been
observed for last few years that students getting admission in engineering faculty may face
difficulties in completing their course work due to various pressures. In number of cases apart
from other factors psychological aspects are prominent. Thus it will be a great help to provide
them some psychological support. Some students are from remote areas, or from lower socioeconomic background. Some students are academically backward. In some cases students are
with low self- esteem and self-confidence. Student may belong to either category but it becomes
difficult for him to cope up competitive modern world. This program is to enable those students
to face challenges of industry and as well as of modern world. For such needy students
Psychological services and support are useful to overcome their problems.
Methodology: This program is proposed in following phases:
1. In the initial stage Psychological Tests will be conducted for first year students to
identify weaker students who will need Psychological support.
2. Then various programs will be conducted to satisfy their needs. It may include
workshops; follow up sessions and group counseling.
3. In special cases personal counseling will be provided.
4. In addition to this some expert lectures, and workshops can organized to create
awareness about importance of psychology and mental strength in the success of life.
Since this program needs experts in concern field we can appoint some experts on the contractual
basis. Fields in which help is necessary are psychological testing and counseling. Internal faculty
will be available wherever it is necessary.
Budget: Honorarium to faculty and staff for psychological testing and group counseling Per
session (of two hours) - Rs. 2000/- including remuneration and T.A. Personal counseling Rs.
1000/- per session. It will also include hospitality, stationary and incidental expenses for
organization of these activities. The amount will be given through TEQIP Funding under support
weaker student on submission of bill of expenses through TEQIP coordinator; Nodal Officers,
Academic and Finance. Maximum budget of Rs. 1.00 Lakh are proposed for this Activity.
8.c

Support for Students to Improve their Employability (Rs. 12.00 Lakh)

Communication and Presentation Skills of many students particularly engineering students who
come out of college really needs to be brushed, this is a general feedback received from
Industries. Students fail miserably to express themselves. Without expression, there is no
impression.
Therefore, the purpose of the program is to enhance and sharpen the required skills among the
engineering graduates and make them employable in the IT & Core industries visiting COEP for
26

campus Placements. This is a supplementary training that attempts to make-up for deficiencies of
low tier students by providing specialized training in technical fields and also in soft skills, to
facilitate their employability and play a part in the supply side issues of the industry. This
training will be designed with sufficient flexibility to benefit the fresh engineering students
coming from far-flung villages and urban places with different backgrounds.
Table 8: The details of Budget for Academic Support for Weak Students
Amount, Rs. Lakh

SN Activity
1

Summer Term
courses for
Academically Weak
Needy Students

Details

Amount
5.00

Students Weak in
Mathematics and
Physics basic courses

Summer Term is the concept of supplementary semester


for weak students. Mainly students joining directly to
second year after diploma found weak in Mathematics and
Physics. Honorarium to faculty and staff involved will be
given as per the norms decided at the institute level.

Psychological
Some students are from remote areas, or from lower socioServices and Support economic background. In some cases students are with
for Needy Students
low self-esteem and self-confidence. Psychological Tests to
identify weaker students; workshops; follow up sessions
and group and personal counseling; expert lectures, and
workshops.

1.00

Support for Students


to Improve their
Employability

12.00

Various tests by Industrial experts to identify weak


students. Design of remedial courses to bridge the gap.
Leadership,
Job
Skills
Etiquettes,
Business
Communications, Group Dynamics, Business Ethics,
Managerial Skills, Persuasion, Negotiation Skills, Self
Esteem, Attitude, and soft skills etc. Honorarium to faculty
and staff for taking remedial bridge courses, and TA, DA
to outside experts for specialized training and their
hospitality during the program.

2.00

Industry Experts who are highly proficient in their own field and working at top-positions in and
around Pune will be invited to interact with the students and also to take some specific sessions
as per need, demand and request of students. Precisely speaking, soft skills make an individual or
a professional a most sought after one in his area of expertise. Further, to put in nutshell, soft
skills soften a person and to be ready to face challenges of his profession or career. The main
objective of finishing course is to equip people to become strong human resource managers.
Initially, various tests will be conducted through Industrial experts and weak students under
different category will be identified. Accordingly remedial courses will be designed and planned
for these students by outsourcing this activity to related consultants. Major components of these
bridging gap remedial training or any finishing /grooming training will be: Leadership, Job Skills
Empowerment, Etiquette, Business Communications, Group Dynamics, Business Ethics, Life
27

Values, Essential Know-How, Business Skills, Managerial Skills, Persuasion, Negotiation Skills,
Self Esteem, Attitude etc. and others.
Honorarium to faculty and staff for taking bridge courses, remedial teaching classes and skill
development training and TA, DA to outside experts for specialized training in soft components
including communication presentation skills and their hospitality during the program will be
considered as expenses. However, the budget is needed to be approved before starting any
program. The planning and proposal to be initiated by Training and Placement officer, in
coordination with Departments T & P In-charge and Students T & P representatives, to be
approved by Dean Students Affairs and TEQIP Coordinator and financially facilitated by TEQIP
Finance officer.

9. Incremental Operating Cost (70.00 Lakhs)


Incremental Operating Cost (IOC) (Rs. 30.00 Lakh)
The Incremental Operating Cost (IOC) is the fund mainly required for the efficient
implementation of TEQIP project. It involves various activities which are necessary for the
implementation of the project. Some of the major activities include:
Expenditure on BoG and other Committee Meetings
TA & DA for faculty and staff attending workshops, Meetings and training in the World
Bank procedures as organized/arranged by the NPIU and SPFUs.
Expenses such as Accommodation, Local Travel for resource persons and Hospitality for
participants while Organizing NPIU, SPFU or World Bank Meetings, Training Programs,
or Workshops.
Occasional hiring of vehicles for project related work only
Inhouse maintenance of existing and new equipment (Rs. 10.00 Lakh)
Maintenance of equipment including computers and related devices and assets provided
under the Project through Annual Maintenance Contracts. It also includes Office operation
including stationery, postage, electronic communication, telephone, electricity, water, etc.
Consultancy Services (Rs. 5.00 Lakh) engaged for technical assistance related to:
Procurement of Civil Works and equipment, pedagogical training, mentoring, handholding
for Project implementation as required by weak institutions, external financial auditing. It
also includes Contract fee for outsourced services.
Procurement Related Expenses (Rs. 5.00 Lakh)
During procurement process various expenses are required for carrying out the process
smoothly. These expenses include charges for giving advertisement in the National
Newspaper, Photography or video shooting of the process to maintain the transparency in the
process, postage, and other incidental charges like stationary, and other incidental charges.
Salaries (Rs. 20.00 Lakh)
Salaries of additional full time staff regular and contract faculty and staff appointed against
posts created under the project.
All these expenses will be prepared and initiated by the TEQIP coordinator and submitted to
Nodal Officer Finance and approved by the Director of the Institute

28

Table 9: The details of Budget for Incremental Operating Cost


Amount, Rs. Lakh

SN Activity
1
2
3
4

5
6

Amount

Expenditure on BoG, Mentor and Performance Auditor Visits and other


Committee Meetings
Organizing NPIU, SPFU or World Bank Meetings, Training Programs, or
Workshops
Expenses for conducting Faculty Recruitment process

10.00

Office operation including stationery, postage, electronic communication,


telephone, electricity, water, etc. and Inhouse maintenance of existing and new
equipment
Salaries of additional fulltime regular and contract faculty and staff appointed
against posts created under the Project

10.00

Contract fee for outsourced services. Consultancy Services related to


procurement of Civil Works and equipment, pedagogical training, mentoring,
external financial auditing etc.
Procurement Related Expenses: advertisement in the National Newspaper,
Photography or video shooting and other incidental charges.

5.00

10.00
10.00

20.00

5.00

A TEQIP Team of officials and different committees are formed for smooth conduct of TEQIP
Implementation of TEQIP project. These committees are given in Appendix-D
Applications for all these activities under the heads of Point 1 to 9 are needed to be applied
in the Formats given Appendix-F to TEQIP Office.

29

Appendix A:
Tables for guidelines for Implementation of TEQIP-II
Table17
Indicative Categorywise Funding for Key Activities Per Project Institution Selected under
SubComponent 1.2 (ScalingUp Postgraduate Education and DemandDriven Research &
Development and Innovation):
S.
Activities
No.
1

5
6
7
8
9

Improvement in teaching,
training and learning
facilities

Providing Teaching and


Research Assistantships
for significantly
increasing enrolment in
existing and new Masters
and Doctoral programmes
in Engineering disciplines
Enhancement of R&D and
Institutional consultancy
Activities
Faculty and Staff
development for improved
competence based on
Training Needs Analysis
(TNA)
Enhanced interaction with
Industry
Institutional Management
Capacity enhancement
Implementation of
Institutional reforms
Academic support for
weak students
Incremental Operating
Cost

Category of Expenditure

(i) Procurement of Goods:


(a) Equipment
30%
(b) Furniture
7%
(c) Books & LRs & Software 1%
(d) Minor Items
2%
(ii) Refurbishment (Minor Civil Works)
(iii) Consultancy Services
Teaching and Research Assistantships

Percentage Cost
(%)
(Rs.
in crore)
40
5.000

3
2
20

0.375
0.250
2.50

Research and Development

0.625

Faculty and Staff Development

10

1.250

Industry Institute Interaction

0.625

Institutional Management Capacity


enhancement
Institutional reforms

0.250

0.125

Academic Support for weak students

0.250

Incremental Operating Cost*

10

1.250

100

12.500

TOTAL

30

Notes:
The funding for key activities as suggested above are purely indicative. The Institutions participating
in this Subcomponent should focus on enhancing the research facilities, modernization and
strengthening of laboratories for MTech, PhD and faculty research, etc. and hence expenditure on
Goods (equipment, furniture, learning resources, coursespecific software etc) could be higher than
40%. However, the Institution should ensure the implementation of all the other indicated activities.
Expenditure on Minor Civil Works in a State shall not exceed 3% of the cumulative allocation for all
the Institutions selected under Subcomponent 1.2 in the State.
Expenditure on Incremental Operating Cost in a State shall not exceed 10% of the cumulative
allocation for all the Institutions selected under Subcomponent 1.2 in the State.
Salary expenditure of faculty and staff appointed on contract against the existing vacancies cannot be
charged to the Project. However, the salary expenditure of contractual faculty and staff appointed
against new posts created under the Project can be charged to the Project.
*

The Incremental Operating Cost means the costs of operation and maintenance of equipment, office
expenses, hiring of vehicles, salaries and allowances of additional staff and travel and supervision
costs incurred for the purposes of carrying out the project. The cost includes organizing workshops,
seminars etc., all expenses for training programme including training / course fee, consumables,
Consultants (experts) fee related to R&D.

PIP: p.93

31

Table19
Permissible and Nonpermissible Expenditure
for Government Funded and Aided Institutions and Private Unaided Participating in
38

SubComponent 1.2: Scalingup Postgraduate Education, Research & Development and Innovation
Activity/Category
Expenditure

of

1. Improvements in
teaching, training and
learning facilities

39

Government Funded and Aided Institutions and Private Unaided Institutions


Permitted
Not Permitted

a) Civil Works40 for:


refurbishment of existing structures/
spaces to create new laboratories for
PG programmes and research
reducing environment degradation
and complying with EMF (see
AppendixIII)
b) New equipment and furniture41for:
establishing new PG laboratories for
existing programmes
establishing laboratories for
new PG programmes42 in
emerging areas of Engineering
and Technology
Faculty research and institutional
consultancy work
Campuswide networking of
academic and administrative
buildings, hostels and faculty
residences, and enhancing internet
facilities
c) Coursespecific Software
d) Modernization and Strengthening
of Libraries:
Procurement of print and digitized
books, ejournals
Expenditure for digitization of
library books
Establishment of CD bank
Membership of INDEST AICTE etc.

2. Providing Teaching
and Research
Assistantships for
significantly
increasing
enrolment in existing
and New Masters and
Doctoral programmes

Teaching Assistance-ships and


Research Assistanceships43 for
nonGATE qualified Masters and
Doctoral students in engineering
disciplines
Foreign fellowships not
exceeding 3 months duration for
Doctoral candidates in

Civil Works undertaken for


betterment of academic
buildings such as UG
classrooms; UG existing
laboratories, workshops,
computer center and library;
constructing new spaces and
betterment of hostels,
Equipment and furniture for:
(a)starting new UG
programmes, and
(b) improving hostel facilities
other than electronic
networking
Purchase of Vehicles

Scholarships for GATE


qualified
students for Masters and
Doctoral programmes are to be
secured from Central and State
agencies

32

in Engineering
Disciplines

engineering disciplines subject to


BoG approval on case to case
basis
3. Research and
Expenditure for:
Development and
securing sponsored Projects and
Institutional
consultancy assignments
Consultancy Activities publication of research papers in
peer reviewed journals
commercialization of research
products
patenting of research products
Travel cost, hospitality and
honorarium paid to Consultant for
participation in Research &
Development and for delivering
Expert lectures
4. Developing research Fiscal incentive (as per norms
interest among UG
approved by the BoG) to students
students
that voluntarily associate with
industry oriented R&D projects
Travel cost of students that
associate with an industry for
about 34 weeks during vacations
to continue work on R&D
projects
5. Resource sharing
Travel expenses; boarding,
through collaborative
lodging, and sundry expenses/
arrangements
allowances for faculty visiting
institutions and industries within
India to develop and implement
joint projects with well defined
deliverables.
6. Faculty
Fees charged for course work and
use of research facilities; and
Qualification
Up-gradation as
consumables by the institution
planned
(other than the parent
through TNA
institution) where faculty is
enrolled for qualification
up gradation either through fulltime
or parttime or by sandwich
arrangement
Expenses towards thesis writing
and publication of thesisbased
research papers
Consumables, if faculty is
registered

Fiscal incentives for increased


participation in research,
sponsored projects and
consultancy work (the incentives
can however be given from
institutional resources including
IRG)
All expenditure including travel
and meetings associated with
implementation of sponsored
projects and consultancy
assignments
Boarding and lodging and
sundry
expenses for spending time
inindustry.

Any other payment to the


faculty
for visits to institutions and
industries for joint projects.

Salary, living expenses and


travel
expenses of faculty registered for
qualification up gradation (on
full
or part time or by sandwich
arrangement) either within the
parent institution or through
deputation to another institution

33

for qualification up-gradation on


fulltime or parttime basis within
the parent Institution
Full fee (training cost + overheads towards
travel, boarding, lodging, travel, training
materials, etc.) charged by the Training
Providers elected by the SPFU(All the
payments will be made by SPFU)
Full fee (training cost + overheads towards
travel, boarding, lodging, travel, training
materials, etc.) charged by the Training
Providers elected by the SPFU(All the
payments will be made by SPFU)
Course fee; travel expenses, boarding and
lodging, and sundry expenses/allowances as
per
applicable norms and rules when faculty is
deputed outstation to another institution
(within India or abroad) for the duration of
the course, travel time and the time permitted
by the BoG for visits to institutions /
organizations of interest and relevance to the
faculty in the vicinity of the location of
training
Course fee and local travel expenses as per
applicable norms and rules when faculty
attends a course instation but at an institution
other than the parent institution
10. Training of technical
Course fee; travel expenses; boarding,
support staff
lodging, and sundry expenses/allowances as
per applicable norms and rules when the
technical support staff is deputed outstation to
another institution/ organization within India
and travel time
Course fee and local travel expenses as per
applicable norms and rules when training is
attended instation but at an institution other
than the parent institution
11.
Travel cost, hospitality and honorarium paid
IndustryInstituteInteraction to industry personnel for participation in
curriculum development /revision /
(I-I-I)
restructure, student assessment and
institutional bodies, and for delivering expert
lectures
Expenditure for increasing III through
PSAG
7. Inhouse Basic
Pedagogical Training of
Faculty from engineering
disciplines and
supporting departments
8. Inhouse Advanced
Pedagogical Training of
Faculty from engineering
disciplines and
supporting departments
9. Subject knowledge and
research competence
up-gradation of Faculty
from engineering
disciplines and
supporting departments
as planned through TNA

Any payment to
the faculty for
attending the
training
programme
Any payment to
the faculty for
attending the
training
programme
Any other
payment to the
faculty
for attending the
course

Any other
payment to the staff
for attending the
training programme

Honorarium to
faculty member in
charge of III
activity (It can be
provided from
Institutions IRG).

34

Expenditure towards inviting industries


(excluding travel cost and lodging boarding)
for campus interviews and hospitality during
campus interviews
Arranging tutoring by industry experts to
prepare students for on and offcampus job
interviews
12.InstitutionalReforms

a) Curricular Reforms:
travel cost, hospitality and honorarium
paid to industry personnel for participation
in curriculum development/
revision/restructure and curricular
reforms;
sundry expenditure on holding meetings
of the concerned committees.
b) Incentives to Faculty for Continuing
Education Programmes, Consultancy and
R&D:
honorarium for organizing and
administering CE programmes
honorarium for delivering lectures and
training in CE programmes as per norms
decided by the BoG
c) Accreditation: Accreditation fee to
NBA/NAAC.

13. Academic Support for


Weak Students through
Finishing School:

14. Institutional
Management Capacity
Enhancement

Honorarium to faculty and staff for


taking bridge courses, remedial teaching
classes and skill development training
Honorarium to faculty, staff,
Honorarium and TA, DA to outside
experts for specialized training in soft
components including
communicationpresentation skills
a) Training of Institution Officials and
Senior Faculty:
Course fee; travel expenses, boarding
and lodging, and sundry
expenses/allowances as per applicable
norms and
rules when deputed outstation to another
institution (within India or abroad) for the
duration of the course, travel time and the

Fiscal incentives for


increased participation
in research, sponsored
projects and
consultancy work (the
incentives can,
however, be given from
institutional resources
including IRG)
Any payment to
Accreditation
Committee members in
cash or kind
Cost towards the
boarding
and lodging of students
for
attending the Finishing
School

Any other payment to


the officials and senior
faculty for attending
the course

35

time permitted by the BoG for visits to


institutions/ organizations of interest and
relevance to the faculty in the vicinity of
the location of training
Trainers fee and overheads; and sundry
expenditure if training programmes
organized within the parent institution.
b) Orientation of BoG Members:
Travel costs, boarding and lodging
expenditure and sitting fee to Board
members; sundry expenses on organizing
Orientation programme.
c) Study Tours: Travel expenses, boarding
and lodging, and sundry
expenses/allowances as per applicable
norms and rules when deputed for study
tour within India or abroad for the
duration of the tour and travel time.
15. Organizing subject
area training
programmes, workshops,
seminars and
conferences
16. Technical Assistance

17. Salaries

18. Maintenance of
equipment including
computers

Hospitality to participants
Venue and logistic arrangements
Replication of printed training materials
Publication of proceedings
Travel, boarding & lodging for invited
experts
Consultancy services engaged for technical
assistance related to:
procurement of Civil Works and
equipment
pedagogical training
mentoring
handholding for Project implementation
as required by weak institutions
external financial auditing
Salaries of additional fulltime regular and
contract faculty and staff appointed against
posts created under the Project

Inhouse maintenance of existing and new


equipment
Maintenance of equipment including
computers and related devices and assets
provided under the Project through Annual
Maintenance Contracts

TA&DA to participants

Salaries to contract faculty


and staff appointed against
existing vacancies
Salaries of Adjunct faculty
appointed against existing
vacancies (These are to be
borne by the institution)
Maintenance of buildings
and furniture (this should be
carried out through
institutions own budget)

36

19. Incremental
Operating Cost

Expenditure on:
BoG and other Committee Meetings
TA & DA for faculty and staff
attending workshops and Meetings
organized by the NPIU and SPFUs
TA & DA for faculty and staff
attending training in the World Bank
procedures as arranged by the NPIU and
SPFUs
Contract fee for outsourced services
Student training materials and other
consumables
Occasional hiring of vehicles for project
related work only
Office operation including stationery,
postage, electronic communication,
telephone, electricity, water, etc.
Expenditure on participation by faculty in
seminars, conferences, workshops, etc.:
o Registration fee; travel expenses;
boarding, lodging, and sundry expenses/
allowances as per applicable norms and
rules when faculty is deputed outstation to
another Institution (within India or abroad)
for the duration of the seminar, conference
or workshop, travel time and the time
permitted by the BoG for visits to
Institutions/ Organizations of interest and
relevance to the faculty in the vicinity of
the location of seminar, workshop or
conference
o Registration fee; and local travel
expenses as per applicable norms and rules
when participation is within station but at
an Institution other than the employer
Institution

Any other payment to the


Faculty for attending
seminars, workshops,
conferences, etc.
if organized within the
parent Institution or at
another Institution but
withinstation

38

Expenditure is permissible only for the AICTE approved UG and PG teaching programmes, provided that Goods,
Civil Works and Consultancy Services (including pedagogical training) are procured in accordance with the
procurement methods and procedures given in the Procurement Manual [see Appendix-II in the Project
Implementation Plan (PIP)and are not declared ineligible expenditure by the financial auditors.
39

The term Aided Institution includes institutions established and operated under Public-Private-Partnership mode.

40

Expenditure for any Civil Work activity will not be admissible if undertaken with co-financing from any other
source. It should be generally limited to about 3% of institutions Project allocation.

37

41

Expenditure for procurement of any equipment and furniture will not be admissible if procured with co-financing
from any other source. Total equipment procurement should be limited to about 50% of the institutions Project
allocation.
42

Provided that admissions to the new programmes are made latest by 2011, more than 50% seats are occupied and
here is sufficiency of faculty at all times
43

The amounts of Teaching and Research Assistance-ships will be governed by the norms as prescribed by the
UGC/AICTE or the State Governments or by the respective Board of Governors.
PIP: pp.109-114

38

Appendix-B
Guidelines for International Travel Support Scheme
Introduction:
These guidelines are framed to ensure that all international travel related to project are
undertaken as per the set procedures and after obtaining the necessary approvals as outlined
hereunder.
Only the PhD students, faculty, Heads of the Departments and Heads of the Project Institutions,
State officials handling the Project, Directors of Technical Education, SPFU officials and MHRD
/NPIU officials are eligible for international travel under the Project. The purpose of
International Travel can be:
a) Presentation of papers in International seminars, conferences, etc.
b) Invitation to chair a session or an invitation to deliver a key note address in
International seminars, conferences, training programs, etc.
c) Study and Networking Tour.
The objective of the International Travel Support Scheme is to enable participants to improve the
quality of education at Project Institutions (in the case of academic travel) or the administrative
effectiveness of Project Institutions (in the case of Heads of Institutions, or State/national
officials). Participants therefore will need to show not only what they expect to learn or gain
from the International experience but also how that experience will be shared with their
institution and result in concrete activities at the Institutional level.
Procedure:
i.
ii.
iii.

iv.

v.

Applicants are required to submit a complete proposal along with the enclosures. (The
Format of the Proposal is enclosed).
The Concerned Project Institution should bring the achievements in the academic
excellence in the lines of the academic grid.
The Concerned Project Institution should submit Faculty and Staff development plan
(Yearly) and International Travel plan for faculty of the Concerned Institution (duly
approved by BoG) to SPFU.
In case of State Government aided/funded and private unaided institutions, the complete
proposal along with BoGs No Objection is to be submitted to SPFU. The State Project
Facilitation Unit (SPFU) will put up for decision of State Steering Committee as per the
Para 5.1.2.1 (iii) (f).
For CFIs, Chairman, Board of Governor (BoG) will accord approval on the basis of
scrutiny and recommendation of the Director of the Institute.
39


S.
No.
1

Particulars

Evaluation Criteria

Is the International visit focused on


improving the quality of teaching or
research (or the institutional
effectiveness) of a Project Institution.

All the evidence that this criterion has been met is strong and clear.

Some of the evidence that this criterion has been met is either weak
or unclear or both.
No evidence that this criterion has been met
All the evidence that this criterion has been met is strong and clear.
Some of the evidence that this criterion has been met is either weak
or unclear or both.
No evidence that this criterion has been met
All the evidence that this criterion has been met is strong and clear.

Some of the evidence that this criterion has been met is either weak
or unclear or both.
No evidence that this criterion has been met
All the evidence that this criterion has been met is strong and clear.

Some of the evidence that this criterion has been met is either weak
or unclear or both.
No evidence that this criterion has been met
All the evidence that this criterion has been met is strong and clear.

Some of the evidence that this criterion has been met is either weak
or unclear or both.
No evidence that this criterion has been met

Will the applicant benefit from the


International visit.

Is the visit linked to the Institutional


Development Proposal Objectives and
to the current training needs
assessment?
Is the action plan for how the applicant
will share the information gained likely
to have an impact on others beyond the
applicant?

Has the Institution ensured that teaching


or research duties will be appropriately
continued during the travel period?

Note:

Selection Criteria: The following criteria will be used by the Screening Committee:
Points

0
2
1
0
2

0
2

0
2

Applicants will have to get at least one point in each category and get a total of at least 7 points in
order for the application to be approved.

Important points to be noted:


o The event should be of an International Character.
o The applicant should not have availed financial assistance from any other source for the
same event.
o Any International tour undertaken without Competent Authoritys approval will not be
considered a part of the Project and therefore, expenditure incurred will not be eligible
for reimbursement.
o Heads of the Institutions will avoid travel during the end of the financial year.
o The period of Study and Networking Tour will be limited to seven working days.
o All austerity measures like discount on training fee, accommodation etc. should be
availed. The travel will be undertaken only under the available cheapest restricted
economy class air fare.
o The officials visiting abroad are required to prepare a detailed report of their visit, clearly
specifying the gains and an action plan for implementing the feasible activities.
o The experience will also be shared with fellow faculty of the institution.

Now BoG Approval is sufficient for Travel Abroad. Only one international travel through
TEQIP is allowed. In addition faculty can avail Institute Funding once in three years. Application
for International Travel is to be given as per the Format-4a. For all travelling in India
Institute TA/DA Rules will be applicable as given in the next appendix.

40

Appendix-C
Rules for TA/DA for travel in India for TEQIP Activity

COLLEGE OF ENGINEERING, PUNE


(An Autonomous Institute of Govt. of Maharashtra)
SHIVAJINAGAR, PUNE-411005 (MAHARASHTRA) INDIA
Tel.No.:020-25507000/25507009

Fax:020-25507299

E-mail: director@coep.ac.in

27 th April 2012

No: COEP/DDOff/2012

OFFICE ORDER
Travelling Allowance and Dearness Allowance Rules
Travelling Allowance and Dearness Allowance for Faculty and Staff of College of Engineering,
Pune (Autonomous Institute) w.e.f. 1st May 2012 will be as follows:
1.

These rules will be applicable to all faculty and staff working in COEP.

1. The Employees are classified into 3 categories for applicability of travelling allowance and
Dearness allowance.
Class
I
II
III
Note:

Grade pay in the revised Pay band


Above Rs. 7000
Above Rs.4000 and below Rs. 7000
Less than Rs. 4000

Accounts Manager /Accounts officer /General Manager appointed by the institute are categorized
under class II category.
Similarly Class C and D employee appointed by the institute are categorized under class III.

2. Eligibility for Public transport by Road or Railway:


Class
I
II

III

4.

Eligibility
Road
Railway
Any public transport A.C. bus / Any class including Rajdhani and Shatabdi
hired taxi
Any public transport A.C. bus
1.Rajdhani-2 class A.C. II tier
2. Shatabdi- A.C. Chair car
3. Other trains - 2 Class A.C. 2 tier /
I Class / A.C. Sleeper.
Any non A.C. public transport bus
A.C. Chair car / 2 Class sleeper Rajdhani / Shatabdi
3AC

Air travelwill be permitted only to Class I officers / employees with prior permission of
the Head of the institute.

41

5.

If the institute vehicle is not available for some urgent work, class I and class II
officers/employees will be allowed to travel by own /hired car /jeep. Allowance in such a
case will be Rs. 16/- per Km. and Rs.8/- per Km if journey is performed by auto
rickshaw/own scooter.

6.

Dearness Allowance will be as follows:

Class

Delhi, Mumbai, Kolkata,


Chennai, Bangalore,
Hyderabad
General
Hotel actual
rate

I
II
III

500
400
300

5000
3000
1500

A grade cities in State /


Country

Cities / Towns/ Villages


not included in any list

General

Hotel actual
rate

General

Hotel actual
rate

400
300
200

3000
2000
1000

300
200
100

2000
1500
800

Note:

For hotel stay additional lunch/ dinner will be admissible. However, the minimum of the actual
expenses and rate given above will be considered for reimbursement. Hotel bills must be
submitted to confirm the hotel stay.

7.

Travel outside the country: Allowance for travelling abroad for all the employees will be
as under:

60$ per day (D.A).

60$ per day or actual expense, whichever is


less (for stay).

8.
A
B
C
9.

Only for conference days + 2 days


travelling.
Only for conference days.

During the period of reappointment, D.A will be as follows:


Only lodging (for stay).
Only boarding (lunch/ dinner).
Lodging & boarding.

75% of the permissible amount.


50% of the permissible amount.
25% of the permissible amount.

Stay outside the headquarters for less than 24 hours, D.A will be as follows:
A
B

up to 12 hours
less than 12 hours

50% of D.A.
25% of D.A.

10.

To settle advance / claim reimbursement Receipt of air travel & all types of vehicles/ first
class/ sleeper/ A.C is must.

11.

Institute Head in exceptional circumstances will have the authority to relax any of the
above mentioned rules.
Sd/Prof. A.D. Sahasrabudhe
(Director)

CC:

For information and necessary action:


Deputy Director; All Dean; HODs; COE, Exam Cell; Administrative Officer;
Accounts Manager
42

Appendix-D
List of TEQIP Nodal Officers and various Committees
Information of TEQIP-II Cell officers for College of Engineering, Pune (COEP):
S/No.

1.

Name & Designation

Correspondence Address

Phone +91-20-25507001

Director
Prof. Anil D. Sahasrabudhe

Contact Number

College of Engineering, Wellesley


Road, Shivajinagar, Pune 411005
(M.S.)

Fax +91-20-25507299
Mobile +91-9423582025
Email ID: director@coep.ac.in

2.

Phone +91-20-25507223;

TEQIP Coordinators
1. Prof. G.V. Parishwad
2. Prof. D.B. Talange

25507129
1. Professor in Mechanical Engg
2. Professor in Electrical Engg
College of Engineering, Wellesley
Road, Shivajinagar, Pune 411005
(M.S.)

Fax +91-20-25507299
Mobile +91-9822871801;
9325117504

Email ID gvp.mech@coep.ac.in
dbt.elec@coep.ac.in

3.

Nodal Officer
(Procurement)
1.

2.

Prof. S.S. Ohol


Prof. V.N. Pande

Phone +91-20-25507229;
1. Asst. Prof. Mechanical Engg
2. Asst. Prof. in Electrical Engg

25507121

College of Engineering, Wellesley


Road, Shivajinagar, Pune 411005
(M.S.)

Mobile +91-9850503949;

Civil Works &Environment


1. Prof. Civil Engg
Management
2. Asst. Prof. in Civil Engg

1. Prof. B.G. Birajdar


2. Prof. R.P. Thanedar

4.

Nodal Officer (Finance)


1.

Prof. B.B. Ahuja

2. Mrs. S.N. Madhekar

College of Engineering, Wellesley


Road, Shivajinagar, Pune 411005
(M.S.)

1. Dy. Director & Prof.


Production
2. Asso. Prof. Civil Engg.
College of Engineering, Wellesley
Road, Shivajinagar, Pune 411005
(M.S.)

Fax +91-20-25507299
9422915473
Email ID: sso.mech@coep.ac.in,
vnp.elec@coep.ac.in

Phone +91-20-25507043;
25507072

Fax +91-20-25507299
Mobile +91-9422011178;
9822021624

Email ID: bgb.civil@coep.ac.in,


rpt.civil@coep.ac.in
Phone +91-20-25507281;
25507044

Fax +91-20-25507299
Mobile +91-9423582028;
9822325683
Email ID: bba.prod@coep.ac.in,
snm.civil@coep.ac.in

43

5.

Phone +91-20-25507141

Nodal Officer (Academic)


1.

2.

Prof. M.S. Sutaone


Prof. A.M. Sapkal

1. Professor in E & TC
2. Professor in E & TC
College of Engineering, Wellesley
Road, Shivajinagar, Pune 411005
(M.S.)

Nodal Officer (FDP)


1.

2.

6.

Prof. P.P. Bartakke


Prof. (Mrs) M.Y. Khaladkar

Nodal Officer (Equity


Assurance Plan)
1.

Dr. M.R. Shindikar

1. Professor in E & TC
2. Professor in Physics

25507148

Fax +91-20-25507299
Mobile +91-9923560608;
9890048452

Email ID:
mssutaone.extc@coep.ac.in;
ams.extc@coep.ac.in
Phone +91-20-25507145
25507148

Fax +91-20-25507299

College of Engineering, Wellesley


Road, Shivajinagar, Pune 411005
(M.S.)

Mobile +91-986007355;

3. Asst. Prof. Applied Science.

Phone +91-20-25507034;

College of Engineering, Wellesley


Road, Shivajinagar, Pune 411005
(M.S.)

9890048452
Email ID: ppr.extc@coep.ac.in;
myk.appsci@coep.ac.in

Fax +91-20-25507299
Mobile +91-9422518291;
Email ID: smh.appsci@coep.ac.in,
maheshshindikar@gmail.com

44

COLLEGE OF ENGINEERING, PUNE


(An Autonomous Institute of Government of Maharashtra)
Shivajinagar, Pune 411005
Tel Off. : + 91- 20- 25507001
Fax: + 91- 20- 25507299
Email: director@coep.ac.in
____________________________________________________________________________________

Date: 23rd January 2013

Ref. No./COEP/TEQIP/2013/ 390

OFFICE ORDER
With reference to the Office Order (Reference COEP/TEQIP/2012/3644 dated 21st July
2012) please find enclosed the revised Office Order.
As per the requirement and for smooth implementation of TEQIP-II program at College of
Engineering, Pune following working committees of faculty members are established with
immediate effect till the end of TEQIP-II program:

A] Industry-Institute-Interaction Cell
S.No.
1
2
3
4
5
6
7

Name
Director of the Institute
Dean R & D
Training and Placement Officer
Head of the Respective Department
TEQIP-Coordinator
Mr. Shekhar Kamble, Head HR, TCS, Pune
Mr. Shawn Kurien, Head HR, Eaton Tech. Ltd., Pune

Chairman
Convener
Member
Member
Member
Member
Member

B] TEQIP-Central Purchase Committee


S.No.
1
2
3
4
5

Name
Director of the Institute
TEQIP-Procurement Coordinator
Head of the Respective Department
TEQIP-Finance Coordinator
TEQIP-Coordinator

Chairman
Convener
Member
Member
Member

45

C] TEQIP-Quality Assurance and Monitoring Committee


S.No.
1
2
3
4
5
6
7

Name
Director of the Institute
Dean Quality Assurance
Dean Student Affairs
Dean Academic
Mr. J.Y. Choudhari, CEO, BEL, Pune
Mr. V.B. Bapat, Adjunct Professor, Mechatronics
Prof. R.R. Joshi, Professor, Civil Engineering

Chairman
Convener
Member
Member
Member
Member
Member

D] TEQIP-FDP Committee
S.No. Name
1
Dr. P.P. Bartakke, Assts. Professor E &TC
Nodal Officer
2
Dr. (Mrs.) M.Y. Khaladkar, Assts. Professor, Applied Member
Science

E] TEQIP-Innovation, Incubation and Entrepreneurship Committee


S.No. Name
1
Dr. Pradeep Waychal, Professor, Computer & IT
2
Dr. J.A. Kher, Asst. Professor, Applied Science

Nodal Officer
Member

F] TEQIP-Institutional Newsletter Committee


S.No. Name
1
Dr. (Mrs.) M. G. Karnik, Asso. Professor, Mechanical
2
Mrs. N. V. Iyer, Asst. Professor, Applied Science

Nodal Officer
Member

G] TEQIP- Equity Assurance Plan


S.No. Name
1
Dr. M.R. Shindikar, Asst. Professor, Applied Science

Nodal Officer

Sd/(Prof. A.D. Sahasrabudhe)


Director

To,
Concerned Faculty members for information and compliance;
TEQIP Coordinators;
All Deans and Heads of Department

46

COLLEGE OF ENGINEERING, PUNE


(An Autonomous Institute of Government of Maharashtra)
Shivajinagar, Pune 411005
Tel Off. : + 91- 20- 25507001
Fax: + 91- 20- 25507299
Email: director@coep.ac.in
____________________________________________________________________________________

Date: 8th May 2013

Ref. No./COEP/TEQIP/2013/ 2168

OFFICE ORDER
With reference to the Office Order (Reference COEP/TEQIP/2012/3644 dated 21st July
2012) please find enclosed the revised Office Order.
As per the requirement and for smooth implementation of TEQIP-II program at College of
Engineering, Pune following working committees of faculty members are established with
immediate effect till the end of TEQIP-II program:

A] TEQIP-Central Purchase Committee


S.No.
1
2
3
4
5

Name
Director of the Institute
TEQIP-Procurement Coordinator
Dr. A.M. Sapkal, Head of the Department E & TC
TEQIP-Finance Coordinator
TEQIP-Coordinator

Chairman
Convener
Member
Member
Member

B] TEQIP Online Data Submission & Related Work


1. Prof. Dr. (Mrs.) Jibi Abraham Department of Computer and IT
2. Prof. Satish Kumbhar, Asst. Professor (Computer and IT)
To speed up the TEQIP Procurement process it is also resolved in the Mentors meeting that
every day at 3.00 pm all Nodal Officers shall meet at the TEQIp Office of the Institute.
Sd/(Prof. A.D. Sahasrabudhe)
Director
To,
Concerned Faculty members for information and compliance;
TEQIP Coordinators;
All Deans and Heads of Department

47

COLLEGE OF ENGINEERING,PUNE
(An Autonomous Institute of Government of Maharashtra)
SHIVAJINAGAR, PUNE 411 005
Tel.No. 25507000/9

Fax No: 25507299

No. COEP/ Circular/DIR OFF /2013/

Email: director@coep.ac.in

Date: 4th June, 2013

CIRCULAR
In order to strengthen procurement activity of TEQIP-II, the institute has
decided to add few more faculties in the team.
Sr.
No.
1.
2.
3.
4.
5.
6.
7.

Name

Department

Remarks

Prof.
Prof.
Prof.
Prof.
Prof.
Prof.
Prof.

Electrical
Mechanical
Electrical
E & TC
E & TC
Electrical
Mechanical

TEQIP Coordinator
Procurement In-charge
Member
Member
Member
Member
Member

D. B. Talange
S. S. Ohol
V. N. Pande
S. P. Mahajan
S. P. Mohani
V. S. Bandal
C. M. Sevatkar

Sd/(A. D. Sahasrabudhe)
Director
To,
Deputy Director,
Deans,
HoDs (all department),
COE,
GM (Admin),
Administrative Officer,
Accounts Officer,
Librarian,
Gymkhana In-charge,
Boat Club In-charge
All concerned Faculty members

48

Appendix-E
Minutes of the Meeting NPIU with SPFU
The Meeting under chairpersonship of the Additional Secretary with the
Commissioners/Additional Secretary/Deputy Secretary of Technical Education or Higher
Education Departments of 14 States and SPFUs coordinators held on 19th June, 2013 at India
International Centre, New Delhi. The list of participants is at Annexure II.
The Additional Secretary (T) welcomed all the participants to the meeting and emphasized the
need for increasing the pace of expenditure under TEQIP II through monthly Planning and
monitoring in view of closing date of December 2014. The absence of participation from the
State of Madhya Pradesh, Rajasthan and Orissa was noted and separate meeting with these
States will be held at the earliest.
Summary of the decisions:
1. The unspent balances of participating states were on higher side; therefore targeted monthly
expenditure should include at least 90% of the unspent Balances till 31st July 2013 and additional
expenditure for August and September 2013 as per Annexure I. The participating States should
submit their monthly expenditure plan to NPIU before 30th June 2013.
2. In the event of States not achieving the expenditure target by due date, the unspent funds will
be transferred to well performing States.
3. In the event of deviation and escalation of the estimates BoGs/Head of the Institutions is the
competent authority for approval, the SPFUs may only be informed about such cases.
4. The BoGs of the Institutes are empowered to approve the International Travel Plan in respect of
International Travel Support Scheme.
5. Seed grant for research to faculty members and/or students may be provided to venture into
innovative research and to strengthen research culture in Institutes. However, Institutes will lay
down norms for implementation.
6. In the case of Private Unaided Institutions, text books, e-journals and software can be procured
as soft component but it needs to be ensured that all the available funding will not be spent
under a single head of expenditure.
7. As regards procurement of Services, Institutes own BoG/Head of Institutions will be
empowered to give the required NOC. Only in case of Services requiring World Banks NOC,
such cases will be processed through NPIU.
8. It is clarified that in case of delay in constituting the BoG/appointment of the Chairperson in
participating institution, Ex Director of the Institute can be appointed a Chairman of the BoG.
9. For the Institutions selected in second cycle, Procurement Plan be reviewed and approved by
the BoG/Head of Institution.
10. The project supports Teaching & Research Assistantships for Masters and Doctoral students of
Applied Sciences viz. Physics, Chemistry & Mathematics.
11. Tie up with IITs and IIMs be encouraged to expedite the faculty development activities in the
Project Institutions.
12. Joint venture with Industry for academic and research activities be encouraged under project.

*******