Está en la página 1de 8

OUM to AIM Mapping

PHASE ACTIVITY

OUM
TASK ID

OUM TASK NAME

Comparable Comparable ABF Task Name


ABF
Task ID

A Inception
A.ACT.GBRI Gather Business Requirements - Inception
A.RD.001

Detail Business and System Objectives

A.RD.011.1

Develop Future Process Model

A.RD.012
A.RD.015

Document Present and Future Organization Structures


Determine KPI Collection and Reporting Strategy

A.AP.010
A. BF.055
A BF.003
A.BF.005
A. BF.015
A. BF.020
BF.010
A.BF.055

Define Executive Project Strategy


Confirm/Refine KPI Collection and Reporting Strategy
Define Business Flow Family Baseline Functionality
Review Business Flow Family Baseline Functionality
Prepare/Update Future Process Model
Review Future Process Model
Identify Current Financial and Operating Structure
Confirm/Refine KPI Collection and Reporting Strategy

A.BF.100.1
A.BF.070

Conduct Phase-End Review


Identify Business Availability Requirements

A. BF.045
A.BF.100.1

Prepare/Update High-Level Solution Document


Conduct Phase-End Review

A.CV.010
A.TE.010
A. BF.050

Define Data Conversion Requirements and Strategy


Define Testing Requirements and Strategy
Gather Business Volumes and Metrics

A.DO.010
A.BF.060

Define Documentation Requirements and Strategy


Determine Audit and Control Requirements

A.BF.090
A. BF.016

Conduct Business Architecture Workshops


Develop/Update Application Setup Documents

A.AP.010
A.AP.010

Define Executive Project Strategy


Define Executive Project Strategy

A.AP.030

Develop Project Team Learning Plan

A.AP.050

Conduct Project Team Learning Events

A.ACT.GR Gather Solution Requirements


A.RD.045.1
A.RD.055
A.RA.023.1

Prioritize Requirements (MoSCoW)


Detail Supplemental Requirements
Develop Use Case Model

A.ACT.ECBB Establish Current Business Baseline


A.RD.034

Document Current Business Baseline Metrics

A.ACT.CR Consolidate Solution Requirements


A.RD.140.1
A.RD.150.1

Create Requirements Specification


Review Requirements Specification

A.ACT.GSP Gather Supporting Requirements


A.CV.010
A.TE.005.1
A.PT.010
A.TA.010
A.DO.010
A.RD.070

Define Data Acquisition and Conversion Requirements


Determine Testing Requirements
Conduct Performance Management Workshop
Conduct Technical Architecture Workshop
Define Documentation Requirements and Strategy
Determine Audit and Control Requirements

A.ACT.SKSD Specify Key Structure Definition


A.RA.040.1
A.DS.010

Define Business Data Structures


Define Business Data Structure Setups

A.ACT.CEAW Conduct Executive Alignment Workshop


A.OCM.020
A.OCM.030

Prepare for Executive Alignment Workshop


Conduct Executive Alignment Workshop

A.ACT.TPT Train Project Team


A.TR.010.1

Define Training Strategy

A.TR.020
A.TR.030
A.TR.040
A.TR.050

Prepare Project Team Learning Plan


Prepare Project Team Learning Environment
Develop Project Team Learningware
Conduct Project Team Learning Events

A.ACT.CAWI Conduct Alignment Workshops - Inception


A.OCM.090
A.OCM.100

Design Change Agent Workshop


Conduct Change Agent Workshop

OUM to AIM Mapping

PHASE ACTIVITY

OUM
TASK ID

OUM TASK NAME

Comparable Comparable ABF Task Name


ABF
Task ID

A.ACT.CORA Conduct Organizational Readiness Assessment


A.OCM.110
A.OCM.120
A.OCM.130

Create Assessment Tools


Gather and Analyze Assessment Data
Build Communication Strategy and Change Management
Roadmap

A.AP.070

Develop Organizational Change Management Plan

A.ACT.DCMRCCI Deploy Change Management Roadmap / Communication Campaign - Inception


A.OCM.140
Develop Communication Campaign
A.OCM.150.1 Conduct Change Management Roadmap / Communication
Campaign

A.AP.080

Develop Communication Plan

A. BF.015
A. BF.020

Prepare/Update Future Process Model


Review Future Process Model

A.BF.100.1

Conduct Phase-End Review

A.MD.010
A.TE.010
A.TE.010
A.CV.010

Define Strategy for Application Extensions and Integration


Define Testing Requirements and Strategy
Define Testing Requirements and Strategy
Define Data Conversion Requirements and Strategy

B.DO.020
B.TR.010.2

Define Application Extension Strategy


Determine Testing Requirements
Develop Testing Strategy
Define Data Acquisition, Conversion and Data Quality
Strategy
Define Documentation Standards and Procedures
Define Training Strategy

A.DO.020

Define Documentation Standards and Procedures

B.TS.020.1

Define Cutover Strategy

A.PM.010

Define Transition Strategy

A.TA.010
A.TA.020
B.TA.050
A.BF.120
B.TA.060
C.TA.150
C.TA.150

Define Architecture Requirements and Strategy


Identify Current Technical Architecture
Define System Availability Strategy
Conduct Integration Fit Analysis
Define Reporting and Information Access Strategy
Define System Management Procedures
Define System Management Procedures

A.ACT.LCOB Lifecycle Objective Milestone Summary


A.PMC.LCOB Lifecycle Object Milestone

B Elaboration
B.ACT.GBRE Gather Business Requirements - Elaboration
B.RD.011.2

Develop Future Process Model

B.RA.055.1

Document Business Procedures

B.ACT.DUC Develop Use Cases


B.RA.023.2
B.RA.024.1

Develop Use Case Model


Develop Use Case Details

B.ACT.CS Consolidate Specification


B.RD.045.2
B.RD.140.2
B.RD.150.2
B.RA.180.1

Prioritize Requirements (MoSCoW)


Create Requirements Specification
Review Requirements Specification
Review Use Case Model

B.ACT.DPS Define Project Strategy


B.DS.020.1
B.TE.005.2
B.TE.010
B.CV.020

B.ACT.DI Define Infrastructure


B.TA.020

Define Architecture Requirements and Strategy

B.TA.030
B.TA.040
B.TA.050
B.TA.060

Define Integration Requirements and Strategy


Define Reporting and Information Access Strategy
Define Disaster Recovery Strategy
Define System Operations and Management Strategy

OUM to AIM Mapping

PHASE ACTIVITY

OUM
TASK ID

OUM TASK NAME

B.TA.070

Define Initial Architecture and Application Mapping

B.TA.080
B.TA.090

Define Backup and Recovery Strategy


Develop Security and Control Strategy

Comparable Comparable ABF Task Name


ABF
Task ID
A.TA.030
B.TA.070
C.TA.150
B. BF.170
B.TA.080

Develop Preliminary Conceptual Architecture


Revise Conceptual Architecture
Define System Management Procedures
Design Security Profiles
Define Application Security Architecture

B.TE.030
A.TE.040
B.TE.050

Develop Link Test Script


Prepare/Update System Test Script
Develop Systems Integration Test Script

C.MD.090
A. BF.030
B.TE.060.1
C.MD.090
A. BF.030
B.TE.060.1
A.DO.040

Prepare Development Environment


Prepare CRP 1 Environment
Prepare CRP 2 Environment
Prepare Development Environment
Prepare CRP 1 Environment
Prepare CRP 2 Environment
Prepare Documentation Environment

B.BF.100.2
B.MD.020
B.BF.100.2

Conduct Phase-End Review


Define and Estimate Application Extensions
Conduct Phase-End Review

A. BF.016
A. BF.016

Develop/Update Application Setup Documents


Develop/Update Application Setup Documents

B.MD.050
B.MD.050
B.MD.050
B.MD.050
B.MD.080

Create Application Extensions and Interfaces Functional Design


Create Application Extensions and Interfaces Functional Design
Create Application Extensions and Interfaces Functional Design
Create Application Extensions and Interfaces Functional Design
Review Functional and Technical Designs

B.MD.070
B.MD.070
B.MD.070
B.MD.070
B.MD.070
B.MD.060
B.MD.080

Create Application Extensions Technical Design


Create Application Extensions Technical Design
Create Application Extensions Technical Design
Create Application Extensions Technical Design
Create Application Extensions Technical Design
Design Database Extensions
Review Functional and Technical Designs

A. BF.035
B.TE.065

Prepare for CRP1 Workshop


Prepare for CRP 2 Workshop

B.ACT.DTP Develop Test Plans


B.TE.015.1
B.TE.050.1
B.TE.080
B.TE.082

Develop Integration Test Plan


Develop System Test Plan
Develop Systems Integration Test Plan
Develop Acceptance Test Plan

B.ACT.PEE Prepare Environments-Elaboration


B.IM.007.1
B.TE.018.1

Prepare Development Environment


Prepare Test Data

B.TE.038.1
B.TE.060.1

Prepare Integration Test Environment


Prepare System Test Environment

B.DO.040

Prepare Documentation Environment

B.ACT.PFG Perform Fit Gap


B.AN.010
B.AN.020
B.AN.030

Map Business Requirements


Define and Estimate Application Extensions
Define Gap Resolutions

B.ACT.SSC Specify Software Configuration (Multiply Instantiated)


B.RA.040.2
B.DS.030.1

Define Business Data Structures


Define Application Setups

B.ACT.AE Analyze - Elaboration


B.AN.050.1
B.AN.060.1
B.AN.090.1
B.AN.100.1
B.AN.110.1

Analyze Data
Analyze Behavior
Analyze User Interface
Prepare Analysis Specification
Review Analysis Model

B.ACT.DE Design - Elaboration


B.DS.050
B.DS.080.1
B.DS.090.1
B.DS.100.1
B.DS.130.1
B.DS.140.1
B.DS.150.1
B.DS.160.1

Determine Design and Build Standards


Design Software Components
Design Data
Design Behavior
Design User Interface
Prepare Design Specification
Develop Database Design
Review Design Model

B.ACT.DP Develop Prototypes


B.IM.010

Develop Functional Prototype

OUM to AIM Mapping

PHASE ACTIVITY

OUM
TASK ID

OUM TASK NAME

B.IM.085
B.IM.040.1
B.IM.060.1

Develop User Interface Standards Prototype


Implement Database
Perform Component Review

Comparable Comparable ABF Task Name


ABF
Task ID

B.ACT.VP Validate Prototypes


B.RA.085

Validate Functional Prototype

B.RA.090

Conduct Reporting Fit Analysis

B.RA.095
B.TE.019.1

Validate User Interface Standards Prototype


Collect, Assess and Refine KPI Measurements

A. BF.040
B.TE.110
A. BF.040
B.TE.110

Conduct CRP 1 Workshop


Conduct CRP 2 Workshop
Conduct CRP 1 Workshop
Conduct CRP 2 Workshop

B.TE.117.1

Collect, Assess and Refine KPI Measurements

A.PT.010
B.PT.020
B.PT.040
B.PT.050
B.PT.060
B.PT.070

Define Performance Testing Strategy


Identify Performance Test Scenarios
Create Performance Test Scripts
Design Performance Test Transaction Programs
Design Performance Test Data
Design Test Database Load Programs

B.CV.020
A.BF.110

Define Conversion Standards


Map Business Data

B.ACT.PPM Plan Performance Management


B.PT.020
B.PT.030
B.PT.040
B.PT.050

Define Performance Management Requirements and


Strategy
Define Performance Testing Strategy
Identify Performance Testing Models and Scenarios
Design Performance Test Scripts and Programs

B.PT.060

Design Performance Test Data and Load Programs

B.ACT.PACDE Prepare to Acquire and Convert Data - Elaboration


B.CV.025
B.RA.160

Define Data Acquisition and Conversion Standards


Conduct Business Data Source Gap Analysis

B.ACT.DCMRCCE Deploy Change Management Roadmap / Communication Campaign - Elaboration


B.OCM.150.2 Conduct Change Management Roadmap / Communication
Campaign
B.OCM.155.1 Monitor Change Management Roadmap / Communication
Campaign Effectiveness

B.ACT.LCAR Lifecycle Architecture Milestone Summary


B.PMC.LCAR Lifecycle Architecture Milestone

C Construction
C.ACT.AC Analyze - Construction
C.AN.050.2
C.AN.060.2
C.AN.090.2
C.AN.100.2
C.AN.110.2

Analyze Data
Analyze Behavior
Analyze User Interface
Prepare Analysis Specification
Review Analysis Model

B.MD.050
B.MD.050
B.MD.050
B.MD.050
B.MD.080

Create Application Extensions and Interfaces Functional Design


Create Application Extensions and Interfaces Functional Design
Create Application Extensions and Interfaces Functional Design
Create Application Extensions and Interfaces Functional Design
Review Functional and Technical Designs

B.MD.070
B.MD.070
B.MD.070
B.MD.070
B.MD.070

Create Application Extensions Technical Design


Create Application Extensions Technical Design
Create Application Extensions Technical Design
Create Application Extensions Technical Design
Create Application Extensions Technical Design

C.ACT.DC Design - Construction


C.DS.080.2
C.DS.090.2
C.DS.100.2
C.DS.130.2
C.DS.140.2

Design Software Components


Design Data
Design Behavior
Design User Interface
Prepare Design Specification

OUM to AIM Mapping

PHASE ACTIVITY

OUM
TASK ID

OUM TASK NAME

C.DS.150.2
C.DS.160.2

Develop Database Design


Review Design Model

Comparable Comparable ABF Task Name


ABF
Task ID
B.MD.060
B.MD.080

Design Database Extensions


Review Functional and Technical Designs

B.TE.030
A.TE.040

Develop Link Test Script


Prepare/Update System Test Script

C.MD.090

Prepare Development Environment

C.MD.090
C.TE.060.2
C.TE.090
B.CV.030

Prepare Development Environment


Prepare CRP 3 Environment
Perform Installation Test
Prepare Conversion Environment

C.MD.100
C.MD.110
C.MD.120

Create Database Extensions


Create Application Extension Modules
Create Installation Routines

C.MD.120
C.TE.090

Create Installation Routines


Perform Installation Test

B.TE.020
C.TE.070

Develop Uhit Test Scripts


Perform Unit Test

B.TE.030
C.TE.080

Develop Link Test Script


Perform Link Test

C.ACT.PTP Perform Test Planning


C.TE.015.2
C.TE.050.2

Develop Integration Test Plan


Develop System Test Plan

C.ACT.PEC Prepare Environments - Construction


C.IM.007.2
C.TE.018.2
C.TE.038.2
C.TE.060.2
C.TE.085
C.CV.030.2

Prepare Development Environment


Prepare Test Data
Prepare Integration Test Environment
Prepare System Test Environment
Prepare Systems Integration Test Environment
Prepare Conversion Environment (Initial Load)

C.ACT.IS Implement System


C.IM.040.2
C.IM.050

Implement Database
Implement Components

C.DS.030.2
C.IM.060.2
C.IM.070
C.IM.090
C.TE.065

Define Application Setups


Perform Component Review
Assemble Components
Create Installation Routines
Perform Installation Test

C.ACT.PUTC Perform Unit Test - Construction


C.TE.020.2
C.TE.030.2

Develop Unit Test Scripts


Perform Unit Test

C.ACT.PITC Perform Integration Test - Construction


C.TE.035.2
C.TE.040.2

Create Integration Test Scenarios


Perform Integration Test

C.ACT.PSTC Perform System Test - Construction


C.TE.025.2

Create System Test Scenarios

B.TE.040

Prepare/Update System Test Script

C.TE.068
C.TE.070.2
C.RA.055.2
B.TE.019.2

Configure System Test Environment


Perform System Test
Document Business Procedures
Collect, Assess and Refine KPI Measurements

C.TE.112
C.TE.115

Prepare for CRP 3 Workshop


Conduct CRP 3 Workshops/ System Test

C.TE.117.1

Collect, Assess and Refine KPI Measurements

B.TE.050
C.TE.120

Develop Systems Integration Test Script


Perform Systems Integration Test

C.TA.140
C.PT.080
C.PT.090

Assess Performance Risks


Create Performance Test Transaction Programs
Create Test Database Load Programs

C.ACT.CSIT Conduct Systems Integration Test


C.TE.090
C.TE.100

Develop Systems Integration Test Scenarios


Perform Systems Integration Test

C.ACT.PPT Prepare for Performance Testing


C.PT.070

Build Performance Test Scripts and Programs

OUM to AIM Mapping

PHASE ACTIVITY

OUM
TASK ID

OUM TASK NAME

C.PT.080

Construct Performance Test Environment and Database

C.PT.090

Conduct Performance Test Dress Rehearsal

Comparable Comparable ABF Task Name


ABF
Task ID
C.PT.100
C.PT.110

Construct Performance Test Database


Prepare Performance Test Environment

C.TA.150

Define System Management Procedures

B.TA.090
B.TA.100
B.TA.120
B.TA.110

Define Application and Database Server Architecture


Define and Propose Architecture Subsystems
Define Platform and Network Architecture
Define System Capacity Plan

C.PM.030

Develop Transition and Contingency Plan

C.PM.020

Design Production Support Infrastructure

B.CV.040

Perform Conversion Data Mapping

B.CV.050
B.CV.060
B.CV.070

Define Manual Conversion Procedures


Design Conversion Programs
Prepare Conversion Test Plans

C.CV.080
C.CV.090
C.CV.100

Develop Conversion Programs


Perform Conversion Unit Tests
Perform Conversion Business Object Tests

C.CV.110

Perform Conversion Validation Tests

D.CV.120
D.CV.130

Install Conversion Programs


Convert and Verify Data

C.DO.060
C.DO.070
C.DO.080

Publish User Reference Manual


Publish User Guide
Publish Technical Reference Manual

C.ACT.PT Prepare for Transition


C.TA.100
C.TA.110
C.TA.150

Define System Management Procedures


Define Operational Testing Plan
Define Final Platform and Network Architecture

C.TA.160

Define System Capacity Plan

C.ACT.PCO Prepare for Cutover


C.TS.020.2
C.TS.030
C.TS.040

Define Cutover Strategy


Develop Installation Plan
Design Production Support Infrastructure

C.ACT.TI Test Infrastructure


C.TA.120
C.TA.130
C.TA.140

Conduct Operational Testing


Conduct Backup and Recovery Test
Conduct Disaster Recovery Test

C.ACT.PACDC Prepare to Acquire and Convert Data - Construction


C.CV.027.2
C.RA.170.2
C.CV.035.2
C.CV.040.2
C.CV.050.2

Perform Data Mapping


Conduct Data Quality Assessment
Define Manual Conversion Procedures (Initial Load)
Design Conversion Components (Initial Load)
Prepare Conversion Test Plans (Initial Load)

C.ACT.ACDC Acquire and Convert Data-Construction


C.CV.055.2
C.CV.060.2
C.CV.062.2
C.CV.063.2
C.CV.064.1
C.CV.065.1
C.CV.068.1

Implement Conversion Components (Initial Load)


Perform Conversion Component Unit Test (Initial Load)
Perform Conversion Component Business Object Test
(Initial Load)
Perform Conversion Component Validation Test (Initial
Load)
Install Conversion Components (Initial Load)
Convert and Verify Data (Initial Load)
Clean Data

C.ACT.PD Produce Documentation


C.DO.060
C.DO.070
C.DO.080
C.DO.100

Publish User Reference Manual


Publish User Guide
Publish Technical Reference Material
Produce Online Help

C.ACT.DCMRCCC Deploy Change Management Roadmap / Communication Campaign - Construction


C.OCM.150.3 Conduct Change Management Roadmap / Communication
Campaign

OUM to AIM Mapping

PHASE ACTIVITY

OUM
TASK ID

OUM TASK NAME

Comparable Comparable ABF Task Name


ABF
Task ID

C.OCM.155.2 Monitor Change Management Roadmap / Communication


Campaign Effectiveness

C.ACT.DEUT Design End-User Training


C.TR.060
C.TR.070

Conduct User Learning Needs Analysis


Develop User Learning Plan

C.AP.130
C.AP.140

Conduct User Learning Needs Analysis


Develop User Learning Plan

D.AP.150
D.AP.160

Develop User Learningware


Prepare User Learning Environment

C.TE.130

Perform User Acceptance Test

C.PT.120
C.PT.130

Execute Performance Test


Create Performance Test Report

D.CV.120
D.CV.130

Install Conversion Programs


Convert and Verify Data

C.ACT.BEUT Build End-User Training


C.TR.080
C.TR.090

Develop User Learningware


Prepare User Learning Environment

C.ACT.IOCM Initial Operational Capability Milestone Summary


C.PMC.IOCM Initial Operational Capability Milestone

D Transition
D.ACT.SUAT Support User Acceptance Test
D.TE.105
D.TE.110
D.TE.120

Prepare Users for Testing


Prepare Acceptance Test Environment
Support Acceptance Test

D.ACT.CPTST Conduct Performance Test


D.PT.100
D.PT.110

Execute Performance Test


Create Performance Test Report

D.ACT.CDT Convert Data - Transition


D.CV.064.2
D.CV.065.2
D.CV.068.2

Install Conversion Components (Initial Load)


Convert and Verify Data (Initial Load)
Clean Data

D.ACT.DCMRCCT Deploy Change Management Roadmap / Communication Campaign - Transition


D.OCM.150.4 Conduct Change Management Roadmap / Communication
Campaign
D.OCM.155.3 Monitor Change Management Roadmap / Communication
Campaign Effectiveness

D.ACT.TEUT Train End Users - Transition


D.TR.100.2

Conduct User Learning Events

D.AP.170

Conduct User Learning Events

D.PM.040
D.CV.120
D.PM.050
D.PM.060
D.PM.070
D.PM.080
E.PM.120

Prepare Production Environment


Install Conversion Programs
Set Up Applications
Implement Production Support Infrastructure
Verify Production Readiness
Begin Production
Decommission Former Systems

D.ACT.FD Finalize Documentation


D.DO.110

Finalize Documentation

D.ACT.GP Go Production
D.TS.050

Prepare Production Environment

D.TS.052
D.TS.058
D.TS.060
D.TS.070

Implement Production Support Infrastructure


Verify Production Readiness
Go Production
Shut Down Legacy System

D.ACT.SIP System in Production Milestone Summary


D.PMC.SIP

System in Production Milestone

OUM to AIM Mapping

PHASE ACTIVITY

OUM
TASK ID

OUM TASK NAME

Comparable Comparable ABF Task Name


ABF
Task ID

E Production
E.ACT.MPSP Manage Production System Performance
E.PT.120

Conduct Production Performance Management

E.PM.090

Measure System Performance

E.AP.180
E.PM.100

Conduct Effectiveness Assessment


Maintain System

E.PM.100

Maintain System

E.ACT.EPS Evaluate Production System


E.PS.010
E.PS.050

Audit System
Analyze Problems

E.ACT.RPP Resolve Production Problems


E.PS.060

Monitor and Respond to System Problems

E.ACT.DCMRCCP Deploy Change Management Roadmap / Communication Campaign - Production


E.OCM.150.5 Conduct Change Management Roadmap / Communication
Campaign
E.OCM.155.4 Monitor Change Management Roadmap / Communication
Campaign Effectiveness

E.ACT.PF Plan for Future


E.PS.135
E.PS.140

Determine Future Functional Enhancements


Plan Enhancements

E.PM.130

E.ACT.SO Sign Off Milestone Summary


D.PMC.SO

Sign Off Milestone

Propose Future Business Direction

También podría gustarte