CENTRAL POLLUTION CONTROL BOARD

[Questionnaire for Baseline surveyfor Pilot ETS]

Contents
Section 1: General Section
Section A: Survey Background
Section B: Certificates
Section C: Industry Description .......................................................................................... 5
Section D: Industry Fuel Consumption .................................................................................. 8
Section E: Product Outputs ............................................................................................. 15
Section F: Ambient Air Monitoring ..................................................................................... 17
Section G: DG Sets or Gas Based Alternate Energy Sources ....................................................... 18
Section I : Technical Details ............................................................................................ 21
Section J: Stack Details ................................................................................................. 23
Section K: Stack Attachments (for each Parallel Chain)......................................................... 26
Section L1: Boilers .....................................................................................................
Section L2: Furnaces ..................................................................................................
Section L3: Thermopacks/Thermic Fluid Heaters ................................................................
Section M1: Gravity Settling Chamber .............................................................................
Section M2: Single Cyclone ...........................................................................................
Section M3: Multi Cyclone ............................................................................................
Section M4: Bag filter .................................................................................................
Section M5: ESP ........................................................................................................
Section M6: Scrubber .................................................................................................

28
30
32
33
34
35
36
39
41

**Section O1: Monitoring Data from sampling at Inlet ........................................................... 44


**Section O2: Monitoring Data from sampling at intermediate sampling port ............................... 45
**Section O3: Monitoring Data from sampling at Outlet ......................................................... 46
Section P: Stack Continuous Emissions Monitoring System ........................................................ 47
**Section Q: Ringelmanns Measurement ............................................................................. 49

Commentsp1:

IndustryID: 

Page1

CENTRAL POLLUTION CONTROL BOARD


[Questionnaire for Baseline surveyfor Pilot ETS]

EmissionsTradingSchemeBaselineSurvey:
I.GeneralSection
Tobefilledbytheenvironmentallaboratory.
ForOfficeUSEONLY
IndustryID
Dateofquestionnaire
reviewing
(DD/MM/YY)

|___|___|___|___|___|___| Reviewer'sname

|__|__|/|__|__|/|__|__|

Numberofmistakes
found

Isfollowupneeded?

|___|___|___|

Yes/No

Generalinstructions
TheGeneralSectionshouldbefilledENTIRELYbytheSurveyorswithoutanyunjustifiedmissingvalues.It
shouldbenextreviewedbytheMonitor,BEFORELEAVINGTHEINDUSTRY.
EverythinginthequestionnaireshouldbewritteninUPPERCASEandNEATLY.Useblueinkpen.
Donotleaveblankswithoutjustification.AlwayswriteNotApplicable,etcifthequestionsdoesnotapplyto
thisindustry

Inthequestionnaire:Last12monthsreferstoTHEMOSTRECENT12monthperiodthattheindustrycan
providegooddatafor.Themonthsshouldbeclearlyspecified.
Donotwriteoutsidetheboxesgiven.Comments,exceptionscanbewrittenintheCommentsfieldoneach
pageorintheadditionalpageattheendofthegeneralsection.
Leavetwodigitsbehindthedecimalpoint.Forexample,21.56302shouldbewrittenas21.56
WritedowntheIndustryIDonthefootofEVERYpage.
Thumbrulesshouldbeavoided.Ifmustuseit,writedowntheruleusedincommentsclearly
Alwayswritedowntheunitofmeasurement.
Allquestionsthatmustbeobservedormeasuredbythesurveyorstartwith**.Allotherquestionsrequire
responsesfromtheindustry.Ifanentiresectionismarked**,everyquestionrequires
measurement/observation.

Commentsp2:

IndustryID: 

Page2

CENTRAL POLLUTION CONTROL BOARD


[Questionnaire for Baseline surveyfor Pilot ETS]

SectionA:Surveybackground
Enter:|___|___|hrs|___|___|mins
**Time(24hr)

Leave:|___|___|hrs|___|___|mins
**Date

|___|___|/|___|___|/20|___|___|

**SurveyInstitution

Industrynameand
address
Onrecord

District

State

Telephonenumber

**GPSCoordinates
MarkGPSwaypoint
andrecorddetailsat
factorygate.

EmailAddress

2.Latitude:N|___||___||___||___|.|___||___||___|
3.Longitude:E|___||___||___||___|.|___||___||___|
4.Elevation(ifavailable):_________________________

Commentsp3:

IndustryID: 

Pincode

Page3

CENTRAL POLLUTION CONTROL BOARD


[Questionnaire for Baseline surveyfor Pilot ETS]

**SectionB:Certifications
Name

Designation

1.
2.
Surveyteam

members
3.

4.

5.

6.

Asrepresentativeof______________________(surveyinstitution/lab),Icertifythatthe
informationcollectedisreportedaccurately.
Surveyor
Nameofsignatory

Certification
Designationofsignatory

Signature

Asafieldmonitor,Icertifythattheinformationcollectedisreportedaccurately.
FieldMonitor
Name:
Signature:Date:|___|___|/|___|___|/2012
TheSurveyor/EnvironmentalLabpresentisconductingthissurveyonbehalfoftheCentralPollutionControl
Board.Thepurposeofthesurveyistostudyindustrialpollutionemissionsandmeasurestakentoabatethese
emissions. The survey information will be used by the Central Pollution Control Board to design future
programmesandwillbekeptconfidential.
Industry
Name
Designation
ContactNumber
respondents

Personswho
answered

questions
Asrepresentativeof______________________(industryname),Icertifythatthe
informationprovidedhereinistrueandcorrect.
Nameofsignatory

Industry
Certification
Signatureofsignatory

Companystamp

Commentsp4:

IndustryID: 

Page4

CENTRAL POLLUTION CONTROL BOARD


[Questionnaire for Baseline surveyfor Pilot ETS]

Section C: Industry Description


Wheneverpossible,pleasecheckdocumentstoverifyresponses.Notethatpast12monthsreferstothemost
recent12monthsforwhichthereisgooddata.

C1.

Industryname

C2.

Address:
Industryaddress(fromindustry

records/businesscard)

Attachabusinesscardtothegeneral
Phone:
section

|__|__|__|__|__|__|__|__|__|__|__|__|
1. Yes skiptoC5andcontinuesurvey
2. No,poweroutage/powercycling
3. No,seasonalclosure/monsoon

4. No,industrypermanentlyclosed

5. No,SPCBClosure
AnswerC4
6. No,notinnormalproductiondueto

C3.

Isindustryoperating&innormal
productionatthetimeofsurvey
visit?
ONLYconductsurveyandtake
samplesifinproductionthatwould
producethelevelofemissionexpected 7.
oftheindustryunderordinary
operatingconditions
8.

No,notinproductiondueto

only
andEND
SURVEY
without
taking
samples

No,other(specify):

C4.

Iftheindustryisnotinoperation,
accordingtothemanager,onwhat
dateistheindustryexpectedtobe
operating?

1. Daterange:
2.

1.

Yes,whoisthecommonowner/parentgroup

Industryclosedpermanently.

C5.

Arethereotherindustrialunitsinthe
stateownedbythesame
owner/parentgroupasthisindustry?

CommonOwner
OR
ParentGroup

99.
2.

C6.

CompanyIdentificationNumber
(CIN#):[Example:U27200MH1973P]

Commentsp5:

IndustryID: 

No
Don'tknow

Page5

CENTRAL POLLUTION CONTROL BOARD


[Questionnaire for Baseline surveyfor Pilot ETS]

C7.

Isthisindustrypublicorprivate
sector?

1.

Publicsector(governmentowned)
Privatesector(privatelyowned)

2.

NICcode(ifavailable):|___|___|___|___|___|

Cement
2. Chemicals
3. Distilleries
4. Dyemanufacturing
5. Engineering
6. FoodandBreweries
7. Foundries
8. IronandSteel
9. MineralProcessing
10. Paper
11. Petrochemicals
12. Pharmaceuticals
13. Power
14. Refinery
15. RollingMill
16. Textiles(dyeingand/orprinting)
17. Other(specify)____________
1. Red
2. UltraRed
3. Orange
4. Green
1. Smallscale
2. Mediumscale
3. Large-scale
1.

C8.

SectoroftheIndustry(Textiles,
Cement,etc.)PleasefillintheNICcode
ANDcheckonebox.Fillintheprimary
sector,asrecordedonthe
environmentalconsent.

C9.

CategoryoftheIndustry(Pollution
category)

C10.

Size[basedontotalamountofcapital
investment]Asrecordedonthe
environmentalconsent.

C11.

NumberofShiftsinthePlant
(Pleasefillinthetimingofeachshift,
in24hrtime)

C12.

NumberofWorkdaysperyear

Noofshifts:|__|__|
Timing:

1.
2.
3.
4.
5.

[ ][ ] : [ ] [ ]
[ ][ ] : [ ] [ ]
[ ][ ] : [ ] [ ]
[ ][ ] : [ ] [ ]
[ ][ ] : [ ] [ ]

to
to
to
to
to

[
[
[
[
[

]
]
]
]
]

[
[
[
[
[

]:[][]
]:[][]
]:[][]
]:[][]
]:[][]

Commentsp6:

IndustryID: 

|___|___|___|

Page6

CENTRAL POLLUTION CONTROL BOARD


[Questionnaire for Baseline surveyfor Pilot ETS]

C13.

1.

Werethereanymonthswhenthe
unitwasnotinproductioninthelast
twelvemonths?Ifso,notedownthe
monthsthatwereclosed.

2.

No,notclosedforanymonth
Yes,closedfor|___|___|monthsoutofthelast

12months.Monthsclosedare:

(ex.Jul2011;Jan2012)
Howmanystaffdidtheindustryemploydirectlyorcontract,onaverage,overthelast12months?(Fill
inaverageemploymentbycategory.Iffiguresforlast12monthsnotknown,fillfiguresapplicableto
lastfiscalyear.)
Numberofstaff
Stafftype

C14.

Managementstaff
Includeallactiveownersas
management.
Nonmanagementworkers&
contractlabours

BookValueoffixedassets(excludingland):
Asofdate:|___|___|/|___|___|/||___||___||___||___|
BEFOREtotaldepreciation(GROSSBLOCK):

C15.

Whatisthetotalindustryinvestment
inplant&machinery&building,
excludingland?
(Fillindatafromthemostrecentdate
possible.Fillallfieldsforwhichdatais
available)

Rs.:Lakh/Crore

AFTERtotaldepreciation(NETBLOCK):

Rs.:Lakh/Crore

EstimatedMarketValue:
Asofdate:|___|___|/|___|___|/|___||___||___||___|

Rs.:Lakh/Crore

C16.

Whatwasthegrosssalesrevenue
1. Financialyear0910:Rs.:Lakh/Crore
(i.e.turnover)inthelastthree
2. Financialyear1011:Rs.:Lakh/Crore
financialyears?
(DraftfiguresacceptableforFY1112)
3. Financialyear1112:Rs.:Lakh/Crore
TotalNumberofStacks(NOT

includingDGsetstacks)
AgeofthePlant:Whatwasthefirst
|___|___|___|___|
yearofIndustryOperation?

C17.
C18.
C19.

1.

IsindustryISO9001certified?

2.
1.

C20.

IsindustryISO14001certified?

C21.

2.
Areaoftheindustry(insquareyards)

Yes
No
Yes
No

Commentsp7:

IndustryID: 

Page7

CENTRAL POLLUTION CONTROL BOARD


[Questionnaire for Baseline surveyfor Pilot ETS]

Section D: Industry Fuel Consumption


1.
2.
3.
4.
5.
6.
7.
8.

D1.

Pleaselistallfuelsburntinthisindustry
inthelast12months.Pleasecheckallthat
apply.

9.
10.
11.
12.
13.
14.
15.
16.
17.
18.

Coal (Indian)
Coal (Imported)
Coke
Lignite
Pet Coke
Wood
Bagasse
Rice Husk
Biomass (Other) Specify ________________
Other Solid Fuel (specify) ________
Crude Oil
LDO (Light Diesel Oil)
Fuel Oil (Residual Fuel Oil)
Furnace Oil
Diesel (Diesel/High Speed Diesel)
LSHS (Low Sulphur Heavy Stock)
Other Liquid Fuel (specify) _________
Gaseous Fuels (specify) ___________

Commentsp8:

IndustryID: 

Page8

CENTRAL POLLUTION CONTROL BOARD


[Questionnaire for Baseline surveyfor Pilot ETS]

D2.1 InformationonFuel_____(1,2,3,4,etc)outof_______(totalnumberoffuels)

a. Whichfueliscoveredinthistable
1. No fuel Skip section D2.1 and proceed to Section E
?(Tickonethatapplies.Iffuelis
2. Coal (Indian)
biomassotherthanwood,filltypeof
3. Coal (Imported)
biomass.)
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.

b.

Coke
Lignite
Pet Coke
Wood
Bagasse
Rice Husk
Biomass (Other) Specify ________________
Other Solid Fuel (specify) ________
Crude Oil
LDO (Light Diesel Oil)
Fuel Oil (Residual Fuel Oil)
Furnace Oil
Diesel (Diesel/High Speed Diesel)
LSHS (Low Sulphur Heavy Stock)
Other Liquid Fuel (specify) _________
Gaseous Fuels (specify) ___________

Whichsuppliersdoyoupurchasethis
fuelfrom?Pleaselistthethreemain 1.
suppliersonly.

Name

Address

2.

c.

3.
Ifyouhaveafuelanalysisreportfor
thisfuel,pleaseattachittothe
Attached(Circleone):Yes/No
survey.

Commentsp9:

IndustryID: 

Page9

CENTRAL POLLUTION CONTROL BOARD


[Questionnaire for Baseline surveyfor Pilot ETS]

Ifthefuelconsumptiondataisonly 1. data below is for the fuel indicated above only (most
availableforamixtureoffuel,
of the time)
indicatewhatthedatabelow
2. data below is for the above indicated fuel and another
represents.
fuel
Getseparatedataforeachfuel
3. data below not filled because separate data for this
fuel not available
wheneverpossible
Whatisthemonthwiseconsumptionofthisfuelforthelast12months?(Pleasewriteincomments
whetherthedataisofactualfuelconsumptionorfuelpurchase)
UnitsofMeasurement

Month/Year
Consumption(Units)(Onlynumericvalues)

(|___|___|/|1|___|)

(|___|___|/|1|___|)

(|___|___|/|1|___|)

(|___|___|/|1|___|)

(|___|___|/|1|___|)

(|___|___|/|1|___|)

(|___|___|/|1|___|)

(|___|___|/|1|___|)

(|___|___|/|1|___|)

(|___|___|/|1|___|)

(|___|___|/|1|___|)

(|___|___|/|1|___|)

f.

WhatistheANNUALconsumptionofthisfuelforthelastfouryears?
(Noteincommentsanyunusualeventsthatmightaccountforfluctuation,suchasmonthsclosed)

1. Calendar Year
FormatoftheYear

d.

e.

2.

Year

Financial Year

Consumption
(Units)

2012
2011
2010
2009

UnitofMeasurement

TotalCost(Rs)

Commentsp10:

IndustryID: 

Page10

CENTRAL POLLUTION CONTROL BOARD


[Questionnaire for Baseline surveyfor Pilot ETS]

D2.2 InformationonFuel_____(1,2,3,4,etc)outof_______(totalnumberoffuels)

a.
1. No fuel Skip section D2.2 and proceed to Section E
Whichfueliscoveredinthistable?
2. Coal (Indian)
(Tickonethatapplies.Iffuelis
3. Coal (Imported)
biomassotherthanwood,filltypeof
4. Coke
biomass.)

Lignite
6. Pet Coke
7. Wood
8. Bagasse
9. Rice Husk
10. Biomass (Other) Specify ________________
11. Other Solid Fuel (specify) ________
12. Crude Oil
13. LDO (Light Diesel Oil)
14. Fuel Oil (Residual Fuel Oil)
15. Furnace Oil
16. Diesel (Diesel/High Speed Diesel)
17. LSHS (Low Sulphur Heavy Stock)
18. Other Liquid Fuel (specify) _________
19. Gaseous Fuels (specify) ___________
5.

b.

Whichsuppliersdoyoupurchasethis 1.
fuelfrom?Pleaselistthethreemain
suppliersonly.
2.

Name

Address

3.
c.

Ifyouhaveafuelanalysisreportfor
thisfuel,pleaseattachittothe
Attached(Circleone):Yes/No
survey.

Commentsp11:

IndustryID: 

Page11

CENTRAL POLLUTION CONTROL BOARD


[Questionnaire for Baseline surveyfor Pilot ETS]
d.

e.

Ifthefuelconsumptiondataisonly 1. data below is for the fuel indicated above only (most
availableforamixtureoffuel,
of the time)
indicatewhatthedatabelow
2. data below is for the above indicated fuel and another
represents.
fuel
Getseparatedataforeachfuel
3. data below not filled because separate data for this
fuel not available
wheneverpossible
Whatisthemonthwiseconsumptionofthisfuelforthelast12months?(Pleasewriteincomments
whetherthedataisofactualfuelconsumptionorfuelpurchase)
UnitofMeasurement

Month/Year

Consumption(Units)(OnlyNumericValues)

(|___|___|/|1|___|)

(|___|___|/|1|___|)

(|___|___|/|1|___|)

(|___|___|/|1|___|)
(|___|___|/|1|___|)

(|___|___|/|1|___|)

(|___|___|/|1|___|)

(|___|___|/|1|___|)

(|___|___|/|1|___|)

(|___|___|/|1|___|)

(|___|___|/|1|___|)

(|___|___|/|1|___|)

f.

WhatistheANNUALconsumptionofthisfuelforthelastfourCALENDARyears?

FormatoftheYear
1. Calendar Year
2.

Year

Financial Year
UnitofMeasurement

TotalCost(Rs)

2012

Consumption
(U it )

2011

2010

2009

Commentsp12:

IndustryID: 

Page12

CENTRAL POLLUTION CONTROL BOARD


[Questionnaire for Baseline surveyfor Pilot ETS]

D2.3InformationonFuel_____(1,2,3,4,etc)outof_______(totalnumberoffuels)

No fuel Skip section D2.3 and proceed to Section E


2. Coal (Indian)
3. Coal (Imported)
4. Coke
5. Lignite
6. Pet Coke
7. Wood
8. Bagasse
9. Rice Husk
10. Biomass (Other) Specify ________________
11. Other Solid Fuel (specify) ________
12. Crude Oil
13. LDO (Light Diesel Oil)
14.Fuel Oil (Residual Fuel Oil)
15.Furnace Oil
16.Diesel (Diesel/High Speed Diesel)
17. LSHS (Low Sulphur Heavy Stock)
18. Other Liquid Fuel (specify) _________
19.Gaseous Fuels (specify) ___________

a.

Whichfueliscoveredinthistable?
(Tickonethatapplies.Iffuelis
biomassotherthanwood,filltypeof
biomass.)

b.

Whichsuppliersdoyoupurchasethis 1.
fuelfrom?Pleaselistthethreemain
suppliersonly.

1.

Name

Address

2.
3.

c.

Ifyouhaveafuelanalysisreportfor
thisfuel,pleaseattachittothe
Attached(Circleone):Yes/No

Commentsp13:

IndustryID: 

Page13

CENTRAL POLLUTION CONTROL BOARD


[Questionnaire for Baseline surveyfor Pilot ETS]

Ifthefuelconsumptiondataisonly 1. data below is for the fuel indicated above only (most
availableforamixtureoffuel,
of the time)
indicatewhatthedatabelow
2. data below is for the above indicated fuel and another
represents.
fuel
Getseparatedataforeachfuel
3. data below not filled because separate data for this
fuel not available
wheneverpossible

Whatisthemonthwiseconsumptionofthisfuelforthelast12months?(Pleasewriteincomments
whetherthedataisofactualfuelconsumptionorfuelpurchase)
UnitofMeasurement

Month
Consumption(Units)(OnlyNumericValues)

(|___|___|/|1|___|)

(|___|___|/|1|___|)

(|___|___|/|1|___|)

(|___|___|/|1|___|)

(|___|___|/|1|___|)

(|___|___|/|1|___|)

(|___|___|/|1|___|)

(|___|___|/|1|___|)

(|___|___|/|1|___|)

(|___|___|/|1|___|)

(|___|___|/|1|___|)

(|___|___|/|1|___|)

f.

WhatistheANNUALconsumptionofthisfuelforthelastfourCALENDARyears?
(Noteincommentsanyunusualeventsthatmightaccountforfluctuation,suchasmonthsclosed)
FormatoftheYear 1. Calendar Year

e.

2.

Year
2012
2011
2010
2009

Financial Year

Consumption(Units) UnitofMeasurement

TotalCost(Rs)

Iftherearemorethanthreefuels,pleasefilloutandattachcopiesoftheSectionDExtension,
availableintheGeneralSectionExtension.

Commentsp14:

IndustryID: 

Page14

CENTRAL POLLUTION CONTROL BOARD


[Questionnaire for Baseline surveyfor Pilot ETS]

Section E: Product Outputs


E0.

TotalNumberofProducts:|____|____|
Whatproductshastheindustryproducedinthelast12months,inwhatquantity?Pleasefillouttheentiretable
Iftherearemorethan5products,ONLYLISTthetopthreeproductsintermsofannualsalesvalue.Fillfiguresforthemostrecent12months
From:|___|___|/|2|0|_1_|___|to|___|___|/|2|0|1|___|

E1.0 Latest12monthperiod:

Product2

Product3

E1.1. ProductName

E1.2. UnitsofQuantityforMeasuringthisProduct

E1.3. ProductioninMonth1(|___|___|/|1|___|)

E1.4. ProductioninMonth2(|___|___|/|1|___|)

E1.5. ProductioninMonth3(|___|___|/|1|___|)

E1.6. ProductioninMonth4(|___|___|/|1|___|)

E1.7. ProductioninMonth5(|___|___|/|1|___|)

E1.8. ProductioninMonth6(|___|___|/|1|___|)

E1.9. ProductioninMonth7(|___|___|/|1|___|)

E1.10. ProductioninMonth8(|___|___|/|1|___|)

E1.11. ProductioninMonth9(|___|___|/|1|___|)

E1.12. ProductioninMonth10(|___|___|/|1|___|)

E1.13. ProductioninMonth11(|___|___|/|1|___|)

E1.14. ProductioninMonth12(|___|___|/|1|___|)

Commentsp15:

IndustryID: 

Product1

Page15

CENTRAL POLLUTION CONTROL BOARD


[Questionnaire for Baseline surveyfor Pilot ETS]
E2.0 WhatistheQuantityofAnnualProductioninlast4years
E2.1 FormatoftheYear
1. Calendar Year 2. Financial Year

E2.2
E2.3
E2.4
E2.5
E2.6

Year/Product
UnitsofQuantityforMeasuringthis
Product

2012(NumericValueonly)

2011(NumericValueonly)

2010(NumericValueonly)

2009(NumericValueonly)

Product1

Product2

Product3

Commentsp16:

IndustryID: 

Page16

Emissions Trading Scheme Baseline Survey (Technical Section)

Section F: Ambient Air Monitoring


Notevaluesasrecordedbytheindustryinmostrecentambientairmonitoring.Ifanindustryhasnotrecordeda
particularvariable,writeNotApplicable/NA
F0.NumberofAmbientMonitoring
Locations(onetimereadingsAND
permanentstations)

Zero Skip to the Section G


Other (specify) ____________

1.
2.

Fill in Section F

PleasefillinthemostrecentambientairdataforeveryAmbientAirMonitoringlocationintheindustry.If
therearemorethan5locations,fillinandattachtheSectionFExtensionAdditionalPages.
Location5
No.
Parameter
Location1
Location2
Location3
Location4

AmbientAir
Location
F1.

Identifier(if
any):
Permanent
F1b. monitoring
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
station?
F2.

Dateof
monitoring

|___|___|/
|___|___|/
20___

|___|___|/
|___|___|/20___

|___|___|/
|___|___|/
20___

|___|___|/
|___|___|/20___

F3.

Timeof
monitoring

|___|___|hrs|__||
___|mins

|___|___|hrs|___||___
|mins

|___|___|hrs|__||
___|mins

|___|___|hrs|__||_
__|mins

F4.
F5.
F6.
F7.
F8.
F9.
F10.
F11.

TotalSPM
concentration
(ifavailable)
PM10conc.
PM2.5conc.
SO2conc.
NOXconc.
NO2conc.
COconc.
CO2conc.

|___|___|/
|___|___|/
20___

|___|___|hrs|___|
|___|mins

Commentsp17:

IndustryID:StackID:

Page17

Emissions Trading Scheme Baseline Survey (Technical Section)

Section G: DG Sets or Gas Based Alternate Energy Sources


FillinthefollowingquestionsforallDGsetsintheindustry.
G0.
1. Zero Skip to the end of the General Section
Number
ofDGsets 2. One or more (specify) |__|__| Fill in Section G
PleasefillinthemostdataforeveryDGsetintheindustry.Iftherearemorethan4DGsets,fillinandattachthe
SectionGExtensionintheAdditionalPages.
Preferred
DGset1
DGset2
DGset3
DGset4
Units
No. Parameter
Unit

DGsetstackheight
DGsetstack
diameter

mm

G3.

DGSetCapacity

G4.
G5.
G6.

DGSetFuel
DGSetfuelfeedrate
Sulphur%infuel
|__|__|%
Hours/monthon
avg.thisDGset
operates
YearthisDGSetwas
installed

FuelName

G1.
G2.

G7.

G8.
G9.

|__|__|%

|__|__|%

|__|__|%

WhatistheBharat
ratingofthisDGSet?

Diesel/Fuel
G10. consumptioninlast
12months
DGenergy
G11. productioninlast12
months
Last12months
G12. periodinG10and
G11

|__|__|/|1|__|

|__|__|/|1|__|

|__|__|/|1|__|

|__|__|/|1|__|

to

to

to

to

|__|__|/|1|__|

|__|__|/|1|__|

|__|__|/|1|__|

|__|__|/|1|__|

KVA or KW
rating
Fuel Name

kg/hr

Hours/month

Year

Year

N/A

Bharat Rating
(ex. Bharat I,
Bharat IV)

Kg/year

KW-h/year

MM/YYto MM/YY to
MM/YY
MM/YY

Commentsp18:

IndustryID:StackID:

Page18

Emissions Trading Scheme Baseline Survey (Technical Section)

Commentsp19:

IndustryID:StackID:

Page19

Emissions Trading Scheme Baseline Survey (Technical Section)

EmissionsTradingSchemeBaselineSurvey:
II.Technical/StackSection
Tobefilledbytheenvironmentallaboratory.

ForOfficeUSEONLY
IndustryID
Dateofquestionnaire
reviewing(DD/MM)

|__|__|__|__|__|__|
|__|__|/|__|__|/2013

Reviewer'sname

Numberofmistakes
found

|__|__|

Generalinstructions
TheGeneralSectionshouldbefilledENTIRELYbytheSurveyorswithoutanyunjustifiedmissingvalues.Itshouldbe
nextreviewedbytheMonitor,BEFORELEAVINGTHEINDUSTRY.
EverythinginthequestionnaireshouldbewritteninUPPERCASEandNEATLY.Useblueinkpen.
Donotleaveblankswithoutjustification.AlwayswriteNotApplicable,etcifthequestionsdoesnotapplytothis
industry
Donotwriteoutsidetheboxesgiven.Comments,exceptionscanbewrittenintheCommentsfieldoneachpageor
intheadditionalpageattheendofthegeneralsection.
WritedowntheIndustryIDonthefootofEVERYpage.
Thumbrulesshouldbeavoided.Ifmustuseit,writedowntheruleusedincommentsclearly
Alwayswritedowntheunitofmeasurement.
Allquestionsthatmustbeobservedormeasuredbythesurveyorstartwith**.Allotherquestionsrequireresponses
fromtheindustry.Ifanentiresectionismarked**,everyquestionrequiresmeasurement/observation.

Commentsp20:

IndustryID:StackID:

Page20

Emissions Trading Scheme Baseline Survey (Technical Section)

SectionH:Surveybackground
SurveyAttempt:Sampling&Questionnaire
Enter:|__|__|hrs|__|__|mins

Time(24hr)
Leave:|__|__|hrs|__|__|mins
Date(mm/dd/yyyy)
|__|__|/|__|__|/2013
SurveyInstitution

Industryname

Telephonenumber
EmailAddress

Section I :Technical Details


I.1.
I.2
I.3.

NumberofStacksinthe
|____|____|
IndustrywithPMconsent
NumberofStacksinthe
IndustryforwhichPMconsent
|____|____|
notrequired
ForeachstackintheindustrycountedinI1(NOTincludingDGsetstacksornon
PMprocessstacks),pleaselistthefollowing:
Howdoestheindustry
Processstack/Combustion
JPALStackID
describethisstack?
stack(circleone)

IfCombustionStack,mentionthe
typeoffuel
1.

a.

S|0|1|

Process/Combustion(Flue)

2.
3.
1.

b.

S|0|2|

Process/Combustion(Flue)

2.
3.
1.

c.

S|0|3|

Process/Combustion(Flue)

2.
3.
1.

d.

S|0|4|

Process/Combustion(Flue)

2.
3.
1.

e.

S|0|5|

Process/Combustion(Flue)

2.
3.
1.

f.

S|0|6|

Process/Combustion(Flue)

2.
3.
1.

g.

S|0|7|

Process/Combustion(Flue)

2.
3.

Commentsp21:

IndustryID:StackID:

Solid Fuel
Liquid Fuel
GaseousFuel
Solid Fuel
Liquid Fuel
Gaseous Fuel
Solid Fuel
Liquid Fuel
Gaseous Fuel
Solid Fuel
Liquid Fuel
Gaseous Fuel
Solid Fuel
Liquid Fuel
Gaseous Fuel
Solid Fuel
Liquid Fuel
Gaseous Fuel
Solid Fuel
Liquid Fuel
Gaseous Fuel

Page21

Emissions Trading Scheme Baseline Survey (Technical Section)

1.
h.

S|0|8|

Process/Combustion(Flue)

2.
3.
1.

i.

S|0|9|

Process/Combustion(Flue)

2.
3.
1.

j.

S|1|0|

Process/Combustion(Flue)

2.
3.

Solid Fuel
Liquid Fuel
Gaseous Fuel
Solid Fuel
Liquid Fuel
Gaseous Fuel
Solid Fuel
Liquid Fuel
Gaseous Fuel

Commentsp22:

IndustryID:StackID:

Page22

Emissions Trading Scheme Baseline Survey (Technical Section)

Section J: Stack Details


StackdetailsshouldonlybefilledinforstacksburningSOLIDorLIQUIDfuels
J.1

ThisSectionisbeingfilledoutforthe
stackwiththefollowing
StackID:

S|____|____|

J.2

StackHeight(fromthegroundlevel)

J.3

Numberofsamplingportsatthestack
outlet

|____|____|samplingportsatstackoutlet

J.4

NumberofAPCDParallelChains

|_____|____|APCDParallelChains

Unit(Specify)

PreferredUnit
m

Commentsp23:

IndustryID:StackID:

Page23

J.9 OverallStackDiagram(Pleaselabelallsamplingpointsclearly)

a. ParallelChain1

b.ParallelChain2

Commentsp24:

IndustryID:StackID:

STACK

Emissions Trading Scheme Baseline Survey (Technical Section)

Page24

Emissions Trading Scheme Baseline Survey (Ringelmanns Section)

Atthispoint,attachthenumberofstackattachmentsheets(SectionK)correspondingtothe
numberofparallelchainslistedinJ.4.AfterfillingoutsectionKforeachparallelchainonthis
stack,attachthenumberofequipmentsheetscorrespondingtothenumberandtypeofeachlisted
inSectionK.Forexample,ifthisstackhas2parallelchainswith2APCDsand1IDfanoneach,
thereshouldbetwostackattachmentsheets,twoIDfansheets,and4APCDsheets.Lastly,
accordingtotheaboveprocedure,attachthenumberofrelevantsamplingportsheets

Commentsp1:

IndustryID:
StackID:

Page1

Emissions Trading Scheme Baseline Survey (Stack Attachment Section)

EmissionsTradingSchemeBaselineSurvey:
IV.StackAttachmentSection
Tobefilledbytheenvironmentallaboratory.

SectionK:StackAttachments(foreachParallelChain)
K1.
K2.
K3.

ThisSectionisbeingfilledoutforthestackwiththe
followingStackID:

ParallelChainNumber

2.
3.

EmissionSource1

4.

5.
6.
7.
8.
1.
2.
3.

b.

EmissionSource2

4.
5.
6.
7.
8.
9.
1.
2.
3.

c.

|_____|

EmissionSources
1.

a.

S|_____|_____|

EmissionSource3

4.
5.
6.
7.
8.
9.

Commentsp26:

IndustryID:StackID:

Boiler
Thermic Fluid Heater/Thermopack
Furnace/Bhatti
Process emissions
Incinerator
DG Set
Gas Engine
Other(specify)___________
Boiler
Thermic Fluid Heater/Thermopack
Furnace/Bhatti
Process emissions
Incinerator
DG Set
Gas Engine
Other(specify)___________
N/A (only 1 Emission Source)
Boiler
Thermic Fluid Heater/Thermopack
Furnace/Bhatti
Process emissions
Incinerator
DG Set
Gas Engine
Other(specify)___________
N/A (less than 3 emission sources)

Page26

Emissions Trading Scheme Baseline Survey (Stack Attachment Section)

AirPollutionControlDevices

K4.

ForeachAPCDinthisparallelchain,tickthecorrespondingAPCDnamefromthecheckboxes
below.

a.

APCD1
1.

Gravity Settling

APCD2
1.

Chamber

Chamber
2.
3.

4.
5.
6.
7.

Single-Cyclone
Multi-cyclone
Bag Filter
ESP
Scrubber
Other (Specify)

2.
3.
4.
5.
6.
7.

Single-Cyclone
Multi-cyclone
Bag Filter
ESP
Scrubber
Other (Specify)
____________

____________

Gravity Settling

8.

N/A

APCD3
1.

Gravity Settling

APCD4
1.

Chamber
2.
3.
4.
5.
6.
7.

Single-Cyclone
Multi-cyclone
Bag Filter
ESP
Scrubber
Other (Specify)

Chamber
2.
3.
4.
5.
6.
7.

____________
8.

N/A

(lessthan3APCDs)

Gravity Settling
Single-Cyclone
Multi-cyclone
Bag Filter
ESP
Scrubber
Other (Specify)
____________

8.

N/A

(lessthan4APCDs)

(only1APCD)
AnnualOperatingandMaintenanceCostsforall
theAPCDsofthisParallelChain(incl.electricity
costs,maintenancecosts,andmaterialcosts).

K5.

1.

K6.

NumberofIDfans

2.
3.
4.

Zero SkiptoSectionL
One
Two
Other(specify):_______________

Commentsp27:

IndustryID:StackID:

Page27

Emissions Trading Scheme Baseline Survey (Boiler Section)

EmissionsTradingSchemeBaselineSurvey:
L1BoilerSection
Tobefilledbytheenvironmentallaboratory.

Section L1: Boilers


L1.1

StackID

L1.2

ParallelChain
numbertowhich
boilerisattached
EmissionsSource
number

S|___||___|

L1.3

|___|copycorrespondingentryfromK2forthestackIDlistedinL1.1
|___|copycorrespondingentryfromK3forthestackIDlistedinL1.1

L1.4

L1.5
L1.6

Manualor
Automaticcontrol?

1.
2.

BoilerSteam

GeneratingCapacity
FeedWater

Consumption

m3/hr

OperatingSteam
Pressure

L1.8

1.
Nameallfuelsinuse
2.

kg/cm2

3.
4.
5.

TypeofFuelFiring

1.
2.
3.
4.

Coal(Indian)
Coal(imported)
Lignite
Biomass/Husk
Other (Specify ______________)

N/A

Nameof
Fuel
(Coal/Bioma
ss/etc)

Manual
Fluidized
Burner
Other (Specify) ____________

N/A

Type
(Manual/Flu
idized/Burn
er/others)

|____||____||____|

L1.10

Fuelfeedrate

L1.11

**Loadonthe
boileratthetimeof 1.
Monitoring.This
shouldbeobserved 2.
notasked

Istherean
economizer
installed?

Yes
No

L1.12

Preferred
Unit
Manual/Aut
omatic

Tons/hr

L1.7

L1.9

Manual Control
Automatic Control

Unitof
Measurement
Manual/Auto
matic

1.
2.

kg/hr
%

N/A

N/A

|____|____|%
Notapplicable

Commentsp28:

IndustryID:StackID:

Page28

Emissions Trading Scheme Baseline Survey (Boiler Section)

L1.13

L1.14

L1.15

L1.16

L1.17

L1.18

L1.19

L1.20

L1.21

L1.22
L1.23

Isthereanairpre
heaterinstalled?

Yearthisboilerwas
installed
Numberofhoursa
daythisboiler
operates
Numberofdaysper
yeartheboiler
operates
Ratedefficiencyof
boiler
Ifthereisan
efficiencydisplay,
whatisthereading?
Ifthereisoxygen
monitoring,whatis
thereading?
Totalpower
consumptionofthis
boiler
GrossCalorific
ValueofFuelused
(GCV)
NetCalorificValue
offuelused(NCV)
Whetherblended
fuelused?

N/A

N/A

Year

Year

Hours/day

Hours/day

|____||____||____|

Days/year

Days/year

|____|____|

1. |____|____|

1.
2.

|____|____|____|____|

|____||____|

2.

Ifyes,whatisthe
percentageof
blend?

No Efficiency Display Available

1. |____|____|

2. No Oxygen Reading Available

|____|____|

Kw

Kcal/Kg

Kcal/Kg

Kcal/Kg

Kcal/Kg

1.
2.

L1.24

Yes
No

Yes
No

Commentsp29:

IndustryID:StackID:

Page29

Emissions Trading Scheme Baseline Survey (Furnace Section)

EmissionsTradingSchemeBaselineSurvey:
L2FurnaceSection
Tobefilledbytheenvironmentallaboratory.

Section L2: Furnaces


L2.1

StackID

S|___||___|

L2.2

ParallelChainNumberto
whichFurnaceisattached

|___|copycorrespondingentryfromSectionK2forthestackIDlistedinL2.1

L2.3

EmissionSourceNumber

|___|copycorrespondingentryfromSectionK3forthestackIDlistedinL2.1

Unitof
Measurement

Preferred
Units
Nameof
Type

L2.4

TypeofFurnace

N/A

L2.5

FurnaceProduction

T/day

L2.6

AnnualProduction

T/year

L2.7

FurnaceDiameter
(D)/Dimensions

mm

L2.8

CapacityofFurnace

Tons/melt

L2.9

FurnaceCycleTime

|____||____|

hour/melt

N/A

Nameofthe
Fuel
(Electricity/Oi
l/Coaletc)

|____|____|%

mm

mm

mm

Yes
No

N/A

N/A

Yes
No

N/A

N/A

1.
L2.10

Nameallfuelsinuse

2.
3.
4.

Electricity
FuelOil
LPG
Other(Specify) ________________

L2.11

BurningLosses

L2.12 HoodDiameter
HeightofHoodfrom
Furnace
DiameterofPipe
L2.14
ConnectedtoHood
L2.13

**CanYouseeSubstantive
FugitiveEmissionsfrom
L2.15
thefurnace?Thisshouldbe
observedbythesurveyor
**Areanysharpbends
visibleinthefurnace
L2.16
ducting?Thisshouldbe
observedbythesurveyor

1.
2.

1.
2.

Commentsp30:

IndustryID:StackID:

Page30

Emissions Trading Scheme Baseline Survey (Furnace Section)

L2.17

L2.18

L2.19
L2.20

**Areanyofthehoods
connectedtotheducting
fromthesidesofthe
hoods?
Thisshouldbeobservedby
thesurveyor
**Canthehoodbeeasily
placedandremovedfrom
thefurnaceduring
operation?
Thisshouldbeobservedby
thesurveyor
Numberofhoursadaythis
furnaceoperates
Numberofdaysperyear
thisfurnaceoperates

Yes
No

N/A

N/A

Yes
No

N/A

N/A

|____||____|

Hours/day

Hours/day

|____||____||____|

Days/Year

Days/Year

1.
2.

1.
2.

Commentsp31:

IndustryID:StackID:

Page31

Emissions Trading Scheme Baseline Survey (Thermopack Section)

EmissionsTradingSchemeBaselineSurvey:
L3ThermopackSection
Tobefilledbytheenvironmentallaboratory.

Section L3: Thermopacks/Thermic Fluid Heaters


L3.1

StackID

L3.2

ParallelChainnumberto |___|copycorrespondingentryfromSectionK2forthestackIDlisteninL3.1
which
Thermopack/Thermic
FluidHeaterattached
EmissionSourceNumber |___|copycorrespondingentryfromSectionK3forthestackIDlisteninL3.1

L3.3

L3.4

S|___||___|

ManualorAutomatic
control?

1.
2.

L3.5

Whatisthe
thermopackcapacity?

L3.6

NameallFuelsinuse

1.

Manual Control
Automatic Control

Unit(Specify) PreferredUnit
Manual/Auto Manual/Automatic
matic
mKcal

2.
3.
4.

Coal(Indian)
Coal(imported)
Lignite
Other (Specify): _______________

N/A

NameofFuel
(Coal/Biomass/etc)

L3.7

Fuelfeedrate

L3.8

Numberofhoursaday |____||____|
thisthermopack
operates
Numberofdaysper
|____||____||____|
yearthisthermopack
operates
Isthereaneconomizer 1. Yes
installed?
2. N0

Hours/day

Hours/day

Days/year

Days/year

N/A

N/A

Isthereanairpre
heaterinstalled?

N/A

N/A

Year

Year

L3.9

L3.10

L3.11

L3.12

1.
2.

kg/hr

Yes
No

Yearthisthermopack
wasinstalled

|____|____|____|____|

Commentsp32:

IndustryID:StackID:

Page32

Emissions Trading Scheme Baseline Survey (Gravity Settling Chamber Section)

EmissionsTradingSchemeBaselineSurvey:
M1GravitySettlingChamberSection
Tobefilledbytheenvironmentallaboratory.

Section M1: Gravity Settling Chamber


M1.1

StackID

M1.2

ParallelChainNumbertowhich
GravitySettlingChamber
attached
APCDIDnumber

M1.3

M1.4

Whatistheannualoperating
andmaintenancecostofthis
gravitysettlingchamber(s)?

S|___||___|
|___|copycorrespondingentryfromSectionK2forstackIDlistedinM1.1

|____|copycorrespondingentryfromSectionK4forstackIDlistedinM1.1

1. Rupees
2.
3.

M1.5

Whichyearwasthisequipment
|____|____|____|____|
purchased?
WhatwasthecostofInstallation
andCommissioning

M1.6

1.
2.
3.

M1.7

Hasthisequipmentever
undergonemajormodifications?

M1.8

Ifyes,whichyeardidthe
modificationstakeplace?
Ifyes,howmuchdidthe
modificationscost?

M1.9

1.

2.
Skip to Question M1.10
|____|____|____|____|

1.

3.
Manufacturer&ModelName
RatedEfficiencyoftheAPCD
accordingto
model/manufacturer
SizeoftheGravitySettling
Chamber

M1.12

Rupees
LakhsRupees
CroresRupees

Yes
No

2.
M1.10
M1.11

LakhsRupees
CroresRupees

Rupees
LakhsRupees
CroresRupees

|____|____|%
Parameter
Measurement

Length
Breadth
Height

Unitof
Measurement

PreferredUnit

mm
mm
mm

Commentsp33:

IndustryID:StackID:

Page33

Emissions Trading Scheme Baseline Survey (Single Cyclone Section)

EmissionsTradingSchemeBaselineSurvey:
M2SingleCycloneSection
Tobefilledbytheenvironmentallaboratory

Section M2: Single Cyclone


M2.1
M2.2
M2.3
M2.4
M2.5

StackID
Parallelchainnumbertowhich
singlecycloneisattached

S|___||___|

APCDIDnumber
Whatistheannualoperatingand
maintenancecostofthissingle
cyclone(s)?
Whichyearwasthisequipment
purchased?

|___|copycorrespondingentryfromK4forstackIDlistedinM2.1

|___|copycorrespondingentryfromK2forstackIDlistedinM2.1

Rupees
LakhsRupees
CroresRupees

1.
2.

Rupees
Lakhs Rupees
Crores Rupees

|____|____|____|____|

WhatwasthecostofInstallationand

Commissioning

M2.6

1.
2.
3.

3.

Yes
No

1.

M2.7

Hasthisequipmenteverundergone
majormodifications?

M2.8

Ifyes,whichyeardidthe
modificationstakeplace?

|___|___|___|___|

M2.9

Ifyes,howmuchdidthe
modificationscost?

M2.10

Manufacturer&ModelName

M2.11

RatedEfficiencyoftheAPCD
accordingtomodel/manufacturer

2.

SkiptoQuestionM2.10.
1.
2.
3.

Rupees
LakhsRupees
CroresRupees

|____|____|%
Unitof
Measurement

M2.12
M2.13

CylindricalBodyDimensions:(Height)
CylindricalBodyDimensions:(Diameter )
CycloneConeDimensions:
(verticalheight)
CycloneConeDimensions:
(bottomopeningdiameter)
GroundClearance(Cyclonebottomto
groundlevel)
AverageQuantityofDustCollectedper
day
FrequencyofDustCollection
Doesthiscyclonehaveavalveora
flangeatthebottom?

M2.14
M2.15
M2.16
M2.17
M2.18
M2.19

M2.20

Ifthereisavalve,whattypeisit?

PreferredUnit
mm
mm

mm

mm

mm

kg/day
Nooftimes/month

1. Valve 2. Flange
1. RotaryAirlock
2. Butterflydamper
3. Slidingdamper
4. Other(specify)
________

N/A

Typeofvalve(rotaryair
lock/butterfly
damper/sliding
damper/etc)

Commentsp34:

IndustryID:StackID:

Page34

Emissions Trading Scheme Baseline Survey (Multi Cyclone Section)

EmissionsTradingSchemeBaselineSurvey:
M3MultiCycloneSection
Tobefilledbytheenvironmentallaboratory.

Section M3: Multi Cyclone


M3.1

StackID

M3.2

ParallelChainnumbertowhich
MultiCycloneisattached
APCDIDnumber

M3.3

S|___||___|
|___|copycorrespondingentryfromSectionK2forthestackIDlistedinM3.1
|___|copycorrespondingentryfromSectionK4forthestackIDlistedinM3.1

M3.4

Whatistheannualoperatingand
maintenancecostofthismulticyclone?

M3.5

Whichyearwasthisequipment
purchased?
WhatwasthecostofInstallationand
Commissioning

M3.6

M3.7

Hasthisequipmenteverundergone
majormodifications?

M3.8

Ifyes,whichyeardidthemodifications
takeplace?
Ifyes,howmuchdidthemodifications
cost?

M3.9

M3.10

Manufacturer&ModelName

M3.11

RatedEfficiencyoftheAPCDaccording
tomodel/manufacturer

M3.12
M3.13
M3.14

1. Rupees
2. LakhsRupees
3. CroresRupees
|____|____|____|____|

1. Rupees
2. LakhsRupees
3. CroresRupees
1.

Yes
No

2.
Skip to Question M3.10.
|____|____|____|____|

4. Rupees
5. LakhsRupees
6. CroresRupees
|____|____|%

OuterCasingDimension(Length)
OuterCasingDimension(Breadth)
CylindricalBodyDimension(Diameter)of
cells/cyclones
No.ofcells(cyclones)
GroundClearance(MultiCyclonebottomto
GroundLevel)
AverageQuantityofDustCollectedperday
FrequencyofDustCollection

M3.15
M3.16
M3.17
M3.18
M3.19

Doesthiscyclonehaveavalveoraflangeat 1.
thebottom?
2.
Ifthereisavalve,whattypeisit?
1.
2.
3.
4.

M3.20

MeasurementUnit

PreferredUnit
mm
mm
mm

Nos.

Nos.
mm
kg/day
Noof
times/month

Valve
Flange
RotaryAirlock
Butterflydamper
Slidingdamper
Other(specify) _________

N/A

Commentsp35:

IndustryID:StackID:

Page35

Emissions Trading Scheme Baseline Survey (Bag Filter Section)

EmissionsTradingSchemeBaselineSurvey:
M4BagFilterSection
Tobefilledbytheenvironmentallaboratory.

Section M4: Bag filter


M4.1

StackID
ParallelChainnumbertowhich
BagFilterisattached

M4.2
M4.3

APCDIDnumber
Whatistheannualoperatingand
maintenancecostofthisbag
filter?
Whichyearwasthisequipment
purchased?

M4.4
M4.5

WhatwasthecostofInstallation
andCommissioning

M4.6

Hasthisequipmentever
undergonemajormodifications?
Ifyes,whichyeardidthe
modificationstakeplace?

M4.7
M4.8

Ifyes,howmuchdidthe
modificationscost?

M4.9

S|___||___|
|___|copycorrespondingentryfromSectionK2forthestackIDlistedinM4.1
|___|copycorrespondingentryfromSectionK4forthestackIDlistedinM4.1

1. Rupees
2. LakhsRupees
3. CroresRupees

|____|____|____|____|
1. Rupees
2. LakhsRupees
3. CroresRupees

1. Yes
2. No SkiptoQuestionM4.10.
|____|____|____|____|
1. Rupees
2. LakhsRupees
3. CroresRupees

Manufacturer&ModelName

Inspection/Maintenance
|____|____|____|timesperyear
Schedule:Refertothemaintenance
registerifavailable
RatedEfficiencyoftheAPCD
|____|____|%
accordingtomodel/manufacturer

M4.10
M4.11
M4.12

1.
2.
LastInspection/Maintenance
Date:Refertothemaintenance
registerifavailable

M4.13

3.
4.
5.

[ ] [ ] [ ] [ ] [ ] [ ] [ ] [ ]
Month : |__|__| Year : |__|__|__|__|
Year|__|__|__|__|
DoesntNeedMaintenance
Donotremember

M4.27.

OperationofValve

1. Motorized
2. Manual
3. Other(Specify)
__________

MethodofDustRemovalfrom
Hopper

1. Manual
2. Con nuous
3. Other(Specify)
__________

Type
(Motorized/Manual/
Others)

Type
(Manual/Continuous
/Other)

Type(InEmpty
CementBags/Trolley/

M4.28.

ModeofDustCollection

M4.29.

1. EmptyCementBags
2. Trolley

Commentsp36:

IndustryID:StackID:

Page36

Emissions Trading Scheme Baseline Survey (Bag Filter Section)

ScrewConveyer/On
Ground/Others)

3. ScrewConveyor
4. OnGround
5. Other(Specify)
__________

M4.41.

Ifdustisremovedmanually,what
isthefrequencyofdustremoval?
Ifdustisremovedmanually,
quantity/removal
Ifdustisremovedmanually,
quantity/day
No,ofbagsofdustcollected/day
No.oftrolleysofdustcollected/
day
QuantityofDustCollection
Totalno.ofFilterBagsfitted
insidebaghouse
DiameteroffilterBag
Lengthoffilterbag
No.ofRowsinBagFixing
Arrangement
No.ofColumnsinBagFixing
Arrangement
No.ofCells

M4.42.

No.ofRows/Cell

M4.43.

No.ofColumns/Cell

M4.44.

DesignedTotalFiltrationArea
DesignedInletGasFlow
Quantity?
DesignedInletDustLoading
DesignedInsideAngle/Slopeof
Hopper
DesignedaircompressorHP?

M4.30.
M4.31.
M4.32.
M4.33.
M4.34.
M4.35.
M4.36.
M4.37.
M4.38.
M4.39.
M4.40.

M4.45.
M4.46.
M4.47.
M4.48.

Nosoftimes/day

kg/removal

kg/day

Noofbags/day

Noofbags/day

Nooftrolleys/day

Nooftrolleys/day

Nos.

Nos.

mm
mm

Nos.

Nos.

Nos.

Nos.

Nos.

Nos.

Nos.

Nos.

Nos.

Nos.

m2

m3/hr

kg/hr

degree

HP

N/A

N/A

CubicFeetperMinute
(cfm)

kg/cm2

No.pulses/min

Noofpulses/minute

Nos.

Noofbags

Istheaircompressordedicatedto
thebagfilter?

M4.49.

Designedaircompressorflow
rate?
Designedaircompressor
pressure?
Ifthisisapulsejetfilter,how
manypulsesperminute?
Howmanyreplacementbagsdid
youpurchaselastyear?

M4.50.
M4.51.
M4.52.
M4.53.

1.
2.

Yes
No

1. ________pulses/min
2. N/A(notpulsejet)

kg/hour

Commentsp37:

IndustryID:StackID:

Page37

Emissions Trading Scheme Baseline Survey (Bag Filter Section)

M4.
54.

M4.
55.
M4.
56.
M4.
57.

SURVEYOROBSERVATIONOFBAGFILTER
N/A
**Arethereairleakagesatthe
1. Yes
bottomofthehopper?
2. No
Pleasefeelforairleakageswithyour
hand

N/A
**Ifthedustisremovedmanually,is 1. Yes
dustpuffing(dustleakage)seen?
2. No
**Foramotorizedvalve,isdust
N/A
1. Yes
fallingcontinuously?
2. No
**Whatisthepowerconsumption
ofthecompressorofthebagfilter?

N/A

N/A

N/A

KW

Thisshouldbemeasuredwithaportable
poweranalyser.

Commentsp38:

IndustryID:StackID:

Page38

Emissions Trading Scheme Baseline Survey (ESP Section)

EmissionsTradingSchemeBaselineSurvey:
M5ESPSection
Tobefilledbytheenvironmentallaboratory.

Section M5: ESP


M5.1

StackID

M5.2

Parallelchainnumberto
whichESPisattached
APCDIDnumber

M5.3.
M5.4.

Whatistheoperating
andmaintenancecost
perannumofthis
equipment,notincluding
IDfancosts?

S|___||___|
|___|copycorrespondingentryfromsectionK2forthestackIDlistedinM5.1
|___|copycorrespondingentryfromsectionK2forthestackIDlistedinM5.1

1.
2.
3.

Rupees
LakhsRupees
Crores Rupees

1.
2.
3.

Rupees
LakhsRupees
CroresRupees

Includethepower
consumptioncosts.

M5.5.

Whichyearwasthis
equipmentpurchased?
Whatwasthecostof
Installationand
Commissioning
Hasthisequipmentever
undergonemajor
modifications?
Ifyes,whichyeardidthe
modificationstakeplace?
Ifyes,howmuchdidthe
modificationscost?

M5.6.

M5.7.

M5.8.
M5.9.

M5.10.

Manufacturer&Model
Name
RatedEfficiencyofthe
APCDaccordingto
model/manufacturer
Inspection/Maintenance
Schedule

M5.11

M5.12.

|____|____|____|____|

1.

Yes
No

2.
Skip to Question M5.10.
|____|____|____|____|
1. Rupees
2. LakhsRupees
3. CroresRupees

|____|____|%
|____|____|____|timesinayear

Refertothemaintenance
registerifitisavailable

M5.13.

Last
1.
Inspection/Maintenance
2.
Date
Refertothemaintenance
registerifitisavailable

3.
4.
5.

[ ] [ ] [ ] [ ] [ ] [ ] [ ] [ ]
Month : |__|__| Year : |__|__|__|__|
Year|__|__|__|__|
DoesntNeedMaintenance
Donotremember

M5.14.

UnitofMeasurement
TypeofESP

PreferredUnit
Type(Parallelplate/Wire

Commentsp39:

IndustryID:StackID:

Page39

Emissions Trading Scheme Baseline Survey (ESP Section)

1.
2.
3.
4.
5.
M5.15.

OverallESPDimensions:
Width
OverallESPDimensions:
Breadth
OverallESPDimensions:
Height(AboveHopper)
No.offields
Nooffieldsinoperation
PlateCollectionArea
QuantityofDust
Collected/day
Hours/dayESPisinoperation
Days/yearESPisinoperation
**Whatisthepower
consumptionoftheESP?

M5.16.
M5.17.
M5.18.
M5.19.
M5.20.
M5.21.
M5.22.
M5.23.
M5.24.

6.

Plate & Wire Type


Tabular ESP
WetESP
TwoStagePrecipitator
HotStagePrecipitator
ColdStagePrecipitator

andplate/others)

mm

mm

mm

Nos.
Nos.

Nos.
Nos.
m2
kg/day

hrs/day
days/year

hrs/day
days/year
KW

Thisshouldbemeasuredwitha
portablepoweranalyser.

Commentsp40:

IndustryID:StackID:

Page40

Emissions Trading Scheme Baseline Survey (Scrubber Section)

EmissionsTradingSchemeBaselineSurvey:
M6ScrubberSection
Tobefilledbytheenvironmentallaboratory.

Section M6: Scrubber


M6.1

StackID

M6.2

Parallelchainnumberto
whichScrubberis
attached
APCDIDnumber

M6.3.
M6.4.

S|___||___|
|___|copycorrespondingentryfromsectionK2forthestackIDlistedinM6.1
|___|copycorrespondingentryfromsectionK4forthestackIDlistedinM6.1

Whatistheoperatingand
maintenancecostper
annumofthisequipment,
excludingIDfancosts?

1.
2.
3.

Includetheoperatingcostsof
thepump

M6.5.
M6.6.

Whichyearwasthis
scrubberpurchased?
Whatwasthecostof
Installationand
Commissioning

|____|____|____|____|
1.
2.
3.

M6.7.

M6.8.
M6.9.

Hasthisscrubberever
undergonemajor
modifications?
Ifyes,whichyeardidthe
modificationstakeplace?
Ifyes,howmuchdidthe
modificationscost?

1.

2.
Skip to Question M6.10.
|____|____|____|____|

1.

3.

M6.11

M6.12.

M6.13.

Manufacturer&Model
Name
RatedEfficiencyofthe
APCDaccordingto
model/manufacturer
Inspection/Maintenance
Schedule
Refertothemaintenance
registerifitisavailable
Last
Inspection/Maintenance
Date
Refertothemaintenance
registerifitisavailable

Rupees
LakhsRupees
CroresRupees

Yes
No

2.
M6.10.

Rupees
LakhsRupees
CroresRupees

Rupees
LakhsRupees
CroresRupees

|____|____|%
|____|____|timesinayear

1.
2.
3.
4.
5.

[ ] [ ] [ ] [ ] [ ] [ ] [ ] [ ]
Month:|__|__|Year:|__|__|__|__|
Year|__|__|__|__|
DoesntNeedMaintenance
Donotremember

Unitof
Measurement

PreferredUnit

Commentsp41:

IndustryID:StackID:

Page41

Emissions Trading Scheme Baseline Survey (Scrubber Section)

M6.14.

TypeofScrubber

Simple
Spray
PackedBed
Impingement
Venturi
Dry
7. Other(Specify):_________
Isthescrubberroundorrectangular? 1. Round2.Rectangular

Ifthescrubberisround,whatisthe
1. ________mm2.NA(rectangular)

M6.15.
M6.16.

diameter?
Ifthescrubberisrectangular,whatis
thelength?
Ifthescrubberisrectangular,whatis
thebreadth?
ScrubberTotalHeight
Waterrequirement(Freshwateror
causticsolution)
PumpSize
PumpPressure
QuantityofWastewaterdischarged
fromScrubber
QuantityofDustCollectedperday
(intheformofcake)
Sludgesettlingarrangement
provided(ifany)
Typeoftreatmentgivento
slurry/wastewater(ifany)
Hours/daythescrubberisin
operation
Days/yearthescrubberisin
operation
**Whatisthepowerconsumptionof
thescrubberpump?

M6.17.
M6.18.
M6.19.
M6.20.
M6.21.
M6.22.
M6.23.
M6.24.
M6.25.
M6.26.
M6.27.
M6.27a.
M6.28.

1.
2.
3.
4.
5.
6.

Type
(Simple/Spray/Packed
Bed/Impingement/
Venturi/Dry/Other)

1. _________mm2.NA(round)
1. _________mm2.NA(round)

M
m3/hr

HP
kg/cm2
m3/day
kg/day

Hrs/day

Hrs/day

Days/year

Days/year
Kw

Thisshouldbemeasuredwithaportable
poweranalyser.

DesignedDeltapressureforthis
scrubber?
DesignedPumpFlow

M6.29.
M6.30.

Changeinmmwc

Commentsp42:

IndustryID:StackID:

Page42

Emissions Trading Scheme Baseline Survey (Scrubber Section)

EmissionsTradingSchemeBaselineSurvey:
NIDFanSection
Tobefilledbytheenvironmentallaboratory.

SectionN:IDFans(FillthissectionforeachIDFan)
N1
N2.

N3.

StackID
ParallelchainnumbertowhichIDFanis
attached

S|___||___|

WhereistheIDfanlocated?

1.

BeforethefirstAPCD

2.

Betweenfirstandsecond

|____|

APCDs
3.

Betweensecondand
thirdAPCDs

4.

Betweenthirdandfourth
APCDs

5.

AfterallAPCDs

6.

Other(specify)
_________________

N4.

UnitofMeasurement

WhatistheratedHPoftheIDfan?

PreferredUnit
HP

N5.

**WhatisthestaticpressureattheINLETofthe
IDfan?

mmwc

Measurethestaticpressureattheinlet.Thisquestion
canbefilledinafterthesamplingiscomplete.

N6.

**WhatisthestaticpressureattheOUTLETof
theIDfan?

mmwc

Measurethestaticpressureattheoutlet.Thisquestion
canbefilledinafterthesamplingiscomplete.

N7.
N8.

WhataretheannualoperatingcostsoftheID
fan?
**WhatisthepowerconsumptionofthisIDfan?

Rs.
KW

Useaportablepoweranalysertomeasurethepower
consumption.

N9.
N10
.

DesignedRPM(rotationsperminute)oftheID
fan?(UsuallytheRPMatmaxpoweroutput)
IsthereaVariableFrequencyDriveinstalledfor
thisIDfan?

RPM
1.

Yesthecurrentfrequencyis|____|____|%ofthe
designedRPMinquestionN8.

2.

No

Commentsp43:

IndustryID:StackID:

Page43

Emissions Trading Scheme Baseline Survey (Scrubber Section)

EmissionsTradingSchemeBaselineSurvey:
SectionO1InletSampling
Tobefilledbytheenvironmentallaboratory.

**Section O1: Monitoring Data from sampling at Inlet


StacksamplingwilloccuratonlyONEstack.Foreachparallelchainatthatstack,fillTableO1,basedonthecompletestackmonitoringatinletsampling
location.Alsoattachthecompletesamplingreport,whichshouldbeclearlylabeledSectionS:P1BeforeAllAPCDsandIDFan.

O1.1
O1.2.

O1.3.

StackIDwherestacksampling
takingplace
Parallelchainnumberonwhich
inletsamplingportislocated

S|___||___|

|____|

1.
2.
1.
2.

Yes
complete Section O1
No skip to Section O2
Yes
No (Specify Why) ______________________________

O1.5.

Isthereasamplingportatthis
location?(circleone)
Isthecompletesamplingreport
attached?
DateofSampling

|__|__|/|__|__|/2013

O1.6.

TimeofSampling(24hour)

|__|__|hrs|__|__|mins

O1.4.

UnitofMeasurement

O1.7.

O1.13.

Istheductcrosssectionroundor
rectangular?
Iftheductcrosssectionisround,
whatistheinternaldiameter?
Iftheductcrosssectionisrectangular,
whatisthelength(internal)?
Iftheductcrosssectionisrectangular,
whatisthebreadth(internal)?
Distanceofsamplingportfromthe
nearestbendinupstream
Distanceofsamplingportfromthe
nearestbendindownstream
Diameteroftheport

O1.14.
O1.15.
O1.16.
O1.17.
O1.18.
O1.19.
O1.20.
O1.21.
O1.22.
O1.23.
O1.24.
O1.25

Collarlengthattheport
AverageCO2%
AverageO2%
AverageCO%
AverageMoisture%
AverageFlueGasTemperature
GasMolecularWeight
StaticPressure
AverageVelocityMeasurement
AveragePMConcentration
AverageGasFlow
DustLoading

O1.8.
O1.9.
O1.10.
O1.11.
O1.12.

1.
2.
1.
2.
1.
2.

Round
Rectangular
________
NA (rectangular)
_________
NA (round)

1.
2.

_________
NA (round)

PreferredUnit

mm

mm

mm

mm

mm

mm

mm
%
%
PPM
%
DegCelsius
Mg
mmwc
m/sec
mg/Nm3
Nm3/hr
kg/hr

Commentsp44:

IndustryID:StackID:

Page44

Emissions Trading Scheme Baseline Survey (Intermediate Sampling Port Section)

EmissionsTradingSchemeBaselineSurvey:
SectionO2IntermediateSamplingPort
Tobefilledbytheenvironmentallaboratory.

**Section O2: Monitoring Data from sampling at


intermediate sampling port
StacksamplingwilltakeplaceononlyONEstack.Foreachsamplingportoneachparallelchainonthatstack,fillTableO2withgasflow
andstaticpressurereadingsfromsamplinglocation(Refertothesurveyormanualforlocationofsamplingpoints,oriftherearemore
than4intermediatepoints.)
Alsoattachthecompletegasflowandstaticpressuremonitoringreport

O2.1.

StackIDwherestack
samplingtakingplace

O2.2

ParallelChainnumber

O2.3

SamplingportSequence
number(e.g.1forfirst
portfrominlet,2for
secondport,etc.)
Isthereasampling
pinholeatthislocation?

O2.4.

|___|

|___|
|___|

1.
2.

Yes complete Section O2


No, there are less than two APCDs & ID fans
skip to Section O3

3.

No, there are two or more APCDs & ID fans but no port
here skip to Section O3

O2.5.

O2.6.

O2.7.

O2.8.

O2.9.
O2.10.
O2.11
O2.12.

Unitof
Measurement
Istheductcrosssection
roundorrectangular?
Iftheductcrosssectionis
round,whatisthe
diameter?
Iftheductcrosssectionis
rectangular,whatisthe
length?
Iftheductcrosssectionis
rectangular,whatisthe
breadth?
AverageFlueGas
Temperature
StaticPressure
AverageVelocity
Measurement
AverageGasFlow

1.
2.
1.
2.
1.
2.
1.
2.

Round
Rectangular
________
NA (rectangular)
_________
NA (round)
_________
NA (round)

PreferredUnit

mm

mm

mm

DegCelsius

Mmwc

m/sec

Nm3/hr

Commentsp45:
IndustryID:StackID:

Page45

Emissions Trading Scheme Baseline Survey (Stack Attachment Section)

EmissionsTradingSchemeBaselineSurvey:
SectionO3OutletSamplingPort
Tobefilledbytheenvironmentallaboratory.

**Section O3: Monitoring Data from sampling at Outlet


StacksamplingwilltakeplaceatonlyONEstack.FillTableO3forthatstack,basedonthecompletestackmonitoringatoutletsampling
location,afterallAPCDsandaftertheIDfan.
Alsoattachthecompletesamplingreport,whichshouldbeclearlylabeledSectionT:P2AfterAllAPCDs.

O3.1

O3.4.

StackIDwherestacksampling
S|___||___|
takingplace
Isthereasamplingportatthis
1.
Yes
complete Section O3
location?(circleone)
2.
No skip to Section P
Isthecompletesamplingreport
1.
Yes
attached?
2.
No (Specify Why) ______________________________
DateofSampling
|__|__|/|__|__|/2013

O3.5.

TimeofSampling(24hour)

O3.2.
O3.3.

|__|__|hrs|__|__|mins

O3.6.
O3.7.
O3.8.
O3.9.

O3.10.
O3.11.

O3.12.
O3.13.
O3.14.
O3.15.
O3.16.
O3.17.
O3.18.
O3.19.
O3.20.
O3.21.
O3.22.
O3.23.
O3.24.

UnitofMeasurement
Isthestackcrosssectionround
orrectangular?
Ifthestackcrosssectionis
round,whatisthediameter?
Ifthestackcrosssectionis
rectangular,whatisthelength?
Ifthestackcrosssectionis
rectangular,whatisthe
breadth?
Distanceofsamplingportfrom
thenearestbendinupstream
Distanceofsamplingportfrom
thenearestbendin
downstream
Diameteroftheport
Collarlengthattheport
AverageCO2%
AverageO2%
AverageCO%
AverageMoisture%
AverageFlueGasTemperature
GasMolecularWeight
StaticPressure
Avg.VelocityMeasurement
Avg.PMConcentration
AverageGasFlow
DustLoading

1.
2.
1.
2.
1.
2.

________
NA (rectangular)
_________
NA (round)

Round
Rectangular

PreferredUnit

mm

mm

1. _________
2. NA (round)

mm

mm

mm

mm
mm
%
%
PPM
%
DegCelsius
mg
mmwc
m/sec
mg/Nm3
Nm3/hr
kg/hr

Commentsp46:

IndustryID:StackID:

Page46

Emissions Trading Scheme Baseline Survey (Stack Attachment Section)

Section P: Stack Continuous Emissions Monitoring System


P.1

StackID:

S|____||____|
1.
2.
3.
4.

P.2

Whatexistingcontinuousemissionsmonitoring
systemisinplace?
(CheckAllthatApplies)

5.
6.
7.
8.
9.
10.

None skiptoSectionU
CEMSforPM
CEMSforNOX
CEMSforNo2
CEMSforSox
CEMSforSO2
CEMSforCO
CEMSforCO2
CEMSforVOC
CEMSforOtherGases
(Specifypollutantsmonitored___________________

P.3

IsthereaCEMSforPM?

Yes
2. No
1.

Goto P.2
Goto Part III, Ringlemann Section
1.

P.4

WhatwastheinstallationcostforthisSPMCEMS?

2.

3.
P.5

WhichyearwasthisSPMCEMSinstalled?

|____|____|____|____|

1.
P.6

Whatistheoperatingcostperannum?

2.
3.

P.9

ManufacturerNameoftheSPMCEMS
ModelNumber/NamefortheSPMCEMS
AnnualMaintenanceContractSigned

1.

P.10

MaintenanceSchedule

|____|____|____|peryear

P.7
P.8

2.

Whenwastheinstrumentcalibratedlast?

3.
4.
5.
1.

P.12

Whenwastheinstrumentinspectedlast?
Refertothemaintenanceregisterifitisavailable

2.
3.
4.
5.

Commentsp47:

IndustryID:StackID:

Yes

/ 2.

Rupees
Lakhs
Crores

No

1.

P.11

Rupees
Lakhs
Crores

[ ] [ ] [ ] [ ] [ ] [ ] [ ] [ ]
Month:|__|__|Year:|__|__|__|__|
Year|__|__|__|__|
DoesntNeedCalibration
Donotremember
[ ][ ][ ][ ][ ][ ][ ][ ]
Month: |__|__|Year:|__|__|__|__|
Year|__|__|__|__|
DoesntNeedMaintenance
Donotremember

Page47

Emissions Trading Scheme Baseline Survey (Stack Attachment Section)

EmissionsTradingSchemeBaselineSurvey:
III.RingelmannsSection
TobefilledbytheFieldMonitor.

ONECOPYOFSECTIONIIIMUSTBEFILLEDINFOREACHSTACK

ForOfficeUSEONLY
SurveyID

Reviewer's
|______|____|______|____|______| name

IndustryID

Dateof
questionnaire
reviewing
(DD/MM)

|______|____|/|______|____|/
2013

Numberof
mistakes
found

|______|____|

Commentsp48:

IndustryID:StackID:

Page48

Emissions Trading Scheme Baseline Survey (Stack Attachment Section)

**Section Q: RingelmannsMeasurement
ThepurposeoftheRingelmannsProcedureistocomparethecolourofsmokefromastacktoanestablished
scaleofgreyness.Steps:
1) Stand in the line between the stack and the sun. The sun should be behind you and the stack directly
ahead.
2) Hold the Ringelmann Chart on a level with your eye, and in line with the top of the chimney. Get assistance
if needed.
3) Look at the smoke and identify which slice of the chart is the closest shade of grey.
4) Each slice has a number from 0-6, note the number of the matching slice down in Table G
5) Take TEN observations every THREE minutes over a period of 30 minutes.
6) Complete Table G

Q1. StackID
Q2. Date

S|___||___|
|______|____|/|______|____|/2013
1.Yes

Q3.

Isthesunbehindyouand
thestackinfrontofyou?

2.No Indicatewherethesunisrelativetoyouandstack,ifyouareat
thecenterofaclockdialandthestackisatpositionofhour12.Positionof
thesunisat:|______|____|

Measurement
Time(24hr):
Number:

1
|____|____|hrs|____|____|mins

2
|____|____|hrs|____|____|mins

3
|____|____|hrs|____|____|mins

4
|____|____|hrs|____|____|mins

5
|____|____|hrs|____|____|mins

6
|____|____|hrs|____|____|mins

7
|____|____|hrs|____|____|mins

8
|____|____|hrs|____|____|mins

9
|____|____|hrs|____|____|mins

10
|____|____|hrs|____|____|mins
SumofObserved
Q5.
|____|____|____|
RingelmannNumbers:
Q6. AverageNumber(Sum/10)
|____|____|
AverageSmokeDensity(%)
Q7.
|____|____|%
(AverageNumber*20)
Q4.

1.

Q8.

Whatistheweatherlike
today

2.
3.

ObservedRingelmannNumber:

Sunny
Cloudy
Raining

Commentsp49:

IndustryID:StackID:

Page49

Emissions Trading Scheme Baseline Survey (Backcheck Sheet)

EmissionsTradingSchemeBaselineSurvey
BackcheckSheet:Tobefilledbytheenvironmentallaboratory

S|___||___|

StackID
ParallelChain1
Equipment

Count

StackAttachmentSheet
EmissionSource
Boiler
ThermicFluid
Heater/Thermopack
Furnace/Bhatti
TotalESattachmentsheets
APCD/IDfan
GravitySettlingChamber
SingleCyclone
Multicyclone
BagFilter
ESP
Scrubber
IDfan
TotalAPCD/IDfan
attachmentsheets
SamplingPorts
Inlet
Intermediate
Totalsamplingattachment
sheets

Commentsp50:

Parallelchain2
Attachment
section

Equipment

StackAttachmentSheet
EmissionSource
Boiler
ThermicFluid
Heater/Thermopack
Furnace/Bhatti
TotalESattachmentsheets
APCD/IDfan
GravitySettlingChamber
SingleCyclone
Multicyclone
BagFilter
ESP
Scrubber
IDfan
TotalAPCD/IDfan
attachmentsheets
SamplingPorts
Inlet
Intermediate
Totalsamplingattachment
sheets

L1
L2
L3

M1
M2
M3
M4
M5
M6
N

O1
O2

Count
1

Parallelchain3
Attachment Equipment
section
K
L1
L2
L3

M1
M2
M3
M4
M5
M6
N

O1
O2

StackAttachmentSheet
EmissionSource
Boiler
ThermicFluid
Heater/Thermopack
Furnace/Bhatti
Total ESattachmentsheets
APCD/IDfan
GravitySettlingChamber
SingleCyclone
Multicyclone
BagFilter
ESP
Scrubber
IDfan
TotalAPCD/IDfanattachment
sheets
SamplingPorts
Inlet
Intermediate
Totalsamplingattachment
sheets

TotalAttachmentSheets

forParallelChain1

TotalAttachmentSheetsfor
ParallelChain2

TotalAttachmentSheetsfor
ParallelChain3

IndustryID:StackID:

Count
1

Attachment
section
K
L1
L2
L3

M1
M2
M3
M4
M5
M6
N

O1
O2

Page50