Project : Proposed Construction of Retaining Wall at Tamion Production Well
Location : Lower Tamion, Vitali, Zamboanga City
Scope of Works : Construction of 30.00 Linear Meters of Concrete Retaining Wall A. NON- ENGINEERING BASIC ITEMS A. SUPERVISION B. Construction of Temp. Facilities B. ENGINEERING BASIC ITEMS I. MOBILIZATION/HAULING OF MATERIALS II. DEMOLITION OF EXISTING 28.00 LINEAR METERS RIP-RAP III. DIVERSION WORKS IV. CONCRETING WORKS V. SCAFFOLDING WORKS VI. REBAR WORS VII. DEMOBILIZATION Cost of Project : Qty Unit Unit Cost Sub - Total Total A. NON- ENGINEERING BASIC ITEMS A. SUPERVISION 1 - Engineering Assistant 48 days 542.00 26,016.00 26,016.00 Direct Cost 26,016.00 OCM 2602.00 Total Cost of Item A 28,618.00 B. CONSTRUCTION OF TEMP. FACILITIES (Area = 3.00mtrs. X 5.00mtrs., 1 - Unit) A. Materials 26 pcs. - 2" x 4" x 10' Coco Lumber 173 bd.ft. 20.00 3,460.00 18 pcs. - 2" x 3" x 10' Coco Lumber 90 bd.ft. 20.00 1,800.00 16 pcs. - 2" x 2" x 10' Coco Lumber 53 bd.ft. 20.00 1,060.00 12mm thk x 1.20m x 2.40m Ordinary Plywood 18 shts. 750.00 13,500.00 Gauge 26 x 1.80m Length Corrugated G.I. Roofing Sheets 18 shts. 221.00 3,978.00 Gauge 26 x 1.20m x 2.40m G.I. Plain Sheet 1 sht. 425.00 425.00 2" C.W. Nail 2 kgs. 70.00 140.00 3" C.W. Nail 1 kg. 63.00 63.00 4" C.W. Nail 2 kg. 63.00 126.00 Padlock (Big) 1 pc. 150.00 150.00 3-1/2" Loose Pin Hinges 3 pairs 220.00 660.00 1/8" G.I. Chain (1Kg. Equal to 2mtrs.) 1 kg. 110.00 110.00 2" C.W. Umbrella Roofing Nails 2 kgs. 65.00 130.00 25,602.00 B. Labor: 2 - Carpenters 6 days 366.00 4,392.00 4 - Laborers 6 days 317.00 7,608.00 12,000.00 37,602.00 B. ENGINEERING BASIC ITEMS I. MOBILIZATION/HAULING OF MATERIALS A. Equipment Rental 1 - Unit Forward Truck (w/Driver) 14 days 5,500.00 77,000.00 Diesel 2,800 liters 49.00 137,200.00 214,200.00 B. Labor 4 - Laborers 14 days 317.00 17,752.00 17,752.00 Direct Cost 231,952.00 OCM 23195.00 Total Cost of Item I 255,147.00 II. DEMOLITION OF EXISTING 28.00 LINEAR METERS RIP-RAP A. Labor 2 - Carpenter 8 days 366.00 5,856.00 4 - Mason 8 days 366.00 11,712.00 4 - Steelman 8 days 366.00 11,712.00 10 - Laborers 8 days 317.00 25,360.00 54,640.00 Direct Cost 54,640.00 OCM 5,464.00 Total Cost of Item II 60,104.00 III. DIVERSION WORKS Note: Diversion the flow of water from river. A. Labor: 2 - Carpenter 10 days 366.00 7,320.00 4 - Mason 10 days 366.00 14,640.00 4 - Steelman 10 days 366.00 14,640.00 10 - Laborers 10 days 317.00 31,700.00 68,300.00 Php1,582,808.00 Republic of the Philippines ZAMBOANGA CITY WATER DISTRICT Pilar Street, Zamboanga City BILL OF MATERIALS AND COST ESTIMATE Item Description Page 1 of 19 B. Equipment Rental/Fuel: 1 - Water Pump 10 days 500.00 5,000.00 Gasoline 40 liters 57.00 2,280.00 7,280.00 Direct Cost 75,580.00 OCM 7,558.00 Total Cost of Item III 83,138.00 IV. CONCRETING WORKS A. Materials: Concrete Portland Cement 1,337 bags 230.00 307,510.00 Washed Sand 51 cu.m. 1,000.00 51,000.00 Gravel (G-1) 101 cu.m. 1,000.00 101,000.00 459,510.00 Forms 12mm thk x 1.20m x 2.40m Ordinary Plywood 21 shts. 750.00 15,750.00 124 124pcs. - 2" x 3" x 8' Coco Lumber 496 bd.ft. 20.00 9920.00 2" C.W. Nail 12 kgs. 63.00 756.00 4" C.W. Nail 16 kgs. 63.00 1008.00 27,434.00 B. Labor: 2 - Carpenter 28 days 366.00 20496.00 4 - Mason 28 days 366.00 40992.00 4 - Steelman 28 days 366.00 40992.00 10 - Laborers 28 days 317.00 88760.00 191,240.00 C. Equipment Rental/Fuel: 1 - Unit Concrete Bagger Mixer 17 days 2,600.00 44,200.00 1 - Concrete Vibrator 17 days 500.00 8,500.00 Special Gasoline 374 liters 57.00 21,318.00 74,018.00 Direct Cost 752,202.00 OCM 75,220.00 Total Cost Item IV 827,422.00 V. SCAFFOLDING WORKS A. Materials: 84 84pcs. - 2" x 4" x 10' Coco Lumber 560 bd.ft. 20.00 11,200.00 74 74pcs. - 2" x 3" x 10' Coco Lumber 369 bd.ft. 20.00 7,380.00 4" C.W. Nail 28 kgs. 63.00 1,764.00 20,344.00 B. Labor: 2 - Carpenter 14 days 366.00 10,248.00 10,248.00 Direct Cost 30,592.00 OCM 3,059.00 Total Cost Item V 33,651.00 VI. REBAR WORS A. Materials: 16mm x 6.00m Def. Reinforcing Steel Bar 402 pcs. 511.00 12mm x 7.50m Def. Reinforcing Steel Bar 120 pcs. 363.00 12mm x 6.00m Def. Reinforcing Steel Bar 451 pcs. 290.00 130,790.00 Hacksaw Blade 12 pcs. 53.00 636.00 #16 G.I. Tie-wire 139 kgs. 65.00 9,035.00 140,461.00 B. Labor: 4 - Steelman 30 days 366.00 43,920.00 4 - Laborers 30 days 317.00 38,040.00 81,960.00 C. Equipment Rental 1 - Unit Bar Cutter 15 days 300.00 4,500.00 4,500.00 Direct Cost 226,921.00 OCM 22,692.00 Total Cost Item VI 249,613.00 VII. DEMOBILIZATION A. Labor: 2 - Carpenter 1 day 366.00 732.00 4 - Mason 1 day 366.00 1464.00 4 - Steelman 1 day 366.00 1464.00 10 - Laborers 1 day 317.00 3170.00 6,830.00 Direct Cost 6,830.00 OCM 683.00 Total Cost Item VII 7,513.00 Page 2 of 19 A. NON- ENGINEERING BASIC ITEMS A. SUPERVISION B. Construction of Temp. Facilities B. ENGINEERING BASIC ITEMS I. MOBILIZATION/HAULING OF MATERIALS II. DEMOLITION OF EXISTING 28.00 LINEAR METERS RIP-RAP III. DIVERSION WORKS IV. CONCRETING WORKS V. SCAFFOLDING WORKS VI. REBAR WORS VII. DEMOBILIZATION Prepared by: Reviewed & Checked by: Submitted by: FELIXBERTO R. CAARE, JR. MARIE CLAIRE C. BONGO MARLI P. ACOSTA-DE FIESTA Researcher/Analyst A, (J.O.) Officer-In-Charge Officer-In-Charge Planning & Development Section Planning & Development Section Planning & Design Division Recommending Approval for Approved by: Certified as to Availability of Funds: Project Implementation: CARLOS L. PEREZ, SR. ROBERTO R. MENDOZA ALEJO S. ROJAS, JR. Officer-In-Charge Assist. General Manager Assistant General Manager Engineering Department For Finance and Administration Group for Operations Approved for Project Implementation: LEONARDO REY D. VASQUEZ General Manager 37,602.00 PhP 249,613.00 PhP S U M M A R Y 33,651.00 PhP 7,513.00 PhP 1,582,808.00 PhP 28,618.00 PhP 255,147.00 PhP 60,104.00 PhP 83,138.00 PhP 827,422.00 PhP Page 3 of 19 PROJECT : Proposed Construction of Retaining Wall at Tamion Production Well Location : Lower Tamion, Vitali, Zamboanga City Project Cost : Project Duration : FIFTEEN (15) Calendar Days Manpower Requirements : 21 Manpower (1-Engineering Assistant, 10-Laborers, 4-Steelman, 2-Carpenters, & 4-Masons) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 A. NON- ENGINEERING BASIC ITEMS A. SUPERVISION 1.81% B. Construction of Temp. Facilities 2.38% B. ENGINEERING BASIC ITEMS 0.00% I. MOBILIZATION/HAULING OF MATERIALS 16.12% II. DEMOLITION OF EXISTING 28.00 LINEAR METERS RIP-RAP 3.80% III. DIVERSION WORKS 5.25% IV. CONCRETING WORKS 52.28% V. SCAFFOLDING WORKS 2.13% VI. REBAR WORS 15.77% VII. DEMOBILIZATION 0.47% TOTAL PROJECT COST 100% CASH OUTLAY REQUIREMENT TARGETED COMPLETION THIS PERIOD COMMULATIVE COMPLETION TO DATE Recommending Approval for Prepared by: Reviewed & Checked by: Submitted by: Approved by:Project Implementation : FELIXBERTO R. CAARE, JR. MARIE CLAIRE C. BONGO MARLI P. ACOSTA-DE FIESTA CARLOS L. PEREZ, SR. ALEJO S. ROJAS, JR. Researcher/Analyst A (J.O.) Officer-In-Charge Officer-In-Charge Officer-In-ChargeAssistant General Manager for Operation Planning & Development Section Planning & Development Section Planning & Design Division Engineering Department Approved for Project Implementation: LEONARDO REY D. VASQUEZ General Manager 0.00 0.00% 0.00% 0.00 0.00% 0.00% % Perfected C A L E N D A R D A Y S 255,147.00 Php 60,104.00 Php 33,651.00 Php GANTT CHART 1,582,808.00 Php Work Item Amounts 37,602.00 Php 1,582,808.00 Php 28,618.00 Php 249,613.00 Php 7,513.00 Php 83,138.00 Php 827,422.00 Php Republic of the Philippines ZAMBOANGA CITY WATER DISTRICT Pilar St., Zamboanga City I. Excavation Works a. Wall Footing L: 56.46 m w: 0.3 m depth: 0.55 m Vol: 9.32 cu.m. 10 Rate: 0.7 cu.m./day Due: 2 days b. Footing Column L: 0.4 m w: 0.4 m depth: 0.55 m n: 20 units Vol: 1.76 cu.m. 10 Rate: 0.7 cu.m./day Due: 1 day II. Concreting Works a. Wall Footing L: 56.46 m w: 0.3 m d: 0.15 m Vol: 2.54 cu.m. Cement 25 bags 1 cu.m. 2 cu.m. b. Footing Column L: 0.4 m w: 0.4 m d: 0.2 m n: 20 units Vol: 0.64 cu.m. Column L: 0.15 m w: 0.15 m d: 1.05 m n: 20 units Vol: 0.47 cu.m. volt: 1.11 cu.m. Cement 11 bags 0.5 cu.m. 1 cu.m. Forms and Scaffolding P = 2 (a+b) + 0.20 Washed Sand G (G-1) Washed Sand G (G-1) Manpower: Manpower: a: 0.15 m b: 0.15 m h: 0.85 m P = 0.8 m A: 0.68 sq.m. n: 20 units 5 pcs. Of plywood Frame 153 bd.ft. - 2" x 3" wood 31 pcs. - 2" x 3" x 10' wood Steel Works L: 112.92 m n: 19 pcs. - 50mm G.I. Pipe n: 24 pcs. - 50mm x 50mm Mesh x 1.20m x 2.40m Steel Matting Gate: 6.5 m 1 pc. - 50mm G.I. Pipe Painting Works 50mm G.I. A: #REF! sq.m. n: #REF! gals. - Red Lead Metal Primer n: #REF! gals. Quick Dry Enamel (Royal Blue) n: #REF! gals. Paint Thinner Steel Matting A: #REF! sq.m. n: #REF! gals. - Red Lead Metal Primer n: #REF! gals. Quick Dry Enamel (Royal Blue) n: #REF! gals. Paint Thinner Laying of 4" CHB @ wall footing L: 56.46 m d: 0.4 m A: 23 sq.m. n: 288 pcs. - 4" CHB @ wall L: 54.46 m H: 0.5 m A: 27 sq.m. n: 338 pcs. - 4" CHB Rebar vertical L: 1.2 m n: 95 pcs. n per 6m: 5 pcs. N: 19 pcs. - 10mm Bars Horizontal L: 56.46 n: 10 pcs. - 10mm Bars Tie-wire 2 kgs. Plastering A: 55.86 sq.m. thk: 16 mm 0.192 20.91264 22 bags 2 cu.m. Rebar Works 10mm Bars #REF! pcs. 3.696 kg. #REF! kgs. 10 kgs./hr./1 steelman 2 steelman #REF! day - fab. #REF! day - instal. #REF! #REF! 2.3275 Painting @ Masonry @ 4" CHB Wall A: 54 sq.m. @ Ground Tank A: 76.8 sq.m. 1. Concreting of Plain Flooring 2 men pour 1.2 2. Concreting of Reinf. Flooring 2 men pour 0.84 3. Concreting of Column & Beam 2 men pour 0.50 4. Finishing of Flooring (rough) 2 men finishes 5. Finishing of CHB Joints 2 men finishes 6. Plastering of CHB 2 men plaster 7. Laying of CHB 2 men lay 100 8. Breaking old RC Flooring 2 men break 0.3 9. Laying of glazed tile 4"x4" 2 men lay 100 10. Laying of glazed tile 6"x6" 2 men lay 72 11. Installation of Water Closet 2 men install 1 12. Installation of Lavatory 2 men install 1 13. Installation of G.I. Sheets 32"x8" on Steel Frames 2 men install 11 14. Installation of G.I. Sheets 32"x8" on Wooden Frames 2 men install 20 15. Installation of G.I. Sheets 32"x12" on Steel Frames 2 men install 10 16. Installation of G.I. Sheets 32"x12" on Wooden Frames 2 men install 15 17. Fabricating and Installation of Gutter Downspout, Ridge roll 2 men fab. Install 18. Installation of G.I. Pipe 1/2 x 20" 2 men install 20 19. Installation of Doors and Window Jamp 1 men install 3 20. Installation of Door (Complete of Hinges and Knob) 1 men install 2 21. Fabrication of Doors (Excluding Planning of Frames) 1 men makes 3 22. Planning Rough Lumber (Including Allignment) 1 man Planes 48 23. Planning Rough Lumber (No Allignment) 1 man Planes 120 24. Installation of Plywood Board 2 men install 15 25. Installation of Wooden Post 2 men install 96 26. Installation of Wood Jalousies Windows 1 men install 18.75 I. Earth Works: a. Excavation 1.82 man hours/cu.m. b. Backfill 1.34 man hours/cu.m. II. Form Works: a. Footing, grade, 2.5 man hours/sq.m. column b. Beams, bond beams, 2.8 man hrs./sq.m. floor slab c. Roof beams & bond 3.01 man hrs./sq.m. beams d. Roof slab 3.34 man hrs./sq.m. e. Retaining Walls 2.4 man hrs./sq.m. f. Stairs & Landing 2.48 man hrs./sq.m. g. Form oil application 6 man hrs./sq.m. III. Reinforcement: a. Reinforcement of 9 man hours/100 kilos footing up to roofing Labor Estimate Activities CONSTRUCTION WORK CAPACITIES IN MAN HOURS b. Grade Slab EWP 13 man hours/100sq.m. c. Floor membrane 15 man hours/100sq.m. d. Roof beams & bond 2.88 man hours/cu.m. beams e. Stairs 2.6 man hours/cu.m. f. Roof Slab 2.91 man hours/cu.m. g. Curing (water) 2 man hours/day for 7 days h. Equipment: 1 Vibrator 16 min./cu.m. 2 Crane 4 cu.m./man hour FORMWORKS MANHOURS PER SQUARE METER ITEMS Carpenter Laborer 1. Continous Wall Type (CHB) 0.70 0.40 1.10 2. Foundation on Pile Caps 1.50 0.65 2.15 3. Grade Beam or FTB 0.75 0.40 1.15 4. Walls Ground to 8 ft. high 1.10 0.72 1.82 5. Walls 8 ft. to 16 ft. high 1.21 0.78 1.99 6. Walls 16 ft. to 20 ft. high 1.35 0.90 2.25 7. Columns 1.22 0.80 2.02 8. Beams & Girders 1.90 1.22 3.12 9. Elevated Slabs (word shores) 1.15 1.16 2.31 10. Elevated Slabs (adjusted shores) 0.70 0.90 1.60 SCAFFOLDING LENGTH Erect Dismantle Total Erect 1 to 2 Section Long 1.20 0.35 1.55 1.40 3 to 5 Section Long 0.75 0.5 1.25 0.85 6 section or more long 0.65 0.35 1.00 0.75 1. Common Excavation (Manual) 6.00 MH/cu.m. 2. Common Excavation (Machine) 0.50 MH/cu.m. 3. Hook Excavation (Manual & Machine) 8.00 MH/cu.m. 4. Structural Backfill (Manual) 5.00 MH/cu.m. 5. Structural Backfill (Machine) 2.00 MH/cu.m. 6. Hauling Spoils 1.00 MH/cu.m. 7. Trenching by Hand 6.00 MH/cu.m. 8. Trenching by Machine 0.20 MH/cu.m. 9. Piping Installation CONCRETE FOUNDATION AND ELEVATED CONCRETE UNIT MANHOURS 1. GRADE MEMBER Formwork 2.54 MH/sq.m. MANHOURS Total 1 or 2 Section High More than 2 Sec. High Dismantle 1.00 0.60 0.40 UNIT MANHOURS ITEM OF WORK Concreting 8.54 MH/sq.m. Rebar Works 0.07 MH/sq.m. Finishing 0.40 MH/sq.m. 2. SUSPENDED MEMBER Formwork 3.28 MH/sq.m. Concreting 16.70 MH/sq.m. Rebar Works 0.08 MH/sq.m. Finishing 0.80 MH/sq.m. Excavation 1.35 cu.m./man day Backfill 3.87 cu.m./man day Disposal of spoils 4.70 cu.m./man day Formworks 2.70 cu.m./man day Steelworks 10.00 kg./man day Concreting 0.91 cu.m./man day Finishing 11.80 cu.m./man day CHB Zocalo wall 2.40 sq.m./man day Ground floor slab (concreting) 1.00 cu.m./man day 6 mm 0.222 0.2827 1.332 1.665 1.998 10 mm 0.616 0.7854 3.696 4.62 5.544 12 mm 0.887 1.131 5.322 6.6525 7.983 16 mm 1.577 2.011 9.462 11.8275 14.193 20 mm 2.463 3.142 14.778 18.4725 22.167 25 mm 3.848 4.919 23.088 28.86 34.632 28 mm 4.827 6.1575 28.962 36.2025 43.443 32 mm 6.305 8.0425 37.83 47.2875 56.745 36 mm 7.98 10.179 47.88 59.85 71.82 FORMULAS TO FIND APPROXIMATE NUMBER OF NAILS REQUIRED Number of Pounds (12d + 60d, framing) = d/6 x BF/100 Number of Pounds (2d to 12d, sheating) = d/4 x BF/100 where d = size of desired nail in pennies BF = total board feet to be nailed MISCELLANEOUS LABOR OUTPUT PHILIPPINE STANDARD WEIGHT OF REINFORCING BARS Nominal diameter Unit Wt. kg./meter Nominal sectional 6.00m kilograms 7.50m kilograms 9.00m kilograms 10.50m kilograms 12.00m kilograms 2.331 2.664 6.468 7.392 9.3135 10.644 16.5585 18.924 25.8615 29.556 40.404 46.176 83.79 95.76 50.6835 57.924 66.2025 75.66 cu.m. concrete/day cu.m. conc./day cu.m. conc./day 72 sq.m./day 420 pcs./day 8 sq.m./day pcs./day cu.m./day pcs./day pcs./day set water closet/2 days set Lav./1 1/2 day sheets/day sheets/day sheets/day sheets/day 5 sheets: 32"x8" G.I. sheets/day lights/day pcs. 2"x5"x16" or 40 bd.ft./day pcs. Door/day pcs./day bd.ft./day bd.ft./day sheets 4'x8'/day bd.ft./day sq.ft/day 88.88889 Labor Estimate CONSTRUCTION WORK CAPACITIES IN MAN HOURS Total 2.40 1.45 1.15 More than 2 Sec. High Dismantle 1.00 0.60 0.40 MISCELLANEOUS LABOR OUTPUT PHILIPPINE STANDARD WEIGHT OF REINFORCING BARS 12.00m kilograms 2.664 7.392 10.644 18.924 29.556 46.176 95.76 57.924 75.66 1. Concreting of Plain Flooring 2 men pour 1.2 cu.m. concrete/day 2. Concreting of Reinf. Flooring 2 men pour 0.84 cu.m. conc./day 3. Concreting of Column & Beam 2 men pour 0.50 cu.m. conc./day 4. Finishing of Flooring (rough) 2 men finishes 72 5. Finishing of CHB Joints 2 men finishes 420 6. Plastering of CHB 2 men plaster 8 7. Laying of CHB 2 men lay 100 pcs./day 8. Breaking old RC Flooring 2 men break 0.3 cu.m./day 9. Laying of glazed tile 4"x4" 2 men lay 100 pcs./day 10. Laying of glazed tile 6"x6" 2 men lay 72 pcs./day 11. Installation of Water Closet 2 men install 1 set water closet/2 days 12. Installation of Lavatory 2 men install 1 set Lav./1 1/2 day 13. Installation of G.I. Sheets 32"x8" on Steel Frames 2 men install 11 sheets/day 14. Installation of G.I. Sheets 32"x8" on Wooden Frames 2 men install 20 sheets/day 15. Installation of G.I. Sheets 32"x12" on Steel Frames 2 men install 10 sheets/day 16. Installation of G.I. Sheets 32"x12" on Wooden Frames 2 men install 15 sheets/day 17. Fabricating and Installation of Gutter Downspout, Ridge roll 2 men fab. Install 5 18. Installation of G.I. Pipe 1/2 x 20" 2 men install 20 lights/day 19. Installation of Doors and Window Jamp 1 men install 3 pcs. 2"x5"x16" or 20. Installation of Door (Complete of Hinges and Knob) 1 men install 2 pcs. Door/day 21. Fabrication of Doors (Excluding Planning of Frames) 1 men makes 3 pcs./day 22. Planning Rough Lumber (Including Allignment) 1 man Planes 48 bd.ft./day 23. Planning Rough Lumber (No Allignment) 1 man Planes 120 bd.ft./day 24. Installation of Plywood Board 2 men install 15 sheets 4'x8'/day 25. Installation of Wooden Post 2 men install 96 bd.ft./day 26. Installation of Wood Jalousies Windows 1 men install 18.75 sq.ft/day I. Earth Works: a. Excavation 1.82 man hours/cu.m. b. Backfill 1.34 man hours/cu.m. II. Form Works: a. Footing, grade, 2.5 man hours/sq.m. column b. Beams, bond beams, 2.8 man hrs./sq.m. floor slab c. Roof beams & bond 3.01 man hrs./sq.m. beams d. Roof slab 3.34 man hrs./sq.m. e. Retaining Walls 2.4 man hrs./sq.m. f. Stairs & Landing 2.48 man hrs./sq.m. g. Form oil application 6 man hrs./sq.m. III. Reinforcement: a. Reinforcement of 9 man hours/100 kilos footing up to roofing b. Grade Slab EWP 13 man hours/100sq.m. c. Floor membrane 15 man hours/100sq.m. d. Roof beams & bond 2.88 man hours/cu.m. Labor Estimate Activities CONSTRUCTION WORK CAPACITIES IN MAN HOURS beams e. Stairs 2.6 man hours/cu.m. f. Roof Slab 2.91 man hours/cu.m. g. Curing (water) 2 man hours/day for 7 days h. Equipment: 1 Vibrator 16 min./cu.m. 2 Crane 4 cu.m./man hour FORMWORKS MANHOURS PER SQUARE METER ITEMS Carpenter Laborer 1. Continous Wall Type (CHB) 0.70 0.40 1.10 2. Foundation on Pile Caps 1.50 0.65 2.15 3. Grade Beam or FTB 0.75 0.40 1.15 4. Walls Ground to 8 ft. high 1.10 0.72 1.82 5. Walls 8 ft. to 16 ft. high 1.21 0.78 1.99 6. Walls 16 ft. to 20 ft. high 1.35 0.90 2.25 7. Columns 1.22 0.80 2.02 8. Beams & Girders 1.90 1.22 3.12 9. Elevated Slabs (word shores) 1.15 1.16 2.31 10. Elevated Slabs (adjusted shores) 0.70 0.90 1.60 SCAFFOLDING LENGTH Erect Dismantle Total Erect 1 to 2 Section Long 1.20 0.35 1.55 1.40 3 to 5 Section Long 0.75 0.5 1.25 0.85 6 section or more long 0.65 0.35 1.00 0.75 1. Common Excavation (Manual) 6.00 MH/cu.m. 2. Common Excavation (Machine) 0.50 MH/cu.m. 3. Hook Excavation (Manual & Machine) 8.00 MH/cu.m. 4. Structural Backfill (Manual) 5.00 MH/cu.m. 5. Structural Backfill (Machine) 2.00 MH/cu.m. 6. Hauling Spoils 1.00 MH/cu.m. 7. Trenching by Hand 6.00 MH/cu.m. 8. Trenching by Machine 0.20 MH/cu.m. 9. Piping Installation CONCRETE FOUNDATION AND ELEVATED CONCRETE UNIT MANHOURS 1. GRADE MEMBER Formwork 2.54 MH/sq.m. Concreting 8.54 MH/sq.m. Rebar Works 0.07 MH/sq.m. Finishing 0.40 MH/sq.m. 2. SUSPENDED MEMBER MANHOURS Total 1 or 2 Section High More than 2 Sec. High Dismantle 1.00 0.60 0.40 UNIT MANHOURS ITEM OF WORK Formwork 3.28 MH/sq.m. Concreting 16.70 MH/sq.m. Rebar Works 0.08 MH/sq.m. Finishing 0.80 MH/sq.m. Excavation 1.35 cu.m./man day Backfill 3.87 cu.m./man day Disposal of spoils 4.70 cu.m./man day Formworks 2.70 cu.m./man day Steelworks 10.00 kg./man day Concreting 0.91 cu.m./man day Finishing 11.80 cu.m./man day CHB Zocalo wall 2.40 sq.m./man day Ground floor slab (concreting) 1.00 cu.m./man day 6 mm 0.222 0.2827 1.332 1.665 1.998 10 mm 0.616 0.7854 3.696 4.62 5.544 12 mm 0.887 1.131 5.322 6.6525 7.983 16 mm 1.577 2.011 9.462 11.8275 14.193 20 mm 2.463 3.142 14.778 18.4725 22.167 25 mm 3.848 4.919 23.088 28.86 34.632 28 mm 4.827 6.1575 28.962 36.2025 43.443 32 mm 6.305 8.0425 37.83 47.2875 56.745 36 mm 7.98 10.179 47.88 59.85 71.82 FORMULAS TO FIND APPROXIMATE NUMBER OF NAILS REQUIRED Number of Pounds (12d + 60d, framing) = d/6 x BF/100 Number of Pounds (2d to 12d, sheating) = d/4 x BF/100 where d = size of desired nail in pennies BF = total board feet to be nailed MISCELLANEOUS LABOR OUTPUT PHILIPPINE STANDARD WEIGHT OF REINFORCING BARS Nominal diameter Unit Wt. kg./meter Nominal sectional 6.00m kilograms 7.50m kilograms 9.00m kilograms 10.50m kilograms 12.00m kilograms 2.331 2.664 6.468 7.392 9.3135 10.644 16.5585 18.924 25.8615 29.556 40.404 46.176 83.79 95.76 50.6835 57.924 66.2025 75.66 cu.m. concrete/day cu.m. conc./day cu.m. conc./day sq.m./day pcs./day sq.m./day set water closet/2 days set Lav./1 1/2 day sheets: 32"x8" G.I. sheets/day pcs. 2"x5"x16" or 40 bd.ft./day pcs. Door/day sheets 4'x8'/day Labor Estimate CONSTRUCTION WORK CAPACITIES IN MAN HOURS Total 2.40 1.45 1.15 More than 2 Sec. High MISCELLANEOUS LABOR OUTPUT