There are five maturity levels, each a layer in the foundation for ongoing process improvement,
designated by the numbers 1 through 5:
1. Initial 2. Managed SP 1.1 Identify Configuration Items. Identify the configuration items, components, and related work products that will be placed under configuration management. SP 1. !stablish a Configuration "anagement System ca SP 1.# Create or $elease %aselines Create or release baselines for internal use and for delivery to the customer. SP .1 Trac& Change $e'uests Track change requests for the configuration items. SP . Control Configuration Items Control changes to the configuration items. SP #.1 !stablish Configuration "anagement $ecords Establish and maintain records describing configuration items. SP #. Perform Configuration (udits Perform configuration audits to maintain integrity of the configuration baselines. SP 1.1 !stablish "easurement )b*ectives Establish and maintain measurement obectives that are derived from identified information needs and obectives. SP 1. Specify "easures !pecify measures to address the measurement obectives. SP 1.# Specify +ata Collection and Storage Procedures !pecify how measurement data will be obtained and stored. SP 1., Specify (nalysis Procedures !pecify how measurement data will be analy"ed and reported. SP .1 Collect "easurement +ata #btain specified measurement data. SP . (naly-e "easurement +ata $naly"e and interpret measurement data. SP .# Store +ata and $esults %anage and store measurement data, measurement specifications, and analysis results. SP ., Communicate $esults &eport results of measurement and analysis activities to all relevant stakeholders. SP 1.1 "onitor Pro*ect Planning Parameters %onitor the actual values of the proect planning parameters against the proect plan. SP 1. "onitor Commitments %onitor commitments against those identified in the proect plan. SP 1.# "onitor Pro*ect $is&s %onitor risks against those identified in the proect plan. SP 1., "onitor +ata "anagement %onitor the management of proect data against the proect plan. SP 1.5 "onitor Sta&eholder Involvement %onitor stakeholder involvement against the proect plan. SP 1.. Conduct Progress $evie/s Periodically review the proect's progress, performance, and issues. SP 1.0 Conduct "ilestone $evie/s &eview the accomplishments and results of the proect at selected proect milestones. SP .1 (naly-e Issues Collect and analy"e the issues and determine the corrective actions necessary to address the issues. SP . Ta&e Corrective (ction Take corrective action on identified issues. SP .# "anage Corrective (ction %anage corrective actions to closure. SP 1.1 !stimate the Scope of the Pro*ect Establish a top(level work breakdown structure )*+!, to estimate the scope of the proect. SP 1. !stablish !stimates of 1or& Product and Tas& (ttributes Establish and maintain estimates of the attributes of the work products and tasks. SP 1.# +efine Pro*ect 2ifecycle -efine the proect lifecycle phases on which to scope the planning effort. SP 1., +etermine !stimates of !ffort and Cost Estimate the proect effort and cost for the work products and tasks based on estimation rationale. SP .1 !stablish the %udget and Schedule Establish and maintain the proect.s budget and schedule. SP . Identify Pro*ect $is&s Identify and analy"e proect risks. SP .# Plan for +ata "anagement Plan for the management of proect data. SP ., Plan for Pro*ect $esources Plan for necessary resources to perform the proect. SP .5 Plan for 3eeded 4no/ledge and S&ills Plan for knowledge and skills needed to perform the proect. SP .. Plan Sta&eholder Involvement Plan the involvement of identified stakeholders. SP .0 !stablish the Pro*ect Plan Establish and maintain the overall proect plan content. SP #.1 $evie/ Plans That (ffect the Pro*ect &eview all plans that affect the proect to understand proect commitments. SP #. $econcile 1or& and $esource 2evels &econcile the proect plan to reflect available and estimated resources. SP #.# )btain Plan Commitment #btain commitment from relevant stakeholders responsible for performing and supporting plan e/ecution. SP 1.1 )b*ectively !valuate Processes #bectively evaluate the designated performed processes against the applicable process descriptions, standards, and procedures. SP 1. )b*ectively !valuate 1or& Products and Services #bectively evaluate the designated work products and services against the applicable process descriptions, standards, and procedures. SP .1 Communicate and !nsure $esolution of 3oncompliance Issues Communicate quality issues and ensure resolution of noncompliance issues with the staff and managers. SP . !stablish $ecords Establish and maintain records of the quality assurance activities. SP 1.1 )btain an 5nderstanding of $e'uirements -evelop an understanding with the requirements providers on the meaning of the requirements. SP 1. )btain Commitment to $e'uirements #btain commitment to the requirements from the proect participants. SP 1.# "anage $e'uirements Changes %anage changes to the requirements as they evolve during the proect. SP 1., "aintain %idirectional Traceability of $e'uirements %aintain bidirectional traceability among the requirements and work products. SP 1.5 Identify Inconsistencies %et/een Pro*ect 1or& and $e'uirements Identify inconsistencies between the proect plans and work products and the requirements. SP 1.1 +etermine (c'uisition Type -etermine the type of acquisition for each product or product component to be acquired. SP 1. Select Suppliers !elect suppliers based on an evaluation of their ability to meet the specified requirements and established criteria. SP 1.# !stablish Supplier (greements Establish and maintain formal agreements with the supplier. SP .1 !6ecute the Supplier (greement Perform activities with the supplier as specified in the supplier agreement. SP . "onitor Selected Supplier Processes !elect, monitor, and analy"e processes used by the supplier. SP .# !valuate Selected Supplier 1or& Products !elect and evaluate work products from the supplier of custommade products. SP ., (ccept the (c'uired Product Ensure that the supplier agreement is satisfied before accepting the acquired product. SP .5 Transition Products Transition the acquired products from the supplier to the proect. 3. Defined SP 1.1 !stablish 7uidelines for +ecision (nalysis SP 1. !stablish !valuation Criteria SP 1.# Identify (lternative Solutions SP 1., Select !valuation "ethods SP 1.5 !valuate (lternatives SP 1.. Select Solutions SP 1.1 !stablish the Pro*ect8s +efined Process SP 1. 5se )rgani-ational Process (ssets for Planning Pro*ect (ctivities SP 1.# !stablish the Pro*ect9s 1or& !nvironment SP 1., Integrate Plans SP 1.5 "anage the Pro*ect 5sing the Integrated Plans SP 1.. Contribute to the )rgani-ational Process (ssets SP .1 "anage Sta&eholder Involvement SP . "anage +ependencies SP .# $esolve Coordination Issues SP 1.1 !stablish Standard Processes SP 1. !stablish 2ifecycle "odel +escriptions SP 1.# !stablish Tailoring Criteria and 7uidelines SP 1., !stablish the )rgani-ation8s "easurement $epository SP 1.5 !stablish the )rgani-ation8s Process (sset 2ibrary SP 1.. !stablish 1or& !nvironment Standards SP 1.1 !stablish )rgani-ational Process 3eeds SP 1. (ppraise the )rgani-ation8s Processes SP 1.# Identify the )rgani-ation9s Process Improvements SP .1 !stablish Process (ction Plans SP . Implement Process (ction Plans SP #.1 +eploy )rgani-ational Process (ssets SP #. +eploy Standard Processes SP #.# "onitor Implementation SP #., Incorporate Process:$elated !6periences into the )rgani-ational Process (ssets SP 1.1 !stablish the Strategic Training 3eeds !stablish and maintain the strategic training needs of the organi-ation. SP 1. +etermine 1hich Training 3eeds (re the $esponsibility of the )rgani-ation +etermine /hich training needs are the responsibility of the organi-ation and /hich /ill be left to the individual pro*ect or support group. SP 1.# !stablish an )rgani-ational Training Tactical Plan !stablish and maintain an organi-ational training tactical plan. SP 1., !stablish Training Capability !stablish and maintain training capability to address organi-ational training needs. SP .1 +eliver Training +eliver the training follo/ing the organi-ational training tactical plan. SP . !stablish Training $ecords !stablish and maintain records of the organi-ational training. SP .# (ssess Training !ffectiveness (ssess the effectiveness of the organi-ation8s training program. SP 1.1 +etermine Integration Se'uence +etermine the product component integration se'uence. SP 1. !stablish the Product Integration !nvironment !stablish and maintain the environment needed to support the integration of the product components. SP 1.# !stablish Product Integration Procedures and Criteria !stablish and maintain procedures and criteria for integration of the product components. SP .1 $evie/ Interface +escriptions for Completeness $evie/ interface descriptions for coverage and completeness. SP . "anage Interfaces "anage internal and e6ternal interface definitions, designs, and changes for products and product components. SP #.1 Confirm $eadiness of Product Components for Integration Confirm, prior to assembly, that each product component re'uired to assemble the product has been properly identified, functions according to its description, and that the product component interfaces comply /ith the interface descriptions. SP #. (ssemble Product Components (ssemble product components according to the product integration se'uence and available procedures. SP #.# !valuate (ssembled Product Components !valuate assembled product components for interface compatibility. SP #., Pac&age and +eliver the Product or Product Component Pac&age the assembled product or product component and deliver it to the appropriate customer. SP 1.1 !licit 3eeds !licit sta&eholder needs, e6pectations, constraints, and interfaces for all phases of the product lifecycle. SP 1. +evelop the Customer $e'uirements Transform sta&eholder needs, e6pectations, constraints, and interfaces into customer re'uirements. SP .1 !stablish Product and Product Component $e'uirements !stablish and maintain product and product component re'uirements, /hich are based on the customer re'uirements. SP . (llocate Product Component $e'uirements (llocate the re'uirements for each product component. SP .# Identify Interface $e'uirements Identify interface re'uirements. SP #.1 !stablish )perational Concepts and Scenarios !stablish and maintain operational concepts and associated scenarios. SP #. !stablish a +efinition of $e'uired ;unctionality !stablish and maintain a definition of re'uired functionality. SP #.# (naly-e $e'uirements $naly"e requirements to ensure that they are necessary and sufficient. SP #., (naly-e $e'uirements to (chieve %alance $naly"e requirements to balance stakeholder needs and constraints. SP #.5 <alidate $e'uirements 0alidate requirements to ensure the resulting product will perform as intended in the user's environment. SP 1.1 +etermine $is& Sources and Categories -etermine risk sources and categories. SP 1. +efine $is& Parameters -efine the parameters used to analy"e and categori"e risks, and the parameters used to control the risk management effort. SP 1.# !stablish a $is& "anagement Strategy Establish and maintain the strategy to be used for risk management. SP .1 Identify $is&s Identify and document the risks. SP . !valuate, Categori-e, and Prioriti-e $is&s Evaluate and categori"e each identified risk using the defined risk categories and parameters, and determine its relative priority. SP #.1 +evelop $is& "itigation Plans -evelop a risk mitigation plan for the most important risks to the proect as defined by the risk management strategy. SP #. Implement $is& "itigation Plans %onitor the status of each risk periodically and implement the risk mitigation plan as appropriate. S7 1 Select Product Component Solutions Product or product component solutions are selected from alternative solutions. SP 1.1 +evelop (lternative Solutions and Selection Criteria -evelop alternative solutions and selection criteria. SP 1. Select Product Component Solutions !elect the product component solutions that best satisfy the criteria established. SP .1 +esign the Product or Product Component -evelop a design for the product or product component. SP . !stablish a Technical +ata Pac&age Establish and maintain a technical data package. SP .# +esign Interfaces 5sing Criteria -esign product component interfaces using established criteria. SP ., Perform "a&e, %uy, or $euse (nalyses Evaluate whether the product components should be developed, purchased, or reused based on established criteria. SP #.1 Implement the +esign Implement the designs of the product components. SP #. +evelop Product Support +ocumentation -evelop and maintain the end(use documentation. SP 1.1 Select Products for <alidation !elect products and product components to be validated and the validation methods that will be used for each. SP 1. !stablish the <alidation !nvironment Establish and maintain the environment needed to support validation. SP 1.# !stablish <alidation Procedures and Criteria Establish and maintain procedures and criteria for validation. SP .1 Perform <alidation Perform validation on the selected products and product components. SP . (naly-e <alidation $esults $naly"e the results of the validation activities. SP 1.1 Select 1or& Products for <erification !elect the work products to be verified and the verification methods that will be used for each. SP 1. !stablish the <erification !nvironment Establish and maintain the environment needed to support verification. SP 1.# !stablish <erification Procedures and Criteria Establish and maintain verification procedures and criteria for the selected work products. SP .1 Prepare for Peer $evie/s Prepare for peer reviews of selected work products. SP . Conduct Peer $evie/s Conduct peer reviews on selected work products and identify issues resulting from the peer review. SP .# (naly-e Peer $evie/ +ata $naly"e data about preparation, conduct, and results of the peer reviews. SP #.1 Perform <erification Perform verification on the selected work products. SP #. (naly-e <erification $esults $naly"e the results of all verification activities. 4. Quantitatively Managed SP 1.1 Select Processes !elect the processes or subprocesses in the organi"ation's set of standard processes that are to be included in the organi"ation's process(performance analyses. SP 1.2 Establish Process-Performance Measures Establish and maintain definitions of the measures that are to be included in the organi"ation.s process(performance analyses. SP 1.3 Establish Quality and Process-Performance Objectives Establish and maintain quantitative obectives for quality and process performance for the organi"ation SP 1. Establish Process-Performance !aselines Establish and maintain the organi"ation's process(performance baselines. SP 1." Establish Process-Performance Models Establish and maintain the process(performance models for the organi"ation.s set of standard processes SP 1.1 Establish the Project#s Objectives Establish and maintain the proect.s quality and processperformance obectives. SP 1.2 $om%ose the &efined Process !elect the subprocesses that compose the proect.s defined process based on historical stability and capability data. SP 1.3 Select the Sub%rocesses that 'ill !e Statistically Mana(ed !elect the subprocesses of the proect's defined process that will be statistically managed. SP 1. Mana(e Project Performance %onitor the proect to determine whether the proect.s obectives for quality and process performance will be satisfied, and identify corrective action as appropriate SP 2.1 Select Measures and )nalytic *echni+ues !elect the measures and analytic techniques to be used in statistically managing the selected subprocesses. SP 2.2 )%%ly Statistical Methods to ,nderstand -ariation Establish and maintain an understanding of the variation of the selected subprocesses using the selected measures and analytic techniques. SP 2.3 Monitor Performance of the Selected Sub%rocesses %onitor the performance of the selected subprocesses to determine their capability to satisfy their quality and processperformance obectives, and identify corrective action as necessary. SP 2. .ecord Statistical Mana(ement &ata &ecord statistical and quality management data in the organi"ation.s measurement repository 5. Optimizing SP 1.1 Select &efect &ata for )nalysis !elect the defects and other problems for analysis. SP 1.2 )naly/e $auses Perform causal analysis of selected defects and other problems and propose actions to address them. SP 2.1 0m%lement the )ction Pro%osals Implement the selected action proposals that were developed in causal analysis. SP 2.2 Evaluate the Effect of $han(es Evaluate the effect of changes on process performance. SP 2.3 .ecord &ata &ecord causal analysis and resolution data for use across the proect and organi"ation. SP 1.1 $ollect and )naly/e 0m%rovement Pro%osals Collect and analy"e process( and technology(improvement proposals. SP 1.2 0dentify and )naly/e 0nnovations Identify and analy"e innovative improvements that could increase the organi"ation.s quality and process performance. SP 1.3 Pilot 0m%rovements Pilot process and technology improvements to select which ones to implement SP 1. Select 0m%rovements for &e%loyment !elect process and technology improvements for deployment across the organi"ation. SP 2.1 Plan the &e%loyment Establish and maintain the plans for deploying the selected process and technology improvements. SP 2.2 Mana(e the &e%loyment %anage the deployment of the selected process and technology improvements SP 2.3 Measure 0m%rovement Effects %easure the effects of the deployed process and technology improvements.