Está en la página 1de 45

1

96 11 23
--961123

--961123

--961123

: ,,

98%

: WWEA

--961123

--961123

--961123

9.0/

3.5/()

1.7/

1.2/

0.8/

2.0
--961123

1
0.250.37
1
1 CO23.5NOx6.1
SO2

--961123

--961123

10

Annual Wind Power Development


Actual 1990-2006 & Forecast 2007-2011
40,000
35,000
30,000

20%30%

MW

25,000
20,000

15,000

10,000

5,000
0
1990

1995

Source: BTM Consult ApS - March 2007

: BTM

2000
Europe

2006
USA

A sia

2011

Rest of World

Existing

--961123

11

200673,904MW14,900MW2006
25.3%
2010160,000MW2006 ~ 2010
20%

: WWEA

--961123

12

--961123

13

2006

Total Americas
Total Europe
Total South & East Asia
Total OECD-Pacific
Total Africa
Total other continents and
areas:
Annual
MW
installed
capacity
Cumulative MW installed
in the world

Installed
MW
2005
2,671
6,372
1,971
484
44

Accu.
MW
2005
10,062
41,044
5,753
2,137
278

Installed
MW
2006
3,515
7,682
3,220
491
109

Accu.
MW
2006
13,577
48,627
8,963
2,628
386

% of installed
MW
2006
23.4%
51.2%
21.4%
3.3%
0.7%

124

0.0

124

0.0%

11,542

15,016
59,398

74,306

Source: BTM Consult ApS - March 2007

: BTM

--961123

14

2006

53247MW
72%

: WWEA

--961123

15

2005
77.8%(200485.5%; 200375%)

: BTM

--961123

16

2006
82.4%(200577.8%; 200485.5%; 200375%)

Top-10 Suppliers in 2006


% of the total market 15,016 MW
GE WIND (US)
15.5%

ENERCON (GE)
15.4%

GA MESA (ES)
15.6%
SUZLON (Ind)
7.7%

SIEMENS (DK)
7.3%

V ESTA S (DK)
28.2%
Source: BTM Consult ApS - March 2007

: BTM

NORDEX (GE)
3.4%
REPOWER (GE)
3.2%
A CCIONA (ES)
Others
4.6% GOLDWIND (PRC) 2.8%
2.8%

--961123

17

2006
(MW)

(MW)

GoldWind
Acciona
Repower
Nordex
Siemens
Suzlon
Enercon
GE Wind
Gamesa
Vestas
0

: BTM

500

1000

1500

2000

2500

3000

3500

4000

4500 MW

--961123

18


--96.03.08
1.
2.
3.
4.
5.

202020%
2020199020%
202010%

2010
LED

1.
2.
3.
4.
5.
6.
7.

: 96.03.11

--961123

19

2006

1( )

2,454MW
(26..8%)

2,194MW
(11.9%)

1,587MW
(15.8%)

8MW
(0.3%)

2006

11,603 MW

20,622 MW

11,615 MW

3,136 MW

()

30,000 MW
(2010)
100,000MW
(2020)

28,000 MW
(2010)

20,000 MW
(2011)

5,000 MW
(2010)

2006

1( )

1,840 MW
(41.5%)

1,145 MW
(90.93%)

354 MW
(34%)

79.8 MW
(600%)

2006

6,270 MW

2,405 MW

1,394 MW

103.7 MW

()

12,000MW
(2012)

30,000MW
(2020)
100,000MW
(2030)
400,000MW
(2050)

3,000MW
(2010)
11,800MW
(2030)

2,159MW
(2010)

1()2006
WWEA (2007/02)

--961123

20

--961123

21

--961123

22

2040

--961123

23

Pe = Pw Cp m g

Cp ()
0.59 {Betz limit}
g ()
50%,80%
m ()
95%

--961123

24

Power in the Wind


(W/m2)
= 1/2 x air density x swept rotor area x (wind speed)3
A
V3

Density = P/(RxT)
P - pressure (Pa)
R - specific gas constant (287 J/kgK)
T - air temperature (K)

kg/m3

Area = r2
m2

Instantaneous Speed
(not mean speed)
m/s

--961123

25

--961123

vs

26

--961123

vs

27

--961123

28

(20kw)

()


H

--961123

()

29

--961123

30

--961123

31

3m/sec(
2m/sec)

--961123

32

--961123

33

1.

2.

1.

3.

2.

!!

5.
1. 2. 3.4.

)
1. 2. 3. 4. 5.

1. 2.

1. 2. 3. 4.

6.

--961123

34

--961123

35

--961123

36

Wake loss3~6

Ris National Lab.

--961123

37

shadow flicker

--961123

38

(wind mill)

(wind turbine)

wind farm

--961123

40


Grid Connection

Hybrid System

--961123

41

660

1,750

23.5

33

45

60

8 x 82 15 x 152

Vestas 660
Vestas 1,750

--961123

700

600

3 ~ 4 /
25/

500

60/

20

15 m/s

300

4 m/s

200

100

0
0

25 m/s

400

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

Vestas V47-660 kW

43

--961123

44

Yaw

--961123

45

(Rotor blade)
(Hub)
(Main Bearing)
(Rotor control)
(Gear box)
(Shafting)
(Generator)
(Disc Brake & caliper)
(Machine bed)
(Spinner & Nacelle)
(Yaw-gear)
(Meteorological sensors)
(Tower & Foundation)
(Converter)
(Control panel)
(Scada software)
(Cooling system)
(Lighting protection)
(Ladder & lift)
(Underground Cable)
--961123

También podría gustarte