paso=25 cm
contrapaso=0.18 cm
0.40
b=1.0 (ancho)
2.00
0.40
1.20
Wu1 =
79056.00 kg/m
pp=
790.56 kg/m
acabado=
100 x 1 x (1.2)
120.00 kg/m
s/c=
500 x 1 x (1.6)
800.00 kg/m
1710.56 kg/m
Wu1 =
pp=
435.60 kg/m
acabado=
100 x 1 x (1.2)
120.00 kg/m
s/c=
500 x 1 x (1.6)
800.00 kg/m
1355.60 kg/m
G. OLIVA CAIRO
0.25
t=
Ln
t=
20.00
t=
t=
0.18
t= 0.15
20.00
Ln
t=
25.00
=
3.525
3.53
t=
0.14
25.00
=
C.A
= 3571'
0.81
H
Cos =
h=
18.47
hm=
27.47
hm= h + cp/2
G. OLIVA CAIRO
ELEMENTO
DESCRIPCION SECCCION (A)
N
1
2
3
4(a)
4(b)
4c
5(a)
5(b)
6
7
8
9
Tablones
Soleras
Bases
Pie Derecho
Pie Derecho
Pie Derecho
Arriostres
Arriostres
Barrotes
Contrapasos
Costados
Refuerzo
Contrapasos
1 1/2"x8"
2"x4"
3"x3"
2"x4"
2"x4"
2"x4"
1 1/2"x4"
1 1/2"x4"
2"x4"
1 1/2"x8"
1 1/2"x8"
LONGITUD
M.L PIES (B)
1.20
4.20
1.20
1.55
0.90
0.30
1.50
1.20
1.20
1.00
4.20
3.94
13.78
3.94
5.09
2.95
0.98
4.92
3.94
3.94
3.28
13.78
1"x4" 0.30
0.98
14.37
(1.0X4.20)+2(4.20X0.18)+(11X1.0X0.18)= 7.69 M2
DESPERDICIOS
MADERA 10%
(0x1.10)=E
91.01
20.21
13.00
14.93
4.32
4.44
10.82
8.67
11.56
39.69
30.32
15.81
N DE
USOS
N DE
USOS
(H=E/G)
U.M
(H/U.M)
7
7
7
6
6
6
6
6
7
4
7
13.00
2.89
1.56
2.49
0.72
0.24
1.80
1.45
1.65
9.92
4.33
1.69
0.38
0.24
0.32
0.09
0.03
0.23
0.19
0.21
1.29
0.56
3.95
0.51
TOTAL
5.74
DESCRIPCION
SECCCION (A)
M.L
10
ALAMBRE NEGRO N 16
(0.0017 KG/ML)
11
PIES (B)
CANTIDAD DE
CLAVOS,
ELEMENTOS ALAMBRS, ETC
(C)
KG (D)
32.00
250.00
(1.0X4.20)+2(4.20X0.18)+(11X1.0X0.18)= 7.69 M2
DESPERDICIOS
CLAVOS,
ALAMBRE, ETC
15% (Dx1.15)=F
N DE USOS
(G)
MATERIAL DE
U.M (H/U.M)
USOS (H=F/G)
0.54
0.62
1.00
0.62
0.08
1.39
1.60
2.00
0.80
0.10
TOTAL
0.18
PARTIDA
RENDIMIENTO
HABILITACION
PARTIDA
RENDIMIENTO
COLOCACION
CLAVOS DE 3"
ALAMBRE NEGRO RECOGIDO #8
EQUIPOS
HERRAMIENTAS MANUALES
04.01.03
ACERO
KG/DIA
250.00
DESCRIPCION DEL RECURSO
MANO DE OBRA
CAPATAZ
OPERARIO
OFICIAL
05.02.00
ACERO
KG/DIA
250.00
CAPATAZ
OPERARIO
OFICIAL
MATEREIALES
FIERRO CORRUGADO DE 1/2" (PROMEDIO)
ALAMBRE NEGRO RECOGIDO #8
EQUIPOS
HERRAMIENTAS MANUALES
CIZALLA
KG
KG
0.1300000
0.2600000
5.50
5.50
0.72
1.43
%MO
5.0000000
32.12
1.61
1.61
UND
HH
HH
HH
0.1000
1.0000
1.0000
0.0032000
0.0320000
0.0320000
18.76
18.76
16.12
HH
HH
HH
KG
15.67
PARCIAL S/. TOTAL S/.
1.18
0.06
0.60
0.52
KG
1.18
0.06
0.60
0.52
5.15
KG
KG
1.0700000
0.0600000
4.50
5.50
4.82
0.33
3.0000000
0.0320000
2.35
35.00
7.06
1.12
8.18
%MO
HM
1.0000
Obra
Form.
Cliente
Ubicac.
ITEM
01.00.00
01.01.00
01.01.01
02.00.00
02.01.00
02.01.01
02.01.02
02.01.03
03.00.00
03.01.01
02.01.02
03.02.01
03.02.01
04.00.00
04.01.00
04.01.01
04.01.02
04.01.03
METRADO
P. UNITARIO
1.00
300.00
3.85
0.76
3.85
3.85
3.76
3.66
3.85
2.43
0.16
0.82
0.96
7.69
141.00
430.99
57.60
15.67
7.850000%
7.500000%
P. PARCIAL
300.00
300.00
300.00
2.94
2.94
28.58
14.49
14.10
3,074.27
9.36
9.36
0.13
0.13
3,064.77
3,064.77
412.03
442.95
2,209.79
6,470.56
507.94
485.29
7,463.79
1,343.48
8,807.28
PLANILLA DE FIERROS
Obra
Form.
Cliente
Ubicac.
N
05.02.00
N de
N
Long.
1/4"
DESCRIPCION
Diam. Veces Piezas Pieza
0.25
ACERO
Longitudinal
Transversal
05.02.00
3/8"
1/2"
1/4"
1/2"
6
6
4
24
2.9
1.2
172.80
3/8"
1/2"
1/4"
1/2"
3
2
4
24
5.3
1.2
57.60
3/8"
1/2"
1/4"
1/2"
2
2
4
34
5.3
1.2
81.60
1/4"
1/2"
1
1
20
15
5
6
VIGAS
VIGA 1
Longitudinal
Transversal
VIGA 2
Longitudinal
Transversal
05.03.03
ACERO
Longitudinal
Losa aligerada
100.00
412.00
LA DE FIERROS
SO (PERSONA NATURAL)
CONTRATISTA: ROGI SAC
INSPECTOR: ING. FLAVIO CASTAON
FACTOR DE RELACION: 1.0000000000
LONGITUD (m) por
3/8"
1/2"
5/8"
3/4"
1"
Peso
0.56
1.02
1.56
2.26
4.04
Kg
TOTAL
kg
114.19
0.00
0.00
70.99
43.20
0.00
69.60
0.00
79.27
0.00
0.00
64.87
14.40
0.00
63.60
0.00
63.65
0.00
0.00
43.25
20.40
0.00
42.40
0.00
116.80
0.00
90.00
265.60
0.00
0.00
0.00
25.00
91.80
373.91
373.91
1/4"
3/8"
1/2"
5/8"
3/4"
1"