Está en la página 1de 6

R.M.K. COLLEGE OF ENGINEERING AND TECHNOLOGY R S M Nagar,Puduvoyal 601 206 LECTURE PLAN 2013 - 2014.

. (VIII Semester / IV Year) Individual Time Table Section A Name of the Faculty : Dr. P. K .DEVAN Department Subject Code Subject Name : MECHANICAL ENGG. : ME 2036 : PRODUCTION PLANNING & CONTROL Year / Semester Branch : IV /VIII : MECHANICAL ENGG. Tuesday Wednesday Thursday Friday Saturday PPC PPC PPC PPC Period PPC PPC PPC PPC PPC Days I II III IV V VI VII VIII

Tentative dates for Unit tests and Model Exam.


Unit Test I : 30.01.2014 to 05.02.2014

Unit Test II

: 27.02.2014 to 05.03.2014

Model Exam : 31.03.2014 to 09.04.2014

RMKCET/COM/F/15

Proposed Lecture Sl. No Topics to be covered Date Period

Teaching Aids to be used O B P H B P P

Actual Lecture Remarks by the faculty Date Period

Steps taken to cover the incomplete portions, if any Signature of the Staff Member

UNIT I - INTRODUCTION

1 19.12.2013 - 24.12.2013

19.12.2013

1,2

20.12.2013

1,5

3 21.12.2013 23.12.2013 24.12.2013 3,4 2,4

4 5

Objectives and benefits of planning and control-Functions of production control Types of production-job- batch and continuous-Product development and design Marketing aspect - Functional aspects-Operational aspectDurability and dependability aspectaesthetic aspect. Profit consideration-Standardization, Simplification & specialization Break even analysis-Economics of a new design.

19.12.2013

1,2

20.12.2013

1,5

x 21.12.2013 x x 23.12.2013 24.12.2013

3,4 Signature of 2,4 HoD Signature of The Principal

No.of hours planned : 9

Actual hours taken: 9

RMKCET/COM/F/15

Proposed Lecture Sl. No Topics to be covered Date Period

Teaching Aids to be used O B P H B P P

Actual Lecture Remarks by the faculty Date Period

Steps taken to cover the incomplete portions, if any Signature of the Staff Member

UNIT II - WORK STUDY

1 26.12.2013 - 31.12.2013

26.12.2013

1,8

2 3 4 5

27.12.2013 28.12.2013 30.12.2013

1,5 3 3,4 2,4

Method study, basic procedureSelection-Recording of process Critical analysis, Development - Implementation Micro motion and memo motion study Work measurement - Techniques of work measurement Time study - Production study Work sampling - Synthesis from standard data - Predetermined motion time standards.

26.12.2013

1,8

x x x x

27.12.2013 28.12.2013 30.12.2013

1,5 3 3,4 2,4 Signature of HoD Signature of The Principal

31.12.2013

31.12.2013

No.of hours planned : 9

Actual hours taken: 9

RMKCET/COM/F/15

Proposed Lecture Sl. No Topics to be covered Date Period

Teaching Aids to be used O B P H B P P

Actual Lecture Remarks by the faculty Date Period

Steps taken to cover the incomplete portions, if any Signature of the Staff Member

UNIT III - PRODUCT PLANNING AND PROCESS PLANNING

1 2 2.1.2014 8.1.2014

2.1.2014

1,8 1,5

3.1.2014 3 4.1.2014 7.1.2014 8.1.2014 2,4 3,4

3 4 5

Product planning-Extending the original product information Value analysis-Problems in lack of product planning-Process planning and routing Pre requisite information needed for process planning-Steps in process planning Quantity determination in batch production-Machine capacity, Balancing-Analysis of process capabilities in a multi product system.

x x

2.1.2014

1,8 1,5

3.1.2014 3 4.1.2014 7.1.2014 8.1.2014 2,4 Signature of 3,4 HoD Signature of The Principal

x x x

No.of hours planned : 9

Actual hours taken: 9

RMKCET/COM/F/15

Proposed Lecture Sl. No Topics to be covered Date Period

Teaching Aids to be used O B P H B P P

Actual Lecture Remarks by the faculty Date Period

Steps taken to cover the incomplete portions, if any Signature of the Staff Member

UNIT IV - PRODUCTION SCHEDULING

1 2

9.1.2014 9.1.2014 21 .1.2014

1,8 1,5

10.1.2014

11.1.2014

20.1.2014

1,5

5 21.1.2014 No.of hours planned : 9

2,4

Production Control Systems-Loading and scheduling-Master Scheduling Scheduling rules-Gantt chartsPerpetual loading-Basic scheduling problems Line of balance - Flow production scheduling-Batch production scheduling-Product sequencing ProductionControl systems-Periodic batch control-Material requirement planning kanban Dispatching Progress reporting and expeditingManufacturing lead time-Techniques for aligning completion times and due dates.

x x

9.1.2014

1,8 1,5

10.1.2014

11.1.2014

20.1.2014

1,5

x 21.1.2014

2,4 Actual hours taken: 9

Signature of HoD

Signature of The Principal

RMKCET/COM/F/15

Proposed Lecture Sl. No Topics to be covered Date Period

Teaching Aids to be used O B P H B P P

Actual Lecture Remarks by the faculty Date Period

Steps taken to cover the incomplete portions, if any Signature of the Staff Member

UNIT V - INVENTORY CONTROL AND RECENT TRENDS IN PPC

1 22.1.2014 29 .1.2014 2 3 4 5 6

22.1.2014 23.1.2014 24.1.2014 25.1.2014 28.1.2014

3,4 1,8 1,5 3 2,4 3,4

29.1.2014

Inventory control-Purpose of holding stock Effect of demand on inventoriesOrdering procedures. Two bin system -Ordering cycle system Determination of Economic order quantity and economic lot size ABC analysis-Recorder procedureIntroduction to computer integrated production planning systems elements of JUST IN TIME SYSTEMS-Fundamentals of MRP II and ERP.

x x x x x x

22.1.2014 23.1.2014 24.1.2014 25.1.2014 28.1.2014

3,4 1,8 1,5 3 2,4 3,4 Signature of HoD Signature of The Principal

29.1.2014

No.of hours planned : 11

Actual hours taken: 11

RMKCET/COM/F/15

También podría gustarte