GOVT OF KHYBER PAKHTUNKHWA DIRECTORATE OF MONITORING & EVALUATION PLANNING & DEVELOPMENT DEPARTMENT

FOLLOW UP MONITORING REPORT REGARDING IMPROVEMENT AND WIDENING OF MATTA-FAZIL BANDA ROAD, BAGH DHERI - RAHAT KOT ROAD, GARI LALKOO ROAD, BERYUM GAT SHAWAR AND GAT PEOCHAR ROAD,SWAT (59 KM) (ADP NO !"9#!""$$)
A follow up to the above mentioned project was paid to the site by Divisional Monitoring Office Malakand Division along with Executive Engineer, DO and ub Engineer !"# $ighway Division, scheme% A DESCRIPTION &he scheme '(mprovement and widening of Matta)*a+il ,anda -oad, ,agh Dheri ) -ahat .ot -oad, /ari 0alkoo -oad, ,eryum /at hawar and /at 1eochar -oad, wat 234 .M56 is reflected in AD1 7899)97 at a /eneral erial :o% ;94% &he scheme was originally approved at a cost of -s% <;%78 million by 1D#1 in its meeting held on 77 nd =une, 788>% &he scheme has been revised four 2>5 times since then% &he >th revision of scheme is approved by 1D#1 at a cost of -s% >93%?;; million on 9; th December, 7897% &he scheme is scheduled to be completed in the month of =une, 789;% $owever, its proceedings are in progress and report is awaited% B SCOPE OF WORK AND PROGRESS &he scope of work and physical progress of the scheme are as under% @ S N% " D&'()*+,*%(mpvt@ " #idening of -oad from Matta to *a+il ,anda, ,agh Dherai, -ahat .ot -oad " /harai 0alkoo 27;%3 km5 9% Matta to Aghal Aillage 2.m 9 to 935 7% Aghal Aillage to *a+il ,anda 2.m 93 to 7;%35 ,agh Dherai -ahat .ot -oad 20ength 7%38 .m5 /harai 0alkoo -oad length 2>.m5 !onstruction of > :os% ,ridges -ehabilitation of ,eryum hawar /at -oad 277 .m5 /at 1eochar -oad 2C .m5 !hief Minister Directive C%', (R' *- M) R&./)0' wat to inspect the road to monitor the physical and financial progress of the subject

#ork on portion .M 93 to 7;%3 has been awarded to MBs her 97?%<3> Ali " !o% 3>%<>> 9%?> !ompleted 99%4?9 !ompleted 97%<C9 87 :os bridges constructed% >8%84 !ompleted 977%C?3 #ork started

$ ! 1 5 2

C FINDINGS, OBSERVATIONS AND ANALYSIS3 * A departmental inDuiry committee has been constituted to conduct preliminary inDuiry and to fix responsibility on 9;th March, 7897% &he inDuiry has been completed and responsibility has been fixed accordingly% $owever, the actions

D(A( (O:A0 MO:(&O-(:/ O**(!E, A(DE $A-(* #A&, MA0A.A:D D(A( (O:

1age 9 of 7

GOVT OF KHYBER PAKHTUNKHWA DIRECTORATE OF MONITORING & EVALUATION PLANNING & DEVELOPMENT DEPARTMENT taken by the department in this regard has not been communicated with the monitoring team% ** (t is pertinent to mention here that left over work on portion 'Aghal Aillage to *a+il ,anda 2.m 93 to 7;%356 has been awarded to !ontractor MBs her Ali " !o%by the Executive Engineer !"# $ighway Division, wat% ,ut the approval for awarding this work has not been taken from $igher EpsBcompetent authority which may result in litigation issues at later stages% *** &he work on portion '/at 1eochar -oad 2C .m5 implemented under !hief Minister Directive6 has been stopped by the contractors on the presumption that funds for the scheme has been lapsed% *4 Ender the codal reDuirement, &echnical anction of all schemes is reDuired to be issued immediately after approval of the 1!)(% &his reDuirement has been delayed apparently to cover lapses in the planning and implementation of the project% &herefore, according to !1# code, payments made to the contractor on all items without &echnical anction by the !ompetent Authority are irregular% D RECOMMENDATIONS3 * (t is recommended that the actions taken based on recommendations of inDuiry committee may be shared with Directorate /eneral 2M"E5 for verification% ** &he award of work to MBs her Ali " !o% needs to be regulari+ed by following the approved procedures% *** &he funds may be released to only those portions of scheme where no advance payments have been made so that pace of work on scheme be expedited% *4 A proper work plan may be devised jointly by contractor and executing agency to ensure completion of scheme% 4 &he project shall be immediately technically sanctioned to avoid irregular expenditure%