Está en la página 1de 3

STATEMENT OF THE PROBLEM

The lack of sustainable development Office demand Demand for residential accommodation close to town centers. The protection, conservation and enhancement of urban development and revitalization of the dilapidated place.

To minimize the traffic congestion of the place through the use of traffic calming environment. To provide a new development that will intensify commercial and residential not only within the city but within its nearby cities. To invite more investors in the area.

OBJECTIVES
To revitalize and transform the dilapidated buildings and depressed areas into a mixed-use development in order to increase its economic potential. To create pedestrian friendly environments with a variety of uses that enable people to live, work, play, and shop in one place. To provide for a more compact development and stronger neighborhood character.

SITE
Caloocan has a combined total land area of 5,333.40 hectares and is located at the northern part of the National Capital Region (NCR, Region IV-A). The city is divided into two geographic locations, namely: South Caloocan, with an area of 1,362.50 hectares and North Caloocan, with an area of 3,970.90 hectares The site is situated along Rizal Avenue, located right in the center of one of Metro Manilas busiest districts.

The site is also a major convergence point of mallgoers from all walks of life coming from everywhere. It is accessible via the LRT and the main thoroughfares of northern Manila The site is situated along Rizal Avenue, located right in the center of one of Metro Manilas busiest districts. The site is situated along Rizal Avenue, located right in the center of one of Metro Manilas busiest districts. It is accessible via the LRT and the main thoroughfares of northern Manila
1. 2. 3. 4. 5. 6. 7. 8. 9. Araneta Square Puregold Monumento A view of EDSA road under the LRT1 railway. Victory Liner bus terminal along Rizal Avenue The view of the cleared site Victory Central Mall The sidewalk adjacent to the site A view of the sidewalk on the other side of the road A view of the road under the LRT railway

The site is located in the citys commercial district. The existence of the LRT station in the proximity Access to minor and major roads Lots of students, workers and residents are surrounding the site. Weakness Vehicular and pedestrian traffic in the area. Adjacent to blighted establishments which need redevelopment and revitalization. Opportunities The area has a great potential of becoming another business center in the country. The sites location is a point of arrival of pedestrians from different locations, from them; the proposal will attract more patrons. The proposal will serve as an agent in promoting revitalization in the area to increase its entire economic value. The proposal will light up the area.

SWOT Analysis
Strength

Threats Uncontrolled vehicular congestion in the area. Street crime hot spot area. and pedestrian

the country, the need for housing is becoming even more critical.

Objectives of the Study


To come up with a model of a house construction that can withstand various natural disasters that periodically happen in the country. To provide a self-sufficient building where they can produce the needed water and electricity through the systems of rain water harvesting and waste recycling. To promote Stilted Housing as a possible solution for the flooding problem in Malabon. To give the beneficiaries of the project, a feeling of security by giving them shelter fit for their needs. The demand for housing continues to grow as the Philippine population continues to grow rapidly. And with the disasters that regularly hit

También podría gustarte