Purpose of Today
Raise awareness of recent developments in Powercor technical standards
general overview details are in the standards (see the Intranet/Internet) varied audience (high/medium/low users of the standards)
Network Engineering
Agenda
Introduction Technical Standards changes
New Standards Recent Revisions and Updates Work in Progress Upcoming initiatives
Network Engineering
Powercor Policy
Where a Powercor Technical Standard exists, it shall be used in lieu of the superseded VESI standard
PCA staff, Contractors, Trainers and Auditors
Material/plant to be used on the Network must be approved and used as defined in the standards
if it is not specified in the standards, it is not approved auditing will identify non-compliance and replacement /rework will be required
Impacts
More reliable, safe, legally compliant and cost effective solutions
Technical Standards Group
Network Engineering
Recent Initiatives
VESI Standards are on the Intranet Work instructions, product brochures and user manuals Powervision information video Use of training CDs Approved materials list on the Internet
high risk areas eg : U/G, P/L, LAs, Insuls, Tx
Non-compliance memos
Technical Standards Group
Network Engineering
Transformers
Pole rebutting O/H Switch location guidelines Innovations via Eighthgate ETSA technical alignment
Network Engineering
Network Engineering
Change Speaker...
Network Engineering
DC - Clearances
DC141, DC151 & DC201 - Updated to include 66kV clearance information (EK - Subtransmission)
Network Engineering
DE - Connectors
Updated to include connectors for underground applications, including new link standard (DE206) Bonding standard updated (DE303):
Removed bonding on pole-top for intermediate wood pole structures Include additional bonding in some cases in coastal & polluted applications
Technical Standards Group
Network Engineering
DG - Earthing
DG111 - New earthing installation standard for ACRs DG301 - Updated CMEN standard for LVABC DG211 - Kiosk Earthing Assembly
Completion by December 2001 Based on 3.5m x 3.5m reserve for front access kiosks
Network Engineering
DG - Earthing
Software Example - An Earthing Analysis via MATLAB
Voltage
2 = 344 ohm/m
Network Engineering
Network Engineering
Install Fault Tamers in lieu of BA and PF fuses for all new installations 20A
Selection information in DP011
FTs weight is comparable to BA and less than a PF Reporting of maloperation to the hotline
9683 4151 (24hr)
Technical Standards Group
Network Engineering
New cable head pole arrangement introduced to reduce potential for animal induced flashovers on cable head pole structures (DQ201): Phase-phase flashover - increase phasephase clearance via re-designed bracket
400mm 550mm 750mm (arrester-arrester)
Technical Standards Group
DQ - Overvoltage Protection
Network Engineering
750mm
Network Engineering
Change Speaker...
Network Engineering
DD-Drafting Standard
LV Reticulation Plans - Substation Circuits (DD091) and Town Plans (DD095)
interim standard until GIS takes over
Network Engineering
Old version to be recycled locally Colour coded cover (latest colour is green) Issue number has been included Updates to be inserted into pocket at the back Next issue approx. April 2002
Network Engineering
Change Speaker...
Network Engineering
EB - Poles
New high-strength wood pole specifically for 66kV construction only (17m/20kN)
Introduced to reduce the amount of stayed poles in 66kV construction Cost analysis completed (versus staying) Standard 12kN footing - concrete and log, but increased setting depth of 3.4m (standard 17m setting depth is 2.5m) Minimum pole diameter @ ground line - 445mm Approximate weight - 2200kg
Technical Standards Group
Network Engineering
EC - Conductors
Removed fixed MES sag and tension tables
EC211 to EC441 Now use variable MES with StringEx
New stringing tension for 66kV construction (EC255) with 19/4.75 AAC
Standard stringing for 19/4.75 AAC Introduced to provide longer spans than EC251 and greater unstayed angles than EC261
Network Engineering
EC - Conductors cont..
New stringing tension (EC255) with 19/4.75 AAC cont.
Cost analysis completed (versus EC251 and EC261), identified 10% cost saving on hypothetical 50km line Based on maximum tension (18% of CBL) before requiring vibration dampers Nominal MES is 95m, maximum MES is 130m May also be used at 22kV StringEx to be updated with EC255
Technical Standards Group
Network Engineering
EE - Crossarms
New intermediate crossarms for 66kV construction
Reduction in weight and cost S(IN)2.6-66 - 100 x 100 x 4 SHS, 32kg S(IN)3.2-66 - 100 x 100 x 4 SHS, 39kg
Network Engineering
EE - Crossarms cont..
New strain crossarm selection charts
19/4.75, 37/3.75 SL series & S(ST) series
Network Engineering
New contract awaiting CEO signoff 6 month to 16 week initial delivery lead times many new items to be introduced
Network Engineering
Network Engineering
Approx. 2000mm
Technical Standards Group
Network Engineering
Reduced weight and less potential for waste MI # 351971 Provided in 80% of installations (No 5, 15.5m pole and below) 56m coils still available for longer stay installations
Network Engineering
Break
Network Engineering
EK - Subtransmission
Standard structures for 66kV construction
Vertical Insulators
Bridging Bracket
Steel Crossarms
Centre- Bracket
Strain
Technical Standards Group
Intermediate
Network Engineering
EK - Subtransmission cont..
New design (not 22kV) Mech. tested to 11kN 100 x 100 x 4 SHS Weight - 32kg Bracket Integral M24 nut for insulator mounting
Network Engineering
EK - Subtransmission cont..
Use 22kV pole top centrephase bracket Two additional holes to mount for bridging
Bracket M12 Bolt M12 x130 Coachscrew
Technical Standards Group
Network Engineering
EK - Subtransmission cont..
Network Engineering
EK - Subtransmission cont..
EE - Crossarms (new intermediate) EF - Insulators & Attachments (post and strain) EG - Stays & Anchors (new stay arrangement) EB - Poles (new 17m/20kN wood poles) EC - Conductors (new chart - EC255) EJ - Three-Phase Structures (new subsidiary standards)
Target date for release of EK and other existing standards is end Dec
Technical Standards Group
Network Engineering
EA - General Overhead
Raiser bracket design for low conductors
Spreadsheet (EA141 HVRaiser) for determining maximum spans and angles Wood pole 1-phase and 3-phase applications (with or without LV subsidiary)
Network Engineering
Network Engineering
EJ to be amended to include subsidiary const for use with 66kV standards (EK)
Technical Standards Group
Network Engineering
Change Speaker...
Network Engineering
EL- Transformers
EL101, EL201 - Wood & Concrete Transformer Structures
Split into Single Phase and Three Phase transformer structures EL101, EL201 - Single Phase\SWER transformers EL103, EL203 - Three Phase transformers
Network Engineering
EL- Transformers
EL101, EL201, EL103, EL201, EL301
Include option of ordering LV fuse and mounts Fusing size based on transformer fusing tables (DP021)
Network Engineering
Network Engineering
New approved ground mounted design formulated (dwg PCA 17/000001 and PCA 17/000003)
Compatible with 2x1, 3x1 or 1x3 units Allows upgrades from 3MVA (100A) to 10+MVA Operator, maintenance staff and public safety Whole of life costing showed minimal difference Eliminates ESNA Regs clearance issues (highlighted in recent OCEI audit) Currently the only approved design in Powercor
Technical Standards Group
EP - Regulators
Network Engineering
EP - Regulators
Future directions.....
Develop pole mounted 100A solution Investigate alternate regulator makes Investigate in-line ground mounted solution Remote control Develop a comprehensive technical standard
information and installation sections approved products in SAP task lists
Network Engineering
Change Speaker...
Network Engineering
Network Engineering
ER - ACRs
Three Phase ACRs
Standard structures ER101 - Rural (high current, high fault level) - 3 sets of isols ER111 - Rural (low current, low fault level) - 1 set of isols ER121 - Urban - 2 sets of isols
Network Engineering
ER - ACRs cont..
Keep by-pass options for access, testing and H&S reasons esp. in rural areas Nulec - CAPM 2 (CAPM 4 by December)
Cooper ACRs very expensive due to exchange rate CAPM 4 provides more protection options
Network Engineering
ER - Sectionalisers
To be used as part of Network Reliability solution Cost effective method to isolate section of lines
where a new ACR is not financially viable where coordination of fuses and ACR/CBs is difficult avoids spurious operation that can occur with fuses
Network Engineering
ER - Sectionalisers cont..
Utilises mechanical drop out mechanism
avoids incorrect operation found in chemical actuated styles of sectionalisers reset by pushing in lever (No spare actuators needed)
Network Engineering
ER - Fault Indicators
ER031 - Info Section
Provides guidelines on selection, location, and settings FIs are not for co-gen or 66kV ring lines. Overhead
Pole mount - 22kV single cct (Clean) pole only
Earth, LV, CATV catenaries, other HV circuits provide alternate fault path and may trigger pole mount units
Network Engineering
Network Engineering
Network Engineering
600A
185mm2, 240mm2
Very cost effective option (approx $70 each) Use on all outgoing switched HV at kiosks
Technical Standards Group
Network Engineering
Sectionalisers
New single phase drop out style - mechanical lever Two ratings which are field setable Ratings to be shown in SAP, GIS and on System plans
Fault Indicators
Overhead indicators have limited battery life. All FIs to be in SAP, GIS and on System Plans
Technical Standards Group
Network Engineering
ACRs
ER - Future Investigations
Sectionalisers
Review other products
Fault Indicators
Review need for SCADA connection as part of Comms and Control strategy Review application of directional fault indicators (approx. $4000 each)
Network Engineering
Change Speaker...
Network Engineering
F- Public Lighting
Standard to be completed approx. end of Dec 2001 Standard outline:
FA - General Information FB - Poles FC - Cable FE - Brackets & Stays FL - Lanterns FM - Electrical Connections, Fusing & Control FY - General Materials
Network Engineering
Public lighting equipment reviewed and new tenders in place by Dec 2001 Metal Halides to be reviewed in 2002 Powercor design via software (Perfect Lite) or spacing tables to Council requirements
Technical Standards Group
Network Engineering
Catenary supported of up to 4 services Maximum of 70m LV Bare span and 35m service Future review of single in span service via spreader rods to be investigated in 2002
Problem - Long services tend to twist spreader rod and LV and cause uplift/potential failure on LV insulators and reduces clearances
Network Engineering
Network Engineering
Network Engineering
Network Engineering
Network Engineering
Network Engineering
Network Engineering
Change Speaker...
Network Engineering
G - Underground
GA - General Underground GB - Underground HV Cable & Accessories GC - Conduits & Cable Pulling GE - Cable Head Poles GL - Kiosk Substations GS - Underground LV & Servicing GV - Equipment Bases & Enclosures
Network Engineering
GA - General U/G
GA070 - HV Network Design Guidelines (revisit)
Residential switching zones based on number of customers at risk, not the number of substations Consistent and smart approach to HV U/G design
technical and commercial
Network Engineering
Network Engineering
Network Engineering
Network Engineering
Network Engineering
Network Engineering
Conduit Procurement
Contract placed with Iplex Large $$ savings achieved, now all SAP items Continuous polyethylene conduit
approved for use at 750mm depth only (at this stage) 63mmOD (351691) and 110mmOD (351692) Currently negotiating with OCEI to classify as equivalent to HD conduit for mechanical protection
Network Engineering
Network Engineering
GL - Kiosk Substations
New tender in progress New design & layout Rotary in-oil switches Load break/make fuses Smaller land reserve Front access only Provision to fit loggers Generator connection Slab provided ( 500kVA)
Slab Pr
ovide d
Network Engineering
Network Engineering
Indicative costs
315kVA RMU : was $27K, now $20K* (-25%) 315kVA Loop : was $21K, now $18K* (-15%)
* includes slab
Technical Standards Group
Network Engineering
Network Engineering
Network Engineering
The End
Thankyou
1. Satisfaction Survey 2. Raiser Bracket Software Demo
Network Engineering
Software Demo...