0|fferences 8tudy 88A aan |Vc - 88A ERP
LN .1 0verv|ew
Copyright 2004 by Baan nternational B.V., a subsidiary of SSA Global Technologies, nc.
All rights reserved. No part of this publication may be reproduced, stored in a retrieval system, or transmitted in any way
or by any means, including, without limitation, photocopying or recording, without the prior written consent of Baan
nternational B.V.
mportant Notices
The material contained in this publication (including any supplementary information) constitutes and contains
confidential and proprietary information of Baan nternational B.V.
By gaining access to the attached, you acknowledge and agree that the material (including any modification, translation
or adaptation of the material) and all copyright, trade secrets and all other right, title and interest therein, are the sole
property of Baan nternational. and that you shall not gain right, title or interest in the material (including any
modification, translation or adaptation of the material) by virtue of your review thereof other than the non-exclusive right
to use the material solely in connection with and the furtherance of your license and use of software made available to
your company pursuant to a separate agreement ("Purpose).
n addition, by accessing the enclosed material, you acknowledge and agree that you are required to maintain such
material in strict confidence and that your use of such material is limited to the Purpose described above.
Although Baan nternational, has taken due care to ensure that the material included in this publication is accurate and
complete, Baan nternational, cannot warrant that the information contained in this publication is complete, does not
contain typographical or other errors, or will meet your specific requirements. As such, Baan nternational, does not
assume and hereby disclaims all liability, consequential or otherwise, for any loss or damage to any person or entity
which is caused by or relates to errors or omissions in this publication (including any supplementary information),
whether such errors or omissions result from negligence, accident or any other cause.
Baan nternational B.V., is a wholly subsidiairy of SSA Global Technologies, nc.
Trademark Acknowledgements
SSA Global, SSA and the SSA Global logo are trademarks of SSA Global Technologies, nc. in the United States
and/or other countries. Baan is a trademark of Baan nternational B.V., in the United States and/or other countries.
All other company, product, trade or service names referenced may be trademarks of their respective owners.
Publication nformation
Document code P3558A US
Document group Product nformation
Document titIe Differences Study SSA Baan Vc - SSA ERP LN 6.1 Over-
view
Subject SSA ERP LN 6.1
Created on 9/28/2004 2:17:35 PM
Table of Contents
Chapter 1 CentraI Invoicing................................................................. 1-1
New functionality............................................................................1-1
Central nvoicing - Differences B40c/B61................................. 1-1
Central nvoicing....................................................................... 1-2
Chapter 2 Enterprise PIanning.............................................................2-1
Changed functionality.................................................................... 2-1
Main differences between SSA Baan ERP 6.1Enterprise Planning
and SSA Baan Vc Constraint Planning....................................2-1
Plan items................................................................................. 2-2
Scenarios.................................................................................. 2-3
Plan units.................................................................................. 2-3
Product families........................................................................ 2-4
Distribution planning................................................................. 2-4
Capable to promise (CTP)........................................................ 2-5
Lot size optimization................................................................. 2-5
Default order frequency............................................................ 2-6
New functionality............................................................................2-7
Master-plan functionality for order-planned items.....................2-7
Channels................................................................................... 2-7
Order grouping.......................................................................... 2-7
Supply sourcing........................................................................ 2-8
Fixed delivery moments............................................................ 2-9
Modules......................................................................................... 2-9
Common (COM) module - Differences B40c/B61.....................2-9
Work Load Control- Differences B40c/B61............................... 2-9
Chapter 3 Common............................................................................... 3-1
Changed functionality.................................................................... 3-1
Addresses................................................................................. 3-1
Customers and suppliers.......................................................... 3-2
Calendars and Periods module - Differences B61/B40c...........3-7
Currency nitialization module - Differences B40c/B61.............3-8
Employees................................................................................ 3-9
Error Recovery........................................................................ 3-10
EU VAT setup......................................................................... 3-10
ntra EU transactions.............................................................. 3-11
First free numbers................................................................... 3-12
Maintain Company Data (tccom0100m000)- Differences
B40c/B61.................................................................................3-13
Sales and use tax................................................................... 3-13
Tax setup................................................................................ 3-15
New functionality..........................................................................3-16
Date-effective parameters.......................................................3-16
Enterprise units....................................................................... 3-17
Exchange rate types............................................................... 3-18
Unit Effectivity......................................................................... 3-18
Multicurrency systems............................................................ 3-18
First free numbers................................................................... 3-19
The Parameter Wizard............................................................ 3-20
Lot by unit................................................................................3-21
tem codes...............................................................................3-22
Modules....................................................................................... 3-22
Tables module - Differences B40c/B61.................................. 3-22
Common Data module - Differences B40c/B61...................... 3-25
Calendars and Periods module - Differences B61/B40c.........3-26
Financial ntegrations (FN) module - Differences B61/B40c..3-27
Electronic Data nterchange (ED) module - Differences
B40c/B61.................................................................................3-27
Enterprise Modeling Management module - Differences
B40c/B61.................................................................................3-28
Currency nitialization module - Differences B40c/B61...........3-28
tem Control (TM) module - Differences B40c/B61................ 3-29
Quality Management System (QMS) module - Differences
B40c/B61.................................................................................3-31
Chapter 4 Order Management..............................................................4-1
Changed functionality.................................................................... 4-1
ATP in Sales Control.................................................................4-1
Configured items in Sales Control............................................ 4-2
Cross-docking........................................................................... 4-3
Delivery lines.............................................................................4-5
Delivery types........................................................................... 4-6
nvoicing Commissions and Rebates........................................4-8
Link between Purchase Control and Freight Management.....4-10
Link between Sales Control and Freight Management........... 4-11
Over deliveries........................................................................ 4-13
Purchase back orders............................................................. 4-14
Purchase order origin..............................................................4-15
Purchase order types and activities........................................ 4-17
Reconciliation (Purchase Control).......................................... 4-18
Reconciliation (Sales Control).................................................4-19
Request for quotations............................................................ 4-20
Sales back orders................................................................... 4-21
Sales order acknowledgements.............................................. 4-22
Sales order entry.....................................................................4-23
Sales order origin.................................................................... 4-24
Sales order types and activities.............................................. 4-26
Shipping constraints................................................................4-26
Vendor rating.......................................................................... 4-28
New functionality..........................................................................4-29
Purchase order approval.........................................................4-29
Purchase order line details..................................................... 4-30
Purchase order status............................................................. 4-32
Purchase schedules................................................................4-33
Sales order approval............................................................... 4-34
Sales order status................................................................... 4-35
Sales schedules...................................................................... 4-36
Modules....................................................................................... 4-37
Pricing Control (PCG) module - Differences B40c/B61.......... 4-37
tem Purchase Data (PU) module - Differences B40c/B61.... 4-42
Purchase Control (PUR) module - Differences B40c/B61...... 4-44
Purchase Statistics (PST) module - Differences B40c/B61.... 4-48
tem Sales Data (SA) module - Differences B40c/B61.......... 4-49
Sales Control (SLS) module - Differences B40c/B61............. 4-50
Commission Control System (CMS) module - B40c/B61........4-56
Sales Statistics (SST) module - Differences B40c/B61.......... 4-57
Sales and Marketing nformation (SM) module - Differences
B40c/B61.................................................................................4-58
Chapter 5 FinanciaIs............................................................................. 5-1
Changed functionality.................................................................... 5-1
Bank master data...................................................................... 5-1
Currency nitialization module - Differences B40c/B61.............5-2
Dimension accounting...............................................................5-2
Factoring................................................................................... 5-3
Period closing........................................................................... 5-4
Purchase invoice matching....................................................... 5-4
Remittance based cash application.......................................... 5-6
Trade notes............................................................................... 5-7
Uninterrupted payment and direct debits.................................. 5-7
New functionality............................................................................5-8
Central nvoicing - Differences B40c/B61................................. 5-8
Control accounts....................................................................... 5-9
Dual accounting...................................................................... 5-10
GL account matching.............................................................. 5-10
ntegration mapping scheme...................................................5-11
ntercompany settlement transactions.................................... 5-11
Financial reconciliation............................................................5-12
Multicurrency systems............................................................ 5-12
Localizations........................................................................... 5-13
Accounts Payable Management Dashboard (tfacp2560m000)5-14
Accounts Receivable Management Dashboard (tfacr2560m000)...
5-19
Modules....................................................................................... 5-23
General Ledger module - Differences B40c/B61.................... 5-23
Accounts Payable module - Differences B40c/B61................ 5-24
Accounts Receivable module - Differences B40c/B61............5-25
Cash Management module - Differences B40c/B61...............5-26
Fixed Assets (FAS) module - Differences B40c/B61.............. 5-27
Financial Budget System module - Differences B40c/B61..... 5-28
Cost Allocation (CAL) module - Differences B40c/B61...........5-28
Financial Statements module - Differences B40c/B61............5-29
Chapter 6 Manufacturing...................................................................... 6-1
Changed functionality.................................................................... 6-1
BOM line enhancements...........................................................6-1
Centralized BOM for PCS......................................................... 6-2
Cost components...................................................................... 6-2
Costing work centers................................................................ 6-3
Critical capacity type................................................................. 6-4
Run time....................................................................................6-5
Drawing sizes and drawing locations in EDM........................... 6-5
ECO approval procedure.......................................................... 6-6
End item unit costs....................................................................6-6
Engineering item groups........................................................... 6-7
Financial transactions by production order or work center....... 6-7
Floor stock.................................................................................6-8
Generic engineering data: BOM and routing............................ 6-9
Pull notes................................................................................ 6-11
Man occupation.......................................................................6-11
Engineering Change Orders (ECOs)...................................... 6-12
Merged project and budget in PCS.........................................6-12
Project requirements planning (PRP) for PCS........................6-13
Production order lead-time elements...................................... 6-13
Reference designators............................................................ 6-14
Scrap.......................................................................................6-15
Lot by unit................................................................................6-15
WP warehouses..................................................................... 6-16
Operation overlap................................................................... 6-16
Task type.................................................................................6-17
Task relationships................................................................... 6-18
New functionality..........................................................................6-18
Actual costing for receipt postings.......................................... 6-18
Blocking operations.................................................................6-19
Customized items or standard items in Product Configuration
(PCF).......................................................................................6-20
Default production order data................................................. 6-20
Lean PCS projects.................................................................. 6-21
Micro routing........................................................................... 6-21
Shared work centers............................................................... 6-21
Modules....................................................................................... 6-22
BOM Control (BOM) module - Differences B40c/B61.............6-22
Cost Accounting (CPR) module - Differences B40c/B61........ 6-23
Production Order Costing (CST) module - Differences
B40c/B61.................................................................................6-23
Engineering Data Management (EDM) module - Differences
B40c/B61.................................................................................6-24
Product Configuration (PCF) module - Differences B40c/B616-25
Project Control (PCS) module - Differences B40c/B61...........6-25
Routing (ROU) module - Differences B40c/B61..................... 6-26
Repetitive Manufacturing (RPT) module - Differences B40c/B61...
6-27
Shop Floor Control (SFC) module - Differences B40c/B61.... 6-27
Chapter 7 Project.................................................................................. 7-1
Project - Differences by SSA Baan ERP 6.1 topic...................... 7-1
Changed functionality.................................................................... 7-2
Activity structure........................................................................7-2
Budget cost analysis................................................................. 7-3
Forecast methods..................................................................... 7-4
Revenue Recognition (RR) and Cost of Goods Sold (COGS)..7-4
Hours accounting...................................................................... 7-6
PCS item procedure..................................................................7-6
Project estimation..................................................................... 7-8
New functionality..........................................................................7-10
nternal and Capital project..................................................... 7-10
Project dashboard................................................................... 7-11
Holdback................................................................................. 7-12
ntegration of Project with Service.......................................... 7-12
Performance measurement.................................................... 7-13
Project currency...................................................................... 7-14
Time phased budget............................................................... 7-15
Top down budgeting............................................................... 7-15
Unit rate invoicing and progress invoicing for activities.......... 7-16
User defaults........................................................................... 7-17
Usability improvements........................................................... 7-17
Organization breakdown structure.......................................... 7-18
Project warehouse.................................................................. 7-19
ntegration of Project with MSP 2002......................................7-20
Cost plus invoicing enhancements......................................... 7-21
Project template...................................................................... 7-22
Central invoicing..................................................................... 7-23
Modules....................................................................................... 7-23
Project Data Management (PDM) module - Differences
B40c/B61.................................................................................7-23
Project Estimating (EST) module - Differences B40c/B61......7-26
Project nvoicing (PN) module - Differences B40c/B61......... 7-27
Project Production Control (PPC) module - Differences
B40c/B61.................................................................................7-28
Project Scheduling System (PSS) module - Differences
B40c/B61.................................................................................7-29
Project Technical Calculation (PTC) module - Differences
B40c/B61.................................................................................7-30
Hours Accounting (HRS) module - Differences B40c/B61......7-31
Chapter 8 Service and Maintenance....................................................8-1
Service - Differences by SSA Baan ERP 6.1................................ 8-1
Changed functionality.................................................................... 8-3
Archiving Service Data..............................................................8-3
Contract Terms to be Controlled............................................... 8-4
Control Contract Related Activities........................................... 8-6
Control Service Business.......................................................... 8-7
Control Service Contracts......................................................... 8-8
Control Service nventory..........................................................8-9
Control Service Order Execution............................................ 8-10
Control Service Price.............................................................. 8-11
Control Technician Data......................................................... 8-12
Create Periodic Maintenance Plan......................................... 8-13
Define Contract Contents........................................................8-14
Define Contract nvoicing/Costing...........................................8-15
Generate Periodic Maintenance Orders................................. 8-17
Handle ncoming Service Request..........................................8-18
Handle Repair and Overhaul Requests.................................. 8-19
Handle Service & Maintenance Requests.............................. 8-20
ntegrate Service..................................................................... 8-21
nvoice Service Contract......................................................... 8-22
nvoice Service Order............................................................. 8-23
Maintain Basic Service Order Data......................................... 8-24
Maintain Basic Service Order Data......................................... 8-25
Maintain Basic Short Term Planning Data.............................. 8-27
Maintain Basic Warranty Data................................................ 8-28
Maintain Component Data...................................................... 8-29
Maintain Dynamic Service Data.............................................. 8-31
Maintain nstallation Data........................................................8-32
Maintain Location Details........................................................ 8-34
Maintain Master Data Service nventory Control.................... 8-35
Maintain Periodic Maintenance Data...................................... 8-36
Maintain Service Contract Templates..................................... 8-37
Maintain Service Hours Rates................................................ 8-37
Maintain Service Tables..........................................................8-38
Maintain Basic nstallation Data.............................................. 8-39
Manage nstallations............................................................... 8-41
Manage nstallation Type Data............................................... 8-42
Manage Reference Activities.................................................. 8-43
Manage Service Orders.......................................................... 8-44
Manage Warranty Terms........................................................ 8-45
Master Tables for Service....................................................... 8-46
Plan Periodic Maintenance..................................................... 8-48
Plan Service Orders................................................................ 8-49
Prepare Service Order Pre-execution.....................................8-50
Record Work Performed......................................................... 8-52
Release Orders....................................................................... 8-53
Renew Contracts.................................................................... 8-54
Replenish Service nventory................................................... 8-55
Set Up Service Master Data................................................... 8-56
Specify / Adapt Contract Template......................................... 8-57
Modules....................................................................................... 8-59
Call Management (CLM) module - Differences B40c/B61...... 8-59
Configuration Management (CFG) module - Differences
B40c/B61.................................................................................8-60
Contract Management (CTM) module - Differences B40c/B618-62
Master Data Management (MDM) module - Differences
B40c/B61.................................................................................8-64
RMA and Depot Repair module - Differences B40c/B61........ 8-67
Service Order Control (SOC) and Preventive Maintenance Control
(SPC)module - Differences B40c/B61.................................... 8-68
Service Order Control (SOC) and Preventive Maintenance Control
(SPC)module - Differences B40c/B61.................................... 8-71
Subcontract Management (SBM) module - Differences
B40c/B61.................................................................................8-75
Chapter 9 PeopIe................................................................................... 9-1
Changed functionality.................................................................... 9-1
Hours accounting - Differences B40c/B61................................ 9-1
New functionality............................................................................9-3
Day-End Hours Accounting Processing (bptmm1205m000).... 9-3
Print Hours and Expenses (Completeness Check)
(bptmm1410m000)....................................................................9-5
To distribute team hours........................................................... 9-7
To redefine budget granularity.................................................. 9-7
Update Budget by Employee with Actual Hours
(bptmm3201m000)....................................................................9-9
User Profiles (bpmdm0102m000)............................................. 9-9
Chapter 10 Warehouse Management................................................ 10-1
Changed functionality.................................................................. 10-1
Addresses............................................................................... 10-1
Customers and suppliers........................................................ 10-2
nvoicing.................................................................................. 10-7
Pricing data............................................................................. 10-8
Purchase and sales statistics..................................................10-8
Warehousing order history...................................................... 10-8
Using warehouses.................................................................. 10-9
Using locations......................................................................10-10
Determination of lead time.................................................... 10-10
To block and unblock............................................................ 10-11
New functionality........................................................................10-13
nbound and outbound procedures....................................... 10-13
To handle warehousing orders............................................. 10-15
To define warehousing order types.......................................10-16
Dynamic cross-docking......................................................... 10-17
Warehousing assembly orders............................................. 10-19
Multicompany warehouse transfers...................................... 10-20
Handling units....................................................................... 10-23
Label setup........................................................................... 10-24
Package definitions............................................................... 10-29
Serialized items in Warehouse Management....................... 10-35
nventory Analysis (NA) module - Differences B61/B40c.....10-38
Line supply............................................................................ 10-39
Order groups......................................................................... 10-39
Modules..................................................................................... 10-40
Warehouse Master Data (WMD) module - Differences
B61/B40c...............................................................................10-40
Lot Control (LTC) module - Differences B61/B40c............... 10-43
nventory Planning (NP) module - Differences B61/B40c.... 10-43
nventory Handling (NH) module - Differences B61/B40c....10-44
nventory Reporting (NR) module - Differences B61/B40c.. 10-45
nventory Analysis (NA) module - Differences B61/B40c.....10-46
Chapter 11 Enterprise Server.............................................................11-1
Tools............................................................................................ 11-1
Changed functionality............................................................. 11-1
New functionality................................................................... 11-10
ntegration Tools........................................................................ 11-17
Changed functionality........................................................... 11-17
New functionality................................................................... 11-20
Miscellaneous Tools.................................................................. 11-23
Changed functionality........................................................... 11-23
New functionality................................................................... 11-31
Chapter 12 Data Exchange.................................................................12-1
Changed functionality.................................................................. 12-1
Exchange................................................................................ 12-1
ndex
About this document
Summary
This manual describes the differences between SSA Baan Vc and SSA
ERP LN 6.1 on a high level.
How to read this guide
Every chapter lists the changed and new functionality of an ERP LN
package, and briefly explains the new terms and concepts. The "Modules"
section provides a list of the changes to each module as well as
information on new, replaced, and removed modules.
The chapter titles reflect the ERP LN 6.1 names of the various packages.
For example, for information about the changes to Baan Distribution, refer
to Chapter 4, "Order Management". To list the changes based on the Baan
Vc package titles, please refer to the Differences Baan Vc and ERP LN
6.1 online Help.
This manual was created by extracting the text from the Differences Baan
Vc and ERP LN 6.1 online Help. These topics only describe what has
changed and refer to the ERP LN 6.1 online Help to explain the current
ERP LN functionality. Wherever you read "refer to, you are referred to the
ERP LN 6.1 online Help topics.
New functionality
Central nvoicing - Differences B40c/B61
This topic describes how invoicing in the various packages of Baan Vc is
implemented in Central nvoicing in ERP LN 6.1 .
Invoicing in Baan IVc
n Baan Vc , each package contains invoicing functionality. nvoicing is
performed in the Invoicing sessions of the various packages:
Warehouse Management.
Project.
Debit notes and credit notes, from the Cash Management module of
Financials.
Financials.
n Central nvoicing, SSA ERP can also generate the invoices for the
following situations:
BiIateraI invoicing
n a multicompany structure, SSA ERP can generate invoices for
goods transfers between warehouses that are linked to different
financial companies. For details, refer to Intercompany transactions.
TrianguIar invoicing
SSA ERP can generate triangular invoices for transactions within a
single logistic company that involve entities which are linked to different
enterprise unit. For details, refer to To use trianguIar invoicing.
Intercompany settIement
n a multicompany structure, SSA ERP can generate intercompany
settlement transactions instead of regular invoices for transactions
between logistic companies that involve entities linked to the same
financial company. For details, refer to Intercompany transactions.
CentraI Invoicing concepts
1-2 | Central nvoicing
New in SSA ERP .
n Central nvoicing, the following new concepts are introduced:
Billing request.
Users of Baan Vc can choose whether they want to plan their supply in
one of the following ways:
The distinction between the MPS items and MRP items has been
abandoned. n ERP LN 6.1 , all items can be planned by using a
flexible combination of master-based planning methods and
order-based planning methods. For more information, refer to Master
pIanning versus order pIanning.
Plan items
This topic explains how items are treated in ERP LN 6.1 as compared to
plan items in Baan Vc .
PIan items in Baan IVc
n Baan Vc ,
You had to define plan items separately for each plan code.
PIan items in ERP LN 6.1
n ERP LN 6.1 ,
You do not need to transfer items from the ERP system, but every plan
item in Enterprise Planning must exist as item in the Common Data
package.
The distinction between MPS items and MRP items has been
abandoned. You can generate both a master plan and planned orders
for an item, depending on the settings in the tems - Planning
(cprpd1100m000) session.
2-2 | Enterprise Planning
Scenarios
This topic explains the differences and similarities between scenarios in
ERP LN 6.1 and plan codes in Baan Vc .
PIan codes in Baan IVc
n Baan Vc , plan items existed within the context of a plan code. A plan
code included only items of the MPS Item item type. Planned orders were
independent of a plan code.
You could compare plan codes by means of the PIan Code Performance
Comparison (cprmp4504m000) session.
Scenarios in ERP LN 6.1
The scenario concept in ERP LN 6.1 replaces the plan code concept in
Baan Vc .
n ERP LN 6.1 , the basic data for plan items is the same for all scenarios.
However, you maintain not only the master plan within a scenario, but the
planned orders as well.
For example, for each scenario, you can specify:
Plan items on the lowest plan level were automatically actual items (not
product families ). All plan items on higher plan levels were product
families.
Every family item must be defined in the tem Base Data module.
The relationship between a family item and items on lower plan levels
is defined in aggregation relationships.
Aggregation relationships in ERP LN 6.1 are much more flexible than the
planning bills of material in Baan Vc . For example, you can also define
aggregation relationships between items on the same plan level.
Distribution planning
This topic explains how multisite supply planning in Baan Vc differs from
the functionality in ERP LN 6.1 . Baan Vc uses plan sites and ERP LN 6.1
uses clusters.
PIan sites in Baan IVc
n Baan Vc , you could perform distribution planning by using the
2-4 | Enterprise Planning
Distribution Requirements PIanning (DRP) module in the Distribution
package.
You could also perform distribution planning by generating planned
interplant MPS orders in the Constraint PIanning package. To generate
these interplant orders, you had to define interplant supplying sites.
CIusters in ERP LN 6.1
n ERP LN 6.1 , the Distribution Requirements PIanning (DRP) module
has been removed.
n Enterprise Planning, you can define supplying relationships between
clusters. To associate an item with a cluster, you enter the cluster in the
cluster segment of the item code. For more information, refer to Item
definition in SSA ERP Enterprise PIanning.
Capable to promise (CTP)
This topic explains the changes in the terminology and functionality related
to the available-to-promise (ATP) and capable-to-promise (CTP) concepts.
ATP in Baan IVc
n Baan Vc , the available-to-promise (ATP) concept was extended. n
earlier versions, an item's ATP only included the quantity expected to be
present on the requested date according to the Master Production
Schedule (MPS). The Constraint Planning package in Baan Vc made it
possible to calculate how much the production of that item could be
increased to meet the customer demand. This calculation takes the
production capacity into account that is still available according to the
master plan.
ATP in ERP LN 6.1
n ERP LN 6.1 the terminology was changed. The quantity of an item that
can be promised by increasing the production was renamed
capable-to-promise (CTP).
Additionally, the concept of channel ATP was added.
Lot size optimization
This topic explains how lot size optimization has changed in ERP LN 6.1
Enterprise Planning | 2-5
as compared to Baan Vc .
Lot size optimization in Baan IVc
You can use the lot-size-optimization function to calculate the most
economic values for the economic order quantity and the order interval.
n Baan Vc , lot size optimization was part of the CycIic PIanning (CLP)
module.
Lot size optimization in ERP LN 6.1
n ERP LN 6.1 , you can perform lot size optimization in the Optimize Lot
Sizing (cprao3200m000) session.
Default order frequency
This topic describes the differences between Baan Vc and ERP LN 6.1
with respect to the frequency of the orders that are generated by master
planning.
Order frequency for MPS orders in Baan IVc
n Baan Vc , requirements for an MPS item with the order methodlot-for-lot
result in daily planned MPS orders.
For example, if a plan period contains 10 working days and the net
requirements for an item in that period is 2000 piece, an MPS planning run
generates one planned MPS order of 200 piece for each working day in
the plan period.
Frequency of pIanned orders generated by master pIanning in ERP LN 6.1
n ERP LN 6.1 , requirements for a planned item with the order
methodlot-for-lot result in one planned order per plan period.
For example, if a plan period contains 10 working days and the net
requirements for an item in that period is 2000 piece, a master planning
run will generate a single planned order of 2000 piece for the first working
day in that plan period.
To influence the order quantity of the planned orders, enter appropriate
values in the Maximum Order Quantity field and the Order IntervaI field
in the tems - Ordering (tcibd2500m000) session or choose a fixed order
quantity.
2-6 | Enterprise Planning
New functionality
Master-plan functionality for order-planned items
This topic show how the distinction between master-based planning and
order-based planning in ERP LN 6.1 differs from the situation in Baan Vc .
The master pIan in Baan IVc
n Baan Vc , you could not maintain an item master plan for items with the
order system MRP.
The master pIan in ERP LN 6.1
n ERP LN 6.1 , you can maintain an item master plan also for items which
you plan by using order-based planning.
An item master plan provides advanced functionality for:
AffiIiated companies
Similar in ERP LN 6.1 . Separate logistic companies that act as
business partners to your logistic company. You must specify the
business partner's logistic company.
Other business partners are not represented in enterprise modeling.
Business partner structures
Changed in SSA ERP LN 6.1 .
n ERP LN 6.1 , you can define a distributed business partner organization
by defining parent business partners to link the business partners with
different roles.
n Baan Vc , you can define a distributed business partner organization in
the Maintain Concern Structure of Trade ReIations (tccom3101m000)
session.
The business partner sessions
n ERP LN 6.1 , the business partners and their roles are defined in the
Common Data package in the following sessions:
Separate tax codes can be defined for the various situations. For
details, refer to To define tax codes for EU VAT rates.
To calculate the tax amounts and store the tax data in the Tax Analysis
(tfgld110) table for the various tax reports, the Tax check box on order
headers must be selected. By default, this check box is selected if the
Tax check box for the business partner is selected.
You can select the Tax check box for the business partners in the
following sessions:
EU VAT rates
n ERP LN 6.1 , you can define tax codes for the VAT rates for the
different types of intracommunity transactions and import and export
from the EU in the EU Tax Handling session. For more information,
refer toTo define tax codes for EU VAT rates.
n ERP LN 6.1 , the settings are date effective. For more information,
refer toDate-effective parameters.
n Baan Vc , you used the Parameters sessions in the various SSA ERP
packages to indicate whether a module was implemented. n ERP LN 6.1 ,
this functionality is centralized in the Common Data module.
New fieIds
n ERP LN 6.1 the following fields were added to the mplemented
Software Components (tccom0100s000) session:
The fields for the company's address data were replaced by one field
for the address code. For more information, refer toAddresses.
Common Data.
Common | 3-13
Purchase Control.
Sales Control.
Central nvoicing.
Accounts Payable.
Accounts Payable.
ntra EU transactions.
Tax setup in Baan IVc
n Baan IVc Common, you can set up:
Exemptions for sales taxes for per customer and tax authority.
The sales listing and the import/export statistics required for the
Common | 3-15
ntrastat declaration.
Tax setup in ERP LN 6.1
Changed in SSA ERP LN 6.1 .
n ERP LN 6.1 , the following changes werew made:
For both types of tax code, you must define the sales ledger
account in the Posting Data for Tax Codes (tfgld0171s000)
session.
Kind of tax
n ERP LN 6.1 , two kinds of tax were added. n the Tax Codes by
Country (tcmcs0136s000) session, you must select the tax type in the
Kind of Tax field.
The kind of tax can be:
SSA ERP keeps a history of the parameter settings, so that you can
display the previous parameter values.
f you change the parameter values, you can enter the date and time at
which the new values must take effect.
Enterprise units
This topic describes the various way in which warehouses, sales orders,
and so on are linked to a financial company in Baan Vc and in ERP LN 6.1
.
The Iink to a financiaI company in Baan IVc
n Baan Vc , to link warehouses, orders, and other entities to a financial
company, you can select the financial company in the session in which you
define the entity.
The Iink to a financiaI company in ERP LN 6.1
Changed in SSA ERP LN 6.1
n ERP LN 6.1 , entities for which this is relevant are linked to a financial
company through an enterprise unit. n a single company structure as well
as in multicompany structures, you must define at least one enterprise unit
and you must link every department, warehouse, and so on, to an
enterprise unit.
For more information, refer toEnterprise ModeIing Management (EMM).
Common | 3-17
Exchange rate types
This topic describes the differences between the exchange rate types that
you can define in Baan Vc and in ERP LN 6.1 .
Exchange rate types in Baan IVc
n Baan Vc , you define currency rates in the Currency Rates
(tcmcs0108m000) session. You can define a sales rate, a purchase rate,
and the rate to be used for the intrastat report.
Exchange rate types in ERP LN 6.1
Changed in SSA ERP LN 6.1
n ERP LN 6.1 , you must define exchange-rate types in the Exchange
Rate Types (tcmcs0140m000) session.
n the Companies (tcemm1170m000) session, you can select the
company's default exchange rate types to be used for sales transactions,
purchase transactions, internal calculations, and external reporting.
You can assign exchange rate types, among others, to invoice-to business
partners and to invoice-from business partners. For more information, refer
toTo use exchange rate types.
Unit Effectivity
Use the Unit Effectivity module to define and maintain effectivity units.
Multicurrency systems
This topic describes the new multicurrency systems in ERP LN 6.1 .
The home currency in Baan IVc
n Baan Vc , a company can perform its financial accounting in one
currency. n ERP LN 6.1 terms, Baan Vc only supports a single currency
system. You select a company's home currency in the Maintain Company
Data (tccom0100m000) session of the Common Data module.
The company's currencies in ERP LN 6.1
3-18 | Common
n ERP LN 6.1 , a company can use up to three different home currencies,
one of which is usually the local currency. The home currency for financial
accounting is called the reference currency. n a multicompany structure,
all the companies must have the same reference currency.
n most of the sessions in which you can enter or display amounts, you can
click the Rotate Currency button or click Rotate Currency on the TooIs
menu, to enter or display the amounts in each of the home currencies in
turn.
For many reports, especially in Financials, you can select the home
currency in which you want to print the report.
You select the reference currency, the local currency, and other reporting
currencies for the companies in the Companies (tcemm1170m000)
session of the Enterprise Modeling Management module.
For details, refer to Currency systems.
First free numbers
This topic describes the differences between the setup of series and
generated document numbers in Baan Vc and in ERP LN 6.1 .
First free numbers in Baan IVc
n Baan Vc , you define series and numbers in the Maintain First Free
Numbers (tcmcs0147m000) session. n the Type of Number field, you
must select the type of documents for which the series will be used. The
generated document numbers are always numeric and can consist of up to
six characters.
First free numbers in ERP LN 6.1
Changed in SSA ERP LN 6.1
n ERP LN 6.1 , you must define number groups in the Number Groups
(tcmcs0151m000) session and then in the First Free Numbers
(tcmcs0150m000) session, define the series and numbers of each number
group.
You assign the number groups to various purposes in the corresponding
sessions. For example, in the Sales Order Parameters (tdsls0100s400)
session you can select the number group for sales orders and sales
schedules. n the Sales Offices (tdsls0512m000) session you can then
Common | 3-19
select a series of that number group for the sales orders generated by a
specific sales office.
As the series codes can be alphanumeric, the generated document
numbers can be alphanumeric and they can consist of up to nine
characters. For more information, refer toTo use number groups and
series
The Parameter Wizard
The standard SSA ERP application includes some localized functionality
which is only required for business transactions specific countries or parts
fo the world.
Parameter Wizard terminoIogy
you can use the Parameter Wizard to group the parameters for each
function and to set the parameters to specific values. The various functions
and their parameters are organized on a number of selection levels.
The following levels are implemented:
Aspect.
Option.
Option group.
Topic.
Parameter.
For example, for the Country aspect you can define the various countries
as options and group the options into areas such as Nordic, Latin America,
and Central Europe. During one run of the Parameter Wizard, the user can
only select option groups, options, and topics that belong to the same
aspect.
n the Parameter Wizard, each specific function is defined as a topic.
Some examples of topics are:
nvestment Charge.
Set the various parameters for each topic to the correct values.
ndicate the order in which the parameters must be set to their new
values.
To use the Parameter Wizard consists of two separate activities:
Set up the Parameter Wizard. To define the parameter values for each
topic and to link the topics to the options.
Use the Parameter Wizard. To select the options and topics that must
be implemented and to start the process that sets the parameters to
the required values.
InitiaIize parameters
Before you use the Parameter Wizard, the parameters must have been
initialized in the regular way with the nitialize Parameters
(tcmcs0295m000) session. When you run this session, the tables of the
Parameter Wizard are also filled with default topics, options, and required
parameters.
Lot by unit
This topic is about the use of lot by unit or serialization to track and trace
items.
Lot by unit in Baan IVc
Lot control is used to record and trace groups of items. n Baan Vc , you
can use Lot by Unit in the item data to identify a separate item as a lot. n
this way, you can record and trace the item.
SeriaIization in ERP LN 6.1
n ERP LN 6.1 , the concept of serialized items is introduced. Serialization
is used in the following SSA ERP packages:
Countries
Changed in SSA ERP LN 6.1 . n the Countries (tcmcs0110s000)
session, some fields were added for tax reporting and for the checks
on VAT numbers and bank account numbers. n the new Country
Groups (tcmcs1180m000) session, you can define country groups for
tax reporting and for the tax journal. For more information, refer
toLocaIizations.
Departments
3-22 | Common
New in SSA ERP LN 6.1 . n the new Departments (tcmcs0565m000)
session, you can centrally define thefollowing types of departments.
For more information, refer toTo define departments.
Sales office.
Purchase office.
Shipping office.
Service department.
Work center.
Accounting department
Forwarding Agents
Changed in SSA ERP LN 6.1 . n ERP LN 6.1 , Forwarding Agents are
called Carriers. n the Carriers (tcmcs0180s000) session, you can enter
additional details for the carrier.
Manufacturers
New in SSA ERP LN 6.1 . n the new Manufacturers (tcmcs0160m000)
session, you can define the various manufacturers from which you
purchase your supplies. For details, refer to the online Help of the
Manufacturers (tcmcs0160m000) session.
Projects
New in SSA ERP LN 6.1 . As projects must be defined as key entities
and linked to an enterprise unit in the Enterprise Modeling
Management module of Common Data, you must define all projects in
the new General Projects (tcmcs0552m000) session. For details, refer
to the online Help ofGeneral Projects (tcmcs0552m000) session.
Reasons
Changed in SSA ERP LN 6.1 . n Baan Vc , separate sessions existed
in various packages for each type of reason. n ERP LN 6.1 , the
Reasons (tcmcs0105m000) session in Baan Vc was renamed to
Reasons (tcmcs0105m000). All the reason codes are defined in this
session and you can assign a Reason Type to each reason.
SignaIs
Changed in SSA ERP LN 6.1 . The tem Signals (tcmcs0118m000)
session in Baan Vc was renamed to tem Signals (tcmcs0118m000) in
ERP LN 6.1 . The new Signals (tcmcs0139m000) session was added
which you can use to define business partner signals. For more
information, refer toTo use signaIs.
Warehouses
Changed in SSA ERP LN 6.1 . n ERP LN 6.1 , in the Warehouses
(tcmcs0103s000) session the information about the warehouse
locations was moved to the Warehouse - Location (whwmd3100s000)
session. A number of new warehouse types is available in ERP LN 6.1
. For more information, refer toType of warehouse The warehouse
type Work In Process was changed to Shop FIoor. The warehouse
Common | 3-23
type Transit is no longer available.
FinanciaI TabIes
The most important changes to FinanciaI TabIes are:
Bank addresses
Changed in SSA ERP LN 6.1 . The Maintain Bank Addresses
(tcmcs0120m000) session was removed. n ERP LN 6.1 , the bank
information is maintained centrally in the Accounts Receivable module
of Financials. For more information, refer toBank master data. n
addition, addresses are stored centrally as described in Addresses.
Credit ratings
Changed in SSA ERP LN 6.1 . n ERP LN 6.1 , the Credit Ratings
(tcmcs0164s000) session was extended. Among other options, you
can select the action to be taken if the open order amount of a
business partner exceeds the credit limit, and you can indicate at which
moments in the order process the credit limit must be checked. For
more information, refer toThe business partner's credit Iimit
Factoring companies
Changed in SSA ERP LN 6.1 . The Maintain Factoring Companies
(tcmcs0125m000) session and the Maintain Banks by Factoring
Company (tcmcs0126m000) session were removed. n ERP LN 6.1
factors are defined as pay-to business partners. n addition, you can
set up the factoring of your own invoices. For details, refer to
Factoring.
Tax codes
Changed in SSA ERP LN 6.1 . n ERP LN 6.1 , the TabIes for
Destination SaIes Tax branch of the menu tree was renamed to Tax.
The Tax Codes (tcmcs0137m000) session and the Maintain Tax Codes
3-24 | Common
by Country (tcmcs0136m000) session were moved here.
Company data
Changed in SSA ERP LN 6.1 . The title of the Maintain Company Data
(tccom0100m000) session was changed to mplemented Software
Components (tccom0100s000). As an important new function, you
must use this sesson to indicate which packages, modules, and other
functionality the company uses. For details, refer to the online Help
ofmplemented Software Components (tccom0100s000).
EmpIoyees
New in SSA ERP LN 6.1 . n ERP LN 6.1 , the new People package is
used to register the employees' hours and expenses. The way in which
you define employees was changed to support People. For more
information, refer toEmpIoyees.
Contacts
New in SSA ERP LN 6.1 . n ERP LN 6.1 , you can define the business
partner's employee with whom you communicate about the
transactions as the business partner's contact. For more information,
refer toTo use contacts.
Addresses
Changed in SSA ERP LN 6.1 . n Baan Vc , the addresses of trade
relations, banks, factoring companies, and so on are maintainted in
many different sessions. n ERP LN 6.1 , all the addresses used by the
company are defined centrally in the new Addresses (tccom4130s000)
session. For more information, refer toAddresses.
Intra EU Transactions
Import/Export Statistics
Changed in SSA ERP LN 6.1 . n ERP LN 6.1 , Import/Export
Statistics was renamed to Intrastat transactions report. To meet
Common | 3-25
the current ntrastat report requirements, the existing ntrastat
related sessions were changed and new ntrastat sessions were
added.
SaIes Iisting
Changed in SSA ERP LN 6.1 . To meet the current sales listing
requirement and the Belgian ntracom declaration requirements,
some fields were added to the Sales Listing (tccom7170s000)
session. For more information, refer toIntra EU transactions
.
Calendars and Periods module - Differences B61/B40c
This topic describes the new Calendars and Periods module in ERP LN
6.1 .
CaIendars and periods in Baan IVc
n Baan Vc , calendars are defined in the package in which they are
required, for example, in the Maintain Calendar (cprpd2104m000) session
of Baan IVc Constraint PIanning.
Periods
n Baan Vc , periods are defined in various packages:
ReIations
The relations defined within the module were replaced by business
partners defined centrally in Common Data. For more information, refer
toCustomers and suppIiers.
Item Codes
The various Conversion of Item Codes sessions were removed. The
information about item codes and item code systems is retrieved from
the tem Code Systems (tcibd0106m000) session and the tem Codes
by tem Code System (tcibd0104s000) session.
Addresses
The various Conversion of Address Codes sessions were replaced
Common | 3-27
by the Conversion of Address Codes (in) session and the Conversion
of Address Codes (out) session.
BAAN V Manufacturing.
BAAN V Distribution.
BAAN V Service.
BAAN V Process.
n addition to the Maintain tem Data (tiitm0101m000) session , you can
define items in the following sessions:
Item Data.
n the tem - General (tcibd0101s000) session you only define the item
data that is relevant to multiple packages.
Conversion Factors.
Use the Conversion Factors (tcibd0103m000) session to define
conversion factors.
AIternative Items.
Use the Alternative tems (tcibd0105s000) session to define alternative
items.
List Data.
New in SSA ERP LN 6.1 . You can use the List Groups
(tcibd3101m000) session and the List Components (tcibd3100m000)
session to define list items. For more information, refer toList items.
Masks.
New in SSA ERP LN 6.1 . The serial numbers of serialized items and
lot controlled items are generated using a mask. You can use the
Masks (tcibd4102m000) session to set up masks. For more
information, refer toTo define a mask and to Overview of seriaIized
items.
n ERP LN 6.1 , the Locations functionality was completely replaced.
3-30 | Common
Quality Management System (QMS) module - Differences
B40c/B61
This topic describes the most important differences between the QuaIity
Management System (QMS) module in Baan Vc and the Quality
Management package in ERP LN 6.1 .
n ERP LN 6.1 , the QuaIity Management System (QMS) module of
Common Data was changed into the Quality Management package.
QuaIity Management in ERP LN 6.1
Quality Management in ERP LN 6.1 is very similar to the QuaIity
Management System (QMS) module in Baan Vc .
The most important changes are:
BIocking reasons
n the Quality Management Parameters (qmptc0100m000) session,
you can specify blocking reasons used in the Shop Floor Control
module of Manufacturing. For more information, refer toDefining
bIocking reasons for QM.
Option sets
n Baan Vc , option sets defined for one characteristic cannot be used
for another characteristic. n ERP LN 6.1 , you can link option sets to
multiple characteristics. You can link an option set to a characteristic in
the Characteristics (qmptc0115m000) session.
CaIibration
The menu tree was reorganized so that sessions that are dependent of
other sessions cannot be started directly from the menu tree. For
example, you can only start the Select nstruments for Calibration
(tcqms3201m000) session from the nstruments (qmptc0108m000)
session.
DispIay drawings
n the Quality Management Parameters (qmptc0100m000) session, the
Directory Name for Drawing field and the DispIay Drawing field are
no longer present.
3-32 | Common
Changed functionality
ATP in Sales Control
This topic explains how the available-to-promise (ATP) functionality has
changed in ERP LN 6.1 compared to Baan Vc .
AvaiIabIe to promise (ATP) in Baan IVc
n Baan Vc , when you enter an MPS item on a sales order or sales
quotation, Baan Vc checks the MPS item's ATP if the Check AvaiIabIe To
Promise for SaIes Orders check box is selected in the Maintain MPS
Parameters (timps0100m000) of Manufacturing.
f the free available inventory (ATP) to fulfill the sales order or sales
quotation is insufficient, the order or quotation is blocked.
AvaiIabIe to promise (ATP) in ERP LN 6.1
n ERP LN 6.1 , the ATP functionality is part of a more extensive order
promising technique, called capable-to-promise (CTP). The CTP
functionality consists of the ATP component, which is a rather basic
Chapter 4
Order Management
4
order-promising method, and the CTP component, which is a more
extended version of the order-promising concept. For more information,
refer toAppIication of CTP checks.
Changed in SSA ERP LN 6.1
n ERP LN 6.1 , the MPS functionality is moved to the Enterprise Planning
package and is modified fundamentally. For more information, refer toMain
differences between ERP LN 6.1Enterprise PIanning andBaan IVc
Constraint PIanning.
You can check the ATP/CTP for plan items during the ATP/CTP horizon as
defined in the tems - Planning (cprpd1100m000) session of Enterprise
Planning. Before you can enter a plan item in the tems - Planning
(cprpd1100m000) session, you must set the Order System field to
PIanned for the item in the tem - Ordering (tcibd2100s000) session of the
Common Data package.
f you want ERP LN 6.1 to check an item's ATP/CTP when you enter a
sales order or sales quotation, you must perform the following:
Select the CTP Check for SaIes (for EP and OPS) check box in the
EP Parameters (cprpd0100m000) session.
ndicate the Types of ATP and CTP checks that must be applied and
define the settings for the checks in the tems - Planning
(cprpd1100m000) session.
New in SSA ERP LN 6.1
f the free available inventory (ATP) and additional critical components and
capacities (CTP) are insufficient to fulfill the order or quotation, ERP LN 6.1
comes up with a number of possibilities to handle the shortage. One way
to handle the shortage for a sales order is to propose a delivery schedule,
which you can set up by means of the new ATP Handling (tdsls4899m000)
session.
Note
You can also use the ATP Handling (tdsls4899m000) session to perform
offline ATP/CTP checks. For instance, you can collect multiple orders in
written form and then use the ATP Handling (tdsls4899m000) session to
carry out ATP/CTP checks.
Configured items in Sales Control
4-2 | Order Management
This topic explains how the configuration of items has changed in ERP LN
6.1 compared to Baan Vc .
To configure items in Baan IVc
n Baan Vc , if you want to sell a customized item, you must configure a
generic item in the Product Configurator (tipcf5120s000) session of
Manufacturing. As a result, a product variant is generated.
Next, if the item is for a:
Static cross-docking
A cross-docking order is created in Sales Control and, by means of a
purchase order advice, which was a planned purchase order in Baan
Vc , a purchase order is generated that is linked to the sales order.
The order is called static, because you cannot maintain the
cross-docking order or order lines in Warehouse Management.
Dynamic cross-docking
With dynamic cross-docking you can:
Order/DeIivery Line: This sales order line is a normal line. The line is
created manually or is generated automatically.
A delivery line can be of the following Line Type:
Direct deliveries. For these type of deliveries, the Dir. DeIivery check
4-6 | Order Management
box is selected on the sales order line.
Non-direct deliveries.
For direct deliveries, and if required, also for non-direct deliveries, you can
generate planned purchase orders in the Generate Purchase Order Advice
for Sales Order (tdsls4240m000) session. Next, you must transfer these
orders to actual purchase orders. Once a direct delivery order is closed in
Purchase ControI (PUR), Baan Vc enters the deliveries automatically in
the Maintain Deliveries (tdsls4120m000) session.
For non-direct deliveries, you must execute the normal delivery procedure
in Baan Vc . For more information, refer toDeIivery procedure.
DeIivery types in ERP LN 6.1
Changed in SSA ERP LN 6.1
n ERP LN 6.1 , you can select a delivery type in the new DeIivery Type
field of the Sales Order Lines (tdsls4101m000)/ Delivery Lines
(tdsls4101m100) session.
The following delivery types are available:
Purchase Order.
After deliveries are executed for a delivery type, delivery information is
reported back to Sales Control.
You can view delivery information centrally in the following sessions:
SL Parameters (cisli1500m000)
Commissions/Rebates Parameters (tdcms0100s000)
When calculating and invoicing commissions and rebates in Baan Vc , the
exchange rate type of the sales order is used, which frequently varies. As
a result, when calculating commissions and rebates after for instance six
months or one year, the exchange rate types can lead to incorrect
calculations. To avoid incorrect calculations, in ERP LN 6.1 the following
fields are added to the Commissions/Rebates Parameters
(tdcms0100s000) session:
ReIeased to SLI(Rebate)
For details, refer to the online Help of the Relations by nvoice
(tdcms2502m000) session.
Link between Purchase Control and Freight Management
This topic explains how the Purchase Control module is linked to the new
BaanERP Freight Management package in ERP LN 6.1 .
Transportation in Baan IVc
n Baan Vc , if Transport BAAN V is implemented, the transportation of
the purchased goods can be controlled by this package.
You can indicate whether and how transportation orders are generated in
the Maintain Purchase Order Parameters (tdpur4100m000) session.
4-10 | Order Management
Freight Management in ERP LN 6.1
n ERP LN 6.1 , the new Freight Management package replaces the
Transport BAAN V package. The Freight Management package is revised
completely and extended considerably compared to Transport BAAN V.
As a result, if you want to have information on the setup and use of the
Freight Management package, refer to BaanERP Freight Management.
Link with Freight Management
f Purchase Control is responsible for the transportation of goods and must
consequently collect goods from a supplier, you can generate a freight
order from the purchase order. f the transportation of goods is not the
supplier's responsibility, but the responsibility of Purchase Control, the
supplier must know on what date the goods must be ready. As a result,
you must consider the planned load date in the purchase order as the
shipment date: when to pick up the goods from the supplier.
The following links exist:
Freight Costs.
CIient Rates.
For more information, refer toIntegration Freight Invoicing and
Purchase Invoicing
Link between Sales Control and Freight Management
This topic explains how the Sales Control module is linked to the new
BaanERP Freight Management package in ERP LN 6.1 .
Transportation in Baan IVc
n Baan Vc , if Transport BAAN V is implemented, the transportation of
Order Management | 4-11
the sold goods can be controlled by this package.
You can indicate whether and how transportation orders are generated in
the Sales Orders (tdsls4100m000) session.
Freight Management in ERP LN 6.1
n ERP LN 6.1 , the new Freight Management package replaces the
Transport BAAN V package. The Freight Management package is revised
completely and extended considerably compared to Transport BAAN V.
As a result, if you want to have information on the setup and use of the
Freight Management package, refer to BaanERP Freight Management.
Link with Freight Management
n ERP LN 6.1Sales Control, you can generate a freight order from the
sales order. The purpose of the integration between Sales Control and
Freight Management is to identify and choose the appropriate means of
transportation during order entry.
The following links exist:
Freight Costs.
CIient Rates.
For more information, refer toIntegration Freight Invoicing and SaIes
Invoicing
Over deliveries
This topic explains how the functionality for over deliveries has changed in
ERP LN 6.1 compared to Baan Vc .
Over deIiveries in Baan IVc
n Baan Vc , if more goods are delivered than ordered, you can record
these over deliveries in the Maintain Deliveries (tdsls4120m000) session.
Over deIiveries in ERP LN 6.1
Changed in SSA ERP LN 6.1
n ERP LN 6.1 , the delivered quantity can still deviate positively from the
ordered quantity that is entered on the sales order (delivery) line. However,
before an over delivery can take place for an item and business partner
combination, you must define a number of settings in the new Item SaIes
Data (ISA) module of Order Management.
Define the following fields in the tem - Sales Business Partner
(tdisa0110s000) session:
Select the AIIow Over DeIiveries check box. This check box enables
the Warehouse Management package to ship an over delivery for the
item and business-partner combination.
Define whether the tolerance for the over delivery is expressed either
as a percentage or a quantity in the ToIerance Type field.
n the Action field, define the way in which SSA ERP must handle the
outbound order line if a shipment does not meet the quantity
tolerances.
You have the following options:
Contracts
The order results from the conversion of a delivery schedule in the
Duplicate Contract Lines to RFQs (tdpur3201m000) session.
INV
The order results from the transfer of an order advice in the Transfer
Planned NV Purchase Orders (tdinv3260m000) session.
ManuaI
The purchase order is created manually in the Maintain Purchase
Orders (tdpur4101m000) session.
Lines can be added to the purchase order in a number of sessions,
such as:
MPS
The order results from the transfer of an order advice in the Transfer
Planned MPS Purchase Orders (timps5270m000) session.
MRP
The order results from the transfer of an order advice in the Transfer
Planned MRP Purchase Orders (timrp1260m000) session.
PCS
The order results from the material requirements of projects in the
Transfer Planned PRP Purchase Orders (tipcs5260m000) session.
Purchase Inquiries
The order results from a copied purchase inquiry in the Convert
Quotations to Contracts/Orders/Price Books (tdpur1202m000) session.
SFC
The order results from execution of the Generate Subcontracting
Purchase Orders (tisfc2250m000) session.
SLS
The order results from a direct delivery sales order.
SMA
Order Management | 4-15
The order results from the execution of the Transfer Planned NV
Purchase Orders (tdinv3260m000) session.
TP (Project)
The order results from the transfer of a planned purchase order in the
Transfer Planned PRP Purchase Orders (tppss6230m000) session.
Purchase order origins in ERP LN 6.1
n ERP LN 6.1Purchase Control, you can view the origin of the purchase
order in the Purchase Order Origin field of the Purchase Order
(tdpur4100s000) session.
Changed in SSA ERP LN 6.1
The following purchase order origins have changed in ERP LN 6.1 :
EP
The order results from the execution of the Transfer Planned Orders
(cppat1210m000) session in Enterprise Planning.
This origin replaces the following Baan Vc origins:
MPS
MRP
PCS
SLS
The order results from a direct delivery sales order and is generated
from the Transfer Purchase Order Advice (whina3212m000) session in
Warehouse Management, instead of from the Transfer Planned NV
Purchase Orders (tdinv3260m000) in Baan Vc .
Service
The order results from the execution of the Run Global SRP
(tssoc2260m000) session in Service. This origin replaces the SMA
origin in Baan Vc .
INH
The order results from the execution of the Transfer Purchase Order
Advice (whina3212m000) session in Warehouse Management. This
origin replaces the INV origin in Baan Vc .
Contracts
The order results from the execution of the Generate Purchase Orders
(tdpur3204m000) session, instead of from the Duplicate Contract Lines
to RFQs (tdpur3201m000) session in Baan Vc . For more information,
refer toTo set up a deIivery contract.
RFQ
The order results from the execution of the Convert Quotations to
Contracts/Orders/Price Books (tdpur1202m000) session. This origin
replaces the Purchase Inquiries origin in Baan Vc . For more
information, refer toRequest for quotation procedure.
ManuaI
4-16 | Order Management
The purchase order is entered manually in the Purchase Orders
(tdpur4500m000) session. Purchase order lines can be entered
centrally in the Purchase Order - Lines (tdpur4501m000) session.
New in SSA ERP LN 6.1
The following purchase order origins are new in ERP LN 6.1 :
Requisition
The order results from the execution of the Convert Requisition Lines
to RFQ/PO (tdpur2201m000) session. For more information, refer
toPurchase requisitions.
ASC
The order results from the execution of the Generate WP Transfer
(tiasc7200m000) session in Manufacturing.
CommingIing
The order results from the execution of the Commingle Purchase
Orders (tdpur4210m000) session. For more information, refer
toPurchase orders for commingIing.
Maintenance
The order results from the execution of the Work Order
Planning/Releasing (tswcs3200m000) session in Service. For more
information, refer toIntegration between Purchase ControI and
Depot Repair.
Purchase order types and activities
This topic explains the changed set up of purchase order types and
purchase order activities in ERP LN 6.1 .
Purchase order types and activities in Baan IVc
n Baan Vc , order types and their activities are defined centrally in the
Points of Title Passage (tcmcs0142m000) session of Common Data.
Purchase order types and activities in ERP LN 6.1
n ERP LN 6.1 , you must define purchase order types in the Purchase
Order Types (tdpur0194m000) session and link activities to the order type
in the Purchase Order Type - Activities (tdpur0560m000) session.
Order Management | 4-17
To increase the performance of the various departments, in ERP LN 6.1
you can:
Set the Log Order History Data field to AII in the Purchase Order
Parameters (tdpur0100m400) session.
Compare the prices and discounts of the quotations that are submitted
by different suppliers. Ranking of the inquiry results is only based on
the prices offered by the suppliers.
Price.
4-20 | Order Management
Quantity.
Vendor rating.
Delivery dates.
n the Documents to Print field you can select whether you want to
print order acknowledgments and/or return material authorizations.
With the Promotions check box you can indicate whether you want to
print promotions on the order acknowledgement, if promotions apply to
the order.
Enter a date and time in the DeIivery Date From field, which indicates
from what delivery date the order acknowledgement must be printed.
ERP LN 6.1 only prints those order lines whose delivery date falls after
the entered date.
Note
Contracts
The order results from the conversion of a delivery schedule in the
Generate Sales Orders (tdsls3201m000) session.
ManuaI
The sales order is created manually in the Sales Order Lines
4-24 | Order Management
(tdsls4101m000) session.
Lines can be added to the sales order in a number of sessions, such
as:
Quotations
The order results from a copied sales quotation in the Process
Quotations (tdsls1202s000) session.
EDI
The order is generated in the EIectronic Data Interchange (EDI)
module of Common Data.
SaIes order origins in ERP LN 6.1
n ERP LN 6.1Sales Control, you can view the origin of the sales order in
the Origin field of the Sales Orders (tdsls4100m000) session.
Changed in SSA ERP LN 6.1
The following sales order origins have changed in ERP LN 6.1 :
Contracts
The sales order originates from a delivery contract, which is called a
delivery schedule in Baan Vc . The order results from the execution of
the Release to Order (tdsls3207m000) session, instead of from the
Generate Sales Orders (tdsls3201m000) session in Baan Vc . For
more information, refer toDeIivery contracts.
Quotations
The order results from the execution of the Process Sales Quotations
(tdsls1200m000) session. For more information, refer toSaIes
quotation procedure.
ManuaI
The sales order and sales order lines are entered manually in the
Sales Order - Lines (tdsls4100m900) session. n this session, you can
enter a sales order header and sales order lines on one screen.
EDI
The sales order is generated by means of external electronic data
interchange (ED) in the Electronic Data nterchange module of
Electronic Commerce. For more information, refer toExternaI EDI
communication.
New in SSA ERP LN 6.1
The following sales order origins are new in ERP LN 6.1 :
Phone
The sales order originates from a telephone call.
Fax
Order Management | 4-25
The sales order originates from a fax.
MaiI
The sales order originates from a mail request.
CRM
The sales order originates from the external Customer Relationship
Management (CRM) package.
Intercompany EDI
The sales order is generated by means of internal electronic data
interchange (ED) in the Electronic Data nterchange module of
Electronic Commerce. For more information, refer toInternaI EDI
communication.
RetrobiIIing
The sales order results from the execution of the Generate Retrobilled
Sales Orders (tdsls3271d000) session. For more information, refer
toRetrobiIIing.
Sales order types and activities
This topic explains the changed set up of sales order types and sales order
activities in ERP LN 6.1 .
SaIes order types and activities in Baan IVc
n Baan Vc , order types and their activities are defined centrally in the
Points of Title Passage (tcmcs0142m000) session of Common Data.
SaIes order types and activities in ERP LN 6.1
n ERP LN 6.1 , you must define sales order types in the Sales Order
Types (tdsls0194s000) session and link activities to the order type in the
Sales Order Type - Activities (tdsls0560m000) session.
To increase the performance of the various departments, in ERP LN 6.1
you can:
Delivery date.
Carrier.
Warehouse.
Ship-to address.
Supplier and item in the Print Supplier Reliability by Supplier and tem
(tdpur5413m000) session.
Supplier and item group in the Print Supplier Reliability by Supplier and
tem Group (tdpur5414m000) session.
tem and supplier in the Print Supplier Reliability by tem and Supplier
(tdpur5415m000) session.
Vendor rating procedure in ERP LN 6.1
Changed in SSA ERP LN 6.1
4-28 | Order Management
n ERP LN 6.1 , a supplier's reliability is no longer based only on correct
deliveries. The vendor rating functionality of ERP LN 6.1 is based on
various objective criteria and subjective criteria that can be used to
calculate the vendor's rating.
The set up procedure for analyzing suppliers has changed completely
compared to Baan Vc . For more information, refer toVendor rating.
To execute the vendor rating process, you must update the vendor ratings
in the Update Vendor Rating (tdpur8850m000) session. For details, refer to
To update vendor rating process.
f you update the vendor ratings, the following stages exist in the update
vendor rating procedure:
1. To caIcuIate actuaI weightings
2. To caIcuIate ratings for objective criteria
3. To caIcuIate ratings for subjective criteria
4. To update overaII vendor rating
New functionality
Purchase order approval
This topic explains how you can approve purchase orders in ERP LN 6.1 .
Purchase order approvaI in Baan IVc
n Baan Vc , you need not approve purchase orders in the purchase order
procedure.
Purchase order approvaI in ERP LN 6.1
n ERP LN 6.1 , purchase order approval is a mandatory step in the
purchase order procedure.
To approve purchase orders, you can do one of the following:
Order Line: This purchase order line is a normal line. The line is
created manually or is generated automatically.
A purchase order line detail can be of the following Line Type:
Back Order: The purchase order line detail is a back order line.
To have the correct information on the various order lines, the DetaiI lines
and the Back Order lines are synchronized with the TotaI Line and vice
versa, when they are updated. For more information, refer
toSynchronization between purchase order Iine and purchase order
Iine detaiI.
ERP LN 6.1Purchase Control still contains sequence numbers. However
these sequence numbers are used differently compared to Baan Vc .
The following applies:
When the relevant order line is split, or a back order is generated for
the order line, the order line changes to a TotaI line in the Purchase
Order - Line (tdpur4101s000) session with a sequence number of zero.
The linked line details of line type DetaiI or Back Order in the
Order Management | 4-31
Purchase Order Line Details (tdpur4101s200) session, have a
sequence number greater than zero.
Purchase order status
This topic explains how you can move a purchase order to the next status
in ERP LN 6.1 .
Purchase order Iine status in Baan IVc
n Baan Vc , you can only view the status of a purchase order line.
You can view the purchase order line status in the following sessions:
Open Orders: Displays all orders for which no receipts are booked yet.
Orders for Printing: Displays all orders that are waiting to be printed
in the Print Purchase Orders (tdpur4401m000) session.
Orders for ManuaI Activities: Displays all orders that are waiting for a
manual activity, which you can execute in the Purchase Orders - by
Manual Activities (tdpur4501m150) session.
To view the purchase orders with the Created status that are waiting
for commingling, filter on the For CommingIing check box in the
Purchase Orders (tdpur4500m000) session and commingle the
purchase orders in the Commingle Purchase Orders (tdpur4210m000)
session. For more information, refer toPurchase orders for
commingIing.
Push scheduIes
Segment sets
Purchase reIeases
Authorizations
Resetting authorizations
Select a sales order and click Approve on the Specific menu of the
Sales Order - Lines (tdsls4100m900) session, or the Sales Orders
(tdsls4100m000) session.
Modified: The order is modified after approval because order lines are
added or adapted. As a result, the sales order must be approved again.
SaIes reIeases
SaIes scheduIes
Price matrices
Discount matrices
Promotion matrices
Matrix structure
Define a default sales price book and a supplier price book in the Price
Books (tdpcg0131m000) session.
Enter the price books in the DefauIt SaIes Price Book and SuppIier
Price Book fields of the Pricing Parameters (tdpcg0100m000) session.
For more information, refer to :
Price book
SimuIate prices
You can simulate prices for a particular item (either sales or purchase)
based on a business partner and date in the Price Simulator
(tdpcg0200m300) session. f you click the CaIcuIate button, the Price
Calculator (tdpcg0200m100) session starts in which you can enter the
data for the simulated new prices.
Prices in price books with the Global Update of Prices via Price
Books (tdpcg0231m000) session.
Order Management | 4-41
Order Management
Manufacturing
Process BAAN IV
Service
4-42 | Order Management
Item Purchase Data in ERP LN 6.1
n ERP LN 6.1 , the general item data is moved to the tem Base Data
module of Common Data. All items that are used in SSA ERP , are defined
in the tem - General (tcibd0101s000) session. For more information, refer
toItem ControI (ITM) moduIe - DifferencesB40c/ERP61.
Package-specific item details are moved to the relevant package. As a
result, you can define item purchase data in the new tem Purchase Data
module, and item sales data in the new tem Sales Data module of Order
Management.
n the tem Purchase Data module, you can define:
Buyer dashboard
New in SSA ERP LN 6.1 . A dashboard offers a quick way to access
multiple sessions that are used to perform particular tasks of a user.
The Buyer Dashboard (tdipu0103m000) session is developed to
provide a buyer with a quick overview of item data and easy access to
item- and purchase-related data.
Segment sets
New in SSA ERP LN 6.1 . To support the new purchase schedule
functionality, you must create segment sets in the tem Purchase Data
module.
To define segment sets, take the following steps:
a. Create segments in the Schedule Segments (tdipu0115m000)
session.
b. Create a segment set in the Schedule Segment Sets
(tdipu0113m000) session.
Order Management | 4-43
c. Add the segments to the segment set in the Segment Set -
Segments (tdipu0114m000) session.
For more information, refer to :
Purchase scheduIes
Segment sets
Patterns
New in SSA ERP LN 6.1 . Patterns are also introduced to support the
new purchase schedule functionality.
Patterns, which you can define in the Patterns (tdipu0120m000)
session, are used to calculate:
Purchase offices
n ERP LN 6.1 , the purchase office determines the location from which
purchase orders, contracts, schedules, requisitions, and requests for
quotations are processed. A purchase office is needed to complete
transactions with suppliers. Various purchase offices can be set up for
one company. You must first define the purchase office as a
department in the Departments (tcmcs0565m000) session of the
Tables module. Next, you can specify purchase-office-specific data in
the new Purchase Offices (tdpur0112m000) session. For more
information, refer toDefauIt purchase office.
Effectivity units
Order Management | 4-45
n ERP LN 6.1 , you can define effectivity units in the new Unit
Effectivity (UEF) module of Common Data, after which you can enter
these units in purchase requisitions, requests for quotations, purchase
orders, and purchase contracts.
Effectivity units are used as follows:
Purchase requisitions
n ERP LN 6.1 , the purchase requisition procedure is introduced. For
details, refer to Purchase requisitions.
CommingIing
To reduce the number of purchase orders and to obtain the best
available prices and discounts, commingling is introduced in ERP LN
6.1 . For more information, refer toPurchase orders for commingIing
and To commingIe purchase orders.
SeIf biIIing
n ERP LN 6.1 , you can pay suppliers without waiting for their invoices.
This self billing functionality can apply after receipt of the goods, or
after approval of the goods received. For more information, refer toSeIf
biIIing.
Purchase scheduIes
n ERP LN 6.1 , the purchase schedule procedure is introduced. For
more information, refer toPurchase scheduIes.
Purchase inquiries
n ERP LN 6.1 , the purchase inquiry procedure is renamed to the
request-for-quotation (RFQ) procedure and is extended considerably.
For details, refer to Request for quotations.
Purchase contracts
Because of the new purchase schedule functionality, the purchase
contract functionality is extended in ERP LN 6.1 . n ERP LN 6.1 , you
can no longer link purchase contracts only to purchase orders, but also
to purchase schedules. For more information, refer toPurchase
contracts.
Cost sets
f you want to add additional costs to a purchase order in Baan Vc ,
you must first define additional cost sets in the Maintain Costs Sets
(tcmcs0143m000) session of the TabIes (MCS) module in Common
Data. n ERP LN 6.1 , you must define cost sets in the new Additional
Cost Sets (tdpur0124m000) session of Purchase Control and record
the actual charges in the Pricing ControI (PCG) module of Order
Management. For more information, refer toAdditionaI costs on
purchase orders.
Return orders
n ERP LN 6.1 , you can link purchase return orders to the original
Order Management | 4-47
document. As a result, the Returns group box is added to the
Purchase Order (tdpur4100s000) session.
ReconciIiation
The redesigned reconciliation functionality in SSA ERPFinancials also
affects a number of settings and processes in Purchase Control. For
more information, refer toReconciIiation (Purchase ControI).
Purchase Statistics (PST) module - Differences B40c/B61
This topic describes the most important differences between the Purchase
Statistics (PST) module in Baan Vc and in ERP LN 6.1 .
The differences for this module only contain removed functionality.
Types of purchase statistics
n Baan Vc , the following types of statistics are automatically filled:
Turnover statistics.
Cancellation statistics.
Based on these statistics, in Baan Vc you can:
Order Management
Manufacturing
Process BAAN IV
Service
Item SaIes Data in ERP LN 6.1
n ERP LN 6.1 , the general item data is moved to the tem Base Data
module of Common Data. All items that are used in SSA ERP , are defined
in the tem - General (tcibd0101s000) session. For more information, refer
toItem ControI (ITM) moduIe - DifferencesB40c/ERP61.
Package-specific item details are moved to the relevant package. As a
result, you can define item sales data in the new tem Sales Data module,
and item purchase data in the new tem Purchase Data module of Order
Management.
n the tem Sales Data module, you can define:
Addresses
n Baan Vc , you can define delivery and postal addresses for
quotations, orders, and contracts. n ERP LN 6.1 , all addresses that
are used by a company are defined centrally in the new Addresses
(tccom4130s000) session of the Common Data package. For more
information, refer toTo use addresses.
DeIivery procedure
n Baan VcPurchase Control, you can record the deliveries of sold
items. n ERP LN 6.1 , the new Warehouse Management package
controls the entire procedure for inventory and storage of goods. As a
result, Warehouse Management now handles the outbound and
shipping of items from a warehouse. For details, refer to DeIivery
procedure.
Invoicing procedure
After the goods are delivered, in Baan VcPurchase Control, you can
print sales invoices and send them to your customers. n ERP LN 6.1 ,
the new Baan CentraI Invoicing package controls the entire
procedure for creating, printing and posting sales invoices. For details,
refer to SaIes invoicing procedure.
New functionaIity
Customer search
n ERP LN 6.1 , you can search for customers (which are called sales
business partners, or sold-to business partners in ERP LN 6.1 ) based
on certain predefined search criteria. You can define the default search
criteria on the BP Search Criteria tab of the new Sales Parameters
(tdsls0100s000) session. Anywhere in ERP LN 6.1 where you must
enter a sold-to business partner, you can zoom to the Search by
Address Criteria (tdsls0270m000) session, in which you can maintain
Order Management | 4-51
your selection criteria and perform the search.
SaIes offices
n ERP LN 6.1 , the sales office determines the location from which
sales quotations, sales orders, sales contracts, and sales schedules
are processed. A sales office is needed to complete transactions with
customers. Various sales offices can be set up for one company. You
must first define the sales office as a department in the Departments
(tcmcs0565m000) session of the Tables module. Next, you can specify
sales-office-specific data in the new Sales Offices (tdsls0512m000)
session.
Effectivity units
n ERP LN 6.1 , you can define effectivity units in the new Unit
Effectivity (UEF) module of Common Data, after which you can enter
these units in sales quotations, sales orders, and sales contracts.
Effectivity units are used as follows:
Define order templates for recurring sales orders. For details, refer
to SaIes order tempIates.
Define catalogs for the shopping list type of order entry. For details,
4-52 | Order Management
refer to Product cataIogs.
For more information on how order templates and product catalogs are
used in sales orders, refer to To use tempIates and cataIogs in saIes
orders.
Rush orders
Each company deals with rush requests from customers. To meet
these requests, rush orders can be entered in ERP LN 6.1 . For more
information, refer toRush orders.
Promotions
n ERP LN 6.1 , promotions are used to offer extra discounts and/or
free gifts on sales orders or sales order lines. Before promotions can
be linked to sales orders and sales order lines, you must first set up
promotions in the new Pricing ControI (PCG) module of Order
Management. For more information, refer toTo set up a promotion
matrix.
RetrobiIIing
f you completely processed and reported a sales order to history and if
price changes are made to a sales contract or to an item after the
renegotiation date, in ERP LN 6.1 , you can use the retrobilling
functionality. For more information, refer toRetrobiIIing.
SaIes scheduIes
n ERP LN 6.1 , the sales schedule procedure is introduced. For more
information, refer toSaIes scheduIes.
SaIes contracts
Because of the new sales schedule functionality, the sales contract
Order Management | 4-53
functionality is extended in ERP LN 6.1 . n ERP LN 6.1 , sales
contracts cannot only be linked to sales orders, but also to sales
schedules. For more information, refer toSaIes contracts.
Cost sets
f you want to add additional costs to a sales order in Baan Vc , you
must first define additional cost sets in the Maintain Costs Sets
(tcmcs0143m000) session of the TabIes (MCS) module in Common
Data. n ERP LN 6.1 , you must define cost sets in the new Additional
Cost Sets (tdsls0124m000) session of Sales Control and record the
actual charges in the Pricing ControI (PCG) module of Order
Management. For more information, refer toAdditionaI costs on saIes
orders.
Credit checking
n ERP LN 6.1 , the credit checking functionality is extended. You can
select the action to be taken if a business partner's open order amount
exceeds the credit limit, and you can indicate the moments in the order
process during which the credit limit must be checked. For more
information, refer toCredit ratings.
ATP handIing
n ERP LN 6.1 , the procedure for checking ATP when you enter a
sales order or sales quotation has changed. For more information, refer
toATP in SaIes ControI.
Shipping constraints
n ERP LN 6.1 , the terms and conditions related to the shipment of
goods are extended. For more information, refer toShipping
constraints.
DeIivery types
n ERP LN 6.1 , the settings for direct deliveries and non-direct
deliveries has changed. For more information, refer toDeIivery types.
4-54 | Order Management
DeIivery Iines
n ERP LN 6.1 , the concept of delivery lines has changed. Delivery
lines are now used to store sales back order lines and split sales order
lines. For more information, refer toDeIivery Iines.
Order acknowIedgements
n ERP LN 6.1 , the printing of sales order acknowledgements is
refined. For more information, refer toSaIes order
acknowIedgements.
Over deIiveries
f more goods are delivered than ordered, you can record these over
deliveries without constraints in Baan Vc . n ERP LN 6.1 , however,
you must define whether over deliveries are allowed for an item and
business partner combination and define additional conditions for over
deliveries. For more information, refer toOver deIiveries.
Return orders
n ERP LN 6.1 , you can link sales return orders to the original
document. As a result, the Returns group box is added to the Sales
Orders (tdsls4100m000) session.
InstaIIments
n ERP LN 6.1 , the functionality of invoicing by installments is
extended. For more information, refer toInstaIIments.
Draft invoices
f you want to print a draft invoice for sales orders in Baan Vc , you
must clear the FinaI Invoices check box in the Print Sales nvoices
(tdsls4404m000) session. n ERP LN 6.1 , a separate session is
developed in which you can print draft invoices for sales orders, sales
schedules, and installment orders. For details, refer to the online Help
of the Print Sales Draft nvoices (tdsls4447m000) session.
ReconciIiation
The redesigned reconciliation functionality in SSA ERPFinancials also
affects a number of settings and processes in Sales Control. For more
information, refer toReconciIiation (SaIes ControI).
Order Management | 4-55
Commission Control System (CMS) module - B40c/B61
This topic describes the most important differences between the
Commission ControI System (CMS) module in Baan Vc and in ERP LN
6.1 .
(Re)moved functionaIity
Period data
n Baan Vc , you can define period tables and period data directly in
the Commission ControI System (CMS) module. n ERP LN 6.1 , the
period tables and periods, which you can use to calculate commissions
and rebates on cumulative sales, are defined centrally in the CentraI
CaIendar Management (CCP) module of Common Data
For details, refer to:
To set up periods
Transaction accounts
n Baan Vc , if a link with Financials exists for commissions and
rebates, invoices are created directly in the Commission ControI
System (CMS) module and posted to Financials. As a result, you must
specify the ledger accounts that are used for posting commissions and
rebates in the Maintain Commission/Rebate Transaction Accounts
(tdcms2101m000) session. n ERP LN 6.1 , the Maintain
Commission/Rebate Transaction Accounts (tdcms2101m000) session
is removed from the Commission ControI System (CMS) module,
because invoices are no longer created directly in the Commission
Control System module.
Changed functionaIity
n Baan Vc , if a link with Financials exists for commissions and rebates,
invoices are created directly in the Commission ControI System (CMS)
module and are posted to the GeneraI Ledger (GLD) module of
Financials.
n ERP LN 6.1 , if a link with Financials exists for commissions and
rebates, Commission Control System passes on invoice requests for
rebates to Baan CentraI Invoicing and for commissions to the Accounts
PayabIe (ACP) module of Financials.
As a result of the modified invoicing functionality, the following changes are
made in ERP LN 6.1 :
Draft invoices
f you want to print a draft invoice for commissions and rebates in Baan
Vc , you must clear the FinaI Invoices check box in the Print
Approved Commissions/Rebates (tdcms2402m000) session.
n ERP LN 6.1 :
Turnover statistics.
Cancellation statistics.
Based on these statistics, in Baan Vc you can:
Cash Management.
Finalize transactions.
Close periods.
Automatic matching
f you select the Automatic Matching check box in the ACP
Parameters (tfacp0100s000) session, SSA ERP automatically matches
the purchase invoice when you save the invoice. Matching is really
automatic, no other sessions are started during this process.
Sales type.
Purchase type.
Dual accounting
This topic describes the new dual accounting functionality in ERP LN 6.1 .
Accounting in Baan IVc
Baan Vc supports only one type of ledger accounts.
DuaI accounting in ERP LN 6.1
n ERP LN 6.1 , you can define separate structures of ledger accounts for
fiscal reporting to the government and for commercial reporting to your
company's management.
n the Chart of Accounts (tfgld0108s000) session, you can define for every
ledger account whether it is Statutory or Complementary. For more
information, refer toLedger account and dimension structure.
GL account matching
This topic describes the new ledger account transaction matching
functionality in ERP LN 6.1 .
Account matching in Baan IV c
Baan Vc does not support ledger account transaction matching. Related
postings on a ledger account must be combined and matched manually.
GL account matching in ERP LN 6.1
n ERP LN 6.1 , you can set up and perform GL account matching which is
a form of ledger account transaction matching. Related postings on a
ledger account can be matched automatically according to specific criteria
such as the transaction reference. You can then analyze the remaining
unmatched postings.
For more information, refer toGL account matching.
Note
5-10 | Financials
You cannot perform GL account matching on Integration ledger accounts.
To such accounts you can apply financial reconciliation. For more
information, refer toFinanciaI reconciIiation.
ntegration mapping scheme
This topic describes the redesigned integration mapping scheme of ERP
LN 6.1 .
Integration mapping in Baan IVc
n Baan Vc , the mapping definitions for the integration transactions
between the logistic modules and the Finance package are stored in the
various logistic packages.
Integration mapping scheme in ERP LN 6.1
n ERP LN 6.1 , the mapping of the integration transactions is defined
centrally in the General Ledger module of Financials. You can use the
Mapping Scheme (tfgld4573m000) session to set up an integration
mapping scheme for mapping of the operations management transactions
to ledger accounts and dimensions. For more information, refer
toFinanciaI integrations.
ntercompany settlement transactions
Intercompany invoicing in Baan IVc
n Baan Vc , goods transfer between logistic companies required sales
orders and purchase orders, which resulted in open entries that must be
cleared by generating a payment in the buying logistic company. n a
multilogistic/single finance company structure, these transactions only
represented technical transactions between the logistic companies without
any actual transfer of funds.
Intercompany settIement in ERP LN 6.1
New in SSA ERP LN 6.1
n ERP LN 6.1 , in a multilogistic/single finance company structure the
intercompany invoicing process can be simplified by generating
intercompany settlement transactions.
Financials | 5-11
ntercompany settlement transactions only apply to purchase and sales
transactions between logistic companies in a multilogistic/single-financial
company structure. For more information, refer toTo set up intercompany
settIement transactions.
Financial reconciliation
This topic describes the redesigned reconciliation of logistic transactions
and financial postings in ERP LN 6.1 .
ReconciIiation in Baan IVc
n Baan Vc , the financial reconciliation functionality was limited.
n the Finance package, the following reconciliation sessions were
available:
European Union
The following functionality was added for business partners and bank
acccounts in countries of the European Union:
Financials | 5-13
Germany
The following requirements specific for Germany are part of the ERP
LN 6.1 standard software:
BeIgium
The following requirements specific for Belgium are part of the ERP LN
6.1 standard software:
ntracom reporting.
VAT report.
Tax journal.
Accon interface.
For more information, refer toBeIgian IocaIizations - Differences
B40c/ERP61.
MuIticurrency
New in SSA ERP LN 6.1 . Baan Vc only supports a single currency
system. n ERP LN 6.1 a company can use up to three different home
currencies. For more information, refer toMuIticurrency systems.
DuaI accounting
Financials | 5-23
New in SSA ERP LN 6.1 . n ERP LN 6.1 , in addition to the Statutory
ledger accounts you can define Complementary ledger accounts. For
more information, refer toDuaI accounting.
Dimension accounting
Changed in SSA ERP LN 6.1 . n ERP LN 6.1 , dimension accounting
has been extended. For more information, refer toDimension
accounting.
GL account matching
New in SSA ERP LN 6.1 . n ERP LN 6.1 , a form of ledger account
transaction matching is available. For more information, refer toGL
account matching.
ReconciIiation
Changed in SSA ERP LN 6.1 . n ERP LN 6.1 , reconciliation of logistic
transactions and financial postings was completely redesigned. For
more information, refer toFinanciaI reconciIiation.
Currency resuIts
Changed in SSA ERP LN 6.1 . n ERP LN 6.1 , to support the new
financial reconciliation functionality as well as intercompany
transactions in a multicurrency structure, currency results are
distinguished and handled according to their causes. For more
information, refer toCurrency differences.
The following types of currency results are distinghuished:
Currency differences.
SeIf biIIing
New in SSA ERP LN 6.1 . n ERP LN 6.1 , SSA ERP can create,
match, and approve invoices automatically when goods are received.
For details, refer to SeIf biIIing.
Factoring
Changed in SSA ERP LN 6.1 . n ERP LN 6.1 , factoring of accounts
payable was improved and extended. For details, refer to Factoring.
SaIes Invoices
Changed in SSA ERP LN 6.1 . n Baan Vc , Sales invoices are
maintained and posted in the Accounts Receivable module. n ERP LN
6.1 , sales invoices are release from SSA ERP Order Management to
Central nvoicing in the in the Release Sales Orders/Schedules to
nvoicing (tdsls4247m000) session, which you can start from the
Specific menu in the SaIes Orders (tdsIs4100m000) session or the
Sales Order Line Details session. For more information, refer
toInvoicing.
Interest invoices
Changed in SSA ERP LN 6.1 . n Baan Vc , you can only create
interest invoice advice for late customer receipts. n ERP LN 6.1 , you
can also create interest invoice advice for overdue invoices that have
not been paid. For more information, refer toInterest caIcuIation on
saIes invoices
Financials | 5-25
Factoring
Changed in SSA ERP LN 6.1 . n ERP LN 6.1 , you can set up
factoring both for accounts payable and accounts receivable. For
details, refer to Factoring.
Factoring
New in SSA ERP LN 6.1 . n ERP LN 6.1 , the factoring functionality
has been extended. You can set up factoring both for accounts
payable and accounts receivable. Factoring with recourse and without
recourse are both supported. For details, refer to Factoring.
Trade notes
New in SSA ERP LN 6.1 . n ERP LN 6.1 , dimension accounting has
been extended. For details, refer to Trade notes.
Proforma invoices
Changed in SSA ERP LN 6.1 . The Proforma Invoices business
object was removed from the Cash Management module.
n ERP LN 6.1 , this functionality was replaced:
Location tracking
Financials | 5-27
New in SSA ERP LN 6.1 . You can enter a location for each individual
asset through a segmented location code. Eight segments are
available, which you can use, for example, for
country/city/site/building/floor and so on.
Cost aIIocation
New in SSA ERP LN 6.1 . ndirect costs can be allocated based on the
actual values of logistic and financial cost drivers.
Variance anaIysis
Changed in SSA ERP LN 6.1 . The following variances are
distinguished:
Consumption variances.
You cannot specify a lot from which the BOM line material is issued.
You can use the Lot SeIection field in the Bill of Material
(tibom1110m000) details session to determine whether you want to
issue the material on the BOM line from a specific lot, the same lot, or
from any lot.
You can link exceptions to a BOM line so that you can model a
deviation of the BOM for a unit effective item. For details, refer to
Exceptions in unit effectivity and Overview of unit effectivity.
The possibility of creating one costing work center for every enterprise
unit.
For more information, refer to Costing work centers.
Critical capacity type
This topic describes the critical capacity type that is removed from ERP LN
6.1 , and its relation to cycle time.
CriticaI capacity type in Baan IVc
n Baan Vc , the critical capacity type is used to determine whether man
hours or machine hours are recorded for a work center.
The concept of critical capacity type is essential when viewing capacity
utilization on work centers. Only capacity utilization of resources of the
critical capacity type can be viewed.
CriticaI capacity type in ERP LN 6.1
n ERP LN 6.1 , the concept of critical capacity type has disappeared. Man
hours as well as machine hours are recorded for a work center. The
6-4 | Manufacturing
capacity utilization on work centers can be viewed for man as well as for
machines.
Note
n Enterprise Planning, the concept of critical capacity is still in use.
Run time
This topic is about the change from run time in Baan Vc to cycle time in
ERP LN 6.1
Run time in Baan IVc
n Baan Vc , you can define the run time for a task or an operation.
The duration of an operation is calculated based on the run time, the
production order quantity, and, dependent on the work center's critical
capacity type, the operation's man occupation or the machine occupation.
CycIe time in ERP LN 6.1
n ERP LN 6.1 , the run time is replaced by the concept of cycle time. You
can define the cycle time on the routing operation in the Routing
Operations (tirou1102m000) session, or for a task relationship in the Task
Relationships (tirou0104m000) session.
The production duration of an operation is now solely determined by the
cycle time and the production order quantity. That is, SSA ERP calculates
the duration of an operation by multiplying the cycle time and the
production order quantity. f a setup time is defined, the setup time is also
added.
Drawing sizes and drawing locations in EDM
This topic is about drawing sizes and locations in EDM.
Drawing sizes and Iocations in Baan IVc
Drawing sizes are the paper sizes of engineering drawings. Drawing
locations are places where the engineering drawings are stored. n Baan
Vc , drawing sizes en drawing locations are part of EDM.
Drawing sizes and Iocations in ERP LN 6.1
Manufacturing | 6-5
n ERP LN 6.1 , drawing sizes and drawing locations are stored in the
Document Management (DOC) module in SSA ERP Object Data
Management.
ECO approval procedure
This topic describes the difference between the ECO approval procedure
in Baan Vc and the approval procedure in ERP LN 6.1 .
ECO approvaI procedure in Baan IVc
n Baan Vc , the approval of ECO changes is part of the change
procedure in EDM.
EDM approvaI procedure in ERP LN 6.1
n ERP LN 6.1 , the approval procedure is not part of EDM, but is managed
by change orders in SSA ERP Object Data Management (ODM), in the
Change Management (CHM) module.
End item unit costs
This topic describes the end item unit costs. End item unit costs are the
planned costs of one end item for a specific production order. SSA ERP
calculates the end item unit costs by means of the estimates for hours and
materials (item surcharges included).
End item unit costs in Baan IVc
n Baan Vc , each production order has a field that contains the cost price
of the end item or customized item. This value is updated when the cost
price of items is recalculated.
End item unit costs in ERP LN 6.1
n ERP LN 6.1 , the estimated costs by unit of end item are split up:
Work center-based costs: The costs are displayed by work center, that
is, the calculation office or the work center in production planning,
depending on parameters settings.
A new session is available to display this data: End tem Unit Costs
6-6 | Manufacturing
(ticst0510m000). The session is filled when freezing the estimates. This
moment is determined by the Moment Freezing Estimates field in the
Production Orders (tisfc0101s000) details session.
Engineering item groups
This topic is about engineering item groups.
Engineering item groups in Baan IVc
n Baan Vc , engineering item groups are sets of engineering items
grouped on the basis of common features.
Engineering item groups in ERP LN 6.1
Engineering item groups do not exist in ERP LN 6.1 .
Financial transactions by production order or work center
This topic is about whether financial transactions in Manufacturing are
recorded by production order or by work center.
FinanciaI transactions by production order in Baan IVc
n Baan Vc , all financial transactions in Manufacturing are recorded by
production order.
FinanciaI transactions by production order or work center in ERP LN 6.1
n ERP LN 6.1 , you can choose to record financial transactions by
production order or by work center. f the FinanciaI Transactions by
Work Center check box is selected in the Shop Floor Control Parameters
(tisfc0100s000) session, the financial transactions are recorded by work
center. f the check box is cleared, the transactions are recorded by
production order, as in Baan Vc .
CIosing of operations
n ERP LN 6.1 , you cannot only close production orders, but you can also
close operations. f the FinanciaI Transactions by Work Center check
box is selected, the closing of operations enables you to determine the
financial results for a specific work center because the operation's financial
transactions on the work center are completed. When an operation is
Manufacturing | 6-7
closed, the operation status becomes CIosed.
WIP vaIue
f the FinanciaI Transactions by Work Center check box is selected,
which means that you want to calculate financial results by work center,
the estimated ingoing and outgoing WP value ( WP transfer ) is
determined by production order as well as by work center. You can view
the WP transfer data in the WP Transfers (ticst0520m000) session.
You can use the Transfer WIP method field in the Shop Floor Control
Parameters (tisfc0100s000) session to determine when the WP is
transferred.
Efficiency and price variances
You must also decide how the efficiency variances and price variances are
posted. You can use the Posting Method Efficiency Variances field and
the Posting Method Price Variances field to do so:
Floor stock is part of the standard cost price of the main item.
Fields that express lead time elements, for example, queue time, wait
time, and cycle time. These fields replace lead time elements in Baan
Vc such as setup and run time because the lead time concept has
changed in ERP LN 6.1 . For more information, refer toProduction
order Iead-time eIements.
Fixed Duration
Scrap Quantity
YieId Type
YieId Percentage
For more information, refer toScrap.
Container
Container Method
Container Quantity
Number of Kanbans
Dscr on Kanban
For more information, refer toPuII notes.
6-10 | Manufacturing
Pull notes
This topic explains the new labels funtionality in ERP LN 6.1 .
PuII notes in Baan IVc
n Baan Vc , pull notes are used to cover and initiate the movement of
goods towards, on, or from the shopfloor.
LabeIs in ERP LN 6.1
n ERP LN 6.1 , the pull notes are replaced by the concept of labels. Two
types of labels can be distinguished:
Kanban IabeIs
Trigger the supply of intermediate products between work centers.
Project and budget are two seperate entities, defined and maintained in
6-12 | Manufacturing
seperate sessions.
Cost prices for customized items, calculation parts, and standard items
are calculated and displayed in seperate sessions.
Project and budget in ERP LN 6.1
n ERP LN 6.1 , there are changes for budgets and projects compared to
Baan Vc :
queue time
cycIe time
The Baan Vc term 'run time' is renamed to cycle time. For more
information, refer to Run time.
wait time
move time
Move time is a lead-time element at the end of an operation that is in
working time, that is, planned according to a specific calendar. n Baan
Vc , the last lead-time element of an operation is waiting time, which is
planned independent of a calendar.
You can also define queue time, wait time, and move time on the work
center level in the Work Centers (tirou0101m000) session. These times
then appear as defaults on routing operations that are linked to the work
center. However, you can always change the times on the routing
operations.
Reference designators
This topic is about reference designators.
Reference designators in Baan IVc
n Baan Vc , you can link a number of items on a specific BOM line to one
or multiple locations. A set of locations on a BOM line forms a reference
designator.
The link between reference designators and materials only exists in the
BOM module. The EDM module does not support reference designators.
Furthermore, the estimated materials in SFC are not linked to reference
designators. However, you can print reference designators and the
6-14 | Manufacturing
quantity by reference designator on order documents.
Reference designators in ERP LN 6.1
n ERP LN 6.1 , you can link reference designators to items in the BOM
module as well as in the EDM module. For more information, refer
toOverview of reference designators.
Scrap
This topic is about the concept of scrap and yield.
Scrap factor in Baan IVc
n Baan Vc , the concept of scrap factor exists. The scrap factor is the
percentage of components that is left over or thrown away after production
of a manufactured item. The scrap factor is defined in the item data, and
this percentage is used as a default in the BOM.
Scrap and yieId in ERP LN 6.1
n ERP LN 6.1 , scrap can be defined both as a percentage and a quantity
in the tems - Production Defaults (tiipd0102m000) session or the tems -
Production (tiipd0101m000) session. This scrap is used as a default in the
BOM.
You can also define yield on the BOM.
f the Scrap Quantity and YieId on Operation check box in the Routing
Parameters (tirou0100m000) session is selected, you can also define
scrap and yield on the routing.
For more information, refer to Scrap and yieId and Defining scrap and
yieId.
Lot by unit
This topic is about the use of lot by unit or serialization to track and trace
items.
Lot by unit in Baan IVc
Lot control is used to record and trace groups of items. n Baan Vc , you
can use Lot by Unit in the item data to identify a separate item as a lot. n
Manufacturing | 6-15
this way, you can record and trace the item.
SeriaIization in ERP LN 6.1
n ERP LN 6.1 , the concept of serialized items is introduced. Serialization
is used in the following SSA ERP packages:
f the Transfer < Prdn Batch check box in the Routing Operations
(tirou1102m000) session is selected, you indicate that you want to start
the next operation before the complete production batch is finished.
Subsequently, you must enter a value in the Transfer Batch Qty field
to determine when the next operation can be started. The Transfer
Batch Method field in the Routing Parameters (tirou0100m000)
session determines whether you must type a quantity or a percentage.
f the Transfer < Prdn Batch check box in the Routing Operations
(tirou1102m000) session is cleared, the next operation starts when the
complete production batch is finished.
n ERP LN 6.1 , you can also indicate whether an operation has a fixed
duration by selecting the Fixed Duration check box in the Routing
Operations (tirou1102m000) session.
Task type
This topic is about task types.
Task types in Baan IVc
n Baan Vc , you can define the following task types:
Machine operation
Non-machine operation
ndirect task
Absence
Task types in ERP LN 6.1
n ERP LN 6.1 , task types do not exist in Manufacturing anymore. f a
machine is defined for an operation, SSA ERP considers the task on the
operation as a machine task, and machine hours are taken into account
when calculating hours for the operation. f no machine is present, the task
is a non-machine task, and only man hours are taken into account.
Note
Manufacturing | 6-17
The Absence Task and Indirect Task are task types of general tasks
used in People.
Task relationships
This topic is about task relationships in ERP LN 6.1 .
Task reIationships in Baan IVc
n Baan Vc , you can define data such as setup time, run time, man
occupation and machine occupation on the task level.
Task reIationships in ERP LN 6.1
n ERP LN 6.1 , you cannot define the above mentioned data on the task
level anymore. You can define the data either directly on the routing
operation, or for a task relationship. Task relationships are defined if you
link a specific task to a specific work center and/or machine in the Task
Relationships (tirou0104m000) session. n the Task Relationships
(tirou0104m000) details session, you can define data such as setup time,
cycle time, and the man and machine occupation. f you enter a task on an
operation for which you defined a task relationship , the defined data
appears as defaults on the routing operation.
t is mandatory to define task relationships if the following is true:
Lot costing
FTP (Fixed Transfer Pricing) is not an actual valuation method, because in
FTP a calculated value is used as inventory value. For information, refer to
Introduction on FTP and actuaI costing.
The actual valuation methods are Warehouse Management concepts.
However, for Manufacturing the valuation methods are important when
manufactured end items are received in inventory. f the Use ActuaI Cost
Price for Receipt Posting check box is selected in the Shop Floor Control
Parameters (tisfc0100s000) session, end items are received in inventory at
their actual costs, and valued according to the defined actual valuation
method. f the check box is cleared, FTP is used to determine the receipt
price of end items in inventory.
For information, refer to ActuaI costing for receipt postings in
manufacturing.
Blocking operations
This topic is about blocking operations and blocking reasons in ERP LN
6.1 .
BIocking operations in Baan IVc
n Baan Vc , you cannot block operations.
BIocking operations in ERP LN 6.1
n ERP LN 6.1 , you can prevent proceeding an operation by blocking the
operation. You must enter a blocking reason to indicate why an operation
has been blocked, and which actions cannot be carried out anymore.
Blocking reasons must be defined in the Blocking Reasons
Manufacturing | 6-19
(tisfc2500m000) session. For more information, refer toBIocking
operations.
Customized items or standard items in Product Configuration
(PCF)
This topic is about the possibility to create standard items instead of
customized items when configuring an item in ERP LN 6.1Product
Configuration (PCF).
Customized items in Baan IVc
n Baan Vc , configured items in PCF always are customized items. This
means that an item is part of a PCS project. The advantages of PCS are,
amongst others, that it provides an item with a detailed cost roll-up. t also
provides the possibility of pegging by means of the project code.
Standard items or customized items in ERP LN 6.1
n ERP LN 6.1 , configured items can be customized items as well as
standard items. n high volume environments, the detailed cost roll-up
provided by PCS is often not necessary. Furthermore, using PCS costs
extra time to calculate the project costs and to delete the project structure
afterwards.
f you configure items without PCS projects, standard items are generated
instead of customized items. Pegging functionality is secured by the
unique item codes of the configured items that can be related back to the
sales order.
Default production order data
This topic is about default production data that can be defined in ERP LN
6.1 .
DefauIt production order data in Baan IVc
n Baan Vc , you cannot define default production order data.
DefauIt production order data in ERP LN 6.1
n ERP LN 6.1 , you can use the Default Production Order Data
(tisfc0502m000) session to define default production order data for a
6-20 | Manufacturing
specific production order series.
Lean PCS projects
This topic is about the new lean PCS functionality in ERP LN 6.1 .
PCS projects in Baan IVc
n Baan Vc , only customized items can be in a PCS projects. BOM and
routing of the customized item are always part of the PCS project.
Lean PCS projects in ERP LN 6.1
n ERP LN 6.1 , PCS projects can be used for standard-to-order purposes.
The standard items to be produced are copied to a PCS project, but
without the BOM and routing because those are standard. Consequently,
engineering is no longer possible. Because the BOM and routing of a
standard-to-order item are not copied, the BOM and routing are stored only
once, independent of the number of generated PCS projects, which
prevents redundant data in SSA ERP. The projects can still be used to peg
the activities under the project to a specific sales order, and to know the
costs by PCS project.
For information, refer to Lean PCS projects.
Micro routing
This topic is about a new concept in ERP LN 6.1 , the micro routing.
Micro routing in ERP LN 6.1
n ERP LN 6.1 , the new concept of micro routing is introduced. A micro
routing can facilitate work on the shop floor by providing stepwise, extra
information related to a routing operation.
Shared work centers
This topic is about a new concept in ERP LN 6.1 , shared work centers.
Work centers in Baan IVc
n Baan Vc , you can only plan work for work centers in the current logistic
Manufacturing | 6-21
company.
Shared work centers in ERP LN 6.1
n ERP LN 6.1 , the new concept of shared work centers is introduced. A
shared work center has a relationship with a work center in a different
logistic company. You can use this relationship to plan work in one (or
more) logistic companies that is actually carried out in a different company.
The secondary work center and the primary work center are shared work
center types.
For more information, refer toShared work centers.
Modules
BOM Control (BOM) module - Differences B40c/B61
This topic describes the most important differences between the Bill of
Material module in Baan Vc and in ERP LN 6.1 .
Removed functionaIity
PuII notes
n Baan Vc , you can define the number of notes on the BOM line. n
ERP LN 6.1 , the pull notes concept is removed, and replaced by the
labels concept. For more information, refer toPuII notes.
Changed functionaIity
FIoor stock
Floor stock items are part of the BOM but they are neither allocated in
inventory nor backflushed. For more information, refer toFIoor stock.
6-22 | Manufacturing
Scrap
Scrap can be defined on the BOM line as a percentage and a quantity.
Furthermore, you can define yield on a BOM line. For more
information, refer toScrap.
Reference designators
n ERP LN 6.1 , the reference designator concept has changed. For
more information, refer toReference designators.
New functionaIity
Unit effectivity
You can link exceptions to BOM lines so that you can model a
deviation of the BOM for a unit effective item. For more information,
refer toExceptions in unit effectivity and Overview of unit
effectivity.
Cost Accounting (CPR) module - Differences B40c/B61
This topic describes the most important differences between the Cost Price
Calculation module in Baan Vc and in ERP LN 6.1 .
Changed functionaIity
Cost components
n ERP LN 6.1 , cost components are defined in Common Data, in the
Tables module. Furthermore, you can distinguish aggregated cost
components and detailed cost components. For more information, refer
toCost components.
Production Order Costing (CST) module - Differences B40c/B61
This topic describes the most important differences between the
Production Order Costing module in Baan Vc and in ERP LN 6.1 .
Changed functionaIity
ActuaI costing
n actual costing, actual valuation methods calculate the valuation price
of end items in inventory. For more information, refer toActuaI costing
for receipt postings.
ECOs
n ERP LN 6.1 , ECOs are replaced by MBCs. For more information,
refer toEngineering Change Orders (ECOs).
Unit effectivity
You can link exceptions to an E-BOM line so that you can model a
deviation of the E-BOM for a unit effective item. For more information,
refer toExceptions in unit effectivity, Unit effectivity in EDM, and
6-24 | Manufacturing
Overview of unit effectivity.
Product Configuration (PCF) module - Differences B40c/B61
This topic describes the most important differences between the Product
Configuration module in Baan Vc and in ERP LN 6.1 .
Changed functionaIity
Generic BOM/routing
n ERP LN 6.1 , the generic BOM and routing have some extra
functionality to keep them in line with the production BOM and routing.
For more information, refer toGeneric engineering data: BOM and
routing.
UsabiIity improvements
n ERP LN 6.1 , the new Generic tem - Structure (tipcf3100m100)
session provides fast access to information related to generic items,
such as the generic routing, generic BOM, product features, and
constraints. For more information, refer toTo use a header-Iines
session.
New functionaIity
Run time
The concept of run time is replaced by cycle time. For more
information, refer toRun time.
Operation overIap
n ERP LN 6.1 , operation overlap is determined by the concept of
transfer batch quantity or percentage. For more information, refer
toOperation overIap.
Task type
n ERP LN 6.1 , you cannot define task types anymore. For more
information, refer toTask type.
Man occupation
The man occupation on an operation can be subdivided into a setup
part and a production part. For more information, refer toMan
occupation.
CaIendars
The calendar functionality is moved to the CaIendars and Periods
(CCP) module in Common Data. For more information, refer
toCaIendars and Periods moduIe - DifferencesERP61/B40c.
UsabiIity improvements
n ERP LN 6.1 , the new Work Centers Dashboard (timfc1501m000)
6-26 | Manufacturing
session provides fast access to information related to work centers,
such as utilization and input/output control. Furthermore, from the new
tems Dashboard (timfc1500m000) session, you can easily access the
BOM and routing for a specific item. For more information, refer toTo
use a dashboard session.
New functionaIity
Task reIationships
n ERP LN 6.1 , you can define default data for a specific combination
of task, work center, and/or machine. For more information, refer
toTask reIationships.
Micro routing
The new concept of micro routing enables you to add an extra level of
information to routing operations. For more information, refer toMicro
routing.
Unit effectivity
You can link exceptions to a routing or a routing operation so that you
can model a deviation of the routing (operation) for a unit effective item.
For more information, refer toExceptions in unit effectivity and
Overview of unit effectivity.
Repetitive Manufacturing (RPT) module - Differences B40c/B61
This topic describes the most important differences between the Repetitive
Manufacturing module in Baan Vc and in ERP LN 6.1 .
Changed functionaIity
n ERP LN 6.1 , you must define the periods that are used in the RPT
item production schedule in the CaIendars and Periods (CCP) module
in Common Data. For more information, refer toCaIendars and
Periods moduIe - DifferencesERP61/B40c.
Shop Floor Control (SFC) module - Differences B40c/B61
This topic describes the most important differences between the Shop
Floor Control module in Baan Vc and in ERP LN 6.1 .
Changed functionaIity
Manufacturing | 6-27
Lead-time eIements
Compared to Baan Vc , the lead time elements are changed to
calculate production order lead times. For more information, refer
toProduction order Iead-time eIements.
UsabiIity improvement
n ERP LN 6.1 , the new Production Order (tisfc0101m100) session
provides fast access to information related to production orders, such
as the production planning, estimated material, and inventory. You can
start this session by double-clicking a production order in the
Production Orders (tisfc0501m000) session. For more information,
refer toTo use a header-Iines session.
New functionaIity
BIocking operations
n ERP LN 6.1 , you can block operations to prevent proceeding them.
For more information, refer toBIocking operations.
Input/output controI
n ERP LN 6.1 , the concept of input/output control is introduced to
monitor work center queues. For more information, refer
toInput/output controI.
Order distribution
The unit effectivity concept is introduced in ERP LN 6.1 . f a production
order contains unit effective items, a distribution of the items by
effectivity unit must be present. The Order Distribution (tisfc0105m000)
session displays this distribution. For more information, refer
toOverview of unit effectivity.
Removed functionaIity
6-28 | Manufacturing
PuII notes
n Baan Vc , you can use pull notes to regulate material flows to the
shop floor, and on the shop floor, and to replenish the WP warehouse.
n ERP LN 6.1 , the pull notes concept is removed and replaced by the
labels concept. For more information, refer toPuII notes.
Manufacturing | 6-29
6-30 | Manufacturing
Project - Differences by SSA Baan ERP 6.1 topic
This topic lists the available differences topics for SSA ERP LN 6.1 .
New functionaIity
The following differences topics are available:
CentraI invoicing
HoIdback
Performance measurement
Project currency
Project dashboard
Project tempIate
Project warehouse
UsabiIity improvements
Chapter 7
Project
7
User defauIts
Changed functionaIity
The following differences topics are available:
Activity structure
Forecast methods
Hours accounting
Project estimation
Based on Actuals
Based on Progress
Methods to Determine COGS:
Actual Costs
7-4 | Project
Revenue Recognition and Cost of Goods SoId in ERP LN 6.1.
n ERP LN 6.1 , the revenue recognition and cost of goods sold
functionality has been significantly extended.
The purpose of recognizing revenue is to calculate revenue and to register
the revenue in the project financial data. For long term contracts extending
over accounting periods, recognition of revenue is permitted before the
contract is complete. This information is later sent to Baan Finance. For a
given contract, the revenue recognition is the process that leads to the
calculation (and subsequent posting to the General Ledger) of the total
revenue that the contractor estimates he has 'earned', based on the
progress of the contract. This amount is independent of the amounts that
have been billed/invoiced to the customer and does not represent any kind
of cash flow.
Cost of Goods Sold (COGS) is the expense a company incurs in order to
manufacture, create, or sell a product. t includes the purchase price of the
raw material as well as the expenses of turning it into a product. For a
given contract, the cost of goods sold is the amount of money spent in the
process of building a deliverable (for which revenue can be recognized) or
the money spent on non-recurring activities (such as engineering design)
that have been completed. The Cost of Goods Sold transactions are
posted to the General Ledger.
Revenue Recognition and Cost of Goods Sold can be determined at the
project, extension, element and activity level depending on the method you
select. The usage of element and activity depends on whether the project
is controlled by element or controlled by activity.
Revenue Recognition Limit: You can set a limit on the revenue to be
recognized. A maximum percentage is defined on the project and
extension level. The default value is set to 100%. But the value can be
overwritten. The percentage times the contract amount gives the maximum
revenue that can be recognized (until the completion of the project). The
revenue recognition limit is valid for all RR methods except the Completed
Project method.
For more information, refer toRevenue Recognition (RR) and Cost of
Goods SoId (COGS)
Methods to Recognize Revenue:
MiIestone Method
Project | 7-5
Possibility to view the progress of a PCS item from SSA Baan ERP
Project (by milestone or across milestones).
Digitizer: A digitizer link to help the user to determine the values of the
fieldss from the quantity sheets.
Schedule estimation
Estimate analysis
Preparing a bid
To create an estimate
Copying a project
Digitizer interface
Configurator/template
Norm group(s)
Compress/combine estimates
Changed functionaIity in ERP LN 6.1
Actual consumed material items for which Service item data is defined.
7-12 | Project
ii. You cannot copy:
Actual consumed material items for which Service item data is not
defined.
The copying process is handled in SSA ERP Service in the Copy Project
Breakdown Structure (tscfg2210m200) session.
To handle service requirements of projects in progress, you can generate
service orders for the project, in Project. The cost incurred for the service
performed, is transferred from Service to Project. To generate service
orders, the reference activity from Service is linked to the activity or
element labor budget lines in Projects. When the service order is set to
Costed in Service, the cost is transferred to Project and is aggregated as
labor cost.
The cost is approved, confirmed and transferred to CentraI Invoicing as
service cost. From CentraI Invoicing, the service cost is posted to SSA
ERP FinanciaIs as service cost.
Performance measurement
This topic explains the new performance measurement functionality
introduced in ERP LN 6.1
Performance measurement in ERP LN 6.1
Performance Measurement is one of the two procedures used to monitor
and measure a project's progress.
t is an objective measurement of how much work has been accomplished
on a project. Using the performance measurement method, management
can compare how much work has actually been completed against the
amount of work planned to accomplish. Therefore the following is
determined:
budget-at-completion (BAC)
estimate-at-completion (EAC)
Activity
n the early stages of a project when the details are not yet fully
defined.
na situation where one fixed amount is available for the total project.
f the budget for each activity and the cost for each individual activity are
uncertain, but the approximate distributed amount is known, you must
begin a project with a top-down budget. For the top-down budget version,
enter the contract amount, the profit fee, and the management fee, and the
contract amount left is then the distributed amount. You can use this
amount to budget.
The constraint of a top-down budget is that the amount check for lower
level elements for the distributed amount is used, and therefore you cannot
enter lower level amounts that are higher than the distributed amount.
You can generate the top down budget using the Generate Structure and
Top Down Budget (tpptc5210m000) session.
You can maintain the budget data in the Top Down Budget Data
(tpptc5110s000) session.
Unit rate invoicing and progress invoicing for activities
This topic explains the new functionality which allows Progress invoicing
and unit rate invoicing for activities.
Unit rate and progress invoicing in Baan IVc
n Baan Vc , you can base the unit rate invoice on the sales price of an
element . The amount to be invoiced equals the sales price of the element
multiplied by the physical progress of the element.
n Baan Vc , the progress invoicing procedure resembles the installment
7-16 | Project
invoicing procedure. The progress invoicing procedure consists of
invoicing partial contract amounts at predefined intervals, for example,
every four weeks. n this procedure, the installment amount depends on
the element's progress and the element's sales rates.
Unit rate and progress invoicing for activities in ERP LN 6.1
n ERP LN 6.1 , you can base the unit rate invoice on the sales price of an
element or an activity. The amount to be invoiced equals the sales price of
the element or the activity multiplied by the physical progress of the
element or the activity.
For the progress invoicing procedure, the installment amount can be based
on the element's or the activity's progress and the element's or the
activity's sales rates.
User defaults
This topic explains the new project user defaults functionality in ERP LN
6.1 .
User defauIts in ERP LN 6.1
n ERP LN 6.1 , the newly introduced user defaults functionality offers
user-specific default data to simplify and speed up the creation of new
projects.
Project-related default information can be defined for individual users. User
default settings are recognized using the logon of the user. User defaults
are maintained in the User ProfiIes (tppdm0101s000) session in the
Project Parameters module. The defaults can be defined for :
Project
Project Plan
Template
Estimate data
Number group
Order series
For more information, refer toUser Profiles (tppdm0101s000) session.
Usability improvements
This topic explains the new usability improvements in ERP LN 6.1 .
UsabiIity enhancements in ERP LN 6.1
Project | 7-17
Usability enhancements are essential for the following reasons:
Browse filters: These help to display only the valid records, effectively
preventing the user from selecting a wrong record. Browse filters
minimize scrolling, as fewer records are displayed. Data is filtered for
this specific purpose.
Project tempIate: With the help of this template, you can define a set
of project types for a company. f you select a predefined template
during the project definition, the project settings are created
automatically.
Enterprise unit
New in ERP LN 6.1 . n ERP LN 6.1 , entities such as departments,
work centers, warehouses and projects are linked to a financial
company through an enterprise unit. An enterprise unit can represent a
manufacturing plant, an assembly plant, a sales organization, and so
on. n the multisite structure, an enterprise unit identifies a financial unit
or a fiscal unit. All the transactions related to an enterprise unit are
posted to one financial company. A project is a logistic entity.
Depending on the project's enterprise unit, the postings are posted to a
specific financial company. For more information, refer toEnterprise
units
Project currency
New in ERP LN 6.1 . Baan Vc only supports a SingIe currency
system. n ERP LN 6.1 , you can define the project currency when you
define a project in the Project (tppdm6100s000) session. The amounts
in the budget lines and cost lines (which are possibly recorded in
different currencies) are converted to the project currency for
monitoring purposes. For more information, refer toProject currency.
MuItipIe currency
New in ERP LN 6.1 . n Baan Vc , a company can perform its financial
accounting in one currency. n ERP LN 6.1 , a company can use up to
three different internal currencies. One of these is usually the local
currency. The base currency for financial accounting is called the
reference currency. For more information, refer toMuIticurrency
systems.
Project warehouse
New in ERP LN 6.1 . n ERP LN 6.1 , project warehouses have been
introduced. Warehouses have to be set up in SSA ERP Common in
the Warehouses (tcmcs0103s000) session, the warehouse type must
be set to Project. When a particular project is defined, the warehouse
can be linked to the project. For more information, refer toProject
warehouse.
7-24 | Project
Project tempIate
New in ERP LN 6.1 . The introduction of templates in ERP LN 6.1
helps speed up the creation of new projects. The project template is
used in Baan Project by linking it to a user in the User Profiles
(tppdm0101s000) session. For more information, refer toProject
tempIate.
UsabiIity improvements
New in ERP LN 6.1 . Usability enhancements are essential for more
effective and efficient working, less errors, higher quality, less training
requirement and more user friendly application. For more information,
refer toUsabiIity improvements.
Project dashboard
New in ERP LN 6.1 . A dashboard is aimed at improving the ease of
use of the ERP application. t is a new session wherein the project
functionality is placed together, introducing a quicker and easier way to
access multiple sessions. For Project, the Projects Dashboard
(tppdm6500m100) session has been introduced for the purpose. For
more information, refer toProject dashboard.
Surcharges on activities
New in ERP LN 6.1 . n ERP LN 6.1 , surcharge on budget, cost and
revenue can be calculated and posted to an element, activity, or a cost
component, defined for a project.
User defauIts
New in ERP LN 6.1 . n ERP LN 6.1 , the newly introduced user
defaults functionality offers user-specific default data to simplify and
speed up the creation of new projects. Project-related default
information can be defined for individual users. User defaults are
maintained in the User profiIes (tppdm0101s000) session in the
Project Parameters module. For more information, refer toUser
defauIts.
Changed functionaIity
Activity structures
Changed in ERP LN 6.1 . n Baan Vc , two project structures are
possible: the element structure and the activity structure. A network of
activities can be defined because it is possible to define relationships
between activities. The effect of the activity relationship depends on the
relationship type. n ERP LN 6.1 , the element structure functionality
remains unchanged. The activity structure functionality has been
Project | 7-25
extended. t is a multi-level hierarchical structure used to break a
project down into time-scaled activities. For more information, refer
toActivity structure.
Estimate version
To use a bid
To create an estimate
Estimate version
Estimate type
ntegration with MS excel for calculation and MS word for bidding text.
You can use the Object Data Management (ODM) package to link the
documents.
Note
The integration with microsoft excel is mainly used to update field values
such as Quantity, Surcharges, Cost Price, SaIes Price and so on, for a
range of records; create new estimate lines; draw charts/graphs of the data
imported.
Changed functionaIity
Digitizer interface
Configurator/template
Norm group(s)
Compress/combine estimates
For more information, refer toProject estimation
Project nvoicing (PN) module - Differences B40c/B61
This topic describes the most important differences between the Project
Invoicing (PN) module in Baan Vc and in ERP LN 6.1 .
New functionaIity
HoIdback
New in ERP LN 6.1 . Holdback means a percentage of an invoice
amount is withheld by the customer. The holdback amount serves as a
guarantee that project activities will be performed according to the
agreements made with the customer. The Holdback percentage is
defined in the Project (tppdm6100s000) session in the Project
Definition module. For more information, refer toHoIdback.
Performance measurement
New in ERP LN 6.1 . Performance Measurement is one of the two
procedures used to monitor and measure a project's progress (the
Control inquiries and report is the other procedure). Use the Generate
Performance Measurement (tpppc5200m000) session to monitor the
cost variance and schedule variance. For more information, refer
toPerformance measurement.
Progress registration
Changed in ERP LN 6.1 . n ERP LN 6.1 , progress registration is
restructured owing to the enhancement of the activity structure. Of the
four activity types, progress can only be booked at the project cost
account (PCA) or work package (WP) level. For more information, refer
toHow to register progress.
7-28 | Project
Forecast method
Changed in ERP LN 6.1 . n Baan Vc , only one forecast method,
estimate-to-complete (ETC) forecast method is supported. n ERP LN
6.1 , two new forecasting methods have been introduced:
estimate-at-completion and Estimate extra cost. The method ERP LN
6.1 uses, is determined by the value of the Leading Forecast Method
field in the PPC Parameters (tpppc0100s000) session. For more
information, refer toForecast methods.
RR and COGS
Changed in ERP LN 6.1 . n ERP LN 6.1 , the revenue recognition and
cost of goods sold functionality has been significantly extended.
Revenue Recognition and Cost of Goods Sold can be determined at
the project, extension, element and activity level depending on the
method you select. The usage of element and activity depends on
whether the project is controlled by element or controlled by activity.
For more information, refer toRevenue Recognition (RR) and Cost of
Goods SoId (COGS).
Removed functionaIity
CaIendars and Periods
n Baan Vc , calendars are defined in this module. n ERP LN 6.1 , the
calendars and periods are defined centrally in the CaIendars and Periods
module of SSA ERP Common Data. Each company has a default
calendar and you can define more specific calendars for entities such as
department, employees, and business partners. For more information,
refer toCaIendars and Periods moduIe - DifferencesERP61/B40c.
Project Scheduling System (PSS) module - Differences B40c/B61
This topic describes the most important differences between the Project
ScheduIing System module in Baan Vc and in ERP LN 6.1 .
New functionaIity
Integrate Service
Manage InstaIIations
ReIease Orders
Renew Contracts
Service Orders.
The invoice analysis are not handled in the Central nvoicing Package.
Service Order Blank Sheets are not stored as data. They are however
available as hard copies as they can be printed. Due to this reason,
deletion of the soft copy is not possible.
The above sub-process results in the archiving of Service Data in ERP LN
6.1 .
Contract Terms to be Controlled
The topic explains in detail the process by which the Contract Terms can
be controlled.
This process begins with the requirement of controlling Contract Terms.
This is a process which involves a number of actions which are as follows:
Renew Contracts.
Maintain Contracts.
Release Orders.
Handle Exceptions.
The process results in controlling Service Order Execution by handling
processes relevant to execution.
ControI Service Order Execution in Baan IVc
8-10 | Service and Maintenance
The objective of this process is to control Service Order Execution by
handling processes relevant to execution. The process proceeds in Baan
Vc in the following manner:
This process is used to release Service Orders to ready them for
execution, then monitor the work performed during progress and handle
any exceptions or changes that might occur in the course of execution
The process results in the controlling of Service Order Execution in Baan
Vc .
ControI Service Order Execution in ERP LN 6.1
The objective of this process is to control Service Order Execution by
handling processes relevant to execution. The process proceeds in ERP
LN 6.1 in the following manner:
Cost lines of three cost types can provide details about the amounts.
Review Prices.
The user can use this process to create Contract InstaIIments ready
for invoicing.
The user can use this process to compare Contract Budget with
ActuaI Consumption as a part of the Contract performance overview.
The above process results in the defining of the Service Contract
nstallations, nstallments and Budgets related to Contracts. in Baan Vc .
Define Contract Contents in ERP LN 6.1
The objective of this process is to define the Service Contract nstallations,
nstallments and Budgets related to Contracts. The process in ERP LN 6.1
covers the following:
Next, if the invoicing has to be defined, then the data in the Contract
nstallments (tsctm4100m000) session has to be maintained.
With the above actions the defined Contracts are said to be invoiced
and costed.
Note
To know more about nstallment Generation, Acceptance Procedure and
the Transfer Process, refer to "nstallment status", as a part of the Related
8-16 | Service and Maintenance
Topics listed below.
The above process results in the invoicing and costing of contracts in ERP
LN 6.1 .
Generate Periodic Maintenance Orders
This sub-process is used to handle periodic maintenance plans.
The sub-process begins with the requirement of generating Periodic
Maintenance Orders.
This is a sub-process which involves a few actions which are as follows:
Define Projects.
Manage Projects.
The process results in managing large repair jobs to be handled in the
project control lines.
HandIe Repair and OverhauI Requests in Baan IVc
The objective of this process is managing large repair jobs to be handled in
the project control lines.This main process has many other processes as a
part of it. The main process proceeds in the following manner in Baan Vc :
When large parts or assemblies come for repairs, they are handled
through SaIes Orders or PCS Projects in Baan Vc . This process
facilitates the following:
Service Orders.
nvoice Analysis.
Service and Maintenance | 8-21
WIP AnaIysis.
Cost Type Groups and Accounts for Service Orders and Service
Contracts.
The sub-process results in setting up integration data for financial
integration in the Baan Vc scenario.
Integrate Service in ERP LN 6.1
Concept
The objective of this sub-process is to setup integration data for financial
integration in ERP LN 6.1 :
n ERP LN 6.1 , the cost type definitions are fixed . However, if they are
used in combination with Cost Components, a greater flexibility is
provided in arriving at many more combinations. For this no specific setup
is required . The ledger accounts are maintained in the processes related
to the Finance package.
The sub-process results in setting up integration data for financial
integration in the ERP LN 6.1 scenario.
nvoice Service Contract
This sub-process is used to invoice Service Contracts.
This sub-process begins with the requirement of invoicing Service
Contracts.
This is a sub-process which involves a few actions which are as follows:
8-22 | Service and Maintenance
The printing of the invoices is carried out using the Central invoicing
processes.
Maintain Symptoms.
Maintain Problems.
Maintain Fixes.
Maintain Symptoms.
Maintain Problems.
Maintain Fixes.
service car s.
skill s.
Service and Maintenance | 8-27
Skills by Technician.
Warranties.
Warranty Codes.
Warranty Grades.
Warranty Components.
This sub-process results in defined standard warranty codes that need to
be linked to installations.
Maintain Basic Warranty Data in Baan IVc
Concept
The objective of this sub-process is to define data like Warranties,
Warranty Grades and Warranty Components. This data is linked to the
8-28 | Service and Maintenance
InstaIIations and InstaIIation Components to be enabled in Baan Vc .
Note
General conditions can be recorded when warranties are being defined by
installation at a high level. This is sufficient for one-level warranties with
one discount and one warranty period. To define warranties at a deeper
level, use the Maintain Warranty Grades (tssma1131m000) and
Maintain Warranty Components (tssma1132m000) sessions.
Important!
Maintain Warranty Grades (tssma1131m000): n this session, the
validity of a particular warranty code is subdivided into different periods so
that defined percentages can be applied to specific periods in the Maintain
Warranty Components (tssma1132m000) session.
Important!
Maintain Warranty Components (tssma1132m000): n this session, the
warranty percentages to be applied for each cost price component are
entered by grade. This session is only concerned with deviations in
warranty percentages recorded in the Maintain Warranties
(tssma1130m000) session.
The above process describes the maintenance of the Basic Warranty Data
in Baan Vc .
Maintain Basic Warranty Data in ERP LN 6.1
Concept
The objective of this sub-process is to define the Basic Warranty Data. The
process of maintenance in ERP LN 6.1 is the same as Baan Vc except for
the following differences:
Maintain tems.
Service Tables.
n ERP LN 6.1 , the terms used in the case of nstalled base are
different, which is consituted by terms such as Clusters
(tsbsc1100m000) and Serialized tems (tscfg2100m000) structures. n
Baan Vc it is possible to define only single or two level installation
structure. However, in ERP LN 6.1 multi-level structure with agreement
implications can be defined.
Maintain Customers.
Maintain Locations.
Maintain nstallations.
The process results in the maintenance of Locations for installed base.
Maintain Location DetaiIs in Baan IVc
The objective of this process is to maintain Locations for installed base.
The process in Baan Vc is as follows:
This sub-process is used to maintain customer data such as Location
details, Change details for a given location address, or change location
address as whole for an InstaIIation.
The process results in the maintenance of Locations for installed base in
Baan Vc .
Maintain Location DetaiIs in ERP LN 6.1
The objective of this process is to maintain Locations for installed base.
The process in ERP LN 6.1 is as follows:
n ERP LN 6.1 too, Location and Change details can be defined and
maintained at any time. Customers details are maintained for the SoId-to
BP related roles. The location details can be modified for address type.
The Location D can be changed for Clusters (tsbsc1100m000) and
Serialized tems (tscfg2100m000).
Note
To know more about Cluster Lines, refer to "Cluster and cluster line status
overview" as part of the Related Topics listed below.
8-34 | Service and Maintenance
The process results in maintenance of Locations for installed base in ERP
LN 6.1 .
Maintain Master Data Service nventory Control
This sub-process is used to maintain the master data related to tem and
Warehouses.
The process begins with the requirement of maintaining master data
related to tem and Warehouses.
This is a process which involves a few actions which are as follows:
Maintain tems.
Maintain Warehouses.
Maintain Vehicles.
Maintain Tasks.
Tasks.
HourIy Rates.
Labor Rates defined with the Tasks can be used for costing and billing
of service transactions provided the task definition is picked up by the
Labor Rate Fetch method. A Labor Rate is also attached with the other
criteria for labor rate pick up such as Service Departments
(tsmdm1100m000), Service Areas (tsmdm1105m000), Employees -
Service (tsmdm1140m000), Tasks (tsmdm0115m000), Reference
Activities (tsacm1101m000) and a few other definitions.
Service Areas.
Priorities.
ZP Code Ranges.
Periods.
Location Types.
Contract Types.
Renewal Types.
Tasks.
The sub-process results in the maintenance of General Service Master
Data.
Maintain Service TabIes in Baan IVc
Concept
The objective of this sub-process is to maintain General Service Master
Data. The sub-process in Baan Vc can enable a user to maintain general
Service Master Data such as Service Areas, Zip Code Ranges, Contract
Types, RenewaI Types, Tasks, Periods, Priorities, Response Times
and Location Types.
The above sub-process results in the maintenance of General Service
Master Data in Baan Vc .
Maintain Service TabIes in ERP LN 6.1
Concept
The objective of this sub-process is to maintain General Service Master
Data. n ERP LN 6.1 the user can maintain most of the information which is
in Baan Vc .Some other information related to Periods and Priorities are
maintained in other processes.
The above sub-process results in the maintenance of General Service
Master Data in ERP LN 6.1 .
Maintain Basic nstallation Data
This topic explains the process used to define the basic data of
Service and Maintenance | 8-39
installations.
This process starts with the requirement to define basic data of
installations.
This process describes the steps needed to perform the following:
Maintain Priorities.
Maintain Servicings.
Manage nstallations.
Maintain Components.
ZP Code Ranges.
Location Types.
Contract Types.
Renewal Types.
Priorities.
Service Areas.
Periods.
Service Department
Periodic Maintenance.
The first level is long term planning while handling Planned Activity -
Costs Overview (tsspc2513m000).
Cost lines can be modified for three cost types, namely MateriaI Cost
Lines, Labor Cost Lines and Other Cost Lines.
Booking of Hours.
Additional steps like entering the material return lines can also be
registered.
ssuing inventory for Service Orders depend on the delivery type used.
nstallation Data.
CIusters
t is possible to link Serialized tems to Clusters (tsbsc1100m000),
which is optional. Clusters or Serialized tems can be internal or they
are owned by the Business Partners (tccom4500m000) or customers.
PhysicaI Breakdowns
Optional procedures are available to replace, remove or insert
Serialized tems in Breakdowns, to change the ownership of the
Serialized tems. Serialized tems when generated by the system,
using different processes, can be set to dummy implying that they
should be actualized later on. Selected changes occurring in
breakdowns will be logged in the Physical Breakdown Log
(tscfg2515m000) which is a completely new session. Preferred
Engineers can be assigned to Clusters or Serialized tems, which will
form the basis while selecting the right Service Engineer when Service
Orders are handled. A procedure is present where the Preferred
Engineers can be linked to Clusters or Serialized tems.
Warranties
Warranties (tsctm0120m000) can be assigned to Serialized tems.
Service and Maintenance | 8-61
Definitions of the Warranty terms can be entered and the Warranty
percentage applied to each cost type and so on.
FunctionaI EIements
Each serialized item in the breakdown can be linked to a Functional
Elements (tscfg0140m000), with a common function across the entire
structure, and can be used to group serialized items based on
functional importance. The user can find replacements based on
functional equivalence while one views alternative items depicted by an
augmented view of item breakdowns. This functionality has been
implemented in ERP LN 6.1 .
Contract Management (CTM) module - Differences B40c/B61
This topic describes the most important differences between the Contract
ControI module in Baan Vc and known as the Contract Management
module in ERP LN 6.1 .
The functionality of the module in ERP LN 6.1 has considerably changed
to improve the ease of setup, the flexibility, and the overall performance of
Contract Management as part of Service contract management.
Contract ControI in Baan IVc
Contracts can be defined, for customers, on various installations in Baan
Vc . Contracts can be used to manage and control the following:
Conditions of Servicings.
nvoicing Conditions.
Contract data is used as input for service orders to calculate response
time. After completing a service job, invoicing will be done using the
contract conditions.
Before entering service contracts, specific contract terms can be assigned.
n this business area, contract terms can be entered, including:
Response Time.
Service Package.
Discounts.
Number groups.
History setting.
Gross margin.
Warranties (tsctm0120m000)
Service and Maintenance | 8-63
Free.
Printed.
Accepted.
Processed.
Cancelled.
Contract can be defined using Contract Terms. There can be more
Clusters, Serialized tems or Service tems linked to a Contract or
Quotation. The contract price can be calculated using different pricing
methods such as:
tem Pricing.
Clusters (tsbsc1100m000)
Service tems.
Coverage terms.
Cost Terms.
These steps are common for Contract Quotations (tsctm2100m000) as
well as Service Order Quotations (tssoc1100m000). Contract Templates
(tsctm0150m000), Warranty Template and Serialized tem Warranty
definition includes defining Coverage Terms and Cost Terms. Contracts
can undergo different changes while under execution such as IncidentaI
Changes, Contract RenewaI, and Indexation. The most important
historical contract data is stored in the Contract History business object.
Master Data Management (MDM) module - Differences B40c/B61
This topic describes the most important differences between the Service
TabIes module in Baan Vc and known as the Master Data Management
module in ERP LN 6.1 .
8-64 | Service and Maintenance
The functionality of the module in ERP LN 6.1 has considerably changed
to improve the ease of setup, the flexibility, and the overall performance of
Master Data Management as part of Service data management.
Service TabIes in Baan IVc
n Baan Vc , before the user starts working on the Service modules,
certain parameters must be established and the service tables of the
company data must be entered. When the link to Finance is active, the
financial tables must also be defined. This setup data is used in the
Service (SMA/SPF) modules to realize more efficient flows through the
procedures.
The business flow starts by setting Service parameters to define the
system to fit company requirements and conditions. This includes the
working time of the Service Department, the Response Time Grades, the
documents required to be printed, and whether the link to Baan Vc
Finance is active or not. After setting Service parameters, the Service
tables must be entered. Frequently used data is stored using an
alphanumeric code in the tables. These codes are used in various
sessions in the Service module. The following tables are defined: Areas,
Zip Code Ranges, Priorities, Order Types, Contract Types, and
RenewaI Types.
Master Data Management in ERP LN 6.1
n ERP LN 6.1 , before the user starts working on the Service modules,
certain parameters must be established and the service tables of the
company data must be entered. Based on the Packages implemented, the
integrations are possible, for example, Engineering Revisions are active,
Tooling is implemented, ODM is implemented and so on. This setup data
is used in the Service modules to realize more efficient flows through the
procedures.
This business flow starts by setting Service Parameters to define the
system to fit company requirements and conditions. This includes Field
Service mplementation, Depot Repair mplementation, Time Units,
Traveling Rates and their set up, Search Engine/criterion, Sales price
search method and so on. After setting service parameters, the service
tables must be entered. n addition to the above mentioned fuctionality,
additional functionality has been built into ERP LN 6.1 to define tables.
New and changed functionaIity
Service and Maintenance | 8-65
Coverage Types
Coverage Types (tsmdm0135m000) are used as a differentiator for
coverage under various agreements, such as warranties, contracts, or
quotations. A coverage type is also used as a differentiator while
defining reference activities. You can use a coverage type to indicate
conditions under which coverage can be afforded to the customer,
under an agreement. By changing the coverage type in cases not
applicable when damage occurs to equipment because of a fault at the
customer site, then, simply by changing the coverage type, you can
deny agreement coverage. While Coverage type now deals with cost
coverage control, Service Type deals solely with execution control.This
functionality has been enhanced in ERP LN 6.1 .
Tasks
Tasks (tsmdm0115m000) are a specification of short-term work carried
out by employees. This functionality has been further enhanced in ERP
LN 6.1 .
CheckIists
Checklists (tsmdm0140m000) provide a list of checks to be carried out
while performing an activity. These checks can be useful and can be
copied while carrying out service order or work order activities. n ERP
LN 6.1 this functionality is very well developed.
Paging Assignments
The MDM module enables the user to capture assignments. These
Paging Assignments (tsmdm1185m000) are planned allocations of
time that the user can use to speed up the hours -registration process
by loading the assignments on your timesheet. This way you could for
example, define a recurrent meeting to show on your timesheet. This
functionality has been built in ERP LN 6.1 .
Service EmpIoyees
Service Employee - Skills (tsmdm1135m000) are those who are used
mostly for service-related activities, such as in carrying out orders, or in
registering or handling calls. Each employee can be defined with user
profile details that are used during the transactions carried out by the
employee. Each employee can be listed with particular skills. These
skills can be general skills in nature or can be specific to a particular
8-66 | Service and Maintenance
group of serialized items.
Service Cars
A Service Cars (tsmdm1145m000) are mobile Warehouses, and have
similar definition and usage as a Service kit. ERP LN 6.1 provides the
interface to define all this data at a very detailed level.
User ProfiIes
Each employee must be defined with User Profiles (tsmdm1150m000)
details that are used during the transactions carried out by the
employee. This again is an enhanced functionality in ERP LN 6.1 .
Exchange/replacement of parts.
Warranty/contract coverage.
Technician skills
8-68 | Service and Maintenance
Planning of technicians.
Block/signalling setting.
Paging settings.
Prior to starting the Service Order procedure, certain data must be defined
to plan and assign service orders quickly and accurately based on Service
Employee - Skills (tsmdm1135m000), calendars and so on. This data
makes it possible to plan the right engineer for the service orders. A
service order can be blocked in different stages of Entry, Planning and
Releasing based on the setting in Service Order Control Parameters. A
signal can be used instead of blocking the service order for unpaid
customer services or various other settings.
The service order procedure starts with service order entry. Service Orders
can be generated from different origins as follows:
Manual creation.
ERP Projects.
Planned activities.
Calls (tsclm1500m000)
Tools refurbishment .
nspections (tssoc2550m000)
This module has integrations with the following:
8-70 | Service and Maintenance
Tooling.
Finance.
Warehousing.
ERP Project.
PCS Project.
Purchase.
Central nvoicing.
After completing the Service Orders, costs and revenues can be
calculated, inventory replenished to Service Cars (tsmdm1145m000) and
taking into account the prevailing obligations like Contract, Warranty,
Service Order Quotation, Project, Field Change Order and so on, the
nvoice is created.
The Service Order data can be stored in Service Order History. Between
Service Order entry and its completion, the service work must be planned
and assigned to Service Engineers. The service order planning/releasing
procedures control planning of service engineers, assigning service orders
to the engineers, searching for the availability of materials and so on.
Service engineer settings can be overwritten manually. Calendars will be
used in a hierarchy starting from more specific, for example an Engineer,
to the more generic, for example a Company. Financial data of the service
orders will be transferred to ledger accounts during Work In Progress and
as a part of the nvoicing. When the Service Order is linked to ERP Project
the costs are booked against the Project and nvoicing takes place via the
Project itself. n case of PCS Projects, Service will invoice the customer.
Features like Service Order Quotations (tssoc1100m000) and Field
Change Orders (tssoc5100m000) Field Change Orders are present in ERP
LN 6.1 .
Important!
The Preventive Maintenance Control (SPC) module also includes the
functionality related to Activity Management (ACM) module. The Activity
Management module is used to define the following:
Technician skills
Planning of technicians.
Block/signalling setting.
Paging settings.
Prior to starting the Service Order procedure, certain data must be defined
to plan and assign service orders quickly and accurately based on Service
Service and Maintenance | 8-73
Employee - Skills (tsmdm1135m000), calendars and so on. This data
makes it possible to plan the right engineer for the service orders. A
service order can be blocked in different stages of Entry, Planning and
Releasing based on the setting in Service Order Control Parameters. A
signal can be used instead of blocking the service order for unpaid
customer services or various other settings.
The service order procedure starts with service order entry. Service Orders
can be generated from different origins as follows:
Manual creation.
ERP Projects.
Planned activities.
Calls (tsclm1500m000)
Tools refurbishment .
nspections (tssoc2550m000)
This module has integrations with the following:
Tooling.
Finance.
Warehousing.
ERP Project.
PCS Project.
Purchase.
Central nvoicing.
After completing the Service Orders, costs and revenues can be
calculated, inventory replenished to Service Cars (tsmdm1145m000) and
taking into account the prevailing obligations like Contract, Warranty,
Service Order Quotation, Project, Field Change Order and so on, the
nvoice is created.
The Service Order data can be stored in Service Order History. Between
Service Order entry and its completion, the service work must be planned
and assigned to Service Engineers. The service order planning/releasing
procedures control planning of service engineers, assigning service orders
to the engineers, searching for the availability of materials and so on.
Service engineer settings can be overwritten manually. Calendars will be
used in a hierarchy starting from more specific, for example an Engineer,
to the more generic, for example a Company. Financial data of the service
orders will be transferred to ledger accounts during Work In Progress and
as a part of the nvoicing. When the Service Order is linked to ERP Project
8-74 | Service and Maintenance
the costs are booked against the Project and nvoicing takes place via the
Project itself. n case of PCS Projects, Service will invoice the customer.
Features like Service Order Quotations (tssoc1100m000) and Field
Change Orders (tssoc5100m000) Field Change Orders are present in ERP
LN 6.1 .
Important!
The Preventive Maintenance Control (SPC) module also includes the
functionality related to Activity Management (ACM) module. The Activity
Management module is used to define the following:
General tasks
Projects
PCS Project
Production orders
Assembly orders
Service orders
Work orders
Hours budgeting
Hours are budgeted for an employee, team, and department. Differences
between the budgeted hours and actual hours can be calculated and
displayed for budget by employee. The advantage of the People package
is the centralized reports for budgeted hours and actual hours.
Hours approvaI and processing
The registered hours in People are related to the respective packages for
control, progress and tracking of tasks and activities. After the hours are
registered, (optionally) approved, and processed, the details are sent to
the respective packages.
Note
n the People Parameters (bpmdm0100m000) session, on the Process
Labor Costs/Expenses tab, you can set processing options for hours
registered for any of the following:
GeneraI Task
Project
FieId Service
Depot Repair
Manufacturing
Update budgets with actuaI hours
After processing hours, you can update employees' budgets by using the
Update Budget by Employee with Actual Hours (bptmm3201m000)
session.
ReIated data
With the creation of the employee data in People, all other related
9-2 | People
attributes and functionality that was previously (that is, prior to ERP LN 6.1
) moved to a separate module in Common Data, is now available from
within the People package.
Supporting details, together with employee information, that are also
maintained in the Master Data Management module, include the following:
Teams
Roles
Skills
Labor types
Labor rates
Production Order
AssembIy Order
PCS Project
For these transaction types, hours can be processed if the status of the
activity or operation is CIosed.
Click the DetaiIs button to specify additional employee selection criteria in
the Selection Details (bpmdm1800m000) session.
To reactivate interrupted transactions, select the Activate Interrupted
Hours Transactions check box.
FieIds Description
Close Hours Transac-
tions Up To
The date up to which you wish to set the status of hours transactions
to CIosed.
People | 9-3
Activate
f this check box is selected, you can enter a date in the Activate
Hours Transactions As Of field.
Activate Hours Transac-
tions As Of
The date as of which you wish to set the status of hours transactions
to Active.
Note
This field is only available if the Activate check box is selected.
Activate nterrupted
Hours Transactions
f this check box is selected, the status of interrupted hours transac-
tions is set to Active.
Note
This field is only available if the Activate check box is selected.
Approve Closed Hours
f this check box is selected, closed hours transactions with status
CIosed will be approved.
Process Closed Hours
f this check box is selected, hours transactions with status CIosed will
be processed.
Note
This field is only available if the Approve CIosed Hours check box is
selected.
Commands Description
Spec. Employees
Selects all (active) employees in the Specific Employees
(bpmdm1140m000) session. As a result, the employee range fields be-
come unavailable.
Reset Selection
Cancels the selection of specific employees. As a result, the employee
range fields become available.
Details
Starts the Selection Details (bpmdm1800m000) session.
9-4 | People
Print Hours and Expenses (Completeness Check)
(bptmm1410m000)
Use this session to check the hours and/or expenses of a range of
employees.
Click the DetaiIs button to further specify the employee range.
Note
To restrict the output, select the Print Exceptions OnIy check box.
FieIds Description
Check ReguIar Time
Check Regular Time
f this check box is selected,SSA ERP compares employees' actual
hours with the employment hours.
Note
f this check box is selected, you can also select the Notify EmpIoyee
option.
Lower Margin
The quantity below the employment hours which SSA ERP uses to de-
termine whether the actual regular time is an exception.
Upper Margin
The quantity above the employment hours which SSA ERP uses to de-
termine whether the actual regular time is an exception.
Lower Margin
The unit in which the regular time and overtime margins are expressed.
Check Overtime
Check Overtime
f this check box is selected,SSA ERP prints the actual overtime hours
that exceed the quantity specified in the Upper Margin field.
Upper Margin
The quantity above which SSA ERP considers actual overtime as an
exception.
Check Expenses
People | 9-5
Check Expenses
f this check box is selected,SSA ERP prints expenses that exceed the
amount specified in the Upper Margin field.
Upper Margin
The currency in which the expenses' upper margin is expressed.
Upper Margin
The amount above which SSA ERP considers expenses as an excep-
tion.
Options
Print Exceptions Only
f this check box is selected,SSA ERP prints only the hours and/or ex-
penses that exceed the margins set.
Notify Employee
f this check box is selected,SSA ERP notifies employees whose re-
gistered hours do not match their employment hours, using the e-mail
address defined in the Employees - People (bpmdm0101m000) ses-
sion.
Note
This option is only available if Check ReguIar Time is selected.
From Mail Address
The e-mail address from which notifications must be sent.
Note
This field is only available if Notify EmpIoyee is selected.
Sort By
Specify the sequence in which the data must be printed.
Select either of the following:
EmpIoyee
Department
Commands Description
Spec. Employees
Selects all (active) employees in the Specific Employees
(bpmdm1140m000) session. As a result, the employee range fields be-
come unavailable.
9-6 | People
Reset Selection
Cancels the selection of specific employees. As a result, the employee
range fields become available.
Details
Starts the Selection Details (bpmdm1800m000) session.
To distribute team hours
You can register hours for a team, and thus have the hours distributed
equally among the individual members. You only need to enter the task,
enter an hour's total or a number of hours for each day, and distribute
these hours. f no error report appears, the distributed team hours line's
Hours Distribution Done check box will be selected. All team members
will be able to see the exact number of hours as entered for the team.
Changes can then still be made.
ExampIe
The leader of a team has defined in the hours accounting that 8 hours will
be spent by the team members on a specific task. The team leader
chooses Distribute Team Hours on the Specific menu to start the
Distribute Team Hours (bptmm1220m000) session. n this session, the
team leader specifies the team code, the year and period, selects the
applicable transaction types, and clicks Distribute Hours. Each team
member then receives an 8-hour line. The team members can edit or
approve these hours.
Note
You can only register team hours if the view in the hours accounting
session is set to Team, Year, Period.
Team hours can neither be approved nor processed. You can only
distribute team hours among the members of the team.
To redefine budget granularity
n the budget sessions, to redefine budget granularity, you can use either
the RoIIup or the RoIIdown command on the Specific menu:
RoIIup
Redistributes the budgeted hours for the Period TabIe Code
parameter setting across the periods defined by the period table code
specified in the budget session, and recalculates the budgeted costs
accordingly.
People | 9-7
RoIIdown
Redistributes the budgeted hours for the period table code specifed in
the budget session across the periods defined by the Period TabIe
Code parameter setting, and recalculates the budgeted costs
accordingly.
Note
For the RoIIup and RoIIdown commands the following applies:
Both commands are only available if the two period table code settings
are not the same.
Either command is executed for the current year and the current
employee, department, or team.
Startup defaults for hours entry and hours history sessions, including:
Startup Session
Startup View
Startup Period
For hours entry, you can set these startup defaults without accessing
the details session.
Prj
Manufacturing
Service
FieIds Description
Logon Code
The logon code of the user whose user profile is displayed.
Reference Activity
The default reference activity.
Cost Component
The default cost component.
Working Time Schedule
The default working time schedule.
Time Unit
The default time unit.
Cost Type
The default cost type.
Task
The default task.
Cost Component
The default cost component.
Working Time Schedule
The default working time schedule.
Time Unit
The default time unit.
PCS Project
The default PCS Project.
Activity
The default activity.
Working Time Schedule
The default working time schedule.
Time Unit
The default time unit.
Project
The default project.
Element
The default element.
9-10 | People
Activity
The default activity.
Extension
The default extension.
Task
The default task.
Cost Type
The default cost type.
Expense
The default expense.
Cost Component
The default cost component.
General Task
The default general task.
General Expense
The default general expense.
Cost Component
The default cost component.
Department
The default department.
Startup Session
The session to be started after you click Hours and Expenses or
Hours and Expenses History in your SSA ERP interface.
Startup View
The sort order in the startup session, for example, EmpIoyee, Year,
Period.
Note
The available startup views depend on the specified startup session.
Startup Period
The default period used in the startup session.
Check Employment
Hours
f this check box is selected,SSA ERP checks whether entered hours
conflict with the number of hours defined in the EmpIoyment field of
the Employees - People (bpmdm0101m000) session.
Check Overlap of Hours
f this check box is selected,SSA ERP checks whether entered hours
People | 9-11
overlap.
Labor Type
The default labor type.
Commands Description
Print User Profiles
Starts the Print User Profiles (bpmdm0402m000)
session.
9-12 | People
Changed functionality
Addresses
This topic describes the different ways in which address information is
maintained in Baan Vc and ERP LN 6.1 .
Addresses in Baan IVc
n Baan Vc , the addresses of trade relations, banks, factoring companies,
and so on are maintainted in numerous sessions, among others:
AffiIiated companies
Similar in ERP LN 6.1 . Separate logistic companies that act as
business partners to your logistic company. You must specify the
business partner's logistic company.
Other business partners are not represented in enterprise modeling.
Business partner structures
Changed in SSA ERP LN 6.1 .
n ERP LN 6.1 , you can define a distributed business partner organization
by defining parent business partners to link the business partners with
different roles.
n Baan Vc , you can define a distributed business partner organization in
the Maintain Concern Structure of Trade ReIations (tccom3101m000)
session.
The business partner sessions
n ERP LN 6.1 , the business partners and their roles are defined in the
Common Data package in the following sessions:
Safety stock
Reorder point
Forecast method
Pricing information
tem data (by warehouse) is used to do the following:
receiving location
inspection location
pick location
bulk location
staging location
reject location
Locations are used to do the following:
n all other cases, SSA ERP retrieves the outbound lead time from the
Warehouse (whwmd2100s000) session.
To block and unblock
You can block inbound movement, outbound movement, transfer (receipt,
issue), or assembly of items at various inventory levels:
Zone
Location
Lot
Stockpoint
Serialized item
At each of these levels, you can impose a blocking for one or more
transactions. You can also (un)block inventory at these levels for all
transactions at once.
To bIock or unbIock zones and Iocations
You can (un)block all transactions on zones and locations using the
Warehouse - Blocked Zones/Locations (whwmd6110m000) session. n this
session, you can (partly) (un)block the warehouse inventory. Only
locations of types BuIk or Pick can be blocked using this session.
Use the Warehouse - (Un)Blocked Locations by Transaction
(whwmd6111m000) session to block or unblock specific transactions in an
entire location or a part of a location. Use the Warehouse - (Un)Blocked
Zones by Transaction (whwmd6112m000) to (un)block transactions at
zone level.
Use the Global (Un)Block Zones/Locations (whwmd6210m000) session to
(un)block a range of zones or locations at once for a specific transaction
type.
To bIock or unbIock Iots
Use the tem - Blocked Lots (whwmd6120m000) session to (un)block lots
Warehouse Management | 10-11
for all transactions.
You must use the Warehouse - tem - (Un)Blocked Lots by Transaction
(whwmd6121m000) session to (un)block transaction types for lots.
You can (un)block a range of lots by transaction using the Global
(Un)Block Lots (whwmd6220m000) session.
To bIock or unbIock stockpoints
Use the Warehouse - Location - tem - Blocked nventory
(whwmd6130m000) session to (partially) (un)block stockpoints for all
transactions.
To (un)block specific serialized items in case of a partial blocked
stockpoint, use the Blocking by Stock Point Serials (whwmd6135m000)
session.
You can use the tem - (Un)Blocked Stock Point by Transaction
(whwmd6131m000) session to (un)block transaction types for stockpoints.
You can (un)block a range of stockpoints by transaction by using the
Global (Un)Block Stock Point (whwmd6230m000) session. Only locations
of types BuIk or Pick can be blocked by using these sessions.
Tip
To block goods that are at a receiving location or reject location (neither of
which supports stockpoints), in the Warehouse - Location
(whwmd3100s000) session, on the Transactions tab, select the BIocked
check box next to the appropriate transaction type.
To bIock or unbIock seriaIized items by transaction
Use the Warehouse - tem - (Un)Block Serials by Transaction
(whwmd6136m000) session to (un)block transaction types for serialized
items.
Consequences of bIocking inventory
f you block inventory of an item for specific transactions, the item's
inventory on hold is not inreased; the inventory is just blocked for inbound,
outbound, assembly, or transshipment.
Blocking inventory for all transactions will raise the quantity of inventory on
hold and decrease the quantity of inventory available.
10-12 | Warehouse Management
f you block:
A lot, SSA ERP also blocks the stockpoint for that lot.
CycIe-count orders
You can also block inventory if the items are included on a cycle-count
order. When you process a counting list, the inventory blocked for cycle
counting is automatically unblocked.
New functionality
nbound and outbound procedures
n ERP LN 6.1 , user-definable warehousing procedures control the
inbound, storage, and outbound goods flows in your warehouse.
A warehousing procedure includes various activities that determine the
way goods are processed in the warehouse.
The warehousing inbound flow comprises the following default procedures:
Warehouse Management | 10-13
f the order origin is SaIes or SaIes ScheduIe and the order origin has
a sales order type to which a warehousing order type is linked, SSA
ERP retrieves this warehousing order type for the warehousing order.
You can link a warehousing order type to a sales order type in the
Sales Order Types (tdsls0194s000) session.
Receipt
Use a warehousing order type of inventory transaction type Receipt to
receive goods in a warehouse. You can link a Receipt Procedure and,
optionally, an Inspection Procedure to a warehousing order type of
inventory transaction type Receipt.
Issue
Use a warehousing order type of inventory transaction type Issue to
issue goods from a warehouse. You can link a Outbound Procedure
and a Shipment Procedure to a warehousing order type of inventory
transaction type Issue
Transfer
Use a warehousing order type of inventory transaction type Transfer to
transfer goods between warehouses, locations, business partners,
projects, or work centers.
You must link the following procedures to a warehousing order type of
inventory transaction type Transfer:
Receipt Procedure
Inspection Procedure
Outbound Procedure
Shipment Procedure
A transfer involves either one or two warehouses. f items are
transferred between two different warehouses, all activities of the
warehousing procedures must be carried out. However, if a transfer
takes place between two locations within the same warehouse, the
receipt activities are not carried out. You can use transfer orders to
define a replenishment system within a single warehouse. This system
controls replenishment from bulk locations to pick locations.
WIP Transfer
Use a warehousing order type of inventory transaction type WIP
Transfer to transfer work from one costing work center to another.
Dynamic cross-docking
n SSA ERP , dynamic cross-docking enables users to create cross-dock
orders and cross-dock order lines at an ad hoc basis. Changes to the
cross-dock order and cross-dock order lines, including cancelation, can be
done at various moments in the cross-docking process. SSA ERP can
also automatically create cross-dock orders and/or a cross-dock order
lines.
Warehouse Management | 10-17
PuII system
Dynamic cross-docking supports a pull system. The cross-docking process
is initiated by creating a cross-dock order for an outbound-order line. For
this cross-dock order, cross-dock order lines can be created. The
cross-dock order lines are basically inbound-order lines. The outbound
order line serves as cross-dock order, while the inbound order lines serve
as the cross-dock order lines. The outbound order lines and inbound order
lines are linked to each other by creating cross-dock orders and
cross-dock order lines. n this way, cross-docking is initiated from the
outbound order line and the goods are pulled from the receipt location to
the staging location. Users can also initiate cross-docking from the receipt
line or inbound order line. However, a cross-dock order/outbound order
line is required to link the inbound order line to.
SpeciaI scenarios
One inbound order line can fulfill multiple cross-dock orders, that is, for
a single inbound order line, multiple cross-dock order lines for multiple
cross-dock orders can be created. ( Example 1)
Fewer transactions.
Note
KANBAN
Order ControIIed/Batch
Order ControIIed/SILS
Order ControIIed/SingIe
The inbound-order line in the ship-to company is blocked until the
outbound-order line in the ship-from company get the Shipped status. f
the goods are shipped, SSA ERP unblocks the inbound-order line in the
ship-to company to enable the receipt of the goods.
f in the ship-from company an outbound-order line is created with a lot,
serial number, or effectivity unit the following scenarios are possible:
Lot
Effectivity unit
Serial numbers
n the ship-to company the receipt lines are created based on the shipment
lines in the ship-from company.
When, in the ship-to company, the receipt is confirmed, the received
quantity is also updated in the ship-from company.
Inventory
n case of a multicompany warehousing order, SSA ERP maintains the
inventory as follows:
The ship-to company when the inbound-order line is created. When the
receipt is confirmed the planned inventory transaction is deleted and an
inventory transaction by item and warehouse is created.
Handling units
A handling unit is a uniquely identifiable physical unit that consists of
packaging and contents. A handling unit can contain items registered in
Warehouse Management and can contain other handling units.
Structure
A handling unit has a structure of packing materials and items. A
handling-unit structure can vary from a simple box that contains a
particular number of items, to a more complex structure such as a pallet
with a number of boxes, which in turn can contain smaller boxes that
contain a number of items. A handling unit structure can consist of various
handling units related in a parent-child fashion. You can manually create a
handling unit structure for a given number of items, or you can define a
package definition in which you set up a template that determines the
handling unit structure for particular types of items. For further information,
see Package definitions and HandIing unit structures.
The use of handIing units
A handling unit is a single entity that is used to process goods in the
warehouse. As a result, you can use a handling unit to receive, store, and
issue goods.
To use a handling unit for warehouse processing, you must link the
handling unit to a warehousing order line, a receipt header or receipt line,
an inspection line, an advice line, or a shipment header or shipment line.
By linking handling units to warehousing order lines, receipt lines, and so
on, the warehousing order lines will represent both administrative
information, as well as physical information about the contents.
To link a handling unit to any of these types of headers or lines, generate a
handling unit for this line. For example, if you generate a handling unit for a
shipment line, you establish the link between the handling unit and the
shipment line. For further information, see To maintain handIing units.
Because users must be able to control item movements with as few
Warehouse Management | 10-23
keystrokes as possible, automatic identification of handling units is
possible. Therefore, you can attach a label to a handling unit. Defining
handling unit structures and scanning labels enables you to have a highly
automated execution of warehousing activities at receiving and shipping.
You can use both warehouse processing based on handling units and
warehouse processing based on order lines.
Setup
To make the handling unit functionality work in the preferred way, you must
define some master data and set some parameters. You can specify how
handling units are used for particular items, warehouses, and/or business
partners.
Label setup
You can maintain labels in the Label Layouts (whwmd5520m000) session.
You can print labels in the Print Labels for Handling Units
(whwmd5430m100) session.
You can use labels to uniquely identify handling units, for example,
containers, items, packages, and so on.
To create a label for a specific handling unit, in the Handling Units
(whwmd5130m000) session, on the Status tab, select the LabeIed check
box.
Note
f you use package definitions, you can specify that labels are
automatically created for specific parts of the handling-unit structure.
LabeI Iayouts
To create and maintain label layouts, use the Label Layouts
(whwmd5520m000) session. n this session, to create or modify label text,
select the appropriate label layout, then click or press CTRL-T.
The label layout can contain one or more field names from the tem Data
by Warehouse (whwmd210) table in the form of a variable name. These
variable names must be preceded by a hash, lb, and a dot (#lb.). On the
label, the variable name will be replaced with the value of the
corresponding field. You can use the following variables to be printed on a
10-24 | Warehouse Management
label:
Warehouse Management | 10-25
VariabIe Description
#lb.advice Advice
#lb.ass.kit AssembIy Kit
#lb.ass.order AssembIy Order
#lb.blocked FuIIy BIocked
#lb.bom.line BOM Line
#lb.complete CompIete
#lb.depth Depth
#lb.dim.unit Unit
#lb.eff.unit Effectivity Unit
#lb.gross.wght Gross Weight
#lb.hand.rmrk HandIing Remark
#lb.handl.unit HandIing Unit
#lb.version Version
#lb.height Height
#lb.counting BIocked for CycIe Counting
#lb.floor.space FIoor Space
#lb.blocked FuIIy BIocked
#lb.volume VoIume
#lb.inv.date Inventory Date
#lb.item Item
#lb.job.seq Job Sequence
#lb.kanban.id Kanban ID
10-26 | Warehouse Management
VariabIe Description
#lb.ln.station Line Station
#lb.load Load
#lb.location Location
#lb.log.name User
#lb.lot Lot
#lb.mission Mission
#lb.multi.item MuIti-Item HandIing Unit
#lb.net.wght Weight
#lb.quan.pack Quantity of Packaging Items
#lb.visible Number of VisibIe Units
#lb.order Order
#lb.order.orig Order Origin
#lb.order.set OrderSet
#lb.from.huid From HandIing Unit
#lb.pack.def Package Definition
#lb.pack.item Packaging Item
#lb.parent.huid Parent HandIing Unit
#lb.parent.seri Parent SeriaI Number
#lb.order.line Order Line
#lb.quan.str Quantity
#lb.quan.inv Quantity
#lb.receipt Receipt
Warehouse Management | 10-27
VariabIe Description
#lb.receipt.ln Receipt Line
#lb.reference Reference
#lb.rejected Rejected
#lb.run.number Run Number
#lb.order.line.seq Packaging Sequence Number
#lb.serial SeriaI Number
#lb.shfr.code Ship-from CodeSuppIy Warehouse
#lb.shfr.comp Company
#lb.shfr.loca From Location
#lb.shfr.type Ship-from Type
#lb.shto.code Ship-to Code
#lb.shto.comp Company
#lb.shto.loca To Location
#lb.shto.type Ship-To
#lb.shipment Shipment
#lb.shipment.ln Shipment Line
#lb.status Status
#lb.trans.date Transaction Date
#lb.unit Unit
#lb.volume VoIume
#lb.warehouse Warehouse
#lb.weight.unit Weight
10-28 | Warehouse Management
VariabIe Description
#lb.width Width
Note
f you insert 'bc' between the hash sign and 'lb', such as #bc.lb.[variable],
the bar code is printed, provided that the correct cartridge is installed. The
bar code is not displayed on your screen. You can print the label layouts in
the Print Label Layouts (whwmd5420m000) session.
Print IabeIs for handIing units
n SSA ERP , you can print labels for handling units. For high-quality
printing you can also use a label printing application, whose input is then
supplied by SSA ERP . Note that a label is not just a bar code, but usually
a combination of an item code and a handling unit number (both in digits
and in bar codes).
Use the Print Labels for Handling Units (whwmd5430m100) session to
print labels for handling units. The labels are printed according to the
layout as specified in the Label Layouts (whwmd5520m000) session.
Serial numbers are only printed on the label if:
Identification code
Package definitions are uniquely defined by means of the identification
code.
Description
The description is a free text that can provide some easy reference to
the package definition.
Purchased items
Manufactured items
List items
BOM items
A packing structure for a fixed package definition can include multiple
packaging items, but only one type of tradeable item. To use the previous
example, a pallet cannot include (packing materials for) sour cream and
yoghurt in addition to milk cartons. Therefore, a parent can have only one
child, as shown in the structure illustrated in the previous picture. f
handling units are used, a fixed package definition includes a handling unit
template in which the number of packaging items and items is fixed.
The user uses storage units from Common Data to define the number of
packaging items for each node. When a fixed package definition is linked
to an item, the following takes place:
SSA ERP LN uses the conversion factors of the storage units defined
for each node to calculate the fixed number of packaging items for
each node. For example, if the conversion factor for storage unit Pallet
and storage unit Box is 50, a pallet has 50 boxes. For further
information, see Packaging IeveIs.
Purchased items
Manufactured items
List items
BOM items
A handling unit structure of a variable package definition can include
multiple packaging items, but only one type of tradeable item. To use the
previous example, a pallet cannot include (packing materials for) sour
cream and yoghurt in addition to milk. List items and BOM items can
include various component items, but you cannot specify how component
items are packed. For further information, see List items, BOM items,
and package definitions.
Warehouse Management | 10-31
The relations between the nodes of the handling unit structure are
user-definable. This means that, unlike fixed package definitions, you can
specify the number of packing items per node both on general and
item-level handling unit templates without referring to the storage units and
conversion factors defined in Common Data. n addition, you can define
various nodes with various packaging items for all nodes except the top
node.
ExampIe
n this picture, box A and box B represent nodes 2 and 3, which are both
on the second node level just below the top level. The pallet includes 10
boxes of type A and 25 boxes of type B. Box A contains 50 items X and
box B contains 30 items X.
You can use the same variable package definition to define handling unit
structures for individual items and add or delete nodes and specify several
numbers of packaging items for the nodes. Therefore, this method is a
more flexible way of defining package structures than the fixed package
definition.
ExampIe
Package definition A consists of one pallet X, 15 boxes type A. Package
definition A is linked to item A, item B, and item C.
For item A, the number of items that is packed in box type A is 150.
For item B, the number of items that is packed in box type A is 100.
For item C, 10 boxes of type A are used, and 40 boxes of type B. 300
items C are packed in box type A, and 50 items C are packed in box
type B.
10-32 | Warehouse Management
Variable package definitions are useful, for example, for items that are sold
to various business partners with various packing requirements.
To define variable package definitions, see To define package
definitions.
Mixed package definitions
Mixed package definitions are used to define handling unit structures that
include more than one type of item.
However, you can only link items to a mixed package definition on the
general package definition level. You cannot define mixed package
definitions on item level. Mixed package definitions are used to validate
manually created free-style handling units. f you manually define handling
units for multiple items listed on an order, you can validate the manually
created handling unit setup against a mixed package definition that
includes a handling unit template for those items and handling units.
Validating is used to prevent mistakes from being made when you
manually create handling units.
HandIing unit tempIates
A handling unit template defines how handling units are used to pack
particular items. A handling unit template includes a hierarchical structure
that consists of several nodes that are related in a parent - child fashion.
Each node represents a generic handling unit.
Warehouse Management | 10-33
ExampIe
For example, a fluid item such as milk is packed in cartons, the cartons are
packed in boxes of twenty cartons each, and 50 boxes are placed on a
pallet.
Top
The top node includes the whole structure. n the previous example,
the pallet is the top node.
Parent
A node that ranks higher than another node. A parent node includes
one or more children. n the previous example, the boxes are the
parent nodes of the milk cartons. At the same time, the pallet (the top
node) is the parent of the boxes, thus the boxes are the children of the
pallet.
ChiId
A node that is linked to a parent. n the previous example, the milk
cartons are the children of the boxes.
A node includes the following information:
The parent node to which the node belongs (except for the top node, of
course).
The packing item that is used for the node. n the previous example,
the packing item for the top node is pallet, and for the children of the
top node the packing item is box.
For package definitions of the variable and mixed type, the number of
packing items used for the node. n the previous example, the number
of packing items for the top node is one (one pallet), and for the second
node the number is 50 (50 boxes per pallet). For fixed packaging
definitions, the number of packaging items is determined in a different
10-34 | Warehouse Management
way, which is explained in Packaging IeveIs.
For variable and mixed package definitions, the number of items that
the packaging item must contain. For variable and mixed package
definitions, this number is displayed for both the general-level and the
item-level handling unit template. For fixed packaging definitions, the
number of items is only displayed for the item-level handling unit
template. For further information, see To define package definitions
and Packaging IeveIs.
The node is labeled or unlabeled. Labeled means that for each packing
item defined for the node, a label record is created. n this way, each
existing packing item is uniquely identified. These labels can be
printed. f the boxes with milk cartons from the previous example are
labeled, each box obtains a label when handling units are generated
for an order for milk cartons. For further information on labels, see
LabeI setup.
Auxiliary packing material, such as sealing plastic that is used for the
node.
Serialized items in Warehouse Management
n Warehouse Management, you can use serial numbers to track serialized
items through receipts, transfers, storage, or issues, the latter of which is
mandatory. This package also enables you to track serialized items back
to their source. The source of a serialized item is, for example, the
purchase order or the production order that caused the receipt of the
serialized item, or the sales order or the work order that caused the issue
of the serialized item.
The need to track items by means of serial numbers arises from the items'
cost. The more expensive the item, the more closely you want to monitor
the item during its life cycle. n general, expensive items are produced and
handled in relatively low quantities, whereas the goods flow of less
expensive items involves higher quantities. n SSA ERP , this concept is
modeled in the following scenarios:
Low voIume scenario
This scenario is used for expensive items produced and handled in
relatively small quantities that require intensive tracking throughout the
warehouse flow. During receipt in the warehouse, for each serialized item
an individual receipt line is created and, either manually or automatically, a
serial number is allocated. For more information, refer toTo register serial
numbers in the low volume scenario. Upon receipt, each item/serial
number combination is individually stored in inventory and, consequently,
Warehouse Management | 10-35
financial transactions are initiated for each individual serialized item.
For each inventory transaction, such as a receipt, transfer, or an issue, the
inventory records of the serialized items are updated. When issued from
the warehouse, for each serialized item SSA ERP creates an individual
outbound advice line and, if applicable, a shipment line, and allocates a
serial number.
As a result of receiving a serialized item and registering the serial number,
you can track the serialized items in the sessions involved in warehouse
transactions and storage, such as the following:
Warehouse Management
Receipt Lines (whinh3112s000)
ApprovaIs
f warehouse inspections are included in your warehouse flow, the
serialized items that you entered in the Receipt Line Serials
(whinh3123m000) session are also displayed in the Warehouse
nspections (whinh3122m000) session. n addition, you can indicate
the serialized items that must be rejected or destroyed in the Receipt
Line Serials (whinh3123m000) session.
For warehouse issues of all other types, you must register serial
numbers in the Shipment Line Serials (whinh4133m000) or the
Outbound Advice Serials (whinh4126m000) session for the items that
you issue, for example, to track the shipment of serialized items to a
customer.
Production
For serialized manufactured end items, you must register serial
numbers in the Serial End tem - As-Built Headers (timfc0110m000)
session. n this session, you can register serial numbers during various
moments of the production process. These moments are determined
parameter settings in the Shop Floor Control Parameters
(tisfc0100s000) session in Manufacturing.
After you plan a work order, SSA ERP issues the serialized item that
Warehouse Management | 10-37
you want to repair or maintain to the repair shop by means of outbound
order lines of the Maintenance Work origin. Settings in the tem -
Warehousing (whwmd4100s000) session determine whether you must
register the serial numbers in the Outbound Advice Serials
(whinh4126m000) session or the Work Orders (tswcs2100m000)
session.
Next, after you release the work order, SSA ERP issues the serialized
component items required to carry out the repair or maintenance
activities described on the work order by means of outbound order
lines of the Maintenance Work origin. Settings in the tem -
Warehousing (whwmd4100s000) session determine whether you must
register serial numbers for components in the Outbound Advice Serials
(whinh4126m000) session or the Work Order Material Resources
(tswcs4110m000) session. For further information, see To set up
serialized items.
Tracking originating orders of seriaIized items
Warehouse Management also provides the option to track the orders that
initiated the receipt, transfer, or issue of serialized items, such as
production orders, purchase orders, or sales orders. This option is
available for both the low volume scenario and the high volume scenario.
For further information on serial tracking options, see SeriaI Tracking.
nventory Analysis (NA) module - Differences B61/B40c
This topic describes the most important differences between the inventory
analysis functionality present in the Inventory ControI (INV) module in
Baan Vc and the nventory Analysis (NA) module in ERP LN 6.1 .
n Baan Vc , you could perform an inventory valuation for a range of items
by:
tem groups
Warehouses
n ERP LN 6.1 , you can perform an inventory valuation for a range of
items by:
tem type
Warehouse
n ERP LN 6.1 , the following inventory valuation methods are available:
Kanban
Order controlled/Batch
Order controlled/SLS
Order controlled/Single
Based on these supply systems, warehousing orders are generated in
several ways, taking into account various aspects and requiring different
master data.
Order groups
Warehouse Management | 10-39
This topic explains the new order grouping funtionality in ERP LN 6.1 .
Order grouping is a flexible and dynamic new capability that facilitates
more efficient order processing for users interacting with ERP LN 6.1 . For
example, if several separate orders must undergo the same operations
and/or must be managed by the same person, it can be useful to group
and process the orders simultaneously.
User interaction with Warehouse Management includes confirming,
transferring, printing, releasing, and processing outbound advice, all based
on order groups. The order groups are generated in Manufacturing where
all orders that meet particular criteria are automatically linked to the
newly-generated order group. n Warehouse Management, the order group
is displayed only, but can be used to group orders for which the previously
mentioned transactions can be performed.
The functions affected by this change, are:
HandIing units
10-40 | Warehouse Management
A handling unit is a uniquely identifiable physical unit that consists of
packaging and contents. The contents of a handling unit are the items
that you receive, store, issue, or transfer into or from your warehouse.
You can use both handling units and warehousing orders as a basis for
processing inventory transactions. f you use handling units to process
goods in the warehouse, the inventory levels and warehousing orders
on which the handling units are based are updated in the background.
For more information, refer toHandIing units.
Package definitions
A package definition shows how items are packed. For example, a
package definition can specify that an item is packed in boxes that
contain four pieces of the item, and twelve of these boxes are stacked
on a pallet. You can link a package definition to an item or to a
handling unit. f you link a package definition to an item, the package
definition shows how the item is packed, as in the previous example. f
you link a package definition to a handling unit, the package definition
shows how the handling unit, and the handling unit structure of the
handling unit, is packed. Unlike handling units, items are no uniquely
identifiable objects that you can use for warehouse processing.
Therefore, if you use package definitions without handling units to
define the packing structure of items, you must use warehousing
orders to process inventory transactions. For more information, refer
toPackage definitions.
Packaging items
Packaging items are items specifically defined as package materials.
You can use packaging items to set up packing structures of package
definitions and handling units.
SeriaI tracking
n the Warehousing Master Data (WMD) module, various settings are
available to enable tracking of serialized items. For more information,
refer toSeriaIized items in Warehouse Management.
Changed functionaIity
Warehouses
n Baan Vc , warehouses are defined in the TabIes (MCS) module of
BAAN IV Common. n ERP LN 6.1 , basic warehouse data is defined
in the Tables module of Common Data. More detailed warehouse
information is defined in the Warehousing Master Data module of
Warehouse Management. The warehouse definition now includes
multisite links with an assignment of an enterprise unit. For more
information, refer to :
Using warehouses
Type of warehouse
Consignment
Locations
n Baan Vc , to use locations, you must implement the Location
ControI module to define locations for one or more warehouses within
Warehouse Management | 10-41
a company. n ERP LN 6.1 , the Location ControI module does no
longer exist. The location control functionality is integrated in the
Warehousing Master Data and the nventory Handling modules. For
each warehouse within a company, users can choose whether or not to
set up locations without having to implement location control
functionality. For more information, refer to :
Using Iocations
Using zones
Using warehouses
Lead times
Receipt and delivery calculations have been enhanced by introducing
warehouse lead times. For more information, refer toDetermination of
Iead time.
SuppIy systems
n ERP LN 6.1 , various supply systems are available. For more
information, refer toLine suppIy.
Negative inventory
n Baan Vc , you cannot use negative inventory if you use locations. n
ERP LN 6.1 , negative inventory is allowed with or without locations.
For more information, refer toNegative inventory.
BIocking
The blocking functionality has been moved from the Inventory
Location ControI (ILC) module in Baan Vc to the Warehousing
Master Data module. n ERP LN 6.1 , you can use blocking with or
without locations. For more information, refer toTo bIock and unbIock.
Moved functionaIity
The following functionality has been moved from the Inventory Location
ControI (ILC) and Inventory ControI (INV) modules in Baan Vc to the
Warehouse Master Data (WMD) module in ERP LN 6.1 :
Messages
The functionality available in the Maintain Messages (tdiIc0160m000)
session has been moved to the Remarks (whwmd1130m000) session
in the Warehousing Master Data module.
BiII of Enterprise
The functionality that is used to set up bills of enterprise has been
moved from the Maintain BiII of Enterprise (tdinv0116m000) session
to the Bills of Enterprise (whwmd2130m000) session.
Storage conditions
The functionality that controls storage conditions is moved from the
Inventory Location ControI (ILC) module in Baan Vc to the
Warehousing Master Data module. For more information, refer toUsing
storage conditions and Master Data Parameters (whwmd0100s000).
10-42 | Warehouse Management
User authorizations
User authorizations for inventory transactions maintained in the
Maintain User Authorizations for Inventory Transactions
(tdinv1110m000) is no longer supported. User authorizations are
centrally managed in TooIs.
Lot Control (LTC) module - Differences B61/B40c
This topic describes the most important differences between the Lot
ControI (LTC) module in Baan Vc and the Lot ControI (LTC) module in
ERP LN 6.1 .
New and changed functionaIity
Lot tracking
n Baan Vc , you can only track lots by item. n ERP LN 6.1 , you can
also track lots by warehouse/item combination, using the new
Warehouse - tem - Lots nventory (whltc1505m000) session.
SeriaI tracking
n ERP LN 6.1 , you can track serialized items for which, in the tem -
Warehousing (whwmd4100s000) session, the SeriaI Tracking check
box is selected. You can use the following sessions to track serialized
items on various levels:
For warehouse orders of type Issue with any of the following order
origins:
SaIes
Service
Maintenance SaIes
Maintenance Work
Warehouse Management | 10-43
SFC Production
ASC Production
Automatically, with entry or order line. ERP LN 6.1 then checks not
only the availability of the inventory, but also the inventory commitment
date (= item lead time+ outbound lead time ).
n ERP LN 6.1 , you can also create inventory buffers, which facilitate
inventory commitments without relations to specific orders.
nventory Handling (NH) module - Differences B61/B40c
This topic describes the most important differences between inventory
handling functionality present in the Inventory Location ControI (ILC),
Inventory ControI (INV), and RepIenishment Order ControI (RPL)
modules of Baan Vc and the nventory Handling module in ERP LN 6.1 .
New functionaIity
Warehousing orders
n ERP LN 6.1 , the inbound goods flows, the outbound goods flows,
and all inventory transactions, with the exception of cycle counts and
adjustments, are handled by means of warehousing orders. For more
information, refer toTo handIe warehousing orders.
RepIenishment
The replenishment orders of the RepIenishment Order ControI (RPL)
module in Baan Vc are replaced with warehousing orders of the
Transfer origin in ERP LN 6.1 . For more information, refer toTo use
repIenishment matrices.
Warehouse assembIy
For more information, refer toWarehousing assembIy orders
Order grouping
10-44 | Warehouse Management
n ERP LN 6.1 , you can use order groups. For more information, refer
toOrder groups.
Invoicing information
n ERP LN 6.1 , the new Accounts Receivable Management
Dashboard (tfacr2560m000) session provides fast access to the sales
invoices and to various types of related information such as the
invoice-to and pay-by business partner information.
Changed functionaIity
Inventory history
Separate records for location inventory are not kept in ERP LN 6.1 .
nventory history data are integrally maintained in the nventory
Handling module. For more information, refer toWarehousing order
history.
Inventory position
n addition to viewing the inventory position by item and warehouse, in
ERP LN 6.1 you can also view:
Inventory structure
To view the packaging structure on inventory level, use the tem -
nventory Structure (whinr1550m000) session.
Inventory transactions
n ERP LN 6.1 , you can view inventory transactions at multiple levels,
using the following sessions:
QuaIified demand
nstead of using actual demand, in ERP LN 6.1 , you can use qualified
demand to calculate a demand forecast in the Calculate Demand
Forecast (whina2202m000) session.
To view and maintain qualified demand, you can use either of the
following sessions:
tem groups
Warehouses
n ERP LN 6.1 , you can perform an inventory valuation for a range of
items by:
tem type
10-46 | Warehouse Management
Warehouse
n ERP LN 6.1 , the following inventory valuation methods are available:
To define authorizations
Roles (ttams2500s000)
Text group authorizations and default text groups are defined for each
individual user.
The texts and all related settings, such as text windows, text groups,
text group authorizations and default text groups, are stored per
company number.
Text Management in ERP LN 6.1
n ERP LN 6.1 the following changes are implemented:
Text editing
Multiple text editors are available. The text editor, that is started when
you edit a text, depends on the text group to which the text belongs.
You can select one of the following editors:
BAAN Editor: the standard Baan text editor. dentical to the text
editor in Baan Vc .
Word
Storage
Texts, text windows and text groups are stored per company. However,
the templates that contain the settings for text group authorizations and
default text groups are stored in company 000. f Word is used as a
text editor, the format settings (RTF settings) are stored separately in
the RTF texts (tttxt015) table.
Text boxes
n ERP LN 6.1 sessions and forms are dynamic. n dynamic forms text
fields can be displayed as text boxes, where you can type the text
directly. However, in most sessions the text handling is similar to the
situation in Baan Vc : the form contains a check box, indicating
whether a text exists for a record, and the text is edited through a text
editor. Refer to Dynamic sessions and dynamic forms (DFE) for
more details on dynamic sessions and dynamic forms.
The Text Management sessions
Refer to The Text Management sessions for information on the sessions
that can be started from the Text Management menu.
Audit Management
This topic explains the differences between Audit Management in Baan Vc
and in ERP LN 6.1 .
Audit Management in Baan IVc
n Baan Vc :
You can activate audit trail for tables, not for individual table fields.
When a user inserts, updates or deletes a record in an audited table,
only the content of the key fields and changed fields is stored in the
audit file.
Some audit settings can only be defined by editing runtime files directly
in the operating system, for example:
You must edit the audit_spec file to define security settings, the
maximum audit trail file size, and the maximum number of audit trail
files.
To specify an audit host for the audit server, you must edit the
tabledef6.1 file.
Security level and maximum file size can be defined, per audit
sequence, through the Maintain Audit nformation File
(ttaad4160m000) session.
The directories where the audit trail files are stored, are defined in the
Maintain Audit File Directories (ttaad4116m000) session.
Audit Management in ERP LN 6.1
n ERP LN 6.1 the following changes are implemented:
Audit configuration
The configuration of audit settings is centered around audit profiles. To
define audit settings you must create one or more audit profiles. n an
audit profile you can group the tables that must be audited. Each audit
profile is linked to a company group, which determines for which
companies the specified tables will be audited. Audit profiles can be
grouped in audit categories to bundle profiles in the same functional
area.
This way all settings that serve a specific purpose can be grouped. For
example:
activate audit trail for only a subset of the fields in the table: you
must specify the fields for which audit trail must be activated, and
per field you must select the desired audit type.
New moduIe
Most audit configuration sessions are entirely new. They belong to the
new Audit Management (tt/aud) module.
Transaction notifications
You can define a replication process that transfers changes, based on
11-8 | Enterprise Server
the content of audit files, to another system. ERP LN 6.1 uses
transaction notifications to ensure that only committed transactions are
replicated. For details, refer to the online help of the Transaction
Notifications (ttaud1510m000) session.
Note
The changes only affect the configuration of the audit settings. The user
interface for viewing, printing or maintaining the generated sequence files
is not changed.
AppIication DeveIopment
This topic explains the differences between the Application Development
concepts in Baan Vc and ERP LN 6.1 .
AppIication DeveIopment in Baan IVc
n Baan Vc :
All sessions and forms are static, i.e. the forms have a fixed layout and
are edited through an ASC oriented form editor (ottadvformedit).
For each language, a separate set of menu dumps, form dumps and
report objects is stored.
All sessions and forms are dynamic, i.e. the layout of a form is not
fixed. The runtime appearance of a dynamic form is based on the order
and grouping of fields that is defined in the form definition and on the
table field authorizations of the user. Dynamic forms are edited through
the Dynamic Form Editor. Refer to Dynamic sessions and dynamic
forms (DFE) for more information.
There is only one set of dumps/objects of forms, menus and reports for
all languages. Labels are compiled separately. Software translation is
Enterprise Server | 11-9
much easier now. Refer to Language TransIation Support (LTS) for
more information.
A program script only contains the session's user interface logic. The
database logic, e.g. the execution of data integrity checks and of
non-interactive update actions, is now stored in a Data Access Layer
(DAL) script. Refer to Data Access Layer (DAL & DAL2) for more
information.
Further, the following new application development concepts are
introduced in ERP LN 6.1 :
a single package VRC can only contain one version of each software
component. t is not possible to store multiple revisions of the same
component. Program scripts form an exception to this: each program
script may have a maximum of five variants in the same VRC.
Components are only locked during the time they are being edited. You
can not lock a component for a longer period. So, during your absence,
other developers might (accidentally) perform changes in your
component.
Software Configuration Management (SCM) in ERP LN 6.1
Software Configuration Management (SCM) is a version control system for
all software components developed in ERP LN 6.1 Tools.
11-10 | Enterprise Server
SCM is especially useful if multiple developers create and maintain
software components in the same VRCs.
SCM offers the following features:
Check-out
You can check out a software component from an original VRC to a
development VRC. When the component is checked out, you are the
only one that can modify and test the component. Each time you
perform a check-out action, a new revision of the software component
is created in the development VRC.
Check-in
f the changes on the software component are tested and completed,
you must check in the component, to make the changes available to
other users.
Undo check-out
f necessary, a check-out action can be reversed through the undo
check-out procedure.
Revisions
A development VRC usually contains multiple revisions for the same
software component. You can maintain these revisions through the
Component Revisions (ttscm1501m000) session. f necessary, you can
restore an older revision.
Note
Refer to To use the check-in and check-out procedure for details on
(undo) check-out, check-in and revisions.
Before using SCM, you must create development VRCs, and subsequently
activate SCM for the original VRCs from which they are derived. For
details on the setup of SCM, refer to To use the Software Configuration
Management system.
The Software Configuration Management (SCM) sessions
n ERP LN 6.1 the following Software Configuration Management (SCM)
sessions can be used:
All sessions and forms are static, i.e. the forms have a fixed layout: the
labels and fields in a form are always displayed on the same position.
The form layout is dynamic: the position of fields and labels is not fixed,
but can differ per situation.
Text fields can be displayed as text boxes, where you can type the text
directly.
You can change the appearance of string fields and enum fields, e.g.
from a drop down list box to a set of radio buttons.
Separate storage
n the runtime data dictionary:
the menu dumps, form dumps and report objects only contain
information on the layout of the menu/form/report, and are therefore
language-independent.
TransIation
Language-dependent components, such as labels, messages and
questions, can be exported from the source language to XML files. You
can translate the content of these files in a generic XML translation
environment and subsequently import the files in the target language in
ERP LN 6.1 . After a translation, you must compile the labels (instead
of dumping/compiling forms, menus and reports) to generate new label
resource files.
Storage of IabeIs
Labels are stored based on their context. This reduces redundancy
and prevents labels from being changed while being used in another
context. Examples of label contexts are "General use" and "Session,
table, or report description". n the runtime data dictionary, labels are
stored, per VRC, in label resource files in the ${BSE}/lib/labels
directory.
The Language TransIation Support (LTS) sessions
n ERP LN 6.1 you can use the following sessions to translate software
components:
Labels (ttadv1140m000)
Fast entry
Users can edit both parent data and child data inside a single MMT
session, which makes these sessions extremely powerful for data
entry.
Better overview
An MMT session gives the user a complete overview, in a single
window, of all important data related to an object. This is much more
efficient and user friendly than working in a lot of sessions
simultaneously.
The lower part contains one or more tabs. Each tab contains a list
that shows data for a particular type of child, e.g. the Order Lines.
These tabs are called satellites. Each satellite is actually a separate
session that is linked to the header session.
The header and satellites can also run stand-alone. So, an MMT
session is actually an integration of multiple sessions into one single
session.
Synchronization
n each MMT session the header and its satellites are synchronized: if
you select a different record in the header, the data in the satellites is
refreshed automatically.
Session definition
MMT sessions are created through the Sessions (ttadv2500m000)
session. Some points of attention are:
The window type for MMT sessions is "Multi Main Table Controller".
The link and the synchronization between the header and the
satellites is defined through the MMT SateIIite sessions command
in the Specific menu.
Enterprise Server | 11-15
For more information on MMT sessions and developer guidelines refer
to MuIti Main TabIe sessions.
n ERP LN 6.1 Tools the following MMT sessions exist: Table Definitions
(ttadv4520m000) and Business Objects (ttadv7500m000).
n the other packages also various MMT sessions are available. For
example, sessions to maintain Production Orders (Manufacturing), Sales
Orders and Lines (Order Management) and Mapping Schemes (Finance).
Data Access Layer (DAL & DAL2)
This topic explains the differences between database integrity and
business logic handling in Baan Vc and in ERP LN 6.1 .
Database integrity and business Iogic in Baan IVc
The business logic of Baan Vc completely resides in program scripts and
DLLs. The program script of a session contains both, user interface logic
and database logic:
The user interface logic is used to change the default behavior of the
session. A program script can contain various sections that are used to
enable or disable fields, define default values for fields, calculate the
values for fields, and so on.
The database logic in the program script ensures the logical integrity of
the database. This logic usually resides in:
multiple "check.input" field sections that are used to check the input
values for the fields in a session. These "check.input" sections
contain logical integrity rules, for example: "the net weight can not
be greater than the gross weight" and "the Expiry date should be
later than or equal to the Quotation date".
EIimination of redundancy
Each DAL script belongs to a single table definition. The name of the
DAL script is identical to the table name, for example "tccom001", or
"tdpur100". This architecture eliminates the redundancy of database
logic. All database logic for a particular table is centralized in a single
DAL script, rather than being spread across multiple program scripts.
All sessions that operate on a table use the same database logic, that
is defined in the table's DAL script.
DAL hooks
A DAL usually consists of multiple hooks. A hook is a function, with a
predefined name, that is used to program logical integrity rules for
database access. A DAL can contain multiple types of hooks that can,
for example, contain integrity rules for various table fields and can
automatically run actions when read or write actions occur on the main
table.
The log files do not contain many details. For example, in case of a
database error, only the error code is recorded.
n regular export and import procedures, the ASC files are stored in a
separate directory for each run number. The run number is not
available to the outside world. Therefore external applications do not
know what directory the files must be written to or read from. To solve
this problem, you need to program a session or script to copy the files
before each regular import or after each regular export.
Exchange in ERP LN 6.1
ModuIe Iocation
The Exchange module is moved from the Utilities (tu) package, to the
Data Director (da) package. All session codes for ERP LN 6.1 start with
the da package code.
Improved Iogging
The log files contain more details: the descriptions of database errors
(including the table fields involved) and exchange error messages are
logged. More details are logged for incorrect records.
Each site owns its data and processes and, in turn, each site
decides when and how often to run exchange batches.
f one site is not available for some time, or if the batches at several
sites do not run synchronously, Exchange ensures that no data will
be missing.
DefauIt numbering
When you enter new ASC file fields and table and field relations, ERP
LN 6.1 automatically increases the corresponding sequence numbers
with 10.
Default numbering is implemented in the following sessions:
TerminoIogy changes
Some terms used in Exchange have changed. The titles of the
sessions involved are changed correspondingly:
You need a lot of Baan Vc knowledge, e.g. about business logic and
tables, to build BOs.
The BOs do not work anymore when the Baan Vc business logic
changes, e.g. through a service pack.
This makes it hard to integrate Baan Vc with external applications.
Note
As a work-around, you can build an integration using the Application
Function Server (AFS). AFS can run Baan Vc sessions and therefore
automatically executes the corresponding business logic. n this way you
don't need to rebuild this logic and the integration is more flexible.
However, AFS has a negative impact on the performance.
Business Object ModeIing in ERP LN 6.1
n ERP LN 6.1 the connectivity architecture has changed drastically. Some
key characteristics are:
Business Objects
The software is built from a business perspective: ERP LN 6.1 comes
with various predefined business objects that can be used to build
Enterprise Server | 11-21
integrations with external applications. When an external application
connects to a business object, automatically the relevant business logic
is executed via the DAL 2 scripts of the involved tables.
a public layer: this layer forms the connection with the outside
world. This layer consists of public attributes, methods, and method
arguments. External applications can activate the public methods
via OpenWorldX to run an action, e.g. create or update a Sales
Order, in ERP LN 6.1 . The method arguments are in XML tree
format.
You don't have to rebuild session logic in the integration BOs. So, to
build an integration you don't need to know the ERP LN 6.1 tables and
business logic. You only need to know the structure of the business
objects.
After a change in the ERP LN 6.1 business logic, the integration BOs
still work. So, you don't have to modify these BOs.
11-22 | Enterprise Server
The Business Object ModeIing sessions
n ERP LN 6.1 you can use the following sessions to maintain and test
business objects:
nformix
Oracle
DB2
SQL Server
Operating System / Database Support in ERP LN 6.1
n ERP LN 6.1 only Level 2 Database drivers are supported.
n ERP LN 6.1 the Baan propietary database Baanbase (TP) is not
supported.
Databases from other vendors that are supported in ERP LN 6.1 :
nformix
Oracle
DB2
11-26 | Enterprise Server
SQL Server
Query Processor
This topic shortly describes the main differences between the Query
Processor (QP) in Baan Vc and the New Query Processor (NQP) in ERP
LN 6.1 .
Note
The Query Pocessor was completely rewritten for SSA Baan ERP 5.2a
(Reger) and is called the New Query Processor (NQP).
n the NQP the SQL syntax is more strict and has changed where possible
according to ANS SQL Standards.
SQL Query Syntax differences Baan IVc / ERP LN 6.1
The main differences are described in the table below:
Description Baan IVc ERP LN 6.1
Path finder func-
tionality in the
WHERE ...
REFERS TO ....
f the TO-part of a REFERS TO expression
is a table name, then classic-QP goes
through the DDs to find a path from the
FROM-part to the TO-part. f it doesn't find a
path or finds a path that starts with the
wrong foreign key, then it forces a
"single-step path. f there exist multiple
paths then it chooses one that will.
The FROM-part must specify a
(combined) column of a table
and the TO-part must specify a
unique index of a table. f the
index name in the TO-part is
omitted then _NDEX1 is impli-
cit.
FROM clause
within WHERE ...
FROM ...
REFERS TO ...
FROM clause within WHERE supported FROM clause within WHERE
not supported
WHERE ... RE-
FERRED BY ...
REFERRED BY supported REFERRED BY not supported
Degree mis-
match in
REFERS TO ex-
pression
n classic QP it is possible to have a
REFERS TO expression of which the num-
ber of parts in the left operand does not
match the number of parts in the right oper-
and. On (Oracle) level-2 this construction
works as expected, but on level-1 it does
With NQP it is possible to have
a REFERS TO expression of
which the number of parts in
the left operand does not match
the number of parts in the right
operand.
Enterprise Server | 11-27
Description Baan IVc ERP LN 6.1
not.
Table names in
the SELECT
clause and the
FROM clause
n classic-QP, the query SELECT tabIe is
valid. t is equivalent to SELECT * FROM
tabIe. f a table name is mentioned in the
SELECT clause and the same table name is
not yet included in the FROM clause, it will
be automatically included in the FROM
clause.
Only column (table.col) refer-
ences are allowed in the SE-
LECT clause. The FROM
clause is mandatory. Table
names mentioned in the SE-
LECT clause are not automatic-
ally included in the FROM
clause. SELECT * FROM tabIe
is not valid. SELECT tabIe.*
from tabIe is valid.
Table names in
the WHERE ...
REFERS TO ...
and the FROM
clause
n classic-QP, the query SELECT * FROM
tabIe1 WHERE tabIe1.coI REFERS TO
tabIe2 is valid. (note: no columns of table2
are in the SELECT clause and table2 not
specified in the FROM clause).
n the NQP we have to specify
SELECT tabIe1.* FROM
tabIe1, tabIe2 WHERE
tabIe1.coI REFERS TO tabIe2
Refer to the Baan ERP Programmer's Guide for details.
UsabiIity
This topic describes the differences of the usability aspects of the SSA
BaanERP software in Baan Vc compared with ERP LN 6.1 .
The description mainly concentrates on the differences regarding "How to
use the Baan sessions".
Note regarding Webtop and Worktop
Although Worktop and Webtop are typical usability topics, they are not
described in this Help topic, because both software products are supported
in Baan Vc as well in ERP LN 6.1 .
Note regarding ASCII and GUI
Baan Vc users have the option to work with the ASC User nterface or
the Graphical User nterface (GU). The ASC interface is not supported in
ERP LN 6.1 . This Help topic does not compare ASC with GU.
UsabiIity differences in Baan IVc and ERP LN 6.1
11-28 | Enterprise Server
The differences are described in the table below:
Description Baan IVc ERP LN 6.1
Sessions and
Forms
Static Sessions
and Forms.
Dynamic Sessions and Forms. Forms are dynamically build
on runtime. Not authorized fields are invisable.
Display and
Maintain ses-
sions
Seperate Dis-
play and Main-
tain sessions.
Maintain and Display combined in one session
Print sessions Most Print ses-
sions must be
launched from
the Menu
Browser
Most Print sessions can be launched directly from the Over-
view sessions.
Overview and
Detail sessions
Seperate Over-
view and Detail
sessions.
One Dynamic Form can be presented in Overview or Detail
mode. Session starts normally in Overview mode. Double
click on a row starts the Detail view of that row.
Form tabs Seperate Form
for every Form
tab.
One Dynamic Form can have several Form tabs.
Buttons and
Buttonbars
Different from
Microsoft Ap-
plications
Same as in Microsoft Applications
Pulldown menus Different from
Microsoft Ap-
plications
Same as in Microsoft Applications
Popup menus
(on right mouse
click)
not supported Popup menu on a selected row in Overview mode. Popup
menu on a selected field in Details mode.
Mouse usage Different from
Microsoft Ap-
plications
Same as in Microsoft Applications
Text editing Text editing via
Baan ASC ed-
Text editing via Multi line editor (like Notepad)
Enterprise Server | 11-29
Description Baan IVc ERP LN 6.1
itor
Text boxes not supported Text editing via Text boxes in Dynamic form.
Filtering Query by Form.
Query can not
be saved.
Multiple Filter Support. Filters can be saved and reused
later.
Sorting Pulldown menu:
Order
Pulldown menu: View, Sort by
Dynamic ndex
Switching
not supported ndex fields are displayed in Overview mode according to
the chosen "Sort by".
Windows Clip-
board support
not supported Selected rows in Overview mode can be copied to Clipboard
and pasted in another Windows application, i.e. MS Excel.
Find and Sort Sort within Find
Dialog not sup-
ported
Sort within Find Dialog.
Message mode not supported User can set the Message mode "nteractive" or "Non-
interrupting".
Send to ... not supported User can send selected rows in Overview mode to:
Desktop
Mail Recipient
Task List
Definitions:
Header: Single occurence session appearing on the top
of a MMT session. Also referred to as parent session.
Enter the license code in your application, along with other required
information from the License Code nformation Report (number of Ascii
and MS-Windows users).
The Version Scan Tool will start automatically. Complete the scan and
save the output file.
Hardware changes
Updates/changes in versions
The SSA License Manager product for handling the licenses. t will
check the license requests from the adopting applications according to
the information stored and validated with SSA Baan.
The Activation key that enables the license manager. The Activation
key provides you with a key in such a way that your adopting
applications will work accordingly.
SSA License Manager exists of three components:
Specify at the SSA License Manager Server all the products that
have been installed and that must be licensed by means of SSA
License Manager. The result must be saved in a document. By default,
this document file is called License.xml.
SSA Baan Validation sends the validation key back to the customer,
who submits this activation key to SSA License Manager server. By
doing so, all specified SSA Baan products in the license document
become activated. f other SSA Baan components are installed, or if
additional licenses are bought, the license document must be changed
accordingly and a request for a new activation key must be carried out
following the described process.
Reference materiaI:
For more information on how to use the SSA License Manager to
validate and license your ERP LN 6.1 software, refer to:
SSA License Manager Installation and Configuration Guide (U7631D US)
InstaIIation Wizard and Staging Wizard
This topic explains the concepts of the SSA nstallation Wizard and the
SSA Staging Wizard in ERP LN 6.1 .
InstaIIation procedure in Baan IVc
For Baan Vc different installation procedures are used for each Operating
System / Database System combination.
The installation procedures are described among others in the following
documents:
Installation Guide for Baan IVc4 on Microsoft SQL Server (U7210D US)
Installation Guide for Baan IVc4 for Oracle on Windows (U7051I US)
Installation Guide for Baan IVc4 for Informix on Unix (U7029E US)
Installation Guide for Baan IVc4 for Informix on Windows (U7018L US)
Installation Guide for Baan IVc4 for Oracle on Unix (U7028H US)
SSA ERP LN
Move to da package
n Baan Vc , the Exchange (XCH) module was part of the Baan IVc
UtiIities (tu) package. n ERP LN 6.1 , the module belongs to the Data
Director package.