Está en la página 1de 7

RESUME

Dr.Malcolm J Mudge
FSAIMM,GSSA,SME,AIMME
Project Management,
Metallurgical Positions, and
Consultant. Full Time Positions.
Relocate Anywhere.
Career Summaries:
From Prof. of mining and metallurgy to operational manager and
C.E.O., Developed confidence and in sight into integral aspects of
mining companies. Equally capable of hands on approach which is
appealing at times when training and developing personal
relationships at work, in the management role. Capable of heavy
eqpt. operation for assessment of operators etc. Computer
literate. Speak several languages. Efficient at SAG and Ball Milling
assignments. Considerable experience in alluvial mining and
alluvial eqpt., together with DMS experience. Certified GIA
Diamond assessments, Geophysical studies on Diamond deposits,
Project set-up for operation-DRC. Zambian cassiterite assessmrent
and process design following geological studies on Alluvial
recovery. Director of Green Machine Corp.- Copper gold in DRC and
Australia.

Major Capabilities:
Management capabilities, Milling problems, training, operational,
commissioning, design to drafting stages, excellent interpersonal
relations. Committed to whatever project unconditionally. Mill
Manager and Chief Metallurgist-Lega Dembi-Ethiopia-opencut gold
mine
Ability to adapt to any climate from Amazon to Northern winters.
Multi-lingual:English, Portuguese, French, Spanish, Pidgen,
Italian Alluvial experience in Indonesia, South America, Ethiopia,
Congo, South Africa, Australia on Gold and diamonds and Tin.
Extensive geophysical studies for alluvial deposits.

CONTENTS:
• Contact address and private details
• Education
• Courses Undertaken.
• Work History
• Seminaries Given
• Publications
• References

Name: Malcolm John Mudge,FSAIMM


GSSA, SME,AIMME
33 Star Road, Selcourt,
Springs 1596 Gauteng, South
Africa
+27 72 477 3273
Email: mjmudge2004@yahoo.com
Status: Single Passport: Australian E7071918
2 year work visa to Sth Africa
Languages: English, Spanish, French, Portuguese, Thai, Chinese
(some).

2003 Commenced MBA Phoenix University Arizona


2002 Completed PhD in Metallurgical Engineering/Met Tech and
PhD. Environmental Eng. in Univ. California
1993-1996 PhD Ext Met., Geology- Cuenca Sch. Mines Ecuador and Sao
Paolo, Brasil resp.
1965-1972 School of Applied Science N.S.W. Dept.Tech.Education,
Australia.
1966 Winner of University N.S.W. Metallography exhibit. Metals
Society of N.S.W.
1975.1978 School of Mines, Western Australia.

Leisure activities: Squash, Skiing, Reading, Prospecting, Writing.


Health: Good Height: 170cms Weight: 55kgs.

WORK HISTORY:
Deswik Technologies: Research and development, EPCM,
Deswik Process Engineering. Copper, Platinum, Gold Dumps
recoveries Mill commissioning. Lab testwork. Plant design. ZMI Gold projects on
Arsenopyrite recovery. Merrill Crowe designs for dry tails. Magnetite studies for
LIMS and WHIMS on Hematite.
Employer: Rio Tinto Alcan Engineering. Manager feasibility Studies Brisbane.-Alumina
engineering at Gove Peninsular N.T.
Employer: Engenium Senior Process Engineer, Iron ore. Perth. Iron Ore deposits at
atlas mine Feasibilities.
Employer: CEO-Exec. Dir. DRC Copper, Cobalt, Gold project Precious metal limited-LSX.
Plus market. Pink sheet- Nasdeq- New York. Refineries in Tanzania for Tanzanian Govt.
project. Commodotity Trading in Ghana, DRC, Moz. and Tanzania.
CEO of copper company.- greenmachinecorp.com – Lubumbashi copper projects on 5
leases.
Full reposnsibilities.

Bemex Corp.: Senior Met. Project Technical Management. Gold and base metal
metallurgy and operations thru-out Australia

Metallex: Director Mining and Exploration-Angola Concessions. Contract position.


Employer: Angola Resources. Manager Luanda . Logistics and management of project.
Employer: Self employer mineral processing consultant
2003-2005
Reponsibilities: Design, management and commissioning of Diamond plants, Platinum tails
reprocessing, ERGO gold recovery upgrades using Deswick Fine grinding mills, Platinum
study in Burundi. Diamond studies, Fine milling Technologies, Manganex Manganese study
and feasibility study.
Employer: Manhattan Mining Equipment-Sth. Africa
Position: Process Product Geological Manager
Period: 2002-2003 18months
Reponsibilities:
Ensure total product and processes are correct metallurgically for the conducted proiject.
Design, Commmissioning,Quality control. Design and manufacture of new equipment.
Equipment
sizings and operation servicing. Design of large scale copper gold project in Mauratania.
Large
Kaolin project in Saudi Arabia. Conversion of FAG to WET SAG MILL. Design of 700
tph coal treatment plant using DMS for BHP Billiton project in S.A.
Delivery of paper on Feasibilty studies at international conference on mining in
Jburg. Sept-Oct. Operations in Botswanna, Rwanda, Mozambique, Saudi ,
Geophysical Studies for diamond alluvials,. Conferences at SAIMM, GSSA

2001: Project Manager- Employed working on Diamond project in Congo . Complete


technical input from mining to processing and administration. 8 months

2001: Consultant metallurgical duties PT KOBA TIN Indonesia. Review and recommend
operating changes to improve quality and quantity. Review mining and all processing to
obtain 75% Sn values in product and produce large volumes of ingot and anode quality tin
for export. Change flotation reagent to increase recovery of lead in froth to prevent
contamination. Change mill arrangement to increase grind efficiency. D. Geldard Director
Koba Tin, Trantek-Indonesia and Technical Resources-Australia. Hamish Bohannan-Gallery
Gold M.D. 3 months

2000: Resident Manager-Project Manager: North Korea Developing Mining Alluvial


and tailings projects, pressure jigs and centrifugal concentration set-up, lab. Set
up and maint. And eqpt organisation. Working with Nth Korean Senate Refer
Gekko Systems 8months

1999 Contract metallurgical services


Yandan Mine - Ross Mining. Central Qld. Australia. - 2 months - mathematical
modeling of metallurgical. balances using Excel flowsheets development. Analysis
of polymetallic treatment options for Arsenical pyrite ore types. Daily
consumables and reagent usage for weekly reporting. Incorporation of heap leach
stats for met. balance. 6 months

1998 Plant manager


Plant commissioning duties and Training of local workforce. OH&S Amazon region
of Sth. America Hampton Court Resources, Installation of Equipment for Alluvial
op, and laboratory setup. Electrical set-up and modifications. Training of local and
professional workforce in operation and maint. of plant and accessories.
Installation of electrical circuits and load sharing capabilities for gensets.
Assessment of Case Poclain excavators for open cut mining operations. Cost study
and Feasibility. 8 months

1994-1998: President & Chief Executive Officer Minera Gowanda S.A. Prospectus
and research development for alluvial ore deposit in Ecuador. ¨Maria¨ alluvial
concession-Esmeraldas. Complete bankable document- Engineering study incl.
cash flows and organisational charting. Company administration. Selection of
heavy eqpt. Etc. Research into recovery of gold/platinum/base metals in
polymetallic black sand. Development of computer generated cost studies and
assessments. refer Peter Howe AC Howe and Assoc. Toronto. Various concessions
in Ecuador Assessment and Feasibility Studies. 5 years

Project Manager - Imodiesel Spain- Portovelo Busa Site Development of CIP


process
Technical Advisor to Amlatminas Stock market prospectus issue.
Plant commissioning Amerbrit Ecuador. Ball Mill And cyclone installation and
training in use of cyclones and mills.
Hydrogen Isotope Geochemical Studies in Ecuador. A study of epithermal systems
utilising lab. studies of local water for determination of origin of mineralisation
and transport mechanism for an evolving mineral source.

1997-Commissioning Manager- Client Representative:- Commissioning and


Training workforce at San Gregorio plant in Rivera, Uruguay for 3 months.
Supervision of contractors and Minproc engineers. On site modifications to gold
room and gold room pouring techniques. Rea Gold- Interpreter for Minpro
operators in training roles. RSM View experience-Rockwell programs.Mr.Dennis
Thomas, Mr Z Zigmundowsky-Minproc Perth.

1995-1996: Consultant Mineral Processing Engineer


Eeximcor Afrique - Minpro Toronto Canada- Senegal. Ball mill installation.
Construction of mobile crush/screening plant in Senegal West Africa Site
preparation, leveling and installation.
Fire assay lab eqpt ordering and set up for analysis. Minpro Int.Canada
Installation of milling eqpt. Ball mill Cyclones etc. with pumps. Commission and
trials to production level. 5 months Senegal
Delivery of paper for environmental group/Swiss Govt. in Ecuador on
Environmental Contamination. Use of common decontaminating agents for
cyanide destruction and cost studies related to same. Presentation of papers and
demonstrations for public and gov’t agencies in Ecuador.

1995-Selected by Projeconsult of Germany to conduct surveys and artesinal


studies in Ghana for Govt. of Ghana over 2 year period.
.
1994: Chief Technical Officer for Minroca S.A.¨La Tigrera¨ concession-El Oro.
Design and feasibility study 5000 tpd operation.¨Guisme¨ concesion-Zamora Full
feasibility study with costs included.
Technical Director of Corporación ¨La Plata¨ S.A..
Assessment of various areas for investment purposes. Complete geological
assessment of site.
Advising investment companies on three major projects in Ecuador.
Design of small treatment plant in Portovelo.

1993- 1994: Assessments of:


Bella Rica-Ponce Enriquez Research into polymetallic ore treatment routes-
Arsenopyrite and chalcocyite treatment Full geological study. High temp.
epithermel ore body. 12 months
Portovelo- El Oro Region-Low temp. Epithermal ore zones in Granodiorite.
Rio Santiago-Esmeraldas Minera Gowanda
Rio Payamino & Shapano-Amazon Region Heavy Eqpt management and
procurement. Operation and supervision of alluvial operation. Design of
Concentration module with Goldfields of Salt Lake City. Heavy eqpt. Management
and control. 8 months Granda Centeno. Edwardo Granda CEO-Teleamazonas
Ecuador

Author of "Mining, Geological and Metallurgical aspects in Ecuador" 200 page text
for students World Bank Washington.U.S.A. , Cenda (Swiss Govt Project Ecuador)
Visiting Professor of Mining and Metallurgy Universidad Central del Ecuador-Quito
Presenter of several Seminars in Ecuador-
1993-1994: Visiting Professor
Universidad Católica del Azuay-Cuenca
University Central of Quito.
Universidad del Azuay-Cuenca
Universidad Técnica de Machala-Machala-Primero seminario Aurifero-Orenses.

1993-1994: Technical Manager Mining-Metallurgy


¨Granda Centeno¨ Group
¨Minera Pucabarranco¨ - Amazon Region of Ecuador Project management 4400tpd
Complete construction of camp and workshops. Road construction for 35 kms.
Design of Recovery modules for alluvial recuperation of Gold, Diamonds and
Platinum in SLC Utah

Assessor of various Projects in Bella Rica


1991-1993: Design and Installation of Three Crushing & screening & C.I.P. Plants in
Ecuador. Fabrication of tanks, process units and commission. Low cost assemblies.

1991-1993: South American Representative for Alluvial Mining, Technology and


Services- Australia. Project engineering Services Mr. Allan Russell
Amtas-Perth
1992: Consultant Design Eng. Geolabs CIP Plant in PonceEnriquez construction,
commission and operational training for min.processing plant,construction with
local workforce under strict supervision and control. 1 year
1991: Project Manager
Filanbanco-Minera Gribipe. Feasibility of Gaby Project Ecuador Construction of
mineral processing laboratory. Road construction 15 kms. 1 year
Portovelo Sands Treatment Design Abalta S.A. Heap leach project
Chief Consultant Project Engineer Gowanda- Esmeraldas region Ecuador
1989-1990: Project Management Govt. of Ethiopia.
Ethiopian Mineral Resource Development Corporation. Lega Dembi Project.
Mill Manager/Chief metallurgist Commissioning, Training and supervision of
Engineering company - Davy-Mckee Stockton England-Modifications to plant to
upgrade for correct operational status. 30% increase in output on commissioning.
Govt. of Ethiopia. Commission and operate all plant and ancillary operations.
Install and commission nuclear density units and train locals in safe work practice.
Install and commission gravity circuit and train locals in mercury use and its
properties. Distillation training and detection of mercury gases. Development of
daily log sheets and balances for gold call and reagent usage. 1 year

1988-1990 : Emperor Gold Mines Project Management, Metallurgy Fiji. Phillips


shaft modeling for JV. Research and mineralogy into Black Sands of Ecuador
AMDEL Dr Doug Mason. CIP approval and implementation for J.V. Oversee offshore
units for reporting to board. Upgrade CIP for higher thruput. Board representation
at WMC meetings. Conduct research into polymetallic sand treatment. Oversee
daily operations. CIP and Flotation of Cu Gold ore.- Allan Loosely Emperor Gold Fiji.
Conduct inspection and inventory for plant purchase-TC8- and removal of eqpt.(
Kirfield Eng-Perth) 2 years

1990-PNG Mill Manager Nuigini Mining Kainantu Papua New Guinea Nuigini Gold -
Project technical control. Implementation of gravity circuit. Manufacturing of eqpt.
NDT of ball milling eqpt.locally for upgrades. Ian Gouldie or Gavin Thomas 1 year

1984-1985: Consultant-Project Metallurgical Manager


Mill Manager TC8 Mine Central Australia Frank Steel Operation and
decommissioning, relining and storage of CIP plant and workshops. Scheduling
decommissioning. Inventory control. Upgrade to satisfactory handover for sale. 9
months Manager Frank Steel
EPAC Engineering Freeport McMoran, - Perth Australia. Consultant for Karonie
plant assessment and selection of construction company. Ivan Saracic EPAC Perth.

Nord Resources Australia. Plant Supt. 4000 tpd plant budget and supervisory
control. 9 months
Horseshoe Lights Project - Barrack Mines. Mr.Jack Cashman Consultant plant supt.
and Cu/Au studies. 6 months

Mitchell Cotts Engineering Gold Processing-Project Mill Supt. Patricia project-


Kalgoorlie Mr. Jock Muir 1 year
Broken Hill Metals Geological sampling for feasibility studies- design work on
circuit. Flowsheet development for C H Dodds – Perth

Bamboo Creek JV Mill Supt. Complete operation of CIP plant. Mill upgrade study.
Pilbarra region of WA. 1 year.
1974-1982: Conzinc-Rio-Tinto CRA Hamersley Iron
Raw Materials Metallurgist-Mineralogist Development Dept. Dampier. Iron ore
beneficiation studies.Pellatising Plant metallurgist. Geological-Metallurgical
assessments of major ore fields DTA/TGA studies, Mineralogy, Material balances
Tom Price C concentrator studies and testwork. Author of several company reports
to managing director. XRD Studies. Microscopy. Co-worker with Commonwealth
Scientific Industrial Research Organisation on several research projects.
Production of training manual distributed thru/out CRA for mineral processing lab.
techniques. Differential thermo and gravimetric thermo analysis for mineralogical
determinations. Pilot plant operation and studies. XRD tests to assess mineral
components. Heavy media separation trials. Heavy liquid separations,
Clereci,TBE,MI,Bromoform. Laboratory management for testwork. Several capital
applications for major pilot plant eqpt.Flotation of Taconite ores (BIF) Pellet plant
mineralogy. Noel Poetschka-Karrinup, Doug McKenna, City Beach Perth. Perth 8
years

1975-1982: Founding Branch Secretary-Aust. Inst. of Mining and Metallurgy


Aus.IMM. Dampier-Wickham Branch Liaison with visiting dignitaries and
conferences. Organisational duties for Institute matters in area. Ian Burston Perth
5 years
International Heavy Haul Rail Conference Local Administration and Organisation
Australian Institute of Mining and Metallurgy
1965-1974 BHP Trainee Metallurgist Iron and Steelmaking Blast furnace
foreman. Galvanising metallurgist, Metallographic studies. Sinter plant
metallurgist on Raw materials management. Winner BEST IN CLASS
metallography exhibit Univ. NSW Metals Society Physical testing laboratory
experience Trainee metallurgist. 8 years
Seminaries and Lectures
2002- Nasrec Conference SAIMM BEE seminar.
GSSA-Diamond Mining and processes.
SAIMM Conference on Small Scale Mining.
1992-1995
Seminary in Politecnica Nacional-Quito-Publication
Seminary Catholic University & University of Azuay-Cuenca -Mining and Metallurgy
Visiting professor of Mining Metallurgy and Geology Final year geology students.
Central University Quito
Primero Seminario Aurifero University of Machala
1978- Development of Iron Ore Deposit of the Pilbara,600 million years.
Hamersley Iron site lectures. The development of hematite ore deposits from
original pyritic assemblages and transformation stages over 600M years.
Publications:
SAIMM-Various
GSSA- Various
Author and presentation of university text: "Mining, Geology and Metallurgy in
Ecuador" 300 page text on Ecuadorian mining and an introduction to recent
processing techniques and procedures in mining A.Craig World Bank Washington
USA.
Preparation of feasibility studies for foreign company reporting.- University text for
6th year students of geology and mining.
Training manual publication for lab. Techniques dist. To all CRA affiliates. 1980
Assessment of Banded Iron Formations - CRA 1978
Effects of Ericson Cone Heavy Media Concentration - CRA 1977
Beasley River Iron Ore Formations - Hamersley Iron 1980
Mining Metallurgy and Geology of Ecuador - 1994 World Bank.
Segundo Seminario Aurifero - Escuela Politecnica Quito 1991
Primario Seminario Aurifero Machala 1993 - Univ. Tech. Machala
Assessment of Mt Chanar and Pyrton Deposits Hamersley Range - CRA 1980
Treatment of Arsenopyrites in Ecuador 1995 - Filanbanco
Feasibility Studies - Preparation and Delivery. - Cuenca University 1994
Prospectus Minera Gowanda Concession 1997 - Quito Ecuador
Namuldi Deposit Mineralogy Hamersley Iron - 1980
Coal Assessment in Ecuador - Potential zones and drill interpretations.
Overview of Ecuadorian mineral possibilites and political effects on the mining
industry.
A Geological/Metallurgical Assessment of a Large Volcanic Exhalative Deposit in
Ecuador-La Plata.PhD manuscript.
Comprehensive Training manual for mineral development laboratory Hamersley
Iron 1979
Cyanide Destruction System-A low Cost Alternative to Dumping .Cenda-Swiss
Gov't. Conf.1995
Gowanda Releases Proven Reserves. World Mining Journal 1995
Courses:
Chandler Mcleod Training courses on work psychology assessments
Hewlett Packard computer training on PDP8
Petroleum and Geological Assessments - Environmental issues in Ecuador
X-Ray diffraction Application to mineralogy, DTA/TGA analysis
Work safety Issues and management
Computer studies using basic language for Hewlett Packard.
Adaptation of basic to mass flow studies mathematical modeling
Various courses and seminaries organised by AusIMM
W.A. School of Radiation-Radiation Safety, Officer RSO.Grade1
Various conferences in Canada (PDAC) Toronto, Lima, Santiago, Miami.
Flotation utilisation in Ecuador- Problem solving and optimisation. -1995.
REFEREES:
John Ellis West Australian Mines Dept. Perth 61-8-92223101
Darryl Harris OutoKumpo Perth
Mr. McKnight. Ex minister for mines-Canada 1-416-860-1868
David Salary Minpro Int. Toronto Canada 1-905-847-5915
(Home Phone)
Peter Brook-PMT Q’Land tel: 61-7-55746629
Ray Simpson Perth W.A 61-8--9331351
Paul Matthews River Diamonds S.Africa +27-11-9735303
Jan Franke- AMCL Canada and Brisbane +61 438 7500 887 IMC
Anthony Ogilivy Thompson London +44 20 7350 4602
Chris Rule-Anglo plats- Jburg.
Marek Dworzanowski-AngloGold-27-11 638 5000

También podría gustarte