S.No. 1 Activities TB tightness & cleaning done for GRP panel GENERATOR PROTECTION RELAY MICOM 343 P343 checked for differential protection with o/p relays operation.86U master relay tripping also checked. P343 Checked for Voltage controlled O/c protection at both Normal & undervoltage(<33% V) with o/p relays operation.86G master relay tripping also checked. P343 Checked for under frequency operation with o/p relays operation. P127 (voltage controlled o/current protection) operation & alarm checked Rotor E/F protection relays operation & tripping checked 64B tripping checked Generator transformer differential KBCH (87GT) operation & tripping checked with o/p relays operation 64ST relay operation & tripping checked with o/p relays operation 49AX & 49TX relay operation & tripping checked with o/p contacts 63AX,63TX,26AX &26TX relay operation & tripping checked with o/p contacts 86U &86 G relay operation & tripping checked From GPR(P343) 30A,30B,30C &30D relay operation & tripping checked From GPR(P343) 30E &30F relay operation & tripping checked 30G,30H,30J,30K auxillary relay operation & tripping checked From GPR(P343) Reverse Power protection relay 32 and auxillary 32 X operation

Date:Remarks

3 4 5

7 8 9 10 11 12 13 14 15

16 B/U Impedance protection relay 21 and Auxillary 21x 17 Overload protection relay 51 .1 and auxillary 51.1x

S.No 1 2 3 4

CT
Generator Differential (Ct-4,5,6,7,8,9) Reverse Power Protection (Ct-1,2,3) Generator Transformer Differential (16,17,18) Stator Earth fault protection( Ct-19) 3000/1 3000/1 3000/1 3000/1

CT Ratio

Secondary Injected Current

Primary Current Reading

GT - GRP PANEL TEST FORMAT


SL NO

Checked on : PROCEDURE REMARK

PROTECTION

RELAY

SETTING

PROTECTION CHECKING

AUX / 86 RELAY OPERATION

V>1 Function : 1 Over voltage : Stage 1 (DVR C/O) MICOM 343

DT

Operating voltage : Operating time: Operation checked: Operating voltage : Operating time: Operation checked: Operating current: Time delay : Operating checked :-

30B :Inject voltage after isolating Prot. PT with links in PT circuit Check the Output at DVR panel also

V>1 Voltage Set : 121 V V>1 Time Delay : 0.3s V>2 Function : DT

30T :86G :Inject voltage after isolating Prot. PT with links in PT circuit

Over voltage : Stage 2 (TRIP)

MICOM 343

V>2 Voltage Set : 132.0 V V>2 Time Delay : 2.000 s I set : 0.7 In

51G RL 2, 3 5: Inject current in B phase of Protection CT

Over current definite time / Thermal overload (Alarm)

P 127 (51G)

DT Time delay : 6s V Dep OC Char : IEC S Inverse

V Dep OC I> Set : 800 mA 4 Over current (Voltage controlled) MICOM 343 V Dep OC TMS : 0.3

Current inj (2xIs) OP Time (Nor Vol): OP Time (Red Vol): Operation checked: Operating current : Operating time: Operating current : Operating time: Operation checked:

30R : 86G :-

Inject current in CT terminalsR1 TB-1 5,6,7,8 Time shall be 1.5sec Time shall be 0.64sec

V Dep OC V<1 Set 35 V V Dep OC k Set : 0.4 Ue> 5.5V 5 Back up eart fault (Open Delta) P 125 (64B) Time delay : 1.0sec I2> : Current Set 60mA 6 Negative phase sequence protection (Alarm) MICOM 343 I2>1 Time Delay : 10.0s

64B RL1,2,3,4.5 86U :30P :-

Inject voltage after isolating the links at R1 TB-34, 35

Inject 3 phase current with reverse phase sequence

I2>2 Current Set 80.00mA I2>2 k Setting 7 Negative phase sequence protection (Trip) MICOM 343 I2>2 kRESET I2>2 tMAX I2>2 tMIN 9.000 s 9.000 s 500.0 s 3.000 s Operating current : Operating time: Operation checked: 86G :30H :Inject 3 phase current with reverse phase sequence

GT - GRP PANEL TEST FORMAT


VN>1 Function DT Operating voltage : Time delay : Operation checked: Xa1 : 9.5 ohms Loss of excitation/Field failure ( with U/V) Xb1 : 164 ohms MICOM 343 Time delay: 0.1 s FFail1 DO Timer : 1.0 s Xa2 : 9.5 ohms Loss of excitation/Field failure (without U/V) Xb2 : 164 ohms MICOM 343 Time delay: 2.0 s Ffail2 DO Timer : 1.0 s Rotor earth fault Stage 1 (Alarm) Operating phase angle: Time delay : Operation checked: VAEM 2/64F1 (timer) Operation checked: 12 Rotor earth fault Stage 2 CAEM 64F2 :64F2X: 86U :-P>1 Setting 13 Reverse power (Stage 1) MICOM 343 Power1 TimeDelay : 1.0 s Is : 4.0mA 14 Reverse power (Stage 2) (MWTU14) Ts :1.5 s Is1- 50 mA K1- 0% 15 Generator differential MICOM 343 Is2 1.2A K2 150% Operating time: OP current (O/P side): OP current (Neu side): 86G:30J: 86U :Inject current in both OP side and Neutral side CT input in all phase Operating time: Operating current : 86G :30Q : : 4.0 W Operating current : 30K :Inject PT voltage and current in reverse direction Inject PT voltage in RY phase to check operatin of relay 64F1 :86G :Operating phase angle: Time delay : Operating voltage : Operating current : GPR RL 15,16 :Inject voltage above 77Volts and change the angle of current to operate the relay 86G : Operating voltage : Operating current : 30L : Inject voltage below 77Volts and change the angle of current to operate the relay GPR RL 17, 24 :86U :Inject voltage in the PT input from NGT after isolating PT with links in PT Circuit VN>1 Voltage Set : 7.0 V 8 Stator Earth fault 95% (NGT) MICOM 343 VN>1 Time Delay : 1.0 s

Checked on :

10

11

Inject PT voltage and current in reverse direction

GT - GRP PANEL TEST FORMAT


16 Under frequency Stage 1 (Alarm) (MICOM 343) Under frequency Stage 2 (trip) 17 (MICOM 343) MICOM 343 F<2 Time Delay VN3H< Enabled VN3H< 500.0mV VN3H< Delay 18 100% stator E/F MICOM 343 V< Inhibit set P< Inhibit P< Inhibit set VN3H> Delay Over Frequency 19 (MICOM 343) MICOM 343 86G : 86U :20 Generator Overall Diff prot KBCH OP current (HV side): OP current (LV side): OP current: 21 REF KBCH 87GT RL0 : 87GT ,RL1 : 87GT RL5 : 87GT ,RL6 : 86U :Operating vol: 21 Over fluxing (Alarm) KBCH Operating Freq: Operating time : Is : 0.4 In ( 0.4 x 5A) 22 Gen TR. S/B E/F (64ST) P 122 Time : 1.5s Operating time : Operating vol: 23 Over fluxing (TRIP) KBCH Operating Freq: Operating time : 87GTX2:86U :Inject RY voltage and reduce frequency 86U :Operating Current : 64ST RL1,2,3,4 Inject current in R2 TB1-12,13 87GTX1:Inject RY voltage and reduce frequency Inject current after bypassing stab resistance in REF input Inject current in both HV side and LV side CT input in all phase 1.0 s 100.0 V Enabled 4.0 W 1.0 s GPR RL 14 86U :30N: Check the operation of 86U by shorting the DO of MICOM relay 2.000 s Operating Freq: 86G :F<1 Setting MICOM 343 F<1 Time Delay F<2 Setting 2.000 s Operating Freq: Operating volt 30D :30S :48.50 Hz Operating volt 30C :Inject voltage and reduce the frequency

Checked on :

47.50 Hz

Inject voltage and reduce the frequency

100% St EF VN3H> 1.0 V

GT - GRP PANEL TEST FORMAT


95 deg C 24 TR Winding Temp (Alarm) MVAAM 13 Operation checked: 49AX :Operation to be checked from TR. Marshalling box

Checked on :

105 deg C 25 TR Winding Temp (Trip) MVAAM 13

Operation checked:

49T X:86U:-

Operation to be checked from TR. Marshalling box

85 deg C 26 TR Oil Temp (Alarm) MVAAM 13

Operation checked:

26AX :-

Operation to be checked from TR. Marshalling box

95 deg C 27 TR Oil Temp (Trip) MVAAM 13

Operation checked:

26TX:86U:-

Operation to be checked from TR. Marshalling box

Operation checked: 28 TR Buchholz (Alarm) MVAAM 13

63AX:-

Operation to be checked from TR. Marshalling box

Operation checked: 29 TR Buchholz (Trip) MVAAM 13

63TX:86U:-

Operation to be checked from TR. Marshalling box

Operation checked: 30 TR PRD Trip MVAAM 13

63PX:86U:-

Operation to be checked from TR. Marshalling box

Operation checked: 31 OIL Level Alarm MVAAM 13

63OLX:-

Operation to be checked from TR. Marshalling box Check operation by shorting R2 TB2- 30,31 Check operation by shorting R2 TB2- 32,33 Check operation by shorting R2 TB2- 13,14

32

MARK -V TRIP

MVAAM 11

Operation checked:

30AX1:86U:-

33

CO2 PNL TRIP

MVAAM 11

Operation checked:

30AX2: 86U:

34

DVR PNL TRIP

MVAAM 11

Operation checked:

86G :

TESTED BY :