PART 1 - GENERAL 1.01 SECTION INCLUDES A. Furnish and install in its entirety HVAC & other electrical and non electrical Control System suitable for connection to Campus wide BAS (Building Automation System) as well as suitable for local PC workstation connection, as described herein and as shown on the drawings. The Controls Contractor to base his bid on the system as specified herein. System to include all microprocessor control panels, control modules, sensors, control devices, actuators, control valves, software, handheld field programming device, interconnecting shielded wiring, trunk cable, network cables, and conduit required for a fully operational system. Control System contract to include installation, checkout, testing and commissioning by the Control Contractor.

DESCRIPTION

B.
DATE JOB/EWO

C.

REV. NO.

D.
DISCIPLINE ENGINEER

__ ________ _ DATE: ________

1.02 1.03

RELATED SECTIONS SUBMITTALS A. Submit product data for approval in accordance with General Conditions and Section 15010. Submit shop drawings of the control systems prior to installing the control devices Refer to various control diagrams, control system schematic for control system detail and software function. Each submittal shall include the following information. BAS riser diagram showing all DDC controllers, FCU / PAC controllers, various metering devices etc., routers. Provision for connection to local PC workstation and connection to campus wide BAS shall also be clearly indicated. One-line schematics and system flow diagrams showing the location of all control devices.
SECTION 15985

PROJECT ENGINEER
____________ DATE

CERTIFIED _ __________
DATE: ________

B.

CONSTRUCTION AGENCY
________________ DATE:

C.

OPERATIONS
______________ DATE:_________ REVISION CERTIFICATION EDSD VERIFICATION THIS INDICATES THAT REV. NO.________ OF THIS DRAWING IS COVERED, FOR ALL APPROVAL/CERTIFICATION REQUIREMENTS,, CONTROL NUMBER BY DRAWING COMPLETION CERTIFICATE (DCC) NO.: __________________________ By:

D.

Date:

CONSTRUCTION SPECIFICATIONS
KAUST TOWN CENTER RESIDENTIAL &

DWG. TYPE PLANT NO. INDEX

DRAWING NO.

SHT. NO. REV. NO.

DOC

COMMUNITY SUPPORT BUILDINGS RABIGH SAUDI ARABIA

K55
JOB/EWO#

VE-417361 BI-25-00002

14-Sep-07

1 OF 21

00

Saudi Aramco 2616-ENG (3/99)


OPERNS.


SAUDI ARAMCO OIL COMPANY
Points list for each DDC controller, including: Tag, Point Type, System Name, Object Name etc. Vendors own written description for each sequence of operations, to include the following: a. Sequences shall reference input/output and software parameters by name and description. The sequences of operations provided in the submittal by the controls contractor shall represent the detailed analysis needed to create actual programming code from the design documents. Points shall be referenced by name, including all software points such as programmable setpoints, range limits, time delays, and so forth. The sequence of operations shall cover normal operation and operation under the various alarm conditions applicable to that system.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

DESCRIPTION

ENGG

CERT

PMT

b.

c.
DATE JOB/EWO

d.

REV. NO.

DISCIPLINE ENGINEER

__ ________ _ DATE: ________

Detailed Bill of Material list for each panel, identifying: quantity, part number, description, and associated options. Control Damper Schedules. This spreadsheet type schedule shall include a separate line for each damper and a column for each of the damper attributes, including: Code Number, Fail Position, Damper Type, Damper Operator, Blade Type, Bearing Type, Seals, Duct Size, Damper Size, Mounting, and Actuator Type. Control Valve Schedules. This spreadsheet type schedule shall include a separate line for each valve and a column for each of the valve attributes, including: Code Number, Configuration, Fail Position, Pipe Size, Valve Size, Body Configuration, Close off Pressure, Capacity, Valve CV, Calc CV, Design Pressure, Actual Pressure, and Actuator Type. Cataloged cut sheets of all equipment used. This includes, but is not limited to, the following: DDC panels, sensors, actuators, dampers, control system components, and so forth. Range and scale information for all transmitters and sensors. This sheet shall clearly indicate each device and any applicable options. Where more than one device to be used is on a single sheet, submit two sheets, individually marked.
CONSTRUCTION SPECIFICATIONS
KAUST TOWN CENTER RESIDENTIAL &
DWG. TYPE PLANT NO. INDEX DRAWING NO.

PROJECT ENGINEER
____________ DATE

CERTIFIED _ __________
DATE: ________

CONSTRUCTION AGENCY
________________ DATE:

OPERATIONS
______________ DATE:_________ REVISION CERTIFICATION EDSD VERIFICATION THIS INDICATES THAT REV. NO.________ OF THIS DRAWING IS COVERED, FOR ALL APPROVAL/CERTIFICATION REQUIREMENTS,, CONTROL NUMBER BY DRAWING COMPLETION CERTIFICATE (DCC) NO.: __________________________ By:

Date:

SECTION 15985
SHT. NO. REV. NO.

DOC

COMMUNITY SUPPORT BUILDINGS RABIGH SAUDI ARABIA

K55
JOB/EWO#

VE-417361 BI-25-00002

14-Sep-07

2 OF 21

00

Saudi Aramco 2616-ENG (3/99)


OPERNS.


SAUDI ARAMCO OIL COMPANY
Training course outlines for each four-hour session. E. Controls Contractor shall not order material or begin fabrication or field installation until receiving authorization to proceed in the form of an approved submittal. Controls Contractor shall be solely responsible for the removal and replacement of any item not approved by submittal at no cost to the Owner. O&M Manuals 1. Submit three sets of each manual. a. Include the following documentation in the Hardware Manual: i. General description and cut sheets for all components. Detailed wiring and installation illustrations and complete calibration procedures for each field and panel device. Complete trouble-shooting guidelines. procedures and
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

ENGG

CERT

PMT

DATE JOB/EWO

DESCRIPTION

F.

ii.

REV. NO.

DISCIPLINE ENGINEER

iii.

__ ________ _ DATE: ________

PROJECT ENGINEER
____________ DATE

iv. v.

Complete operating instructions for all systems. Maintenance Instructions: Document all maintenance and repair/replacement procedures.

CERTIFIED _ __________
DATE: ________

b.

CONSTRUCTION AGENCY
________________ DATE:

Include the following documentation in the DDC Software Manual: i. ii. iii. Sequence of Operations Flow Chart Diagrams of Programming Objects. Software Point Name Abbreviation List.. Include Name, Description, Controller Where Located, Point Type and Point ID. I/O Point List. Include Point Name, Controller Location, Point Number, Control Device, Range and Span.

OPERATIONS
______________ DATE:_________ REVISION CERTIFICATION EDSD VERIFICATION THIS INDICATES THAT REV. NO.________ OF THIS DRAWING IS COVERED, FOR ALL APPROVAL/CERTIFICATION REQUIREMENTS,, CONTROL NUMBER BY DRAWING COMPLETION CERTIFICATE (DCC) NO.: __________________________ By:

Date:

iv.

SECTION 15985

CONSTRUCTION SPECIFICATIONS
KAUST TOWN CENTER RESIDENTIAL &

DWG. TYPE PLANT NO. INDEX

DRAWING NO.

SHT. NO. REV. NO.

DOC

COMMUNITY SUPPORT BUILDINGS RABIGH SAUDI ARABIA

K55
JOB/EWO#

VE-417361 BI-25-00002

14-Sep-07

3 OF 21

00

Saudi Aramco 2616-ENG (3/99)


OPERNS.


SAUDI ARAMCO OIL COMPANY
v. Index of all DDC point names with documentation manual page number references.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

CERT

PMT

c. Provide three copies of all manufacturers manuals covering the installed system. This shall include, as a minimum: i. System Engineering Manual System Installation Manual Engineering and Troubleshooting Bulletins All other pertinent manuals published by the control system manufacturer.

DESCRIPTION

ENGG

ii. iii. iv.

DATE JOB/EWO

2.

All manuals shall be provided in hard copy format and also in electronic format. Record Drawings

3. 1.04 WARRANTY A.

REV. NO.

DISCIPLINE ENGINEER

__ ________ _ DATE: ________

PROJECT ENGINEER
____________ DATE

At completion of final test of installation and acceptance by SAUDI ARAMCO, provide any service incidental to proper performance of control system for a period of one year. Control system herein specified to be free from defects in workmanship and material under normal use and service. The Control system herein specified shall be fully integrated and installed as a complete package by the controls Contractor. The System shall include all wiring, piping, installation supervision, calibration, adjustments, and checkout necessary for a complete and fully operational system. If within one year from date of acceptance by SAUDI ARAMCO any equipment or software herein described is proven to be defective in workmanship or material, it is to be replaced or repaired free of charge to SAUDI ARAMCO. The guarantee period not to start until sequence of operation per control diagrams and sequence of operation has been demonstrated to SAUDI ARAMCO representative and certified as acceptable to SAUDI ARAMCO. During the warranty period, if a service contract for the routine care, calibration, parts replacement, or upgrade of the system is required or
DWG. TYPE PLANT NO. INDEX DRAWING NO.

B.

CERTIFIED _ __________
DATE: ________

C.

CONSTRUCTION AGENCY
________________ DATE:

OPERATIONS
______________ DATE:_________ REVISION CERTIFICATION EDSD VERIFICATION THIS INDICATES THAT REV. NO.________ OF THIS DRAWING IS COVERED, FOR ALL APPROVAL/CERTIFICATION REQUIREMENTS,, CONTROL NUMBER BY DRAWING COMPLETION CERTIFICATE (DCC) NO.: __________________________ By:

D.

Date:

E.

F.

SECTION 15985
SHT. NO. REV. NO.

CONSTRUCTION SPECIFICATIONS
KAUST TOWN CENTER RESIDENTIAL &

DOC

COMMUNITY SUPPORT BUILDINGS RABIGH SAUDI ARABIA

K55
JOB/EWO#

VE-417361 BI-25-00002

14-Sep-07

4 OF 21

00

Saudi Aramco 2616-ENG (3/99)


OPERNS.


SAUDI ARAMCO OIL COMPANY
recommended by the manufacturer, or such a contract is to be offered to SAUDI ARAMCO during or after the warranty period, such contract and services shall also be included during the warranty period at no cost to SAUDI ARAMCO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

ENGG

CERT

PMT

1.05

TRAINING The Controls contractor shall conduct training courses for the maintenance personnel for a period of two weeks.

DESCRIPTION

1.06

TECHNICAL PROPOSAL A. It is the intent of this specification to describe the performance requirements of the system. The bidder shall submit at bid due date a technical proposal to establish that both the system design and the bidders qualifications meet the performance requirements of this specification . Proposal Content 1. A section by section listing of clarifications and exceptions taken to these specifications.

DATE JOB/EWO

B.

REV. NO.

DISCIPLINE ENGINEER

C.

__ ________ _ DATE: ________

Identification by the manufacturers part number of the individual controllers to be provided. 1. 2. Proposed Riser Diagram Product information sheets for each model of controller identified on the Riser Diagram Specific printed product information detailing the operator workstation hardware and software. Location of the controls Contractors branch office that would perform both routine maintenance and emergency repair services. Prior project list of at least five projects of similar size, scope and complexity, which have been completed and accepted by the Owner. Include; Project Name, Project Owner, Project Address, Contact Name, Contact Phone Number and a brief description of the system.

PROJECT ENGINEER
____________ DATE

CERTIFIED _ __________
DATE: ________

3.

CONSTRUCTION AGENCY
________________ DATE:

4.

OPERATIONS
______________ DATE:_________ REVISION CERTIFICATION EDSD VERIFICATION THIS INDICATES THAT REV. NO.________ OF THIS DRAWING IS COVERED, FOR ALL APPROVAL/CERTIFICATION REQUIREMENTS,, CONTROL NUMBER BY DRAWING COMPLETION CERTIFICATE (DCC) NO.: __________________________ By:

5.

Date:

PART 02 - PRODUCTS 2.01 GENERAL


SECTION 15985
DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.

CONSTRUCTION SPECIFICATIONS
KAUST TOWN CENTER RESIDENTIAL &

DOC

COMMUNITY SUPPORT BUILDINGS RABIGH SAUDI ARABIA

K55
JOB/EWO#

VE-417361 BI-25-00002

14-Sep-07

5 OF 21

00

Saudi Aramco 2616-ENG (3/99)


OPERNS.


SAUDI ARAMCO OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

PMT

ENGG

The BAS architecture shall consist of the products of a manufacturer regularly engaged in the production of BAS, and shall be the manufacturers latest standard of design. Control modules and DDC (Direct Digital Control) system components shall be current production products. 2.02 ACCEPTABLE MANUFACTURERS A. B. C. D. 2.03 TAC - controls. Siemens. Honeywell. Or Approved equal.

DESCRIPTION

CERT

CONTROLS CONTRACTOR A. The Controls Contractor to have an office within 100 km of project. The Controls Contractor to have been in the control business for a minimum of 5 years and have a proven track record for similar projects.

DATE JOB/EWO

B.

REV. NO.

2.04

EQUIPMENT A. Hardware Components. 1. Remote processing and local control panels capable of standalone operation and control as required. All local control panels shall be compatible with BACnet protocol for network communication. Auxiliary Field Sensing Devices. Interconnecting control cables between various controllers and up to necessary Routers. Shielded wiring and conduit to all sensors and controllers. Provide 2 weeks training to the Saudi Aramco operation personnel for system operation trouble shooting, solving control related problems & maintenance.

DISCIPLINE ENGINEER

__ ________ _ DATE: ________

PROJECT ENGINEER
____________ DATE

CERTIFIED _ __________
DATE: ________

2. 3.

CONSTRUCTION AGENCY
________________ DATE:

4. 5.

OPERATIONS
______________ DATE:_________ REVISION CERTIFICATION EDSD VERIFICATION THIS INDICATES THAT REV. NO.________ OF THIS DRAWING IS COVERED, FOR ALL APPROVAL/CERTIFICATION REQUIREMENTS,, CONTROL NUMBER BY DRAWING COMPLETION CERTIFICATE (DCC) NO.: __________________________ By:

Date:

2.05

System Architecture A. Campus wide network: 1. The proposed control system shall be networked between various controllers and necessary Routers, so that the system will be
SECTION 15985

CONSTRUCTION SPECIFICATIONS
KAUST TOWN CENTER RESIDENTIAL &

DWG. TYPE PLANT NO. INDEX

DRAWING NO.

SHT. NO. REV. NO.

DOC

COMMUNITY SUPPORT BUILDINGS RABIGH SAUDI ARABIA

K55
JOB/EWO#

VE-417361 BI-25-00002

14-Sep-07

6 OF 21

00

Saudi Aramco 2616-ENG (3/99)


OPERNS.


SAUDI ARAMCO OIL COMPANY
suitable for Local PC work station connection through BACnet as well as suitable for connection to campus wide BAS network through BACnet. Refer to the BAS system schematic drawings. B. Building level network: 1. All the various controllers, VFDs, FCU contollers, PAC controllers, BTU meters, energy meters and other contollers reside in this network. This network shall be based on BACnet. Refer to the BAS schematic drawings. All contollers in the network shall work as a standalone system for the building operation irrespective of any connection to the campus wide network. Each of the controllers in this network shall also be suitable for standalone operation and shall perform the required function as enumerated in the control drawings irrespective of any network connections.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

DESCRIPTION

ENGG

CERT

PMT

2.
DATE JOB/EWO

2.06

BAS System Features: The BAS shall be:

REV. NO.

DISCIPLINE ENGINEER

__ ________ _ DATE: ________

Capable of multiple man-machine interface points throughout the BAS network. Capable of unattended operation with manual interaction. Programmable by a trained operator. Monitored for system integrity. Web accessible. BACnet compliant and tested. 2.07 PORTABLE OPERATOR TERMINAL 1. Manufacturers shall provide their standard portable terminals and shall submit technical data sheets for the terminal and all associated software and hardware. Software a. Portable operator terminals shall support all controllers within the system on a direct-connect communications basis. When used to access controllers, the portable operator terminal shall utilize the standard operator workstation software in compliance to BACnet.
SECTION 15985
DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.

PROJECT ENGINEER
____________ DATE

CERTIFIED _ __________
DATE: ________

CONSTRUCTION AGENCY
________________ DATE:

OPERATIONS
______________ DATE:_________ REVISION CERTIFICATION EDSD VERIFICATION THIS INDICATES THAT REV. NO.________ OF THIS DRAWING IS COVERED, FOR ALL APPROVAL/CERTIFICATION REQUIREMENTS,, CONTROL NUMBER BY DRAWING COMPLETION CERTIFICATE (DCC) NO.: __________________________ By:

2.

Date:

b.

CONSTRUCTION SPECIFICATIONS
KAUST TOWN CENTER RESIDENTIAL &

DOC

COMMUNITY SUPPORT BUILDINGS RABIGH SAUDI ARABIA

K55
JOB/EWO#

VE-417361 BI-25-00002

14-Sep-07

7 OF 21

00

Saudi Aramco 2616-ENG (3/99)


OPERNS.


SAUDI ARAMCO OIL COMPANY
c. When used to access Application Specific Controllers, the portable operator terminal shall utilize either the standard operator workstation software or controllerspecific utility software. i. At a minimum, controller-specific utility software shall allow for monitoring/configuring of the following: View/modify all Point Values. View/modify values. all software parameter
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

DESCRIPTION

ENGG

CERT

PMT

DATE JOB/EWO

View/configure alarms. View/configure historical data trending. View/modify schedules. Security. System commissioning. Upload / download / modify controller programs and database information.

REV. NO.

DISCIPLINE ENGINEER

__ ________ _ DATE: ________

PROJECT ENGINEER
____________ DATE

CERTIFIED _ __________
DATE: ________

2.08

DDC / FCU / PAC CONTROLLERS A. DDC Controllers 1. Each DDC controller shall operate as a standalone controller capable of performing its specified control responsibilities independently of other controllers in the network. Each DDC controller shall be a microprocessor-based, multi-tasking, realtime digital control processor Each DDC controller shall have sufficient memory to support its own operating system and databases, including: Control Processes Energy Management Applications Operator I/O (Portable Service Terminal)
SECTION 15985

CONSTRUCTION AGENCY
________________ DATE:

OPERATIONS
______________ DATE:_________ REVISION CERTIFICATION EDSD VERIFICATION THIS INDICATES THAT REV. NO.________ OF THIS DRAWING IS COVERED, FOR ALL APPROVAL/CERTIFICATION REQUIREMENTS,, CONTROL NUMBER BY DRAWING COMPLETION CERTIFICATE (DCC) NO.: __________________________ By:

2.

Date:

CONSTRUCTION SPECIFICATIONS
KAUST TOWN CENTER RESIDENTIAL &

DWG. TYPE PLANT NO. INDEX

DRAWING NO.

SHT. NO. REV. NO.

DOC

COMMUNITY SUPPORT BUILDINGS RABIGH SAUDI ARABIA

K55
JOB/EWO#

VE-417361 BI-25-00002

14-Sep-07

8 OF 21

00

Saudi Aramco 2616-ENG (3/99)


OPERNS.


SAUDI ARAMCO OIL COMPANY
3. Point types Each DDC controller shall support the following types of point inputs and outputs: a. Analog inputs shall monitor the following analog signals: 4-20 mA Sensors 0-10 VDC Sensors Temperature sensor inputs.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

DESCRIPTION

ENGG

CERT

PMT

b.

Binary inputs shall monitor dry contact closures. Input shall provide filtering to eliminate false signals resulting from input bouncing. Counter inputs shall monitor dry contact pulses with an input resolution of one HZ minimum. Analog outputs shall provide the following control outputs: 4.20 mA Sink or Source 0-10 VDC

DATE JOB/EWO

c.

d.

REV. NO.

DISCIPLINE ENGINEER

__ ________ _ DATE: ________

PROJECT ENGINEER
____________ DATE

e.

Binary outputs shall provide SPDT output contacts rated for 2 amps at 24 VAC. TriState outputs shall be paired binary outputs for use as Power Close/Power Open control output contacts rated for 2 amps at 24 VAC.

CERTIFIED

f.
_ __________
DATE: ________

CONSTRUCTION AGENCY
________________ DATE:

4.

OPERATIONS
______________ DATE:_________ REVISION CERTIFICATION EDSD VERIFICATION THIS INDICATES THAT REV. NO.________ OF THIS DRAWING IS COVERED, FOR ALL APPROVAL/CERTIFICATION REQUIREMENTS,, CONTROL NUMBER BY DRAWING COMPLETION CERTIFICATE (DCC) NO.: __________________________ By:

DDC controllers shall have a library of control routines and program logic to perform the sequence of operations specified in the drawings. DDC controllers shall directly support the temporary use of a portable service terminal that can be connected to the controller via zone temperature or directly at the controller. Powerfail Protection All system setpoints, proportional bands, control algorithms, and any other programmable parameters shall be stored such that a power failure of any duration does not necessitate reprogramming the DDC.

5.

Date:

6.

SECTION 15985

CONSTRUCTION SPECIFICATIONS
KAUST TOWN CENTER RESIDENTIAL &

DWG. TYPE PLANT NO. INDEX

DRAWING NO.

SHT. NO. REV. NO.

DOC

COMMUNITY SUPPORT BUILDINGS RABIGH SAUDI ARABIA

K55
JOB/EWO#

VE-417361 BI-25-00002

14-Sep-07

9 OF 21

00

Saudi Aramco 2616-ENG (3/99)


OPERNS.


SAUDI ARAMCO OIL COMPANY
7. The hand-off-auto switch provided in the DDC control panels shall be supervised by the DDC controller to report whether the switch is in off or manual override mode or in auto mode. The FCU controllers and PAC controllers shall be standard controller with all programmable features suitable for operation of FCU and PAC units. These controllers shall be BACnet compliant and shall be suitable for seamless networking using BACnet.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

ENGG

CERT

PMT

8.

DESCRIPTION

2.09

BTU METER. The BTU meter shall be suitable to provide highly accurate thermal energy measurement in chilled water and hot water systems. The measurement shall be based on input from two matched temperature sensors and insertion type flow meters all by BTU meter manufactuer. The meter shall provide energy, flow and temperature data on a local alphanumeric display and shall be suitable for communication via BACnet protocol. The BTU meter shall be ONICON system-10 or approved equal.

REV. NO.

DATE JOB/EWO

2.10

ENERGY METER. Energy meter shall be suitable for the measurement of the following: KVA KW KWH Voltage by Phase Current by Phase Power Factor Energy meter shall complete with necessary CTs and shall be provided with alphanumeric display to display the above mentioned data. Energy meter shall also be suitable for network through BACnet protocol.

DISCIPLINE ENGINEER

__ ________ _ DATE: ________

PROJECT ENGINEER
____________ DATE

CERTIFIED _ __________
DATE: ________

CONSTRUCTION AGENCY
________________ DATE:

OPERATIONS
______________ DATE:_________ REVISION CERTIFICATION EDSD VERIFICATION THIS INDICATES THAT REV. NO.________ OF THIS DRAWING IS COVERED, FOR ALL APPROVAL/CERTIFICATION REQUIREMENTS,, CONTROL NUMBER BY DRAWING COMPLETION CERTIFICATE (DCC) NO.: __________________________ By:

2.11
Date:

ELECTRONIC DATA INPUTS AND OUTPUTS A. Input/output sensors and devices shall be closely matched to the requirements of the remote panel for accurate, responsive, noise-free signal input/output. Control input response shall be high sensitivity and matched to the loop gain requirements for precise and responsive control. Use no actuators or any device which introduces dead time into the control loop.
SECTION 15985

CONSTRUCTION SPECIFICATIONS
KAUST TOWN CENTER RESIDENTIAL &

DWG. TYPE PLANT NO. INDEX

DRAWING NO.

SHT. NO. REV. NO.

DOC

COMMUNITY SUPPORT BUILDINGS RABIGH SAUDI ARABIA

K55
JOB/EWO#

VE-417361 BI-25-00002

14-Sep-07

10 OF 21

00

Saudi Aramco 2616-ENG (3/99)


OPERNS.


SAUDI ARAMCO OIL COMPANY
The HVAC Control Diagrams indicate all digital and analog inputs and outputs. All signal producing inputs into DDC system will be provided by this section. All final element devices controlled by DDC controllers will be supplied under this section. All sensors and devices installed indoor shall be provided with NEMA-1 enclosure and outdoor shall be provided with NEMA-4 enclosure. B. Thermostats & temperature sensors shall be Resistance Temperature Device with suitable analog output. 1. Space thermostats shall have set point adjustment. All thermostats shall have pin jack for connection to the portable operator terminal to adjust VAV airflow as well as to communicate with building network as well as BAS system. Duct temperature sensors shall be multi-sampling averaging type, to guarantee specified accuracy. Water sensors shall be provided with a separable stainless steel well, either type with 4-20mA output. All temperature measurement devices (transducers) shall have + or - 1.0 degrees F accuracy between 32 degrees and 212 degrees, which includes combined affects of conformity, hysteresis and dead band of calibrated span.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

DESCRIPTION

ENGG

CERT

PMT

2.
DATE JOB/EWO

REV. NO.

3.

DISCIPLINE ENGINEER

__ ________ _ DATE: ________

PROJECT ENGINEER
____________ DATE

C.

Humidity Sensors 1. The sensor shall be a solid state type, relative humidity sensor of the Bulk Polymer Design. The sensor element shall resist service contamination. The humidity transmitter shall be equipped with non-interactive span and zero adjustments, a 2-wire isolated loop powered, 420 mA, 0-100% linear proportional output. Outside air relative humidity sensors shall be installed with a rain proof, perforated cover. Duct type sensing probes shall be constructed of 304 stainless steel or other corrosion resistant materials, and shall be equipped with a neoprene grommet, bushings, and a mounting bracket.

CERTIFIED _ __________
DATE: ________

CONSTRUCTION AGENCY
________________ DATE:

2.

OPERATIONS
______________ DATE:_________ REVISION CERTIFICATION EDSD VERIFICATION THIS INDICATES THAT REV. NO.________ OF THIS DRAWING IS COVERED, FOR ALL APPROVAL/CERTIFICATION REQUIREMENTS,, CONTROL NUMBER BY DRAWING COMPLETION CERTIFICATE (DCC) NO.: __________________________ By:

3.

4.
Date:

E.

Water flow analog sensors shall be provided complete with flow element and shall be an all solid state precision industrial type with stainlesssteel meter body, maximum error of no more than .5% of span, and 4 to
SECTION 15985

CONSTRUCTION SPECIFICATIONS
KAUST TOWN CENTER RESIDENTIAL &

DWG. TYPE PLANT NO. INDEX

DRAWING NO.

SHT. NO. REV. NO.

DOC

COMMUNITY SUPPORT BUILDINGS RABIGH SAUDI ARABIA

K55
JOB/EWO#

VE-417361 BI-25-00002

14-Sep-07

11 OF 21

00

Saudi Aramco 2616-ENG (3/99)


OPERNS.


SAUDI ARAMCO OIL COMPANY
20 ma output. Sensor shall be rated for 250 psi minimum and installed in strict accordance to the manufacturer's instructions. F. Differential switches: Fan proof-of-flow switches shall be adjustable set point and differential pressure type. Switches shall be piped to fan discharge except where fans operate at less than one inch WC, they shall be piped across the fan. For fractional horsepower and non-ducted fans, current switches shall be used. Maximum pressure rating shall be at least 6 inches WC. Duct air flow, filter differential and duct static pressure analog transducers. Absolute pressure or differential pressure transmitters/transducers required for system or duct static pressure measurement. Maximum pressure design for transmitter pressure range is 0-8" w.c. Elevated zero adjustment permissible to obtain the following spans. Accuracy includes combined effects of conformity, hysteresis, dead band and repeatability only variable reluctance or capacitance transducers can be used. 0-1" w.c. at + 1.5% of span 0-2" w.c. at + 1.5% of span 0-3" w.c. at + 1.5% of span 0-4" w.c. at + 1.5% of span Electronic transducer output: 4-20 mA to correspond to above span calibrations, and will be in accordance with ISA-S50.1/ANSI:MC12. Minimum safe working pressure 6" W.C. SWP. Differential pressure transmitters/transducers required for velocity pressure measurement. Maximum pressure design for transmitter range is 2" w.c. differential with zero elevation acceptable to attain the recalibrated spans required. Accuracy includes combined effects of conformity, hysteresis, dead band and repeatability. Only variable reluctance or capacitance transducers can be used. 0-0.1" w.c. at + 0.5% of span (1200 FPM) 0-0.25" w.c. at + 1% of span (2000 FPM) 0-0.50" w.c. at + 1% of span (2500 FPM) Electronic transducer output: 4-20 mA. to correspond to above span calibrations, and will be in accordance with ISA-S50.0/ANSI:MC12. Minimum safe working pressure: 6" w.c. SWP. I. Duct static pressure or filter pressure elements, insertion probes shall be bullet-nose shaped per detailed radius as illustrated in latest
DWG. TYPE PLANT NO. INDEX DRAWING NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

DESCRIPTION

ENGG

CERT

PMT

F.

REV. NO.

DATE JOB/EWO

DISCIPLINE ENGINEER

__ ________ _ DATE: ________

PROJECT ENGINEER
____________ DATE

CERTIFIED _ __________
DATE: ________

CONSTRUCTION AGENCY
________________ DATE:

OPERATIONS
______________ DATE:_________ REVISION CERTIFICATION EDSD VERIFICATION THIS INDICATES THAT REV. NO.________ OF THIS DRAWING IS COVERED, FOR ALL APPROVAL/CERTIFICATION REQUIREMENTS,, CONTROL NUMBER BY DRAWING COMPLETION CERTIFICATE (DCC) NO.: __________________________ By:

Date:

SECTION 15985
SHT. NO. REV. NO.

CONSTRUCTION SPECIFICATIONS
KAUST TOWN CENTER RESIDENTIAL &

DOC

COMMUNITY SUPPORT BUILDINGS RABIGH SAUDI ARABIA

K55
JOB/EWO#

VE-417361 BI-25-00002

14-Sep-07

12 OF 21

00

Saudi Aramco 2616-ENG (3/99)


OPERNS.


SAUDI ARAMCO OIL COMPANY
Industrial Ventilation Manual. Probe distance from duct wall will be selected far enough into process stream to be able to reject surface wall effects. Material to be either copper for standard applications or 316 S.STL for exhaust applications, flanged duct connection with compression to be fitting connection.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

ENGG

CERT

PMT

J.
DESCRIPTION

Duct Air flow measuring station: 1. Each device shall be designed and built to comply with, and provide results in accordance with, accepted practice as defined for system testing in the ASHRAE Handbook of fundamentals, as well as in the Industrial Ventilation Handbook. Airflow measuring stations shall be fabricated of galvanized steel welded casing with 90 Deg. connecting flanges in configuration and size equal to that of the duct into which it is mounted. Each station shall be complete with an air directionalizer and parallel cell profile suppressor (3/4 maximum cell) across the entering air stream and mechanically fastened to the casing in such a way to withstand velocities up to 6000 feet per minute. This air directionalizer and parallel cell honeycomb suppressor shall provide 98% free area, equalize the velocity profile, and eliminate turbulent and rotational flow from the air stream prior to the measuring point. The total pressure measurement side (high side) will be designed and spaced to the Industrial Ventilation Manual. The static pressure sensing probes (low side) shall be bulletnosed shaped, per detailed radius, as illustrated in Industrial Ventilation Manual. The main take-off point from both the total pressure and the static pressure manifolds must be symmetrical. Total and static pressure manifolds shall terminate with external ports for connection to control tubing. An identification label shall be placed on each unit casing, listing model number, size, area, and specified airflow capacity.

2.
DATE JOB/EWO REV. NO.

DISCIPLINE ENGINEER

__ ________ _ DATE: ________

PROJECT ENGINEER
____________ DATE

3.

CERTIFIED _ __________
DATE: ________

4.

CONSTRUCTION AGENCY
________________ DATE:

5.

OPERATIONS
______________ DATE:_________ REVISION CERTIFICATION EDSD VERIFICATION THIS INDICATES THAT REV. NO.________ OF THIS DRAWING IS COVERED, FOR ALL APPROVAL/CERTIFICATION REQUIREMENTS,, CONTROL NUMBER BY DRAWING COMPLETION CERTIFICATE (DCC) NO.: __________________________ By:

6.

Date:

7. Installation Considerations The maximum allowable pressure loss through the Flow and Static Pressure elements shall not exceed .065 w.c. at 1000 feet per minute, or .23 w.c. at 2000 feet per minute. Each unit shall measure the airflow rate within an accuracy of plus 2% as determined by U.S. GSA
SECTION 15985

CONSTRUCTION SPECIFICATIONS
KAUST TOWN CENTER RESIDENTIAL &

DWG. TYPE PLANT NO. INDEX

DRAWING NO.

SHT. NO. REV. NO.

DOC

COMMUNITY SUPPORT BUILDINGS RABIGH SAUDI ARABIA

K55
JOB/EWO#

VE-417361 BI-25-00002

14-Sep-07

13 OF 21

00

Saudi Aramco 2616-ENG (3/99)


OPERNS.


SAUDI ARAMCO OIL COMPANY
certification tests, and shall contain a minimum of one total pressure sensor per 36 square inches of unit measuring area. The units shall have a self-generated sound rating of less than NC40, and the sound level within the duct shall not be amplified nor shall additional sound be generated. Where the stations are installed in insulated ducts, the airflow passage of the station shall be the same size as the inside airflow dimension of the duct. Station flanges shall be two inch to three inch to facilitate matching connecting ductwork. K. Valve/Damper Actuators. 1. Construction: Interior building Nema 1, exterior building Nema 4 enclosure. Casing to withstand non-condensing moisture. Direct drive actuators matching final element (such as damper or valves) motion is desirable, if direct linkage is used, hysteresis must be analyzed to guarantee minimum effect to control. Use only D.C. motor servo with current overload protection or reduced power at all angles of rotation or thrust. Limit switch protection is not acceptable. Position feedback via potentiometer will contribute no more than + .005 hysteresis. Input signals 0-10VDC, four (4) wire 24 VAC or DC power supply. 60,000 life cycle testing under full load with stall in each direction. As manufactured by Belimo or approved equal.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

DATE JOB/EWO

DESCRIPTION

ENGG

CERT

PMT

2. 3.

REV. NO.

DISCIPLINE ENGINEER

4.

__ ________ _ DATE: ________

PROJECT ENGINEER
____________ DATE

5.

CERTIFIED _ __________
DATE: ________

6.

CONSTRUCTION AGENCY
________________ DATE:

7.

OPERATIONS
______________ DATE:_________ REVISION CERTIFICATION EDSD VERIFICATION THIS INDICATES THAT REV. NO.________ OF THIS DRAWING IS COVERED, FOR ALL APPROVAL/CERTIFICATION REQUIREMENTS,, CONTROL NUMBER BY DRAWING COMPLETION CERTIFICATE (DCC) NO.: __________________________ By:

8.

L.
Date:

Automatic control valves. Refer to specification section 15510.

M.

Pressure Switches: Devices shall be 150 PSIG rated except for chilled which shall be rated at 300 psig. Switch shall be fully adjustable throughout out its range with a 5 amp SPDT contact, 1/2" NPT connection.
SECTION 15985

CONSTRUCTION SPECIFICATIONS
KAUST TOWN CENTER RESIDENTIAL &

DWG. TYPE PLANT NO. INDEX

DRAWING NO.

SHT. NO. REV. NO.

DOC

COMMUNITY SUPPORT BUILDINGS RABIGH SAUDI ARABIA

K55
JOB/EWO#

VE-417361 BI-25-00002

14-Sep-07

14 OF 21

00

Saudi Aramco 2616-ENG (3/99)


OPERNS.


SAUDI ARAMCO OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

PMT

CERT

N.

Local Control Panels. 1. Supplier shall furnish as necessary all mounting screws, studs, nuts and all other materials not specified but required to make complete control panels. All fasteners to be non-ferris cadmium plated. Use lock washers on all fasteners. Power and logic wiring will conform to the latest NEC Code and recommended practices ISA-RP60.08. Markers to be permanent and visible. Color code of wiring to conform to the ISA engineering standard. Wire to be 18 AWG stranded type TW or THW, 600 volt. Use non-insulated spade terminals throughout. All electronic 4-20 mA internal signal wires will be single pair twisted and shielded cables. Ground shields on one end only. All signal cables will be segregated from power wiring. Cable coding will be per NEMA WC30-1976. ANSI:C39.5-1974 will be applied to conform to standard safety requirements for electrical and electronic measuring and controlling instrumentation. The basic construction of the panel will utilize a single door NEMA 12 enclosure, surface mounting. The left hand hinged door with key locking latch will be permanently mounted on a full piano hinge. The enclosure will be made of 14 gauge steel with welded, ground and polished seams. A removable internal panel board on a 1/2" riser. The control panel will conform to NEMA:ICS6-1978 and NEMA:PB1-1977 standards for Panel Boards. The exterior of the panel will be painted with an acrylic enamel per ANSI standard Z53.1. The panel exterior will be painted Industrial Electrical Cabinet Gray. The interior of the panel will be painted with high gloss acrylic white enamel. Front face name plates will be lamicoid plastic with white surface with black core. These name plates will be installed using approved polyurethane adhesive foam-black tape. Name plates will be further fastened with chromium or cadmium plated fasteners screw or driven type. All other instruments will have non paper legend designated name plates. Bulk head fittings to be permanently labeled and visible after all work is completed. name plate sizes and engraving layout to conform to NEC and ISA RP60.6. Completed panel will be tested to ISA-RP60.10 standard. Upon completion and testing, the control panels should be ready for shipping. All moveable instruments and equipment should be
DWG. TYPE PLANT NO. INDEX DRAWING NO.

ENGG

DESCRIPTION

2.

3.
DATE JOB/EWO REV. NO.

4.

DISCIPLINE ENGINEER

__ ________ _ DATE: ________

PROJECT ENGINEER
____________ DATE

CERTIFIED _ __________
DATE: ________

5.

CONSTRUCTION AGENCY
________________ DATE:

6.

OPERATIONS
______________ DATE:_________ REVISION CERTIFICATION EDSD VERIFICATION THIS INDICATES THAT REV. NO.________ OF THIS DRAWING IS COVERED, FOR ALL APPROVAL/CERTIFICATION REQUIREMENTS,, CONTROL NUMBER BY DRAWING COMPLETION CERTIFICATE (DCC) NO.: __________________________ By:

Date:

7. 8.

SECTION 15985
SHT. NO. REV. NO.

CONSTRUCTION SPECIFICATIONS
KAUST TOWN CENTER RESIDENTIAL &

DOC

COMMUNITY SUPPORT BUILDINGS RABIGH SAUDI ARABIA

K55
JOB/EWO#

VE-417361 BI-25-00002

14-Sep-07

15 OF 21

00

Saudi Aramco 2616-ENG (3/99)


OPERNS.


SAUDI ARAMCO OIL COMPANY
secured. All delicate equipment such as meters, plug-in relays and components should all be separately packaged items, carefully marked to insure proper installation in the field. Collect and package all vendor's supplied information such as chart and instructions which will be shipped with the control panel. The panel should be wrapped and crated for outdoor storage and complete protection during handling and shipping. Shipping, crating and handling procedures for control panels should follow ISA standard RP60.11.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

DESCRIPTION

ENGG

CERT

PMT

2.12

WIRING A. B. Sensors: All wiring to be shielded minimum # 18 AWG. Communication Trunk: Control manufacturers Standard. Rigid Galvanized Conduit: 1. Provide and install rigid galvanized steel conduit associated couplings, connectors, and fittings as manufactured by Thomas and Betts Corp. or approved equal. Provide flex conduit for branch circuits exposed below 6 feet. Provide rigid conduit for all wiring where routed in or through a return plenum. Minimum 1/2 inch size.

REV. NO.

DATE JOB/EWO

C.

2.
DISCIPLINE ENGINEER

__ ________ _ DATE: ________

3.

PROJECT ENGINEER
____________ DATE

4. 2.13

CERTIFIED _ __________
DATE: ________

SYSTEM SOFTWARE A. The Controls Contractor to be required to furnish the standard software functions and any custom functions, program the local control panels and test the operation of every control loop before the components are shipped to the project. A letter certifying that the system is ready for inspection to be submitted before the control system is shipped to the field. The SAUDI ARAMCO Representative may choose to witness proper operation of each control loop prior to shipping from the Controls Contractor's point of fabrication. The Controls Contractor to provide a means of simulating every input to the system for debugging the software. Prior to shipping of the completely pre-wired, the debugged software to be transmitted to the Engineer for written approval before the system is shipped.
DWG. TYPE PLANT NO. INDEX DRAWING NO.

CONSTRUCTION AGENCY
________________ DATE:

OPERATIONS
______________ DATE:_________ REVISION CERTIFICATION EDSD VERIFICATION THIS INDICATES THAT REV. NO.________ OF THIS DRAWING IS COVERED, FOR ALL APPROVAL/CERTIFICATION REQUIREMENTS,, CONTROL NUMBER BY DRAWING COMPLETION CERTIFICATE (DCC) NO.: __________________________ By:

B.

C.

Date:

D.

E.

SECTION 15985
SHT. NO. REV. NO.

CONSTRUCTION SPECIFICATIONS
KAUST TOWN CENTER RESIDENTIAL &

DOC

COMMUNITY SUPPORT BUILDINGS RABIGH SAUDI ARABIA

K55
JOB/EWO#

VE-417361 BI-25-00002

14-Sep-07

16 OF 21

00

Saudi Aramco 2616-ENG (3/99)


OPERNS.


SAUDI ARAMCO OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

PMT

ENGG

CERT

F.

After all field connections have been made, the SAUDI ARAMCO Representative to be notified and the control system to be energized. Any required reloading of the software to be performed and start up of the mechanical system and automatic control system to commence. The Controls Contractor to be responsible for all necessary revisions to the software to provide a complete and workable system consistent with the letter and intent of the specifications and process and instrumentation diagram. Any software upgrading during the first year of operation is the responsibility of the controls Contractor. The software required to provide the initial operating routine to not consume more than 60 percent of the memory capability of the Controller. Software programs to include the following: 1. 2. 3. 4. 5. On-off summary of all systems. Manual two-state and three-state switching. Analog display of selected points on central microcomputer. Analog limit capability with fully adjustable limits. Manual and automatic set point adjustment of designated points on the point summary. Scheduled and optimum start/stop control of motors and systems as indicated on the point summary., Totalization programs. Trend logging. English language user interface. Message outputs. Direct Digital Control (DDC) of discharge air temperature with reset at designated control points on each air handler. Start/stop control of indicated lighting in the building and outdoor lighting.
SECTION 15985

G.

H.
DESCRIPTION

I.

J.
DATE JOB/EWO

K.

REV. NO.

DISCIPLINE ENGINEER

__ ________ _ DATE: ________

PROJECT ENGINEER
____________ DATE

CERTIFIED _ __________
DATE: ________

6.

CONSTRUCTION AGENCY
________________ DATE:

7. 8. 9. 10.

OPERATIONS
______________ DATE:_________ REVISION CERTIFICATION EDSD VERIFICATION THIS INDICATES THAT REV. NO.________ OF THIS DRAWING IS COVERED, FOR ALL APPROVAL/CERTIFICATION REQUIREMENTS,, CONTROL NUMBER BY DRAWING COMPLETION CERTIFICATE (DCC) NO.: __________________________ By:

Date:

11.

12.

CONSTRUCTION SPECIFICATIONS
KAUST TOWN CENTER RESIDENTIAL &

DWG. TYPE PLANT NO. INDEX

DRAWING NO.

SHT. NO. REV. NO.

DOC

COMMUNITY SUPPORT BUILDINGS RABIGH SAUDI ARABIA

K55
JOB/EWO#

VE-417361 BI-25-00002

14-Sep-07

17 OF 21

00

Saudi Aramco 2616-ENG (3/99)


OPERNS.


SAUDI ARAMCO OIL COMPANY
13. Monitoring of critical temperatures and humidity in designated rooms. Chilled water supply temperature monitoring and alarm. Supply and exhaust fan duct static pressure control. DDC variable air volume control at air handlers from duct static pressure. DDC control of all air handling unit discharge temperatures. DDC control of all electric heat element. VAV zone temperature control and air handler heating coil feedback control. Monitor and alarm electrical and communication room protection annunciator relays and power usage's. Preventative maintenance and parts inventory package. Smoke damper shutdown interface with fire alarm and smoke control system. Operation of the systems during occupied and unoccupied modes as per programmed schedules. Zoned lighting control. Measurement of flow rates and cumulative flow volumes.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

CERT

PMT

ENGG

14. 15. 16.

DESCRIPTION

17. 18. 19.

DATE JOB/EWO

20.

REV. NO.

21. 22.

DISCIPLINE ENGINEER

__ ________ _ DATE: ________

23.

PROJECT ENGINEER
____________ DATE

24. 25.

CERTIFIED _ __________
DATE: ________

CONSTRUCTION AGENCY
________________ DATE:

2.14

GENERAL SYSTEM FUNCTIONS A. B. Digital Contact Monitoring to be provided for all digital points. The current condition of these points to be continuously stored in memory. Analog Monitoring and Indication: 1. The system to measure and transduce analog values and transmit this information to the local control panels in digital form. These values to be displayed in decimal format.
SECTION 15985

OPERATIONS
______________ DATE:_________ REVISION CERTIFICATION EDSD VERIFICATION THIS INDICATES THAT REV. NO.________ OF THIS DRAWING IS COVERED, FOR ALL APPROVAL/CERTIFICATION REQUIREMENTS,, CONTROL NUMBER BY DRAWING COMPLETION CERTIFICATE (DCC) NO.: __________________________ By:

C.
Date:

2.

CONSTRUCTION SPECIFICATIONS
KAUST TOWN CENTER RESIDENTIAL &

DWG. TYPE PLANT NO. INDEX

DRAWING NO.

SHT. NO. REV. NO.

DOC

COMMUNITY SUPPORT BUILDINGS RABIGH SAUDI ARABIA

K55
JOB/EWO#

VE-417361 BI-25-00002

14-Sep-07

18 OF 21

00

Saudi Aramco 2616-ENG (3/99)


OPERNS.


SAUDI ARAMCO OIL COMPANY
3. Standard temperature displays to have end-to-end (sensor to readout) accuracy within plus or minus one degree F.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

CERT

PMT

ENGG

D.

Start/Stop Control 1. The system to, upon command, send three mode start and stop commands to field equipment.

DESCRIPTION

E.

Alarm Reporting. 1. Alarm conditions to be reported at the controller and at central microcomputer. Critical alarms can be selectable by the operator for automatic printout at the time they occur. Non-critical alarms to be printed on command. Air pressure relationships.

2.

DATE JOB/EWO

3. 4. F. Status. 1.

REV. NO.

DISCIPLINE ENGINEER

Status indication to be provided by means of differential pressure switches for AHU's, fans, and analog for other devices. Indication of status to be provided at the central console.

__ ________ _ DATE: ________

2. G.

PROJECT ENGINEER
____________ DATE

Calculations and Totalization. 1. The TC to make at minimum the following calculations and totalizations: a. b. Calculate average temperatures. Totalize run time of equipment.

CERTIFIED _ __________
DATE: ________

CONSTRUCTION AGENCY
________________ DATE:

OPERATIONS
______________ DATE:_________ REVISION CERTIFICATION EDSD VERIFICATION THIS INDICATES THAT REV. NO.________ OF THIS DRAWING IS COVERED, FOR ALL APPROVAL/CERTIFICATION REQUIREMENTS,, CONTROL NUMBER BY DRAWING COMPLETION CERTIFICATE (DCC) NO.: __________________________ By:

H.
Date:

Data Logging. 1. TC to be capable of logging various parameters (RH, SP, Temperature, etc.) in operator selectable increments from 1 minute to 24 hours. The operator to be able to select whether the logged information is a specific value or an averaged value and alarm these conditions.
DWG. TYPE PLANT NO. INDEX DRAWING NO.

2.

SECTION 15985
SHT. NO. REV. NO.

CONSTRUCTION SPECIFICATIONS
KAUST TOWN CENTER RESIDENTIAL &

DOC

COMMUNITY SUPPORT BUILDINGS RABIGH SAUDI ARABIA

K55
JOB/EWO#

VE-417361 BI-25-00002

14-Sep-07

19 OF 21

00

Saudi Aramco 2616-ENG (3/99)


OPERNS.


SAUDI ARAMCO OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

PMT

CERT

I.

Sequence of Operation. 1. Refer to HVAC Control Diagram.

ENGG

PART 03 - EXECUTION 3.01 INSTALLATION, TESTING AND COMMISSIONING A. General: All requirements, including qualified personnel, for system installation, checkout, testing and commissioning, shall be provided by the Controls Contractor as referred to in Parts 1 and 2 above. B. Commissioning the control System is a mandatory documented performance requirement of the selected controls Contractor for all control systems detailed in this Specification and sequence of operations. Commissioning shall include point verification and calibration, system/sequence of operation verification with respect to specified operation, and network verification. Documentation shall be presented upon completion of each commissioning step and final completion to ensure proper operation of the control system. Acceptance Check List: An acceptance checklist shall be completed that documents compliance with each item of this Specification. Testing Procedure: Upon completion of the installation the controls Contractor shall start-up the system and perform all necessary testing and run diagnostic tests to ensure proper operation. The controls Contractor shall be responsible for generating all software and entering all database information necessary to perform the sequences of control herein specified. Testing Documentation: Prior to acceptance testing, controls Contractor shall create, on an individual system basis, trend logs of input and output points, or have an automatic Point History feature for documentation purposes.

REV. NO.

DATE JOB/EWO

DESCRIPTION
DISCIPLINE ENGINEER

__ ________ _ DATE: ________

C.

PROJECT ENGINEER
____________ DATE

D.

CERTIFIED _ __________
DATE: ________

CONSTRUCTION AGENCY
________________ DATE:

E.

OPERATIONS
______________ DATE:_________ REVISION CERTIFICATION EDSD VERIFICATION THIS INDICATES THAT REV. NO.________ OF THIS DRAWING IS COVERED, FOR ALL APPROVAL/CERTIFICATION REQUIREMENTS,, CONTROL NUMBER BY DRAWING COMPLETION CERTIFICATE (DCC) NO.: __________________________ By:

F.
Date:

Field Points Testing: 1. This step shall verify that all of the installed points receive or transmit the correct information prior to loading/activating the system software. On/Off commands from the workstation shall be performed in order to verify each binary output point.
SECTION 15985

2.

CONSTRUCTION SPECIFICATIONS
KAUST TOWN CENTER RESIDENTIAL &

DWG. TYPE PLANT NO. INDEX

DRAWING NO.

SHT. NO. REV. NO.

DOC

COMMUNITY SUPPORT BUILDINGS RABIGH SAUDI ARABIA

K55
JOB/EWO#

VE-417361 BI-25-00002

14-Sep-07

20 OF 21

00

Saudi Aramco 2616-ENG (3/99)


OPERNS.


SAUDI ARAMCO OIL COMPANY
3. All binary input points are to be tested using the Hand/Off/Automatic selector switch on the associated motor control center or by manually jumpering across the field
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

ENGG

CERT

PMT

3.02

SYSTEMS INTEGRATION/BAS A. The control system shall be locally networked at the building level network. This network shall be connected to router suitable for local PC workstation hook-up as well as connection to campus wide BAS system using BACnet open protocol. END OF SECTION

REV. NO.

DATE JOB/EWO

DESCRIPTION
DISCIPLINE ENGINEER

__ ________ _ DATE: ________

PROJECT ENGINEER
____________ DATE

CERTIFIED _ __________
DATE: ________

CONSTRUCTION AGENCY
________________ DATE:

OPERATIONS
______________ DATE:_________ REVISION CERTIFICATION EDSD VERIFICATION THIS INDICATES THAT REV. NO.________ OF THIS DRAWING IS COVERED, FOR ALL APPROVAL/CERTIFICATION REQUIREMENTS,, CONTROL NUMBER BY DRAWING COMPLETION CERTIFICATE (DCC) NO.: __________________________ By:

Date:

SECTION 15985

CONSTRUCTION SPECIFICATIONS
KAUST TOWN CENTER RESIDENTIAL &

DWG. TYPE PLANT NO. INDEX

DRAWING NO.

SHT. NO. REV. NO.

DOC

COMMUNITY SUPPORT BUILDINGS RABIGH SAUDI ARABIA

K55
JOB/EWO#

VE-417361 BI-25-00002

14-Sep-07

21 OF 21

00

También podría gustarte