Documentos de Académico
Documentos de Profesional
Documentos de Cultura
NOT CEBOARD
08.08.09 Keeping Canberra in the know.
Stromlo Forest Park draft Master Plan To RSVP phone Therapy ACT Reception on 6207 1360.
The Project Team has prepared a draft Master Plan as the context for the future For further information visit www.dhcs.act.gov.au/therapyact
development of Stromlo Forest Park. The draft Master Plan was developed with
input from community members and interested user groups during the first round
of consultation.
Notices
Interested persons are invited to view the draft Master Plan at a drop-in session.
When: Saturday 8 August (9.30am to 3.30pm)
Where: Event Pavilion, Stromlo Forest Park, Uriarra Road, Stromlo.
FREE e-Waste recycling days in Canberra and
Queanbeyan
Members of the Project Team will be available to explain the plans and answer
any questions. Canberra and Queanbeyan householders are encouraged to drop off unwanted
e-Waste for recycling on Saturday 15 August and Sunday 16 August 2009 from
The draft plans feedback forms are available online at
9.00am to 4.00pm at the following venues.
www.stromloforestpark.com.au
Mugga Lane Resource Management Centre, Mugga Lane
For further information phone Lee McCourt from Parsons Brinckerhoff on 6281 9500
or email Stromlo@pb.com.au Mitchell Resource Management Centre, Flemington Road
Tuggeranong Park and Ride car park, corner of Cowlishaw and Anketell Streets
Farrer shops forward design study Greenway
Territory and Municipal Services is undertaking a design study for the future Queanbeyan Waste Minimisation Centre, 5 Lorn Road, Queanbeyan
refurbishment of the public spaces at the Farrer shopping centre. The e-Waste will be recycled courtesy of Apple Pty Ltd.
You are invited to comment on the draft plan and meet with the design and For further information phone Canberra Connect on 13 22 81 or visit
consultation team at the following drop-in session:
www.tams.act.gov.au or www.apple.com.au/environment/recycling/program
When: Saturday 8 August 2009 (10.00am – 1.00pm)
Where: Farrer shopping centre
Belconnen Arts Centre – enrolments for 2009
The draft preliminary Sketch Plan will be on display at the Farrer shopping centre,
the Woden Public Library and online at www.tams.act.gov.au ‘Get Involved’. Spring Program
Submissions are due by Friday 21 August 2009. The new Belconnen Arts Centre will provide a wide range of opportunities for the
people of Canberra and surrounds to engage with the arts.
For further information contact Lea Durie through Canberra Connect on 13 22 81.
During Spring, the Centre is conducting an exciting program that will cater for
people of all ages, abilities, and cultural backgrounds interested in the arts.
Temporary Road Closures The program will include creative workshops, exhibitions, free performances and
concerts, art and drama classes, talks and presentations, and children’s programs run
by local artists and performers.
Notice is hereby given pursuant to Section 4 of the Roads and Public Places Act /
Roads and Public Places Ordinance 1937, of the intention to close the following For further information and how to enrol visit www.belconnenartscentre.com.au
roads in the ACT. or phone Canberra Connect on 13 22 81.
Parkes
Parkes Way: westbound between Kings Avenue and Glenloch Interchange Belconnen town centre improvements –
Menindee Drive: at the intersection with Morshead Drive. Joynton Smith Drive closed
Time: Sunday 16 August 2009 (8.30am – 12.30pm) The ACT Government, in partnership with Westfield, is implementing significant
improvements to the Belconnen town centre giving people better access to the
Please note that access to local traffic and emergency vehicles along Menindee
shopping centre, improved public transport with simpler bus routes, and easier
Drive will be available at all times
pedestrian access to the town centre.
Reason: Australian Duathlon Championships 2009
As part of Westfield Belconnen’s upgrade, which includes the construction of a new
Any person wishing to comment on this notice, should contact Slobodan Paunovic bus station integrated into the western entrance of the shopping centre, the red
on 6207 6601. pedestrian bridge will be relocated approximately 100 metres closer to Benjamin
Dickson Way and will provide continuous pedestrian access from the Lathlain street car park
Community Path: Dooring Street (western side) between ABC Studio carpark to the level 3 entrance of the centre.
and Karuah Street On Monday 10 August 2009 Joynton Smith Drive will be closed to allow for
Time: Saturday 15 August to Saturday 14 November 2009 (7.00am – 5.00pm daily) preparatory works on the relocation of the red pedestrian bridge.
Reason: building construction works Access will be maintained at both ends of Joynton Smith Drive to service the
existing Westfield shopping centre car parks. During these works pedestrian access
Chisholm
will be available to the shopping centre from the underpass on Lathlain Street near
Pedestrian Footbridge: Isabella Drive between Benham Street and Coyne Street / the Police Station as well as off Benjamin Way. Signs will be posted to alert people of
Hambidge Crescent the temporary access arrangements.
GREY 18188
Time: Monday 17 August and Friday 25 September 2009 (9.00am to 3.00pm daily) For further information on the Belconnen town centre improvements visit
Reason: installation of safety screens www.tams.act.gov.au or phone Canberra Connect on 13 22 81.