Small and Medium Enterprises Development Authority Ministry of Industries & Production
Government of Pakistan
www.smeda.org.pk
HEAD OFFICE
4th Floor, Building No. 3, Aiwan-e-Iqbal Complex, Egerton Road, Lahore Tel: (92 42) 111 111 456, Fax: (92 42) 36304926-7
helpdesk@smeda.org.pk
REGIONAL OFFICE PUNJAB 3rd Floor, Building No. 3, Aiwan-e-Iqbal Complex, Egerton Road Lahore, Tel: (042) 111-111-456 Fax: (042) 36304926-7 helpdesk.punjab@smeda.org.pk REGIONAL OFFICE SINDH 5TH Floor, Bahria Complex II, M.T. Khan Road, Karachi. Tel: (021) 111-111-456 Fax: (021) 5610572 helpdesk-khi@smeda.org.pk REGIONAL OFFICE KPK Ground Floor State Life Building The Mall, Peshawar. Tel: (091) 9213046-47 Fax: (091) 286908 helpdesk-pew@smeda.org.pk REGIONAL OFFICE BALOCHISTAN Bungalow No. 15-A Chaman Housing Scheme Airport Road, Quetta. Tel: (081) 831623, 831702 Fax: (081) 831922 helpdesk-qta@smeda.org.pk
September 2013
Pre-Feasibility Study
Contents
1. DISCLAIMER ......................................................................................................................... 3 2. PURPOSE OF THE DOCUMENT ......................................................................................... 4 3. INTRODUCTION TO SMEDA .............................................................................................. 4 4. INTRODUCTION TO SCHEME ........................................................................................... 5 5. EXECUTIVE SUMMARY ..................................................................................................... 5 6. BRIEF DESCRIPTION OF PROJECT ................................................................................... 5 7. CRITICAL FACTORS ............................................................................................................ 6 8. INSTALLED AND OPERATIONAL CAPACITIES ............................................................ 6 9. GEOGRAPHICAL POTENTIAL FOR INVESTMENT ........................................................ 7 10. POTENTIAL TARGET MARKETS ................................................................................... 7 11. PROCESS FLOW ................................................................................................................ 7 12. PROJECT COST SUMMARY ............................................................................................ 7 12.1 Project Economics ........................................................................................................ 8 12.2 Project Financing .......................................................................................................... 8 12.3 Project Cost................................................................................................................... 8 12.4 Space Requirement ....................................................................................................... 9 12.5 Machinery and Equipment............................................................................................ 9 12.6 Human Resource Requirement ................................................................................... 10 12.7 Revenue Generation ................................................................................................... 10 12.8 Other Costs ................................................................................................................. 11 13. CONTACTS - SUPPLIERS .............................................................................................. 11 14. ANNEXURES ................................................................................................................... 12 14.1 Annexure 1 Income Statement ........................................................................... 12 14.2 Annexure 2 Balance Sheet ................................................................................. 13 14.3 Annexure 3 Cash Flow Statement ..................................................................... 14 14.4 Useful Project Management Tips ......................................................................... 15 14.5 Useful Links ............................................................................................................. 16 15. KEY ASSUMPTIONS....................................................................................................... 17
September 2013
Pre-Feasibility Study
1. DISCLAIMER
This information memorandum is to introduce the subject matter and provide a general idea and information on the said matter. Although, the material included in this document is based on data/information gathered from various reliable sources; however, it is based upon certain assumptions which may differ from case to case. The information has been provided on as is where is basis without any warranties or assertions as to the correctness or soundness thereof. Although, due care and diligence has been taken to compile this document, the contained information may vary due to any change in any of the concerned factors, and the actual results may differ substantially from the presented information. SMEDA, its employees or agents do not assume any liability for any financial or other loss resulting from this memorandum in consequence of undertaking this activity. The contained information does not preclude any further professional advice. The prospective user of this memorandum is encouraged to carry out additional diligence and gather any information which is necessary for making an informed decision, including taking professional advice from a qualified consultant/technical expert before taking any decision to act upon the information. For more information on services offered by SMEDA, please contact our website: www.smeda.org.pk
September 2013
Pre-Feasibility Study
3. INTRODUCTION TO SMEDA
The Small and Medium Enterprises Development Authority (SMEDA) was established in October 1998 with an objective to provide fresh impetus to the economy through development of Small and Medium Enterprises (SMEs). With a mission "to assist in employment generation and value addition to the national income, through development of the SME sector, by helping increase the number, scale and competitiveness of SMEs" , SMEDA has carried out sectoral research to identify policy, access to finance, business development services, strategic initiatives and institutional collaboration and networking initiatives. Preparation and dissemination of prefeasibility studies in key areas of investment has been a successful hallmark of SME facilitation by SMEDA. Concurrent to the prefeasibility studies, a broad spectrum of business development services is also offered to the SMEs by SMEDA. These services include identification of experts and consultants and delivery of need based capacity building programs of different types in addition to business guidance through help desk services.
September 2013
Pre-Feasibility Study
4. INTRODUCTION TO SCHEME
Prime Ministers Small Business Loans Scheme, for young entrepreneurs, with an allocated budget of Rs. 5.0 Billion for the year 2013-14, is designed to provide subsidised financing at 8% mark-up per annum for one hundred thousand (100,000) beneficiaries, through designated financial institutions, initially through National Bank of Pakistan (NBP) and First Women Bank Ltd. (FWBL). Small business loans with tenure upto 7 years, and a debt : equity of 90 : 10 will be disbursed to SME beneficiaries across Pakistan, covering; Punjab, Sindh, Khyber Pakhtunkhwah, Balochistan, Gilgit Baltistan, Azad Jammu & Kashmir and Federally Administered Tribal Areas (FATA).
5. EXECUTIVE SUMMARY
Catering and Decoration Services Business is proposed to be located in a medium income area in cities like Karachi, Lahore, Rawalpindi, Hyderabad, Faisalabad, Multan etc. Product(s) include Catering of Food & Services to events such as Weddings, Mehndi & Mayun, Corporate Events etc and Decoration of Event Site (this service is to be outsourced). Capacity: Maximum 150 events per year and initial utilization upto 67 % Total Cost Estimates is Rs.2,104,000 with fixed investment of Rs. 1,369,000 and working capital of Rs. 735,000. Given the cost assumptions IRR and payback are 39 % and 3 years respectively The most critical considerations or factors for success of the project are: 1. Procurement of Raw material 2. Location- proximity to marriage halls, business hubs etc 3. Quality Food
September 2013
Pre-Feasibility Study
Product: The proposed project will offer high quality food & catering services to events such as weddings, anniversaries and corporate events etc. Target Market: Target customer for catering business would be event management companies, corporate and individual clients, marriage hall & lawns etc. Employment Generation: The proposed project will provide direct employment to 08 people. Financial analysis shows the business shall be profitable from the very first year of operation
7. CRITICAL FACTORS
Procurement of Raw material Location- proximity to marriage halls, business hubs etc Quality Food In depth Management Professionalism and Courteous Customer Service Skilled Staff / Cooks Planning & Organizing Time Management Contract with Suppliers for Decoration
September 2013
Pre-Feasibility Study
10.
The recommended areas for the proposed business will be cities like Karachi, Lahore, Rawalpindi, Hyderabad, Faisalabad, Multan etc. This business can also be done in all small 2nd tier towns in addition to suburban towns of large cities. Target customers for the said business would be Corporate and Individual clients, Event Management Companies, Marriage Halls & Lawns etc.
11.
PROCESS FLOW
For a regular event, following process is to be followed: Hiring and scheduling of staff Ordering and serving arrangements for menu items Ordering equipment as needed from event rental companies Obtaining licenses and permits, if needed, for use of the site etc. Coordinating all accessory services with the client and the vendors
12.
A detailed financial model has been developed to analyze the commercial viability of Catering & Decoration Service Business under the Prime Ministers Small Business Loan Scheme. Various cost and revenue related assumptions along with results of the analysis are outlined in this section.
September 2013
Pre-Feasibility Study
The projected Income Statement, Cash Flow Statement and Balance Sheet are attached as appendix
Returns on the scheme and its profitability are highly dependent on regular occurrence of such events, good marketing practices, quality of services and more importantly good quality and taste of food served.
September 2013
Pre-Feasibility Study
Machinery & Equipment Office Equipment & Furniture Advance Rent Vehicles Preliminary Expenses Total Capital Costs Initial Working Capital Total Project Cost
Area Required
No.
750
Description Burners / fittings / Others Daigs / Kadhai / Others Storage Racks Deep Freezers Other Kitchen Utensils Total
September 2013
Pre-Feasibility Study
Quantity Computer & UPS Printer Tables Chairs Sofa Set Split AC Others Total 1 1 2 6 1 1 1
Description Owner Head Cook Cooks / Karigars Helpers Driver Total Staff
Nos. 1 1 2 4 1 9
The table above provides details of human resource required to run a Catering and Decoration Services Business. Salaries of all employees are estimated to increase at 10% annually.
10
September 2013
Pre-Feasibility Study
Catering & Decoration Service. Sales Price (Rs.) 90 15 90 20,000 250 225
Events Banquet Arrangement (Per Head) Shamiana / Kanats (Per Head) Marquee Set up (Per Head) Stage Water (Per Head) Food Standard Menu (Per Head) Total Sales Revenue Total Sales Revenue in a Year
Revenue (Rs.) 36,000 6,000 36,000 20,000 4,000 90,000 192,000 19,200,000
13.
CONTACTS - SUPPLIERS
KITCHEN 'N' RESTAURANT SYSTEMS 102-A, Allama Iqbal Road Butt Lane, Garhi Shahu, Lahore, Punjab, Pakistan Phone: 9242-36366590 / 36305989 Fax: 9242-36305989 KITCHEN CARE # 103, Golden Plaza F-7, Blue Area, Islamabad, Capital, Pakistan Phone: 9251-32875226 Fax: 9251-32277176 PRESTIGE KITCHENS Kehkashan Shopping Arcade Block-7, Clifton, Karachi 75600, Sindh, Pakistan Phone: 9221-35862978 / 35862839 Fax: 9221-5871814 KITCHEN EQUIPMENTS Syed Qaiser Imam 554 Buffer Zone, Karachi Phone: 03333045358
11
September 2013
Pre-Feasibility Study
14.
ANNEXURES
14.1 Annexure 1 Income Statement
12
September 2013
13
September 2013
14
September 2013
14.4 Technology
List of Equipment Burners / fittings / Others Daigs / Kadhai / Others Storage Racks Deep Freezers Other Kitchen Utensils
Energy Requirement: Should not be overestimated or installed in excess and alternate source of energy for critical operations be arranged in advance Equipment Suppliers: Should be asked for training/orientation and after sales services under the contract with the suppliers Quality Assurance Equipment & Standards: Products/service quality standards need to be defined and a monitoring system for compliance to be instituted. This improves credibility.
Marketing Product Development & Packaging: Expert's help may be engaged for product/service and packaging design & development Ads & P.O.S. Promotion: Business promotion and dissemination through banners and launch events is highly recommended. Brochures from good quality Decoration Service Providers need to be obtained and kept for further use. Sales & Distribution Network: Expert's advise and distribution agreements are required. Price - Bulk Discounts, Cost plus Introductory Discounts: Price should never be allowed to compromise quality. Price during introductory phase may be lower and used as a promotional tool. Product cost estimates should be carefully documented before price setting. Government controlled prices shall be displayed.
Pre-Feasibility Study
Adequacy & Competencies: Skilled and experienced staff should be considered an investment even to the extent of offering share in business profit. Performance Based Remuneration: Attempt to manage human resource cost should be focused through performance measurement and performance based compensation. Training & Skill Development: Encouraging training and skill of self & employees through experts and exposure of best practices is route to success. Least cost options for Training and Skill Development (T&SD) may be linked with compensation benefits and awards.
14.5
Useful Links
Prime Ministers Office www.pmo.gov.pk Small & Medium Enterprises Development Authority (SMEDA) www.smeda.org.pk National Bank of Pakistan (SBP) www.nbp.com.pk First Women Bank Limited (FWBL) www.fwbl.com.pk Government of Pakistan www.pakistan.gov.pk Ministry of Industries & Production www.moip.gov.pk Ministry of Education, Training & Standards in Higher Education http://moptt.gov.pk Government of Punjab www.punjab.gov.pk Government of Sindh
16
September 2013
Pre-Feasibility Study www.sindh.gov.pk Government of Khyber Pakhtoonkhwa www.khyberpakhtunkhwa.gov.pk Government of Balochistan www.balochistan.gov.pk Government of Gilgit Baltistan www.gilgitbaltistan.gov.pk Government of Azad Jamu Kashmir www.ajk.gov.pk Trade Development Authority of Pakistan (TDAP) www.tdap.gov.pk Security Commission of Pakistan (SECP) www.secp.gov.pk
Federation of Pakistan Chambers of Commerce and Industry (FPCCI) www.fpcci.com.pk State Bank of Pakistan (SBP) www.sbp.org.pk Pakistan Institute of Fashion Design(PIFD) www.pifd.edu.pk Pakistan Fashion Design Council (PFDC) www.pfdc.org
17
September 2013
Pre-Feasibility Study
Description Debt Equity Ratio Interest Rate Loan Tenure Sales Price Growth Rate Depreciation Rate Weighted Average Cost of Capital Prepaid Rent Period Increase in Staff Salaries Increase in Office expense