AIMS srl
VIA XXIV MAGGIO 61 19124 LA SPEZIA ITALY
THE CONCEPT
The concept of SAIPEM TAD is to have a mobile drilling rig (Drilling Set ) dismounted and stowed on the barge deck to be moved on location and erected on a fixed platform by means of the100 t lifting capacity lattice boom crane as well as with the capability to provide all exploitation services together with accommodation for 100 persons. The two different way of operation can be summarized as shown:
PROJECT SCHEDULE
CONTRACT AWARDED BARGE ARRIVAL IN DOUALA BARGE DEPARTURE FROM DOUALA FEB 7 2007 APRIL 10 2007 MAY 25 2008
BASIC DESIGN
2. 3. 4. 5.
DETAIL ENGINEERING
A COMPLETE 3D MODEL WAS DEVELOPED TO MINIMIZE THE ERRORS DURING CONSTRUCTION
DETAIL ENGINEERING
AN EXAMPLE OF THE PRECISION THAT CAN BE ACHIEVED BY MEANS OF THE 3D MODEL
3D MODEL
ON BOARD
DETAIL ENGINEERING
DETAIL ENGINEERING
PART 1
Plate
11662
6000
10
5597,8
1119,6
100
1119,6
1679,3
100
1679,3
2798,9
100
2798,9
L
Stiffners L=140x80x10 6000
h
140
b
80
t
10 11 1161,6 232,3 100 232,3 580,8 100 580,8 348,5 100 348,5
L
Deck Trans Deck Trans Deck Trans Side Frame Gussets 3038 1512 2420 6000
h
600 600 600 600
thk 1
10 10 10 10
b
200 200 200 280
thk 2
20 20 20 25 2 1 1 3 486,1 121,0 193,6 1872,0 97,2 24,2 38,7 374,4 100 100 100 100 97,2 24,2 38,7 374,4 243,0 60,5 96,8 936,0 100 100 100 100 243,0 60,5 96,8 936,0 145,8 36,3 58,1 561,6 100 100 100 100 145,8 36,3 58,1 561,6
TOTAL WEIGHT
9432,0
1886,4
3596,4
3949,2
SEA FASTENING
ACHIEVED RESULTS
THE FOLLOWING SLIDES WILL SHOW THE CONSTRUCTION DEVELPMENT ALONG THE BUILDING PERIOD, FROM THE BARGE ARRIVAL TO THE BARGE DEPARTURE FOR OPERATION.
THE HELIDECK