Está en la página 1de 140

DEIFY INFRASTRUCTURE LIMITED JAYASWAL NECO INDUSTRIAL LIMITED 2x25 MW CAPTIVE POWER PLANT

TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES DOC. NO : 4 3643 ELCT 001

SECTION 4 TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES 1.0 SF6 CIRCUIT BREAKER 1.1 1.1.1 1.1.2 1.1.3 1.1.4 1.1.5 1.1.6 1.1.7 1.2 1.2.1 Scope of supply 132kV live tank single pole SF6 circuit breaker with supporting structure 5 nos. Engineering, Design, fabrication, manufacture, assembly, shop testing including type test as specified and inspection at manufacturers works. Transportation, Unloading and storage at site. Erection, Testing at Site & Commissioning of SF6 circuit breakers. All spare parts required for commissioning of the equipment/system covered under this specification. Recommended Spares for two (2) years of trouble free operation. Special tools and tackles required for operation and maintenance inspection and repair of the equipment/system offered. Standards The circuit breaker shall conform to the recent editions/ latest revisions, available at the time of placement of order/s of relevant standards, rules and codes listed below. SI.No. 1 2 Standard reference no Title IEC 62271-100 IEC 376 Specification for alternating current circuit breaker. Specification and acceptance of new supply of sulphur hexafluoride. Degree of protection provided for enclosures for low voltage switch-gear and control gear. Specification for 3phase induction motor Recommended practice for hot dip galvanising of iron and steel.

IEC529/IS 2147

4 5

IS 325 IS 2629

Consultant: Snyder Energo Private Limited Bangalore & Chennai

Section-4

1 of 140

DEIFY INFRASTRUCTURE LIMITED JAYASWAL NECO INDUSTRIAL LIMITED 2x25 MW CAPTIVE POWER PLANT

TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES DOC. NO : 4 3643 ELCT 001

6 7 8

IEC-2331 IEC - 60 IEC 71 Part-I & II

High Voltage porcelain bushings. High voltage test techniques Insulation co-ordination, Terms, principles and rules definitions,

CIGRE Working group

Switching over-voltages in EHV Report No.13-021973 and UHV systems with special reference to closing and re-closing transmission lines. Partial discharge measurements.

10 11

IEC 270 Indian Rules. Electricity

1.3 1.3.1

PRINCIPAL PARAMETERS The breaker shall conform to the specific technical requirements specified below. SI.No. 1 Item Rated voltage of the breaker / Highest system voltage kV rms 2 3 4 5 6 7 System frequency System Neutral grounding Continuous current rating (A) Installation (Indoor/Outdoor) Type of breaker Mounting 50 HZ Effectively earthed 800 Outdoor Live tank SF6 On hot dip galvanised steel support structure or on the operating mechanism box. 1
Section-4 2 of 140

Requirements 145

Number of Poles

Consultant: Snyder Energo Private Limited Bangalore & Chennai

DEIFY INFRASTRUCTURE LIMITED JAYASWAL NECO INDUSTRIAL LIMITED 2x25 MW CAPTIVE POWER PLANT

TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES DOC. NO : 4 3643 ELCT 001

9 10

Type of operation Individual Phase to phase spacing in the switchyard i.e. preferred inter pole spacing for breaker (in mm).

Individually operated single poles 3600

11

Required ground clearance 4600 from the lowest live part from the top of the concrete plinth ( mm ) i) If both the terminals are 5200 not in the same horizontal plane. ii) If both the terminals are in the same horizontal plane.

6200

12

Height of concrete plinth 300mm height plinth from FGL above ground level (to be provided by the Purchaser) (mm) Minimum height of the lowest 2750 part of the support insulator from ground level (mm).

13 14

Operating mechanism

Spring operated

Auto re-closing duty (Only one Single phase & Three phase if gang operated breaker out of 6 breakers) Rated operating duty cycle. O-0.3 seconds-CO-3 minutes-CO

15

16 17

"First pole to clear factor Max.closing time (ms)

1.5 60 (3 cycles)
Section-4 3 of 140

Consultant: Snyder Energo Private Limited Bangalore & Chennai

DEIFY INFRASTRUCTURE LIMITED JAYASWAL NECO INDUSTRIAL LIMITED 2x25 MW CAPTIVE POWER PLANT

TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES DOC. NO : 4 3643 ELCT 001

18

Maximum total break time at 60 (3 cycles) rated breaking capacity. Lightning impulse level (kVP) 650

19 20

One minute power frequency 275 withstands voltage (kV rms.) Max.radio interference voltage 1000 at 156 kV (micro volts) Rated breaking capacity. i) Line charging voltage(A) ii)Single Capacitor (Amp) current

21

22

at rated 125

Bank 400

iii) Small inductive current (A)

0.5 to 10 without switching over voltage exceeding 2.0 pu.

iv) Short Circuit current a) Rated short circuit breaking 40 current kA rms b) Short time current carrying 40 capacity for 3 sec in kA rms c) Percentage D.C.component Corresponding to minimum opening time as per standard.

23

Rated short circuit making 100 current capacity (kA peak) Permissible limit of As per IEC
Section-4 4 of 140

24

Consultant: Snyder Energo Private Limited Bangalore & Chennai

DEIFY INFRASTRUCTURE LIMITED JAYASWAL NECO INDUSTRIAL LIMITED 2x25 MW CAPTIVE POWER PLANT

TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES DOC. NO : 4 3643 ELCT 001

temperature rise of various parts in the equipment. 25 Maximum acceptable difference in the instants of 5 ms closing/opening of contacts: i) Between poles (ms) 26 Minimum creepage distance of support insulator (mm) 1.4 1.4.1 1.4.2 GENERAL TECHNICAL REQUIREMENTS Similar parts of the breaker, especially the removable ones, shall be freely interchangeable without the necessity of any modification at site. The breakers will be required to break Capacitor currents, small inductive currents and line charging current without causing excessive over voltage, and charging current without restrike. The breaker shall also be required to handle evolving faults and meet the requirements regarding partial discharge, radio interference etc, as specified in relevant standards. Breaker contacts Main contacts shall have ample area and contact pressure for carrying the rated continuous and short time currents of the breaker without excessive temperature rise which may cause pitting or welding. Contacts shall be adjustable to allow for wear, shall be easily replaceable and shall have a minimum number of movable parts and adjustments to accomplish these results. Main contacts shall be the first to open and the last to close so that there will be little contact burning and wear. Tips of main contacts shall be silver plated. Arcing contacts, if provided, shall be the first to close and the last to open and shall be easily accessible for inspection and replacement. The arcing contacts shall have tungsten alloy tipping. If multi-break interrupters are used, they shall be so designed and augmented that a fairly uniform voltage distribution is developed across them. The inside operating rod or insulated fibre glass connecting rods wherever used, shall be sturdy and shall not break during the entire life period of the breaker. The insulated rods shall have anti tracking quality towards electrical stresses.
Consultant: Snyder Energo Private Limited Bangalore & Chennai

3625

1.4.3

Section-4

5 of 140

DEIFY INFRASTRUCTURE LIMITED JAYASWAL NECO INDUSTRIAL LIMITED 2x25 MW CAPTIVE POWER PLANT

TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES DOC. NO : 4 3643 ELCT 001

1.4.4

Take off terminal pads Terminal pads shall be provided with silver plating of at least 25 microns thickness if these are made of metal other than aluminium. No such plating shall be required if the terminal pad is made out of Aluminium. The pads shall be suitably designed to take the approximate terminal loads, specified below. The breaker shall be designed to withstand the rated terminal load, wind load/Earth quake load and short circuit forces. The short circuit forces to be considered for the design shall be based on length of bus bars consisting of conductors and phase to phase spacing shown below. The current density adopted for the design of the terminal pad shall in no case exceed 1.6A/sq.mm for copper pad and 1.0 A/sq.mm for pad made of other material. The vertical clearance of lowest live part from ground level (excluding concrete foundation plinth) shall be as given below. In no case the height less than 4600mm will be accepted:

1.4.5

Porcelain Housing The porcelain housing for the interrupter shall be of a single piece construction without any joint. It shall be made of homogeneous, vitreous porcelain of high mechanical and dielectric strength. Glazing of porcelain shall be of uniform brown or dark brown colour with a smooth surface arranged to shed away rain water or condensed water particles (fog).

1.4.6

Support insulator Breaking units shall be mounted on insulator column of not more than two insulators in each column.

1.4.7

Surface Finish All metal sheet surfaces exposed to atmosphere shall be given two primer coats of zinc phosphate and two coats of epoxy paint with epoxy base thinner. All metal parts not accessible for painting shall be made of corrosion resisting material. All machine finished or bright surfaces shall be coated with a suitable preventive compound and suitably wrapped or otherwise protected. All paints shall be carefully selected to withstand tropical heat and extremes of weather within the limits specified. The paints shall be light grey shade No.631 of IS 5. The paint shall not scale off or wrinkle or be removed by abrasion due to normal handling.

1.4.8

Supporting structures and Galvanising

Consultant: Snyder Energo Private Limited Bangalore & Chennai

Section-4

6 of 140

DEIFY INFRASTRUCTURE LIMITED JAYASWAL NECO INDUSTRIAL LIMITED 2x25 MW CAPTIVE POWER PLANT

TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES DOC. NO : 4 3643 ELCT 001

All ferrous parts including nuts, bolts, plain and spring washers of size M 10 and above, support channels, structures, etc. shall be hot dip galvanised to conform to latest version of IS 2629 or any other equivalent authoritative standard. All other fixing nuts, bolts, washers of size below M 10 shall be made out of stainless steel. 1.4.9 Earthing The operating mechanism housing, support structures etc. shall be provided with two separate earthing terminals for bolted connection to 50 x 8 mm GI flat to station earth mat. The connecting point shall be marked with "earth" symbol No.86 of IEC publication 117-1 part 1. The coils of operating devices shall be marked clearly with the catalogue number/reference number as indicated in control wiring diagram. 1.4.10 Control Circuits The control circuit shall include the following features: i) Two electrically independent trip circuits including two trip coils per pole/CB as the case may be along with 2 bus arrangement for DC system protected with two separate MCBs. One local/remote selector switch. Conveniently located manual emergency trip Pole discrepancy feature to trip closed poles in the event of pole discrepancy (not applicable for gang operated breaker). While opening and/or closing, all the three poles shall operate simultaneously. Anti pumping feature Auxiliary switches as specified else where. Independence of trip circuit from local/remote selection.

ii) iii) iv)

v) vi) vii)

viii) Alarms, indications, monitoring equipments and interlocks as specified elsewhere. ix) Trip circuit supervision for pre trip as well as post trip

A separate cabinet shall be provided for housing operating mechanism and control circuitry. These control cabinets shall meet the standard requirements. 1.4.11 Auxiliary Switches Each operating mechanism of the circuit breaker shall be provided with Cam/Snap
Consultant: Snyder Energo Private Limited Bangalore & Chennai Section-4 7 of 140

DEIFY INFRASTRUCTURE LIMITED JAYASWAL NECO INDUSTRIAL LIMITED 2x25 MW CAPTIVE POWER PLANT

TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES DOC. NO : 4 3643 ELCT 001

type auxiliary switches with Ten (10) normally open and Ten (10) normally closed contacts for EHV CBs & 4NO+4NC for CBs exclusively for the Purchaser's use with continuous current rating of 10 A D.C. Breaking capacity of the contacts shall be minimum 2 A with circuit time constant less than 20 milli seconds at the rated D.C. voltage. Normal position of auxiliary switches refers to contact position when circuit breaker is open. 1.4.12 Alarms and Indications: (as applicable) Potential free contacts shall be provided, duly wired up to the operating mechanism housing/control cabinet for the following alarms and indications to control panel. Alarms i) ii) iii) iv) v) vi) Indications i) ii) iii) Breaker on-off Spring charged Breaker Trip General lockout for SF6 gas/air. Low pressure of SF6 gas. Auto reclosing lockout (for low pressure of gas/air). Pole discrepancy Auxiliary a.c./d.c. supply failure Spring charging motor overload

1.4.13 Indications in Operating Mechanism The operating mechanism housing shall be provided with the following mechanical and Electrical indications/counters: i) ii) iii) 1.4.14 Interlocks The details of the scheme shall be furnished by the successful Tenderer. The requirement of auxiliary contacts to be provided in breaker operating mechanism
Consultant: Snyder Energo Private Limited Bangalore & Chennai Section-4 8 of 140

Breaker on-off Spring Charged Operation counters to register the number of breaker operations.

DEIFY INFRASTRUCTURE LIMITED JAYASWAL NECO INDUSTRIAL LIMITED 2x25 MW CAPTIVE POWER PLANT

TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES DOC. NO : 4 3643 ELCT 001

by the Tenderer for successful operation of the scheme 1.4.15 Mounting The design and supply of support structure, required for mounting the circuit breaker shall be in the Tenderers scope. The Purchaser's scope shall necessary civil works for the support structures. The support structure shall be lattice type or tubular type and shall be made out of hot dip galvanised steel. The support structure shall be installed on a concrete plinth of 300 mm height. The height of the support structure shall meet the following requirements. i) ii) Vertical clearance of lowest live part as mentioned in specification. Minimum height of 2450 mm above the top of concrete plinth (This is a Statutory Regulation)

The Circuit Breaker shall be connected to adjacent equipment in the switch yard through Drake conductor. The support structure shall be designed on the basis of applicable Indian/International Standards and codes of practice. 1.5 Operating mechanism, control cabinet & Associated equipments

Control cabinets shall preferably be of the free standing floor mounting type for EHV CBs. Control cabinets shall be sheet steel enclosed and shall be dust, water and vermin proof. Sheet steel shall be at least 2.6 mm thick when control cabinets are specified for indoor use and 3.0 mm thick when control cabinets are intended for outdoor operation. There shall be sufficient reinforcement to provide level surfaces, resistance to vibrations and rigidity during transportation and installation. Control cabinets shall be provided with double hinged door and padlocking arrangement. The door hinges shall be of union joint type to facilitate easy removal and the distance between hinges shall not exceed 350 mm. Door shall be properly braced to prevent wobbling. Sloping rain-hood shall be provided to cover all sides. 15mm thick neoprene or better type of gaskets shall be provided to ensure degree of protection of at least IP55 as per IS: 2147. Equipment and devices shall be suitable for operation on specified auxiliary A.C. supply system. Motors rated 1 kW and above being controlled from the control cabinet would be suitable for operation on a 415 V, 3 phase 50Hz system. Fractional kW motors would be suitable for operation on a 240V, 1Phase, two pole 50 Hz A.C. supply system, with one pole grounded. Push button shall be rated for not less than 6 Amps, 415 Volts A.C or 2 Amp,220 V D.C and shall be flush mounted on the cabinet door and provided with appropriate name plates. Red, green and amber indicating lamps shall be flush mounted and provided with series resistors to eliminate the possibility of short circuiting of control supply in the event of fusing of lamps.
Consultant: Snyder Energo Private Limited Bangalore & Chennai Section-4 9 of 140

DEIFY INFRASTRUCTURE LIMITED JAYASWAL NECO INDUSTRIAL LIMITED 2x25 MW CAPTIVE POWER PLANT

TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES DOC. NO : 4 3643 ELCT 001

For motors up to 5 kW, starters shall be direct-on-line with air break, single throw type contactors suitable for making and breaking the stalled current of the associated motor which shall be assumed equal to 6.5 times the full load current of the motor at 0.2 p.f. For motors above 5 kW, automatic star delta type starters shall be provided. 3 pole contactors shall be furnished for 3 phase motors and 2Pole contactors for single phase motors. Reversing contactors shall be provided with electrical interlocks between forward and reverse contactors. If possible, mechanical interlocks shall also be provided. Contactors shall be suitable for uninterrupted duty and shall be of duty category class AC4 as defined in IS 2959. The main contacts of the contactors shall be silver plated and the insulation class for the coils shall be Class E or better. The dropout voltage of the contactors shall not exceed 70% of the rated voltage. Contactor shall be provided with a three element, positive acting ambient temperature compensated, time lagged, hand reset type thermal over load relay with adjustable setting. Hand reset button shall be flush with the front door of the cabinet and suitable for resetting with starter compartment door closed. Relays shall be either direct connected or CT operated depending on the rated motor current. Single phasing protection shall be built in the thermal over load protection. Mini starters shall be provided with no volt coils when required. Power cables shall be of 1100 Volt grade stranded aluminum conductor, PVC insulated PVC sheathed single steel wire armoured and PVC jacketed. All necessary cable terminating accessories such as glands, crimp type tinned copper lugs etc., for power as well as control cables shall be included in Tenderer's scope of supply. Double compression type brass cable glands shall be provided for cable entry. Cable details for same will be furnished during vendor drawing review. Wiring for all control circuits shall be carried out with 1100 Volts grade PVC insulated tinned copper stranded conductors of sizes not smaller than 2.5 mm. At least 10% spare terminal blocks for control wire terminations shall be provided on each panel. The terminal blocks shall be similar to ELMEX type CAT-44. All terminals shall be provided with ferrules indelibly marked or numbered and these identifications shall correspond to the designations on the relevant wiring diagrams. The terminals shall be rated for adequate capacity which shall not be less than 10 Amps. Control cabinet shall be provided with 240 V, 1-phase 50 Hz, 20W fluorescent lighting fixture with on /off switch and a suitably rated 240 V, 1 phase, 15 amp, 3 pin socket for hand-lamp/hand tools. Suitable heaters shall be provided inside each cabinet. Heaters shall be controlled by suitable MCBs. All a-c control equipment shall be suitable for operation on 240V, 1 Phase two wire 50 Hz system, with one pole grounded.
Consultant: Snyder Energo Private Limited Bangalore & Chennai

Section-4

10 of 140

DEIFY INFRASTRUCTURE LIMITED JAYASWAL NECO INDUSTRIAL LIMITED 2x25 MW CAPTIVE POWER PLANT

TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES DOC. NO : 4 3643 ELCT 001

Item inside the cabinet made of organic material shall be coated with a fungus resistant varnish. For protection of AC/DC aux. circuits, MCBs of suitable capacity & reputed make to be provided. The schematic/ wiring diagram plate shall be provided on the door of the mechanism Box. The circuit breaker shall be designed for electrical local as well as remote control. In addition there shall be provision for local mechanical control. The operating mechanism shall be of motor charged spring closing type operated by electrical control under normal operation. The mechanism shall be adequately designed for the specified tripping and reclosing duty. The entire operating mechanism control circuitry, spring charging motor etc., as required, shall be housed in an outdoor type, steel enclosure. This enclosure shall conform to the degree of protection IP-55 of IS-2147/IEC 529. All metal parts in the mechanism shall be of corrosion resistant material. All bearings which require greasing shall be equipped with pressure grease fittings. The design of the operating mechanism shall be such that it shall be practically maintenance free. The guaranteed number of years of maintenance free operation, the number of possible full load and full rated short circuit current breaking operations without requiring any maintenance or overhauling shall be clearly stated in the tender bid. As far as possible, the need for lubricating the operating mechanism shall be kept to the minimum and eliminated altogether, if possible. The operating mechanism shall be anti-pumping and trip free. There shall be no rebounds in the mechanism and it shall not require any critical adjustments at site. Operation of the power operated closing device, when the circuit breaker is already closed, shall not cause damage to the circuit breaker or endanger the operator. Provision shall be made for attaching an operation analyser to facilitate testing of breaker at site. The technical requirement of spring type operating mechanism, and pneumatic mechanism shall be as below. 1.6 1.6.1 Specification for operating mechanism Spring operating mechanism i) The spring operating mechanism shall have adequate energy stored in the operating spring to close and latch the circuit breaker against the rated making current and also to provide required energy for the tripping mechanism in case the tripping energy is derived from the operating mechanism. The mechanism shall be capable of performing the rated operating duty cycle of O-0.3 Sec - CO - 3 min - CO. The spring charging motor shall not take more than 30 secs for fully charging the closing springs and provision shall be made for automatic charging of the closing springs as soon as they are discharged in a closing operation. For this, the mechanism shall be such that the charging of the springs by the motor does not interfere with the operation of the breaker.
Section-4 11 of 140

Consultant: Snyder Energo Private Limited Bangalore & Chennai

DEIFY INFRASTRUCTURE LIMITED JAYASWAL NECO INDUSTRIAL LIMITED 2x25 MW CAPTIVE POWER PLANT

TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES DOC. NO : 4 3643 ELCT 001

ii)

The motor shall be adequately rated to carry out a minimum of 10 close and open operations continuously. Overload relay shall be provided to protect the motor against overloads. In case of failure of power supply to the spring charging motor, the mechanism shall be capable of performing one sequence of O - 0.3 Sec - CO. Mechanical interlocks shall be provided in the operating mechanism to prevent discharging of the closing springs when the breaker is already in the closed position. Provision shall also be made to prevent a closing operation to be carried out with the spring partially charged. Facility shall be provided for manual charging of the closing springs. The actuating force required for manually charging the spring shall be less than 250N. In support of this requirement the Tenderer shall furnish the test report for actual requirement of force based on actual measurement.

iii) iv)

v)

1.6.2

Operating Mechanism Housing i) ii) The operating mechanism housing/control cabinet shall conform to additional requirements specified in Clause 7.16.6. All the electrical control equipments/switches, the operating point for manual spring charging handle etc. shall not be at a height of more than 1500mm from ground level OR from a suitable platform which shall be provided by Tenderer on the structure at a height not more than 750mm from ground level. The size of the platform shall be such that clear working space on the platform shall not be less than 300mm from all sides of operating mechanism/control box. The Tenderer shall specifically confirm that the offered breaker meets this requirement and furnish the G.A. Drawing showing the arrangement.

1.6.3

SF6 Gas The SF6 breakers shall be supplied with first filling of SF6 gas, which shall meet the requirements as below. In addition to this, 20 % of the total gas requirement shall be supplied in separate cylinders as spare requirement. (Every CB shall be provided with a separate cylinder). Specification and acceptance of new Sulphur Hexafluoride Gas (SF6)

Consultant: Snyder Energo Private Limited Bangalore & Chennai

Section-4

12 of 140

SI.No. 1

Technical particulars

Requirements non- Colourless, odourless, non toxic


DOC. NO : 4 3643 ELCT 001 TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES

Physical properties and JAYASWAL NECO INDUSTRIAL LIMITED flammable.


2x25 MW CAPTIVE POWER PLANT

DEIFY INFRASTRUCTURE LIMITED

2 3 4

Density at 20 deg.c and 1 bar Electric strength that of Nitrogen. Compatibility

6.08 grams/litre Two and one half times Up to temperature of about 180 deg. C. its compatibility with material used in electrical construction shall be similar to that of Nitrogen. SF6 gas shall comply with the requirements of the test as per clause 22 of IEC: 487-1971. Impurity or group: Maximum permitted concentration of impurities % by mass. CF 4 - 0.05% Oxygen + Nitrogen - 0.05% Water - 15 PPM Acidity expressed as HF - 0.3 PPM. Hydrolysable fluorides expressed as HF 1.0 PPM Oil content - Substantially free from oil.

Toxic impurities

6 7 8

Standard sizes of cylinders Preferred sizes of cylinders Test pressure of cylinder

3,5,10,20,40,80,150 and 500 litres 10 and 40 litres. According to gas cylinder rules 1981 and to comply with IS 7285-1974.

Maximum filling ratio for tropical -- do -country. Tests Toxicity test As per IEC 60376

10

Consultant: Snyder Energo Private Limited Bangalore & Chennai Carbon tetrafluoride

Water content and condensation -- do -temperature


Section-4 13 of 140

oxygen and -- do --

nitrogen contents.

DEIFY INFRASTRUCTURE LIMITED JAYASWAL NECO INDUSTRIAL LIMITED 2x25 MW CAPTIVE POWER PLANT

TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES DOC. NO : 4 3643 ELCT 001

Special Requirements of SF6 Gas Breaker i) SF6 breaker shall be so designed that upon loss of pressure the gap between open contacts shall be adequate to withstand at least the rated voltage at atmospheric pressure of gas. Tenderer shall clearly bring out in his offer, the precautions to be taken in the use of SF6 breaker. Following features shall be provided for monitoring of SF6 gas in the breaker: a. A temperature compensated SF6 gas density monitor with two potential free contacts of suitable rating. One of these contacts shall be used for annunciation of low density. The other contact shall be used by the Tenderer to ensure breaker lockout in the event of low SF6 gas density. The successful Tenderer shall furnish a chart showing relation between pressure and density of SF6 gas, as well as settings for alarm and lockout. Preferably temperature compensated pressure gauges shall be provided for SF6 gas, pneumatic air, as applicable. Gauge dials shall be clearly visible with naked eye to an observer standing on ground. Adequate number of pressure contacts, shall be provided for monitoring pressure of SF6 gas/air. The pressure switches shall be provided with sufficient number of potential free NO & NC contacts for Purchaser's use in control, protection and alarm circuits.

ii) iii)

b.

c.

iv)

For 132kV CBs independent gas system in each pole with separate pressure gauge, density monitor, gas filling port etc. should be provided if applicable. The Tenderer shall furnish along with the tender bid, detailed Schematic drawings showing all types of control, protection, monitoring schemes to be employed by him. The successful Tenderer shall be required to modify the schemes, if necessary, after discussions with the Purchaser/Consultant. Closing coil shall operate correctly at all values of voltage between 85% and 110% at the rated control voltage and trip coil shall operate correctly at all values of voltage between 70% and 110% of the rated control voltage.

v)

vi)

1.7

TESTS The Breaker offered shall have been type tested and validity of the type test reports shall not be more than five years from the date of offer for the following tests.

1.7.1

List of type tests


Section-4 14 of 140

Consultant: Snyder Energo Private Limited Bangalore & Chennai

DEIFY INFRASTRUCTURE LIMITED JAYASWAL NECO INDUSTRIAL LIMITED 2x25 MW CAPTIVE POWER PLANT

TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES DOC. NO : 4 3643 ELCT 001

i) ii) iii) iv) v) vi) vii) viii) ix) x) xi) xii) xiii) xiv) breaker). xv)

Basic short circuit tests. Short line fault tests. Out of phase making and breaking tests. Line charging breaking current tests. Cable charging breaking current tests. Single Capacitors Bank breaking current tests. Short time and peak withstand current tests. Lightning impulse voltage test. P.F.Voltage withstand test (dry & wet). Temperature rise test. Mechanical operation test. Degree of protection (IP55) for all cabinets. RIV Test/Visible corona test. Single phase short circuit test (for 3 phase mechanically gang operated Seismic test.

The type test shall be carried out at following Laboratories or at any other Laboratories accredited by National Accreditation Board for Testing & Calibration Laboratories (NABL). i) ii) iii) 1.7.2 Central Power Research Institute (CPRI). Electrical Research and Development Association, Vadodara (ERDA). Indian Institute of Technology (IIT) for Seismic Test.

Acceptance & Routine Tests All acceptance and routine tests as stipulated in relevant standards, amended up-to-date, shall be carried out by the Tenderer in the presence of Purchaser's representative without any extra cost to the Purchaser. (Note: - All measuring/testing equipments shall be of appropriate class of accuracy and shall have valid calibration certificates which shall be produced to the Inspecting Officer

Consultant: Snyder Energo Private Limited Bangalore & Chennai

Section-4

15 of 140

DEIFY INFRASTRUCTURE LIMITED JAYASWAL NECO INDUSTRIAL LIMITED 2x25 MW CAPTIVE POWER PLANT

TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES DOC. NO : 4 3643 ELCT 001

for verification) After finalisation of the programme of type/acceptance/routine testing, the Tenderer shall give three weeks advance intimation to the Purchaser, to enable him to depute his representatives for witnessing the tests. 1.8 INSPECTION The inspection may be carried out by the Purchaser or his representative at any stage of manufacture. The successful Tenderer shall grant free access to the Purchaser's representative/s at a reasonable notice when the work is in progress. Inspection and acceptance of any equipment under this specification by the Purchaser, shall not relieve the Tenderer of his obligation of furnishing equipment in accordance with the specification and shall not prevent subsequent rejection if the equipment is found to be defective. The Tenderer shall keep the Purchaser informed in advance, about the manufacturing programme so that arrangement can be made for stage inspection. The Purchaser reserves the right to insist for witnessing the acceptance/routine testing of the bought out items. The Tenderer shall keep the Purchaser informed, in advance, about such testing programme. 1.9 DOCUMENTATION After award of contract, the bidder shall submit 3 sets of drawings/documents to Purchaser/Consultant giving details, for scrutiny and approval. Once the drawings have been approved, no alteration or modification will be carried out without prior approval of the Purchaser.

The manufacturing of the equipment shall be strictly in accordance with the approved drawing and no deviation shall be permitted without the written approval of the purchaser. All manufacturing and fabrication work in connection with the equipment prior to the approval of the drawing shall be at the BIDDER's risk.

Approval of drawing/work by purchaser shall not relieve the BIDDER of his responsibility and liability for ensuring correctness and correct interpretation of the latest revision of applicable standards, rules and code of practices. After award of contract, the bidder shall also submit 2 sets of type test reports to C.E. (Tr. Pl.) for scrutiny and approval, before commencement of supply. Adequate copies of acceptance and routine test certificates, duly approved by the purchaser, shall accompany the dispatch consignment.

Consultant: Snyder Energo Private Limited Bangalore & Chennai

Section-4

16 of 140

DEIFY INFRASTRUCTURE LIMITED JAYASWAL NECO INDUSTRIAL LIMITED 2x25 MW CAPTIVE POWER PLANT

TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES DOC. NO : 4 3643 ELCT 001

2.0 SINGLE BREAK ISOLATOR 2.1 2.1.1 2.1.2 2.1.3 2.1.4 Scope of supply 132kV single break centre pole rotating motorized isolator without earth switch 4 nos. 132kV single break centre pole rotating motorized isolator with one manual earth switch 8 nos. 132kV single break centre pole rotating motorized isolator with two manual earth switches 1 no. Engineering, Design, fabrication, manufacture, assembly, shop testing including type test as specified and inspection at manufacturers works.

Consultant: Snyder Energo Private Limited Bangalore & Chennai

Section-4

17 of 140

DEIFY INFRASTRUCTURE LIMITED JAYASWAL NECO INDUSTRIAL LIMITED 2x25 MW CAPTIVE POWER PLANT

TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES DOC. NO : 4 3643 ELCT 001

2.1.5 2.1.6 2.1.7 2.1.8 2.1.9

Providing all labours, materials and equipment for testing at site as required. Unloading and storage at site. Commissioning of the isolators. All spare parts required for commissioning of the equipment/system covered under this specification. Recommended Spares for two (2) years of trouble free operation.

2.1.10 Special tools and tackles required for operation and maintenance inspection and repair of the equipment/system offered. 2.2 Standards SI. No. 1. Standard No. IS : 9921 Title Alternating current isolators (Disconnectors) and earthing switches -- do -Porcelain post insulators -- do -Degree of protection provided by enclosures. -- do -Three phase induction motors. Rotating electrical machines. Recommended practice for hot dip galvanising of iron and steel. Hot dip galvanization coating on structural steel. Method of testing weight thickness and uniformity of coating on fasteners.

2. 3. 4. 5. 6. 7. 8. 9.

IEC : 60129 IS : 2544 IEC : 168 IS : 13947 IS : 4691 IS : 325 IS : 4722 IS : 2629

10. 11.

IS : 4759 IS : 2633

Consultant: Snyder Energo Private Limited Bangalore & Chennai

Section-4

18 of 140

DEIFY INFRASTRUCTURE LIMITED JAYASWAL NECO INDUSTRIAL LIMITED 2x25 MW CAPTIVE POWER PLANT

TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES DOC. NO : 4 3643 ELCT 001

12. 13. 14. 15. 16.

IS : 1573 IS : 3033 IS : 2016 NEMA Pub. 107 ISRI 1972 Pub. 1-

Electro plated coating of zinc on iron and steel. Separating washers. Plain washers. Radio Interference Voltage Tests. -- do --

17. 18. 19.

IS 5561 IS 1554 IS 375

Power Connectors PVC Cables Marking and arrangement for switch gear busbar main connectors and auxiliary wirings. Recommended current rating for PVC insulated & PVC sheathed heavy duty cables. Standard for ERW pipes. Method for RIV test on high voltage insulators. Radio Interference voltage test.

20.

IS 3961

21. 22. 23. 2.3

IS 1239 IS 8263 IEC 437

PRINCIPAL TECHNICAL PARAMETERS SI.No . 1. Technical Parameter Requirement

Rated system voltage (kV rms) / Highest system voltage Rated normal current (Amps) Rated Freq. (Hz)

132/145 kV

2. 3.

650 50

Consultant: Snyder Energo Private Limited Bangalore & Chennai

Section-4

19 of 140

DEIFY INFRASTRUCTURE LIMITED JAYASWAL NECO INDUSTRIAL LIMITED 2x25 MW CAPTIVE POWER PLANT

TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES DOC. NO : 4 3643 ELCT 001

4. 5. 6. 7.

System Neutral Earthing No. of phases (Poles) Temperature rise Safe duration of overload a. 150% of rated current b. 120% of rated current

Effectively earthed 3 As per relevant IS / IEC Publication

5 minutes 30 minutes Single Break Rotating

8.

Type of disconnect (Air Break, AB) Short circuit interrupting current in kA rms

9.

40

9.1

Rated short time withstands current (kA rms) of Main 40 Switch (MS) and Earth Switch (ES) for 1 second. Rated Peak current (kAp) of MS and EB Rated short circuit (kApeak) making current of E.B. Special requirements 100

10.

11.

100 a) b) Earthing blades shall be capable to discharge the trapped charge of the line. Isolator Main switch shall be required to make or break line charging current when no significant change in voltage occurs across the isolating distance on account of make or break.

12.

13.

Basic insulation level 1) Lightning impulse with stand voltage: (kVpeak)

Consultant: Snyder Energo Private Limited Bangalore & Chennai

Section-4

20 of 140

DEIFY INFRASTRUCTURE LIMITED JAYASWAL NECO INDUSTRIAL LIMITED 2x25 MW CAPTIVE POWER PLANT

TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES DOC. NO : 4 3643 ELCT 001

a) To earth b) Across isolating distance 2) Rated power frequency withstand voltage (kVrms) a) To earth b) Across isolating distance 270 530 14. Minimum Creepage (mm) distance 650 1200

3625

15.

Rated Mech. Term load i) Straight load ii) Across load (kg.) (kg.) 102 33.65

16.

Rated Magnetising (Amp.) current / capacitive current make and break Phase to phase spacing (mm) for installation Minimum Clearances (mm) i. ii. Phase to earth Phase to phase

0.7

17.

2700

18.

1300 1300

19.

Required ground clearance from the lowest live part from the top of the concrete plinth ( mm )

4600

Consultant: Snyder Energo Private Limited Bangalore & Chennai

Section-4

21 of 140

DEIFY INFRASTRUCTURE LIMITED JAYASWAL NECO INDUSTRIAL LIMITED 2x25 MW CAPTIVE POWER PLANT

TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES DOC. NO : 4 3643 ELCT 001

20

Derating factor for specified site condition Rain hood Cross section Area of moving Blade/contacts

1 HDG MS,20 SWG 1250Amp >1000 sq. mm

21 22

23

Nos of operation the isolator can make without deterioration of contact Insulators base plate Contact zone

1000

24 25 2.4

HDG MS plate 10 mm thick As per IS 9921

GENERAL TECHNICAL REQUIREMENTS

2.4.1 Type of disconnects The disconnector, with support structure and without terminal connectors, shall be three phases gang operated horizontal Single break type with turn and twist type moving blades and vertical break earth blades as per requirement given in scope of supply. 2.4.2 Current carrying parts Material of earthing blades and contacts shall be the same as those of main switch moving blades and contacts respectively. Cross sectional area of earthing blades and contacts shall not be less than 50% of cross sectional area of main blades and contacts. The earthing blades shall have the same short time current rating (thermal and dynamic) as that of main switch. 2.4.3 Current density : Current density, to be adopted for all the parts of isolator shall not exceed the following limits: i) ii) Hollow tube sections Other sections - Copper - Copper - 2.0 A/sq. mm. - 1.6 A/sq. mm.

2.4.4 Insulators: The isolators shall be with solid core insulators only. The insulators shall have
Consultant: Snyder Energo Private Limited Bangalore & Chennai Section-4 22 of 140

DEIFY INFRASTRUCTURE LIMITED JAYASWAL NECO INDUSTRIAL LIMITED 2x25 MW CAPTIVE POWER PLANT

TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES DOC. NO : 4 3643 ELCT 001

cantilever strength of minimum 4 KN. The insulators shall be provided with a completely galvanized steel base design for mounting on the support. The base and mounting arrangement shall be such that the insulator shall be rigid and self supporting and no guying or cross bracings between phases shall be necessary. Three no of insulators per pole to be provided The insulator shall be made of homogenous and vitreous porcelain of high mechanical and dielectric strength. It shall have sufficient mechanical strength to sustain electrical and mechanical loading on account of wind load, short circuit process etc. Glazing of the porcelain shall be of uniform brown or dark brown colour with a smooth surface arranged to shade away rain water. The porcelain shall be free from lamination and other flaws or imperfections that might affect the mechanical or dielectric quality. It shall be thoroughly vitrified, tough and impervious to moisture. The porcelain and metal parts shall be assembled in such a manner and with such material that any thermal differential expansion between the metal and porcelain through the range of temperature specified in this specification shall not loosen the parts or create undue internal stresses which may affect the mechanical or electrical strength or rigidity. The assembly shall not have excessive concentration of electrical stresses in any section or across leakage surfaces. The cement used shall not give rise to chemical reaction with metal fittings. The insulator shall be suitable for water washing by rain or artificial means in service conditions. Cap to be provided on top of the insulator shall be of high grade cast iron/malleable steel casting or aluminium alloy. It shall be machine faced and hot dip galvanized. The cap shall have four nos. of tapped holes spaced on a pitch circle diameter of 127 mm. to accommodate the terminal clamp for supporting the Customers busbars for 132 kV rating class of insulators. The holes shall be suitable for bolts with threads having anticorrosive protection. The effective depth of threads shall not be less than the nominal diameter of the bolt. The bottom P.C.D. for the 132 kV rating shall be 200mm. The casting shall be free from blow holes, cracks and such other defects. All the ferrous metal parts shall be hot dip galvanized smoothly as IS 3638 (as amended upto date), IS 2623 or any other equivalent authoritative standard. The material shall be galvanised only after shop operations upon it have been completed. The metal parts before galvanization should be thoroughly cleaned of any paint, grease, rust, scales or alkalies or any foreign deposits which are likely to come in the way of galvanization process. The metal parts coating shall withstand minimum four one minute dips in copper sulphate solutions as per IEC168. The insulator unit shall be assembled in a suitable jig to ensure correct
Consultant: Snyder Energo Private Limited Bangalore & Chennai Section-4 23 of 140

DEIFY INFRASTRUCTURE LIMITED JAYASWAL NECO INDUSTRIAL LIMITED 2x25 MW CAPTIVE POWER PLANT

TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES DOC. NO : 4 3643 ELCT 001

positioning of the top and bottom metal fittings relative to one another. The faces of the metal fittings shall be parallel and at right angle to the axis of the insulator and corresponding holes in the top and bottom metal fittings shall be in a vertical plane containing the axis of the insulator. It shall be the sole responsibility of the Tenderer to carry out thorough inspection and quality checks on the insulators at the insulator Tenderer works, before offering the insulators for Customer's inspection. 2.4.5 Operating Mechanism : Manual operating mechanism individual operated through a crank and reduction gear shall be provided for switch. In addition, three phase AC Motor, operated mechanism shall be provided for main switch of motorised isolators. Manual operated mechanism individual operated through a lever/handle on operating shaft shall be provided for earth switch 2.4.6 Motor Motor shall be suitable for 3-phase 415V AC supply with variations as specified in this specification. Motor shall be squirrel cage induction motor suitable for direct-on-line (DOL) starting and shall generally confirm to IS 325.

Motor shall be total enclosed surface cooled (TESC) type with IP- 67 protection class after mounting on actuator.

It shall be possible to separate the motor from the lubricant filled gearing of actuator allowing easy replacement of motor without loosing any lubricant regardless of mounting position. Motor shall be minimum class F insulation with temperature rise restricted to class B. The motor shall withstand, without damage, stalled torque for at least three times the duration of tripping device. Motor shall be intermittent duty with following duty rating: open/close duty actuators 20 starts/hour. The operating mechanism shall provide quick, simple and effective operation. The design shall be such that one man shall be able to operate the isolator without undue effort. The main switch shall close or open with about 20 (TWENTY) revolutions of
Consultant: Snyder Energo Private Limited Bangalore & Chennai Section-4 24 of 140

DEIFY INFRASTRUCTURE LIMITED JAYASWAL NECO INDUSTRIAL LIMITED 2x25 MW CAPTIVE POWER PLANT

TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES DOC. NO : 4 3643 ELCT 001

the crank. The earth switch shall close or open by rotation of lever/hand through 90 degrees. The operating mechanism shall be suitable to hold the main switch or earth switch in closed or open position to prevent operation by gravity, wind, short circuit, seismic acceleration, vibration, shock, accidental touching etc. 2.4.7 Control Cabinet The control cabinet of each operating mechanism shall be made out of 10 SWG thick) sheet steel or 10 mm thick aluminum in the form of plate or casting. Control cabinet shall be provided with hinged doors along with pad 10 SWG thick arrangements. Sloping rain hood shall be provided to cover all sides. 15 mm thick neoprene or better type of gaskets shall be provided to ensure degree of protection of at least IP55 as per IS 2147. The cabinet shall be suitable for fixing on support structure with adjustment for vertical horizontal and longitudinal alignment. Details of the arrangement provided for such adjustment as well as for sealing shall be furnished along with the tender. The disconnector may be required to operate occasionally, with considerably long idle intervals. Special care shall be taken for selection of material for gear and lubrication of gears to meet this requirement. The gears shall be made of aluminum, bronze or any other better material and lubricated for life with graphite or better quality non draining and non hardening grease. Complete details of components, material, grade, self lubricating arrangement, grade of lubricants, details of jig, fixtures and devices used for quality check shall-be furnished by the tenderer. 2.4.8 Gland plate and glands A removable gland plate with double compression type brass cable glands shall be provided with each operating mechanism for terminating all cables. 2.4.9 Auxiliary switch: The operating mechanism for main switch shall be equipped with eight Nos. each of NO and NC and operating mechanism for earth switch shall be equipped with four Nos. of NO and NC separate and reliable auxiliary switches exclusively for Customer's interlocking and protection scheme. The Customer shall use these switches either directly or through contact multiplication relays for various protection schemes. The auxiliary switches and auxiliary circuits shall be capable of carrying current of at least 10 Amps continuously. Auxiliary switches shall be capable of breaking at least 2 A in a 220 VDC circuit with a time constant of not less than 20 milliseconds. The main requirement of the Aux. contacts of the Isolator is that Aux. contacts should
Consultant: Snyder Energo Private Limited Bangalore & Chennai Section-4 25 of 140

DEIFY INFRASTRUCTURE LIMITED JAYASWAL NECO INDUSTRIAL LIMITED 2x25 MW CAPTIVE POWER PLANT

TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES DOC. NO : 4 3643 ELCT 001

close before the primary (Main) contact closes and open after the primary contact opens. The auxiliary switches shall be actuated by a cam or similar arrangement directly mounted on the isolator shaft without any intermediate levers, linkages etc. to ensure fool-proof operation. 2.4.10 Terminal block and wiring Each operating mechanism shall be provided with 1100V grade stud type terminal block. All auxiliary switches, interlocks and other terminals shall be wired upto the terminal block. The terminal block shall have at least 20 percent extra terminals. All wiring shall be carried out with 1100V grade PVC (Poly Vinyle Chloride) insulated 2.5 sq.mm copper conductor. Maximum conductor temperature shall be as per I.S.:3961. 2.4.11 Interlocking Isolator Main switch and earth switch are required to be interlocked with associated switchgear and protection schemes through auxiliary contacts. It shall not be possible to operate the isolator and the earth switch without meeting the interlocking conditions. Further, mechanical interlocking between main switch and earth switch shall also be provided. Electrical interlocking shall be suitable for 220V d.c. supply. The device shall ensure locking the disconnector when in de energised condition. It shall be possible to engage the crank for operation by energising the device through push button, only when all interlocking contacts are through. Any modifications to scheme suggested by the Customer on scrutiny of the offer shall be acceptable to the tenderer. 2.4.12 Control Circuits Control device shall store OPEN and CLOSE command even if the corresponding switch is momentarily pressed until the command is fully executed and the components get de-energised after execution. Failure of auxiliary power supply or loose contact shall not cause faulty operation. 2.4.13 Limit Switch Limit switches to cut off power supply to motor at either end of travel shall be independent. An auxiliary switch shall not be used as limit switch. Details of make, rating and type of limit switch shall be furnished in the offer. 2.4.14 Overload and Single Phasing Preventer Suitable relay/device shall be provided to prevent over-loading of the motor. Single phase preventer shall be provided to operate on open circuiting of any phase and shall trip off the motor. Complete details of the devices shall be
Consultant: Snyder Energo Private Limited Bangalore & Chennai Section-4 26 of 140

DEIFY INFRASTRUCTURE LIMITED JAYASWAL NECO INDUSTRIAL LIMITED 2x25 MW CAPTIVE POWER PLANT

TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES DOC. NO : 4 3643 ELCT 001

furnished in the offer. 2.4.15 Contactor The contactor shall be suitable for making and breaking stalled motor current. The contactor coil shall be suitable for 220 V D.C. or 415 V A.C. with suitable interlocking D.C. relay to cut off A.C. supply to the motor in accordance with the interlocking scheme. Two Nos. of contactors shall be provided for each motor for OPEN and CLOSE operation respectively. Make, type, rating and details of the contactor shall be furnished in the offer. 2.4.16 Space heaters Space heater suitable for 1 phase 240V A.C. supply shall be provided for each motor operated operating mechanism to prevent condensation. A common switch and individual, fuse/link shall be provided in one of the operating mechanisms of three poles. 2.4.17 Interior illumination A Control cabinet shall be provided with 240 V, 1-phase 50 Hz, 20W fluorescent lighting fixture with on /off switch. 2.4.18 Power socket A 1 phase 240V 15A, 3 pin power socket for hand-lamp / hand tools shall be provided in one of the motor operated mechanisms of three poles. 2.4.19 Control and Auxiliary Supply A 3 phase switch with HRC fuses for phases and link for neutral shall, be provided for power supply and a 2 way switch with HRC fuses shall be provided for control supply in the motor operated mechanisms of three poles. 2.4.20 Accessories The accessories to be provided on the isolator shall include but not be limited to the following: 2.4.21 Position Indicator: A position indicator to show whether the isolator is in ON or OFF position. 2.4.22 Counter Balance Springs: Counter balance springs, cushions etc. shall be provided to prevent impact at the end of travel both on opening and closing of the isolator. The springs shall be made of durable and non-rusting type alloy.
Consultant: Snyder Energo Private Limited Bangalore & Chennai Section-4 27 of 140

DEIFY INFRASTRUCTURE LIMITED JAYASWAL NECO INDUSTRIAL LIMITED 2x25 MW CAPTIVE POWER PLANT

TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES DOC. NO : 4 3643 ELCT 001

2.4.23 Name Plates i) The disconnector shall be provided with a name plate. The nameplate shall be weather proof and corrosion-proof. It shall be mounted in such a position that it shall be visible in the position of normal service and installation. It shall carry the following information duly punched or engraved on it. Isolators base Name of the manufacturer A/T No Type, Designation Serial Number Rated voltage Rated normal current Rated short time current (kArms and duration in sec.) Rated short time peak current (kAp) Weight iii) Operating Device Name of manufacturer A/T No Type, Designation Reduction gear ratio A. C. Motor Rated auxiliary voltage Starting current : : : : : : : : M.S. E.S. : : : : : : : M.S. E.S.

ii)

Designation of AC motor as per IS: 4722 :


Consultant: Snyder Energo Private Limited Bangalore & Chennai

Section-4

28 of 140

DEIFY INFRASTRUCTURE LIMITED JAYASWAL NECO INDUSTRIAL LIMITED 2x25 MW CAPTIVE POWER PLANT

TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES DOC. NO : 4 3643 ELCT 001

Starting torque at 80'% of supply voltage. Over travel in degrees after cutting off supply Total operating time in seconds. CLOSE operation OPEN operation Space heater Rated voltage and power Auxiliary contacts Rated current (Amps) Time constant (ms) No. of contacts used (NC & NO) No. of free contacts (NC & NO) Terminal blocks & wiring Rated current Voltage grade and type : : : : : : : : electrical : electrical Manual Manual :

iv)

Interlocking device Type/ Make Voltage Wattage Any other particulars : : : :

2.4.24 Padlocking device i) The isolator and earthing switch shall be provided with padlock ing device to permit locking of the isolator and earthing switch in both fully open and fully closed positions .

2.4.25 Signaling
Consultant: Snyder Energo Private Limited Bangalore & Chennai Section-4 29 of 140

DEIFY INFRASTRUCTURE LIMITED JAYASWAL NECO INDUSTRIAL LIMITED 2x25 MW CAPTIVE POWER PLANT

TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES DOC. NO : 4 3643 ELCT 001

Signaling of the close position shall not take place unless the, movable contact has set in a position in which the rated normal current, the peak withstand current and the short time withstand currant can be carried satisfactorily. Signaling of open position shall not take place unless the movable contact has reached the position such that the clearance between the contacts is at least 80% of the isolating distance. 2.4.26 Earthing Flexible copper connections shall be provided between rotating earth blades and the frame which shall have cross section of at least 50 sq.mm and shall be tinned or suitably treated against corrosion. The frame of each disconnector and earthing switch shall be provided with two reliable earthing terminals for connection to the Customers earthing conductor / flat so also clamping screw suitable for carrying specified short time current. The diameter of clamping screw shall be at least 12 mm. The connecting point shall be marked with earth symbol. 2.5 Design and construction: Full particulars of design, manufacture, jig, template and qualify control devices developed for manufacture of the equipments offered in respect of the following items shall be furnished with drawings and descriptions along with the tender. i) ii) iii) iv) v) vi) vii) viii) ix) x) xi) Contacts, material, current density etc. Design of contact pressure Contact support and fixing arrangement on Insulators, Turn and twist mechanism, clamps locks etc. Bearings, housing of bearings, bushes etc. Balancing of heights Coupling pipes, joints, connection adjustments Base plates Down pipe, guides joints. Brass bushes and bearings at various joints Operating mechanism, type thickness of box, degree plate, gland etc.

Consultant: Snyder Energo Private Limited Bangalore & Chennai

Section-4

30 of 140

DEIFY INFRASTRUCTURE LIMITED JAYASWAL NECO INDUSTRIAL LIMITED 2x25 MW CAPTIVE POWER PLANT

TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES DOC. NO : 4 3643 ELCT 001

xii) xiii)

Nuts, bolts and fasteners Interlocking devices

All live parts shall be designed to have smooth surfaces without any sharp points, edges and other corona producing surfaces so as to eliminate corona at specified extinction voltage is not specified. 2.5.1 Fasteners Nuts, bolts and washers of 5\8" and higher size shall be hot dip galvanised. The bolts used on tapped holes of insulator cap shall be galvanised by centrifuge process to avoid excess deposition of zinc on threads. Nuts, bolts and washers of less than 5\8" size shall be of stainless steel .when used on live parts and nickel plated brass in other parts. 2.5.2 Contacts Contacts shall be made out of hard drawn electrolytic grade copper. Arcing contacts wherever provided shall close first and open last. The contact surface shall be silver plated to 15 micron thickness. Fabrication shall be made with suitable jig to avoid deviations during production. Details of size and shape of contacts, spring, back plate, fixing arrangements, design of contact pressure, life of contacts, limit of temperature rise etc. shall be furnished along with the tender. 2.5.3 Terminal Pad The Terminal pad shall be made out of electrolytic grade copper silver plated to 15 micron thickness. Dimensions of the terminal pad shall be furnished with holes by tenderer. Earth switch terminal pad shall also be made of electrolytic grade copper. 2.5.4 Mounting of contacts Fixed contacts shall be mounted on a block or channel welded to 10 mm thick M.S. plate with holes for fixing on insulators. Slots shall be provided for marginal adjustment of height of contacts. The contacts shall rest on a brass block and with Initial tension. Suitable device shall be provided to prevent from dashing, fabrication, welding etc. shall be done in suitable jig to avoid deviations during production. 2.5.5 Moving Blades Moving blade shall be made of electrolytic grade copper. Contact surface of moving blades shall be silver plated to 15 micron thickness. The surface shall be wiped during closing and opening operations to remove any film, oxide coating etc. Wiping action shall not cause scouring or abrasion of surfaces.
Consultant: Snyder Energo Private Limited Bangalore & Chennai Section-4 31 of 140

DEIFY INFRASTRUCTURE LIMITED JAYASWAL NECO INDUSTRIAL LIMITED 2x25 MW CAPTIVE POWER PLANT

TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES DOC. NO : 4 3643 ELCT 001

2.5.6 Turn and twist Mechanism Turn and twist mechanism shall be provided with adequate locking to avoid opening or closing by wind, short circuit force etc. on moving blade. The springs shall be made out or stainless steel or phosphor bronze or any other better material to have adequate strength and resilience and shall be encased with grease to avoid exposure in rain. The clamps and plates shall be made out of at least 10mm thick M.S. Plate or flat. Fasteners with nylock nuts shall be used wherever necessary. Vulnerable parts shall be fabricated by tubular gas cutting or milling. The entire mechanism shall be fabricated in suitable jig and template to avoid deviations during production. 2.5.7 Bearings Rotating - insulator shall be mounted on housing with bearings. The housing shall be made of gravity die cast Aluminum with smooth surfaces and suitably machined for seating the bearings. Two nos of bearings with adequate shaft diameter and distance between the bearings shall be provided to avoid wobbling during operations. The bearings shall be of at least 75 mm internal diameter for 145kV class rating isolators. The bearings shall be of reputed make and lubricated for life. All other friction locations shall be pro vided with suitable bearings of stainless steel or brass bushes. The bearings bushes, joints, springs etc. shall be so designed that no lubrication shall be required during the service. Complete details of bearings bushes, housing, greasing etc. shall be furnished with the tender. 2.5.8 Balancing of height Fixed insulators shall be provided with elevator base plate with four studs for balancing of heights. Thickness of plate and diameter of stud shall be 10mm and 25mm respectively, for isolators of rated voltage of 145 kv and above. Adequate numbers of nuts, lock nuts and washers shall be provided. Taper washer shall be provided to match inclined surface of steel sections. 2.5.9 Tandom Pipe Tandom pipes shall be of at least 25mm ID and class B. Tandom pipes shall be used for phase coupling of Single break, isolators. Base plate of insulators for connection of tandom pipe shall be made out of one piece of at least 10mm thick M.S. Plate. Bolt and shackle device shall be used to connect tandem pipe to the bass plate. Wherever unavoidable sliding clamps may be used. These clamps shall be made out of at least 10 mm thick M.S. Flat with four nos. of nuts and bolts. A grub screw shall be provided for securing connection on tandem pipes. 2.5.10 Down Pipe 50mm ID class B pipe shall be provided for operating disconnects. The pipe shall
Consultant: Snyder Energo Private Limited Bangalore & Chennai Section-4 32 of 140

DEIFY INFRASTRUCTURE LIMITED JAYASWAL NECO INDUSTRIAL LIMITED 2x25 MW CAPTIVE POWER PLANT

TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES DOC. NO : 4 3643 ELCT 001

be terminated into a suitable swivel or universal type joint between the insulator bottom bearing and the operating mechanism to take care of marginal angular misalignment at site. All brackets, guides etc. shall be mounted on the base of the isolator. Arrangement of mounting any guide, bracket, part etc. on support structure except the operating mechanism and the base shall not be accepted. 2.5.11 Base Each phase of isolator shall be provided with a rigid base fabri cated from steel sections made out of hot rolled Steel. The base channel shall be a composite frame connected back to back in the case of 245 kV rating Isolators. The base channel size and weight shall be as per I.S. 808(1989) or any latest I.S. and shall not be less than 125 x 65.mm for 245 kV rating Isolators. The base shall be suitable for mounting or support structures. Fabrication, welding etc shall be done by suitable jig, power press, templates to avoid deviations during production. Details and dimensions of sections, jig, templates and device used for production of the base shall be furnished with the offer. 2.5.12 Assembly The disconnector shall be fully assembled at the works of the tenderer. Typical operations shall be carried out 'on each type of fully assembled disconnector to ascertain that all parts fit correctly and function satisfactorily. 2.5.13 Painting, galvanizing and climate proofing All interiors and exteriors of enclosures, cabinets and other metal parts shall be thoroughly cleaned to remove all rust, scales, corrosion, grease and other adhering foreign matter and the surfaces treated by recognized phospating (e.g. seven tank phospating sequenced). After such preparation of surfaces, two coats of zinc oxide primer shall be given by suitable staving and air drying ate. before final painting. Colour of the final paint shall be of shade 631 of IS: 5 i.e. light gray. The final painted cubical shall present asthetically pleasing appearance free from any dent or uneven surface. Paint inside the metallic housing shall be of anti-condensation type and the paint on outside surfaces shall be suitable for' outdoor installation. All ferrous parts not suitable for painting such as structural steel pipes rods, levers, linkages, nuts and bolts used in other than current path etc. shall be hot dip galvanized. Galvanization shall be done after completion of fabrication which shall be done after completion of fabrication which shall be capable to prevent corrosion in view of the severe climatic conditions. Thickness of zinc coating shall not be less than 610gm of zinc per sq. meter of surface. Zinc coating shall be smooth clean and of uniform thickness and free from defect. Preparation of galvanizing and the galvanizing itself shall not adversely affect the mechanical properties of the coated material. The affect the mechanical properties of the
Consultant: Snyder Energo Private Limited Bangalore & Chennai Section-4 33 of 140

DEIFY INFRASTRUCTURE LIMITED JAYASWAL NECO INDUSTRIAL LIMITED 2x25 MW CAPTIVE POWER PLANT

TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES DOC. NO : 4 3643 ELCT 001

coated materials. The quality shall be established by tests as per IS2633. Galvanising of nuts and bolts shall be carried out by centrifugal or suitable process so that the bolts will easily fit into the tapped holes/nuts. All components shall be given adequate treatment of climate proofing as per IS:3202 so as to withstand corrosion and severe service conditions. Complete details of painting, galvanizing and climate proofing of the equipments shall be furnished in the offer. 2.6 TESTS

2.6.1 Type Tests Short time current test Lightening impulse test (Dry/Wet) power impulse test Temperature rise test Mechanical endurance test IP- 55 Test IP- 67 Test High volt test on solid core post insulator test Additional Test applicable as per IS 2.6.2 Routine Test /Acceptance Test Visual and dimension check Voltage test on control & Auxiliary circuit Measurement of resistance of the main circuit Mechanical operation test Additional Test applicable any The equipment/material offered should have been successfully type tested in any NABL (National Accreditation Board for Testing and Calibration Laboratories) accredited test laboratory in line with relevant standards, amended up to date,
Consultant: Snyder Energo Private Limited Bangalore & Chennai Section-4 34 of 140

DEIFY INFRASTRUCTURE LIMITED JAYASWAL NECO INDUSTRIAL LIMITED 2x25 MW CAPTIVE POWER PLANT

TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES DOC. NO : 4 3643 ELCT 001

Standard and Technical Specification within the last 5(five) years prior the date of opening of the Tender. The Tenderer shall be required to submit four (4) copies of the Type Test Reports along with the offer. In case these type tests are conducted earlier than five years all the type tests shall be carried out by the successful Tenderers in the presence of Customers representative free of cost. If there is any change in the components or design in the equipment since after earlier passing of the Type Test, the Tenderer shall bring out in his offer all such changes made in the components, materials, designs etc. In such case the Tenderer shall carryout the Type Tests at his cost and in the presence of Customer's representative. Even if the equipment /material has been Type Tested earlier, the Customer reserves the right to demand repetition on one or more tests included in the list of Type Tests in the presence of Customer's representative. For this purpose the Tenderer shall quote unit rates for carrying out each Type Test included in the list of type tests as per relevant Standard and Tender Specification. During the type test the disconnector shall be mounted on its own support structure of equivalent support structure and installed with its own operating mechanism to make the type test representative. Drawing of equivalent support structure if any and mounting arrangements made for type test shall be furnished for Customers approval before conducting the type tests. The type tests shall be conducted on the disconnector along with approved insulators and terminal connectors. Mechanical endurance test shall be conducted on the main switch as well as earth switch on one disconnector of each type. The Customer reserves the right to conduct Type Tests included in list of Type Tests on requisite number of samples/ items from any of the lots during the presence of Customers representatives. If the equipment/material doesnt withstand the Type Test then the equipment / material supplied till then will be liable for rejection. These Type Tests shall however be conducted by the Tenderer within a reasonable time. After successful passing of the Type Tests, all the equipments/material supplied earlier shall be modified in line with the equipment/materials which has successfully passage the Type Test. Incase Tenderer fails to carryout the Type Tests within reasonable time or doesn't agree to carryout the Type Tests at his cost, his equipment/material supplied earlier shall be rejected and order placed shall be cancelled and payments made earlier for these supplies shall be recovered by the Customer. 2.6.3 Acceptance and Routine Tests All acceptance and routine tests as stipulated in the relevant standards shall be carried out by the Tenderer in presence of Customer's representative.
Consultant: Snyder Energo Private Limited Bangalore & Chennai Section-4 35 of 140

DEIFY INFRASTRUCTURE LIMITED JAYASWAL NECO INDUSTRIAL LIMITED 2x25 MW CAPTIVE POWER PLANT

TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES DOC. NO : 4 3643 ELCT 001

Mechanical operation test (routine test) shall' be conducted on the complete disconnect (Main switch and Earth switch) at Tenderer's works and a certified test report be furnished to the Customer. Alternatively the tenderer may offer to conduct this test at Customer's substation in which case the Customer shall make necessary arrangement to erect the disconnector at his substation site under supervision of tenderer's representatives (if necessary) in case this test is offered to be conducted at site. Expenses of the tenderer's representative for supervision shall not be borne by the Customer. The test report of power frequency voltage withstand test con ducted on the insulator shall be furnished for Customers acceptance in lieu of conducting the power frequency (dry) test on main circuit (routine test). Immediately after finalization of the programme of type/ac ceptance/routine testing, the Tenderer shall give three weeks' advance intimation to the Customer, to enable him to depute representative for witnessing the tests. 2.6.4 Special Tests Test on insulators IS:2544 Test on insulators IEC-168 Operation test on operating mechanism and interlocking. Endurance test on auxiliary switches Test certificates and documents in respect of following items shall be furnished at the time of routine tests. i) Chemical analysis of copper along with a copy of central excise certificate/gate pass indicating genuine source or procurement of electrolytic grade copper. Bearings Fasteners Universal / Swivel joint coupling Insulators Gears Auxiliary Switch Interlocking Devices
Section-4 36 of 140

ii) iii) iv) v) vi) vii) viii)

Consultant: Snyder Energo Private Limited Bangalore & Chennai

DEIFY INFRASTRUCTURE LIMITED JAYASWAL NECO INDUSTRIAL LIMITED 2x25 MW CAPTIVE POWER PLANT

TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES DOC. NO : 4 3643 ELCT 001

ix)

Terminal block

The Customer may at his discretion request additional test certificates for other items as reasonably required to substantiate the quality of the same. 2.7 DOCUMENTATION After award of contract, the bidder shall submit 3 sets of drawings/documents to Purchaser/Consultant giving details, for scrutiny and approval. Once the drawings have been approved, no alteration or modification will be carried out without prior approval of the Purchaser.

The manufacturing of the equipment shall be strictly in accordance with the approved drawing and no deviation shall be permitted without the written approval of the purchaser. All manufacturing and fabrication work in connection with the equipment prior to the approval of the drawing shall be at the BIDDER's risk.

Approval of drawing/work by purchaser shall not relieve the BIDDER of his responsibility and liability for ensuring correctness and correct interpretation of the latest revision of applicable standards, rules and code of practices. After award of contract, the bidder shall also submit 2 sets of type test reports to C.E. (Tr. Pl.) for scrutiny and approval, before commencement of supply. Adequate copies of acceptance and routine test certificates, duly approved by the purchaser, shall accompany the dispatch consignment.

2.8 2.8.1

INSPECTION The inspection may be carried out by the Customer at any stage of manufacture. The successful Tenderer shall grant free access to the Customer's representative at a reasonable time when the work is in progress. Inspection and acceptance of any equipment under this specification by the Customer, shall not relieve the Tenderer of his obligation of furnishing equipment in accordance with the specification and shall not prevent subsequent rejection if the equipment is found to be defective. The Tenderer shall keep the Customer informed in advance about the manufacturing programme so that arrangement can be made for inspection.

2.8.2 The Customer reserves the right to insist for witnessing acceptance/routine testing of the bought out items. 2.9 QUALITY ASSURANCE PLAN
Section-4 37 of 140 Consultant: Snyder Energo Private Limited Bangalore & Chennai

DEIFY INFRASTRUCTURE LIMITED JAYASWAL NECO INDUSTRIAL LIMITED 2x25 MW CAPTIVE POWER PLANT

TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES DOC. NO : 4 3643 ELCT 001

2.9.1

The tenderer shall invariably furnish QAP for information along with his offer.

3.0 INSTRUMENT TRANSFORMERS 3.1 3.1.1 3.1.2 3.1.3 3.1.4 3.1.5 Scope of supply 132kV, single phase, outdoor and oil immersed type, 5 core current transformer 12 nos. 132kV, single phase, outdoor and oil immersed type, 1 core current transformer 6 no. 132kV, single phase, outdoor and oil immersed type, 3 winding capacitor voltage transformer 6 nos. 132kV, single phase, outdoor and oil immersed type, 1 winding capacitor voltage transformer 6 nos. Engineering, Design, fabrication, manufacture, assembly, shop testing including type test as specified and inspection at manufacturers works.

Consultant: Snyder Energo Private Limited Bangalore & Chennai

Section-4

38 of 140

DEIFY INFRASTRUCTURE LIMITED JAYASWAL NECO INDUSTRIAL LIMITED 2x25 MW CAPTIVE POWER PLANT

TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES DOC. NO : 4 3643 ELCT 001

3.1.6 3.1.7 3.1.8 3.1.9

Providing all labours, materials and equipment for testing at site as required. Unloading and storage at site. All spare parts required for commissioning of the equipment/system covered under this specification. Recommended Spares for two (2) years of trouble free operation

3.1.10 Special tools and tackles required for operation and maintenance inspection and repair of the equipment/system offered. 3.2 3.2.1 Standards CURRENT TRANSFORMER SI.No. 1. 2. 3. 4. 5. 6. 7. Standard No. IS-2165 IS-2705(I-IV) IS-2099 IS-3347 IS-2071 IS-335 IS-2147 Title Insulation co-ordination of highest voltages for equipment. Current Transformers High voltage porcelain bushing. Dimensions of porcelain transformer bushing. Method of high voltage testing. Insulation oil for transformers and switchgears. Degree of protection provided by enclosures for low voltages, switchgear and control. Current transformers. Partial discharge measurement. Instrument transformer measurement of PDs. Insulation co-ordination. High voltage test techniques.
Section-4 39 of 140

8. 9. 10. 11. 12.

IEC-44-1 IEC-270 IEC-44(4) IEC-171 IEC-60

Consultant: Snyder Energo Private Limited Bangalore & Chennai

DEIFY INFRASTRUCTURE LIMITED JAYASWAL NECO INDUSTRIAL LIMITED 2x25 MW CAPTIVE POWER PLANT

TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES DOC. NO : 4 3643 ELCT 001

13. 14. 3.2.2

IEC-8263 IEC-60044

Method of RIV tests on high voltage insulators. International standard.

POTENTIAL TRANSFORMERS SI.No. 1. 2. 3. 4. 5. Standard No. IS-3156 IS-2099 IS-3347 IS-335 IS-3202 Title Voltage transformers. High voltage porcelain bushings. Dimensions of porcelain transformer bushing. Insulating oil for transformers and switchgears. Code of practice for climate proofing of electrical equipments. Degree of protection provided by enclosures for low voltage switchgears and controls. Voltage transformers. Porcelain housing for instrument transformers.

6.

IS-2147

7. 8. 3.3 3.3.1

IEC-186 IEC-815

PRINCIPAL TECHNICAL PARAMETERS Current transformers SI.No. 1. Technical Parameter Type of CT/ Installation Requirement Single phase, Live tank, Outdoor, Oil filled and Hermetically sealed Pedestal type 50 Hz Achievable by secondary side
Section-4 40 of 140

2. 3. 4.

Type of mounting Suitable for system frequency Ratio taps

Consultant: Snyder Energo Private Limited Bangalore & Chennai

DEIFY INFRASTRUCTURE LIMITED JAYASWAL NECO INDUSTRIAL LIMITED 2x25 MW CAPTIVE POWER PLANT

TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES DOC. NO : 4 3643 ELCT 001

reconnection at CT terminals 5. Method of earthing the system to be connected to Rated continuous thermal current(A) Acceptable limit of temperature rise above the specified ambient temperatures for continuous operation at rated current Acceptable partial discharge level at 1.1 times the rated voltage Max .radio interference voltage at 1.1 times the rated voltage Current Ratio Nominal system voltage Number of core CT ratio / Accuracy class / Burden 11. Rated system voltage / Highest system voltage (kV rms) Basic Insulation level(kVp) One minute dry power frequency withstand voltage primary(kV rms) (Dry/Wet) One minute power frequency withstand voltage secondary (kV rms) 13. Rated short time withstand current 132kV As Per Annexure-I Solidly Effectively earthed

6.

120% of the rated primary current

7.

As per IS 2705/ IEC 44-1

8.

As per IEC 44.1

9.

Less than 500 micro volts

10.

145kV

12.

650 270

40

Consultant: Snyder Energo Private Limited Bangalore & Chennai

Section-4

41 of 140

DEIFY INFRASTRUCTURE LIMITED JAYASWAL NECO INDUSTRIAL LIMITED 2x25 MW CAPTIVE POWER PLANT

TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES DOC. NO : 4 3643 ELCT 001

for 1 second duration (kA rms) 14. Rated dynamic withstand current(kAp) Visual corona extinction voltage(kV rms) Minimum creepage distance of porcelain housing(mm) Primary Terminals requirement Mounting Frame size requirement(mm) mounting holes 19. Type of oil compensation provided. Type of Tank Suitable test tap for measurement of capacitance tan delta 600x600mm 30mm SS Bellow 100

15.

156

16.

3625

17. 18.

30x80 mm

20. 21.

Live To be provided

3.3.2

Capacitor Voltage Transformers SI.No. 1. Technical Parameter Type Requirement Single phase/Outdoor type of oil filled and hermetically sealed. Pedestal type On secondary side by reconnection of link.

2. 3.

Type of mounting Ratio taps(wherever applicable) Rated voltage factor

4.

1.2 Continuous & 1.5 for 30 seconds.


Section-4 42 of 140

Consultant: Snyder Energo Private Limited Bangalore & Chennai

DEIFY INFRASTRUCTURE LIMITED JAYASWAL NECO INDUSTRIAL LIMITED 2x25 MW CAPTIVE POWER PLANT

TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES DOC. NO : 4 3643 ELCT 001

5.

Number of winding / PT ratio / Accuracy class / Burden Nominal system voltage Highest system voltage (kV rms.) Basic insulation level(kVP) One minute power frequency withstands voltage primary dry/wet (kV rms.)/ secondary Kvrms

As Per Annexure-II

6. 7.

132kV 145

8.

650 270/ 3

9.

Minimum creepage distance (mm). Acceptable limits of temperature rise. Mounting details

3625

10.

As per IEC

11.

700x700 Holes 30mm

12. 13. 3.4 3.4.1

Primary Terminal (mm) Type of oil compensation

30 x 80mm SS Bellow or Nitrogen cushion

GENERAL TECHNICAL REQUIREMENTS Common for all instrument transformers The insulation of the instrument transformers shall be so designed that the internal insulation shall have higher electrical withstand capability than the external insulation. The designed dielectric withstand values of external and internal insulations shall be clearly brought out in the Guaranteed technical particulars (GTP) for instrument transformers (To be filled by tenderer). The dielectric withstand values specified in this specification are meant for fully assembled instrument transformer. Porcelain Housing

Consultant: Snyder Energo Private Limited Bangalore & Chennai

Section-4

43 of 140

DEIFY INFRASTRUCTURE LIMITED JAYASWAL NECO INDUSTRIAL LIMITED 2x25 MW CAPTIVE POWER PLANT

TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES DOC. NO : 4 3643 ELCT 001

i)

The porcelain housing shall be of a single piece construction without any joint or coupling. The housing shall be made of homogeneous, vitreous porcelain of high mechanical and dielectric strength. Glazing of porcelain shall be of uniform brown or dark brown colour with a smooth surface arranged to shed away rainwater or condensed water particles. (fog.). The profile of porcelain shall be aerodynamic type as per IEC 815. Details of attachment of metallic flanges to the porcelain for pressure release valve, and primary/secondary terminals shall be brought out in the offer.

ii)

Metal tanks i) The metal tanks shall have bare minimum number of welded joints so as to minimize possible locations of oil leakage. The metal tanks shall be made out of mild steel. The thickness of the metal tank shall be more than 3.00mm. Actual thickness provided shall be specified by the tenderer.

Surface finish i) The metal tanks shall be coated with at least two coats of zinc rich epoxy painting. All the ferrous hardware, exposed to atmosphere, shall be hot dip galvanized. All other fixing nuts, bolts, washers in the electrical current path shall be made out of stainless steel.

Insulating oil i) Insulating oil required for first filling of the instrument transformer shall be covered in Tenderer's scope of supply. The oil shall meet the requirements of latest edition of IS 335.

Prevention oil leakages and entry of moisture i) As specified elsewhere in this specification, the instrument transformer shall be guaranteed for a trouble free and maintenance - free performance for a period as specified by tenderer. Therefore, the Tenderer shall ensure that the sealing of instrument transformer is properly achieved. In this connection the arrangement provided by the Tenderer at various locations including the following ones shall be described, supported by sectional drawings. Locations of emerge of primary and secondary terminals. Interface between porcelain housing and metal tanks Cover of the secondary terminal box

Consultant: Snyder Energo Private Limited Bangalore & Chennai

Section-4

44 of 140

DEIFY INFRASTRUCTURE LIMITED JAYASWAL NECO INDUSTRIAL LIMITED 2x25 MW CAPTIVE POWER PLANT

TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES DOC. NO : 4 3643 ELCT 001

ii)

Nuts and bolts or screws used for fixation of the interfacing porcelain bushings for taking out terminals shall be provided on flanges cemented to the bushings and not on the porcelain. For gasket joints, wherever used nitrite butyl rubber gaskets shall be used. The gasket shall be fitted in properly machined groove with adequate space for accommodating the gasket under compression.

iii)

Oil level indicators i) For compensation of variation in volume of the oil due to temperature variation, nitrogen cushion or Stainless Steel bellows shall be used, Rubber diaphragms shall not be permitted for this purpose. Instrument transformer provided with nitrogen cushion for Compensation of oil volume variation shall be provided with prismatic type oil sight window at suitable location so that the oil level is clearly visible with naked eye to an observer standing at ground level. If metal bellow is used for the above purpose, a ground glass window shall be provided to monitor the position of metal bellow.

ii)

Earthing i) Metal tank of the instrument transformer shall be provided with two separate earthing terminals for bolted connection to 50 x 8 mm MS flat for connection to station earth-mat. The size of two numbers of earthing terminals shall be 16mm dia x 30mm length, HDG (Hot Dip Galvanized), with one plain washer and one nut. Instrument transformers shall be provided with suitable lifting arrangement, to lift the entire unit. The lifting arrangement (lifting eye) shall be positioned in such a way as to avoid any damage to the porcelain housing, primary terminals or the tanks during the process of lifting for installation/transport. The general arrangement drawing shall show clearly the lifting arrangements provided such as lifting eye, lug, guides etc.

ii)

Name plate i) The instrument transformer shall be provided with noncorrosive, legible nameplates, with the information specified in relevant standards, duly engraved/punched on.

Enamel, if used for conductor insulation, shall be either polyvinyl acetate type or amide type and shall meet the requirements of IS 4800. Polyester enamel shall not be used. Double cotton cover, if used, shall be suitably covered to ensure that it does not come in contact with oil.

Consultant: Snyder Energo Private Limited Bangalore & Chennai

Section-4

45 of 140

DEIFY INFRASTRUCTURE LIMITED JAYASWAL NECO INDUSTRIAL LIMITED 2x25 MW CAPTIVE POWER PLANT

TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES DOC. NO : 4 3643 ELCT 001

Oil filling and/or oil sampling cocks to be provided. It is to be ensured that due to opening / closing of cock hermetic sealing shall not be disturbed further, sufficient extra oil shall be available in the CT to take out sample for DGA test throughout the working life of CT. 3.4.2 Current transformer The C.T. shall be of dead tank / live tank design and shall be so constructed that it can be easily transported to site within the allowable transport limitation, even in horizontal position, if the transport limitation so demands. The C.T. shall be hermetically sealed and method of such sealing shall be detailed in the offer and shall be subject to the approval of the Customer. The C.T. secondary terminals shall be brought out in a weatherproof terminal box. The terminal box shall be provided with removable gland plate and glands. The cable glands shall be suitable for 1100 volts grade PVC insulated, PVC sheathed multi core stranded 6 sq.mm copper or 10 sq.mm. aluminum conductor cable. This terminal box shall be dust and vermin proof. The dimensions of the terminal box and its opening shall be adequate to enable easy access and working space with the use of normal tools. Polarity shall be invariably marked in each primary and secondary terminal. Facility shall be provided for short circuiting and grounding of the CT secondary terminals inside the terminal box. The CT shall be provided with a rating plate with dimensions and marking as per IS 2705. The markings shall be punched and not painted. The serial number and code of the Tenderer shall also be punched on the tank to identify the unit in case of loss or damage to the rating plate. The Current Transformer shall be vacuum filled with oil after processing and thereafter hermitically sealed to eliminate breathing and to prevent air and moisture entering into the tank. Oil filling and/or oil sampling cock to be provided. It is to be ensured that due to opening / closing of cock hermetic sealing shall not be disturbed, further extra oil shall be available in the CT to take out sample for DGA test throughout the working life of the CT. The casting of base collar etc. shall be die-cast and tested before assembly to detect cracks and voids if any. The instrument security factor of metering core shall be low enough, but not greater than 5. This shall be demonstrated on all the ratios of metering core in accordance with procedure specified in IEC44-1 or IS2705. In case the instrument security factor of 5 or less is not possible to be achieved on higher ratio, auxiliary CTs of ratio 1/1 and 0.2 accuracy class shall be deemed to be included in the tenderers scope of supply. This shall also be specifically brought-out by the tenderer in his offer. 3.4.3 Primary winding
Section-4 46 of 140

Consultant: Snyder Energo Private Limited Bangalore & Chennai

DEIFY INFRASTRUCTURE LIMITED JAYASWAL NECO INDUSTRIAL LIMITED 2x25 MW CAPTIVE POWER PLANT

TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES DOC. NO : 4 3643 ELCT 001

i)

Primary winding shall be hair-pin type or wound type made out of high conductive copper or Aluminum Specific reasons for selection of particular metal/alloy and its merits shall be clearly brought out in the offer. Conductors used for the primary winding shall be rigid or housed in rigid metallic shell. Unavoidable joints in the primary winding shall be welded type. The details of such welded joints shall be indicated in the drawings submitted with the offer. For primary winding, current densities shall not exceed the following limit for normal current. For Live tank CTs primary winding material of copper or Aluminum. The primary winding shall be bar/wound type. For copper For Aluminum 1.65 A/sq.mm. 1.00 A/sq. mm.

ii)

The design density for short circuit current as well as conductivity of the metal used for primary winding shall meet the relevant requirement of IS2705. The tenderer shall, in his offer furnish detailed calculations for selection of winding cross sections. The cross section area of primary winding, cross section of secondary winding, number of primary turns, number of secondary turns, current density etc shall be mentioned by the tenderer. The primary winding shall be designed for extended primary current at 120% of rated primary current.

iii)

iv) 3.4.4

Secondary winding i) Suitably insulated copper wire of electrolytic grade shall be used for secondary windings. Type of insulations used shall be described in the offer. For multi-ratio design, the multi-ratio shall be achieved by reconnection of the secondary terminals at the CT. The excitation current of the CT shall be as low as possible. The tenderer shall furnish, along with his offer, the magnetizing curve/s for all the core/s.

ii)

3.4.5

Primary terminals Each primary terminal shall be made of 30 dia.x80 mm length copper /Aluminum. The primary terminal shall be of heavily tinned electrolytic copper of 99.9% conductivity. The minimum thickness of tinning shall be 15 microns. Expansion chamber at the top of porcelain insulator should be suitable for expansion of oil and have provision for twin primary terminals.

3.4.6

Secondary terminals
Section-4 47 of 140

Consultant: Snyder Energo Private Limited Bangalore & Chennai

DEIFY INFRASTRUCTURE LIMITED JAYASWAL NECO INDUSTRIAL LIMITED 2x25 MW CAPTIVE POWER PLANT

TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES DOC. NO : 4 3643 ELCT 001

Secondary terminal studs shall be provided with atleast 3 nuts and adequate plain and spring washer for fixing the leads. The studs, nuts and washer shall be made of brass duly nickel-plated. The minimum outside diameter of stud shall be 6mm. The length of atleast 15mm shall be available on the studs for inserting the leads. Horizontal spacing between centers of adjacent studs shall be atleast 1.5 times the circum dia of the nuts. The current transformer shall be provided with CT ratio changing facility on CT secondary side terminals only. Current transformer characteristic shall be such as to provide satisfactory performance for burdens ranging from 25% to 100% of rated burden over a range of 5% to120% of rated current in case of metering CTs and upto accuracy limit factor/knee point voltage in case of protection CTs. Following accessories/fittings shall, but not restricted to be supplied along with the current transformers. i) Pressure release device. ii) Oil level indicator. iii) Lifting lugs. 3.4.7 Capacitor Voltage Transformers (CVT) The CVT shall be vacuum filled with oil after processing and hermetically sealed to eliminate breathing and to prevent air and moisture entering the tanks. Method adopted for hermetic sealing shall be described in the offer and shall be subject to approval of the Customer. The 132kV CVT shall be so constructed that it can be easily transported. 3.4.8 Primary winding Primary winding shall be made of suitably insulated electrolytic copper wire. Type of insulation used shall be described in the offer. The CVT shall be provided with suitable taps on the secondary windings and the same shall be brought out at the terminals to enable the connections to be made at site for operation at either of the voltages specified. The change-over shall be suitable for locking after the reconnections. The arrangement provided for change over as well as locking shall be clearly brought out in the tender bid. The rating and the diagram plates specified elsewhere in this specification should also indicate the above reconnection arrangement.
Consultant: Snyder Energo Private Limited Bangalore & Chennai

Section-4

48 of 140

DEIFY INFRASTRUCTURE LIMITED JAYASWAL NECO INDUSTRIAL LIMITED 2x25 MW CAPTIVE POWER PLANT

TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES DOC. NO : 4 3643 ELCT 001

3.4.9

Secondary winding Suitably insulated copper wire of electrolytic grade shall be used for secondary windings. Type of insulation used shall be described in the offer. The secondary windings of the CVT shall be protected by 2 Nos. of MCB in parallel for each core. The CVT secondary terminal shall be brought out to a weatherproof terminal box. MCBs meant for protection of secondary winding shall also be located in the terminal box. The terminal box shall be provided with removable gland plate and glands suitable for 1100 volts grade PVC insulated, PVC sheathed multi-core 2.5sq.mm. to 10 sq.mm. stranded copper or aluminum conductor cable. The terminal box shall be dust and vermin proof. Suitable arrangement space heater shall be provided for drying the air inside the terminal box. The dimensions of the opening of terminal box shall be adequate to enable easy access and working space with the use of normal tools. Polarity shall be invariably marked at the secondary terminals in the terminal box. The CVT shall be provided with a rating plate with dimensions and markings as per IS 3156. The markings shall be punched and not painted.

3.4.10 Primary terminals The primary terminal shall be of size 30mm dia x 80mm length for all CVTs. The primary terminal shall be of heavily tinned electrolytic copper of 99.9% conductivity. The minimum thickness of tinning shall be 15 microns. 3.4.11 Secondary terminals For external connection of secondary windings, terminal studs shall be provided with at least 3 nuts and adequate plain and spring washers. The studs, nuts and washers shall be of brass properly nickel-plated. The size of stud shall be 6mm outside dia. A length of at least 15mm shall be available on the studs for inserting the leads. Horizontal spacing between the centers of adjusant stud shall be at least 1.5 times the circum dia of the nuts. 3.5 TESTS Sr.No. A 1. 2. Particulars Type Test Short time current tests. Temperature rise test. As per IS/IEC As per IS/IEC As per IS/IEC

Consultant: Snyder Energo Private Limited Bangalore & Chennai

Section-4

49 of 140

DEIFY INFRASTRUCTURE LIMITED JAYASWAL NECO INDUSTRIAL LIMITED 2x25 MW CAPTIVE POWER PLANT

TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES DOC. NO : 4 3643 ELCT 001

3. 4.

Lightning impulse test exposed installation.

As per IS/IEC

High voltage power frequency wet withstand As per IS/IEC voltage test Radio interference voltage measurement (RIV) test Routine Test Verification of terminal marking Power frequency dry on primary winding Power frequency dry on secondary winding Over voltage inter turn test Partial discharge test (PD test) Determination of error and accuracy test As per IS / IEC As per IS / IEC As per IS / IEC As per IS / IEC As per IS / IEC As per IS / IEC As per IS/IEC

5. B 1. 2. 3. 4. 5. 6. 7.

Power frequency between primary and secondary As per / IEC winding Thermal stability test Considered as Addl.Test Considered additional test as

8.

9.

BDV Test on oil ,tan delta of oil ,DGA Test

10.

Thermal co-efficient test, i.e. measurement of Tan delta test at different temperatures.

Considered as Addl.lTest

C 1. 2.

Special test, Optional test and Chopped Lightning impulse test Measurement of capacitance

additional test As per IS / IEC and dielectric As per IS / IEC

Consultant: Snyder Energo Private Limited Bangalore & Chennai

Section-4

50 of 140

DEIFY INFRASTRUCTURE LIMITED JAYASWAL NECO INDUSTRIAL LIMITED 2x25 MW CAPTIVE POWER PLANT

TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES DOC. NO : 4 3643 ELCT 001

dissipation factor 3. 4. 5. 6. 7. Multi-chopped impulse test/Fast transient test. Mechanical Test Measurement of transmitted over voltage Commission test on new C .T. Seismic test As per / IEC As per / IEC As per / IEC As per IS / IEC Considered as Addl.Test As per / IEC

9. 3.5.1

Switching impulse test

List of type tests on CVT Sr.No. 1) 2) Particulars Lightning impulse voltage withstand test. High voltage power frequency wet withstand voltage test Temperature rise test. Other type tests applicable

3) 4)

The equipment/material offered in the tender should have been successfully type tested in line with the relevant Indian standards and technical specification, within the last five years from the date of opening of the tender. The Tenderer shall be required to submit copies of the type test report along with the offer. In case these type tests are conducted earlier than 5 years, all the type tests shall be carried out by the successful Tenderer in the presence of Customers representative, free of cost, before commencement of supply. Undertaking to this effect shall be furnished alongwith the offer without which the offer shall be liable for rejection.
Consultant: Snyder Energo Private Limited Bangalore & Chennai

Section-4

51 of 140

DEIFY INFRASTRUCTURE LIMITED JAYASWAL NECO INDUSTRIAL LIMITED 2x25 MW CAPTIVE POWER PLANT

TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES DOC. NO : 4 3643 ELCT 001

3.5.2

If there is any change in the components or design in the equipment since its earlier passing of the type test, the Tenderer shall bring out in his offer all such change made in the component, materials, design etc. In such cases, Tenderer shall carry out the type test at his cost and in presence of Customers representative. The type test shall be carried out at Laboratories accredited by National Accreditation Board for testing and calibration Laboratories (NABL). If, the equipment/material has been type tested earlier, the Customer reserves the right to demand repetition of one or more tests included in the list of type test in presence of Customers representative. The Customer reserves the right to conduct tests included in the list of type tests as per IS on requisite number of samples/items from any of the lots during the tenure of the supply at Customers cost in the presence of Customers representative. If the equipment/material does not withstand the type test, then the equipment/material supplied till then will be liable for rejection. The Tenderer, in such an eventuality shall be allowed to modify the equipment and type test the same again at his cost in the presence of the Customer's representative. These type tests shall however be conducted by the Tenderer within a reasonable time. After successful passing of the type tests, all the equipments/material supplied earlier shall be modified in the line with equipment /materials which has successfully passed the type test. In case Tenderer fails to carry out the type test within reasonable time or does not agree to carry out the type test at his cost, his equipment/ materials supplied earlier shall be rejected and order placed shall be cancelled and payments made earlier for these Tenderers shall be recovered by the Customer. Acceptance and Routine Tests i) ii) All acceptance and routine tests as stipulated in the relevant standards shall be carried out by the Tenderer in presence of Customer's representative. Immediately after finalisation of the programme of type /acceptance /routine testing, the Tenderer shall give three weeks advance intimation to the Customer, to enable him to depute his representative for witnessing the tests.

3.5.3 3.5.4

3.5.5

3.5.6

3.6 3.6.1

INSPECTION The inspection may be carried out by the Customer at any stage of manufacture. The successful Tenderer shall grant free access to the Customer's representative at any reasonable time when the work is in progress. All facilities must be made available by Tenderer/ manufactures for unrestricted inspection of the works, raw material, and manufacture of all the accessories and for conducting necessary tests as declared herein. The Tenderer shall keep the Customer informed, in advance, of the time of starting and of the progress of manufacture of equipment in its various stages so that arrangement should be made for inspection.
Section-4 52 of 140

3.6.2

Consultant: Snyder Energo Private Limited Bangalore & Chennai

DEIFY INFRASTRUCTURE LIMITED JAYASWAL NECO INDUSTRIAL LIMITED 2x25 MW CAPTIVE POWER PLANT

TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES DOC. NO : 4 3643 ELCT 001

3.6.3 3.6.4

No material shall be dispatched from its point of manufacture unless the been satisfactorily inspected and tested.

material has

Inspection and acceptance of any equipment under this specification by the Customer shall not relieve the Tenderer of his obligation of furnishing equipment in accordance with the specification and shall not prevent subsequent rejection, if the equipment is found to be defective. QUALITY ASSURANCE PLAN: The tenderer shall invariably furnish the QAP along with his offer DOCUMENTATION After award of contract, the bidder shall submit 3 sets of drawings/documents to Purchaser/Consultant giving details, for scrutiny and approval. Once the drawings have been approved, no alteration or modification will be carried out without prior approval of the Purchaser.

3.7 3.7.1 3.8

The manufacturing of the equipment shall be strictly in accordance with the approved drawing and no deviation shall be permitted without the written approval of the purchaser. All manufacturing and fabrication work in connection with the equipment prior to the approval of the drawing shall be at the BIDDER's risk.

Approval of drawing/work by purchaser shall not relieve the BIDDER of his responsibility and liability for ensuring correctness and correct interpretation of the latest revision of applicable standards, rules and code of practices. After award of contract, the bidder shall also submit 2 sets of type test reports to C.E. (Tr. Pl.) for scrutiny and approval, before commencement of supply. Adequate copies of acceptance and routine test certificates, duly approved by the purchaser, shall accompany the dispatch consignment.

4.0 LIGHTNING ARRESTORS 4.1 4.1.1 4.1.2 4.1.3 Scope of supply 120kV, Single phase units, Heavy duty, Station class lightning arrester 12 nos. Engineering, Design, fabrication, manufacture, assembly, shop testing including type test as specified and inspection at manufacturers works. Unloading and storage at site.
Section-4 53 of 140

Consultant: Snyder Energo Private Limited Bangalore & Chennai

DEIFY INFRASTRUCTURE LIMITED JAYASWAL NECO INDUSTRIAL LIMITED 2x25 MW CAPTIVE POWER PLANT

TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES DOC. NO : 4 3643 ELCT 001

4.2 4.2.1 4.2.2 4.2.3 4.3

Standards Lightning arresters Bushings Hot dip galvanizing - IS 3070, IEC 60099 - IS 2099, BS 223, IEC 60137, IS 10314, 5621, 13134. - IS 2629, BS 729, IEC, IS 2633

Principal technical parameters

SI.No. Technical parameter General 1 2 3 4 5 6 Designation Quantity Installation Class Type of connection Applicable standard Rating 1 2 3 Rated arrestor voltage Rated frequency

Requirement

Gapless ZnO Lightning Arrestor 12 Nos. in single phase units Outdoor Station class (Class 3) Phase to earth IEC 60099

kV Hz

120 50

Nominal discharge current of 8/20S kA(peak) wave shape Performance data

High current (4/10S wave)

impulse

withstand kA(peak)

100

Consultant: Snyder Energo Private Limited Bangalore & Chennai

Section-4

54 of 140

DEIFY INFRASTRUCTURE LIMITED JAYASWAL NECO INDUSTRIAL LIMITED 2x25 MW CAPTIVE POWER PLANT

TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES DOC. NO : 4 3643 ELCT 001

Minimum switching surge spark over kV(peak) voltage Maximum switching surge (30/60S) kV(peak) residual voltage at 1kA peak Maximum leakage current at rated mA operating voltage 455

Resistive <0.4 Capacitive <1.5 562

Maximum residual voltage at rated kV(peak) nominal discharge current Maximum residual voltage at steep kV(peak) front impulse(1x20S) at rated nominal discharge current Design data

600

1 2 3

Discharge class (as per IEC 60099) Min. discharge capability of arrestor Maximum continuous voltage (MCOV) kJ/kV

III 7.5 145

operating kV(rms)

Temporary over voltage withstand kV(rms) capacity at 1.0 sec Seismic zone Wind velocity Insulation g Mts/Sec

336

5 6

Zone 2 39

Withstand voltages

test a) One minute kV(rms) power frequency dry & wet

270

Consultant: Snyder Energo Private Limited Bangalore & Chennai

Section-4

55 of 140

DEIFY INFRASTRUCTURE LIMITED JAYASWAL NECO INDUSTRIAL LIMITED 2x25 MW CAPTIVE POWER PLANT

TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES DOC. NO : 4 3643 ELCT 001

b) 1.2/50S kV(peak) Impulse 2 Min creepage a) Total distance b) Protected mm mm

650

3625 3070

Additional Requirements 1 Min. cantilever strength of arrestor kg assembly Max. radio interference voltage (as V per NEMA-LA1, 1962) No visual discharge up to a voltage of Pressure relief class (as per IEC60099) Current for pressure relief test kA kV As per manufacturers standard -

3 4

5 6

40

Special requirement with regard to harmonic NA content in supply voltage Accessories required Yes/No a) discharge counter b) Leakage current monitor c) Grading rings Yes Yes Yes

d) Clamps & Connectors on Yes arrestor terminals 8 Purchasers conductor sizes a) Line side terminal b) Earth side terminal Tests
Consultant: Snyder Energo Private Limited Bangalore & Chennai

Drake 75 X 6 GS

Section-4

56 of 140

DEIFY INFRASTRUCTURE LIMITED JAYASWAL NECO INDUSTRIAL LIMITED 2x25 MW CAPTIVE POWER PLANT

TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES DOC. NO : 4 3643 ELCT 001

Test certificates in addition a) Type test those specified in IS: 3070(Part I) b) tests

As per IEC to be submitted on award of contact

acceptance As per IEC.

4.4 4.4.1

General Requirement The lightning arrester shall be heavy duty, station class type, discharge Class III, gapless Zinc Oxide type rated for 120 kV and suitable for use in 132 kV solidly earthed neutral system, 10 kA current rating. The arresters shall be capable of spark over on severe switching surges and multiple strokes. The lightning arresters shall be capable of discharging over voltage occurring during switching of unloaded transformers. Surge counters shall be furnished with the insulating bases for connection, supporting insulator and necessary hardwares. No radio interferences shall be caused by the arresters operating at the normal rated voltage. Each lightning arrester shall be fitted with a pressure relief device. Insulators Porcelain used for the manufacture of insulators shall be homogeneous, free from flaws or imperfections that might affect the mechanical or dielectric quality. These shall be thoroughly vitrified, tough and impervious to moisture. The glazing of the porcelain shall be uniform brown colour, free from blisters, burrs and other defects. The insulators shall have creepage distance of 25 mm/kV. The porcelain and metal parts shall be assembled in such a manner that any thermal expansion difference between the metal and the porcelain parts throughout the range of temperature variation shall not loosen the parts or create undue internal stresses which may affect the electrical or mechanical strength and rigidity. Each cap and base shall be of high grade cast steel of malleable steel casting and shall be machine faced smoothly and galvanized. Terminals The terminals shall be of non-ferrous, corrosion proof materials and provided with biSection-4 57 of 140

4.4.2 4.4.3 4.4.4 4.4.5 4.4.6 4.5 4.5.1

4.5.2

4.5.3 4.6 4.6.1

Consultant: Snyder Energo Private Limited Bangalore & Chennai

DEIFY INFRASTRUCTURE LIMITED JAYASWAL NECO INDUSTRIAL LIMITED 2x25 MW CAPTIVE POWER PLANT

TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES DOC. NO : 4 3643 ELCT 001

metallic material suitable for single Drake conductor. 4.7 4.7.1 4.7.2 4.7.3 4.7.4 4.8 4.8.1 4.9 4.9.1 Surge Counter Cyclometric dial type surge counter shall be provided for each lightning arrester for automatically recording the number of discharges. Each counter shall have a continuous leakage current indicator and shall not require an external power source for operation. Discharge counter shall be mounted at approximately 1.5 meters above ground level. Insulating bases shall be provided for all arresters. Earthing Pads Suitable earthing pads shall be provided in the lightning arrester and surge counter for earthing. TESTS Factory Tests Complete tests shall be made at the manufacturers plant to determine the performance and operating characteristics of the assembled lightning arresters, and their respective accessories and to determine whether or not the guarantees have been met. Unless otherwise specified, all tests shall be carried out in accordance with IS : 3070 and shall include the following: 4.9.2 Routine Tests Dry and wet power frequency voltage test Wet tests Polluted housing test 4.9.3 Type Tests Residual voltage test Current impulse withstand test Operating duty test Pressure relief test All routine and acceptance test shall be witnessed by the Customer / Consultants.
Consultant: Snyder Energo Private Limited Bangalore & Chennai Section-4 58 of 140

DEIFY INFRASTRUCTURE LIMITED JAYASWAL NECO INDUSTRIAL LIMITED 2x25 MW CAPTIVE POWER PLANT

TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES DOC. NO : 4 3643 ELCT 001

The Tenderer shall furnish two (2) sets of type test reports for all the tests along with bid. 4.10 INSPECTION

4.10.1 The inspection may be carried out by the Customer at any stage of manufacture. The successful Tenderer shall grant free access to the Customer's representative at any reasonable time when the work is in progress. All facilities must be made available by Tenderer/ manufactures for unrestricted inspection of the works, raw material, manufacture of all the accessories and for conducting necessary tests as declared herein. 4.10.2 The Tenderer shall keep the Customer informed, in advance, of the time of starting and of the progress of manufacture of equipment in its various stages so that arrangement should be made for inspection. 4.10.3 No material shall be dispatched from its point of manufacture unless the material has been satisfactorily inspected and tested. 4.10.4 Inspection and acceptance of any equipment under this specification by the Customer shall not relieve the Tenderer of his obligation of furnishing equipment in accordance with the specification and shall not prevent subsequent rejection, if the equipment is found to be defective. 4.11 QUALITY ASSURANCE PLAN

4.11.1 The tenderer shall invariably furnish QAP for information along with his offer. 4.12 DOCUMENTATION After award of contract, the bidder shall submit 3 sets of drawings/documents to Purchaser/Consultant giving details, for scrutiny and approval. Once the drawings have been approved, no alteration or modification will be carried out without prior approval of the Purchaser.

The manufacturing of the equipment shall be strictly in accordance with the approved drawing and no deviation shall be permitted without the written approval of the purchaser. All manufacturing and fabrication work in connection with the equipment prior to the approval of the drawing shall be at the BIDDER's risk.

Approval of drawing/work by purchaser shall not relieve the BIDDER of his responsibility and liability for ensuring correctness and correct interpretation of the latest revision of applicable standards, rules and code of practices. After award of contract, the bidder shall also submit 2 sets of type test reports to C.E. (Tr. Pl.) for scrutiny and approval, before commencement of supply. Adequate copies of acceptance and routine test certificates, duly approved by the
Consultant: Snyder Energo Private Limited Bangalore & Chennai Section-4 59 of 140

DEIFY INFRASTRUCTURE LIMITED JAYASWAL NECO INDUSTRIAL LIMITED 2x25 MW CAPTIVE POWER PLANT

TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES DOC. NO : 4 3643 ELCT 001

purchaser, shall accompany the dispatch consignment.

5.0 CONTROL, RELAY & METERING PANELS 5.1 5.1.1 5.1.2 5.1.3 5.1.4 Scope of supply Bay Control & Relay Panels. Synchronising Trolley. Substation Automation System Engineering, Design, fabrication, manufacture, assembly, shop testing as specified and
Section-4 60 of 140

Consultant: Snyder Energo Private Limited Bangalore & Chennai

DEIFY INFRASTRUCTURE LIMITED JAYASWAL NECO INDUSTRIAL LIMITED 2x25 MW CAPTIVE POWER PLANT

TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES DOC. NO : 4 3643 ELCT 001

inspection at manufacturers works. 5.1.5 5.1.6 5.1.7 5.1.8 5.1.9 5.2 5.2.1 5.2.2 Unloading and storage at site. Commissioning of the Relay & Control Panel and Synchronizing Panel. All spare parts required for commissioning of the equipment/system covered under this specification. Recommended Spares for two(2) years of trouble free operation Special tools and tackles required for operation and maintenance inspection and repair of the equipment/system offered. BUS CONFIGURATION & BUS TRANSFER SCHEME Bus-bar arrangement at the sub-station will be one main bus + one auxiliary bus. Details of the 132 kV Switchyard are furnished in the attached Dwg No. 1-3614-400-015, Rev-01. Auxiliary bus (also called 'Transfer bus") wherever exists will have one transfer bus coupler breaker, and is used mainly for taking the load of any one circuit when the main breaker of that circuit is to be taken out for maintenance/ repair. When a circuit is taken on the transfer bus, all the protection circuits connected to that bay shall be transferred so as to trip the transfer breaker in the event of occurrence of any fault on the feeder. The transfer scheme shall be such that it should be possible to transfer any circuit from its own breaker to the transfer breaker and vice versa, without any interruption in power. The transfer scheme shall include one three position (Normal-Intermediate-Transfer) switch having adequate contacts (ways) to transfer all the trip circuits. All the protection trip signals shall be connected to the main breaker in Normal and Intermediate position of the N-I-T switch, and in the Intermediate and Transfer position of the switch, all the protection trip signals shall be wired to to the transfer breaker TECHNICAL SPECIFICATION FOR CONTROL AND PROTECTION SYSTEM Bay controller Concept

5.2.3

5.2.4 5.2.5

5.3 5.3.1

In the bay controller concept, conventional control and relay panels are not envisaged. Instead, bay level Intelligent Electrical/ Electronic Devices (IED) for bay control functions and bay protection functions are to be supplied and installed in the Switchyard control room in the switchyard. It is not intended to install any control/protection panels in the main control room. Main control room will accommodate only the SCADA/ substation automation system. However, PLCC room, etc will be a part of the main control room building. Conventional control panels are not envisaged. All the controls, indications, alarms, metering etc are required to be made possible through/available in the
Consultant: Snyder Energo Private Limited Bangalore & Chennai Section-4 61 of 140

DEIFY INFRASTRUCTURE LIMITED JAYASWAL NECO INDUSTRIAL LIMITED 2x25 MW CAPTIVE POWER PLANT

TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES DOC. NO : 4 3643 ELCT 001

SCADA system. It is therefore envisaged to provide Bay controller IED/ Bay Control Unit (BCU), in place of the conventional control panel. Thus Bay protection unit (BPU) & Bay control unit with discrete multifunction meters shall be offered. Since all the cables for CT/ CVT/ CB/aux. supply circuits will be connected to the bay level cubicle i.e. Bay protection and bay control unit through Bay Marshalling Box, only optical fibre cable shall be laid between the various bay level IEDs/ relays/meters and the SCADA. The SCADA system shall be connected to main plant DCS trough MOD bus protocol. Dedicated Bay Control Units and Bay Protection Units (BPU) shall be provided for each bay for Control and protection functionality in compliance with IEC-61850 standard. The offered protection and control unit shall comply with the logical node structure as per IEC-61850 and the trip and priority messages viz. interlocking data shall be on GOOSE. Combined Bay Protection and Control Unit shall not be acceptable. The required Control functions in BCU and Protection functions in BPU shall be as per the details given in this specification. 5.3.2 Bay Control Units (BCU)

One Bay Control Unit shall provide complete functionality for one bay. Each set of BCUs shall have sufficient digital inputs to acquire the status of each and every circuit breaker, isolator, earth switch etc. of that bay. Similarly the digital output shall be sufficient to control all the switchgears and also for functions like re-settings of relays etc. in one bay. 5.3.3 Bay Protection Unit (BPU)

Each Bay Protection Unit shall comprise one or more numerical relays to meet the protection requirements specified for each type of feeder. The attached SLD shall be referred for various bay protection systems in the 132kV switchyard. Bay Protection Units of various bays shall interact with BCUs over inter bay Network Bus to share information related to Bay Level Interlocking, fault data, alarms/events etc. However, the trip commands from Bay Protection Units shall be hard-wired directly (through suitable trip relay) to appropriate switchyard equipment. Also, critical interlocking data between Bay Protection Units and Bay Control Units, including the substation level interlocks such as breaker-disconnector and bus earth switch interlocks, busbar protection trip, etc. shall also be hard-wired to ensure complete bay level functionality even in case of failure of substation LAN. The interlocking information to be hard-wired between Bay Protection Units and Bay Control Units. After award of contract, Contractor shall submit control and protection logic diagrams for each circuit covering breaker isolator earth switch interlocks, auto reclosing scheme, protection trippings and manual closing and tripping, Protective relays and SAS shall be programmed and control wiring diagrams for the hard - wired interlocks shall be prepared on the basis of approved control and protection logic diagrams.
Consultant: Snyder Energo Private Limited Bangalore & Chennai Section-4 62 of 140

DEIFY INFRASTRUCTURE LIMITED JAYASWAL NECO INDUSTRIAL LIMITED 2x25 MW CAPTIVE POWER PLANT

TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES DOC. NO : 4 3643 ELCT 001

5.3.4

Protective Relays

Protective relays shall be covered as per the attached Switchyard SLD 1-3643-400-011 The above protections shall be devided into two groups namely Group-1 and Group-2. Each group wired on different DC supply and have separate trip relays 86-1 and 86-2 and contact of each trip relay shall be wired to energise both trip coil of the CB. The back-up Directional Overcurrent (67) and E/F protection (67N) shall be provided using independent hardware other than the hardware provided for Main-1 Distance protections. The Trip Rlays shall be of High Burden type with adequate no. of NO and NC contacts required for tripping and locking out the 132 kV CB, intertripping 11 kV CB in case of Transformer bays, initiating 50 BF protection etc. Each trip relay shall be provided with Trip Relay Healthy Indicating (white) lamp Two (2) numbers of, Trip circuit supervision relay and required nos of auxiliarys relay shall be provided for satisfactory operation of the 132kV switchyard. All the protective relays shall be fully programmable digital (numerical) with Protection elements realized using software algorithm. Hardware based/ Analog measurement shall not be acceptable. The relay should have high immunity to electrical and electromagnetic interference. It should be compatible with all the IS/ IEC standards as listed above. The offered relay shall have a comprehensive local MMI for interface. It shall have the following minimum elements so that the features of the relay can be accessed and setting changes can be done locally. i. ii. iii. Alphanumeric backlit LCD display unit Fixed LEDs for indication of trip, relay available and relay out of service. Keypad for browsing, setting the relay parameters

The relays should have at least two communication ports viz. Front Ethernet RJ45 port for local communication for relay settings, modifications, extraction and analysis of fault/event/disturbance records by means of a laptop and a Rear fibre optic port on IEC61850 standard for remote communication to SCADA system. The relays shall have the following tools for fault diagnostics, i. Fault record The relay shall have the facility to store fault records with information on cause of trip, date, time, trip values of electrical parameters.

Consultant: Snyder Energo Private Limited Bangalore & Chennai

Section-4

63 of 140

DEIFY INFRASTRUCTURE LIMITED JAYASWAL NECO INDUSTRIAL LIMITED 2x25 MW CAPTIVE POWER PLANT

TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES DOC. NO : 4 3643 ELCT 001

ii. iii. iv.

Event record The relay shall have the facility to store time stamped event records with 1 ms resolution. It shall be possible to synchronise the clocks of all relays the clock in SAS Disturbance records At least 10 seconds of disturbance records shall be provided in the offered Numerical relays. Each record shall store data from 8 analogue channels and 32 digital channels. The data from DR function shall be available in IEEE/COMTRADE format and shall be compatible with the relay test kit being supplied under this contract.

It shall be possible to store this information in the event of an auxiliary supply failure with the help of a long life Lithium battery backup. State of the battery shall be supervised and shall easily replaceable. The relay settings shall be provided with password protection. It shall be possible to change the relay setting from the front panel using the keypads. The relay shall have comprehensive self-diagnostic feature. This feature shall continuously monitor the healthiness of all the hardware and software elements of the relay. Any failure detected shall be annunciated through an output watchdog contact. The fault diagnosis information shall be displayed on the LCD and also through the communication port. The Numerical Relays shall be provided with 1 set of common support Windows based software which will allow easy settings of relays in addition to downloading of event, fault, disturbance records, and measurements. The relay settings shall also be changeable from local or remote using the same software.

5.4 5.4.1

TESTS The BCU and Protection System supplied by the Contractor shall be subjected to following tests to establish compliance with IEC 61850 for EHV substation equipment installed in sheltered area in the outdoor switchyard and specified ambient conditions. Type Tests

5.4.2

Type tests shall be carried out as per relevant IS/IEC standard.


Consultant: Snyder Energo Private Limited Bangalore & Chennai Section-4 64 of 140

DEIFY INFRASTRUCTURE LIMITED JAYASWAL NECO INDUSTRIAL LIMITED 2x25 MW CAPTIVE POWER PLANT

TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES DOC. NO : 4 3643 ELCT 001

Control IEDs and Communication Equipment shall be subjected to the following type tests i. ii. iii. iv. Power Input (burden) Auxiliary Voltage Current Circuits Voltage Circuits Indications Accuracy Tests Operational Measured Values Currents Voltages Time resolution Insulation Tests Dielectric Tests Impulse Voltage withstand Test Influencing Quantities Limits of operation Permissible ripples Interruption of input voltage

v.

Electromagnetic Compatibility Test 1 MHZ, burst disturbance test Electrostatic Discharge Test Radiated Electromagnetic Field Disturbance Test Electrical Fast transient Disturbance Test
Section-4 65 of 140

Consultant: Snyder Energo Private Limited Bangalore & Chennai

DEIFY INFRASTRUCTURE LIMITED JAYASWAL NECO INDUSTRIAL LIMITED 2x25 MW CAPTIVE POWER PLANT

TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES DOC. NO : 4 3643 ELCT 001

vi. vii.

Conducted Disturbances Tests induced by Radio Frequency Field Magnetic Field Test Emission (Radio Interference level) Test Conducted Interference Test Function Tests Indication Commands Measured Value Acquisition Display Indications Environmental Tests Cold Temperature Dry Heat Wet heat Humidity (Damp heat Cycle) Vibration Bump Shock

5.4.3

Factory Acceptance Tests

The Contractor shall submit a test specification for factory acceptance test (FAT) and commissioning tests of the station automation system for approval. For the individual bay level IEDs, applicable type test certificates shall be submitted. The manufacturing phase of the complete system shall be concluded by the factory acceptance test (FAT). The purpose is to ensure that the Contractor has interpreted the
Consultant: Snyder Energo Private Limited Bangalore & Chennai Section-4 66 of 140

DEIFY INFRASTRUCTURE LIMITED JAYASWAL NECO INDUSTRIAL LIMITED 2x25 MW CAPTIVE POWER PLANT

TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES DOC. NO : 4 3643 ELCT 001

specified requirements correctly and that the FAT includes checking to the degree required by the user. The general philosophy shall be to deliver a system to site only after it has been thoroughly tested and its specified performance has been verified, as far as site conditions can be simulated in a test lab. If the FAT comprises only a certain portion of the system for practical reason, it has to be assured that this test configuration contains at least one unit of each and every type of equipment incorporated in the delivery system. If the complete system consists of parts from various Sub-contractors s or some parts are already installed on site, the FAT shall be limited to sub system tests. In such a case, the complete system test shall be performed on site together with the site acceptance test (SAT). 5.4.4 Integrated Testing

The integrated system tests shall be performed as detailed in subsequent clauses as per following configuration: i. ii. 5.4.5 Redundant station HMI, DR works station, two switches (i.e. for two diameters) along with all IEDs for the Dia and printers. All other switches for complete substation as detailed in section project shall be simulated as needed.

Hardware Integration Tests

The hardware integration test shall be performed on the specified systems to be used for Factory tests when the hardware has been installed in the factory. The operation of each item shall be verified as an integral part of system. Applicable hardware diagnostics shall be used to verify that each hardware component is completely operational and assembled into a configuration capable of supporting software integration and factory testing of the system. The equipment expansion capability shall also be verified during the hardware integration tests. 5.4.6 Integrated System Tests

Integrated system tests shall verify the stability of the hardware and the software. During the tests all functions shall run concurrently and all equipment shall operate a continuous 100 Hours period. The integrated system test shall ensure that all the Sub-Systems are free of improper interactions between software and hardware while the system is operating as a whole. 5.4.7 Field Tests

The field tests shall completely verify all the features of Protection and SAS hardware and software. 5.5 INSPECTION
Section-4 67 of 140

Consultant: Snyder Energo Private Limited Bangalore & Chennai

DEIFY INFRASTRUCTURE LIMITED JAYASWAL NECO INDUSTRIAL LIMITED 2x25 MW CAPTIVE POWER PLANT

TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES DOC. NO : 4 3643 ELCT 001

5.5.1

The inspection may be carried out by the Customer at any stage of manufacture. The Contractor shall grant free access to the Customer's representative at any reasonable time when the work is in progress. All facilities must be made available by Contractor/ manufactures for unrestricted inspection of the works, raw material, and manufacture of all the accessories and for conducting necessary tests as declared herein. The Contractor shall keep the Customer informed, in advance, of the time of starting and of the progress of manufacture of equipment in its various stages so that arrangement should be made for inspection. No material shall be dispatched from its point of manufacture unless the been satisfactorily inspected and tested. material has

5.5.2

5.5.3 5.5.4

Inspection and acceptance of any equipment under this specification by the Customer shall not relieve the Contractor of his obligation of furnishing equipment in accordance with the specification and shall not prevent subsequent rejection, if the equipment is found to be defective. DOCUMENTATION After award of contract, the bidder shall submit 3 sets of drawings/documents to Purchaser/Consultant giving details, for scrutiny and approval. Once the drawings have been approved, no alteration or modification will be carried out without prior approval of the Purchaser.

5.6

The manufacturing of the equipment shall be strictly in accordance with the approved drawing and no deviation shall be permitted without the written approval of the purchaser. All manufacturing and fabrication work in connection with the equipment prior to the approval of the drawing shall be at the BIDDER's risk.

Approval of drawing/work by purchaser shall not relieve the BIDDER of his responsibility and liability for ensuring correctness and correct interpretation of the latest revision of applicable standards, rules and code of practices. After award of contract, the bidder shall also submit 2 sets of type test reports to C.E. (Tr. Pl.) for scrutiny and approval, before commencement of supply. Adequate copies of acceptance and routine test certificates, duly approved by the purchaser, shall accompany the dispatch consignment.

Consultant: Snyder Energo Private Limited Bangalore & Chennai

Section-4

68 of 140

DEIFY INFRASTRUCTURE LIMITED JAYASWAL NECO INDUSTRIAL LIMITED 2x25 MW CAPTIVE POWER PLANT

TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES DOC. NO : 4 3643 ELCT 001

6.0 POWER, CONTROL & SIGNAL CABLES 6.1 6.1.1 DESIGN CRITERIA The cables shall be sized based on the maximum continuous load current, the voltage drop, system voltage, system earthing and short circuit withstand criteria. The derating due to ambient air temperature, ground temperature, grouping and proximity of cables with each other, thermal resistivity of soil, etc. shall have to be taken into account. All power and control cables shall be in continuous lengths without any splices or Intermediate joints. GENERAL REQUREMENTS All cables shall comply with the latest edition of the IEC & IS standards. The cables shall be brand new and in good condition and shall be suitable for laying in trays, trenches, ducts, conduits and underground buried installation with uncontrolled backfill and possibility of flooding by water. 6.3 LV Power Cables General construction: The cables shall have copper conductor for 6 Sq mm and below. For cables above 6 Sq.mm it will be of Aluminium conductor. The cables shall be brand new and in good condition and shall be suitable for laying in trays, trenches, ducts, conduits and underground buried installation with uncontrolled backfill and possibility of flooding by water. All power cables for use on low voltage systems shall be heavy duty type, 1100 V grade with Copper /Aluminium as applicable with, PVC insulated, inner sheathed, Steel wire / strip armoured as per IS and overall PVC sheathed as detailed below: The construction of the conductor shall be stranded for all cables. Conductors of nominal area less than 25 mm shall be circular only. Conductors of nominal area 25 mm and above may be circular or sector shaped. The core insulation shall be with PVC compound applied over the conductor by extrusion and shall conform to the requirements of IS. The inner sheath shall be applied over the laid-up cores by extrusion and shall be of PVC conforming to the requirements of Type STI PVC compound of IS. The extruded inner sheath shall be of uniform thickness of size not less than 0.5 mm up to 16 mm, 0.8 mm from 25 mm up to 120 mm and 1.0 mm above 120 mm conductor size. Taped inner sheath is not acceptable.
Consultant: Snyder Energo Private Limited Bangalore & Chennai Section-4 69 of 140

6.1.2 6.2

DEIFY INFRASTRUCTURE LIMITED JAYASWAL NECO INDUSTRIAL LIMITED 2x25 MW CAPTIVE POWER PLANT

TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES DOC. NO : 4 3643 ELCT 001

The outer sheath for the cable shall be applied by extrusion and shall be PVC compound confirming to the requirements of type STI compound of IS. The dimensions of the insulation and outer sheath materials shall be as per IS. Size of the cable, voltage grade, cable length, numbering at an interval of 1m throughout the cable. 6.4 LV CONTROL CABLES & SIGNAL CABLES All control & Signal cables shall have Copper conductor. Control / Signal cables shall be of 1100 V grade, stranded copper, PVC insulated, colour coded, PVC inner sheathed, steel wire armoured and PVC sheathed overall, conforming to IS. The routine and type tests shall be performed as per applicable IS Standard. The cables shall be supplied in non-returnable drums of sturdy construction. All ferrous and other metal parts of drum shall be treated with suitable rust preventive finish or coating to avoid rusting during transit or storage. 6.4.1 Conductor: The material of conductor shall be from annealed high conductivity copper. The maximum conductor temperature shall be limited to 85C. 6.4.2 Insulation: The material of insulation shall be PVC. The insulation of cores shall be colour coded as per IS. It is recommended that the cores have been individually numbered. The core numbers are repeated for each 1 mtr. Cable length. 6.4.3 Inner Sheath: The material of inner sheath shall be of extruded / tapped PVC. It shall not have any deteriorating effect on any other material used in the cable. 6.4.4 Outer Sheath: The material of outer sheath shall be PVC. 6.4.5 Packing, Marking and Dispatch: Cable shall be dispatched in wooden drum of suitable barrel diameter, securely battened, with the take-off end fully protected against mechanical damage. The wood used for construction of the drum shall be properly seasoned, sound and free from defects. Wood preservatives shall be applied to the entire drum. On flange of the drum necessary
Consultant: Snyder Energo Private Limited Bangalore & Chennai Section-4 70 of 140

DEIFY INFRASTRUCTURE LIMITED JAYASWAL NECO INDUSTRIAL LIMITED 2x25 MW CAPTIVE POWER PLANT

TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES DOC. NO : 4 3643 ELCT 001

information such as manufacturer's name, type, size, voltage grade of cable, length of cable in meters, drum No. Cable code, Certification mark, gross weight etc. shall be printed. An arrow shall be printed on the drum with suitable instruction to show the direction of rotation of the drum. 6.5 TESTS Testing and Inspection: All cables supplied shall undergo routine testing in accordance with the relevant IS Standards. The cables shall be tested and examined at the manufacturers works. After completion of manufacture of cables and prior to dispatch, cables shall be subject to routine tests as per IS guidelines. 6.6 DATA TO BE FURNISHED The TENDERER shall furnish technical data as required in Data Sheets and also furnish technical and descriptive literature giving details of the insulation, sheathing, testing, etc. of the offered cables.

Consultant: Snyder Energo Private Limited Bangalore & Chennai

Section-4

71 of 140

DEIFY INFRASTRUCTURE LIMITED JAYASWAL NECO INDUSTRIAL LIMITED 2x25 MW CAPTIVE POWER PLANT

TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES DOC. NO : 4 3643 ELCT 001

7.0 DC SYSTEM 7.1 7.1.1 7.1.2 7.1.3 7.1.4 7.1.5 7.1.6 7.1.7 7.1.8 7.1.9 Scope of supply 1000Ah Valve Regulated Lead Acid (VRLA) rechargeable battery, Heavy-duty, 220V Battery system. Battery charger consisting two nos (2) of float cum boost chargers for 220V DC system. 220V DC Distribution Board (DCDB). 240Ah Valve Regulated Lead Acid (VRLA) rechargeable battery, Heavy-duty, 48V Battery system. Battery charger consisting two nos (2) of float cum boost chargers for 48V DC system. 48V DC Distribution Board (DCDB). Engineering, Design, fabrication, manufacture, assembly, shop testing as specified and inspection at manufacturers works. Unloading and storage at site. Commissioning of the DC system.

7.1.10 All spare parts required for commissioning of the equipment/system covered under this specification. 7.1.11 Recommended Spares for two(2) years of trouble free operation 7.1.12 Special tools and tackles required for operation and maintenance inspection and repair of the equipment/system offered. 7.2 7.2.1 Battery Unit General The equipment offered shall be complete with all parts are usual for the efficient operation of the equipment, whether specifically mentioned or not. The construction shall be generally rugged and tough. The battery shall withstand high rate of discharge or over boost charge, accidental shorting and polarity reversals and severe shock & vibration. 7.2.2 Codes and Standards The battery covered by this specification shall be built to generally conform to the latest revision of IEC: 60896-2. The design, manufacture and performance of equipment comply with all currently applicable laws, regulations and safety codes in the locality
Consultant: Snyder Energo Private Limited Bangalore & Chennai Section-4 72 of 140

DEIFY INFRASTRUCTURE LIMITED JAYASWAL NECO INDUSTRIAL LIMITED 2x25 MW CAPTIVE POWER PLANT

TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES DOC. NO : 4 3643 ELCT 001

where the equipment will be installed. Nothing in this shall be conserved to relieve SUPPLIER of this responsibility. 7.2.3 Technical Specification / requirements 1. Type application : Valve Regulated Lead-Acid (VRLA) rechargeable battery, Heavy-duty Stationary Long life batteries. Meantime before Failure should be about 10 years. Normal life span about 20 years.

2. 3.

Type of installation Performance

: :

4.

AH efficiency

Better than 90%

5. 6.

Self discharge/week. Ambient temperature (max)

: :

0.5 to 1% of rated capacity. 50C

7.

Terminal Posts

Shall be of solid brass and adequately dimensioned for strong construction with least Electrical resistance Heavy duty copper

8.

Type of connector

9.

Plates

The plates shall be of flat pasted, first class material and workmanship and shall be free from blow holes, cracks and other imperfections.

The positive plate shall consist of a suitable bar with spines cast of suitably alloyed lead to give adequate mechanical strength. The construction and material shall be such as to reduce loss of active material to the
Consultant: Snyder Energo Private Limited Bangalore & Chennai Section-4 73 of 140

DEIFY INFRASTRUCTURE LIMITED JAYASWAL NECO INDUSTRIAL LIMITED 2x25 MW CAPTIVE POWER PLANT

TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES DOC. NO : 4 3643 ELCT 001

minimum and to withstand normal internal stresses developed during service. Negative plate shall be of the pasted type and of adequate mechanical strength.

10.

Separating grills

The separators shall be impervious of the chemical action inside the cell and oxidation resistant. These shall be provided to separate the plates and insulate the plate from one another. The grills at the same time shall allow free circulation of electrolyte between plates. These materials shall be inert to react with electrolyte. 1000Ah/240Ah Unearthed 220 V / 48V 242/52.8 V

11. 12. 13. 14.

Capacity DC system Normal Voltage Full boost charge Voltage Fully discharged Voltage Boost charge current

: : : :

15.

198/43.2 V

16.

To be decided by TENDERER

17.

Total number of cells

To suit the application

18.

Terminal Posts

Terminal posts shall be designed to accommodate external bolted connection conveniently and positively. Each terminal posts shall have two bolt holes of the same diameter, preferably at right angles to each other. Electrolyte shall be sulphuric acid of specific gravity 1.160 / 1.180
Section-4 74 of 140

19.

Electrolyte

Consultant: Snyder Energo Private Limited Bangalore & Chennai

DEIFY INFRASTRUCTURE LIMITED JAYASWAL NECO INDUSTRIAL LIMITED 2x25 MW CAPTIVE POWER PLANT

TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES DOC. NO : 4 3643 ELCT 001

20.

Container

The containers shall be made from Poly propylene copolymer material. They shall be sufficiently robust and free from flaws with leak proof. Shall be self resealing with flame arrestor

21. 7.2.4

Safety Vent

Accessories The battery shall preferably be complete with all devices required including the following: i. Battery racks These shall be constructed from good quality teakwood and painted with two coats of approved acid resisting paint. The construction of the racks, unless otherwise mentioned shall be suitable for fixing to a flat concrete floor. The racks shall be rigid, free standby type and free from warp. The complete racks shall be suitable for being bolted end to end to form a continuous row. Stacking arrangement shall be to occupy less room space. ii. iii. iv. Porcelain insulators, rubber pads etc. Set of inter cell, inter-tier and inter bank connectors as required for the complete installation Accessories for testing and maintenance One set terminals and cable boxes with glands for connecting cable as required One set spare connectors One set spare nuts & bolts Suitable set of spanners

7.2.5

Tests Routine tests and type tests (on at least four random samples) shall be carried out and test certificates shall be furnished. All acceptance tests as per IEC shall be carried out at site.

7.3 7.3.1

Battery Charger The equipment shall comply with the following standards. IS 1248 IS 3715 : : Direct acting electrical indicating instruments Letter symbols for semi-conducting devices
Section-4 75 of 140

Consultant: Snyder Energo Private Limited Bangalore & Chennai

DEIFY INFRASTRUCTURE LIMITED JAYASWAL NECO INDUSTRIAL LIMITED 2x25 MW CAPTIVE POWER PLANT

TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES DOC. NO : 4 3643 ELCT 001

(Part 1 to 4) IS 4411 IS 5469 : : Code for designation of semi-conductor devices Code of practice for the use of semi-conductor Junction (part 1 to 3) devices IS 7204 : Stabilised power supplies D.C. Output (Part 1 to 4) IS 12021 : Control transformers for switchgear and control Gear for voltages not exceeding 1000V AC IS 13314 IS 13703 : : Solid state inverters run from storage batteries Low voltage fuses for voltage not exceeding 1000V AC or (part 1 to 4) 1500V AC IS 13947 : Specification for low voltage switchgear and Control gear (part-4/Sec-1) IEC 60146 7.3.2 7.3.3 : Semiconductor converters.

In case Indian standards are not available for any equipment, standards IEC/BS/VDE/ IEEE/NEMA or equivalent shall apply. Technical Requirements The battery charger shall be an integrated system comprising of static rectifiers, isolating and protection devices and all other equipment / accessories required for completeness of the system. The battery chargers shall be suitable for input power supply of 415V +10%, 3 Phase 50 Hz and frequency of 50 Hz + 5% The battery charger shall be suitable for installation and satisfactory operation in a pressurised or non-pressurised room with restricted natural air ventilation.

7.3.4

System Operation The battery chargers #1 and #2 shall operate in parallel feeding the DC load and flow charging the batteries under normal operation. However, in case of failure of either of the chargers, the other charger shall float charge the battery while feeding

Consultant: Snyder Energo Private Limited Bangalore & Chennai

Section-4

76 of 140

DEIFY INFRASTRUCTURE LIMITED JAYASWAL NECO INDUSTRIAL LIMITED 2x25 MW CAPTIVE POWER PLANT

TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES DOC. NO : 4 3643 ELCT 001

the complete DC load. In case of AC mains failure, the battery shall continue to supply the load. The process of change over from float to boost charging and from boost to float charging shall be selectable by an auto / manual selector switch. In auto mode, the change over shall be initiated through a current sensor. In manual mode, the change over shall be performed manually using push buttons. Manual switch shall have priority over automatic switching. When boost charging mode is selected, the battery shall be charged by constant current mode or by constant voltage mode as per battery manufacturers recommendation. Selection of constant current mode or constant voltage mode shall be fully automatic. A digital timer shall be provided for initiating the change over to float mode by default after a preset time period. In the event of failure of the charger feeding the load, when battery is being boost charged by the other charger, DC supply to the loads shall be maintained from the battery through tap cell (if required) or through a contactor. In the event of failure of the charger feeding the load, when battery is being boost charged by the other charger, DC supply to the loads shall be maintained from the battery through tap cell (if required) or through a contactor. Interlock shall be provided in each charger to disconnect the charger from both the DC load and the charger operating under float mode. 7.3.5 Design Basis

Each charger shall be sized for the most stringent of the following duty conditions, whichever is higher: i. ii. The charger shall be sized considering off line boost charging current in Amps of 0.2 Ah (C10) of VRLA battery. With on line float charging of battery, the charger current in Amps shall be 1.15 x Average DC load + Float charging current. The loading conditions shall be as elaborated in battery specifications. iii. Initial charging of uncharged battery assembly to fully charged condition.

Silicon blocking diodes shall be provided in the charger output circuit to prevent backfeed from battery into the charger and filters. Filter circuits consisting of smoothing choke and condenser to limit the ripple content at the output to the maximum of 1/2 - 1% of the DC voltage. Protection against reverse battery connection and DC earth fault relay shall be provided.
Consultant: Snyder Energo Private Limited Bangalore & Chennai Section-4 77 of 140

DEIFY INFRASTRUCTURE LIMITED JAYASWAL NECO INDUSTRIAL LIMITED 2x25 MW CAPTIVE POWER PLANT

TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES DOC. NO : 4 3643 ELCT 001

Internal cooling shall be preferably by natural ventilation. If forced air cooling is considered, a redundant air cooling fan shall be provided. All electronic power devices like thyristor, transistors, diodes etc. shall be rated under operating conditions for at least 150% of the maximum current carried by the device. All electrical components such as transformers, reactors, contactors, switches, busbars etc. shall be rated for at least 125% of the maximum required rating. No electronic device shall experience a PIV greater than 50% of its rated value. The DC system shall be unearthed. However, a high impedance earth fault relay shall be provided for the protection of the battery. 7.3.6 Charger Performance

The automatic voltage regulating equipment shall regulate the battery voltage within +1% of the set value from no load to full load for AC voltage and frequency variation of +10% and +5% respectively. The output voltage dynamic response of the charger unit with battery disconnected shall not vary more than +10% of nominal output voltage in the event of step load of upto 50% of the rated output. The output voltage shall be restored within the steady state limits within 250 msec. The maximum noise level from the charges measured at 1 metre distance in any position, at any load between 0-100% shall not exceed 75 dB (A). 7.3.7 Controls The controls shall be provided but not limited to the following: ON / OFF control switch for AC supply to charger (push buttons are not acceptable) Push buttons for float and boost charging mode selection Potentiometers under float mode for voltage and current adjustment Potentiometers under boost mode for voltage and current adjustment Auto / manual selector switch to select mode of operation Others as required. 7.3.8 Charger Panel Metering and Indication These shall include but limited to the following: a. Meters
Consultant: Snyder Energo Private Limited Bangalore & Chennai

Section-4

78 of 140

DEIFY INFRASTRUCTURE LIMITED JAYASWAL NECO INDUSTRIAL LIMITED 2x25 MW CAPTIVE POWER PLANT

TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES DOC. NO : 4 3643 ELCT 001

Charger -1 AC input Voltmeter with selector switch AC input Ammeter with selector switch DC output Voltmeter DC output Ammeter DC Voltmeter with selector switch (battery voltage) DC Ammeter (battery) DC Earth leakage Ammeter (mA).

Charger -2 b. Lamps Chargers - 1 & 2 7.3.9 AC power ON (1 lamp for each phase) Float charger ON Quick charger ON Charger fault AC input Voltmeter with selector switch AC input Ammeter with selector switch DC output Voltmeter DC output Ammeter

Alarms & Protections Following annunciations shall be provided and also potential free contacts for the following shall be made available for hooking up to annunciation and control panel: DC under voltage DC over voltage DC earth leakage

Consultant: Snyder Energo Private Limited Bangalore & Chennai

Section-4

79 of 140

DEIFY INFRASTRUCTURE LIMITED JAYASWAL NECO INDUSTRIAL LIMITED 2x25 MW CAPTIVE POWER PLANT

TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES DOC. NO : 4 3643 ELCT 001

AC incoming power supply failure Thyristor / diode failure DC output fuse blown-off DC battery fuses blown-off Filter capacitor fuse blown-off Short circuit Reverse Polarity Battery current limiter

7.3.10 Charging Panel The charger shall be fabricated with 2.0 / 2.5 mm thick sheet steel and structural steel. It shall be free-standing with suitable louvers for ventilation and must be suitable for use in tropical climate. Hinged doors shall be provided at the front and back where required. Inter panel sheet steel barriers shall be provided. The sheet steel used for fabrication shall be thoroughly cleaned and degreased to remove mill scale, rust, grease and dirt. Fabricated structures shall be pickled and then rinsed to remove any trace of acid. All instruments shall be switchboard type & back connected. Stranded copper wires 2.5 sq. minimum shall be used for secondary wiring. The insulation for all equipment where provided shall be heat resistant, moisture proof and tropicalised. All fuses/MCBs shall be provided inside the panel. All fuses shall be link type. Dazed fuses will not be acceptable. Terminal blocks shall be `Elmex' type. All potential free metallic parts shall be earthed with soft drawn copper conductor. An earth bus of 25 x 6 mm Sq.Cu. (or equivalent Al.) Shall run through the panel. The main earth connection shall be brought out to two terminals for connection to station earthing system. All live parts shall be properly shrouded. This shall ensure complete safety to personnel intending routine maintenance by opening the panel doors. Busbars shall be colour coded. All the equipment inside the panel shall have suitable name plates. 7.3.11 Mechanical Requirements The battery charger set shall be assembled in a free standing type sheet metal cubicle completely wired for indoor installation. Access to internal equipment shall be through a hinged door equipped with latches.
Consultant: Snyder Energo Private Limited Bangalore & Chennai Section-4 80 of 140

DEIFY INFRASTRUCTURE LIMITED JAYASWAL NECO INDUSTRIAL LIMITED 2x25 MW CAPTIVE POWER PLANT

TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES DOC. NO : 4 3643 ELCT 001

Louvers shall be provided for ventilation as necessary the ventilation openings shall be screened to prevent access to insects and other foreign material. The charger compartment shall be provided with a door operated light, 11W CFL for internal illumination. 7.3.12 Painting Painting shall include at least one coat of anti corrosive prime, one coat of finishing under coat and two coats of flint / pebble grey, shade RAL 7032. The painting shall have to render the surface scratch resistant. 7.4 7.4.1 DC Distribution Board The distribution board shall generally conform to the following standards: IEC-439 & IS: 8623 IEC-947 & IS: 13947 IEC-269 & IS: 9224 IEC-144 & IS: 2147 : : : Specifications of Low Voltage Switchgear & Control gear Assemblies Specification of Low-Voltage Switchgear & Control gear : Low voltage fuses

Degree of protection of enclosure for Low voltage switchgears and Control gear

IE rules, guidelines, regulation of CEIG 7.4.2 The panels shall be dust, damp & vermin proof construction, sheet steel clad totally enclosed, compartmentalized, floor mounted, self standing type with access from front & back by means of hinged doors. The panels shall have bottom entry provisions and shall be natural cooled. The panels shall be fabricated with 2.0 / 2.5 mm thick sheet steel and structural steel. It shall be free-standing with suitable louvers for ventilation and must be suitable for use in tropical climate. Hinged doors shall be provided at the front and back where required. Inter panel sheet steel barriers shall be provided. The sheet steel used for fabrication shall be thoroughly cleaned and degreased to remove mill scale, rust, grease and dirt. Fabricated structures shall be pickled and then rinsed to remove any trace of acid. All metal surfaces shall be chemically cleaned, degreased and pickled in acid to produce a smooth surface, free of scale, grease and rusts. After cleaning, phosphating and passivation treatment, the surface shall be given two (2) coats of zinc rich epoxy primer. The assembly shall be finished with two coats of epoxy paint in pebble / flint grey shade RAL 7032.
Section-4 81 of 140

7.4.3

7.4.4

7.4.5

Consultant: Snyder Energo Private Limited Bangalore & Chennai

DEIFY INFRASTRUCTURE LIMITED JAYASWAL NECO INDUSTRIAL LIMITED 2x25 MW CAPTIVE POWER PLANT

TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES DOC. NO : 4 3643 ELCT 001

7.4.6 7.4.7 7.4.8

Reverse engraved name plates shall be provided for the panels and all module sections. All fuses shall be provided inside the panel. All fuses shall be link type. Diazed fuses will not be acceptable. All potential free metallic parts shall be earthed with soft drawn copper conductor. The main earth connection shall be brought out to two terminals for connection to station earthing system. All live parts shall be properly shrouded. This shall ensure complete safety to personnel intending routine maintenance by opening the panel doors. Busbars shall be colour coded. All the equipment inside the panel shall have suitable name plates.

7.4.9

7.4.10 The DC distribution board shall have the following feeders to meet Customers requirements: Incoming - One (1) number 250A MCB feeder Outgoing - 10 nos of 20A MCB feeder 7.4.11 The distribution board shall have the following meters / relays / transducers: Ammeter and Voltmeter at the incomer Current and Voltage transducers at the incomer 7.4.12 For interfacing with Purchasers DCS, the following signals shall be hooked-up to a marshalling compartment in the distribution board: ON and OFF status of incomer and all outgoing feeders (4-20) mA signals from all transducers

7.5 7.5.1

Tests Di-electric Tests: A DC voltage equal to 2U + 1,000 V where U represents the highest input or output voltage. This voltage shall be applied to the two interconnected output terminals.

Consultant: Snyder Energo Private Limited Bangalore & Chennai

Section-4

82 of 140

DEIFY INFRASTRUCTURE LIMITED JAYASWAL NECO INDUSTRIAL LIMITED 2x25 MW CAPTIVE POWER PLANT

TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES DOC. NO : 4 3643 ELCT 001

An AC voltage equal to 500 V applied between the live parts of the low voltage circuits and the rack. 7.5.2 Heat Run Tests: Each of the two chargers shall be subjected to heat run test at rated load and voltage for a period not less than 8 hours. The other charger during this test shall be energised under zero load current condition. The temperature of electronic power devices shall be measured and the device junction temperature shall be calculated. 7.5.3 Functional Tests: Following functional test shall be carried out at charger: Floating and boost voltage regulation Check of current limit Check of change - over operation by simulation of chargers failure Operation of alarms Measure of ripple voltage at zero and full load. 7.5.4 Parallel Operation Parallel operation of both chargers, sharing of the load and automatic isolation of faulty charger shall be checked. 7.5.5 Charger efficiency Efficiency shall be determined by measurement the active power input and output of 50%, 75% and 100% load. 7.5.6 Noise Tests Audible noise shall be measured at one meter distance in at least 4-5 positions shall be measured and shall be within the permissible limits.

7.6 7.6.1

INSPECTION The inspection may be carried out by the Customer at any stage of manufacture. The successful Tenderer shall grant free access to the Customer's representative at any reasonable time when the work is in progress. All facilities must be made available by Tenderer/ manufactures for unrestricted inspection of the works, raw material, and manufacture of all the accessories and for conducting necessary tests as declared herein.
Section-4 83 of 140

Consultant: Snyder Energo Private Limited Bangalore & Chennai

DEIFY INFRASTRUCTURE LIMITED JAYASWAL NECO INDUSTRIAL LIMITED 2x25 MW CAPTIVE POWER PLANT

TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES DOC. NO : 4 3643 ELCT 001

7.6.2

The Tenderer shall keep the Customer informed, in advance, of the time of starting and of the progress of manufacture of equipment in its various stages so that arrangement should be made for inspection. No material shall be dispatched from its point of manufacture unless the been satisfactorily inspected and tested. material has

7.6.3 7.6.4

Inspection and acceptance of any equipment under this specification by the Customer shall not relieve the Tenderer of his obligation of furnishing equipment in accordance with the specification and shall not prevent subsequent rejection, if the equipment is found to be defective. Packing and Despatch The equipment shall be properly packed for transportation by ship / rail or trailer. As the equipment may be stored outdoors for long periods before installation, the packing shall be suitable for outdoor storage under severe temperature conditions. DOCUMENTATION After award of contract, the bidder shall submit 3 sets of drawings/documents to Purchaser/Consultant giving details, for scrutiny and approval. Once the drawings have been approved, no alteration or modification will be carried out without prior approval of the Purchaser.

7.7 7.7.1

7.8

The manufacturing of the equipment shall be strictly in accordance with the approved drawing and no deviation shall be permitted without the written approval of the purchaser. All manufacturing and fabrication work in connection with the equipment prior to the approval of the drawing shall be at the BIDDER's risk.

Approval of drawing/work by purchaser shall not relieve the BIDDER of his responsibility and liability for ensuring correctness and correct interpretation of the latest revision of applicable standards, rules and code of practices. After award of contract, the bidder shall also submit 2 sets of type test reports to C.E. (Tr. Pl.) for scrutiny and approval, before commencement of supply. Adequate copies of acceptance and routine test certificates, duly approved by the purchaser, shall accompany the dispatch consignment.

Consultant: Snyder Energo Private Limited Bangalore & Chennai

Section-4

84 of 140

DEIFY INFRASTRUCTURE LIMITED JAYASWAL NECO INDUSTRIAL LIMITED 2x25 MW CAPTIVE POWER PLANT

TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES DOC. NO : 4 3643 ELCT 001

8.0 PLCC SYSTEM 8.1 8.1.1 8.1.2 8.1.3 8.1.4 8.1.5 8.1.6 8.1.7 8.1.8 8.2 Scope of supply PLCC system. Power packs for 48V DC system with 100% redundancy. Engineering, Design, fabrication, manufacture, assembly, shop testing including type test as specified and inspection at manufacturers works. Unloading and storage at site. Commissioning of the PLCC. All spare parts required for commissioning of the equipment/system covered under this specification. Recommended Spares for two(2) years of trouble free operation Special tools and tackles required for operation and maintenance inspection and repair of the equipment/system offered. Standards i) The individual equipments offered shall conform in all respects to the latest editions of Indian National Standards or the relevant IEC Specifications as mentioned in specification. Equipment meeting other internationally accepted standards which ensure an equivalent or higher quality than the standards mentioned, will also be considered.

Line traps IEC Publ 353-1971 IEC Draft 57-1983 IEC Publ 919-11970 IS 8792 - 1978 IS 8793 - 1978 IS 9859 Part-I-1981 IS 3070 Part-I-1974 Coupling devices IEC 481-1974 IS 8997-1978
Consultant: Snyder Energo Private Limited Bangalore & Chennai

Line Traps Revision of publication 353 (2nd edition) Recommendations for lightening arrestors Line Traps Method of tests for Line Traps Installation of Line Trap Lightning arrestor for A.C.system

Coupling devices for Power Line Carrier systems. Coupling devices for PLC systems
Section-4 85 of 140

DEIFY INFRASTRUCTURE LIMITED JAYASWAL NECO INDUSTRIAL LIMITED 2x25 MW CAPTIVE POWER PLANT

TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES DOC. NO : 4 3643 ELCT 001

e)

IS 9859-1982 Coupling devices IS 9859-1983 Part- Code of practice for installation and maintenance of outdoor III PLC equipments IS 8998-1978 Method of tests for coupling devices for PLC systems

H.F. Coaxial Cable I.S.: 5802 Part-II 1975 Coaxial R.F.Cable with characteristic impedance 75 ohms PLC Terminals a) b) c) d) e) f) VFT CCITT (Yellow book)1980 Protection coupler a) b) c) Cigre Document March 1969 Teleprotection IEC-663-1980 Teleprotection Cigre study committee 35 report Teleprotection -1978 R35, R37, R38,V23, V24. Recommendations IEC 495- 1974 IEC 663-1980 IS 9482-1980 IS 9528-1980 Part-I IS 9528-1980 PartII IS 10706-1983 commended values for characteristic input and output quantities of signals Planning SSB PLC system. Characteristic values of inputs and outputs of SSB PLC terminals. Manual for Planning of SSB PLC systems. PLC system planning. Methods of tests for SSB PLC terminals.

Recommendations a) b) c) d) e) f) IEC 688-1-1980 IEC 255-20-1984 IEC Draft 57-1985 IEC Draft 57-1983 IEC Draft 85-1984 IS 5561-1970 Part-I general purpose transducers Part-20-Protective systems Recommended standards for the performance and testing of Teleprotection equipments Part-I command systems recommended standards for the performance and testing of Teleprotection equipments Part-II Analogue systems. Electrical measuring transducers for converting A.C. into D.C.electrical quantities Specification for Electric Power connectors
Section-4 86 of 140

Consultant: Snyder Energo Private Limited Bangalore & Chennai

DEIFY INFRASTRUCTURE LIMITED JAYASWAL NECO INDUSTRIAL LIMITED 2x25 MW CAPTIVE POWER PLANT

TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES DOC. NO : 4 3643 ELCT 001

g) h) i) j) k)

IS 1554 Part-I 1976 CCITT Indian Electricity CIGRE IEEE (USA)

Specification for PVC insulated electrical cables As applicable. As amended upto date Rules Guide on Power Line Carrier 1979. Guide on Power Line Carrier Application

Additional reference if any shall be furnished with supporting documents. 8.3 System particulars i) The equipment offered against these specifications shall be suitable for system conditions and particulars as per project specific information. The atmosphere is to be considered as laden with industrial and town gas and dust in suspension during the dry months, fog, smoke and milked acid are also present. Heavy lightning is also present during the months from June to October.

8.4 8.4.1

SPECIFIC REQUIREMENTS General The Tenderer shall note that the following points were considered while working out the quantity Schedules and the schemes for the speech communication system on automatic dialling basis. i) ii) Power supply i) All the equipments to be offered against this specification, unless otherwise stated specifically, shall be suitable for connection to 48 V D.C. supply with + Ve earthed. Phase to phase/ Inter system coupling for all the lines Carrier protection facilities considered for all the lines.

Consultant: Snyder Energo Private Limited Bangalore & Chennai

Section-4

87 of 140

DEIFY INFRASTRUCTURE LIMITED JAYASWAL NECO INDUSTRIAL LIMITED 2x25 MW CAPTIVE POWER PLANT

TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES DOC. NO : 4 3643 ELCT 001

8.5

PRINCIPAL TECHNICAL PARAMETERS Technical parameters of line trap

Sr. No. 1 2 3 4 5 6 7 8 9 10

Item Purpose Rated System Voltage Inductance (mH.) Rated current(Amps) Rated short time current for 1 sec. duration (kA rms) Assymetric peak value of the Ist Half wave of short time current (kA peak) Minimum resistive Component of impedance within the bandwidth (Ohms) Rated tapping loss within rated bandwidth in db Radio interference voltage mV(Maximum value) Protective device: a) Rated Voltage b) Nominal discharge current(1 kA rms) c) Applicable standard Desired blocking band

Specification To prevent undue loss of carrier signal for all power system conditions 145kV 0.5 mH 800Amps 40 100 >600 ........2.6..... To be furnished by manufacturer ...to be decided by the linetrap mfgr... .................10.................... ...........IEC - 99 - 1 PART I........ .....^.50 to 500KHz ....* 90 to 500 KHz.............. ...............Out door................ Tower mounted

11 12 13 14

Installation Type of mounting Type of terminal pads terminal connections to be provided by Tenderer on line side and sub-station side. Suitable for Single Moose Conductor Take off .....Horizontal and Vertical.... Note:i)

For 132kv * between 90 KHz and 500 KHz depending upon actual frequencies used. If it is not possible to achieve blocking band of 90 KHz to 500 KHz in some cases, the possible blocking bands shall be indicated. If it is possible to
Section-4 88 of 140

Consultant: Snyder Energo Private Limited Bangalore & Chennai

DEIFY INFRASTRUCTURE LIMITED JAYASWAL NECO INDUSTRIAL LIMITED 2x25 MW CAPTIVE POWER PLANT

TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES DOC. NO : 4 3643 ELCT 001

achieve the complete blocking band from 90 KHz to 500 KHz by using more than one tuning units the same shall also accordingly be indicated. Technical parameters of coupling device Sr.No. 1 Item Purpose Specification Transmission of signals from carrier side to the high voltage line and vice-versa with minimum loss. Protect the PLC equipment against the effects of high voltage 600 ohms with phase to phase coupling. 75 ohms for unbalanced secondary circuit 2 dB > 6600 p.f. for 220 kV & below (Tenderer to check with APTRANSCO connecting substation)

2 3 4 5

6 7 8 9

Primary Impedance Secondary impedance Maximum composite loss Capacitance of the CVT/C.C. in pf in conjunction with the coupling device is to be used Pass Band Peak envelope power: Return loss: a) Line side b) Equipment side Constituent elements a) For phase to phase inter circuit coupling Mounting Installation Interconnection

80 KHZ to 500 KHZ 200 Watts for 220 kV & below > 12 dB > 12 dB Three element protective device-2 Nos., Coupling filters -2 Nos., Balancing transformer -1 No. On a single galvanised steel frame Outdoor Suitable interconnecting copper leads of 4 (Four) mm sq. C/S provided with crimped lugs and Stainless steel nuts and bolts for connection

10 11 12

Technical parameters of H.F cable Sr.No. 1 2 3 Purpose Impedance Withstand voltage Item Specification IS:5802 Part-II) - 1975 Interconnection between C.D. & PLC terminals 75 +/- 3 Ohms unbalanced 4 kV minimum
Section-4 89 of 140

Consultant: Snyder Energo Private Limited Bangalore & Chennai

DEIFY INFRASTRUCTURE LIMITED JAYASWAL NECO INDUSTRIAL LIMITED 2x25 MW CAPTIVE POWER PLANT

TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES DOC. NO : 4 3643 ELCT 001

4 5 6 7 8. 9. 10. 11. 12. 13.

Attenuation Frequency Range Length required: Preferred Minimum acceptable Type of Laying Dielectric Rated capacitance Rated velocity ratio Maximum alternating voltage for continuous use. Maximum voltage for unidirectional pulse operation Inner conductor a) Single dia b) Material

Frequency in KHz- 10 60 300 Attenuation-dB/Km 0.8 1.4 3.3 10 KHz to 500 KHz

500 4.7

500 Meters and 1000 Mtr. 200 Meters In cable ducts or directly underground Solid polyethylene dielectric with thickness 2.44 mm minimum. 67 pf/m 0.66 5.0 kV (peak) 10 kV (peak) Minimum 1.104 mm Nominal 1.120 mm Maximum 1.136 mm Plain annealed and high conductivity electrolytic copper Minimum 7.11 mm Nominal 7.25 mm Maximum 7.40 mm Single braid of plain annealed copper wire of diameter 0.20 mm. The braid angle shall be less than or equal to 450 Material : Compounded PVC black in colour Thickness : Minimum 0.85 mm Maximum 1.05 mm Minimum 10.0 mm Nominal : 10.3 mm Maximum : 10.6 mm 8 kV (r.m.s) 23000 Mega Ohms/Per KM 0.1 dB/m maximum. The measuring frequency shall be 200 MHZ

14. 15.

Cores diameter over dielectric Outer conductor Protective sheath

Overall diameter Dielectric strength of core Insulation resistance Attenuation constant Technical parameters of PLC terminals Sr.No. 1 Purpose Item

Specification Transmission of speech data and protection & control signals.


Section-4 90 of 140

Consultant: Snyder Energo Private Limited Bangalore & Chennai

DEIFY INFRASTRUCTURE LIMITED JAYASWAL NECO INDUSTRIAL LIMITED 2x25 MW CAPTIVE POWER PLANT

TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES DOC. NO : 4 3643 ELCT 001

2 3 4 5 6

Mode of Transmission H.F.Range Nominal carrier frequency band Mode of working Nominal impedance i) Carrier frequency side ii) VF side Return Loss i) Within the nominal carrier frequency band in the transmit direction ii)Within the effectively transmitted frequency band. Nominal carrier frequency (Peak envelop power available at line output of the terminal at a resistive load equal to the nominal load impedance for single Tone keying) Single channel Twin channel

side-band, amplitude modulation. 50 to 500 KHz. 4 KHz, Multipurpose/Unipurpose operation. Fixed frequency. 75 Ohms unbalanced 600 Ohms. Greater than 10 dB. Greater than 14 dB.

Single

20 W to 40 W Programmable 40 Watts. (Carrier sets with more output than those specified above will not be considered.) a)300 to 2400 Hz for PLC terminals with speech cut off at 2400 Hz. b)300 to 2000 Hz for PLC terminals with speech cut off at 2000 Hz

Effectively transmitted speech frequency band selectable

10

Effectively transmitted signal frequency band selectable depending on speech cut-off

a)300 to 3400 Hz for Uni purpose PLC terminals b) 2520 to for multipurpose 3600 Hz OR carrier terminals 2640 to 3720 with speech cut Hz off at 2400 Hz.
Section-4 91 of 140

Consultant: Snyder Energo Private Limited Bangalore & Chennai

DEIFY INFRASTRUCTURE LIMITED JAYASWAL NECO INDUSTRIAL LIMITED 2x25 MW CAPTIVE POWER PLANT

TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES DOC. NO : 4 3643 ELCT 001

11 12 13

Effectively transmitted speech and data signaling frequency band. Stability of carrier frequency from its nominal value. Relative levels (VF side)

c) 2160 to 3600 Hz OR 2280 to 3720 Hz 300 to 3720 Hz +/- 5 Hz.

for multipurpose carrier terminals with speech cut off at 2000 Hz.

14

Level Regulation(Automatic gain control)

15

Telephone signalling channel

16

Pulse distortion

17

Permissible limits for variation of overall loss (attenuation) of the speech channel relative to 800 Hz for back to back operation of one pair of terminals without compandor. R.F.sensitivity

18

a) 4 wire-transmit: 0dBr to -17 dBr. b) 4 wire-receive: -3.5 dBr to + 8 dBr. c) 2 wire-transmit: 0dBr. d) 2 wire-receive: -7 dBr. In the case of a 30 dB change in carrier frequency signal level within the regu lation range, the change in voice-frequency receive levels of both speech and signals shall be less than 1 dB. By frequency shift keying. The signalling channel shall be operated by a potential free open OR close contact at the transmit side and provide a potential free change over contact at the receive side. All relays to be provided in the speech circuit shall be hermetically sealed. The pulse distortion of the signalling channel, when operated at a signaling of 10 pulses per second and within a mark-tospace ratio of 40/60, shall not exceed 5 mS for a pair of PLC terminals. 300 - 400 Hz:-0.9 to +3dB)OR+ 1.5dB for 400 - 600 Hz:-0.9 to +1.8dB)the complete 600 1600 Hz:-0.9 to +0.9dB)band of 300 to 1600-2000 Hz:-0.9 to +1.8dB)2400 Hz (without 2000 -2400 Hz :-0.9 to + 3dB) compandor). (-) 43 dBm

Consultant: Snyder Energo Private Limited Bangalore & Chennai

Section-4

92 of 140

DEIFY INFRASTRUCTURE LIMITED JAYASWAL NECO INDUSTRIAL LIMITED 2x25 MW CAPTIVE POWER PLANT

TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES DOC. NO : 4 3643 ELCT 001

19

Transmit/Receive frequency difference.

20 i)

Noise performance Noise generated within the terminals

ii)

S/N Ratio (as per Report Committee No.14 Teletransmission of CIGRE1962) for voice communication referred to 1 mW at a relative level of zero. Group delay distoration

In a pair of PLC terminals,the frequency difference between a voice-frequency signal applied to the transmit end and that received at the receive end shall be "O" The weighted telephone noise level measured at the speech output of a pair of PLC terminals without compandors shall not exceed -60dBmoP,measurements shall be carried out as per IEC No.495 latest edition. 35 dB.

21

Measured at V.F.signal input points shall not be more than 3 ms over the entire effectively transmitted data signal frequency band a)48V D.C. (+Ve pole earthed), with+ 15% and - 10% variation. b)The terminal shall remain operational when the supply voltage rises or falls by 20% of its nominal value without any damage or failure to the equipment.

22

Power supply for PLC

Consultant: Snyder Energo Private Limited Bangalore & Chennai

Section-4

93 of 140

DEIFY INFRASTRUCTURE LIMITED JAYASWAL NECO INDUSTRIAL LIMITED 2x25 MW CAPTIVE POWER PLANT

TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES DOC. NO : 4 3643 ELCT 001

23

Voltage withstand requirements a)Power supply

b) Carrier frequency input/ output terminals

Test to be carried out as per IEC publication 60 H.V. Test Techniques 1962). When the D.C. power supply terminals are both isolated from earth, they shall be capable of withstanding with out damage a voltage of 500 V D.C. applied for one minute between both terminals connected together and earth When D.C. power supply terminals are not isolated from earth, they shall be capable of withstanding without damage an impulse voltage of 1000V 1.2/50 S., applied between each terminal and earth When the carrier frequency terminals are isolated from earth they shall be capable of withstanding without damage a voltage of 2000 rms at power frequency, applied for 1 minute between both terminals connected together and earth. When the carrier frequency terminals are not isolated from earth they shall be capable of withstanding without damage an impulse voltage of 3000 V, 1.2/50S. applied between each terminal and earth. Voice frequency, signalling and alarm circuits, when free from earth, shall be capable of withstanding without damage a voltage of 500 V,D.C. applied for 1 minute between the terminals of the circuit connected together and earth.

c) Voice frequency signalling & alarm circuits.

Consultant: Snyder Energo Private Limited Bangalore & Chennai

Section-4

94 of 140

DEIFY INFRASTRUCTURE LIMITED JAYASWAL NECO INDUSTRIAL LIMITED 2x25 MW CAPTIVE POWER PLANT

TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES DOC. NO : 4 3643 ELCT 001

Technical parameters of electronic exchange (Version PLCC) Sr. No. 1 2 3 Item Purpose Type Capacity a)Equipped and for Facilities provided Specification To establish dialing network Electronic, Microprocessor based, fully digital. Wired 12Trunk Lines and 8 Local subscribers, -12/8 20Trunk Lines and 8 Local subscribers, -20/8

5 6 7 8 9 10

i) Call transfer ii) Priority interrupt iii) Conference iv) Call forward v) Call consult vi) Facility to connect Data channels vii) Automatic alternate route selection Compatibility with PLCC, MICROWAVE, UHF, VHF, OPTICAL FIBRE AND DOT LINES. Power supply 48 V,D.C. Tolerance for variation +15% - 10% The equipment shall continue to in power supply operate satisfactorily if the supply voltage rises to 20% of the rated value Subscriber loop 1000 Ohms. resistance. Exchange Identification Two digit and three digit scheme. Miscellaneous a. The equipment shall be wired up completely with main distribution frame using 5 mtrs. length telephone cable. b. One no. crone tool shall be supplied with each equipment.

Technical parameters of digital EPAX for express cum dialling communication Sr. No. 1 2 3 Item Purpose Type Capacity Equipped And Wind Specification To establish Express cum Dialing Communication (ECD) to LD Centre Digital, Microprocessor based Exchange 16 E&M Trunks 8 Remote interface units
Section-4 95 of 140

Consultant: Snyder Energo Private Limited Bangalore & Chennai

DEIFY INFRASTRUCTURE LIMITED JAYASWAL NECO INDUSTRIAL LIMITED 2x25 MW CAPTIVE POWER PLANT

TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES DOC. NO : 4 3643 ELCT 001

Facilities provided

5 6

Compatibility with Power Supply

7 8 9 10

Subscriber loop resistance Exchange identification Remote extension interface unit Miscellaneous

- Abbreviated Dialing - Alarm/Wake up - Automatic Call Back - Busy Override - Call Transfer - Extension to other subscriber - Conferencing - Programmable Voice Guidance - Distinctive Ringing - Emergency Reporting - Multilevel Priority - Music on Hold Block/ Release of dialling from Remote interface PLCC, Optical Fibber and DOT Lines 48 V DC +/- 15% The operating voltage limits shall be + 15% and 10 % and the equipment shall continue to operate satisfactorily. 1000 ohm max Single, Two Digit and Three Digit Shall be operated on 48 V DC Any additional feature shall be configured provided is advantages.

Consultant: Snyder Energo Private Limited Bangalore & Chennai

Section-4

96 of 140

DEIFY INFRASTRUCTURE LIMITED JAYASWAL NECO INDUSTRIAL LIMITED 2x25 MW CAPTIVE POWER PLANT

TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES DOC. NO : 4 3643 ELCT 001

8.6

TECHNICAL SPECIFICATIONS FOR POWER LINE CARRIER EQUIPMENT Technical specifications and technical parameters/GTP of PLCC equipments are as follows.

8.6.1

Line traps The line traps offered shall confirm to the technical requirement data sheet. Line traps shall be inserted into high voltage transmission lines to prevent undue loss of carrier signal for all power system conditions, thus making functioning of the Power Line Carrier Systems independent of switching conditions inside the sub-station. Its impedance shall be negligible at power frequency (50 Hz) so as not to affect the power transmission but must be relatively high for the entire carrier frequency band. Line trap shall consist of a main coil designed to carry continuously the rated current at the maximum ambient temperature. It shall be provided with a suitable protective device and a tuning device. Line trap shall be provided with a protective device which shall be so designed and arranged that neither significant alteration in its protective functions nor physical damage shall result from either temperature rise or the magnetic field of the main coil at continuous rated current or rated short time current. The protective device shall neither enter into operation nor remain in operation following transient actuation of the power frequency voltage across the line trap by the rated short time current. For proper co-ordination with the lightning arrestors installed in the sub-stations, the line traps shall be provided with protective device. The protective device shall be shunt connected to the main coil and the tuning device. All nuts and bolts used for connections shall be of stainless steel. One set of copper connectors, with fixing nuts & bolts for connection between main coil, tuning device and protective device shall be provided. 132kV line traps, no visual corona discharge at 156kV R.M.S. power frequency voltage should take place. To achieve this if it is necessary to provide corona ring/s the same shall be considered as an integral part of the equipment to be supplied. Depending on the design, it may be necessary to provide bird barriers which shall be included by the Tenderer in his offer. Line traps are to be tuned for a broad carrier frequency band which will include the carrier frequency pairs chosen for transmission line section. The resistive component of impedance of the trap, within its bandwidth, shall not be less than 600 ohms. The Tenderer shall offer only broad band line traps to ensure the minimum value of resistive component of impedance in blocking range. If it is not possible to cover the entire carrier frequency band with one tuning pot, two tuning pots with overlapping blocking bands shall be provided so that carrier frequency band of 90KHz to 500 KHz is covered. In such cases the quoted price of line traps shall

Consultant: Snyder Energo Private Limited Bangalore & Chennai

Section-4

97 of 140

DEIFY INFRASTRUCTURE LIMITED JAYASWAL NECO INDUSTRIAL LIMITED 2x25 MW CAPTIVE POWER PLANT

TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES DOC. NO : 4 3643 ELCT 001

include cost of both the tuning pots. It shall be possible to adopt the desired blocking band of the line trap at site by selecting the suitable tuning units. The Tenderer shall bring out clearly whether it is possible to cover the entire blocking band from 90 KHz to 500 KHz with both the tuning units in circuit when it is not possible to achieve the same with single tuning unit. Further the tuning devices shall be so arranged that it should be possible to replace the tuning device without removing the line trap. The line traps should be suitable for outdoor mounting. Magnetic separators if required shall also be provided. The Tenderer shall quote line traps of series II for following rated continuous current and rated short-time current capacities, as per IS-8792-1978.

Rated continuous current a) 630 A 0.5 mH

Rated short-time current (series 2) 40kA 40kA 40kA

b) 1250 A 0.5 mH c) 2000 A 1.0 mH 8.6.2 Coupling Capacitors

The coupling capacitors shall be part of the CVT (Provided by Purchaser). The rated capacitance value of the coupling capacitor is 6600 pf (Tenderer to check with APTRANSCO connecting substation) 8.6.3 Coupling device The coupling device shall generally be in accordance with latest IEC-481 and IS 8997-1978 & IS: 8998-1978 and shall be complete with the drainage coil, earthing switch, protective arrestors, tuning device, matching transformer etc. The copper connectors between the coupling device and the C.V.T./CC on one side and the earth on the other, shall also be supplied. All the elements of the coupling device including the three element protective device shall be mounted on a tower. This frame in turn shall be securely housed in a 2.0 mm thick hot dip galvanised sheet metal box. The hot dip galvanising of the box shall be done after all the fabrication work. The box shall be waterproof and provided with suitable arrangement to mount the same on steel support of the C.V.T./CC The G.I. Sheet steel box shall have and interlock personnel safety, it should not be possible to open the box without closing the earth switch. GI bolts for mounting the box on the CVT/CC support should be included in the supply.
Consultant: Snyder Energo Private Limited Bangalore & Chennai Section-4 98 of 140

DEIFY INFRASTRUCTURE LIMITED JAYASWAL NECO INDUSTRIAL LIMITED 2x25 MW CAPTIVE POWER PLANT

TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES DOC. NO : 4 3643 ELCT 001

For interconnecting the elements of the coupling device the 4 mm. sq interconnection copper leads shall be used. All the interconnectors shall be provided with crimped lugs and stainless steel nuts and bolts for interconnection. The coupling device shall be provided with suitable gland and connector for connection of 75 ohms unbalanced of any reputed make. The height of the center line for coupling device shall be 1200 mm from ground level. The design and enclosure of coupling device will be subject to the approval of the Customer. The arrester on the primary side of the coupling device shall be of air gap type and shall have a power frequency spark over voltage of 2 kV rms and 5 kA, impulse discharge current of 8/20 microseconds wave shape. Phase to phase coupling arrangement is employed. Two numbers of phase to earth coupling devices shall be used to achieve phase-to-phase coupling. Any separate matching transformer or matching unit required shall be included in the scope of supply. This matching transformer or matching unit shall have its output compatible for both 75 ohms. Connections between these units shall be such that reliable communication shall be ensured even if one of the coupled phases is earthed or open circuited on the line side. The coupling device shall confirm to the principle tech. Parameters as mentioned in the specification The Tenderer shall submit the guaranteed technical particulars of the coupling device in accordance with Schedule It has been observed that due to connection of 2 or more carrier terminals in parallel. Specially when the carrier terminals are having adjacent frequency bands, there is considerable loss due to paralleling and R.F. loading. The Tenderers shall therefore incorporate special filters as a built in feature in the PLC terminals on some other equipment which will minimize this loss. Tenderer shall furnish along with his offer, the design features of these filters/equipment and detailed calculations high lighting to which extent this will reduce paralleling losses and R.F. loading. Tenderer should ensure that line filter should have minimum handling capacity of 5 PLCT each of 40 W capacity.

Consultant: Snyder Energo Private Limited Bangalore & Chennai

Section-4

99 of 140

DEIFY INFRASTRUCTURE LIMITED JAYASWAL NECO INDUSTRIAL LIMITED 2x25 MW CAPTIVE POWER PLANT

TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES DOC. NO : 4 3643 ELCT 001

8.6.4

High frequency Co-axial cable (Unbalanced) I.S. 5802 Part-II, 1975 High frequency co-axial cable shall be offered to connect coupling unit installed in the switchyard to the PLC terminals installed indoor. The high frequency cable to be offered by the Tenderers shall be suitable for being laid directly to the ground or in trenches or in ducts. The cable shall be braided tinned copper screened and steel armoured. The capacitance of the cable shall be low so as to minimize attenuation at the carrier frequency range. The impedance of the cable shall be so as to match with the output impedance of the PLC terminals and secondary impedance of the coupling units. The cable shall be insulated to withstand a test voltage of 4kV. The H.F .cable offered shall conform to the technical requirements as per the specification.

8.6.5

Power line carrier terminal The Tenderer shall offer single channel and twin channel PLC terminals. The PLC terminal shall use amplitude modulation with suppressed carrier, single side band, multipurpose, 4KHz and shall be site programmable for Audio frequency, Carrier Frequency, Pilot Frequency and transit band pass filters. The equipment shall be suitable for duplex working and shall use the latest technology using Digital Signal Processor. The PLC terminal shall be suitable for adjacent band working and shall have necessary frequency stability. The entire signalling band shall be available for transmission of data from one station to end station with back to back connection of signalling band at the in between stations. The PLC terminal shall have common AF bus so that protection coupler. VFT equipment can be insered in reserve slots of PLC terminal in future without any necessity of wiring or any intermediate unit. Filters or any other equipments required for this purpose shall be built-in feature of the PLC terminal offered. The carrier terminals offered for lines of different voltages shall confirm to the technical requirements. Provision shall be made in the carrier terminals offered to compensate for rising and falling trend of frequency response due to change of line characteristics. The measures adopted to incorporate this feature with its limitations shall be clearly brought out in the offer. The Tenderer shall offer fully field tunable ( suitable for tuning at site) PLC terminals including i) ii) iii) Programmable transit band-pass filters, data cards, from 300 to 3760 Hz in incremental steps of 60 Hz. Programmable "Pilot" frequency Programmable "speech cut off" suitable for 2 KHz and 2.4 kHz.

Consultant: Snyder Energo Private Limited Bangalore & Chennai

Section-4

100 of 140

DEIFY INFRASTRUCTURE LIMITED JAYASWAL NECO INDUSTRIAL LIMITED 2x25 MW CAPTIVE POWER PLANT

TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES DOC. NO : 4 3643 ELCT 001

The tuning of frequencies shall be possible both in IF and H.F. sections. The tuning of frequencies shall be easily possible without any cumbersome procedure. Any equipment required for this purpose shall be clearly brought out and shall be offered as an optional item. The procedure of tuning of frequencies shall be given in detail in the offer, with the support of drawings etc. Suitable facility shall be incorporated in the PLC terminals to compensate the mismatch introduced due to paralleling of a number of PLC terminals at a station. Measures adopted for this purpose shall be clearly brought out and explained in detail in the offer. Suitable connectors for termination of H. F. cable of 75 ohms unbalanced shall be provided in the PLC terminal. The connectors shall be of universal type suitable to adopt 75 ohms unbalanced, H.F. cable, and also suitable for connection to adjacent PLC terminals. The connectors shall be installed in the PLC cabinet at such a height so as to facilitate working with ease. Screw clamp type terminals shall be provided for interconnection wiring. A diagram indicating each function for which tag/connectors provided shall be embossed on metal plate of size 250 mm x 150 mm and the same shall be displayed inside the cabinet. The PLC terminals shall be equipped with companders through selectable switches so as to enable to introduce as and when necessary. Further, the PLC terminals shall also be provided with the following minimum built-in features: i) ii) iii) iv) v) Programmable H.F. hybrid to facilitate adjacent band working. Matching impedance. transformer to facilitate working for 75 ohms unbalanced 75 ohms unbalanced for testing, with a selector

Dummy impedance switch as applicable.

Programmable Transit band pass filter to facilitate data transmission. Universal type H.F. connector suitable for 75ohms unbalanced H.F .cable as applicable. The H.F .connectors shall be T-type and mounted at such a height so as to facilitate working with ease. Exhaust fan working on 230 V, 1 phase, A. C. supply. Loop test facility. Each PLCC terminal for speech as well as for protection purpose shall be provided with plug in type telephone hand set, four wire express telephone & buzzer
Section-4 101 of 140

vi) vii) viii)

Consultant: Snyder Energo Private Limited Bangalore & Chennai

DEIFY INFRASTRUCTURE LIMITED JAYASWAL NECO INDUSTRIAL LIMITED 2x25 MW CAPTIVE POWER PLANT

TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES DOC. NO : 4 3643 ELCT 001

ix)

(a) Normal band width of each PLCC channel shall be 300-3600 HZ and shall be suitable for transmission of Facsimile messages preferably at 2400 baud. (b)One speech channel 300-2000 HZ plus a band of 2000-4000 HZ for the transmission of data. Data signalling rates 50,200,600,1200 baud shall be possible. (c)Three 600 baud channels or one 2400 baud channel for full band of 300-3600 HZ (d) Transmission for speech and protection channels. Protection channels shall be suitable for coded as well as un coded transmission and should have in-band signalling i.e. trip signal frequencies shall be transmitted within the speech band without any necessity for separate band for protection.

The cabinets shall provide required alarm facilitate such as pilot fail, carrier fail etc. The indication on panel will be by display LED's associated with an acoustic alarm. Three spare potential free contacts will be provided and wired unto terminal strip for remote indication. The terminal shall be provided with sufficient test points on front side of various printed circuit boards to facilitate checking of important voltages and current values in different parts of the PLC terminals. A built-in meter to check important voltages/currents in PLC terminals shall be provided on the panel. Protection fuses should be provided in all important circuits and the fuses shall be so mounted as to allow their easy inspection and replacement. The power supply module shall be provided with miniature-circuit breaker of good quality with overload and short circuit release features. It shall be ensured that operation of PLC terminal is not affected by impulse noise due to switching operation in switchyard. The PLC terminals shall be provided with emergency call facility from the carrier set for point to point contact with the next station complete with telephone hand set suitable for hanging inside the PLC cabinet and with termination to enable to connect an external telephone set for point to point communication. In the PLC terminals offered suitable features shall be incorporated to ensure that in the event of any short circuit of the output terminals of the power supply unit. The unit is switched off the supply without causing any damage to the power supply unit itself. This is necessary to provide protection against any accidental short circuits or short circuits due to failure of some components in the circuits. The power consumption of the PLC terminals shall be minimum and shall be commensurate with the output power of the PLC terminals as specified to keep the size of the battery optimum.

Consultant: Snyder Energo Private Limited Bangalore & Chennai

Section-4

102 of 140

DEIFY INFRASTRUCTURE LIMITED JAYASWAL NECO INDUSTRIAL LIMITED 2x25 MW CAPTIVE POWER PLANT

TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES DOC. NO : 4 3643 ELCT 001

PLC terminal shall be mounted in floor mounting, vermin proof sheet metal cabinet. The construction will incorporate a swing frame on which all the equipments are mounted. The cubicle will be provided with an exhaust fan on the top working off 230 V, A.C.,1-phase. Louvers for inlet of air in the cubicle shall be provided at the bottom of the cubicle to avoid dust entering from below. The individual parts of the carrier set should be accessible from the front, making it possible to place the carrier cabinets side by side, back to back and against the wall. All component parts of the carrier sets shall be suitably tropicalised and protected against bad effects of humidity, fungus etc. Building block principle should be employed in the construction of carrier sets. The cabinet shall be suitable for bottom cable entry. 8.6.6 Equipment for tele-protection The F .M .voice frequency transmission equipment for protection signalling is required for transfer of trip commands from one end of the line to the other for remote tripping of breaker. The carrier protection equipment offered shall have four command based on microprocessor and digital signal processing technique. It shall be suitable for handling the tripping signals i.e. blocking, permissive and direct transfer tripping schemes. Four commands enable parallel circuit lines to be protected with permissive tripping of the line protection and direct transfer tripping or the breaker back up protection. The speed of transfer trip channels shall be such that the time interval measured from the point of initiation of the transmitter (including the time taken for transmission of the signal over carrier link) and closing of the output contact at the receiver end shall not exceed 25 ms. The Tenderers shall offer only in band type-protection equipment such that speech channels and the tele-protection signals are arranged in such a manner that the superimposed signalling band is kept free for tele-metering, etc. In other words, the transmission of Tele-protection signals should take place within speech band. No trip signalling frequency should be beyond 2000 HZ. The Tele-protection equipment shall be provided with interconnection unit suitable for connection to the protective relays. The output contact provided in the receiver shall be capable of making the trip coil circuit of the 132kV breaker whose rating is 110 V D.C. / 200 W per trip coil per phase. In case, however, an additional relay is required to be include for providing the contact of desired rating, the trip transfer time mentioned in clause 6.7.3 above of 25 ms shall be inclusive of the operating time of this auxiliary relay.

Consultant: Snyder Energo Private Limited Bangalore & Chennai

Section-4

103 of 140

DEIFY INFRASTRUCTURE LIMITED JAYASWAL NECO INDUSTRIAL LIMITED 2x25 MW CAPTIVE POWER PLANT

TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES DOC. NO : 4 3643 ELCT 001

8.6.7

Common features for tele-protection equipment i) The equipment shall be of modular construction and of plug in type using solid state components/integrated circuits and shall be suitable for mounting in PLC cabinets offered and shall be fully wired with contact of units, tag blocks etc and ready for commissioning. The equipment shall be provided with sufficient test points on the printed circuit board and built in indicating meters to check up important voltages and currents in various circuits. The fuses shall be so mounted as to allow their easy identification, inspection and replacement. Suitable supervision and alarm facilities and potential free contacts for repeat alarm purpose shall be provided. All individual parts of the equipment shall be accessible from front. The equipment shall be suitably tropicalised and protected against the harmful effects of humidity, fungus etc. Disconnectable terminals shall be provided for interconnection with relaying equipment. It shall be possible to test the reliability of the protection channels end to end and to conduct Signal Return Test with the equipment remaining fully operational to ensure that the genuine trip command will be transmitted during such testing. Any additional equipment/modules required for this purpose shall be included. Counters to register the number of trip commands transmitted/received shall be provided at both ends. Possibility of providing digital electronic counters shall be examined. The frequencies used for trans mission of trip commands shall be in the speech band. The performance of the equipment shall not in any way be affected while speech is in progress. In event of trip command the speech and all other channels shall be cut and the trip command will be transmitted with full power in case of use of multipurpose PLC terminals. The voice frequency transmission equipment shall be insensitive to corona noise and shall remain unaffected by impulse type noises generated by operation of switchgear equipments or by short circuits. The Tenderer shall clearly explain the measures adopted to make the equipment insensitive to corona noise, white noise and impulse type noise of amplitude greater than the level of the trip signal. The equipment shall have reliability and high security within the stipulated transmission time. The Tenderers shall specifically indicate the reliability expressed numerically as a fail to trip rate and security expressed numerically as a false trip for the equipment offered by him Supervision of failure of 220 V station input supply required for tripping shall be provided in the coupler unit. Two potential free contacts of this, relay will be wired for use of failure indication in the C/R. Other parameters for above shall be as per IEC standard. The speed of trip circuit transfer channel shall be such that the time interval measured from the point of energisation of the transmitter (including time taken for transmission of the signal over the carrier link) and closing of the output contact at the receiver end shall not exceed 20 mS. The teleprotection equipment shall be provided with interconnection unit suitable for connection to
Section-4 104 of 140

ii)

iii)

iv)

v)

Consultant: Snyder Energo Private Limited Bangalore & Chennai

DEIFY INFRASTRUCTURE LIMITED JAYASWAL NECO INDUSTRIAL LIMITED 2x25 MW CAPTIVE POWER PLANT

TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES DOC. NO : 4 3643 ELCT 001

protective relays. However the output contact provided in the receiver is capable of making and breaking the trip coil circuit of the 132 kV breaker whose rating is 110V. D.C 200 W per trip coil per phase. In case, however, an additional auxiliary relay is needed to be included for providing the contact of desired rating, the above mentioned trip transfer time of 20 mS shall be inclusive of the operating time of this auxiliary relay, and such an auxiliary relay shall be included in the teleprotection equipment offered. vi) The protection equipment offered by the Tenderer shall include 2 Nos. of changeover contacts as spares for use by the protection relaying scheme.In addition to these, 4 Nos. of spare changeover contacts shall be provided for each of the supervision contacts provided in protection equipment. The Tenderer shall prepare a coordinated interconnection drawing to connect his teleprotection equipment with the protection relays. The equipment shall work on supply voltage of 48 V DC (+ with + 15% - 10% voltage variation. pole earthed)

vii) viii) ix) x) xi) 8.6.8

The Tenderer shall submit the guaranteed technical particular of the equipment in accordance with Schedule. The teleportation equipment offered shall be suitable for installation in the respective PLC terminals. The Tenderer shall provide detailed description and full technical particulars and added features connected with it, if any. Built in test facility should exit for end to end and loop test shall be provided to ensure transmission of genuine trip commands during testing.

Electronic automatic exchange for PLCC The Electronic Private Automatic Exchange (EPAX) for PLCC shall be used at all the stations in APSEB. Board's Power Grid, where several local subscribers shall be able to inter-communicate selectively with one another as well as place or receive trunk calls. The EPAX offered shall be of latest technology and of modular design. Any line (outlet) of the EPAX shall be reached by any other line of the same EPAX by dialing the corresponding local number. The later shall consist of one or two digits according to the number of lines. No four wire group selectors are being provided for the PLC terminals. As such the EPAX offered shall incorporate the function of four wire group selectors also for all the directions. The EPAX offered shall confirm to the technical requirement as per this specification.

The EPAX similar to that offered should have been in service with PLCC in SEBS, for at least three years on the date of submission of the offer. A performance report of
Consultant: Snyder Energo Private Limited Bangalore & Chennai Section-4 105 of 140

DEIFY INFRASTRUCTURE LIMITED JAYASWAL NECO INDUSTRIAL LIMITED 2x25 MW CAPTIVE POWER PLANT

TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES DOC. NO : 4 3643 ELCT 001

EPAX, for a period of at least three years .as on date of submission of tenders, shall be submitted alongwith the offers. The Tenderers are required to quote for EPAXs equipped as under. i) ii) 20 Trunk lines and 8 subscriber lines. 12 Trunk lines and 8 subscriber lines.

It shall be possible to use the lines of EPAXs as either subscriber lines or trunk lines. The EPAXs offered shall be micro processor based fully digital, non-blocking and programmable. The procedure of programming may be clearly brought out and explained with the help of diagrams etc. in the offer. The EPAX offered shall be automatic and shall be able to function without the help of operator. The EPAX should support single two or three digit numbering Scheme. The software should support both E&M signaling and D.C. loop trunks. The EPAX shall have universal ports wherein any type of card of EPAX can be inserted into any slots. If, The Customer requires more than designated trunks, the same has to be met with a decrease in the subscriber lines. The number of Trunks can be either E&M or loop or a combination of both. The EPAX shall support duplication of CPU and PSU cards, In the event of Master CPU or PSU card failure, the slave cards Takeover smoothly without any break down. The EPAX shall support digital Telephones with display, on single pair of cable. The EPAX shall have voice guidance cards with call back facility for proper guidance to the subscriber. The procedure of programming may be clearly brought out and explained with the help of diagrams etc. in the offer. The EPAX offered shall be automatic and shall be able to function without the help of operator. The EPAX offered shall be provided with the following facilities:i) ii) iii) iv) v) vi) vii) viii) ix) Call transfer Priority interrupt Conference Call forward Call consult Facility to connect data Automatic alternate route selection follow me Ring when free
Section-4 106 of 140

Consultant: Snyder Energo Private Limited Bangalore & Chennai

DEIFY INFRASTRUCTURE LIMITED JAYASWAL NECO INDUSTRIAL LIMITED 2x25 MW CAPTIVE POWER PLANT

TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES DOC. NO : 4 3643 ELCT 001

x) xi) xii)

Either party release Real time clock Audible & visual alarm on all fault cards.

The EPAX shall be self-contained and shall provide its own ringing current and tones. The tones shall be from 400 Hz oscillator. The call processing time should be minimum. While a call is being initiated the pulses sent shall be visually displayed with the help of LEDs on the line and trunk card. The pulses sent should also be audible to the person initiating call. The EPAX offered shall be compatible for working in conjunction with PLC terminals, microwave, UHF, VHF, Optical fibre and DOT lines. The interface card required for this purpose shall be offered as an optional item. However the EPAX shall be wired for this purpose. Alarm type of fuses shall be provided with both audible and visual alarms and the bead of the blown fuse shall give instant indication of the blown fuse. The EPAXs shall be housed in dust proof steel cabinets of suitable design which shall be such as to facilitated efficient maintenance of the unit. The EPAX shall work on (-) 48 V D.C. supply. The operating voltage limits shall be + 15% and -10% and the equipment shall continue to operate satisfactorily if the supply voltage rises to 20% of the rated value. Loop resistance limits for EPAXs: The subscriber loop resistance should be 1000 ohms and for tie lines 1500 ohms maximum C.I.T.T. performance for the telephone of EPAX. i) for 'O' lines a) Sending reference equivalent + 3.03 dB NOSFER. b) Receiving reference equivalent - 5.03 dB NOSFER. ii) For a length of 4.1 Km of 4Lb cable a) Sending reference equivalent + 8.62 dB NOSFER. b) Receiving reference equivalent - 1.4 dB NOSFER.

8.6.9

Push button telephones Auto-desk push button type telephone sets with memory and redial facility shall be offered as indicated in the Schedule of requirements and these shall be sturdy and of

Consultant: Snyder Energo Private Limited Bangalore & Chennai

Section-4

107 of 140

DEIFY INFRASTRUCTURE LIMITED JAYASWAL NECO INDUSTRIAL LIMITED 2x25 MW CAPTIVE POWER PLANT

TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES DOC. NO : 4 3643 ELCT 001

elegant design and shall conform to international standards. The telephone instrument shall be provided with line cords and handset cords of adequate lengths (length to be mentioned in the offer) preferably of the same colour as that of instruments. 8.6.10 Voice frequency telegraphy equipments The Tenderer shall quote unit rates for Voice Frequency Telegraphy Transmitter/Receiver equipments suitable for transmission of data and facsimile signals over power line carrier in the frequency range of 0.3 to 3.7 KHz. The VFT should have modular construction and modern design features with high stability and consistency for the characteristic frequencies under all conditions of operation. The maximum frequency deviation should not be more than 0.1 Hz. The VFT shall be suitable for operation on 48 V D.C. power supply with positive pole earthed. The VFT shall be able to strap at site to any required centre frequency of required channel number at a given baud rate up to 200bauds as per CCITT Standards. The VFT shall be provided with necessary modules e.g. galvanic isolator, line matching module with send & receive amplifiers, line transformers for 4 wire and hybrid for 2 wire operation. The system impedance will be 600 ohms. The VFT offered shall have monitoring facilities for receive levels, operating voltage and the automatic indication for any fault and shall be suitable for mounting in carrier terminal. The quantity of VFTs to be supplied will be finalized after placement of orders. 8.6.11 Transit band pass filters The Tenderer shall quote unit rates for transit band pass filters to filter out the super imposed channels from the V. F. band. This is in addition to the built-in transit band pass filters of PLC terminals. The output and input impedance of transit band pass filters shall be 600 ohms and suitable also for working with the earlier version of PLC terminals supplied by theTenderer in past to APSEB. The Transit Band Pass Filter offered shall be suitable for installation in the carrier terminals. The TBF shall be modular and plug in type. The band width for the offered TBF shall be suitable for group of CCITT channels of different baud rates upto 600Bds.,which will be intimated to the successful Tenderer after finalization of order. The quantities of TBFs to be supplied shall be finalized after placement of orders.

8.6.12 Digital EPAX for express cum dialling communication


Consultant: Snyder Energo Private Limited Bangalore & Chennai Section-4 108 of 140

DEIFY INFRASTRUCTURE LIMITED JAYASWAL NECO INDUSTRIAL LIMITED 2x25 MW CAPTIVE POWER PLANT

TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES DOC. NO : 4 3643 ELCT 001

The Digital EPAX offered shall be of latest technology and of modular design. Any line (outlet) of the EPAX shall be reached by any other line of the same EPAX by dialing the corresponding local number. The later shall consists of one or two digits according to number of lines. The EPAX offered shall be microprocessor based fully digital non blocking and programmable. The EPAX should support single, two or three digit numbering scheme. The software should support both E&M signaling and DC loop trunks. The EPAX shall have universal ports wherein same type of PCB of EPAX can be inserted into any slots. The number of trunks can be either E&M or DC loop or a combination of both. The EPAX shall support duplication of Central Processing Unit PCB with automatic switchover with annunciation in case of failure. It shall also support duplication of Power Supply units wherein both the PSUs are individually capable of catering supply requirements of all other PCBs of the EPAX. In the event of Master CPU or PSU card failure, the slave card take over smoothly without any breakdown. Digital EPAX Exchange shall have, as minimum following capabilities. i) ii) iii) iv) v) vi) vii) viii) ix) x) Compatibility with existing PLCC terminal equipments. Automatic Processor switchover on failure Diagnostic Checks for Trunks Power fail transfer Computer Connectivity On line system Programming Capacity for accommodation of 16, 4 wire E&M PLCC Trunk lines. Capacity for accommodation of 4 other exchange (CO) lines. Capacity for accommodation of 8 subscribers using digital telephones. Features of Digital EPAX Exchange.

Following features shall be supported by Digital EPAX Exchange. i) ii) iii) iv) v) Abbreviated Dialling Alarm/Wake up Automatic Call Back Busy Override Call Transfer
Section-4 109 of 140

Consultant: Snyder Energo Private Limited Bangalore & Chennai

DEIFY INFRASTRUCTURE LIMITED JAYASWAL NECO INDUSTRIAL LIMITED 2x25 MW CAPTIVE POWER PLANT

TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES DOC. NO : 4 3643 ELCT 001

vi) vii) viii) ix) x) xi) xii) xiii)

Extension to other Subscriber Conferencing Programmable Voice Guidance Distinctive Ringing Emergency Reporting Multilevel Priority Music on Hold Block/Release of dialling from Remote interface.

The EPAX shall be a compact, self contained unit and shall provide its own ringing current and tones. The tones shall be from 400 Hz oscillator. The call processing time should be minimum. While a call is being initiated the pulses sent shall be visually displayed with the help of LEDs on the line and trunk cards. The pulses sent should also be audible to the person initiating call. Alarm type of fuses shall be provided with both audible and visual alarms and visual alarms and the bead of the blown fuse shall give instant indication of the blown fuse. The EPAX shall be housed in dust proof steel cabinet of suitable design which shall be such as to facilitate efficient maintenance of the unit. The EPAX shall work on (- 48) V DC supply. The operating voltage limits shall be + 15% and 10% and the equipment shall continue to operate satisfactorily if supply voltage rises to 20% of the rated value for a short duration. The EPAX offered shall have a capability for connection of similar type of EPAX at the other end of 4 wires E&M PLCC trunk line. The offered EPAX shall have a provision for atleast 8 analog subscriber lines in addition to the Digital subscriber lines. 8.6.13 Digital Telephone Equipments The digital Telephone equipments offered shall be compact, sturdy and elegant design and shall conform to the international standards. The Telephone equipments shall be provided with cords of adequate lengths. The digital Telephones shall support the following features. i) Operation on single pair cable for greater flexibility.
Section-4 110 of 140

Consultant: Snyder Energo Private Limited Bangalore & Chennai

DEIFY INFRASTRUCTURE LIMITED JAYASWAL NECO INDUSTRIAL LIMITED 2x25 MW CAPTIVE POWER PLANT

TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES DOC. NO : 4 3643 ELCT 001

ii) iii) iv) v)

Trunk Identification LCD screen Visual interface Abbreviated Dialing for atleast 30 trunk lines/other exchange lines. Programmable function keys.

8.6.14 Remote Extension Interfaces (REI) The Digital EPAX offered shall be enable to connect REI with normal P.B.telephones. The REI units shall work on 48 V DC. The same shall enable to connect 4 wire E&M trunk and conversion of 4 wire to 2 wire communication. Surge arrestor and fuses shall be equipped in REI units. 8.6.15 Terminal Box Terminal Box/Marshalling Distribution Frame shall be supplied by the contractor. The TB/MDF shall be Krone type with surge arrestor and fuses and shall be equipped with terminals for I/O connections (Subscribers, PLCC trunk lines and other exchange lines). The TB/MDF shall be wall mountable/panel mountable with adequate terminals matching with the EPAX capacity.

Consultant: Snyder Energo Private Limited Bangalore & Chennai

Section-4

111 of 140

DEIFY INFRASTRUCTURE LIMITED JAYASWAL NECO INDUSTRIAL LIMITED 2x25 MW CAPTIVE POWER PLANT

TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES DOC. NO : 4 3643 ELCT 001

8.7 8.7.1

TESTS TYPE TESTS TO BE CONDUCTED ON PLCC EQUPMENTS (FOR ALL PLCC EQUIPMENTS) Wave traps i) ii) iii) iv) v) Coupling Devices i) a. Short time current test b. Impulse voltage test c. Composite loss d. Return loss ii) a. Short time current test b. Continuous current test iii) a. Current carrying capacity b. Insulation test iv) Lightening arrestors a. Power frequency spark over test b. Impulse voltage test Earth switch Drainage coil Line Matching Unit Impulse voltage test Radio influence voltage test Corona test short time current test Temperature rise test

Consultant: Snyder Energo Private Limited Bangalore & Chennai

Section-4

112 of 140

DEIFY INFRASTRUCTURE LIMITED JAYASWAL NECO INDUSTRIAL LIMITED 2x25 MW CAPTIVE POWER PLANT

TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES DOC. NO : 4 3643 ELCT 001

High frequency cable i) ii) iii) iv) v) vi) PLC terminal i) ii) iii) iv) v) vi) vii) viii) ix) x) xi) xii) xiii) xiv) xv) xvi) xvii)
Consultant: Snyder Energo Private Limited Bangalore & Chennai

High voltage test Conductor resistance Insulation resistance Capacitance characteristics Attenuation test Impedance test

Ambient temperature & Humidity Supply voltage with battery operation Storage conditions Nominal impedance & return loss Spurious emission Carriers frequency control Frequency accuracy test Loss of speech frequency test Loss of signal test Group delay distortion Automatic grain control Transmit receive freq. Difference Linearity Limiter action Noise generated within terminal Near & Far cross talk Pulse distortion
Section-4 113 of 140

DEIFY INFRASTRUCTURE LIMITED JAYASWAL NECO INDUSTRIAL LIMITED 2x25 MW CAPTIVE POWER PLANT

TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES DOC. NO : 4 3643 ELCT 001

xviii) xix) withstand xx) Protection couplers i) ii) iii) iv) v) 8.8 DOCUMENTATION Impulse voltage withstand test

Voltage withstand test on D.C.P.S.Unit Carrier freq. Input/output terminal voltage

Radiated susceptibility test

H.F. disturbance test Power supply interruption test Performance test High voltage withstand test

After award of contract, the bidder shall submit 3 sets of drawings/documents to Purchaser/Consultant giving details, for scrutiny and approval. Once the drawings have been approved, no alteration or modification will be carried out without prior approval of the Purchaser.

The manufacturing of the equipment shall be strictly in accordance with the approved drawing and no deviation shall be permitted without the written approval of the purchaser. All manufacturing and fabrication work in connection with the equipment prior to the approval of the drawing shall be at the BIDDER's risk.

Approval of drawing/work by purchaser shall not relieve the BIDDER of his responsibility and liability for ensuring correctness and correct interpretation of the latest revision of applicable standards, rules and code of practices. After award of contract, the bidder shall also submit 2 sets of type test reports to C.E. (Tr. Pl.) for scrutiny and approval, before commencement of supply. Adequate copies of acceptance and routine test certificates, duly approved by the purchaser, shall accompany the dispatch consignment.

Consultant: Snyder Energo Private Limited Bangalore & Chennai

Section-4

114 of 140

DEIFY INFRASTRUCTURE LIMITED JAYASWAL NECO INDUSTRIAL LIMITED 2x25 MW CAPTIVE POWER PLANT

TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES DOC. NO : 4 3643 ELCT 001

9.0

TECHNICAL SPECIFICATION FOR BUSPOST INSULATORS STANDARDS Unless otherwise specified elsewhere in this specification, the rating as well as performance and testing of the post insulators shall conform to the latest revisions, available at the time of placement of order, of all the relevant standards as listed below: Sr.No. 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. Standard No. IEC-168 IS: 2544-1973 IS: 5350 porcelain IEC-Pub-437 insulators IEC-Pub-506 insulators IEC-Pub-507 IS: 2629 galvanising IS: 2633 IEC-168-1979 IE RULES 1956 Title Specification for porcelain post insulators (3.3 kV and above) Specification for porcelain post insulators for systems with nominal voltages greater than1000 V. Dimensions of indoor and outdoor post insulators and post insulator units. Switch surge test on high voltage Switching surge test on high voltage Artificial pollution test on high voltage insulators on A.C. to be used system. Recommended practice for hot dip of iron and steel Methods of testing uniformity of zinc coated articles. Tests on indoor and outdoor post insulators of ceramic material or glass for system voltage greater than 1000 V Indian Electricity Rules

Equipment meeting with the requirements of other authoritative standards, which ensure equal or better quality than the standards mentioned above, shall also be acceptable. When the equipment offered by the tenderer conforms to other standards, salient points of difference between the standards adopted and the standards specified in this specification shall be clearly brought out in the offer. One copy of such standards, with authentic translation in English, shall be furnished alongwith the offer. PRINCIPLE TECHNICAL PARAMETERS The post insulators covered in this specification shall meet the technical requirements as listed below:

Consultant: Snyder Energo Private Limited Bangalore & Chennai

Section-4

115 of 140

DEIFY INFRASTRUCTURE LIMITED JAYASWAL NECO INDUSTRIAL LIMITED 2x25 MW CAPTIVE POWER PLANT

TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES DOC. NO : 4 3643 ELCT 001

Sr. No. 1.

Particulars Phase to phase rated voltage (kV rms)

Requirement

. 132

2.

Standard lightning impulse withstand voltage dry (KV peak) Switching surge withstand voltage wet (KV peak) Impulse flashover voltage (KV peak) One minute power frequency withstand voltage (KV rms) Power frequency flashover voltage (kV rms) Power frequency puncture voltage Minimum total creepage distance (in mm) Minimum dry arcing distance (mm) Minimum cantilever strength(upright) (in kg) Ultimate torsional Strength(Kg m) Minimum visible corona discharge extinction voltage (KV rms) Max. Radio interference Voltage at 1 MHz and
Section-4

650

3.

NA

4. 5.

650 270

6.

270

7. 8.

Puncture proof 3625

9. 10.

320 400

11. 12.

460

13.

1000
116 of 140

Consultant: Snyder Energo Private Limited Bangalore & Chennai

DEIFY INFRASTRUCTURE LIMITED JAYASWAL NECO INDUSTRIAL LIMITED 2x25 MW CAPTIVE POWER PLANT

TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES DOC. NO : 4 3643 ELCT 001

1.1x rated phase to earth voltage (micro volts) 14. Bolt circle diameter a) Top b) Bottom 15. 16. Height of insulator (in mm) Size of holes (in mm) a) Top (4 nos.) b) Bottom (8/4/4/4 nos.) System particulars a) No. of phases b) Frequency(Hz) c) Earthing earthed GENERAL TECHNICAL REQUIREMENTS TYPE The Insulator offered shall be suitable for outdoor service. BASE The insulator shall be provided with a completely galvanised steel base. The base and mounting arrangement shall be such that the insulator shall be rigid and self supporting and no guying or cross bracings between phases shall be necessary. PORCELAIN The insulator shall be made of homogeneous and vitreous porcelain of high mechanical and dielectric strength. It shall have sufficient mechanical strength to sustain electrical and mechanical loading on account of wind load, short circuit forces etc. Glazing of the porcelain shall be of uniform brown or dark brown colour with a smooth surface arranged to shed away rain water. The porcelain shall be free from laminations and other flaws or imperfections that might affect the mechanical or dielectric quality. It shall be thoroughly vitrified, tough and impervious to moisture. The porcelain and metal parts shall be assembled in such a manner and with such material that any thermal differential expansion between the metal and porcelain parts through the range of temperature specified in this specification shall not loosen the parts
Consultant: Snyder Energo Private Limited Bangalore & Chennai Section-4 117 of 140

127 184 2150

M-16 18 3 50 Neutral effectively

17.

DEIFY INFRASTRUCTURE LIMITED JAYASWAL NECO INDUSTRIAL LIMITED 2x25 MW CAPTIVE POWER PLANT

TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES DOC. NO : 4 3643 ELCT 001

or create undue internal stresses which may affect the mechanical or electrical strength or rigidity. The assembly shall not have excessive concentration of electrical stresses in any section or across leakage surfaces. The cement used shall not give rise to chemical reaction with metal fittings. The insulator shall be suitable for water washing by rain or artificial means in service condition. CAP a) Cap to be provided on top of the insulator shall be of high grade malleable steel casting. It shall be machine faced and hot dip galvanised. The cap shall have four nos. of tapped holes spaced on a pitch circle diameter of 127 mm to accommodate the terminal clamp for supporting the purchaser's bus bars. The holes shall be suitable for bolts with threads having anticorrosive protection. The effective depth of threads shall not be less than the nominal diameter of bolt. The cap shall be so designed that it shall be free from visible corona and shall have radio interference level within the limit specified in this specification. If Corona grading rings are necessary to meet the above requirement, the same shall be in the tenderer's scope of supply.

b)

c)

d) The casting shall be free from blow holes, cracks and such other defects. CORONA AND RIV PERFORMANCE All surfaces shall be even, smooth, without cuts, abrasions or projections. No part shall be subjected to excessive localised pressure. The metal parts and porcelain shall not produce any noise generating corona under all operating conditions. The insulators and metal parts shall be so designed and manufactured that it shall avoid local corona formation and not generate any radio interference beyond specified limit under operating conditions. GALVANISING a) All ferrous parts shall be hot dip galvanized in accordance with IS:2629 and IS:2633. Before galvanisation, the steel section shall be thoroughly cleaned of any paint, grease, rust, scale, acid/alkali or such other foreign matters as are likely to interfere with the galvanizing process or with the quality and durability of the zinc coating. Pickling shall be very carefully done and shall be proper. The zinc used for galvanizing shall be of grade Zn 98 (% of zinc 99.95%) as per IS:209. The mass of zinc coating shall not be less than 610 gm/m2 (86 microns).

b)

Consultant: Snyder Energo Private Limited Bangalore & Chennai

Section-4

118 of 140

DEIFY INFRASTRUCTURE LIMITED JAYASWAL NECO INDUSTRIAL LIMITED 2x25 MW CAPTIVE POWER PLANT

TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES DOC. NO : 4 3643 ELCT 001

c)

The galvanized surface shall consist of continuous and uniformly thick coating of zinc, firmly adhering to the surface of steel. The finished surface shall be clean and smooth and shall be free from defects like discolored patches, bare spots, unevenness of coating, spelter which is loosely attached to the steel, globules, spiky deposits, blistered surface, flaking or peeling off etc. The presence of any of these defects noticed on visual or microscopic inspection shall render the material liable to rejection. There shall be no flaking or loosening when struck squarely with a chisel faced hammer. The galvanized components shall withstand minimum four one minute dips in standard copper sulphate solution as per IS:2633. Defect in any component indicating presence of impurities in the galvanizing bath in quantities larger than that permitted by the specifications, or lack of quality control in any manner in the galvanizing plant, shall render the entire production in the relevant shift liable to rejection.

d)

e)

ASSEMBLY The post insulator unit shall be assembled in a suitable jig to ensure correct positioning of the top and bottom metal fittings relative to one another. The faces of the metal fittings shall be parallel and at right angles to the axis of the insulator and the corresponding holes in the top and the bottom metal fittings shall be in a vertical plane containing the axis of the insulator. BOLTS & NUTS All necessary nuts, bolts, spring washers etc. required for the assembly of the complete insulator stack shall be in tenderer's scope of supply. The bolts and nuts shall be of any of following makes, hot dip galvanised and shall be of high strength generally conforming to IS-136 or any other equivalent international standard. The terminal connector (TC) required for connection of the insulator to supplied by the vendor. The insulator shall be suitable for connection to single or bundled ACSR conductor or 4" IPS tube through the TC. TESTS TYPE TEST The Buspost insulators should be type tested in line with standard and technical specification within last 5 years from the date of opening of tender. The bidder shall submit a copy of type test report for all tests specified under Clause No. 5.2 of specification alongwith the offer as evidence to establish the fulfillment of the requirement.
Consultant: Snyder Energo Private Limited Bangalore & Chennai Section-4 119 of 140

DEIFY INFRASTRUCTURE LIMITED JAYASWAL NECO INDUSTRIAL LIMITED 2x25 MW CAPTIVE POWER PLANT

TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES DOC. NO : 4 3643 ELCT 001

In case, the test(s) on Buspost insulator has been conducted earlier than 5 years, the respective type test(s) shall be carried out by the successful tenderer, after award of contract, in presence of purchaser's representative, free of cost. If there is any change in the manufacturing process, material or design in the equipment since after earlier passing of the type test, the bidder shall bring out in his offer all such changes made in manufacturing process, materials, design etc. In such a case all type tests as specified under Clause No. 5.2 shall be carried out by the successful tenderer, after award of contract, in presence of purchaser's representative, free of cost. The following type tests shall be conducted on a suitable number of buspost insulators as per procedure stipulated in relevant standards. Sr. Particulars of test Testing Standard No. a) Visual examination } b) Verification of dimensions } c) Visible discharge test } d) Impulse voltage withstand test } e) Power frequency voltage withstand test (Dry) } f) Power frequency voltage withstand test (Wet) g) Temperature cycle test } h) Mechanical strength test 1973 i) Torsion test ii) Compression test iii) Bending test iv) Tensile test i) Porosity test j) Galvanising test } } } } } } } IS:2544}

ACCEPTANCE TESTS The following acceptance tests as per procedure stipulated in IS:2544-1973 shall be carried out by the BIDDER in presence of purchaser's representative. Sr. Particulars of test No. a) Verification of dimensions b) Temperature cycle test c) Mechanical strength test i) Torsion test
Consultant: Snyder Energo Private Limited Bangalore & Chennai Section-4

Testing Standard } } } }
120 of 140

DEIFY INFRASTRUCTURE LIMITED JAYASWAL NECO INDUSTRIAL LIMITED 2x25 MW CAPTIVE POWER PLANT

TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES DOC. NO : 4 3643 ELCT 001

ii) Compression test 1973. iii) Bending test iv) Tensile test d) Porosity test e) Galvanising test ROUTINE TESTS

} } } } }

IS:2544-

The following routine tests as per procedure stipulated in IS: 2544-1973 shall be carried out by the BIDDER. a) Visual Examination b) Routine Mechanical test COORDINATION FOR TESTING For tests to be conducted by the manufacturer in presence of purchasers representative, the bidder shall give at least 20 days advance intimation to the purchaser to enable him to depute his representative for witnessing the tests. TEST VALUES For all type and acceptance tests, the acceptance values shall be the values guaranteed by the Bidder in the guaranteed technical particulars or the acceptance value specified in this specification or the relevant standard whichever is more stringent for that particular test. TEST PROCEDURES AND SAMPLING NORMS The norms and procedure of sampling for the above tests shall be as per the relevant Indian Standard or other Internationally accepted standards. The standards and norms according to which these tests are to be carried out are listed against each test. Where a particular test is a specific requirement of this specification, the norms and procedure for the same shall be as specified in Annexure II attached hereto or as mutually agreed to between the BIDDER and the purchaser in the Quality Assurance Plan. TESTING LABORATORIES Electrical Type tests conducted in India shall be from NABL (National Accreditation Board for testing and calibration Laboratories) accredited testing laboratories except for the tests for which testing facility is not available in NABL. However, such tests (i.e. for which testing facility is not available in NABL but facility is available at works of BIDDER) should have been carried out in presence of purchasers representative. INSPECTION
Consultant: Snyder Energo Private Limited Bangalore & Chennai Section-4 121 of 140

DEIFY INFRASTRUCTURE LIMITED JAYASWAL NECO INDUSTRIAL LIMITED 2x25 MW CAPTIVE POWER PLANT

TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES DOC. NO : 4 3643 ELCT 001

a)

The work and materials covered by this specification shall be subject inspection by the authorised representative of the Purchaser manufacturers work. Inspection shall also include the stacking finished material in manufacturer's works and loading in cars wagons, for dispatch to the consignee.

to at of or

b)

Inspector shall have free access at all times to all parts of the shop where raw material is stacked, and where material is being manufactured and shall be provided with all reasonable facilities for inspection and tests. Equipments and instruments required for carrying out pre-dispatch inspection shall be furnished by the bidder. No material shall be dispatched without inspection unless such inspection is waived in writing by Purchaser. Inspection by Inspector or waivel of inspection shall neither relieve the BIDDER from the responsibility of supplying materials confirming to the requirements of this specification nor invalidate any claims which may be made because of defective or unsatisfactory material, workmanship, galvanising etc. Any material that is rejected by Inspector shall be promptly replaced by BIDDER without extra cost. The fact that certain material has been accepted at BIDDER's works shall not prevent final rejection at site if it fails to meet specification requirements or if manufacturing inaccuracies prevent proper assembly. The correct grade and quality of raw material shall be used by the BIDDER. To ascertain the grade of raw/supplied material, the Purchaser may at his discretion get the material tested at an approved Laboratory of his choice.

c)

d)

e)

IDENTIFICATION MARK The porcelain shell of each insulator shall be legibly and indelibly marked with the trade mark/name of the manufacturer, the month and year of manufacture and country of manufacture to facilitate easy identification. The marking shall be printed and not impressed and the same shall be applied before firing. QUALITY ASSURANCE PLAN The bidder shall furnish following information along with the offer, failing which the offer shall be liable for rejection: a) Statement giving list of important raw materials, including but not limited to: 1) Ingredients and their proportion used for porcelain. 2) Cast iron/Malleable steel 3) Cement & adhesives
Consultant: Snyder Energo Private Limited Bangalore & Chennai Section-4 122 of 140

DEIFY INFRASTRUCTURE LIMITED JAYASWAL NECO INDUSTRIAL LIMITED 2x25 MW CAPTIVE POWER PLANT

TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES DOC. NO : 4 3643 ELCT 001

b) Names of sub BIDDERs for the raw materials, standards according to which the raw materials are tested and acceptance norms. c) Names of sub BIDDERs for bought out items, standards according to which tested and acceptance norms. The same shall be supported with copies of test certificates for latest orders executed. d) List of manufacturing and testing facilities available in house for conducting tests mentioned at (b) & (c) above.

The manufacturer shall within 30 days of placement of order, submit Quality Assurance Plan to C.E.(Tr. Pl.) for approval. MAINTAINANCE OF RECORDS The following records shall be maintained by the manufacturer at his works or verification of Purchasers representative. 1) All records of routine test reports. 2) All records of tests conducted on raw and in process material during the process of manufacturing. Proper correlation of test certificates of material, from raw material stage to finished material stage shall be maintained and shall invariably be produced for verification at the time of pre-dispatch inspection. DOCUMENTATION The manufacturer shall furnish outline drawing of buspost insulator indicating all dimensions. The drawings shall be neatly arranged, and all drafting and lettering shall be standard and legible. Dimensions shall be in SI units. The drawings shall give following information: 1) Height of insulator, Top & Bottom PCD, Minimum Creepage distance, Dry Arcing Distance, Colour of Glaze, Standard to which confirming and Identification mark on insulator. 2) Mechanical characteristics like Cantilever Strength, Torsional Strength, Tension & Compression Strength and weight of insulator. 3) Electrical characteristics like One minute power frequency withstand and flashover voltage under dry and wet conditions, Lightening impulse withstand and flashover voltage, Switching surge impulse withstand voltage, Visible discharge and Radio Interference Voltage.

Consultant: Snyder Energo Private Limited Bangalore & Chennai

Section-4

123 of 140

DEIFY INFRASTRUCTURE LIMITED JAYASWAL NECO INDUSTRIAL LIMITED 2x25 MW CAPTIVE POWER PLANT

TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES DOC. NO : 4 3643 ELCT 001

After award of contract, the bidder shall submit 3 sets of drawings to Purchaser/Consultant, giving details as mentioned above, for scrutiny and approval. Once the drawings have been approved, no alteration or modification will be carried out without prior approval of the Purchaser. The manufacturing of the equipment shall be strictly in accordance with the approved drawing and no deviation shall be permitted without the written approval of the purchaser. All manufacturing and fabrication work in connection with the equipment prior to the approval of the drawing shall be at the BIDDER's risk. Approval of drawing/work by purchaser shall not relieve the BIDDER of his responsibility and liability for ensuring correctness and correct interpretation of the latest revision of applicable standards, rules and code of practices. After award of contract, the bidder shall also submit 2 sets of type test reports to C.E.(Tr. Pl.) for scrutiny and approval, before commencement of supply. Adequate copies of acceptance and routine test certificates, duly approved by the purchaser, shall accompany the dispatch consignment.

Consultant: Snyder Energo Private Limited Bangalore & Chennai

Section-4

124 of 140

DEIFY INFRASTRUCTURE LIMITED JAYASWAL NECO INDUSTRIAL LIMITED 2x25 MW CAPTIVE POWER PLANT

TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES DOC. NO : 4 3643 ELCT 001

TECHNICAL SPECIFICATION FOR SUPPLY OF SUB-STATION STRUCTURES SCOPE: The scope consists of supply with steel, zinc and other raw materials for fabrication, hot dip galvanizing, packing, transport and delivery, erection and commissioning of 145 kV lattice type sub-station structures (Josts, Columns, Beams, and equipment support structures) including anchor bolts, plates, nuts & bolts, flat and spring washers and other accessories, complete in all respects. The detailed structural drawings shall be approved by CSEB after award of contract. STANDARDS APPLICABLE: Except as modified in this specification, the materials covered under clause 1.1 conform to the latest revision with amendments thereof of the following Bureau of Indian Standards and other International Standards. Sr. Standard No. No. 1. IS 802 steel in Overhead 2. 3. IS 808 IS 816 Title Use of structural Transmission line towers. Specification for Rolled Steel, beams Channel and angle sections Code of practice for use of metal arc welding for general construction in mild steel. Black hexagonal bolts, nuts and lock nuts and hexagonal screws. Technical supply conditions for nuts and threaded fasteners. Specification for rolling and cutting tolerance for hot rolled steel products Specification for structural steel Fusion welding quality. Specification for hot dip galvanising coatings on structural steel and other allied products.
Section-4 125 of 140

4. 5. 6.

IS 1363 IS l367 IS 1852

7. 8.

IS 2062 IS 4759

Consultant: Snyder Energo Private Limited Bangalore & Chennai

DEIFY INFRASTRUCTURE LIMITED JAYASWAL NECO INDUSTRIAL LIMITED 2x25 MW CAPTIVE POWER PLANT

TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES DOC. NO : 4 3643 ELCT 001

9.

IS 2633

Method of testing weight, Thickness and uniformity of coating on hot dip galvanise articles. Recommended practice on embrittlement of steel. Specification for spring washers. Specification for high tensile structural steel Specification for hexagonal bolts for steel structures. Specification for plain washers Specification for heavy washers for steel structures Specification for hot dip galvanise coatings on fasteners. Specification for electro-plated coating of zinc on iron and steel Dimensions for clearance holes for metric bolts. Specification for Zinc Mild steel and medium tensile bars and hard drawn steel wire for concrete reinforcement Recommended practice for hot dip galvanising of Iron and Steel Methods of determination of weight of zinc coating on zinc coated iron and steel articles

l0. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20.

ASTM A 143 IS 3063 IS 8500 IS 6639 IS 2016 IS 6610 IS 5358 IS 1573 IS 1821 IS 209 IS 432

21. 22.

IS 2629 IS 6745

GENERAL REQUIREMENTS: It is not the intent to specify completely herein all details of design and construction of the structure/work involved. However, the work shall conform, in all respects, to high standards of engineering, and workmanship and shall
Consultant: Snyder Energo Private Limited Bangalore & Chennai Section-4 126 of 140

DEIFY INFRASTRUCTURE LIMITED JAYASWAL NECO INDUSTRIAL LIMITED 2x25 MW CAPTIVE POWER PLANT

TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES DOC. NO : 4 3643 ELCT 001

fulfill the anticipated performance upto BIDDER's guarantee in a manner acceptable to the Purchaser who will interpret the meaning of drawings and specifications and shall have the power to reject any work or materials, which in his judgment, are not in full accordance therewith. DETAILS OF FABRICATION AND WORKMANSHIP: All workmanship and finish shall be first class and conform to the best modern practice for the work. Ease of assembly of the structures in field is of at most importance. Raw materials which are slightly bent in transit or stacking shall be straightened and made true in the shop by methods which will not impair its specified strength in any manner before being laid out or worked on in any way. Materials damaged or badly bent in transit or otherwise shall not be used. Shearing, punching, bevel cutting and bending shall be accurately done, so that the members of the structures may be assembled without drifting or reaming holes. The necessity for drifting or reaming shall be a cause for rejection. Shearing shall be done by gauge and no variation in length shall be allowed except where otherwise noted on the shop detailed drawings. All bevel cutting shall be accurate and variation of more than 1.5 mm shall be a cause for rejection. Punching shall be done by gauge or by other methods acceptable to purchaser to ensure the accuracy required for this class of work. No variation shall be allowed in a group of holes and the centre to centre distance between the end holes of a piece shall not vary more than 1.0 mm. Diameter of holes shall not exceed the diameter of the bolt by more than 1.5 mm. No holes either in structure members for connection or in base plates for anchor bolts shall be made by gas cutting. Bending shall be moderately sharp and true to the details shown on shop drawings. Bends may be done either hot or cold. If cold bending is adopted, purchaser shall have right to make any tests in accordance with ASTM designation No. A 143. Identical pieces of structures bearing same erection mark must be interchangeable in their relative positions in all structures at which they form a part. Joint shall be detailed so as to avoid eccentricity as far as possible. Gusset plates and spacer plates shall be used in conformity with the best modern practice. Number of gusset plates shall be as less as possible. All burrs galvanising. and irregular edges shall be ground smooth before

Consultant: Snyder Energo Private Limited Bangalore & Chennai

Section-4

127 of 140

DEIFY INFRASTRUCTURE LIMITED JAYASWAL NECO INDUSTRIAL LIMITED 2x25 MW CAPTIVE POWER PLANT

TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES DOC. NO : 4 3643 ELCT 001

Holes as required for various attachments, accessories, connections, extensions etc. shall be drilled as shown /required. Leg ends, bearing on each other or resting on bases shall be milled true to bear and ensure good bearing and perfect alignment. Base plates shall have their surfaces milled true and square. No machine or shopwork, die work, punching, welding, grinding, etc. shall be permitted after galvanising. SPECIFIC REQUIREMENTS: GENERAL: Materials used for fabrication shall conform to the required material specification and shall be in accordance with good practice pertinent to the fabrication of structural steel. All material supplied by BIDDER shall be of recent manufacture, free from defects, mill scales, slag intrusions, laminations, pitting, flake, rusts etc. Castings shall not be used except where specifically approved by purchaser. MATERIALS: The following provisions shall apply in connection with the procurement of steel and zinc by the BIDDER. Steel Sections: a) The steel angle sections used for fabrication shall be mild steel or high tensile steel, as indicated in structural drawing, having yield strength as specified below as per IS-2062 and IS-8500 & EN-10025 JR & JO with revision thereof. Description Strength Mild Steel Fe 410 WA/WB Section thickness Yield (Min.) (N/mm 2) 250 240 230 350 330 320

< 20 mm 20-40 mm > 40 mm < 16 mm 16-40 mm 41-63 mm

High tensile Steel Fe 490/B

The confirmation regarding the supply of material as specified above shall be invariably indicated in the offer.

Consultant: Snyder Energo Private Limited Bangalore & Chennai

Section-4

128 of 140

DEIFY INFRASTRUCTURE LIMITED JAYASWAL NECO INDUSTRIAL LIMITED 2x25 MW CAPTIVE POWER PLANT

TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES DOC. NO : 4 3643 ELCT 001

b)

The Bidder shall take into account the fabrication wastage while quoting the rates. The Purchaser will not accept any liability in connection with the wastage of steel during fabrication or otherwise. The following sizes of lattice steel sections (MS & HT) are generally used in the design of structures. Equal Angles a) 200x200x20/16 b) 150X150X20/16/12 c) 130x130x12/10 d) 110x110x10/8 e) 100x100x10/8/7/6 f) 90x90x8/7/6 g) 80x80x6 Unequal Angles a) 45x30x5/4 Plates a) 32 mm thick b) 25 mm thick c) 20mm thick d) 16mm thick e) 12mm thick f) 10mm thick g) 8mm thick h) 6mm thick i) 5mm thick j) 4mm thick h) 75x75x6/5 i) 70x70x5 j) 65x65x6/5/4 k) 60x60x5/4 l) 55x55x4/5 m) 50x50x5/4 n) 45x45x5/4

c)

d)

Substitutions, if any, of steel sections of the structure parts by higher sizes, due to non-availability or otherwise, shall be to the BIDDER's account. The Purchaser will not accept any liability on this account. The steel shall be procured exclusively from the main steel producers. However, sections not rolled by main producers, can be procured from re-rollers provided: - Re-rolling of structural steel sections is done tested quality manufactured by TISCO or SAIL. from billets/ingots of

e)

- Re-rolled sections are duly tested as per relevant standards. Zinc:


Consultant: Snyder Energo Private Limited Bangalore & Chennai Section-4 129 of 140

DEIFY INFRASTRUCTURE LIMITED JAYASWAL NECO INDUSTRIAL LIMITED 2x25 MW CAPTIVE POWER PLANT

TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES DOC. NO : 4 3643 ELCT 001

The zinc used for galvanising fabricated material shall be of Grade Zn98 (purity > 99.95%) as per IS:209-1979. M.S Plates: All M.S. Plates supplied shall confirm to IS:2062 in case of plates thicker than 20 mm and if welding work is involved. ACCESSORIES: Anchor bolts and Galvanized U-bolts, shackles, hangers, clamps shall be supplied as structural parts as per actual requirement. a) Foundation/Anchor Bolts: Anchor bolts shall be galvanized to its entire length and shall be supplied as per drawings to be furnished by the owner to successful bidder and shall conform to IS:5264. The same shall be supplied, as per requirement, as structural part. Hangers: For the attachment of suspension insulator strings a swinging hanger on the column shall be supplied as per the drawing. The hanger shall be fabricated to withstand an ultimate tensile load of 7,000 kgs. The hanger set shall be hot dip galvanized. U-bolts/D shackle: The same shall be supplied as per the drawing to accommodate the hook of the suspension clamps. The U-bolt/D shackle shall be hot dip galvanized and shall comprise of a bolt with nuts as per drawing. Step Bolts: The diameter and length of step bolts shall not be less than 16 mm and 175 mm respectively, as per drawing.

b)

c)

d)

The above accessories (Hangers, U-bolts/D shackle and Step bolts) shall be supplied as structural parts. Drawings for above accessories shall be furnished by C.E.(Tr. Proj.) to the successful bidder. BOLTS, NUTS AND PLAIN / SPRING WASHERS: a) All bolts, nuts and washers shall be hot dip galvanized. Nuts shall be retapped after galvanizing for proper fitting. Beveled washers shall be furnished for all bolts in sloping flanges. All bolts except anchor bolts shall be 16mm HRH unless specifically insisted by the owner in approved drawing. The unthreaded portion of the anchor bolts, if covered by the base plate thickness; shall have adequate surface finish. Bolts and nuts shall conform to latest edition of IS: 1367,IS: 2614. Step bolts shall conform to IS: 10238. The mechanical properties shall conform to class 5.6 for bolts and class 5 for nuts of IS 1367-1991. Spring washers shall conform to IS: 3063, IS: 6821, IS: 1586. Bidder shall supply 10% extra quantity of each size of nuts and bolts, lock nuts, plain/spring washers etc. over and above bill of material
Section-4 130 of 140

b)

c)

Consultant: Snyder Energo Private Limited Bangalore & Chennai

DEIFY INFRASTRUCTURE LIMITED JAYASWAL NECO INDUSTRIAL LIMITED 2x25 MW CAPTIVE POWER PLANT

TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES DOC. NO : 4 3643 ELCT 001

quantity at no cost(i.e. free of cost).The quantity / weight of Bolts and Nuts , washers etc. as per structural requirement and with 10 % extra should be clearly indicated in the Bills of material of the structure. MARKING: a) Each individual structure member shall be marked with its respective identification mark given to it on the erection drawings. The marking shall be stamped with a metal die before galvanising with figure at least 2 cms high in such a manner and to such optimum depth as to be clearly visible after galvanising. The erection mark shall be A-BB-CC-DDD whereA - Purchaser code assigned to the Bidder (Alphabet). BB - BIDDER's Mark (Numerical) CC - Structure type (Alphabet) DDD-Number mark assigned by Purchaser (numerical) b) The marking shall be on the outer surface of all angle sections and near one end but clear of bolt holes. For other members such as channels, flates, gusset plates etc. the markings shall be so stamped that they are easily discernible when sorting out members. Marking on like pieces shall be in identical locations. Members having lengths 3 meters or more shall be stamped with markings at each end. After galvanising, marks shall be circled or bracketed with black paint.

c) d)

GALVANISING: a) After all shop work is complete, all structural members shall be punched with the Erection Mark and be hot dip galvanised in conformity with IS:2629, IS:4759 and IS:2633. Before galvanisation, the steel section shall be thoroughly cleaned of any paint, grease, rust, scale, acid or alkali or such other foreign matters as are likely to interfere with the galvanising process or with the quality and durability of the zinc coating. Pickling shall be very carefully done and shall be proper. The galvanizing bath shall be of adequate dimensions for facilitating galvanizing of structural parts in one dip. c) The zinc used for galvanising shall be of grade Zn98 as per IS:209. The mass of zinc coating shall be as follows: Sr. Thickness of Thickness of No. steel article coating
Consultant: Snyder Energo Private Limited Bangalore & Chennai

b)

Mass of coating

Section-4

131 of 140

DEIFY INFRASTRUCTURE LIMITED JAYASWAL NECO INDUSTRIAL LIMITED 2x25 MW CAPTIVE POWER PLANT

TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES DOC. NO : 4 3643 ELCT 001

1) 5 mm and above microns 2) Below 5 mm microns 3) Fasteners microns 4) Spring washers 2 1 gm/m = 0.14 Microns d)

610 gm/m2 460 gm/m2 300 gm/m2 272 gm/m2

86 64 42 38 microns

The galvanised surface shall consist of continuous and uniformly thick coating of zinc, firmly adhering to the surface of steel. The finished surface shall be clean and smooth and shall be free from defects like discolored patches, bare spots, unevenness of coating, spelter which is loosely attached to the steel, globules, spiky deposits, blistered surface, flaking or peeling off etc. The presence of any of these defects noticed on visual or microscopic inspection shall render the material liable to rejection. There shall be no flaking or loosening when struck squarely with a chisel faced hammer. The galvanising on steel member shall withstand minimum four one minute dips in standard copper sulphate solution as per IS:2633. Galvanising of each member shall be carried out in one complete immersion. Double dipping shall not be permitted. However, in case of members over 7.5 metre length, BIDDER shall take prior approval of Purchaser for double dipping. When the steel section is removed from the galvanising kettle, excess spelter shall be removed by 'bumping'. The process known as 'wiping' or 'scraping' shall not be used for this purpose. All bolts, nuts or locknuts, washers etc. shall be hot dip galvanised conforming to IS 5358. Spring washers shall be galvanised in accordance with IS 1573 service condition IV. Excess spelter from bolts, nuts, etc. shall be removed by centrifugal spinning. Rethreading of bolts after galvanising, shall not be permitted. Nuts however, may be tapped, but this should not cause appreciable racking of the nuts on the bolts. Defects in certain members indicating presence of impurities in the galvanising bath in quantities larger than that permitted by the specifications, or lack of quality control in any manner in the galvanising plant, shall render the entire production in the relevant shift liable to rejection. Prior approval shall be obtained from the done outside the BIDDER's plant. Purchaser if galvanising is

e)

f)

g)

h)

i) j)

BIDDER shall furnish sufficient quantity of appropriate (zinc rich) paint free of cost for repairing galvanised surface, if damaged in transit.

Consultant: Snyder Energo Private Limited Bangalore & Chennai

Section-4

132 of 140

DEIFY INFRASTRUCTURE LIMITED JAYASWAL NECO INDUSTRIAL LIMITED 2x25 MW CAPTIVE POWER PLANT

TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES DOC. NO : 4 3643 ELCT 001

WELDING: Welding where necessary shall be carried out before galvanising and shall conform to relevant Indian Standard Specifications. Caution shall be exercised to obtain full penetration of weld when welding light members to heavy members. TOLERANCES: Finished members without ends finished for contact bearing may have tolerance of +1.5mm for a member upto 3 m length. For member over 3 m length, additional tolerance of 1 mm, for every 3 m additional length is allowed but in no case a tolerance more than 3 mm will be allowed for any member. ERRORS: Any error in shop work which prevents proper assembling and fitting up of parts in the field by moderate use of drift pins or a moderate amount of reaming shall be classified as defective workmanship. All charges required to be incurred in rectification of defective workmanship, shall be deducted from the amount due to the BIDDER against any bill under payment. In case material is rejected, the cost of all handling and transportation of the material shall be entirely to BIDDERs account. All replacement material shall be supplied free and the cost of handling, transport and delivery of material for replacement shall be borne by the BIDDER, alongwith cost of dismantling and re-erection. TESTS: PROTOTYPES: a) The successful bidder shall fabricate and assemble proto assembly of each type of structure and offer it for purchaser's inspection and approval (alongwith relevant shop floor drawings at his works) prior to taking up mass fabrication. The call for inspection of proto assembly should invariably be forwarded to Purchaser / Consultant) along with relevant structural and shop floor drawings. The fabrication of proto type of particular structure/s shall be exempted if the bidder has already fabricated and supplied the same as per the drawings forwarded by this office. The checking and approval of prototypes by purchaser shall not relieve BIDDER from the responsibility of correctness of engineering, workmanship, fitting of parts, details, materials supplied and errors or omissions if any. Purchaser's approval shall only constitute approval of the sizes of members, dimensions and fitting arrangement but shall not constitute approval of the connection between members and other details shown on the shop drawings which shall be responsibility of BIDDER. Purchaser's approval shall not invalidate any claim for damages of any kind for incorrectly fabricated steel.

b)

Consultant: Snyder Energo Private Limited Bangalore & Chennai

Section-4

133 of 140

DEIFY INFRASTRUCTURE LIMITED JAYASWAL NECO INDUSTRIAL LIMITED 2x25 MW CAPTIVE POWER PLANT

TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES DOC. NO : 4 3643 ELCT 001

The cost of assembly and dismantling of each prototype shall be borne by the BIDDER. ACCEPTANCE TESTS: The following acceptance tests, as per procedure stipulated in IS, shall be carried out by the BIDDER in presence of purchaser's representative. a) Verification of dimensions b) Tensile test c) Bend test d) Preece test e) Adhesion test f) Strip test INSPECTION: a) The work and materials covered by this specification shall be subject to inspection by the authorised representative of the Purchaser. Inspection shall also include the stacking of finished material in manufacturers works and loading in cars or wagons, for shipment of dispatch to the consignee. The successful Bidder shall keep the Purchaser informed well in advance of the commencement of manufacture, progress of manufacture thereof and fabrication of various structure parts at various stages, so that arrangements could be made for inspection by the Purchaser. The acceptance of any batch of items shall in no way relieve the BIDDER of any of his responsibilities for meeting all the requirements and intent of this specification and shall not prevent subsequent rejection if it fails to meet specification requirements or if fabrication inaccuracies prevent proper assembly. The correct grade and quality of steel shall be used by the BIDDER. The BIDDER shall submit chemical analysis and mechanical test report alongwith shipment details, issued by the manufacturer, at the time of pre-dispatch inspection. To ascertain the quality of steel, the Purchaser may at his discretion get the material tested at an approved Laboratory of his choice. Drawings and Bill of materials: a Structural/Erection drawings of structures shall show each individual member with its identification mark. Locations and position of the outstanding leg of angle, length of connecting bolts and their diameter etc. The raw steel should meet the requirements of IS 2062 for mild steel and IS-8500 & EN-10025 JR & JO with revision thereof for H.T. Steel. Edge security adopted by the BIDDER shall be clearly indicated in the drawing. : IS:2062/IS:8500/IS:808/IS:1730 : : : : : IS:2062/IS:8500 IS:2062/IS:8500 IS:2633/IS:2629 IS:2629 IS:6745/IS:4759

b)

c)

d)

Consultant: Snyder Energo Private Limited Bangalore & Chennai

Section-4

134 of 140

DEIFY INFRASTRUCTURE LIMITED JAYASWAL NECO INDUSTRIAL LIMITED 2x25 MW CAPTIVE POWER PLANT

TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES DOC. NO : 4 3643 ELCT 001

Any special erection techniques proposed in the erection of the structure shall be shown in the drawings. c Erection/structural drawings shall be drawn to a suitable scale showing all dimensions, sizes of various members, locations, thickness of structural members, gusset plates, diameter and lengths of bolts and their locations, center of gravity and back mark lines, slopes, hardware attachments for insulator strings, grounding wire, erection mark etc.

Consultant: Snyder Energo Private Limited Bangalore & Chennai

Section-4

135 of 140

DEIFY INFRASTRUCTURE LIMITED JAYASWAL NECO INDUSTRIAL LIMITED 2x25 MW CAPTIVE POWER PLANT

TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES DOC. NO : 4 3643 ELCT 001

BUSBAR, JUMPERS, CLAMPS AND CONNECTORS SYSTEM PARTICULARS Nominal system voltages Highest system voltages Basic Insulation level Short time rating System of earthing No. of sub-conductors per bus Type of conductor single - 132 kV - 145 kV - 650 kV - 40 kA for 1 sec. - Effectively earthed. - Two/one (details indicated in the schedule/drawing) -ACSR Double moose for Main Bus & ACSR moose for Transfer Bus, Drake Conductor for connection between equipments. Spacing between conductors - NA (in case of twin conductor bus) Minimum working tension STANDARDS It is not the intent to specify completely herein, all details of design & construction of equipments. However the design, manufacture and performance of clamps and connectors shall comply with all currently applicable standards, regulations and safety codes in the locality where the equipments will be installed. Unless otherwise specified, the equipments shall conform to the latest Indian Standards and in particular to the requirements as detailed below. The equipments shall be capable of continuous commercial operation upto tenderers guarantee in a manner acceptable to the purchaser who will interpret the meaning of the drawings and specifications and shall have the power to reject any work and or material, which in his judgment are not in full accordance therewith. IS-2121-Fittings for Aluminium and steel cord Aluminium conductors for overhead power lines. IS-5561 - Electric power connectors. IS-2633 - Method of testing weights, thickness & uniformity of coating on hot dip galvanized articles.
Consultant: Snyder Energo Private Limited Bangalore & Chennai

- 1000 KG per conductor

Section-4

136 of 140

DEIFY INFRASTRUCTURE LIMITED JAYASWAL NECO INDUSTRIAL LIMITED 2x25 MW CAPTIVE POWER PLANT

TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES DOC. NO : 4 3643 ELCT 001

MATERIAL: The clamps and connectors shall normally be made out of materials as indicated below: i) Connectors for connecting ACSR/ Aluminium terminals: - Aluminium alloy conforming to designate A6 of IS: 617 for bolted type, and EC grade Aluminium for crimping type ii) For connecting to copper terminals: - Electrolytic copper, forged & silver plated/tinned. (The minimum thickness of tinning provided shall not be less than 10 microns.) iii) Nuts, bolts, plain washers, checknuts: - All these shall be of nonmagnetic stainless steel. For aluminium connectors made out of Aluminium or Aluminium alloy, the nuts and bolts shall be of 12mm dia size with plain washer of 2 mm thickness and as per relevant IS. Each set of nut bolt shall be provided with suitable checknuts. For copper terminals, the Nuts & bolts shall be of 10 mm dia with washers of minimum 2 mm thickness. The U bolts shall be made of non-magnetic stainless steel, and washers as per above. Wherever crimping is involved, such clamps and connectors shall be drop forged. Others shall be gravity die-cast with heat treatment for normalizing. The materials shall be of the best workmanship as per the latest modern practice, and all the sharp edges and corners shall be rounded off. CONSTRUCTIONAL DETAILS: All the castings / forgings shall have smooth edges and corners. Unless otherwise specified in the drawings, the thickness of the pads of clamps and connectors shall not be less than 10 mm for copper and 12 mm for Aluminium / Aluminium alloy.
Consultant: Snyder Energo Private Limited Bangalore & Chennai

Section-4

137 of 140

DEIFY INFRASTRUCTURE LIMITED JAYASWAL NECO INDUSTRIAL LIMITED 2x25 MW CAPTIVE POWER PLANT

TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES DOC. NO : 4 3643 ELCT 001

The bolts and nuts shall have hexagonal heads and threads as per IS, and they shall in the normal course be fully threaded. U - bolts shall have threading for the straight position one If felt necessary by the tenderer, he shall offer check nuts also. Size of the terminal/conductor for which the clamps are suitable shall be embossed on each of the clamp. The embossing pattern shall generally be as below: Size of conductor/stud Manufacturer's Name Year of supply : : :

The clamps/connectors shall be designed for minimum 120% of the maximum current carrying capacity of the conductor, and the temperature rise under those conditions shall not be more than 50% of that of the main conductor. All clamps and connectors shall be free from visible corona for their usage upto 245 kV system voltages. DESIGNS The responsibility of the satisfactory design, both from mechanical as well as electrical consideration, rests solely on the tenderer. However, the minimum dimensions as stated above or indicated in the drawings shall be binding on the Tenderer. Wherever the tolerance in dimensions have not been mentioned the relevant (standard) drawings, the same shall be +/- 3%. INSPECTION: Equipments shall be subject to inspection by a duly authorized representative of the Purchaser. Inspection may be made at any stage of manufacture at the option of the Purchaser. The equipment if found unsatisfactory in regard to material or workmanship is liable for rejection. Tenderer shall grant free access to Purchaser's representative at all reasonable time when the work is in progress. Inspection by the purchaser or his representative shall not relieve the tenderer of his obligation of supplying materials in accordance with the technical specification and the approved drawings.
Consultant: Snyder Energo Private Limited Bangalore & Chennai

Section-4

138 of 140

DEIFY INFRASTRUCTURE LIMITED JAYASWAL NECO INDUSTRIAL LIMITED 2x25 MW CAPTIVE POWER PLANT

TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES DOC. NO : 4 3643 ELCT 001

DELIVERY: All the equipment covered under this specification shall be delivered by Road (lorry) transport.. It is the BIDDER's responsibility to supply at respective stores complete goods without damage/loss. UNIT PRICES: Unit prices of all items covered in this specification, including the following spares, shall be quoted by the tenderers : a) Palm type jumper terminals (Pure Aluminium) suitable for various Tconnectors included in this specification. b) Stainless steel U - bolt complete with 2 nuts + 2 check nuts + 4 plain washers. c) Stainless steel fully threaded nut-bolt complete with 2 plain washers and one checknut of sizes (i) M 10, (ii) M 12. TESTS All acceptance tests and routine tests unless specifically exempted shall be carried out as per IS:5561-1970 by the tenderer, and test certificates shall be got approved before effecting the bulk supply. TYPE TEST: The equipment/material offered in the Tender should have been successfully type tested AS PER is : 5561 - 1970 and the Technical Specification within the last 5 (Five) years prior to the date of opening of the Tender. Copies of type test reports required to be submitted along with the offer. The type test reports shall be complete in all respects. Incomplete type test reports and type test reports which are more than 5 years old will be treated as invalid and the offer will be liable for rejection. The bidder shall submit copies of the valid Type Test Reports for approval immediately on receipt of LOA. If there is any change in the components or design of the equipment now offered and the one(s) earlier (successfully) type tested, the bidder shall bring out in his offer all such changes made in components, materials, designs etc. In such case, the bidder shall carry out the type tests at his cost before start of supply and in the presence of the purchaser's representative. Even if the equipment / material has been type tested earlier, the purchaser reserves the right to demand repetition of one or more tests included in the list of type tests in the presence of purchaser's representative. For this
Consultant: Snyder Energo Private Limited Bangalore & Chennai

Section-4

139 of 140

DEIFY INFRASTRUCTURE LIMITED JAYASWAL NECO INDUSTRIAL LIMITED 2x25 MW CAPTIVE POWER PLANT

TECHNICAL SPECIFICATION FOR 132kV SWITCHYARD AND HARDWARES DOC. NO : 4 3643 ELCT 001

purpose the bidder shall quote unit rates for carrying out each test included in the list of type tests as per the relevant standard and the tender specification. The purchaser reserves the right to conduct tests included in the list of Type Tests on requisite number of samples/items from any of the lots during the tenure of the supply, at the purchaser's cost in the presence of purchaser's representatives. If the equipment/material does not withstand the type test, then the equipment/material supplied till then will be liable for rejection. The BIDDER, in such an eventuality, shall be allowed to modify the equipment and type test the same again at his cost in the presence of the purchaser's representative. These type tests shall however be conducted by the BIDDER within a reasonable time. After successful passing of the type tests, all the equipments / materials supplied earlier shall be modified in line with the equipments / materials which have successfully passed the type test. In case the BIDDER fails to carry out the Type Test within a reasonable time or does not agree to carry out the type test at his cost, his equipment/material supplied earlier shall be rejected and the order placed shall be cancelled and payments made earlier for these supplies shall be recovered by the purchaser.

Consultant: Snyder Energo Private Limited Bangalore & Chennai

Section-4

140 of 140