PLTU SELURUH INDONESIA

KELOMPOK 1
AMALIA SARASWATI ARI HASTANTO BAYU PRIMASTHA GIGIH MAHARTOTO

L2F008005 L2F008011 L2F008016 L2F008039

Fast track Power Plants in Java


No 1 Power Plant PLTU 1 Banten Suralaya Capacity (MW) 1 x 625 MW EPC Contractor
Consortium of China National Technical Import & Export Corporation (CNTIC), China National Machinery Import & Export Corporation, Zhejiang Electric Power Design Institute and PT Rekayasa Industri Consortium Truba Jurong Engineering and Chengda Engineering Corp. Consortium Dongfang Electric and Dalle Energy Consortium Sinomach, CNEEC, PT Penta Adi Samudra Consortium Shanghai Electric and Maxima Infrastruktur Consortium Zelan, Tronoh and Priamanaya Consortium Dongfang Electric and Dalle Energy Consortium Harbin Power Engineering and Mitra Selaras Hutama Energi On hand

Status
On hand

2 3 4 5 6 7 8 9 10

PLTU 2 Banten - Labuhan PLTU 3 Banten Lontar,Teluk Naga PLTU 1 Jawa Barat - Indramayu PLTU 2 Jawa Barat Pelabuhan Ratu PLTU 1 Jawa Tengah - Rembang PLTU 1 Jawa Timur - Pacitan PLTU 2 Jawa Timur - Paiton PLTU 2 Jawa Tengah - Cilacap PLTU 3 Jawa Timur Tanjung AwarAwar

2 x 300 MW 3 x 315 MW 3 x 330 MW 3 x 350 MW 2 x 315 MW 2 x 315 MW 1 x 600 MW 1 x 600 MW 2 x 300 MW

On hand

On hand On hand

Consortium Sinomach CNEEC and PT Penta Adi Samudra

PLTU Tanjung Jati B Jepara

Pengelola : PT. PLN (Persero) Pembangkitan Tanjung Jati B LOKASI :Desa Tubanan Kecamatan Kembang Kabupaten Jepara 59457 KAPASITAS :2 x 661 MW Bahan bakar : batu bara Distribusi : Jawa-Bali

PLTU PT Krakatau Daya Listrik


Pengelola : PT Krakatau Steel (KS) dan PT Truba Alam Manunggal Engineering Tbk (TAME) LOKASI : Cilegon, Banten KAPASITAS : 400 MW JENIS & JUMLAH PEMBANGKIT : 5 PLTU Bahan bakar : batu bara Distribusi : Jawa-Bali

PLTU SURALAYA (BANTEN 1)


Pengelola : PT. Indonesia Power PLTU Suralaya terletak di desa Suralaya Merak Kotamadya Cilegon, Jawa Barat 7 Km kearah utara dari Pelabuhan Penyeberangan Merak PLTU Suralaya pembangunannya dilakukan dalam 3 (tiga) tahap yang seluruhnya berjumlah 7 unit : - Tahap I = 2x400 MW beroperasi tahun 1984 - Tahap II = 2x400 MW beroperasi tahun 1989 - Tahap III = 3x600 MW beroperasi tahun 1997 BAHAN BAKAR : BATU BARA Memasok energi ke JAMALI

PLTU I JAWA TIMUR-PACITAN


Pengelola : PT. PLN (Persero) dan Konsorsium dari China National Machenery Industry (SINOMACH ), China National Electric Equipment Corporation (CNEEC ) dan Perusahaan Lokal PT. Penta Adi Samudera Lokasi proyek berada di Desa Sukorejo, Kecamatan Sudimoro, Kabupaten Pacitan PLTU I Jawa Timur Pacitan dengan kapasitas 2 x 315 MW

PLTU Asam-Asam
Pengelola : PT Mentawai Surak Wisata (PMA) LOKASI : Desa Asam-asam, Kecamatan Jorong, Kabupaten Tanah Laut, Kalimantan Selatan KAPASITAS : 2 x 65 MW JENIS & JUMLAH PEMBANGKIT : Unit I dan II Bahan bakar: batu bara

Bangka Power Plant


Project Company Location Fuel Units Minimum fuel requirements Off Take Construction status EPC contractor Expected COD Off Take status Off Take price Designed delivery per annum Financing status PT Bangka Manunggal Power Bangka-Belitung Coal 2x12 MW 30,000 tons per annum PLN 14% PT Truba Jaya Engineering (TJE) September 2009 25 years PPA to PLN Rp.448.15/ Kwh (Coal cost pass through) 147,269,000 Kwh Secured project finance from local bank

Pontianak Power Plant


Project Company Location Fuel Units Minimum fuel requirements Off Take Construction status EPC contractor Expected COD Off Take status Off Take price Designed delivery per annum Financing status PT Equator Manunggal Power Pontianak, West Kalimantan Coal 2x30 MW 218,000 tons per annum PLN 10% PT Truba Jaya Engineering (TJE) December 2010 25 years PPA to PLN Rp.447.05/ Kwh (Coal cost pass through) 350,640,000 Kwh Secured syndicated loan from local banks

CP Bahari Power Plant


Project Company Location Fuel Units Minimum fuel requirements Off Take Construction status EPC contractor Expected COD Off Take status Off Take price Designed delivery per annum Financing status PT Central Daya Energi Tulang Bawang, Lampung Coal 4x30 MW 590,000 tons per annum Central Pertiwi Bahari and Central Protein Prima 30% Shanghai Electric Group Company, TAME Turnkey, PT Manunggal Engineering 1st unit in May 2009, and completion in December 2009 30 years PPA to CPB and CPP Rp.1,165/ Kwh 781,200,000 Kwh In discussion

Kuala Tanjung Power Plant


Project Company Location Fuel Units Minimum fuel requirements Off Take Construction status EPC contractor Expected COD Off Take status Off Take price Designed delivery per annum Financing status PT Manunggal Engineering and Shanghai Machinery July 2010 30 years PPA to PLN USD cents 4.748/ Kwh (Coal cost pass through) 1,789,315,920 Kwh In discussion PT Ranyza Energi Kuala Tanjung, North Sumatra Coal 2x135MW 930,000 tons per annum PLN

Banyuasin Power Plant


Project Company Location Fuel Units Minimum fuel requirements Off Take Construction status EPC contractor Expected COD Off Take status Off Take price Designed delivery per annum Financing status TAME Turnkey Contracting December 2010 30 years PPA to PLN USD cents 4.2568/ Kwh (Coal cost pass through) 1,758,000,000 Kwh In discussion PT Banyuasin Power Energi Banyuasin, South Sumatra Coal 2x125MW 949,000 tons per annum PLN

Banjarsari Power Plant


Project Company Location Fuel Units Minimum fuel requirements Off Take Construction status EPC contractor Expected COD Off Take status Off Take price Designed delivery per annum Financing status CNEEC September 2010 30 years PPA to PLN Rp.459.4/ Kwh (Coal cost pass through) 1,401,600,000 Kwh Local bank financing PT Bukit Pembangkit Innovative Gunung Kembang, South Sumatra Coal 2x100MW 870,000 tons per annum PLN