1.00
ESPESOR
ANCHO
ALA
ALTO
ALMA
LARGO
KG/ML
KG/M2
P. UNIT.
SOLD
% RET
ACERO:
TIJERAL
11,170.12
CANT
Fe Liso
Brida Superior
31.75
33000.00
6.41
211.53
14.00
2,961.42
46.08
88.84
0%
KG
2,961.42
Fe Liso
Brida Inferior
31.75
33000.00
6.41
211.53
14.00
2,961.42
46.08
88.84
0%
KG
2,961.42
Fe Liso
Diagonal
19.05
44991.55
2.26
101.61
14.00
1,422.48
37.70
42.67
0%
KG
1,422.48
Fe Liso
Amarre superior
15.88
200.00
1.56
0.31
658.00
204.64
6.56
6.14
0%
KG
204.64
Fe Liso
Templadores
19.05
30000.00
2.26
67.75
7.00
474.25
12.57
14.23
0%
KG
474.25
Plancha
19.05
300.00
500.00
149.54
22.43
14.00
314.04
4.20
9.42
0%
KG
314.04
Plancha
Cartelas
19.05
400.00
600.00
149.54
35.89
28.00
1,004.93
13.44
30.15
0%
KG
1,004.93
Plancha
Plancha base
25.40
500.00
500.00
199.39
49.85
14.00
697.87
7.00
20.94
0%
KG
697.87
Fe Liso
VIGUETA T
Pernos de Anclaje
3,769.97
1200.00
3.95
4.74
84.00
398.33
8.04
11.95
0%
KG
398.33
Angulo
Superior
5000.00
1.74
8.68
276.00
2,394.30
210.31
71.83
0%
KG
2,394.30
Fe Liso
Diagonal
9.53
6858.00
0.58
3.94
138.00
544.18
28.32
16.33
0%
KG
544.18
Fe Liso
ARRIOSTRES Y TEMPLADORES
Inferior
725.84
12.70
CANT
4231.00
1.00
4.24
138.00
584.85
23.30
17.55
0%
KG
584.85
Fe Liso
Templadores de Viguetas
12.70
33000.00
1.00
33.06
6.00
198.33
7.90
5.95
0%
KG
198.33
Fe Liso
TIMPANO - EJE F
15.88
CANT
9646.89
1.56
15.00
32.00
480.03
15.40
14.40
0%
KG
480.03
Eje Liso
Columna
12.70
6000.00
1.00
6.01
18.00
108.18
4.31
3.25
3%
KG
111.43
Eje Liso
Columna
9.53
8617.68
0.58
4.96
18.00
89.19
4.64
2.68
3%
KG
91.87
Eje Liso
Columna
9.53
Angulo
Superior
3.18
Eje Liso
Diagonal
9.53
Eje Liso
TIMPANO - EJE A
Inferior
2,153.41
12.70
CANT
25.40
CANT
3.18
138
38.1
38.10
38.1
38.10
150.00
0.58
0.09
36.00
3.11
0.16
0.09
3%
KG
3.20
5000.00
1.74
8.68
24.00
208.20
18.29
6.25
0%
KG
208.20
6858.00
0.58
3.94
12.00
47.32
2.46
1.42
0%
KG
47.32
4231.00
1.00
4.24
12.00
50.86
2.03
1.53
0%
KG
50.86
Eje Liso
Columna
12.70
6000.00
1.00
6.01
18.00
108.18
4.31
3.25
3%
KG
111.43
Eje Liso
Columna
9.53
8617.68
0.58
4.96
18.00
89.19
4.64
2.68
3%
KG
91.87
Eje Liso
Columna
9.53
Angulo
Superior
3.18
Eje Liso
Diagonal
Eje Liso
Inferior
Angulo
Viga de Amarre
Fe Liso
Diagonal
Fe Liso
Diagonal
150.00
0.58
0.09
36.00
3.11
0.16
0.09
3%
KG
3.20
5000.00
1.74
8.68
24.00
208.20
18.29
6.25
0%
KG
208.20
9.53
6858.00
0.58
3.94
12.00
47.32
2.46
1.42
0%
KG
47.32
12.70
4231.00
1.00
4.24
12.00
50.86
2.03
1.53
0%
KG
50.86
30000.00
10.30
309.05
4.00
1,236.20
48.77
37.09
3%
KG
1,273.29
19.05
49764.00
2.26
112.38
2.00
224.77
5.96
6.74
3%
KG
231.51
19.05
300.00
2.26
0.68
66.00
44.72
1.18
1.34
3%
KG
46.06
1,201.23
100.10
36.04
0%
KG
1,201.23
18,361.69
686.69
550.85
0%
6.35
Otros
2.00
SOLDADURA:
OXIGENO ( M3/Tn)
GLP 45 KG
PIEDRA DE DESBASTE ( PZA/TN)
CONSUMIBLES (% de Soldadura)
3.00
3.02
3.02
3.04
38.1
101.6
38.10
101.60
7%
18,418.88
3.0%
4.5
KG
BALON
BALON
4
PIEDRAS
10%
%
% SOL
80%
80%
% DIL
MILS
% PERD.
4.00
50%
4.00
50%
CAPAS
1.00
1.00
REND.
15.14
15.14
GLN
GLN
GLN
550.85
8.29
1.66
73.68
45.36
45.36
18.14
TOTAL MATERIAL
FABRICACION
RENDIMIENTO
0.10
CAPATAZ
2.00
OPERARIO
2.00
OFICIAL
6.00
PEON
10.10 PERSONAS
10 KG/HH
1,841.89 Horas
22.80 DIAS
HH
HH
HH
HH
18.24
364.73
364.73
1094.19
1841.89
M2
M2
686.69
686.69
MAQUINA Y EQUIPOS
ACABADO SUPERFICIAL
ARENADO COMERCIAL
PINTADO
CAPAS
2 US$/M2 X CPA
0.4
1373.38
MAQUINA Y EQUIPOS
8 KG/HH
2,302.36 Horas
20.41 DIAS
HH
HH
HH
HH
16.33
326.58
653.15
1306.30
2302.36
MAQUINA Y EQUIPOS
SERVICIOS VARIOS
GALVANIZADO
PERFORADO DE PL DIM. 1,20 X 2,40
VIATICOS
ALQUILER DE HIAB
FLETE
KG
pza
PERS - DIA
H
KG
0.00
0.00
230.24
18.36
18,361.69
pza
kg
kg
Glb
0.00
18,361.69
18,361.69
1.00
MATERIALES VARIOS
Roscado
Perneria
Flete para servicios
Pruebas
MATERIALES:
FABRICACION
ARENADO Y PINTADO
EQUIPO Y HERRAMIENTA:
SERVICIOS
OTROS MAT. Y SERV. PARA FABRICACION
INSTALCION + EQUIPOS
COSTO UNITARIO DIRECTO:
INDIRECTOS:
UTILIDAD:
PRECIO UNITARIO:
0%
0%
(A)
UND.
Cobertura
Cobertura - Techo
Cobertura - Lateral y Frontal
Cobertura Traslucida
Cumbrera
Canaleta
Fijaciones
10%
CANT.
m2
m2
m2
pza
ml
%
990.00
180.00
0.00
10.00
60.00
10%
GG
UT
12.00
12.01
12.01
12.02
MANO DE OBRA
MANO DE OBRA
MANO DE OBRA
EQUIPO
(KG /HR)
(KG /HR)
(MO *
DESMONT
MONTAJE
50%
m2
m2
%
0.00
1,170.00
50%
GG
UT
VIATICOS
ALIMENTACION
HOSPEDAJE
TRANSPORTE DE MATERIAL
PASAJES LIMA-TRUJILLO-LIMA
MOVILIDAD EN TRUJILLO
Das
4
4
2
2
0.00
0.00
0.00
0.00
0.00
GG
UT
VALOR TOTAL
techo
lateral
traslucido
17.95
17.52
#DIV/0!
US$
US$/PZA
0%
VV
US$
17,774.35
3,153.12
#DIV/0!
20927.48
VIATICOS
15
20
15
4500
1.2
5400
AREA
BASE
22.5 ANGULO
ACABADO
22.5
4.76
972.00
50.8
3.60
$ UNIT.
$ PARCIAL
0.90
2,665.28
0.90
2,665.28
0.90
1,280.23
0.90
184.17
0.90
426.83
0.92
288.92
0.92
924.53
0.92
642.04
0.90
358.50
0.85
2,035.16
0.90
489.76
0.90
526.37
0.90
178.50
0.90
432.03
$ TOTAL
Arcos 24 x 4.00 m
#REF!
#REF!
und
und
und
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
und
#REF!
#REF!
#REF!
#REF!
und
#REF!
#REF!
#REF!
#REF!
und
#REF!
#REF!
#REF!
#REF!
und
#REF!
#REF!
#REF!
#REF!
und
#REF!
#REF!
#REF!
0.00
0.00
0.00
0.85
176.97
0.90
42.59
0.90
45.77
#REF!
0.00
0.00
0.00
0.85
176.97
0.90
42.59
0.90
45.77
0.85
1,082.29
0.90
208.36
0.90
41.45
0.75
900.92
15,861.26
3.10
21.92
35.71
4.29
15,861.26
1,707.64
181.72
59.20
315.75
170.76
2,435.07
1,133.90
1,133.90
127.00
2,394.80
(1)
US$/KG
20,691.13
1.13
3.91
3.23
2.85
2.46
2.00
71.30
1,178.08
1,039.48
2,691.71
(2)
US$/KG
4,980.58
3,683.78
0.20
20%
(3)
US$/KG
736.76
0.04
0.75
0.80
515.02
549.35
1,064.37
25
25
7
TOTAL MATERIAL
0.00
#REF!
0.00
#REF!
18,296.33
1.55
(2)
US$/KG
1,064.37
0.06
20%
(3)
US$/KG
212.87
0.01
3.91
3.23
2.85
2.46
2.00
63.85
1,054.84
1,861.48
3,213.51
(2)
US$/KG
6,193.68
4,604.72
0.25
20%
(3)
US$/KG
920.94
0.05
0.35
28.00
11.87
80
0.18
0.00
0.00
0.00
1,468.93
0.00
(4)
US$/KG
1,468.93
0.08
0.00
918.08
805.34
250.00
(5)
US$/KG
1,973.42
0.11
US$
35,356.93
3.36
0.05
0.04
250.00
(1)+(2)+(3)+(4)+
(5)
FABRICACION
ARENADO Y PINTADO
EQUIPO Y HERRAMIENTA:
OTROS MAT. Y SERV. PARA FABRICACION
INSTALCION + EQUIPOS
COSTO UNITARIO DIRECTO:
0%
0%
PRECIO UNITARIO:
1.13
0.20
0.06
0.05
0.08
0.11
0.30
1.93
0.00
0.00
1.93
0.00
0.00
35,356.93
GASTOS GENERALES
UTILIDAD
TOTAL FABRICACION($)
35,356.93
1.54
0.38
1.93
$ UNIT.
$ PARCIAL
13.20
13.20
25.00
7.22
6.00
0%
0%
0.80
2.00
0%
0%
13,065.62
2,375.57
0.00
72.17
360.00
1,544.12
17,417.48
0.00
0.00
17,417.48
$ TOTAL
17,417.48
0.00
2,340.00
1,170.00
3,510.00
0.00
0.00
3,510.00
3,510.00
3.07
7.69
615.38
4.60
0.50
0%
0%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
$ TOTAL:
20,927.48
20,927.48
20,927.48
20,927.48
17.89
17.89
0.00
0.00
20,927.48
17.887
LATERAL
MURO DE 5 MTS
Eje 5/8"
Eje 1/2"
6150
5550
2
2
26
21
35.53
25.90
13.51
8.62
480.1
223.3
MURO DE 25 MTS
Eje 5/8"
Eje 1/2"
6150
25550
2
2
126
21
172.20
119.23
13.51
8.62
2326.4
1027.8
ZAPATAS
Eje 5/8"
Eje 5/8"
2900
30400
2
2
98
6
63.16
40.53
13.51
13.51
853.2
547.6
Eje 5/8"
Eje 5/8"
2900
26200
2
2
84
6
54.13
34.93
13.51
13.51
731.3
471.9
6600
2250
1
1
6
28
4.40
7.00
19.61
4.81
86.3
33.7
TIMPANO
MURO DE 30 MTS
Eje 5/8"
Eje 1/2"
6150
30550
2
2
151
21
206.37
142.57
13.51
8.62
2788.0
1228.9
ZAPATAS
Eje 5/8"
Eje 5/8"
2900
31200
2
2
101
6
65.09
41.60
13.51
13.51
879.4
562.0
200
200
200
8
7
7
98
34
68
17.42
5.29
10.58
13.51
13.51
13.51
235.4
71.5
142.9
COLUMNAS
Eje 3/4"
Eje 3/8"
PISO
Eje 5/8"
Eje 5/8"
Eje 5/8"
# Muros
773.6
12
9283.74
3689.6
3689.63
1540.9
3081.84
1323.6
1323.62
131.9
14
1847.29
4418.6
4418.63
1585.5
1585.50
6004.14
494.7
494.71
494.71
# Muros
19226.12
# Muros
Cliente :
Atencin :
Ref.:
O/T.:
Rev.:
Fecha :
Estimados Sres.:
Mediante la presente les hacemos llegar nuestra cotizacin por la Fabricacion y Montaje de Estructuras
Caractersticas Tcnicas
La estructura presenta las siguientes caractersticas:
. Longitud promedio: 1000ml
. Malla Galvanizada en cocada de 2"x2" con certtificacin tcnica
DESCRIPCION
UNIDAD Cantidad
P.Unitario
US$
P.Parcial
US$
ESTRUCTURA METALICA
1
1.01
1.02
2
Trabajos Preliminares
Movilizacin de Equipos y personal
Desmovilizacin de Equipos y personal
Obras Civiles
2.01
2.02
glb
glb
1
1
0.00
0.00
Trazo y replanteo
ml
1000.00
0.56
560.00
Excavacin Semirocosa
m3
60.00
21.46
1,287.60
2.03
Eliminacin de Material
m3
60.00
4.66
279.60
2.04
2.04
2.05
3
3.01
3.02
3.03
4
4.01
4.02
4.03
5
5.01
5.02
Concreto Ciclpeo
Sobrecimiento
Encofrado y desencofrado
Obras Metlicas
Panel en L2"x2"x3/16"
Malla metlica de 2"x2" de cocada Altura del cerco=2m
Poste Metlico en Tubo de 2" de dimetro Altura del Poste=3m
Portn Metlico
Tubo Metlico de 2" de dimetro (6ml de Longitud)
Tubo Metlico de 3" de dimetro
Malla de 2"x2" de cocada
Otros
Concertina Metlica
Pintura de los ngulos y de los postes
m3
m3
m2
60.00
40.00
400.00
13.36
13.36
9.00
801.60
534.40
3,600.00
kg
m2
kg
12000.00
1988.00
4514.40
2.15
10.57
2.15
25,800.00
21,013.16
9,705.96
kg
kg
m2
100.32
45.90
12.00
2.15
2.15
10.57
215.69
98.69
126.84
ml
m2
1000.00
829.83
2.94
2.4
2,940.00
1,991.59
Subtotal US$
G.G. 10% US$
Util. 10% US$
P. Total US$
La cotizacin no incluye el IGV 19%
Especificaciones Tcnicas
1.- Acero de Perfiles y Planchas: ASTM A-36, Fy=2500 kg/cm2
2.- Acabado: Arenado Comercial, Una Capa de Pintura epxica a 5mils de espesor. Color a definir por el usuario.
3.- Normas Aplicables:
. Materiales: American Society for Testing Material
. Acero: American Institute of Steel Construction
. Soldadura: American Welding Society - AWS
Condiciones Comerciales
A) Los precios incluyen materiales, mano de obra, gastos generales y utilidad
B) Validez de la Oferta: 15 das tiles
C) Plazo de Entrega: 30 das.
D) Cualquier atrazo por causas no imputables al contratista y/o de fuerza mayor nos exonera del plazo de entrega.
E) El cliente proporciona energa elctrica a pie de obra.
F) El Cliente transportar los materiales y estructuras de Lima a Obra.
G) No incluye suministro de gra.
Atentamente
0.00
0.00
68,955.13
13,101.47
6,895.51
88,952.11
1.03864716
2.00
1.93
1.93
1.93
1.93