a. Develop the gate-to-gate schematic of the plant depicting the energy input to the plant boundary, internally generated energy and the product output (Please refer to the case situations in Annexure-A) b. Trend the energy consumption in GtG concept of last 5 years c. Establish the Specific Energy Consumption (SEC) in GtG concept
* instantaneous/hourly/daily/monthly/yearly ** manual reading or recording /scada/Automatic MIS c. Reconcile the data with respect to production, typical parameters like heat rate, specific fuel consumption or any other observations d. Clearly define the inclusions / exclusions of the energy consumption of colony power, temporary constructions, internal transportations etc. in the reported data.
Flow
Diagram
and
Present
a. Study and review the process flow diagram (PFD). Develop the schematic of the PFD depicting the operating parameters like flow, temperature, pressure etc. at each input-output stage b. Divide the entire process into key sub-processes or sub-systems. The typical sub-process of the sectors are given below (but not limited).
Sector Thermal Power Plant (coal) 3 | Page Sub-Processes Coal handling Plant, Ash Handling
Aluminium (Refinery)
Cement Iron & Steel (Integrated) Iron & Steel (Sponge Iron) Fertilizer Pulp & Paper Textile
System, Steam Generation System, Turbo-Generator system, CW system, ESP, Compressed Air System Turbo-Compressor System, Waste Heat Recovery Boiler, CW system, Compressed Air System Rectiformer, Pot-Lines, Carbon Plant (Green Anode Plant, Bake Oven, Rodding Shop), Cast-House, Compressed Air System, Fume Treatment Plant Digester system, Cleaning & Refining System, Calcinations System, Steam Generation System, Co-Gen System Raw Material Preparation System, Cement Kiln, Grinding Section, Captive Power Plant(CPP) Coke oven, Sintering Plant, Blast Furnace, BOF, Casting Section, Rolling Mills, CPP Sintering Plant, DRI section, EAF section / IF Section, Casting section, Rolling Mill, CPP Nitrogen Plant, Urea Plant, Steam Generation System, CPP Raw Material Preparation, Pulping Section, Paper Machine Section, CPP, Co-Gen Plant Spinning section, Drying Section, Steam Generation System, CPP
Chlor-Alakali [The above sub-processes are indicative only. The auditor may suitably select the sub-process depending upon the material & energy flow and quantum of energy consumed]
6. Study of Sub-Processes
a. Define the energy & material flow into and out of each subprocess, process parameters and present metering system for all energy sources in the sub-process under study. (This should be in the form of Block Diagrams). b. Investigate the following in each sub-process
Parameters Brief Description of the Sub-Process Material Flow Energy Input 4 | Page What to look for Name Flow Rate Electricity Value
Design
operating
Major Equipment
Solid Fuel (Coal/Lignite) Liquid Fuel (FO/HSD/LHHS...) Gaseous Fuel (NG/LPG...) Others Name Technology Numbers Technical Specifications Specific Energy Consumption Technical Parameters Operating Parameters Numbers Operating Technical Specifications % Loading or Capacity Utilization Efficiency (%) Specific Energy Consumption Technology Change Process Modification O & M Practice Resulting Energy Saving Approx. Investment done
Operating
Factors Affecting Energy Efficiency Major Auxiliaries Associated (Pumps, Fans, Compressors, Furnaces, HVAC system etc.)
[In order to get the operating values suitable measurements to be done by energy auditing gadgets or observation from installed gadgets]
Possible
Energy
Efficiency
a. Waste Heat Recovery Options i. Source ii. Comment on Feasibility iii. Quantum of Possible Extracted Energy b. Co-Generation Option i. Comment on Feasibility ii. Approximate Thermal & Electrical Energy output c. Fuel Switch Options d. Retrofit Options e. Use of Energy Efficient Equipment i. Energy efficient drives, Pumps, Fans, Compressors, Lighting system etc.
5 | Page
ii. Variable Frequency Drives / Variable Speed Drives iii. Any other f. O & M Practices i. Waste minimization (Reuse, Recycle, Resizing) ii. Control Mechanism iii. Data Monitoring & Accounting g. Cost-Benefit Option in all possible options i. Simple Pay Back Period
Efficiency
Improvement
Investment Done
Resulted Saving
Audit
Report
with
Following
f. Instruments Used for Energy audit g. Brief Description about the plant (Process Flow Diagram) h. Energy Scenario & Usage pattern i. Description about Sub-Process (As per Point # 6) j. Identifying ENCON Options (As per Point # 7) k. Description about Past ENCON activities l. Description about future ENCON strategy m.Conclusion & Critical Comment n. Annexure [The report must be equipped with tables, graphs, sample calculation sheet, assumptions (if any) at suitable places ]
S.P.Garnaik
Energy Economist Bureau of Energy Efficiency Ministry of Power, GOI 4th Floor, Sewa Bhawan, R.K.Puram, New Delhi-66 Ph: 011-26178352 email: sgarnaik@beenet.in
7 | Page
Annexure-A Different Case Situations in Estimating Total Energy Consumption and Specific Energy Consumption in Gateto-Gate Concept
The following are the explanations on estimating the total energy consumption and specific energy consumption in various case situations as encountered in Designated Consumer industries.
Pre-Consideration: 1. The plant boundary has already been defined. 2. There is a single product at the output which has been defined. In case of multiple products, the major product to be considered. 3. The energy consumption is to be considered only for plant process operations to produce the 'defined product'. So, the energy consumed in internal transportation, residential colony etc. have been excluded. 4. The primary energies actually consumed for producing the product are considered. Any primary energy purchased and stored inside the system boundary is excluded.
The cases have been prepared based on prevailing scenario of energy usage in the energy intensive sectors like Power Plant, Iron & Steel, cement, Fertilizer, Aluminium, pulp & paper, Textile, Chlor-Alkali etc.
8 | Page
PROCESS
Total Energy Consumption (Etotal) = [Elect x 860 + FO x GCVfo + Coal x GCVcoal + NG x GCVng + Others x GCVeach] Kcal Total Electrical Energy Consumption (ELtotal) = Electricity KWH
Total Thermal Energy Consumption (THtotal) = [FO x GCVfo + Coal x GCVcoal + NG x GCVng + Others x GCVeach] Kcal Gate to-Gate SEC = [Etotal /kg of product] Kcal/kg
9 | Page
CASE -II : Electricity Partially Generated by DG Sets, other Energy Purchased and Consumed
Process
kwh/ltr
X = ( A x SFC ) kwh where SFC = 3.0 to 3.5 kwh/ltr A = ( X / SFC) kwh where SFC = 3.0 to 3.5 kwh/ltr
Total Energy Consumption (Etotal) = [Elect x 860 + A x GCVa + FO x GCVfo + Coal x GCVcoal + NG x GCVng + Others x GCVeach] Kcal Total Electrical Energy Consumption (ELtotal) = (Purchased Electricity + X) KWH
Total Thermal Energy Consumption (THtotal) = [(FO-A) x GCVfo + Coal x GCVcoal + NG x GCVng + Others x GCVeach] Kcal Gate to-Gate SEC = [Etotal /kg of product] Kcal/kg
10 | Page
CASE -III : Electricity Generated by CPP, other Energy Purchased & Consumed, Electricity partially sold to grid
(a) If X is known and A is known, Heat Rate (HR) = [( A x GCVcoal ) / X] Kcal/kwh (b) If A is known Heat Rate (c) If X is known Heat Rate X = [( A x GCVcoal ) / HR ] kwh where HR = Avg. Plant A =[ ( X * HR)/ GCVcoal]
* If plant HR is not available, then National Avg. HR i.e. 2717 Kcal/kg may be considered * The total electricity consumption also includes the auxiliary power consumption of CPP
Total Energy Consumption (Etotal) = [FO x GCVfo + Coal x GCVcoal + NG x GCVng + Others x GCVeach] Kcal Total Electrical Energy Consumption (ELtotal) = (X - Y) KWH
Total Thermal Energy Consumption (THtotal) = [FO x GCVfo + (Coal-A) x GCVcoal + NG x GCVng + Others x GCVeach] Kcal
11 | Page
Kcal/kg
Electricity is generated by Coal Based CPP, partially sold to grid. CPP is in separate Boundary
Coal
B
CPP
G Y (KWH) to
Others (KG or
Aux P (a
X (KWH)
A
Product (Kg)
PROCESS
Here, in case of two separate boundaries, two different Norms / Targets to be established 1. For the Production Plant Boundary (A):
Total Energy Consumption (Etotal) = [X *860 + FO x GCVfo + Coal x GCVcoal + NG x GCVng + Others x GCVeach] Kcal Total Electrical Energy Consumption (ELtotal) = X kwh Total Thermal Energy Consumption (THtotal) = [FO x GCVfo + Coal x GCVcoal + NG x GCVng + Others x GCVeach] Kcal
12 | Page
Total Energy Consumption (Etotal) = [FO x GCVfo + Coal x GCVcoal + Others x GCVeach] Kcal Total Electrical Energy Consumption (ELtotal) = ( G ) x (a/100) kwh
Gate to-Gate SEC ( i.e Net Heat Rate) = Etotal / (G - ELtotal) Kcal / kwh
Here, the target setting criteria of Power Plant should be adopted which is based on Net Heat Rate.
13 | Page
CASE -V : Energy Purchased & Consumed, Electricity & Heat partially Generated through Co-Gen plant
Product
Total Energy Consumption (Etotal) = [Elect x 860 +FO x GCVfo + Coal x GCVcoal + NG x GCVng + Others x GCVeach] Kcal Total Electrical Energy Consumption (ELtotal) = (Elect + X) KWH
Total Thermal Energy Consumption (THtotal) = [FO x GCVfo + Coal x GCVcoal + NG x GCVng + Others x GCVeach + Y] Kcal Gate to-Gate SEC = [Etotal /kg of product] Kcal/kg
CASE -VI : Energy Purchased & Consumed, Heat energy partially met by waste / 14 | Page
Elect (KWH) Coal (KG) NG (SCM) FO (Ltr) Others (KG or Z Kcal By-Product (X KG)
PROCESS
Product
Total Energy Consumption (Etotal) = [Elect x 860 +FO x GCVfo + Coal x GCVcoal + NG x GCVng + Others x GCVeach] Kcal Total Electrical Energy Consumption (ELtotal) = (Elect) KWH
Total Thermal Energy Consumption (THtotal) = [FO x GCVfo + Coal x GCVcoal + NG x GCVng + Others x GCVeach + Z] Kcal Gate to-Gate SEC = [Etotal /kg of product] Kcal/kg
15 | Page