Calculation of IDMT Over Current Relay Settings:

Name of Feeder Load Current: (IL) 384 Min Fault Current ( Line-Line): 11000 Max Fault Current ( Line-Line): 22000 Relay Type Relay Code Relay No CT Primary Current 600 CT Secondary Current 1 Relay Error (%) 7.5% CT Error (%) 10.0% Over shoot 0.05 C.B Interrupting Time 0.17 Safety 0.33 Total Grading Time 0.58 Expected Operating Time of Relay 0.271 Over Current Relay Setting Low Over Current Setting: (I>) Over Load Current : 125% Over Load Current :(In) 480 Required Over Current Relay Plug Setting 0.8 Actual Plug Setting of Over Current Relay 0.80 Time Dial Setting of Over Current Relay (TMS) 0.125 Curve Selection for Relay Normal Inverse (NI) Pick Up Setting of Over Current Relay (PMS): (I>) 0.8 Plug Setting Multiplier (PSM): 22.92 Operation Time of Relay 2.17 Actual Operating Time of Relay : (tI>) 0.271 Total Grading Time 0.58 Operating Time of Previous Up steam Relay 0.85 High Over Current Setting: (I>>) Actual Plug Setting of Relay 2.50 Time Dial Setting of Over Load Relay (TMS) 0.100 Curve Selection for Relay Normal Inverse (NI) Pick UP Setting of Over Load Relay (PMS): (I>>) 2.5 Plug Setting Multiplier (PSM): 7.33 Time of Operation of Relay 3.44 Actual Operating Time of Relay : (tI>>) 0.34 Total Grading Time 0.58 Operating Time of Previous Up steam Relay 0.92 Summary of Over Current Relay Setting: Low Over Current Setting: (I>) 0.8 A X In Actual Operating Time of Relay(tI>) 0.271 High Over Current Setting: (I>>) 2.5 A X In Actual Operating Time of Relay(tI>>) 0.34 Amp Amp Amp

Amp Amp

Sec Sec Sec Sec Sec

X IL Amp
0.8 A X In 0.8 A X In

Sec Amp Sec Sec Sec Sec


2.5 A X In

Sec Amp Sec Sec Sec Sec Amp Sec Amp Sec

18.33333

Calculation of IDMT Earth Fault Relay Settings:


Name of Feeder Load Current: (IL) 384 Min Fault Current ( Line-Ground): 11000 Max Fault Current ( Line-Ground): 22000 Relay Type Relay Code Relay No CT Primary Current 600 CT Secondary Current 1 Relay Error (%) 7.5% CT Error (%) 10.0% Over shoot 0.05 C.B Interrupting Time 0.17 Safety 0.33 Total Grading Time 0.58 Expected Operating Time of Relay 0.176 Earth Fault Relay Setting Low Earth Fault Setting: (Ie>) Earth Fault Current : 20% Earth Fault Current 96 Required Earth Fault Relay Plug Setting 0.2 Actual Plug Setting of Earth Fault Relay 0.16 Time Dial Setting of Earth Fault Relay (TMS) 0.125 Curve Selection for Relay Normal Inverse (NI) Pick Up Setting of Earth Fault Relay (PMS): (Ie>) 0.16 Plug Setting Multiplier (PSM): 114.58 Operation Time of Relay 1.41 Actual Operating Time of Relay : (te>) 0.18 Total Grading Time 0.58 Operating Time of Previous Up steam Relay 0.76 High Earth Fault Setting: (Ie>>) Actual Plug Setting of Relay 2.50 Time Dial Setting of Over Load Relay (TMS) 0.100 Curve Selection for Relay Normal Inverse (NI) Pick UP Setting of Earth Fault Relay (PMS): (Ie>>) 2.5 Plug Setting Multiplier (PSM): 7.33 Time of Operation of Relay 3.44 Actual Operating Time of Relay : (te>>) 0.34 Total Grading Time 0.58 Operating Time of Previous Up steam Relay 0.92 Summary of Earth Fault Relay Setting: Low Earth Fault Setting: (Ie>) 0.2 A X In Actual Operating Time of Relay(te>) 0.176 High Earth Fault Setting: (Ie>>) 2.5 A X In Actual Operating Time of Relay(te>>) 0.34 Amp Amp Amp

Jignesh.Parmar www.electricalnotes.wordpress.com jiguparmar@yahoo.com

Amp Amp

Sec Sec Sec Sec Sec

X In Amp
0.2 A X In 0.2 A X In

Sec Amp Sec Sec Sec Sec


2.5 A X In

Sec Amp Sec Sec Sec Sec Amp Sec Amp Sec