Está en la página 1de 68

WiringSpecifications for Data,Voice&CATV

Tufts University, Version 4.2 2004, 2005, 2006, 2007, 2008, 2009

GENERALTERMSANDCONDITIONS ..............................................................4 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 USEOFTHEWORKSITE........................................................................4 PENETRATIONSOFWALLS,FLOORS,CEILINGS .............................................6 ROADWAYSANDPARKINGAREAS ............................................................6 CONSTRUCTIONPROCEDURES ................................................................7 MATERIALS ......................................................................................8 PLANNINGANDDOCUMENTATION ...........................................................9 LAWS,ORDINANCES,REGULATIONS,CODES,PERMITSANDSTANDARDS ............ 11 REPORTS ....................................................................................... 13 CABLEREMOVAL ............................................................................. 13 CLEANUP .................................................................................... 13 POLICEDETAILS ............................................................................ 14 VOICECUTOVER ........................................................................... 14 FINALACCEPTANCE ....................................................................... 16 WARRANTY ................................................................................. 16 GENERALREQUIREMENTS ................................................................ 18 TELECOMOUTLETS ........................................................................ 19 VOICETERMINATIONS..................................................................... 22 DATATERMINATIONS ..................................................................... 22 CORDS ....................................................................................... 23 CABLEINSTALLATION ..................................................................... 23 PANELSANDTERMINATINGEQUIPMENT .............................................. 25 EQUIPMENTRACKS ........................................................................ 26 COPPER ...................................................................................... 26 FIBER ........................................................................................ 32 CONDUITTYPESANDSUPPORTS ......................................................... 38 TELECOMMUNICATIONSROOMS ......................................................... 45 GROUNDINGANDBONDINGREQUIREMENTS .......................................... 47 FIRESTOPSPECIFICATIONS ............................................................... 50 CONDUITDUCTBANK&MAINTENANCEHOLESPECIFICATIONS .................... 51 COMMUNITYANTENNATELEVISIONCATV ........................................... 57

INTRODUCTION ThisTuftsUniversityData,Voice&CATVWiringSpecifications (Specifications)manualisincorporatedbyreferenceineachMaster ServicesAgreement,andallworkpursuanttoeachMasterServices AgreementandStatementofWorkshallbeperformedinaccordanceto theseSpecifications.

GENERALTERMSANDCONDITIONS 1 USEOFTHEWORKSITE
1.1 THECONTRACTORSHALLCONFINEOPERATIONSATTHESITETOAREASPERMITTEDBY TUFTSANDSHALLNOTUNREASONABLYENCUMBERTHESITEWITHMATERIALSOR EQUIPMENT. ANYDAMAGETOPERSONSORPROPERTYRESULTINGFROMTHECONSTRUCTION ACTIVITIESBEYONDTHELIMITSDEFINEDINTHECONTRACTDOCUMENTSSHALLBETHE SOLERESPONSIBILITYOFTHECONTRACTOR. STORAGEOFMATERIALSOREQUIPMENTWILLNOTBEALLOWEDWITHOUTCONSENT OFTUFTS. THECONTRACTORSHALLENFORCETUFTSINSTRUCTIONSREGARDINGSIGNS, ADVERTISEMENTS,FIRESANDSMOKING.SHOULDANYROOMORPARTOFTHE PROJECTBETEMPORARILYUSEDBYTHECONTRACTORASSHOP,STOREROOM,LOCKER ROOMORANOFFICE,FORANYPURPOSE,SUCHROOMORPARTOFSHALL,PRIORTO COMPLETIONANDWHENDIRECTED,BETHOROUGHLYCLEANED,ALLDAMAGEARISING THEREFROMMADEGOOD,ANDTHEWHOLELEFTINPERFECTCONDITION,BYTHE PARTYORPARTIESMAKINGUSEOFSAME.NOROOMORAREASHALLBEUSED WITHOUTTHECONSENTOFTUFTS. THECONTRACTORSHALLPERFORMALLWORKINFULLCOMPLIANCEWITHFEDERAL, STATEANDLOCALHEALTHANDSAFETYREGULATIONS.ALLWORKHEREUNDERSHALL BEPERFORMEDINASAFEMANNER.THECONTRACTORSHALLIMMEDIATELYSUSPEND ANDCORRECTANYDANGEROUSCONDITIONCAUSEDBYORRESULTINGFROMITS WORK.IFTHECONTRACTORFAILSTOCORRECT,ORTOACTDILIGENTLYTOCORRECT ANYCONDITIONWHICHTUFTSREASONABLYBELIEVESTOBEAHAZARDTOPERSONS ORPROPERTY,THENTUFTS,UPONORALORWRITTENNOTICETOANYSUPERVISORY PERSONNELOFTHECONTRACTOR,MAY,BUTSHALLNOTBEREQUIREDTOCORRECT THISHAZARDOUSCONDITIONATTHECONTRACTOR'SEXPENSE.TUFTSSHALLCONFIRM INWRITINGANYORALNOTICEGIVENWITHINFIVE(5)DAYSTHEREAFTER. WHEREANYOFTHECONTRACTOR'SOPERATIONSOCCURIN,ONORWITHINFIFTY(50) FEETOFANYDOOR,WINDOWORAIRINTAKEINANOCCUPIEDBUILDING,THE CONTRACTORSHALL,NOTLESSTHANTEN(10)DAYSPRIORTOTHESTARTOFANY OPERATION,SHALLPROVIDEDIRECTLYTOTUFTS,SAFETYDATASHEETSONALL MATERIAL,CHEMICALS,GASES,ETC.,TOBEUSEDINTHEOPERATIONWHICHARE CLASSIFIEDASHAZARDOUSUNDERANYFEDERAL,STATEORLOCALLAWSOR REGULATIONS. THECONTRACTORSHALLNOTROLLORSTORECABLEREELSOROTHERHEAVY MATERIALS/EQUIPMENTWITHOUTANAPPROPRIATEUNDERLAYANDTHEPRIOR APPROVALOFTUFTSORTHEIRREPRESENTATIVES.

1.2

1.3

1.4

1.5

1.6

1.7

1.8

IFAPPLICABLE,NOTWITHSTANDINGANYOTHERPROVISIONOFTHECONTRACT DOCUMENTSTOTHECONTRARY,THECONTRACTOR,ONCEITSACTIVITIESBEGINON THESITE,SHALLBEUNDERTHEDIRECTIONOFTUFTSPROJECTMANAGERANDTHE CONTRACTORSHALLDIRECTITSPERSONNELANDSUBCONTRACTORSTORESPECTAND ABIDEBYTHEAUTHORITYOFTHETUFTSPROJECTMANAGERONALLMATTERS RELATEDTOTHECONTRACTORSOPERATIONATTHESITE,INCLUDINGBUTNOT LIMITEDTO:

Usingsiteresourcessuchaselevatorsandloadingdocks,andthecoordinationofsuch usagebytheContractor,otherTuftssubcontractorsandotherTuftsvendors. Connectiontoanduseofutilities. Safetyissues. Trashremovalandsitecleanliness. Sitesecurity. 1.9 THECONTRACTORACKNOWLEDGESTHATTHEYMAYBEPERFORMINGWORKINA BUILDINGSTILLUNDERCONSTRUCTIONANDTHEREFORETHECONTRACTORSSTAFF MUSTADHERETOOSHAWORKSITEREGULATIONS,ORANYOTHERFEDERAL,STATE, LOCALLAWSANDORDINANCES.THECONTRACTORWILLBERESPONSIBLEFORFINES OROTHERPENALTIESRESULTINGFROMANYVIOLATIONTHEREOF.

1.10 THECONTRACTORWILLBEHELDRESPONSIBLEFORANYANDALLDAMAGESTO PORTIONSOFTHEBUILDINGCAUSEDBYIT,ITSEMPLOYEESORSUBCONTRACTORS; INCLUDINGBUTNOTLIMITEDTO: Damagetoanyportionofthebuildingcausedbythemovementoftools,materialsor equipment. Damagetoanycomponentoftheconstructionofspacesturnedovertothe Contractor. Damagetotheelectricaldistributionsystemand/orotherspaceturnedovertothe Contractor. Damagetotheelectrical,mechanicaland/orlifesafetyorothersystemscausedby inappropriateoperationorconnectionsmadebytheContractororotheractionsof Contractor. Otherdamagetothematerials,toolsand/orequipmentofTufts,itsconsultants,other contractors,subcontractors,architect,agentsandlessees.

PENETRATIONSOFWALLS,FLOORS,CEILINGS
2.1 THECONTRACTORSHALLMAKENOPENETRATIONOFFLOORS,WALLSORCEILINGS WITHOUTTHEPRIORCONSENTOFTUFTSPROJECTMANAGER. WHEREPENETRATIONSTHROUGHACOUSTICALWALLSOROTHERWALLSFOR CABLEWAYSHAVEBEENPROVIDEDFORORBYTHECONTRACTOR,THECONTRACTORIN COMPLIANCEWITHALLAPPLICABLECODEREQUIREMENTSSHALLSEALSUCH PENETRATIONS.SEALINGSHALLBEEITHERUNDERTHEDIRECTIONOFTUFTSPROJECT MANAGER.REFERTONATIONALFIREPROTECTIONASSOCIATION(NFPA)LIFESAVING CODE&ALLSTATE/LOCALCODES. WHEREPENETRATIONSTHROUGHFIRERATEDWALLSFORCABLEWAYSHAVEBEEN PROVIDEDFORTHECONTRACTOR,SUCHPENETRATIONSSHALLBESEALEDBYTHE CONTRACTORASREQUIREDBYCODEANDASDIRECTEDBYTUFTSPROJECTMANAGER. THECONTRACTORSHALL,PRIORTOTHECOMMENCEMENTOFONSITEACTIVITIES, SUBMITTOTUFTSFORREVIEW,DETAILSOFANYSPECIALSYSTEMSTOBEUSED.REFER TONATIONALFIREPROTECTIONASSOCIATION(NFPA)LIFESAVINGCODE&ALL STATE/LOCALCODES. THECONTRACTORSHALLATNOTIMEDIRECTTHEWORKOFTUFTSOTHER CONTRACTORS,ORSUBCONTRACTORS,INCLUDINGTHEELECTRICALCONTRACTOR. COMMUNICATIONBETWEENANYOFTUFTSOTHERCONTRACTORSOR SUBCONTRACTORSANDTHECONTRACTORSHALLBEDIRECTEDTHROUGHTUFTS PROJECTMANAGER.ANYREQUESTSFORCHANGESINTHEWORKOFTUFTSOTHER CONTRACTORSSHALLBEMADETHROUGHTUFTS.

2.2

2.3

2.4

2.5

ROADWAYSANDPARKINGAREAS
3.1 THECONTRACTORSHALLMAKEADEQUATEPROVISIONSTOPREVENTUNNECESSARY INTERFERENCEWITHTHEUSEOFPUBLICANDPRIVATEROADS,WALKWAYS,DRIVES ANDPARKINGLOTS.THECONTRACTORSHALLPROVIDEANDMAINTAINSUITABLE DETOURSOROTHERTEMPORARYEXPEDIENTSIFNECESSARY.CLOSINGOFANYROAD ORTHEOBSTRUCTIONOFFIRELANESMUSTBECOORDINATEDWITHTUFTSANDTHE APPROPRIATEFIREANDSECURITYPERSONNEL. THECONTRACTORSHALLREPAIRROADS,WALKWAYSANDOTHERTRAFFICAREAS DAMAGEDBYTHEIROPERATIONS.THECONTRACTORSHALLKEEPTRAFFICAREASAS FREEASPOSSIBLEOFANYSUPPLIES,EQUIPMENTOREXCAVATEDMATERIALSAND SHALLPROVIDETRAFFICBARRIERS,CONSTRUCTIONSIGNS,WARNINGLIGHTS, DIRECTIONALSIGNS,DETOURS,GUARDSANDALLOTHERDEVICESNECESSARYTO PROTECTTHEPUBLIC.WHERENECESSARY,PERSONNELSUCHASPOLICEANDSECURITY PERSONNELSHALLBEEMPLOYEDTODIRECTTRAFFICTHROUGHCONSTRUCTION AREAS.BRIDGINGMATERIALSSUCHASSTEELPLATESWILLBEPLACEDOVEROPEN TRENCHESANDSHALLBEPROVIDEDWHEREVERNECESSARYTOMAINTAINTHEFLOW OFTRAFFIC.

3.2

3.3

ATALLTIMESWHENWORKISNOTACTUALLYINPROGRESS,THECONTRACTORSHALL MAKEOPEN,PASSABLE,ANDMAINTAINTOTRAFFICSUCHPORTIONOFTHEWORKAND TEMPORARYROADWAYSORPORTIONSTHEREOFASMAYBEAGREEDUPONBETWEEN TUFTSANDALLOTHERAUTHORITIESORPARTIESHAVINGJURISDICTIONOVER PROPERTIESINVOLVED.

CONSTRUCTIONPROCEDURES
4.1 THECONTRACTOR,IMMEDIATELYAFTEREXECUTIONOFTHECONTRACTDOCUMENTS, ORBEINGAUTHORIZEDBYTUFTSTOBEGINWORKONTHEPROJECT,SHALLATTHE DIRECTIONOFTUFTSANDWITHINTHEPRESCRIBEDTIMELIMITSBERESPONSIBLEFOR THEPREPARATIONANDDELIVERYTOTUFTSANYPROGRESSSCHEDULESORSCHEDULE OFVALUESWHICHMAYBEREQUIREDBYTUFTSFORTHEWORKHEREINSPECIFIED. THECONTRACTORSHALLPERFORMTHEWORKSOASTOCAUSEAMINIMUMOF INCONVENIENCETOORINTERRUPTIONOFTUFTSOROTHERVENDORSOPERATIONS. ANYANDALLINTERRUPTION(S)OFTUFTSANDTHEIRVENDORSOPERATIONS,BUT NECESSARYFORTHEPERFORMANCEOFTHEWORK,SHALLBENOTEDINTHEPROGRESS SCHEDULE.THECONTRACTORSHALLGIVETUFTSANDITSVENDORSSUFFICIENT ADVANCENOTICEOFSUCHINTERRUPTIONSASTOALLOWTUFTSANDITSVENDORS TIMETOADJUSTTHEIROPERATIONS.THECONTRACTOR'SFAILURETOSUPPLYTUFTS ANDITSVENDORS,WITHATIMELYNOTICEOFSUCHINTENTIONSSHALLPLACETHE RESPONSIBILITYFORANYRESULTINGDELAYSORADDITIONALCOSTSSOLELYWITHTHE CONTRACTOR. IFANYTIMEPRIORTOCOMMENCING,ORDURINGTHEPROGRESSOFWORK,THE LABOR,MATERIALSANDAPPLIANCESUSEDORTOBEUSED,APPEARTOTUFTSAS INSUFFICIENTORIMPROPERFORSECURINGTHEQUALITYOFWORKREQUIREDORTHE REQUIREDRATEOFPROGRESS,TUFTSMAYORDERTHECONTRACTORTOINCREASE EFFICIENCY,ORTOIMPROVEPROGRESS,ANDTHECONTRACTORSHALLCONFORMTO SUCHORDER.THEFAILUREOFTUFTSTOMAKESUCHADEMANDSHALLNOTRELEASE THECONTRACTORFROMTHEOBLIGATIONTOSECURETHEQUALITYOFWORKORRATE OFPROGRESSSPECIFIED. IFAFTERSEVEN(7)DAYSWRITTENNOTICE,THECONTRACTORFAILSTOCORRECTANY VIOLATIONSOFTHEPROVISIONSOFTHESOWORSPECIFICATIONSORTOMAINTAIN THEPROGRESSSPECIFIEDINTHEPROGRESSSCHEDULEORSCHEDULEOFVALUES, TUFTSMAYWITHOUTPREJUDICEOFANYRIGHTSORREMEDYITMAYPOSSESS, TERMINATETHESERVICESOFTHECONTRACTORINWHOLEORINPARTANDTAKE CONTROLOFTHEWORKASCONTEMPLATEDBYTHECONTRACTDOCUMENTSBY WHATEVERMETHODDEEMEDEXPEDIENTBYTUFTS. THECOSTOFSUCHCOMPLETIONINCURREDBYTUFTSINTHEEVENTOFTERMINATION INWHOLEORPARTBASEDONANYSUCHVIOLATIONSORFAILURETOMAINTAIN PROGRESS,SHALLBETHERESPONSIBILITYOFTHECONTRACTOR. ATTHEWORKSITE,THECONTRACTORSHALLMAINTAINANDMAKEAVAILABLETO TUFTS,ONE(1)RECORDCOPYOFALLDRAWINGS,SPECIFICATIONS,ADDENDA,CHANGE

4.2

4.3

4.4

4.5

4.6

ORDERSANDOTHERMODIFICATIONS.THESESHALLBEINGOODORDERANDMARKED CURRENTLYTORECORDALLCHANGESMADEDURINGCONSTRUCTIONANDALL APPROVEDSHOPDRAWINGS,PRODUCTDATAANDSAMPLES.UPONCOMPLETIONOF WORKTHESEDOCUMENTSSHALLBEDELIVEREDTOTUFTS. 4.7 THECONTRACTORWILLBERESPONSIBLEFORALLCUTTING,FITTINGORPATCHING THATMAYBEREQUIREDTOCOMPLETETHEWORKORMAKEITSSEVERALPARTSFIT TOGETHERPROPERLY. THROUGHOUTTHECONSTRUCTIONPROCESS,THECONTRACTORSHALLFURNISHTUFTS ALLNECESSARYASSISTANCETOFACILITATEINSPECTIONS,ORFORTHEEXAMINATION OFANYMATERIALSENTERINGINTOTHEWORK,ORFORANYOTHERPURPOSE REQUIREDINTHEDISCHARGEOFTUFTSDUTIES. WORKMANSHIPANDNEATAPPEARANCESHALLBEASIMPORTANTASTHEELECTRICAL ANDMECHANICALEFFICIENCYOFTHESYSTEM.

4.8

4.9

MATERIALS
5.1 ALLMANUFACTUREDARTICLES,MATERIALSANDEQUIPMENTSHALLBEPROVIDED, APPLIED,INSTALLED,CONNECTED,ERECTED,CLEANED,CONDITIONEDANDTESTEDIN ACCORDANCEWITHMANUFACTURER'SPRINTEDDIRECTIONSANDSPECIFICATIONS, UNLESSOTHERWISESPECIFIEDINTHECONTRACTDOCUMENTS.WHERESUCH DIRECTIONSAREINCONFLICTWITHTHECONTRACTDOCUMENTS,THECONTRACTOR SHALLREPORTSUCHCONFLICTSTOTUFTSWHOSHALLMAKESUCHCOMPROMISESAS DEEMEDNECESSARYANDDESIRABLE.ALLMATERIALSSHALLPERFORMASNEW,SHALL CONFORMTOTHECURRENTAPPLICABLEINDUSTRYSTANDARDS,NEMASTANDARDS, ANDSHALLBEUNDERWRITERSLABORATORIESSTANDARDSLISTEDANDLABELED UNLESSOTHERWISEINDICATED.DEFECTIVEORDAMAGEDMATERIALSSHALLBE REPLACEDORREPAIREDPRIORTOFINALACCEPTANCE,INAMANNERTHATMEETSTHE APPROVALOFTUFTSANDATNOADDITIONALCOSTTOTUFTS.INADDITION,THE LATESTEDITIONSOFTHEFOLLOWINGSTANDARDSARETHEMINIMUM REQUIREMENTS: ASAStandards NationalElectricCode LocalCodes IndustryStandards AllotherapplicableStandards ITSHOULDBENOTEDTHATSOMEORALLMATERIALS,METHODSANDSPECIFICATIONS MIGHTEXCEEDACCEPTEDINDUSTRYSTANDARDS.CONTRACTORISEXPECTEDTOMEET ALLSPECIFICATIONS,ASWRITTEN,REGARDLESSOFWHETHERTHEYEXCEEDTUFTSOR ACCEPTEDSTANDARDS,NORMS,METHODS,ORPRACTICES. THETERMS"FURNISH","PROVIDE"'AND"INSTALL",WHENUSEDINTHECONTRACT DOCUMENTSSHALLBEINTERPRETEDASREQUIRINGTHECONTRACTORTOBOTH FURNISHAND/ORPROVIDETHEMATERIALS,ANDINSTALLIT,UNLESSSPECIFIC

5.2

5.3

REFERENCEISMADETOTHEFURNISHINGORINSTALLINGOFTHEMATERIALSBY OTHERS. 5.4 Takinganynecessarystepssuchaspainting,greasing,installationofrustpreventative oil,coveringetc.toprotectallmaterialfromelements, Protectingallcrossterminalsandothermaterialsfromcorrosionetc.,duetohumidity, precipitation,temperature,atmosphericconditionsandenvironment. 5.5 ADDITIONALLY,THECONTRACTORWILLBERESPONSIBLEFORTHEACCEPTANCEAND INVENTORYOFALLMATERIALSAND,IFREQUIRED,WILLACCEPTANDINVENTORYANY SUPPLIESORDEREDBYTUFTS,INREGARDSTOTHEWORK. ITSHALLBETHERESPONSIBILITYOFTHECONTRACTORTOFURNISHANYSPECIAL INSTALLATIONEQUIPMENTORTOOLSNECESSARYTOPROPERLYCOMPLETETHEWORK. THISMAYINCLUDE,BUTISNOTLIMITEDTO,TOOLSFORTERMINATINGCABLES, TESTINGANDSPLICINGEQUIPMENTFORCOPPER/FIBERCABLES,COMMUNICATION DEVICES,JACKSTANDSFORCABLEREELS,ORCABLEWINCHES. ANYITEMOFEQUIPMENTORMATERIALNOTSPECIFICALLYADDRESSEDINTHE DRAWINGSORINTHISDOCUMENTANDREQUIREDTOPROVIDEACOMPLETEAND FUNCTIONALPREMISESDISTRIBUTIONSYSTEMINSTALLATIONSHALLBEPROVIDEDINA LEVELOFQUALITYCONSISTENTWITHOTHERSPECIFIEDITEMS. THECONTRACTORSHALLBERESPONSIBLEFORKEEPINGALLMATERIALINGOOD CONDITIONUNTILTHENOTICEOFFINALACCEPTANCE,BY:

5.6

5.7

PLANNINGANDDOCUMENTATION
6.1 CONTRACTORMUSTADHERETOALLDESIGN,ENGINEERINGANDINSTALLATION PROCEDURESANDUTILIZEAUTHORIZEDCOMPONENTSINPROVISIONINGTHEWORK. THEPARTIESSHALLHOLDANINITIALPLANNINGMEETINGIMMEDIATELYAFTER EXECUTIONOFTHECONTRACTDOCUMENTSTOCLARIFYALLREQUIREMENTS (SYSTEMS,SERVICES,DISTRIBUTIONMETHODS,ETC.),IDENTIFYRESPONSIBILITIES,AND SCHEDULETHEEVENTSTHATWILLTRANSPIREDURINGTHEIMPLEMENTATIONOFTHE PROJECT.WITHINTWO(2)WEEKSOFTHEINITIALMEETING,THECONTRACTORSHALL PROVIDEAWRITTENREPORTANDPROJECTSCHEDULETOCLEARLYDOCUMENTTHE EVENTSANDRESPONSIBILITIESASSOCIATEDWITHTHEPROJECT. UPONCOMPLETIONOFTHEINITIALENGINEERINGSTAGE,ANDPRIORTOTHESTARTOF CONSTRUCTION,THESELECTEDCONTRACTORSHALLPROVIDETWO(2)DRAFTCOPIES OFENGINEERINGDOCUMENTATION(PRECONSTRUCTIONDRAWINGS)FORAPPROVAL BYTUFTS.TUFTSWILLREVIEWTHEENGINEERINGDOCUMENTATIONWITHINATWO(2) WEEKPERIOD.IFNOREVISIONSAREREQUIRED,THEDOCUMENTATIONSHALLBE FORMALLYACCEPTEDINWRITINGBYTUFTS.ANYREVISIONSSHALLBECOMPLETEDBY THECONTRACTORWITHINATWO(2)WEEKTIMEPERIODANDRESUBMITTEDFOR

6.2

6.3

REVIEW.THESEPRELIMINARYDRAWINGSWILLBEINAFORMATACCEPTABLETO TUFTS. 6.4 UPONCOMPLETIONOFFINALENGINEERING,THECONTRACTORSHALLPROVIDETO TUFTS,FORITSRECORDS,THEFOLLOWING: AdetaileddrawingofalltelecomRooms.Thesedrawingswillincludeall telecommunicationanddatacomponentsand/orapparatusthatresideintheserooms. Allcablesterminatedorsplicedandtheirrouteswillbedocumented.TheContractor willprovidetoTuftsadetailedlayoutofallwallfieldsandframes.

Allcableroutesfromtelecomoutlettoterminationfield. CrossConnectDocumentationProvidecrossconnectrecordsforallvoice,anddata devices,includingdetailedlayoutofterminationfieldsandpatchpanels. RiserDistributionPlanthatincludesallrisercablerouting. CableTray,Conduit,andRacewayPlans CampusDistributionPlan(ifapplicable) BuildingControlPlansinthefollowingformat: One(1)setofcomputerfilesonCDscontainingthedrawingsinAutoCADformat,or Visio,dependingonTuftsrequirements. One(1)setofcomputerfilesofcrossconnectsdocumentationonCDsinExcel form.

6.5

UPONCOMPLETIONOFTHEPROJECT,THECONTRACTORISTOPREPAREASBUILT DOCUMENTATIONWITHAMINIMUMOFTWO(2)POINTSOFREFERENCEFROM PERMANENTFIXTURES,BUILDINGS,PERMANENTWALLS,ETC.:SHOWINGACTUALSITE CONDITIONSANDINSTALLATIONASCONSTRUCTED,ANDPROVIDECOPIESOFSUCH DOCUMENTATIONASISREQUIREDBYTHESOWANDTHESESPECIFICATIONS.FINAL CONTRACTPAYMENTISCONTINGENTUPONEXECUTIONBYTUFTSOFTHENOTICEOF FINALACCEPTANCE,ANDSUCHFINALACCEPTANCEISCONTINGENTUPON,AMONG OTHERTHINGS,RECEIPTOFTHEDOCUMENTATION. INADDITIONTOTHEENGINEERINGDIAGRAMS,THEFOLLOWINGITEMSSHALLBE PROVIDEDBYTHECONTRACTOR:

6.6

CableRecordsandAssignments ProjectManagement

10

LAWS,ORDINANCES,REGULATIONS,CODES,PERMITSANDSTANDARDS
7.1 NOTWITHSTANDINGANYOTHERPROVISIONOFTHECONTRACT,THECONTRACTOR REPRESENTSANDACKNOWLEDGESTHATANYSERVICESREQUIREDTOBEPROVIDEDBY THECONTRACTORHEREUNDERWILLBEPROVIDEDBYPERSONNELKNOWLEDGEABLE OFALLFEDERAL,STATE,COUNTYANDMUNICIPALLAWS,REGULATIONS,CODES, ORDINANCES,INSURANCERATINGORGANIZATIONREGULATIONSANDALLOTHER REGULATIONSANDPRACTICESAPPLICABLEINTHEJURISDICTIONINWHICHTHEWORK ISLOCATED,INCLUDINGBUTNOTLIMITEDTO,ALLHEALTH,SAFETY,ENVIRONMENTAL, BUILDINGANDZONINGCODES,RULESANDREGULATIONS,ANDBYTHIS REPRESENTATIONAGREESTHATSUCHLAWS,REGULATIONS,CODES,ORDINANCES, ORDERSANDRULESWILLBECOMPLIEDWITH.THECONTRACTORANDTHEIR REPRESENTATIVESSHALLENSUREQUALIFIEDTECHNICIANS,CERTIFIEDASREQUIREDBY TRADECOMPLETETHEINSTALLATION,ANDTHATSUCHWORKISPERFORMEDINA QUALITYANDWORKMANLIKEMANNER.THECONTRACTORSHALLFURTHERENSURE ALLMATERIALSANDEQUIPMENTAREPLACED,MOUNTEDCONNECTED,TERMINATED, SPLICED,CROSSCONNECTED,GROUNDEDANDTESTEDINACCORDANCEWITH MANUFACTURER'SSPECIFICATIONSANDRECOMMENDATIONSINSTRICTCOMPLIANCE WITH,INCLUDINGBUTNOTLIMITEDTO,NATIONALELECTRICCODE,MASSACHUSETTS ELECTRICCODE,CITYORTOWNCODES,ANSI&OSHASTANDARDSANDFCC REGULATIONS.SHOULDTHECONTRACTORFAILTOCOMPLYWITHTHESEAPPLICABLE LAWS,REGULATIONS,CODES,ORDINANCES,ORDERS,ANDRULES,THECONTRACTOR AGREESTOBEARALLCOSTSINCURREDINSECURINGCOMPLIANCEWITHSUCHLAWS, REGULATIONS,CODES,ORDINANCES,ORDERSANDRULES.THECONTRACTOR'S ATTENTIONISDIRECTEDTOTHEFACTTHATALLAPPLICABLESTATELAWS,MUNICIPAL ORDINANCES,RULESANDREGULATIONSOFALLAUTHORITIESHAVINGJURISDICTION OVERCONSTRUCTIONOFTHEPROJECTSHALLAPPLYTOTHECONTRACTTHESAMEAS THOUGHHEREINWRITTENOUTINFULL. THEFOLLOWINGDOCUMENTSAREAPARTOFTHESESPECIFICATIONSANDSHALL INDICATEMINIMUMSAFETYPROVISIONS.ALLWORKCALLEDFORINTHESE SPECIFICATIONSAND/ORTHEPLANSTHATEXCEEDTHEMINIMUMSAFETYPROVISIONS SHALLTAKEPRECEDENCE. NationalElectricalCode NationalElectricalSafetyCode NationalFireProtectionAssociation StateandLocalBuildingCodes OccupationalSafetyandHealthAct NationalElectricalManufacturersAssociation BICSIStandards

7.2

11

7.3

REFERENCETOSTANDARDSPECIFICATIONSOFANYTECHNICALSOCIETY, ORGANIZATION,ORTOCODESOFLOCALORSTATEAUTHORITIES,SHALLMEANTHE LATESTSTANDARD,CODE,SPECIFICATIONORTENTATIVESPECIFICATIONADOPTEDAND PUBLISHEDATTHEDATEOFTAKINGBIDS,UNLESSSPECIFICALLYSTATEDOTHERWISE. THECONTRACTORSHALLBEHELDTOBEFULLYINFORMEDOFALLFEDERAL,STATEAND LOCALLAWS,ORDINANCES,BUILDINGRULES/REGULATIONSANDOTHERSTATUTORY PROVISIONS,ALLAREAPPLICABLETOTHEWORKANDTOALLACTIONS,OMISSIONSOR OPERATIONSINTHEPERFORMANCEOFTHEWORK.THECONTRACTORSHALLCOMPLY THEREWITHANDSHALLGIVEALLREPORTS,STIPULATIONSANDREPRESENTATIONS REQUIREDTHEREBYANDSHALLREQUIRESIMILARCOMPLIANCE,REPORTS, STIPULATIONSANDREPRESENTATIONSBYALLSUBCONTRACTORSANDOTHERSWHOM THECONTRACTORSHALLENTERINTOANYCONTRACTAND/ORCOMMITMENT PERTAININGTOTHEWORK. ITSHALLBETHEDUTYOFTHECONTRACTOR,BEFORESTARTINGANYWORK,TO ASCERTAINWHETHERTHESPECIFICATION(S)ANDPROJECTDRAWING(S)AREAT VARIANCEWITHANYSUCHLAWS,ORDINANCES,RULESANDREGULATIONSOROTHER STATUTORYPROVISIONSANDTOIMMEDIATELYNOTIFYTUFTS,INWRITING,OFSUCH VARIANCES,SHOULDTHEYEXIST,TOPERMITPROPERDETERMINATIONBYTUFTSAND TOALLOWAPPROPRIATEMODIFICATIONSASMAYBEREQUIRED.IFTHECONTRACTOR PERFORMSANYWORKKNOWINGITTOBECONTRARYTOSUCHLAWS,RULESAND REGULATIONSANDWITHOUTSUCHNOTICETOTUFTS,THECONTRACTORSHALL ASSUMEFULLRESPONSIBILITYTHEREOFANDSHALLBEARALLCOSTSATTRIBUTED THERETO. WHERETHECONTRACTREQUIRESTHEWORKORANYPARTSOFSAMETOBEABOVE THESTANDARDSREQUIREDBYAPPLICABLELAWS,ORDINANCES,RULES,REGULATIONS ANDOTHERSTATUTORYPROVISIONSPERTAININGTOTHEWORK,THECONTRACTOR WILLIMMEDIATELYNOTIFYTUFTSFORCLARIFICATION. ALLWORKANDMATERIALSWILLCOMPLYWITHALLSTATEANDFEDERALLAWS, MUNICIPALORDINANCES,REGULATIONSANDDIRECTIONOFINSPECTORSAPPOINTED BYPROPERAUTHORITIESHAVINGJURISDICTION.IFTHEREAREVIOLATIONSOFCODE(S) THECONTRACTORWILLCORRECTTHESITUATIONATNOCOSTTOTUFTS.WORKING CONDITIONSMUSTMEETINDUSTRYSTANDARDSFORSAFETYANDWORK PROCEDURES,ANDPROTECTIONOFPROPERTYESTABLISHEDBYPREVAILINGRULES, REGULATIONS,ORDINANCESANDCODES. ALLCONSTRUCTIONSHALLCONFORMTOALLFEDERAL,STATEANDLOCALCODESAS THEYAPPLYTOCONSTRUCTIONORWIRING.PARTICULARCONSIDERATIONISTOBE GIVENTOTHERESTORATIONOFPENETRATEDFIREANDSMOKESTOPPARTITIONS ANDFLOORSLABSTOTHEIRORIGINALCONDITION. IFANYHAZARDOUSMATERIAL,SUCHASASBESTOSISENCOUNTEREDBYTHE CONTRACTORINTHEPERFORMINGOFWORK,THENTHESEMATERIALSSHALLBE HANDLEDINACCORDANCEWITHALLAPPLICABLELOCAL,STATEORFEDERALLAWS,

7.4

7.5

7.6

7.7

7.8

7.9

12

STATUTES,ORORDINANCESPERTAININGTOTHESEMATERIALS.THECONTRACTOR WILLIMMEDIATELYNOTIFYTUFTSOFANYSUCHCONDITION. 7.10 NOTHINGCONTAINEDINTHISDOCUMENT,SPECIFICATIONS,PLANS,SHALLBE CONSTRUEDASTOCONFLICTWITHANYLOCAL,MUNICIPAL,STATE,FEDERALLAW,OR REGULATIONGOVERNINGTHEINSTALLATIONOFTELEPHONEPLANT;ALLSUCHLAWS ORREGULATIONSAREHEREBYMADEPARTOFTHESEDOCUMENTS.THECONTRACTOR ISREQUIREDTOMEETTHEREQUIREMENTSTHEREOFWITHOUTADDITIONALEXPENSE ORHARMTOTUFTS.THEREQUIREMENTSOFALLTHESECONTRACTDOCUMENTSARE THEMINIMUMTHATWILLBEACCEPTED. 7.11 WHEREREQUIRED,THECONTRACTORWILLPAYFORTHESERVICESOFCITY/STATE POLICE,TUFTSSECURITYPERSONNELOROTHERSFORTHEPUBLICSAFETYANDWHERE REQUIREDBYTUFTS/CITY/STATEORDINANCES.

REPORTS
8.1 TESTREPORTSMUSTBESUBMITTEDINELECTRONICFORMAT.HANDWRITTENTEST REPORTSARENOTACCEPTABLE. TUFTSMAYREQUIREHARDCOPYREPORTS,IFSOTHEYARETOBESUBMITTEDIN LABELED3RINGBINDERSWITHAWITNESSSIGNATUREVERIFYINGPASSINGAND EXECUTIONOFALLTESTS. ELECTRONICREPORTSMUSTBESUBMITTEDINCDFORMAT.CDSSHALLCONTAINTHE SOFTWAREREQUIREDTOVIEWTESTRESULTS.ELECTRONICREPORTSMUSTBE ACCOMPANIEDBYACERTIFICATESIGNEDBYANAUTHORIZEDREPRESENTATIVEOFTHE CONTRACTORWARRANTINGTHETRUTHANDACCURACYOFTHEELECTRONICREPORT. CERTIFICATEMUSTREFERENCETRACEABLECIRCUITNUMBERSTHATMATCHTHE ELECTRONICRECORD. TESTREPORTSSHALLBESUBMITTEDWITHINSEVEN(7)BUSINESSDAYSOF COMPLETIONOFTESTING.

8.2

8.3

8.4

CABLEREMOVAL
9.1 CONTRACTORSHALLREMOVEALLABANDONEDTELEPHONE,COMPUTER,ANDCOAXIAL CABLEINEACHBUILDINGASSPECIFIEDBYTHETUFTSPROJECTMANAGER.ALL REMOVALSWILLBEACCOMPLISHEDBYWORKINGFROMTHETELECOMOUTLETBACK TOTHETELECOMROOM(S).THISREMOVALSHALLTAKEPLACEAFTERTHEACTIVATION OFALLNEWLYINSTALLEDCABLESANDEQUIPMENT.ABLANKPLATESHALLBE PROVIDEDANDINSTALLEDBYTHECONTRACTORTOFITOVEROLDWORKBOXES.

10 CLEANUP
10.1 DURINGTHEPERFORMANCEOFTHEWORK,THECONTRACTORSHALLKEEPA REASONABLEDEGREEOFORDERBYDISPOSINGOFDAILYACCUMULATEDRUBBISHAND WASTEMATERIAL,ANDATTHECOMPLETIONOFTHEDAILYWORK,THESITESHALLBE CLEAREDOFALLDEBRIS,LEFTOVERTOOLS,CONSUMABLESUPPLIESANDMATERIAL

13

WHICHMAYHAVEACCUMULATEDANDLEAVEALLAREASOFTHEWORK"BROOM CLEAN",ORITSEQUIVALENT,UNLESSMOREEXACTLYSPECIFIEDBYTUFTS.WHERETHE CONTRACTOR,AFTERRECEIPTOFWRITTENNOTICEASREQUIRED,FAILSTOKEEPTHE AREAOFWORKREASONABLYCLEANANDSAFE,ORFAILSTOCLEANTHISAREAATTHE COMPLETIONOFWORK,TUFTSMAYPERFORMORHAVETHISWORKPERFORMEDBY OTHERS,THECOSTOFWHICHSHALLBEAGAINSTTHECONTRACTOR'SACCOUNTAND MAYBEDEDUCTEDFROMTHESUMSDUEORTOBECOMEDUETOTHECONTRACTOR. ITWILLBETHERESPONSIBILITYOFTHECONTRACTORTOREMOVETHISDAILY TRASH/DEBRISOFFSITE.TUFTSBEARSNORESPONSIBILITYTOPROVIDESPACEFORON SITEDUMPSTERSOROTHERTRASHRECOVERYSYSTEMS. 10.2 ATTHECOMPLETIONOFTHEWORK,THECONTRACTORSHALLRESTORETOITSFORMER CONDITIONALLASPECTSOFTHEPROJECTSITEONADAILYBASIS,SHALLREMOVEALL WASTEANDEXCESSMATERIALS,RUBBISHDEBRIS,TOOLSANDEQUIPMENTRESULTING FROMORUSEDINTHESERVICESPROVIDEDUNDERTHISCONTRACT.ALLCLEANUP, RESTORATION,ANDREMOVALNOTEDABOVEWILLBEBYTHECONTRACTORANDAT NOCOSTTOTUFTS.IFTHECONTRACTORFAILSINITSDUTIESUNDERTHISPARAGRAPH, TUFTSMAYUPONNOTICETOTHECONTRACTORPERFORMTHENECESSARYCLEANUP ANDDEDUCTTHECOSTSTHEREOFFROMANYAMOUNTSDUEORTOBECOMEDUETO THECONTRACTOR.THECONTRACTORWILLPROVIDEDUMPSTERSFORTHEUSEOF REMOVINGTRASHORDEBRIS.ITSHALLBETHECONTRACTORSRESPONSIBILITYTO REMOVETRASHFROMTHEAREASITISWORKINGINANDBRINGTRASHANDDEBRISTO THEDUMPSTER.THECONTRACTORWILLNOTUSEANYOFTUFTSDUMPSTERSOR TRASHDISPOSALWITHOUTPRIORAPPROVALOFTUFTS.

11 POLICEDETAILS
11.1 THECONTRACTORSHALLBERESPONSIBLEFORPROVIDINGANDARRANGINGPOLICE DETAILSFROMCITYPOLICEFORTRAFFICCONTROLANDPUBLICSAFETYISSUESWHEN WORKINGOUTSIDECAMPUSLIMITS. 11.2 THETUFTSPROJECTMANAGERSHALLBERESPONSIBLEFORPROVIDINGAND ARRANGINGPOLICEDETAILSFROMTUFTSPOLICEFORTRAFFICCONTROLANDPUBLIC SAFETYISSUESWHENWORKINGWITHINCAMPUSLIMITS.

12 VOICECUTOVER
12.1 MOSTBUILDINGVOICECUTOVERSCONSISTOFTHEFOLLOWINGPRIORTOACUTOVER:

Anycrosswiring,TERMINATINGortestingthatcanbedonepriortocutoverdateshall beaccomplishedatleast3dayspriortocutover.AllcutsheetstobeprovidedbyTufts. Allprecrosswiring/testingwillincludeallaspectsoftheproject. Whenrequired,ContractorwillpreterminatetheBDFendofthevoicetiecablefrom theoutsideplantprotection3DAYSPRIORTOCUTOVER. 12.2 MOSTBUILDINGVOICECUTOVERSCONSISTOFTHEFOLLOWINGDURINGACUTOVER:

14

Terminatingtheprotectionendofthevoicetiecable. Carefulvisualinspectionsofeachroomtoinsureallvoicerequirementshavebeen wired.ThiswillincludeFAX,alarms,modemsetc. Removaloftelephonelinecordfromoldjackandplacingitintothenewjack. WhileContractorplacesexistingtelephonecordtonewoutlet,Contractorwillcheck oldjacktoinsurenothingisbeingfedfromoldoutletVoice#2. Verificationofproperoperationoftelephoneset(setisworkingwithnostatic)andthat thepropernumberisassignedtotheset.Thiswillbeverifiedbycallingadigitaldisplay set,whichshallbeprovidedbyTufts. TheContractorshallkeeptrackoftimespentresolvingtroublesthatarerelatedtothe outsideplantportionofthecutovertobebilledathourlyrateasquotedunderunit prices. 12.3 MOSTBUILDINGVOICEPOSTCUTOVERSCONSISTOFTHEFOLLOWING:

Contractorwillprovidetheminimumoftwo(2)workersonthefirstbusinessday followingacutover.Theseworkerswillberesponsibleforallproblemsthatrelatetothe workortesting.

15

13 FINALACCEPTANCE
13.1 ONCEALLWORKHASBEENCOMPLETED,TESTDOCUMENTATIONHASBEEN SUBMITTED,ANDTUFTSISSATISFIEDTHATALLWORKISINACCORDANCEWITHTHE CONTRACTDOCUMENTS,TUFTSSHALLPROVIDECONTRACTORWITHANEXECUTED NOTICEOFFINALACCEPTANCE. 13.2 EXPLANATIONOFTHEITEMSINCLUDEDASPARTOFTHEFINALACCEPTANCE; 13.2.1 Asbuiltinformation: 13.2.2 WorkmanshipInspection; 13.2.3 Electricaltests 13.3 INTHEINSTANCEWHEREANYCOMPONENTFAILSTHEAPPROPRIATETEST,THE CONTRACTORSHALLREPAIRTHEFAULTYCIRCUITANDRETEST. 13.4 INORDERTOSAVETIMEITISEXPECTEDTHATTHECONTRACTORWILLHAVECHECKED THEWORKMANSHIPANDCOMPLETELYCHECKEDALLCONNECTIONSPRIORTOTHE ACCEPTANCETEST.TUFTSSHALLAPPROVETHEACCEPTANCETESTMETHODBEFORE TESTINGBEGINS.THECONTRACTORMAYBEREQUIREDTOREPEATANYTESTSWHICH WEREPERFORMEDWITHOUTTHEAPPROVALOFTHETUFTSPROJECTMANAGER.THE TESTSHALLBEDIVIDEDINTODISCRETEAREASCORRESPONDINGTOTHEFLOORS,AND CANBEPERFORMEDINANYCONVENIENTORDER.

14 WARRANTY
14.1 CONTRACTORMUSTWARRANTINWRITINGTHAT100%OFTHEINSTALLATIONMEETS THESTANDARDSANDREQUIREMENTSSPECIFIED. 14.2 ACCEPTANCESHALLBESUBJECTTOCOMPLETIONOFALLWORK,SUCCESSFULPOST INSTALLATIONTESTINGWHICHYIELDS100%PASSRATING,ANDRECEIPTOFFULL DOCUMENTATION. 14.3 TUFTSRESERVESTHERIGHTTOCONDUCT,USINGCONTRACTOREQUIPMENTAND LABOR,ARANDOMRETESTOFUPTOFIVE(5)PERCENTOFTHECABLEPLANTTO CONFIRMDOCUMENTEDRESULTS.ANYFAILINGCABLINGSHALLBERETESTEDAND RESTOREDTOAPASSINGCONDITION.INTHEEVENTMORETHANTWO(2)PERCENTOF THECABLEPLANTFAILSDURINGRETEST,THEENTIRECABLEPLANTSHALLBERE TESTEDANDRESTOREDTOAPASSINGCONDITIONATNOADDITIONALCOSTTOTUFTS. 14.4 SYSTEMCERTIFICATION ContractorshallwarrantInstallationagainstallproductdefects,andthatallapproved cablingcomponentsmeetorexceedtherequirementsofthisdocumentfortheextent oftheManufacturerswarrantyperiod.Uponsuccessfulcompletionoftheinstallation andsubsequentinspection,thecustomershallbeprovidedwithanumberedcertificate, fromthemanufacturingcompany,registeringtheinstallation.
16

14.5 20YEAREXTENDEDPRODUCTWARRANTY The20YearExtendedProductWarrantyshallensureagainstproductdefects,thatall approvedcablingcomponentsexceedthespecificationsofTIA/EIA568AandISO/IECIS 11801,exceedtheattenuationandNEXTrequirementsofTIA/EIATSB67andISO/IECIS 11801forcablinglinks/channels,thattheinstallationwillexceedthelossand bandwidthrequirementsofTIA/EIATSB67andISO/IECIS11801forfiberlinks/channels, foratwenty(20)yearperiod.Theendtoendpassiveproductsolutionshallbecapable ofdelivering1Gbpstotheworkstation.ThewarrantyshallapplytoallpassiveSCS components. The20YearExtendedProductWarrantyshallcoverthereplacementorrepairof defectiveproduct(s)andlaborforthereplacementorrepairofsuchdefectiveproduct(s) foratwenty(20)yearperiod. 20YearApplicationAssurance.The20YearApplicationAssuranceshallcoverthefailure ofthewiringsystemtosupporttheapplicationwhichitwasdesignedtosupport,aswell asadditionalapplication(s)introducedinthefuture,upto1Gbpsparalleltransmission schemes,byrecognizedstandardsoruserforumsthatusetheTIA/EIA568AorISO/IEC IS11801componentandlink/channelspecificationsforcabling,foratwenty(20)year period.

17

WiringSpecifications
15 GENERALREQUIREMENTS
15.1 WIRINGTOPOLOGYWILLBESTARWITHHOMERUNCABLESFROMTHETELECOM ROOMSTOTHETELECOMOUTLETS.THETUFTSPREMISEWIRINGISDESIGNEDTO SUPPORTHIGHSPEEDDATAAPPLICATIONS,USINGUNSHIELDEDTWISTEDPAIR CABLING.THETELECOMOUTLETSANDDISTRIBUTIONFRAMESAREARRANGED ACCORDINGTOTHESERVICEBEINGPROVIDED. 15.1.1JackandCableSpecificationsandColors Voice: o CableApproved4pairULCategory5eCM,CMRorplenum,Systimax1061or 2061,colorwhite. o OutletMPS100E,White Data: o CableApproved4pairULCategory6(Gigaspeed)CM,CMRorplenum, Systimax1071Eor2071E,colorGreenforData,colorGrayforDataCenter. o OutletMGS400,Green Wireless: o CableApproved4pairULCategory6(Gigaspeed)CM,CMRorplenum, Systimax1071Eor2071E,colorLilac. o OutletDirectterminationofthecablewithaRJ45connectorpluggeddirectly intotheaccesspoint.Ifanoutletisrequired,itshallbeaMGS400,Violetin color. 15.2 TUFTSPREMISEWIRINGMUSTCONFORMTOOREXCEEDEIA/TIASTANDARD568B, THEAPPROPRIATEULSTANDARDREQUIREMENTFOREACHCATEGORY,ASWELLAS COMPLYWITHTHENATIONALELECTRICALCODE,NFPA70(2000EDITION),ARTICLE 800,ANDALLAPPLICABLESTATECODESANDLOCALBUILDINGCODES.ALLCABLE MUSTBEULLISTEDFORTHEINTENDEDPURPOSE.ALLCABLINGTYPESINSTALLEDBY THECONTRACTORMUSTBEONEOFTHEAPPROVEDTYPESASLISTEDBELOW.THE CONTRACTORSHALLMAKENOSUBSTITUTIONSINCABLETYPESUNLESSWRITTEN APPROVALISRECEIVEDFROMTUFTSPROJECTMANAGERPRIORTOTHEINSTALLATION OFANYSUBSTITUTECABLE.CABLETYPESSHALLBECONSISTENTTHROUGHOUTTHE PROJECT. 15.3 CONTRACTORMAYBEREQUIREDTOMOVEFURNITUREANDOTHERITEMSFORTHE INSTALLATIONOFCABLESANDOUTLETS.WHENFURNITUREISMOVED,ITWILLBE IMMEDIATELYRETURNEDTOITSORIGINALLOCATIONWHENTHATPARTICULAR OPERATIONISCOMPLETED.FURNITUREWILLNOTBELEFTFROMITSORIGINAL LOCATIONFORANYEXTENDEDLENGTHOFTIME,ESPECIALLYOVERNIGHT.

18

15.4 LABELING

Alllabelingshallbetypedorelectronicallyprinted. Alltermination,protection,splice,patchpanelhardware,etc.shallbelabeledandthe labelsshallcontainthedistributionandfeedpoints. AllwirelessaccesspointsshallhaveaTOI.D.labelattachedtotheunitsothatitis visiblewithoutdisturbingtheunit.

16 TELECOMOUTLETS
16.1 ALLDATAPRODUCTSTOMEET/EXCEEDSYSTIMAXGIGASPEEDXLSOLUTION,ALLWIRE IS24GAUGE4PAIR 16.2 JACKCOLORCODE

WhiteAllvoiceexceptPublicSafetycircuits GreenData YellowPublicsafety BlackVideo GrayDataCenter RedFireAlarmcircuits VioletPoweroverEthernet/Wireless BlueRetired OrangeNotused

16.3 STANDARDCONFIGURATIONS OfficeAreas 1SystimaxCat5e(Voice) 1SystimaxCat6(Data) ExceptionWhenplacingcableisdifficult,suchasoverspline/permanentceilings,consider placinganadditionaldatacablewhichwillaccommodategrowth. Classrooms,LectureHalls,Labbenches 1SystimaxCat6(Data)perseat 2SystimaxCat6(Data)Podium

Wallphones 1SystimaxCat5e(analog)

AlarmsSeeAppendix1attheendofthisdocument

Elevators 1SystimaxCat5e(analog)with1RJ31x

EmergencyPhone(Ramtech) 1SystimaxCat5e(analog)

19

Payphones 1SystimaxCat5e(analog)

StandAloneFax 1SystimaxCat5e(analog)

AnalogCreditCardSwipes 1SystimaxCat5e(analog)

CardReaderControlPanels 1SystimaxCat5e(analog)&2SystimaxCat6(data)

Standalonenetworkprinters 1SystimaxCat6(data)

Wireless 1SystimaxCat6(data) 16.4 ICONS

ThefollowingcolorediconsshallbeinstalledforallMPS100E&MGS400seriesoutlets; VoiceWhite DataGreen BlackVideo RedFireAlarmcircuits YellowPublicSafety GrayDataCenter VioletPoE/Wireless 16.5 WALLPLATES

TheContractorshallsupplyandinstalleitheroldworkboxesorboxeliminatorsand installtheappropriateSystimaxwallplateandinserts.Ifboxeliminatorsareused, priortotheirinstallationTuftsmustapprovethetypeandinstallationmethod. Tuftswillhaveavarietyofwallplateconfigurationsfordesktopequipment,ranging fromasinglejackwallplateuptoa5jackwallplate.Thewallphoneplatesshallbe mountedat48AFF.Thestandardwallplateshallbemounted18inchesAFF. Markingofwallplatesshallbewithelectronicallyprintedortypedlabels.Thetoplabel shalllisttheproperTuftsbuildingnumberfollowedbythejacknumber(i.e.M023101 A,whereM023referstoMedfordbuildingnumber023and101Aisthefirstoutlet startingfromlefttorightlocatedinroom101)Thelabelingofjacksshallincorporatethe roomnumberfollowedbyanalphabeticalassignment(separatedbyadash)starting fromlefttorightasyouenterthedoor(101A,101B,101C)wouldindicatethreejacks locatedinRoom101).Thebottomlabeloneachworkstationoutletshalllistoffirst terminationpointofthehorizontalstationcabling(i.e.anoutletlabeledTRRoom115

20

atthebottomoftheoutletwouldindicatethatthehorizontalcablingtothisoutletwas terminatedatTRRoom115).Tuftsshallapprovethelabelingofworkstationoutlets beforelabelingisstarted. 16.5.1 SystimaxFacePlatesandinserts.


Item FacePlate,SingleGang FacePlate,DoubleGang Insert,2Port Insert,1Port Insert,Blank TheXXXrepresentsthecolor Part# M13FPXXX M26FPXXX M30FP2RJ45XXX M30FP1RJ45XXX M30FP1BLNKXXX Color White Black Ivory Gray Cream Part# 262 003 246 270 215

21

17 VOICETERMINATIONS
17.1 VOICETERMINATIONSATTHEDISTRIBUTIONFRAMESSHALLBEMADEONSYSTIMAX 110HARDWAREASSHOWNONASSOCIATEDDRAWINGS.THEFRAMESSHALLBELAID OUTINSECTIONS,CORRESPONDINGTOTHEWORKSTATIONLAYOUTS(I.E.,ATTHETOP OFTHEFRAME,ALLVOICESTATIONCABLES,ROOM#&JACKNUMBER.THEJACK ORDERSHALLBEBYFLOOR,INASCENDINGORDER(I.E.1STFLOORATTHETOP,2ND FLOORNEXT,ETC.).110BLOCKSONWALLFIELDSHALLBESIZEDTOALLOWFOR100% GROWTHFOREXPANSIONPURPOSES. 17.2 110AHARDWAREWILLBEEITHER100PAIROR300PAIR.ALLCLIPSWILLBE110C4 WITH1110C5ATTHEENDOFEACHROW. 17.3 ALL110HARDWAREVOICESTATIONSWILLBELABELEDWITHWHITE110STRIPS. 17.4 ALLPUBLICSAFETYCOPPERCIRCUITSWILLTEMINATEONASEPARATE110BLOCK WHICHWILLHAVEAYELLOWDESIGNATIONSTRIP.SPECIFICCIRCUITSTOBE TERMINATEDONTHISBLOCKINCLUDE; 17.4.1 FireAlarm 17.4.2 BurglarAlarm 17.4.3 RamtechPhones 17.4.4 CarbonMonoxide(CO),Heat,&SmokeDetectors 17.4.5 RedEmergencyPhones 17.4.6 ElevatorPhones 17.4.7 PanicButtons

18 DATATERMINATIONS
18.1 DATATERMINATIONSSHALLBEONSYSTIMAXPATCHPANELS(GIGASPEEDCATEGORY 6)MOUNTEDIN19INCHTELECOMRACKSASPERROOMLAYOUTDIAGRAM,EITHER24 OR48PORTS.DATATERMINATIONSWILLBEINSTALLEDONSYSTIMAXVISIPATCH WHENINDICATED. 18.2 ALLDATASTATIONSWILLBELABELEDPERTUFTSLABELINGSTANDARDWITHBLUE TYPEDORELECTRONICALLYPRINTEDSTRIPS. 18.3 CATEGORY5E&CAT6CABLESSHALLBETERMINATEDSOASTOMAINTAINTHEIR TWISTTOWITHIN1/2OFTHEIDCCONTACT.NOSPLICESWILLBEALLOWEDBETWEEN THEWORKSTATIONOUTLETANDTHETELECOMMUNICATIONSWIRINGROOM.

22

19 CORDS
19.1 DATASTATIONCORDSYSTIMAXGS8EGIGASPEEDXLMODULARPATCHCORD(GREY), STANDARDLENGTHSARE7AND14.OTHERLENGTHSMAYBESPECIFIEDBYTHETUFTS PROJECTMANAGER. 19.2 EQUIPMENTCORDSYSTIMAXGS8EGIGASPEEDXLMODULARPATCHCORD,GREEN FORDATA,LILACFORPOE,LENGTHSHALLBEAPPROPRIATEFORLOCATIONANDNOT LONGERTHANONEFOOTINEXCESS. 19.3 ACCESSPOINTCORDSYSTIMAXGS8EGIGASPEEDXLMODULARPATCHCORD,LILAC

20 CABLEINSTALLATION
20.1 THISAPPLIESTOALLVOICE/DATA/ALARMS/FAX/CIRCUITSETC.THATOPERATEOVER THECOPPER/FIBERSYSTEMTHATRESIDEINTHEBUILDING. 20.2 THELENGTHOFEACHINDIVIDUALRUNOFHORIZONTALCABLEFROMTHE TELECOMMUNICATIONSROOMONEACHFLOORTOTHETELECOMMUNICATIONS OUTLETSHALLNOTEXCEED295FT(90M). 20.3 EACHRUNOFCABLEBETWEENTHETERMINATIONBLOCKANDTHE TELECOMMUNICATIONSOUTLETSHALLBECONTINUOUSWITHOUTANYJOINTSOR SPLICES. 20.4 IFTHEINTERIOROFWALLSARENOTOBSTRUCTED,THECONTRACTORSHALLCONCEAL HORIZONTALDISTRIBUTIONWIRINGINTERNALLYWITHINTHEWALLS.IFSUCH OBSTRUCTIONSEXISTTHENTHECONTRACTORSHALLSECUREAPPROVALBYTUFTS PRIORTOTHEUSEOFANYALTERNATEMETHODSUCHASWIREMOLD/CONDUITETC. 20.5 THECONTRACTORSHALLBERESPONSIBLEFORINSTALLINGALLREQUIREDCABLE ENTRANCE/EXITHOLES,VERTICALLYANDHORIZONTALLY,UPTOANDINCLUDING4. MOSTOFTHESEPENETRATIONSWILLBEFORSTATIONTYPECABLINGANDWILLHAVE THEAPPROPRIATESIZESLEEVE.ALLPENETRATIONSWILLBEFIRESEALEDPER NATIONALELECTRICCODEANDALLSTATE&LOCALCODES.ALLSLEEVESAND CONDUITSSHALLCONSISTOFEMT(UNLESSOTHERWISENOTED)WITHNONMETALLIC BUSHINGSONBOTHENDS.ALLRACEWAYSYSTEMSSHALLBEMETALLICWIREMOLD BRAND.AVARIETYOFWIREMOLDSERIES,RANGINGFROMSERIES700TOSERIES4000 WILLBEUSED,WHENINDICATED.ALLWIREMOLDJUNCTIONBOXESSHALLBEIVORYIN COLOR(UNLESSOTHERWISESPECIFIEDINTHESCOPEOFWORK).SURFACEMOUNT WORKSTATIONOUTLETBOXESSHALLBEWIREMOLDTYPEV5745(IVORY).WIREMOLD SHALLBECONTINUOUSWITHOUTGAPS.ALLELBOWS,TEES,REDUCERS,ETC.SHALLBE MADEWITHFACTORYMANUFACTUREDFITTINGS,PROVIDEDTHATTHE MANUFACTURERMAKESTHESPECIFICFITTING.APPLICATIONSUSINGNONFACTORY MANUFACTUREDFITTINGSARETOBEAPPROVEDINADVANCEBYTHETUFTSPROJECT MANAGER.NOCABLINGSHALLBEEXPOSEDUNLESSOTHERWISESPECIFIEDONTHE PROJECTPLANS.

23

20.6 HORIZONTALWIRINGFROMTELECOMROOMSTOTELECOMOUTLETSSHALLBE4PAIR CABLESTHECONTRACTORSHALLMAINTAINDISTANCESFROMPOWERANDLIGHTING CONDUCTORSASSPECIFIEDBELOW:STATIONCABLESANDTIECABLESINSTALLED WITHINCEILING/WALLS/FLOOR/RISERSPACESSHALLBEROUTEDTHROUGHTHESE SPACESATRIGHTANGLESTOELECTRICALPOWERCIRCUITS. Lighting12" Unshieldedpowercable>2KVA5" Unshieldedpowercable>5KVA36"

20.7 COPPERCABLESSHALLBEROUTEDSOASTOMAINTAINAMINIMUMBENDRADIUSOF 6TIMESTHECABLEDIAMETER.VELCROWRAPSUSEDTOBUNDLECABLESSHALLBE PULLEDSNUGBUTNOTCINCHEDSOTHATTHECABLESINTHEBUNDLEARENOT COMPRESSED.THELENGTHOFTHEVELCROTIEWRAPSHOULDOVERLAPTHESIZEOF THECABLEBUNDLEBEINGWRAPPEDBY8TOALLOWFORGROWTH.PLASTICTIE WRAPSARENOTTOBEUSED. 20.8 CABLESBUNDLESSHALLBEWRAPPEDATINTERVALSOF18IN.ALLCABLERUNSSHALL BEPARALLELORPERPENDICULARTOWALLSANDFLOORS.WHENCROSSING CORRIDORS,CABLESSHALLBETIEDINABUNDLEANDSUPPORTEDOVERTHE CORRIDORCROSSINGSOTHATREMOVALOFANYTILEWILLNOTCAUSETHEBUNDLE TODRAPEBELOWTHECEILINGLINE.NOLOOSECABLESSHALLBELAIDONTHEDROP CEILINGS.CABLESMUSTBEATLEAST4ABOVEREMOVABLECEILINGTILES. 20.9 ATNOTIME,EXCEPTDURINGACTUALCABLEPULLINGOPERATIONS,WILLCABLESBE LEFTHANGINGOUTOFCEILINGSORCOILEDINHALLWAYS,OFFICESETC.IF REQUIRED,CONTRACTORWILLLEAVESLACK/COILSABOVECEILINGS,PROPERLY MAINTAININGTHEIRBENDRADIUS.INTELECOMROOMS,THECONTRACTORWILLNOT LEAVECABLESONTHEFLOORORALLOWCABLESTOHANGINCOILS.ALLSLACKIN CABLESWILLBECOILEDANDLEFTABOVECEILING.DONOTLAYDATACABLESDIRECTLY ACROSSCEILINGTILES,GRIDS,ORFIXTURES.USECABLETRAYOROTHERMETHODSTO SUPPORTTHECABLESANDKEEPTHEMATLEAST6INCHESABOVETHECEILINGGRID. 20.10 DURINGINSTALLATION,CONTRACTORWILLPROTECTCABLESFROMBEINGSTEPPED ON.THISAPPLIESTOALLAREAS,INCLUDINGHALLWAYSANDTELECOMROOMS. 20.11 ALLWIRING,INCLUDINGCOPPERANDFIBERJUMPERS,ETC.RUNNINGALONGTHE WALLORPLYWOODBACKBOARDSHALLBESECUREDTOTHEBACKBOARDORWALLS OFTHETELEPHONEROOMS/HALLWAYS,ETC.,USINGAMETHODTOBEAPPROVEDBY TUFTS.CABLESUPPORTSSHALLBEUSEDTOPREVENTSTRAINONTHECONDUCTORS, SUPPLEMENTEDBYSTRAINRELIEFATCONNECTORTERMINATIONPOINTS.SUPPORT HORIZONTALCABLEBUNDLESUSINGBROADSUPPORTSLIKEJHOOKSORCABLE TRAYS.AVOIDUSINGNARROW"BRIDLERINGS"SINCETHEYTENDTOCRUSHTHE DELICATECABLES. 20.12 ALLSTATIONENDCABLEBUNDLESSHALLHAVEATLEAST18"OFSLACKCOILEDUPAND STOWEDINANAREATHATISACCESSIBLEANDHIDDENFROMVIEW.THIS18OFSLACK WILLBEASCLOSEASPOSSIBLETOTHESTATIONENDOFTHERUN.ATTHETELECOM

24

ROOMEND,THECONTRACTORWILLLEAVE10OFSLACKLOCATEDATORNEARTHE TELECOMROOM. 20.13 TOAVOIDSTRESSINGCONDUCTORS,LIMITPULLINGTENSIONTO25POUNDSORLESS ASSPECIFIEDBYTHEEIA/TIA568BSTANDARD.INADDITION,PULLCABLESGRADUALLY ANDWITHCONSTANTTENSION,TAKINGCARENOTTOCRUSHORPINCHBUNDLES.BE PARTICULARLYCAREFULWHENPULLINGCABLESAROUNDCORNERS,WATCHINGOUT FORNAILSANDSHARPEDGESTHATCOULDDAMAGETHEINSULATION. 20.14 THECONTRACTORSHALLMARKEACHCABLESHEATHWITHTHEROOM,PLATELETTER, ANDCABLETYPEATTHEENDOFEACHCABLE(E.G.101AV1SIGNIFIESROOM101, PLATEA,VOICE1CABLE).ONLYINDELIBLE,CLEARLYPRINTEDLABELSORMARKINGS SHALLBEACCEPTABLE. 20.15 WHENCABLELUBRICANTISUSED,READINSTRUCTIONSTOBESUREITISCOMPATIBLE WITHTHECABLESJACKETMATERIAL(PVCORFEP). 20.16 DONOTSPLICEORREPAIRDAMAGEDCABLESBETWEENTHETELECOMROOMAND OUTLETLOCATIONS.IFREQUIRED,PULLANEWCABLE. 20.17 USEGROMMETSTOPROTECTTHECABLEWHEREPASSINGTHROUGHMETALSTUDSOR ANYTHINGTHATCANPOSSIBLYCAUSEDAMAGETOTHECABLES.

21 PANELSANDTERMINATINGEQUIPMENT
21.1 EQUIPMENTRACK(S)FORDATAWILLACCEPTNINETEEN(19)IN.RACKMOUNTABLE, 24/48PORT8PINMODULARTOINSULATIONDISPLACEMENTCONNECTOR(IDC) MEETINGCATEGORY6PERFORMANCESTANDARDS,ANDPINNEDTOT568B STANDARDS. 21.2 EQUIPMENTRACKSSHALLBECHATSWORTH7X19(BLACK)WITH,CHATSWORTH19 UPPERTRANSITIONTRAYFORFIBEROPTICCABLES,CHATSWORTH7HX6DOUBLE SIDEDWIDEVERTICALCABLINGSECTIONS,ANDCHATSWORTH12CABLERUNWAY RADIUSDROPS.ALLEQUIPMENTWILLBECOLOREDBLACK. 21.3 TELECOMROOMLADDERRACK/CABLETRAYSHALLBE12BLACK(UNLESSOTHERWISE SPECIFIED).THESECTIONTHATLIESDIRECTLYOVERTHETOPSOFTHERACKSSHALLBE CHATSWORTHALTERNATESPACECABLERUNWAY.RODSANDANCHORSWILL SUPPORTRACKFROMCEILING,WALLPLATESWILLSUPPORTALLENDSTHATMEET WALLS.ENDCAPSWILLBEUTILIZEDONBOTHENDS.EACHEQUIPMENTRACKSHALLBE SECUREDTOLADDERRACKVIACLAMPSANDRODS. 21.4 CABLETRAYWILLBECONTINUOUSFROMTHEENTRANCEPOINTOFTHECONDUIT(S) ORSLEEVE(S)INTOTHETELECOMROOMOVERTOTHETOPOFTHECABLINGRACKS. REFERTOROOMLAYOUTDIAGRAMSPROVIDEDBYTUFTSFORADDITIONALDETAIL. 21.5 SLEEVESSHALLBE4EMTWITHNONCONDUCTIVEBUSHINGSONEACHENDINTOTHE ROOMFORHORIZONTALCABLEACCESSASPERTELECOMROOMLAYOUTDIAGRAM
25

PROVIDEDBYTUFTS.THESLEEVESSHALLBEATTACHEDTOTHECEILINGUSINGMETAL STRUTSANDSUPPORTS. 21.6 DATA SystimaxPatchmaxGS324or48Port Onepanelforalldataterminations o Exception:IftelecomroomislaidoutusingaseparatepanelforData2,3,4&5 jacks,thennewinstallationshallbethesameifterminatingonexistingpanels,if newpanelsareaddedthenallterminationsshallbeononepanel. OnePanelforallwirelessaccesspointterminations 21.7 VOICEWALLFIELD

Systimax110AB100FTor300FT

22 EQUIPMENTRACKS
22.1 THESTANDARDEQUIPMENTRACKSHALLBETHECHATSWORTH4POSTQUADRARACK. IFADDITIONALRACKSAREREQUIREDTHEYSHALLBECHATSWORTH2POST19RACKS.

23 COPPER
23.1 RISERVOICEOROTHERANALOG Systimaxcertified24gaugeARMM Systimax24gauge1010(PVC)or2010(Plenum)RefertoEIA/TIA607Grounding 23.2 SIZING RiserSizingShouldbebasedontotal#ofundergroundpairs,plus50%growthrounded tothenext100pair 23.3 CROSSWIRING Voicepairswillbecrosswiredasneeded,notprewired. 23.4 BACKBONE 23.4.1 Solidcopper,24AWG,twistedpairbackbonecable,insizesasindicatedonthe drawings,withthefollowingminimum/maximumspecifications: Characteristicimpedance100ohmsat1MHz. Attenuation7.9dBmaximumper1000ftat1MHz.
26

ListedTypeCM,CMR,CMP,MPRand/orMPP(selectcabletype required). 23.5 IDENTIFICATION Provideprelabeledcablecount(HouseCount)insteadofoutletnumberonriserpatch panel. 23.6 PROTECTION 23.6.1 HCs Systimax489TypeProtectorfrom25pairto100minimumfuse4B1EW,suggested 4C1SSolidState Systimax110ANATypeProtectorfrom6to25pairminimumfuse4B1EW,suggested 4C1SSolidState 23.6.2 MainSwitchRoom/Nodes Systimax190/195TypeProtectors4C1SSolidState 23.6.3 TuftsLabelingColorCode Thefollowingchartdepictsthecolorcodingforterminationofallcoppercables: White VoiceStationTerminations,1stLevelBackbone(ISP),HouseRiser Gray 2ndLevelBackbone(OSP) Blue DataJacks,WirelessJacks Brown InterBuildingBackbone(OSP) Yellow PublicSafety(Alarms,RamtechPhones,SmokeDetectors,PanicButtons,Red EmergencyPhones,etc.)

27

23.7 COPPERTESTRULES Everypairineverycablewillbetestedatthefollowingfrequenciesandataminimum, ContractorwillmeetthestandardsofANSI/TIA/EIA568B.1DraftJune01,2001and abovementionedSYSTIMAXSpecifications: Nocablingorcomponentsshallbemovedduringthetests. Inadditiontopass/failindications,theactualmeasuredvalues(atwhateverfrequency taken)shouldberecordedintheadministrationsystemforuseinfutureconfiguration oranalysesofthepremisesnetwork. NEXTandFEXTmustbemeasuredfrombothendsofacablerun. Reconfigurationwillrequireretesting. Qualifiedadaptercordsshallbeusedtoattachthetestinstrumentstothelinkunder inspection. Inachannel,enduserpatchcordsshallbetestedinplace.Enduserpatchcordsmaybe verifiedbyinsertingtheusercordsinthelinkundertestatthecrossconnect.Allowance willbemadefor10metersofequipmentandpatchcordage,andjumpersforthe channel.(5metersoneachendisassumed. UTPtestleadsandassociatedconnectinghardwaretoconnectbetweenthetest equipmentandthelinkundertest,shallbe0.5mm(24AWG)andshallbetakenfrom cablethatmeetsorexceedstherequirementsforCategory5e/CAT6cablesspecifiedin TIA568A. Coaxialcableassembliesbetweennetworkanalyzerandbalunsshouldbeasshortas possible,preferablynotexceeding0.6m(24in)each. Ifarunbarelypasses(theresultiswithinthetester'saccuracylimit),thedatamust carryawarning(suchasanasterisk)toindicatethattheresultwasmarginal ThefieldtestermustmeettheTSB67accuracyrequirementsforLevel1or2.Tester AccuracyLevelsIandIITestershavebeencategorizedbyTSB67intotwolevelsof accuracy: LevelItestersarethoseavailablebeforeTSB67aspublished,andarenotas accurateaspoststandardfieldtestersare. LevelIItestersareclosertolaboratorygradeandthusmoreaccurate,sotheypass fewer'bad'runsandfailfewer'good'runs.

ParametersThatCategory5e/CAT6TestersMustBeAbleToTestForTheTSB67 testingspecificationrequiresthefollowingtests: Lengthforallpairsofaninstalledlink


28

Attenuation NEXT Thedelayonallpairsofaninstalledlink

TesterMustHaveFeatures: ACategory5e/CAT6Testermustbecapableofmeasuringallrequireddataand havea310meterrangetoallowforapproximatemeasurementsofavailablecable onspools.Theunitshouldalsocomewithmanufacturer'sinformationonhowto interpretdatawiththedevice. Category6testingrequirementsforcomponents,linksandchannelsarenow extendedto250MHztosupportarequestfromIEEE(June1998).Thisdoesnot changetheoriginalcategory6channelrequirementofpositivepowersumACRat 200MHz,butservesasasanitychecktoensuretransmissionperformancedoesnot dropabruptlybeyond200MHz.

23.8 TESTINGCAT5E&6CABLES TermsandSpecificationDefinitions

29

Delayisthemeasureoftimerequiredforasignaltopropagatefromoneendofthe circuittotheother. PropagationDelaySkewisthedifferencebetweenthepropagationdelayonthefastest andslowestpairsinaUTPcable.Worsecaseskewmustbekeptunder30nanoseconds @200.0MHz. NearEndCrossTalkLoss(NEXT),istheportionofthetransmittedsignalthatiselectro magneticallycoupledbackintothereceivedsignal.NEXTmustbetestedfromboth ends. AttenuationtoCrossTalkRatio(ACR),isthedifferencebetweentheCrossTalkLossand theattenuationofthetestedpair.Inotherwords,howmuchoverheadbetweenthe sizeofthesignalatthereceiverandthesizeofcrosstalk. PowerSumNearEndCrossTalkLoss(PSNEXT)isacalculation,notameasurement.Itis derivedfrommathematicalsummationoftheindividualNEXTeffectsoneachpairby theother3pairs. FarEndCrosstalkLoss(FEXT)similartoNEXT,exceptthesignalissentfromthelocal endandcrosstalkismeasuredatthefarend.FEXTmustbemeasuredfrombothends. EqualLevelFarEndCrossTalk(ELFEXT)subtractsattenuationfromFEXTresults,sothat theresultisnormalizedforattenuation(length)effects.Itrequiresfieldtestersthat haveadynamicrangeof20dBlowerthantheexpectedsignallevel,Ameasureofthe unwantedsignalcouplingfromatransmitteratthenearendintoanotherpair measuredatthefarend,andrelativetothereceivedsignallevel. WireMapisusedtoidentifywiringerrorsforeachofthe8conductors,someofwhich are:properpinterminationateachend,continuity,shortsbetweenconductors,crossed pairs,reversedpairs,splitpairs,etc. StructuralReturnLoss(SRL)isameasureoftheuniformityofthecablesimpedance. Powersumequallevelfarendcrosstalk(PSELFEXT)isacomputationoftheunwanted signalcouplingfrommultipletransmittersatthenearendintoapairmeasuredatthe farend,andnormalizedtothereceivedsignallevel. ANSI/TIA/EIA568Balsospecifieslaboratorymeasurementmethods,componentand fieldtestmethods,andcomputationalgorithmsoverthespecifiedfrequencyrange.To serveamultidistributorenvironment,thisStandardspecifiesmeasurementparameters bothinworstcasepairtopairmeasurementsandapowersumcalculation, approximatelyrepresentingmultidistributoreffects. Contractorshallperformtestingtoinsureallwiresinallcablesmeetsorexceeds following: ContractorwillprovidetestresultsperSYSTIMAXSCSPerformanceSpecifications, Vol.3,Nov.2002.Allwiresinallcableswillmeetorexceedthe4pairchannel
30

performancesatallrequiredfrequencies,alldblossesandalldelaysforboth PowerSUM&GigaSpeed. TheGigaspeedChannelwithfour(4)connectionsshallhaveaminimumof10dB AttenuationtoCrosstalkRatio(ACR),acrossthefullfrequencyrangeof1MHz 250.0MHz.Atnopointacrossthefrequencyrangeof1MHz250.0MHzshallthe ACRdropbelowSystimaxGigaSpeedChannelSpecifications.

31

24 FIBER
AllFiberOpticcomponentsshallbeCorningunlessotherwisespecified. 24.1 BACKBONECABLE AllfiberopticcableshallbeCorning. OutdoorFiberOpticCableShallBeCorningAltossizedappropriately. IndoorFiberOpticCableShallBeCorningMICRiserorMICPlenumsizedappropriately. 24.2 INTRABUILDINGBACKBONEREQUIREMENTS Whenfiberopticcablepassesthroughaverticalriserroomitshouldbesecuredtothe wallevery48"orfollowmanufacturersrecommendations. AllfiberopticcableswillbeinstalledinInnerductfrompointwhereitexitsaroomall thewaytothepointwhereitentersthenextroomunlessotherwisespecifiedbythe TuftsProjectManager. Contractormustadheretoallmanufacturerrequirementsregardingpullingtensionand allowablelubricantsoffiberandcoppercables. FibersmustcomplywithEIA/TIA492specificationsandIS11801standards. 24.3 INNERDUCTINNERDUCTSHALLBEPLACEDFORFIBEROPTICINSTALLATIONS.ALL INNERDUCTWILLADHERETOTHENATIONALELECTRICANDEIA/TIA568BFORTYPE ANDUSE.ALLINNERDUCTWILLBE2SIZEANDALLINNERDUCTWILLBELEFTWITH MULETAPE. 24.4 CLOSURESANDSHELVESGENERALREQUIREMENTS Thefiberspliceclosureshallseal,bond,anchorandprotectfiberopticcablesplices. Thespliceclosureshallbeastandaloneclosurethatdoesnotrequireanouterclosure. Thespliceclosureshallprovideforamaximumofsix(6)cableentriesinabuttend configuration. Thespliceclosureshallbeusedinaerial,undergroundanddirectburiedapplications.

32

24.5 FIBERPATCHPANELS AllPATCHPANELSwillbeCorningunlessotherwisespecified. ThePATCHPANELshallbewallorrackmountabledependingonthelocation requirement.Theunitsmustfitinto19framearrangements. ThePATCHPANELshallconsistofamodularenclosurewithfrontandrearaccessand canbefullyadministeredfromthefrontorrear. ThePATCHPANELshallhavearemovablecoverovertheconnectorpanelsand connectorpanelsthatsnapintothefrontoftheshelfandaccommodateST,FDDI,SMA, FC,D4,LC,orSCconnectors. ThePATCHPANELshallprovideterminatingcapabilityof24,48,72,or144fibers. ThemanufacturermustbeISO9001certified. 24.6 FIBERPATCHCORDS FiberpatchcordsshallbeCorningbrand. Thefiberpatchcordshallconsistofbuffered,gradedindexfiberwitha50/62.5micron coreanda125microncladdingformultimodeandasteppedindex8.3microncorewith a125microncladdingforsinglemode. ThefibercladdingshallbecoveredbyaramidyarnandajacketofflameretardantPVC. 24.7 FIBEROPTICCONNECTORS Allnewlyinstalledfiberopticcableshallhavetheendsfusionsplicedtoapigtail (CorningFurcationAssembly)withfactoryinstalledLCconnectors. 24.8 RISERFIBER InnerDuct Fiber Corningasspecifiedinthescopeofwork MultiMode62.5,SingleMode8.3 Carlon2Corrugated(RiserGardorPlenumGard) Innerducttobecontinuouswithnosplices Pullstringtobeleftafterinstallationofanycable

33

24.9 SIZING Allow12strandsperTelecomRoomplus24spareintheBDF. Allow12additionalstrandsforanyPhoneswitchinstallations. 24.10 PANELS Corningasspecifiedinthescopeofthework 24.11 FIBERTESTINGSPECIFICATIONS FiberTestingGeneralRequirements: Onestrand/terminationpertubeshallbetestedwithanOTDRbothwaysat850nm forMultiModeand1310forSingleMode.Inaddition,eachfibershallbetested withapowermeterforattenuationat850nmand1300nmforMultiMode,and 1310and1550forSingleMode.Allterminationsandsplicesaretohavea maximumattenuationoflessthanorequalto.75dbpermatedpairmeasuredat 850nm. TheoriginalOTDRtraces,thepowermeterreadingsandthefibercable manufacturercertificationsshallbeprovidedtoTuftsaspartoftheasbuiltplans. Testingofallfiberstrandsinstalledasspecifiedwithtestresultsshallbeprovidedto theTuftsondiskette.Testdetailsarelistedundertheacceptancetestprocedure locatedbelow.

24.11.1 Preinstallationcabletesting TheContractorshalltestallcablepriortotheinstallationofthecable.TheContractorshall assumeallliabilityforthereplacementofthecableshoulditbefounddefectiveatalaterdate. 24.11.2 LossBudget Fiberlinksshallhaveamaximumlossof:(allowablecablelossperkm)(kmoffiberin link)+(plus)(.4dB)(numberofconnectors)=(equals)maximumallowableloss Amatedconnectortoconnectorinterfaceisdefinedasasingleconnectorforthe purposeofthisRFP Lossnumbersfortheinstalledlinkshallbecalculatedbytakingthesumofthebi directionalmeasurementsanddividingthatsumbytwo. Anylinknotmeetingtherequirementsofthestandard(.75dbperpair)shallbebrought intocompliancebytheContractor,atnochargetoTufts.

34

24.12 OPTICALFIBERCABLETESTINGWITHPOWERMETER GeneralSpecifications: IncompliancewithTIA/EIA52614AOpticalPowerLossMeasurementsofInstalled MultimodeFiberCablePlantandTIA/EIA5267MeasurementofOpticalPower LossofInstalledSingleModeFiberCablePlant,thefollowinginformationshallbe recordedduringthetestprocedure: Namesofpersonnelconductingthetest Typeoftestequipmentused(manufacturer,model,andserialnumber) Datetestisbeingperformed Opticalsourcewavelength,spectralwidth,and,formultimode,thecoupledpower ratio(CPR) Fiberidentification Endpointlocations Testdirection Referencepowermeasurement(whennotusingapowermeterwithaRelative PowerMeasurementMode) Measuredattenuationofthelinksegment(seeItem9.3) SinglemodeBackboneandCompositeLinkSegmentsshallbetestedinboth directionsatboth1310nmand1550nmwavelengths. SinglemodeHorizontalLinkSegmentsshallbetestedinbothdirectionsatthe1310 nmand1550nmwavelength. MultimodeBackboneandCompositeLinkSegmentsshallbetestedinboth directionsatboth850nmand1300nmwavelengths. MultimodeHorizontalLinkSegmentsshallbetestedinbothdirectionsatthe850 nmand1300nmwavelength.

24.13 ACCEPTABLELINKATTENUATION HorizontalLinkSegmentsarelimitedto90meters.Therefore,theacceptablelink attenuationcanbebasedonthelongestinstalledlinkwithoutintroducingasignificant error. 24.14 ACCEPTABLEATTENUATIONVALUES:

35

Thegeneralattenuationequationforanylinksegmentisasfollows: CPRAdj.=SeeMultimodeLightSourceCPRAdjustmenttablebelow: SpliceAttn.(CSLorFusion)=Splices0.30dB ConnectionAttn.(LCconnectors)=(Connections0.14dB)+0.24dB ConnectionAttn.(STorSCconnectors)=(Connections0.39dB)+0.42dB CableAttn.=CableLength(km)(3.40dB/km@850nmor1.00dB/km@1300nm) 62.5mMultimodeAttenuationCoefficients Note:Aconnectionisdefinedasthejointmadebymatingtwofibersterminated withconnectors(e.g.ST,SC,LC). AcceptableLinkAttenuation=CableAttn.+ConnectionAttn.+SpliceAttn.+CPR Adj.

MultimodeLightSourceCPRAdjustment Cat1 Cat2 LinkswithST +0.50 0.00 or SCConnections Linkswith +0.25 0.00 LCConnections

Cat3 0.25 0.10

Cat4 0.50 0.20

Cat5 0.75 0.30

24.15 COUPLEDPOWERRATIOMEASUREMENT TheCoupledPowerRatioofalightsourceisameasureofthemodalpowerdistribution launchedintoamultimodefiber.Alightsourcethatlaunchesahigherpercentageofitspower intothehigherordermodesofamultimodefiberproducesamoreoverfilledconditionandis classifiedasalowerCategorythanalightsourcethatlaunchesmoreofitspowerintojustthe lowerordermodesproducinganunderfilledcondition.Underfilledconditionsresultinlower linkattenuation,whileoverfilledconditionsproducehigherattenuation.Therefore,adjusting theacceptablelinkattenuationequationtocompensateforalightsourceslaunch characteristicsincreasestheaccuracyofthetestprocedure. 24.16 TESTINGPROCEDURES CPRTestJumper1shallbemultimode,15meterslongwithconnectorscompatible withthelightsourceandpowermeterandhavethesamefiberconstructionasthelink segmentbeingtested.

36

CPRTestJumper2shallbesinglemode,15meterslongwithconnectorscompatible withthelightsourceandpowermeter. Cleanthetestjumperconnectorsandthetestcouplingpermanufacturersinstructions. Followthetestequipmentmanufacturersinitialadjustmentinstructions. Connectmultimodetestjumper1betweenthelightsourceandthepowermeter.Avoid placingbendsinthejumperthatarelessthan100mm(4inches)indiameter.

SeeFigure1. Ifthepowermeter hasaRelative PowerMeasurementMode,selectit.Ifitdoesnot,recordtheReferencePower Measurement(Pref.).Note:IfthemetercandisplaypowerlevelsindBm,selectthis unitofmeasurementtosimplifysubsequentcalculations. Disconnecttestjumper1fromthepowermeter.DoNOTdisconnectthetestjumper fromthelightsource.Connectjumper2betweenthepowermeterandtestjumper1 usingthetestcoupling.Thesinglemodejumpershouldincludeahighordermode filter.Thiscanbeaccomplishedbywrappingthejumperthreetimesarounda30mm (1.2inches)diametermandrel. SeeFigure2. RecordthePowerMeasurement(Psum).IfthepowermeterisinRelativePower MeasurementMode,themeterreadingrepresentstheCPRvalue.Ifthemeterdoesnot haveaRelativePowerMeasurementMode,performthefollowingcalculation: IfPsumandPref.areinthesamelogarithmicunits(dBm,dBu,etc.):CPR(dB)= |PsumPref.|
37

IfPsumandPref.areinwatts:CPR(dB)=|10log10[Psum/Pref.]| Category4 713.9 711.9 Category5 Underfilled 06.9 06.9 CoupledPowerRatio(CPR)inDb Category1 Category2 Category3 Overfilled 850nm 2529 2124.9 1420.9 Source 1300nm 2125 1720.9 1216.9 Source 24.17 SINGLEMODEATTENUATIONCOEFFICIENTS CableAttn.=CableLength(km)(0.50dB/km@1310nmor0.50 dB/km@1550nm) ConnectionAttn.(STorSCconnectors)=(Connections0.44dB)+0.42dB ConnectionAttn.(LCconnectors)=(Connections0.24dB)+0.24dB SpliceAttn.(CSLorFusion)=Splices0.30dB CPRAdj.=0.00dB(Notapplicableforsinglemode)

25 CONDUITTYPESANDSUPPORTS
25.1 GENERALREQUIREMENTS Allnewconduit,junctionboxesandpulltroughswillnotinterferewithexisting equipmentorblockaccesstoexistingvalves,pullboxesoranyothertypeofequipment. ElectricalMetallicTubing(EMT)shallbestandardstraight(10'0")lengthscomplying withULstandardUL797. FittingsforEMTshallbecompressiontype,dyecast,withinsulatedthroat.Screwtype orindenterconnectorsorcouplingsarenotpermitted. Whererigidconduitfittingsarerequired,taperthreadedhotdipgalvanizedsteelfittings shallbeused.Fittingsshallbecompletewithsealinggasketsofamaterialsuitedtothe environmentinwhichtheyaretobeused.Nosnaponcoversaretobeusedonfittings. Onlyfittingswithcoversfastenedbycaptivescrewsshallbeused.Allfittingsshallhave integralbushingsfortheprotectionoftheconductors. 25.2 RACEWAYSUPPORT Beamclampsshallbesuitableforstructuralmembersandsimilarconditions.

38

ClampsforattachingrigidconduittostructuralmembersshallbegalvanizedUbolts. Trapezehangersshalluseachannelerectorsystem(Unistrut). Rodsshallbegalvanizedsteelorhotdipped(allthread),3/8ofaninchdiameter, minimum. Concreteinsertsandracewaystrapsshallbegalvanized. Steelbolts,nuts,washersandscrewsshallbegalvanized. All1conduitroutesshallnotexceedmorethan270degreesofbendsbetweenpull points,4conduitsroutesshallnotexceedmorethan180degreesofbendsbetween pullpoints. Whereverrequired24X24X8junctionboxes,8X8X24and6X6X24pulltroughs willbeinstalled.Assistboxesaretobeinstalledevery100forallconduitlargerthan1 ,orpriorto270degreebends. Allconduitwillhave800lbtestmuletape(condux#80020002orapprovedequal) installed. 25.3 CONDUITRUNS SingleRunsWhereconduitsarerunindividually,theyshallbesupportedbyapproved conduitclamps,securedbymeansoftoggleboltsonhollowmasonry,expansionshields andmachinescrewsorstandardpresetinsertsonconcreteorsolidmasonry;machine screwsorboltsonmetalsurfaces;andwoodscrewsonwoodconstruction.Theuseof perforatedstrapshallnotbepermitted.Whereindividualconduitsaresuspendedfrom theceiling,theyshallbesupportedbyconduithangers,androd. MultipleRunsWhereanumberofconduitsaretoberunexposedandparallelone withanother,theyshallbegroupedandsupportedbythestructuralsteelortrapeze hangers. 25.4 CONDUITAPPLICATIONS Rigidsteelgalvanizedconduitshallbeusedforall1inchexposedconduit,and1inch embeddedunlessotherwisenotedonthedrawings.Whererequired,lowlevelsignal wiringshallberuninsteelconduitregardlessofsizerequired. Liquidtightflexiblesteelconduitshallbeusedforconnectionstocomputerlab furniture.Maximumlengthof(3'0")shallbeused. Conduitinteriorsshallbeprotectedfromdirt,moisture,waterandforeignsubstances duringandafterinstallation,priortocablepulling,byinstallingflatmetallicdiscsand steelbushingsoneachconduitend.

39

25.5 BENDSANDOFFSETS Contractorshallavoidusingbendsandoffsetswhereverpossible. Manufactured90degreeconduitelbowsshallbeusedinconduitrunsof11/2inch tradesizeandlargerwheneverpractical. 25.6 EXPOSEDCONDUIT Exposedconduitshallbeinstalledinneatandorderlyrows,eitherparallelor perpendiculartowalls,ceilingsandstructuralmembers.Curvedportionsofconcealed conduitshallnotbevisiblewhereemergingfromwalls,slabs,ceilings. Conduitexpansionjointsshallbeinstalledwherestraightconduitrunsexceed200' acrossbuildingexpansionjointsorwhereindicatedonthedrawings. Conduitshallbeinstalledatleast(1'0")fromsteamorhotwaterpipinginparallelruns, atleast(6inches)incrossruns,andatleast(3inches)fromallcoldwaterpiping. Threadedconnectionsatconduitfittingsandjointsshallbesealedforlowresistance,air andmoisturetightconnections. Whereapplicable,theuseofdissimilarmetalsincontactanywhereinthesystemshall beavoidedtoeliminatethepossibilityofgalvanicaction.Wherenecessary,acoatingof Galviconorequalshallbeapplied. Conduitandconduitfittingsshallnotbeweldedtoanystructure. 25.7 CONDUITANDFITTINGREQUIREMENTS Thefollowingareconsideredstandardconduitsizeswhichshallbeusedunlessspecified elsewhere: Rigidsteelconduitshallbefullweight,heavywall,hotdipped,galvanizedandfurnished instandard(10'0")straightlengthswithagalvanizedcouplingononeendandathread protectorontheother.Fittingsandboxesforrigidsteelconduitsystemsshallbe threadedhub,CrouseHindsFeraloytype.Rigidaluminumconduitsystemsshallbe threadedhub,CrouseHindscastaluminumtype. RigidconduithubsshallbeUniSealbyAppletonorequal. 1 1 2 3 4

40

InsulatedgroundingbushingsshallbetypeGIBbyAppletonorequal;whererigid conduitfittingsarerequired,taperthreadedhotdipgalvanizedsteelfittingsshallbe used.Fittingsshallbecompletewithsealinggasketsofamaterialsuitedtothe environmentinwhichtheyaretobeused.Nosnaponcoversaretobeusedonfittings. Onlyfittingswithcoversfastenedbycaptivescrewsshallbeused.Allfittingsshallhave integralbushingsfortheprotectionoftheconductors. ElectricalMetallicTubing(EMT)shallbestandardstraight(10'0")lengthscomplying withULstandardUL797. FittingsforEMTshallbecompressiontype,dyecast,withinsulatedthroat.Screwtype orindenterconnectorsorcouplingsarenotpermitted. ConduitsupportsshallbeaccordingtoTable34612oftheNEC.Outletorconnection boxesshallnotbeusedforsupportofconduit.Supportsshallbespacedamaximumof3 feetfromallfittings,elbows,outletboxes,junctionboxes,panels,motorcontrol centersoranyotherterminalpoint. 25.8 CONDUIT,RACEWAY,HANGERSANDPULLBOXES 25.8.1 GeneralRequirements Installtheconduitsystemsascloseaspossibletothedetaileddrawings. Theinstallationshallbecomplete,includinganyadditionalpullboxes,hangers,and expansionjointsrequiredbutnotshownondrawings. Conduitrunsmayextendthroughoutthebuildingfromtheoutsideplantentranceto theriser,andtothebuildingcustomer'soffices. Bendingradiusonallconduitshallbe10Xthediameteroftheconduitunlessindicated otherwiseonthedrawingsorapprovedbyP.M. Apullboxshallbeinstalledineachconduitrunafteratotalof180degreesofconduit bends. Pulllinesshallbeplacedineachconduitinstalled.Inaddition,labeltheconduit indicatingthattheconduit,racewayorpullboxcontainsfiberopticcableorcopper cables.Thelabelsshallbeplacedevery10feetontheconduitandoneachpullbox. ContractorshallreplaceattheContractor'ssoleexpenseanyexistingitems,materials andceilingtilesdamagedduringinstallation. AllproductsshallconformtoapplicablestandardsoftheNationalElectrical Manufacturer'sAssociationandtheAmericanNationalStandardsInstituteandshallbe listedbyUnderwriter'sLaboratory.Allequipmentmustbeidentifiedbymanufacturer.

41

25.8.2 AdditionalMaterialRequirements Conduit:EMT,IMT,GRC,PVCandrigidaluminumconduitshallbearaULlabelandbe thesizeasindicatedonthedrawings. HangersandClamps:Allhangers,clamps,fittingsandrodsshallbemalleablesteeland beeitherUL,NEMA,orANSIapproved. Allhangers,clamps,fittingsandrodsshallbehotdippedgalvanizedsteelwheresubject tocorrosion. Aluminumconduithangersorfactoryplasticcoatedsteelhangersareacceptable hangersfortheinstallationofEMT,IMTorrigidaluminumconduit. JunctionBoxes:AllinteriorjunctionboxesshallbegrayandconformtoNEMA1unless otherwisespecifiedandshownonthedrawings.Boxsizesshallbeasindicatedonthe drawings. 25.9 TELECOMMUNICATIONSPREMISEWIRINGCONDUITREQUIREMENTS Providesystemofconduit,outlets,pullboxesandmountingboardsasspecifiedand shownontheprojectdrawingsforvoiceanddatasystems. Eachoutletboxshallhavea1"conduitstubbedupwithabushingintothenearest accessibleceilingspace.Conduitsshallbeofasizeasindicatedonthedrawings,but shallnotbesmallerthan1"tradesizeinanyevent. Outletboxesshallbe411/16"squarewithasinglegangmudringasspecifiedonproject plans. Whereoutletsaretobeinstalledinexisting,uninsulatedgypsumboardwalls,asingle gangoldworkboxshallbeplacedwithapullstringtotheclosestaccessiblesuspended ceilingspace. Providehorizontalsleevesthroughfirewallsforcableaccess.Seecablefillrequirements inANSIEIA/TIA569Bforsizingifsizingisnotindicatedonprojectplans. Theexteriorperimeterofallconduitsandsleevesshallbefirestoppedasrequiredto meetalllocal,stateandnationalfire,electricandbuildingcodes.Inaddition,thisfire stopsystemissubjecttoapprovalbytheTuftsUniversityFireMarshallandTuftsProject Manager. Provideasystemofcabletraysorhangersaboveaccessibleceilingsuspendedforalllow voltagesystemcabling. Allconduitrunsfromsystemoutletsshallterminateaboveanaccessiblecorridor suspendedceilingandshallterminatenotmorethan6"fromacabletraysystemabove theaccessibleceilingspace.Providesufficientcablesupportstoaccommodate3times

42

thecabletobeinstalled,eitherbyplacingcablesupportssidebysideorspaced vertically. Wherecorridorshavenonaccessibleceilings,provideconduitsleevesasaminimum(1) persystem,coveringtheentirelengthofnonaccessibleceilingcavity.Numberandsize ofconduit/sleevesshallbeperANSIEIA/TIA569Acablingrequirements. Groundallemptyconduitandassociatedoutletboxesby#12AWGcopperinsulated conductortothenearestpanelboardgroundbus.Provideinsulatedgroundbushingat theendofeachemptyconduitrun. Floorpokethroughfittingsshallhaveaminimumspaceavailableforjacksof2.75"Wx 1.7"Wx1.2"D.FittingsmustcomplywithNECArticle30021andmatchfireresistance ratingofthefloor.Fittingsmaybeflush,pedestal,orfurniturefeedsasdeterminedby Tufts. Substitutedproductsmustbeelectricallyandmechanicallyinterchangeablewiththe productslistedherein.Samplesandwrittenapprovalofallsubstitutionsshallbe submittedforapprovalandmayberejectedwithoutappeal. 25.10 WIREMOLDRACEWAY AllexposedracewaysystemsinroomsshallbemetallicWiremoldbrand. TheContractorwillfurnishandinstallallrequireddeviceplatesassociatedwiththe Wiremoldraceway.ItwillbetheresponsibilityoftheContractortomatchtheexisting racewayinsizeandcolorandtoprovidelaborforthecuttinginofallplates.Allcutting oftheexistingracewaycoverswillbestraightandallcoverswillfitflushtotheadjoining piece. ThetypicaldeviceplateisaWiremoldV4007C1.Ifadifferentsize,typeorcolor racewayisused,thentheContractorwillprovidetherequiredplatetomatchthe knockoutdimensionsoftheaforementionedV4007C1. Wiremold700and2000seriesandallWiremoldjunctionboxesshallbeivoryincolor. SurfacemountworkstationoutletboxesshallbeWiremoldtypeV5745(ivory)usedin conjunctionwithWiremold2000,andV5744(ivory)usedinconjunctionwith1EMT conduit. Conduits,racewaysystems,andWiremoldshallbecontinuouswithoutgaps.Allelbows, tees,reducers,etc.shallbemadewithfactorymanufacturedfittings,providedthat themanufacturermakesthespecificfitting.Applicationsusingnonfactory manufacturedfittingsaretobeapprovedinadvancebytheTuftsProjectManager. A1inchconduitshallfeedeachsectionofWiremold4000racewayservingupto4 voice/dataoutlets.Anadditional1inchconduitshallbeprovidedtotheracewayfor everyadditional4outlets.
43

Example: For1to4outlets,provideone1inchconduit For5to8outlets,providetwo1inchconduits,etc. Theseconduitsshallbefedtooppositeendsoftheracewaysystem(58drops)or spacedapartevenlyaftermultiplesof4drops. OversizesinglegangdevicekitsshallbeusedforoutletswhenusingWiremold4000 raceway(partnumberV4007C1Rgray)toaccommodatevoice/datajacks. Nocablingshallbeexposedunlessotherwisespecifiedontheprojectplans. 25.11 WIREMOLDFILLCAPACITY
Wiremoldtype Wiremold700 Wiremold2000 Wiremold3000 Wiremold4000 Maximumnumberof4paircablesperraceway 3 15 40 72

25.12 VERTICALCONDUITS Verticalrisersleevesorconduitsshallbeaminimumi.d.sizeof4inches.Aminimumof 2sleevesperroomshallbeinstalled.RefertoriserconduitdiagramprovidedbyTufts forquantities Sleevesbetweenfloorsinroomsshallterminate1to3in.abovefinishedfloor. Insulatedbushingsmustbeprovidedonallsleeves. 25.13 FURNITURESYSTEMS Itisimportantthatthefurnitureusedtoprovidetheseaccommodationsmeetsthe requirementsofANSI/TIA/EIA568A,ANSI/TIA/EIA569A,TIA/EIATSB75,andISO/IEC 11801. Furnituresystemtelecommunicationsdistributionplanninganddesignshouldtakeinto considerationthefollowingguidelines: Ensurethattheoverallfurnituresystemplanninghascoordinatedallthesupporting functionsincludingcablepathwaysforbothtelecommunicationsandpower,outletsfor bothpowerandtelecommunicationsdevices,andconnectionoffurniturepathwaysto horizontalbuildingpathways. Consultmanufacturerinformationaboutintendedapplicationsoffurnituresystems, internalpathwaycapacityandbendradius,separationofpowerand telecommunicationscabling,andanyspecialtoolingrequirements.

44

Thecrosssectionalareaofthestraightsectionofafurniturepathwayfor telecommunicationscablingmustbeatleast970mm2(1.5in2).Theminimumsize pathwaymustnotforcethecablebendradiustobelessthanfourtimesthecable diameterunderconditionsofmaximumcablefill. Whereusersneedtofrequentlymovedesksortables,itispreferabletolocateoutletsin furniturepanels,walls,orotherfixedlocationsratherthanondesksortables. TheAmericanswithDisabilitiesAct(ADA)mayaffectoutletmountinglocationsinsome instances.Othernationalregulationsmayapply. RefertoANSI/TIA/EIA569A2forsizingofopeningsformountingoutletsinfurniture systems Liquidtightflexiblesteelconduitshallbeusedforconnectionstocomputerlab furniture.Maximumlengthof(3'0")shallbeused.

26 TELECOMMUNICATIONSROOMS
26.1 GENERALREQUIREMENTS GeneralrequirementsincludeaminimumofoneTelecomRoomperfloor.Multiple Roomsarerequiredif: Usablefloorspaceexceeds10,000sq.ft. Thecablelengthbetweenthehorizontalcrossconnectandthetelecomoutlet, includingslack,exceeds295ft.(90meters). 26.2 SIZING ThefollowingtablecontainstheminimumroomsizerequirementsbasedonServingarea: ServingArea MinimumRoomSize 5,000sq.ft.orless 5,000to8,000sq.ft. 8,000to10,000sq.ft. 10ft.x8ft. 10ft.x9ft. 11ft.x10ft.

26.3 PLACEMENT TelecomRoomsshallbelocatedasclosetothecenteroftheservingareaaspossiblein ordertominimizecablelengths.

45

Inthesituationofmultiplefloors,roomsshallbestackedverticallyfloortofloor. Undernocircumstancesshallthecablelengthbetweenthehorizontalcrossconnect andthetelecomoutlet,includingslack,exceed295ft.(90meters). 26.4 BUILDOUT TelecomRoomsshallbeaminimumheightof8ft.6in. InstallasignonthewalloutsidetheroomthatreadsTelecommunicationsRoomand hastheroomnumberonit. Installasmokedetectorandtieitintotheexistingfirealarmsystem.Itisrecommended thattheContractorusethecurrentTuftsfiresystemcontractor. FloortreatmentshallbeVCTtileornonstaticsurface. ProvideaNECapprovedcoppergroundingbar(ChatsworthProductsInc.part# 10622010)locatedatthetoprighthandsideoftheplywoodbackboard.Thegrounding barshallbebondedwith#6copperwiretothebuildinggroundatthemainpanel.If equipmentracksareusedintheTelecommunicationsRoombondingbetweenthe coppergroundbarandtherack(s)istobeprovided. Uselightcoloredpaintonallwallsandtheplywoodbackboard.Iftheroomwillhouse Telecomequipmentthewallsshallbepaintedwithatleasttwocoatsoffireretardant paint. Provideaminimumswitchedfluorescentlightingof540lux(50footcandles)measured3 ft.AFFasperroomlayout.Lightingmustbeplacedasnottocauseanyelectrical interferencetoanytelecomcabling.RefertoroomlayoutdiagramprovidedbyTuftsfor additionaldetail. Installa100ampminimum3phaseelectricalsubpanellocatedwithintheTelecom Roomoutfittedwith20ampcircuitbreakers,orotherconfigurationasdesignedbythe ProjectManager. Nonswitched20amp110vACduplexutilityoutletsplaced12inchesAFFlocated aroundroomperimeter6ft.oncenter.(seedrawingforexactquantityandlocation) Two(2)nonswitched20amp110v2wayhospitalgradeACduplexoutletsonseparate dedicatedcircuitswithisolatedgrounds.Thetwooutletscanbecontainedinonequad workbox.TheoutletsshallbelabeledCircuit1andCircuit2.Thetwodedicated breakersshallbelabeledatthepanelTelecommunicationsRoomCircuit1and TelecommunicationsRoomCircuit2.(seedrawingforlocationandnumberof electricaloutlets) Install3/4in.A/Cpaintedplywood(8ft.highbyroomwidth)directlytothewall.Mount plywood6in.offfloor,and6in.fromroomcorners.Theplywoodshallbeeitherfire
46

ratedortreatedonallsideswithatleasttwocoatsoffireresistantpaint.Mount plywoodonwallsasshownonroomlayoutdiagramprovidedbyTufts. Provideandinstalla12inchwidecontinuouscabletrayfromtheentrancepointofthe conduit(s)orsleeve(s)intothetelecomroomovertothetopofthecablingracks.Refer toroomlayoutdiagramsprovidedbyTuftsforadditionaldetail. Provideandinstallaminimumof34EMTsleeveswithnonconductivebushingson eachendofthesleeveintotheroomforhorizontalcableaccessasperTelecomRoom layoutdiagramprovidedbyTufts.Thesleevesshallbeattachedtotheceilingusing metalstrutsandsupports. Provideandinstallverticalrisersleeves(orconduits,ifTelecomRoomsarenotstacked) intoroomasperriserconduitdiagramprovidedbyTufts. Nowetpipingshallberunthroughthisroomorintheceilingareaabove.Sprinkler systemsshallbedrychargesystems. AlockingdoortoeachTelecomRoomshallbeprovided.Thedoorshallbe3x80.The doorshallnothaveathreshold.ThelockshallbefittedwithanS156coreinstalledby theTuftslocksmith. Tuftswillprovidedetailedroomlayoutsonceoccupantcapacityhasbeendetermined. ProvideHVACthatwillmaintaincontinuousanddedicatedenvironmentalcontrolby: Maintainingpositivepressurewithaminimumofoneairexchangeperhour. Temperaturerangebetween64&75degreesFahrenheit. RelativeHumidityrange30to50%.

27 GROUNDINGANDBONDINGREQUIREMENTS
27.1 GROUNDINGANDBONDINGGENERALREQUIREMENTS Allserviceequipment's,conduitsystems,supports,protectors,cabinets,cablesheaths, etc.,shallbeproperlygroundedinaccordancewiththelatestissueoftheNational Electric,LocalCodesandANSI/TIA/EIA607GroundingandBondingPractices.Contractor willprovideallbondingwire,jumpers,groundingbushings,clamps,etc.,asrequiredfor completegrounding.Groundwirewillberoutedtoprovidetheshortestandmostdirect pathtoground.Allgroundconnectionsshallhavecleancontactsurfaces.Allground wireswillbelabeled(tagged),coloredandsizedinaccordancewithANSI/TIA/EIA607, andtheNationalElectricCode.

47

27.2 GROUNDINGANDBONDINGMINIMUM/MAXIMUMREQUIREMENTS 27.2.1 MaterialSpecifications: Unlessotherwisespecified,theIC(InterconnectingBondingConductor)(referredtoin TIA/EIA607astheBondingConductorforTelecommunications)shallbeinsulated, copper,No.3/0AWG. Unlessotherwisespecified,theTBB(TelecommunicationsBondingBackbone)shallbe insulated,copper,No.3/0AWG. Unlessotherwisespecified,theEBC(EquipmentBondingConductor)shallbegreen coloredinsulation,copper,No.6AWG. Bondingconductorsshouldnotbeplacedinferrousmetallicconduit.Ifitisnecessaryto placebondingconductorsinferrousmetallicconduitthatexceeds1m(3ft)inlength, theconductorsshallbebondedtoeachendoftheconduitwithaconductorsizedasa No.6AWG,minimum(thismakestheconduitaparallelpathwiththecable).Any groundingorbondingconductorwhichisrunthroughametallicconduitshallbebonded totheconduitatbothends. TheTMGBwillhaveaminimumof6mmthicknessand100mmwidth;itshouldbe electrotinplatedorcleanedpriortoconnectingtheconductorstothebusbar.Justlike theTMGB,theTGBshouldbeatleast6mmthickby50mmwideandelectrotin platedorcleanedpriortoconnectingtheconductorstothebusbar. Allinsulatedgroundbarsmustbeisolatedfromthestructuralsupportbya2minimum separation,usingmanufacturersrecommendedinsulatingstandoffsandhardware. Contractortofurnish&install(1)TGB(TelecommunicationsGroundingBusbar)ineach IDF.ContractortogroundeachTGBtobuildingsteel(ifeffectivelygrounded)via#6 groundwire. BondthefollowingtotheTMGBwhenpresent: Anyelectricalpanelboardfortelecommunicationsthatislocatedinthesameroom orspaceastheTMGB,saidpanelsAlternatingCurrentEquipmentGround(ACEG) bus(whenequipped)ortheenclosureshallbebondedtotheTMGB. Telecommunicationpanelboards. Buildingstructuralsteel,ifexposed(steelrebarsofreinforcedconcretearenot requiredtobebonded). Metallicequipmentracks&CableShield/Sheaths. Allmetalracewaysandcabletraysfortelecommunicationscablingextendingfrom thesameroomorspacewheretheTMGBislocated.
48

Outsideplantcables&Protectors.

27.3 TELECOMMUNICATIONSROOMS 27.3.1 GeneralRequirements AllTelecommunicationsRoomswilladheretothegroundingguidelinessetforthin TIA/EIA607(COMMERCIALBUILDINGGROUNDINGANDBONDINGREQUIREMENTSFOR TELECOMMUNICATIONS)plusanyadditionalcodesinArticle(250GROUNDING)and (800COMMUNICATIONSSYSTEMS)oftheNEC2002. Foranexplanationofwhatconstitutesapropergroundpointforthe TelecommunicationsbusbartobeattachedtoinaTelecommunicationsRoomseeNEC 2002Article80040. 27.4 ACCEPTABLEGROUNDPOINTS Thefollowingthreeoptionsareacceptablegroundpoints,aslongastheymeetallofthe detailedrequirementsoftheabovementionedTIA/EIA607(COMMERCIALBUILDING GROUNDINGANDBONDINGREQUIREMENTSFORTELECOMMUNICATIONS)plusany additionalcodesinArticle250GROUNDINGand800COMMUNICATIONSSYSTEMSof theNEC2002: AttachtoBuildingorStructuregroundingsystem. or Metallicpowerserviceracewayorequipmentenclosure. or Properlyinstalled8Groundrodtoearth.

27.5 SURFACEREQUIREMENTS: Anysurfacetobegroundedmustbefreeofpaintoranyothercoatingthatmayaffecta propergroundtobeachieved. Thesurfacemustbepreparedtoprovideaproperpathtoground. Paintshouldbescrapedorfiledawayuntilametallicsurfacehasbeenexposed.Then thepropergroundingcomponentcanbeattachedtocompletethesystem. Allsystemcomponents(i.e.ladderrack,equipmentracks,etc.)willbeconnected togetherandeventuallywillconnecttotheTRsGroundingBusBarwithaminimumofa #6solidorstrandedcopperwirewithagreeninsulator. TheBusbarwillbeconnectedtotheabovementionedbuildinggroundsystemsinsuch amannerasthatitmeetstheabovementionedrequirementssetforthinTIA/EIA607 (COMMERCIALBUILDINGGROUNDINGANDBONDINGREQUIREMENTSFOR TELECOMMUNICATIONS)plusanyadditionalcodesinArticle(250GROUNDING)and (800COMMUNICATIONSSYSTEMS)oftheNEC2002.TheTelecommunicationsRoom
49

GroundingBusbarwillattachtotheabovementionedgroundingsystembyawirethat isaminimumof#6solidorstrandedgreeninsulatorcopperwire. 27.6 GROUNDINGANDBONDINGINTELECOMMUNICATIONSROOMS: Allmetallicracks,ladderwaysandNetwork/TelecommunicationsEquipmentwillbe properlyterminatedperTIA/EIA607andNEC2002guidelinesandprocedures. ThisEquipmentwilleventuallybetiedbacktotheTRsGroundingBusBarthattiesback totheBuildingsGroundingSystem. TheTRsGroundingBusBarshallbeequippedwithagroundingconductorthatis attachedtoanapprovedelectrodeperNEC2002standardsbya#6copperwirewitha greencoloredinsulator. Thewirejacketwillberatedfortheenvironmentthatithasbeeninstalledin.I.e.ifthe wirerunsbacktoagroundelectrodeinapaththroughaplenumreturnairwaythenthe cableshouldbeplenumrated. Nogrounding/bondingconductorsshallsharethesameconnectionatthebusbar.Each grounding/bondingconductorshallterminateonitsowngroundterminalblock.

28 FIRESTOPSPECIFICATIONS
28.1 FIRESTOPGENERALREQUIREMENTS TheContractorshallberesponsibleforprovidingafirestopsystemforallverticaland horizontalcablepenetrations(THISINCLUDESALLSTATIONCABLING).Thisfirestop systemshallmeetalllocal,stateandnationalfire,electricandbuildingcodes.The Contractorshallsubmitdrawingsshowingthefirestopsystemtobeusedineach buildingforeachtypeofpenetration.Thisfirestopsystemissubjecttoapprovalbythe TuftsUniversityFireMarshallandTuftsProjectManager. AllhorizontalsleevesusedthroughTelecomRoomwallsshallbeequippedwith WiremoldFlamestoppersystem. 28.2 FIRESTOPSTANDARDS Fortheinteriorofconduitsandsleeves,theContractorshalluseaflexible,reenterable approvedfirestopcompound(suchasIPCFSP1000orequal).Thefirestopmaterial mustmeetthefollowingStandards: ASTME814,StandardMethodofFireTestsofThroughPenetrationFirestops. UL1479,FireTestsofThroughPenetrationFirestops.

50

ULFireResistanceDirectory:ThroughPenetrationFirestopsDevices(XHCR)and ThroughPenetrationFirestopSystems(XNEZ). ASTME119,FireTestsofBuildingConstructionandMaterials(forfirerated architecturalbarriers). 2002NFPANationalElectricalCode,Section80052,Paragraph2(b),SpreadofFire andProductsofCombustion. 1998editionoftheBICSITelecommunicationsDistributionMethodsManual, Chapter22,Firestopping. FactoryMutualApprovalGuide. ULCListofEquipmentandMaterials,VOL.II.

29 CONDUITDUCTBANK&MAINTENANCEHOLESPECIFICATIONS
29.1 EXCAVATION TheContractorshallberesponsiblefornotifyingDigSafe.Ifavailable,refertotheplan labeledUTILITYSITEforapproximatelocationsofallknownutilities.TheContractor performingtheexcavationshallhaveaqualifiedoperatorcontrollingallexcavation equipmentandinadditiontherewillbeaqualifiedlaborerconstantlyviewingthe excavationbythebladeforanyutilities.Shutoffsandemergencyblockingdetailsshall beidentifiedbeforeexcavationbegins.TheContractorisresponsibleforcomplyingwith alltrenchingsafetystandards(OSHA,441CMR10.00). IntheeventtheContractordamagesanyutilitiesduringexcavation,theContractorshall beresponsibleforsecuringqualifiedsubcontractorstorepairalldamagedutilities.This repairworkissubjecttoapprovalbyTufts. TheContractorshallberesponsibleforsecuringtheentireworkareatoinsurepublic safety.Workareasshallbetapedoffatalltimes.Alltrenchedareasleftopenattheend oftheworkdayshallbecoveredwithplywood.Allvehicularpathwaysshallbecovered withsteelplatesafterexcavationandpriortobackfillingtoprovideaccessforvehicular trafficovertheexcavatedarea. 29.2 DUCTCONSTRUCTION TheContractorshallsupplyandinstallconduitsinthesizeandquantitiesasspecifiedon theprojectplans.Intheeventthattheconduitscannotbeplacedasshownonthe projectplans,thenewplacementshallbesubjecttoapprovalbyTufts. TheContractorshallsubmitsamplesofallmaterialsforapprovalbyTuftspriorto commencementofwork.
51

Plasticconduitencasedinconcreteshallbetype40,ratedfor90C.Plasticconduitshall becomposedofpolyvinylchloride,ULlisted,andshallconformtoNEMAstandardsand theNationalElectricalCode.Thematerialsshallhaveatensilestrengthof6,000PSIat 73.4,flexuralstrengthof12,500PSI,tensilemodulus470,000PSIandacompressive strengthof9,000PSI.Conduitsizesshownonprojectplansaremeasuredbyinside diameter.Plasticconduit,fittings,andelbowsshallbeproducedbythesame manufacturer.Alljointsshallbesolventweldedinaccordancewiththe recommendationofthemanufacturertoprovideawaterproofsystem. WoodformsshallbeinstalledbytheContractoroneachsideofductsectionsbefore pouringconcrete.Conduit(s)shallbeplacedonalayerofconcretepriortotheirinitial setofnotlessthan3thickness.Theductlineshallbegradedfordrainagetoprevent pocketswheremoisturemayaccumulate.TheContractorshallconstructtheconcrete encasementfortheentiresectionoftheundergroundductbank. Conduit(s)shallbeinstalledataminimumdepthof24inches(measuredfromthetopof theconduit)belowsurroundinggrade. Conduit(s)shallbeplacedapproximatelyasshownontheprojectdrawingsusing approvedprecastspacers.Two(2)spacersshallbeusedpereachten(10)footsection ofPVCconduitwiththespacersbeingleftintheconcrete. Steelreinforcingrodsshallbefurnishedandinstalledasshownonthedrawingsinany areaoftheconduitbankthatrunsunderneathanyroadsurfacethatissubjecttouseby vehiculartraffic.Theconcreteshallbereinforcedonthetopandbottomofthe encasement.Thesplicelapshallbe24bardiameterandtemperaturereinforcements placed24incheso.c. Thetotalnumberofbendsinaconduitsectionshallnotexceedtwo90degreebendsor theequivalentofsweepsandradiusbends.Eachbendshallhaveaminimuminside radiusof10timestheinternaldiameteroftheconduit. Encasementofductsshallnotcommenceuntilconstructionbelowfinishgradehasbeen approvedbyTufts,theexcavationcleanedoftrashanddebris,thefinalexcavationlevel isfirmandundisturbed,allductsystemcomponentshavebeeninstalled,testedand approved,andthelocationsofallconduitsandappurtenanceshavebeenrecorded. Donotcommencebackfillingorencasementoperationsofutilitytrenchesuntilall piping,etc.,havebeeninstalled,testedandapproved,andthelocationsofallpipeand appurtenanceshavebeenrecorded. Abrightcolored,detectable(metallic)warningtapeshallbeplaced18abovethe ductbankandrunparallel(ontopof)theductbankforitsentirelength. Fiberglassmeasurepullstringsshallbeinstalledineachconduitandtiedoffatboth ends.Conduitsintobuildingsshallbefittedwithremovableplugstopreventforeign matterfromenteringthebuilding.

52

Whereconduit(s)turnupriserutilitypoles,conduit(s)shallextend8feetabovegrade. Theexposedportionofconduitrisingupthepoleshallbemetallic.Plugsshallbe providedtosealconduitswheretheyturnup. Whereconduitsturnuptheexteriorofbuildings,theyshallterminateinametalpull boxattachedtothebuildingplacedabovegradelevel.Penetrationsandsleevesinto thebuildingfromwithinthispullboxshallbeequaltothenumberandsizeofconduits enteringthepullboxfromtheground. 29.3 MAINTENANCEHOLESANDHANDHOLES TheContractorshallsupplyandinstallmaintenancehole(s)and/orhandhole(s)made ofprecastconcrete,todimensionsandspecificationsandinlocationsasshownonthe projectplans.Intheeventthatamaintenancehole/handholecannotbeplacedinthe areaasshownontheprojectplans,thenewlocationshallbesubjecttoapprovalbythe Tufts. TheContractorshallplacethelongaxisofeachnewmaintenanceholeparalleltothe lengthofthelargerductlinewhichistoenterthemaintenancehole,ifpossible. Maintenancehole/handholeenclosuresandcoversshallberatedfornolessthan5,000 lbs.overa10"x10"areaanddesignedandtestedtoatemperatureof50Fdegrees. Materialcompressivestrengthshallbenolessthan11,000PSI.Allmaintenance hole/handholecoversshalllieflushwiththesurroundingareawheninstalled.Inmost roadwaylocationsthemaintenanceholeratingshallbeH20. Newmaintenanceholesshallbeequippedwith:30roundcoverslabeled "Telecommunications",andpullingeyesonallwalls.Maintenanceholesshallhave2 setsofgalvanizedsteelverticalracking(5ft.high)installedalongeachendwalland3 setsofgalvanizedsteelverticalracking(5ft.high)installedalongeachlongwall.Two (2)eight(8)inchgalvanizedsteellegsshallbesuppliedandinstalledineachvertical rack. Maintenanceholeconstructionjointsshallbesealedwith1in.diameterasphaltrope. Theexteriorperimeterofthisconstructionjointshallbesealedwithhydrauliccement afterthemaintenanceholehasbeenplacedinitsfinalposition. Newhandholesshallbeequippedwith:24roundcoverslabeled "Telecommunications"andpullingeyesonallwalls.Handholesshallhave1(one)setof galvanizedsteelverticalracking(2ft.long)installedalongeachwallwhereconduitdoes notenter. Aminimumof6"ofproperlycompactedstructuralfillshallbeplacedbeneatheachnew enclosure. Maintenancehole/handholeexcavationandplacementshallbescheduledsothatthe maintenanceholeisplacedonthesamedaythattheexcavationforitismade.
53

Allpenetrationsofexistingmaintenanceholes/handholesshallbemadeusingexisting knockoutsifpossiblestartingatthebottompositionandworkingup.Penetrationsshall becenteredineachendofthemaintenancehole.Allconduitsshallentereach maintenanceholeata90degreeangletothesidewhichtheyenter.Eachconduitshall terminateintoeachmaintenanceholeusingabellfitting.Thisbellfittingshallbe sizedtoacceptthesamesizeconduitenteringthemaintenanceholeandshallbe mountedflushwiththeinteriorwallofthemaintenancehole.Eachpenetrationinto themaintenancehole(interiorandexterior)shallbesealedwithhydrauliccementto provideawaterproofsealandasmoothfinishontheinsidewallofthemaintenance hole. IftheContractormustbreakoutmaintenanceholewalls,caremustbetakentoavoid disturbingexistingservices.Ifworkinexistingmaintenanceholes/handholeswill disruptorrequiremovementofcablesinexistingmaintenanceholes/handholes, ContractorshallgiveTufts48hoursnoticebeforemovingsaidcables.Contractorshall notintentionallycutorotherwisedisruptexistingcablesinmaintenanceholes/hand holes,whetherdeemedtobeactiveorinactivebyContractor,withoutprovidingabove noticetoTufts. Agalvanizedsteelladdershallbeplacedineachnewmaintenancehole.Thebottom legsofthisladdershallbeattachedtoLshapedbracketsattachedtothefloorofeach maintenancehole.Thetopofthisladdershallreachtowithin2ofthetopofthe maintenanceholecover.ThisladdershallconformtoANSIA.14.11982(2),ANSI A.14.21982(3),ANSIA14.31984(4),orANSIA14.51982(5). TheContractorshallsupplyandinstallmaintenanceholesinthesize,quantityand locationasspecifiedonprojectplans. 29.4 BACKFILL Areastobebackfilledshallbefreeofconstructiondebris,refuse,compressibleor decayablematerialsandstandingwater.Donotplacefillwhentemperatureisbelow 30F.,andwhenfillmaterialsorlayersbelowthemarefrozenunlessspecifically approvedbyTuftsfortheparticularlocation. Anyexcavationsinpavedareasshallbebackfilledwithaminimum8"ofcompacted suitablegravelbackfillmaterial.Compactedgravelfillshallconsistofsandandgravel, crushedstoneorotherapprovedmaterial. 29.5 SURFACETREATMENTS 29.5.1 Pavedareas: TheworktobedoneconsistsofconstructingClass"A"permanentpatchesoversewer, drain,water,andelectricalconduitandstructuresinexistingroadways,sidewalks,and parkinglotsandatalllocationswhereexistingbituminousisremovedandreplaced.

54

BituminousconcreteshallbeClassIbituminousconcrete,TypeIl,furnishedandlaidin accordancewiththeMassachusettsDepartmentofPublicWorksandHighways, StandardSpecificationforRoadandBridgeConstruction,latestedition,includingall amendmentsthereto. Concreteshallconformtotherelevantprovisionforhighearlystrength,ClassA ConcreteASTMType3PortlandCementwithaminimum28daycompressivestrength 3,000PSI.Cylinderssix(6)inchesindiameterby12inchesinlengthshallbeusedto sampleconcretefromthetruck.Theyshallbetestedforcompliancetotheabove specificationwithreportssubmittedtoTufts. Allexistingmaterialswithinthelimitsofthepatchshallberemovedtoadepthof24 inchesbelowandparalleltotheexistingpavementgrade.Thesatisfactoryremovaland disposalofallexistingpavementandbasematerialwithin24inchesoftheexisting surfaceshallbeconsideredasincludedunderthisitemandnoadditionalcompensation willbeallowedtherefore. Priortotheremovaloftheexistingroadwaypavementand/orbase,theexisting pavementand/orbaseshallbecutverticallywithasaw.Thecuttingshallbeina straightlineforthefulldepthofpavementandbasetoberemoved.Theexisting pavementshallbecutbacksixinchesfromtheexistingbase.Noraggedorirregular edgeswillbepermitted. Allexistingpavementandbasematerialshallberemovedanddisposedofbythe Contractor. GravelbasecourseshallbepreparedaccordingtotheStandardSpecifications. Upontheproperlypreparedandthoroughlycompactedbasecourse,12inchesbelow andparalleltotheabuttingfinishedpavementsurface,theContractorshallplacehigh earlystrengthClassAcementconcrete,towithin21/2inchesoffinishedgrade.The concreteshallconformtoASTMC175specificationsforreinforcedairentrained concrete. Theconcretebaseshallbecoveredwithabindercourseof11/2inchesandatop courseof1inchofbituminouseachcourseplacedinonelayer.Thecoursesshallbe furnishedandplacedinaccordancewithASTMC175specifications. 29.6 CONCRETEPAVEMENTANDWALKWAYS: CastinplaceconcreteshallbeClassA,airentrainedconcreteconformingtoASTMC175 specificationsforminimum28daycompressivestrength3,000PSIconcrete.Concrete shallbeairentrained5%minimumwitha2inchto4inchmaximumslump. WiremeshforreinforcementshallconformtoAASHTOM55,latestrequirements.The wiremeshsizeshallbeWWF6In.x6in.10/10.Wiremeshusedforreinforcementshall beunrolledbeforeplacinginconcrete.Meshreinforcementshallbeheldfirmlyinplace againstverticalortransversemovement.
55

Concretepavementplacement,curing,testing,reinforcing,protectionandformwork shallbeasspecifiedinASTMC175specifications.Concreteshallhavemediumbroom finish.Nosprayorcuringcompoundsshallbeusedduringconstructionofconcrete basecourse. Expansionjointsshallbeplacedwherepavementmeetsstructures,ortwentyfeeton center.Followthemanufacturer'sapplicationrecommendationsforjointfillerand sealer.Expansionjointsshallbeaminimumof1/2inchwide.Slipdowelsshouldbe placedasrequired. 29.7 REPLACEMENTOFSOD: NewsodlawnshallbeappliedtoaffectedlawnareasandanyareaidentifiedbyTufts relatingtotheexcavation.Atleasteight(8)inchesofscreenedloamshallbeadded abovethegravelbackfill.Loamshallbefertilized,rakedandsodaddedandrolled.New sodshallbewatereddailyforapproximately30minutesforaperiodofthreeweeks. FinalacceptanceofsoddedareaswillbeattheUniversitiesdiscretion. 29.8 REPLACEMENTOFSHRUBBERY: Allshrubbery(includesallplantlife)thatisdisturbedbythisconduitprojectshallbe restoredtoitspreviouscondition.Finalacceptanceofshrubberyrestorationwillbeat theUniversitiesdiscretion. 29.9 PERMITS TheContractorshallberesponsibleforsecuringanypermitsrequiredforthisproject. TheContractorshallalsoberesponsibleforreceivingaDIGSAFEnumberpriortoany excavation. 29.10 DOCUMENTATION TheContractorshallprovideTuftswithasbuiltplansshowingthelocation,size,depth, lengths,andquantitiesofconduitsandmaintenanceholesplacedaspartofthisproject. Note:AUtilitysiteplanisavailabletoallcontractorsfromTuftsBuildingsandGrounds Dept.thatshowsapproximatelocationsofexistingutilities.

56

30 COMMUNITYANTENNATELEVISIONCATV
30.1 GENERALPROCEDURES Itisextremelyimportantthateachjobbeevaluatedpriortocommencingconstruction. Thepropermaterials,tools,andsafetyequipmentmustbeusedtoperformeachgiven task;thisensuresasafeandefficientworkenvironment. AnychangesmadetoadesignwillbeindicatedontheprintandsignedbytheTufts ProjectManager.ContractorwillnotchangethedesignwithoutapprovalbyTufts ProjectManager. AllinstallationsshallbemadeinaccordancewiththeNationalElectricalcode.ACATV fireresistantcableistobeusedfromtaptotheTVset.Forotherusessuchasrisers, ducts,plenum,elevatorshafts,andotherairhandlingspaces,refertoapprovedcable types.AllcoaxialcableswillbesuppliedbytheContractor. AllcustomercomplaintsandTuftsfieldrequestsmustbeaddressedwithin2hoursand mustbecompletedwithin24hours. 30.2 PREPLANNING Contractorwillendeavortomeettheconstructionstartandcompletiondates.Ifforany reasonconstructioncannotbecompletedbythegivendate,Tuftswillbenotifiedin advance. AmeetingwiththeTuftsProjectManager,buildingCurator,DepartmentHeadandthe Contractormustbearrangedtoinspectinternalandexternalutilities,communications lines,sprinklersystems,landscaping,asphalt,concrete,andhouselighting,etc.Thiswill eliminatepotentialdamageclaims. TheContractorisrequiredtonotifyDigSafeifexcavationisnecessary. Thebuildingoccupants,ManagementStaff,andtheCuratororassociationmustbe notifiedfive(5)workingdayspriortostartingconstruction.Thisistoarrangeaccessinto eachunit,ifneeded,andmakepersonalchangestoaccommodateourconstruction needs. TheContractoristoensurethatallmaterialsarepresentbeforestartofprojectsowork canproceedinatimelymanner. 30.3 SPECIFICATIONSANDMINIMUMREQUIREMENTS Careandprideshouldbetakenwhenroutingexteriorcables.Verticalandhorizontal runsmustbestraightandneat.

57

Takeprecautionstoavoidkinking,crushing,stretching,ornickingthewire.Ifthecableis damagedduringtheinstallationprocedure,itmustbereplacedbacktotheTelecom Room,pedestal,orlockbox. AllFeederdropsmustbesecurelyfastenedtothestructureatintervalsnogreaterthan 30inches.Thefastenedand/oranchortypeshallbeapprovedbytheTuftsProject Managerpriortoconstruction. TheFeederpenetrationshallbeanangledrillfromtheoutside.Thepenetrationpoint ontheinsideofthebuildingshouldbeslightlyhigherthanthatoftheoutside;thisisto preventwaterfrommigratingalongthecableintothestructure.Contractorshallensure thatallpower,telephonewiring,waterpipes,pocketdoorsandgaslinesinthewallsare identifiedandprotected.Thisshallincludetheuseofmechanicalblueprints,locators, groundfaultinterruptersandtestholes. Useofmoldingrisertoincludethedistributioncableanddropcables.Musthave6"drip loopatALLentrypoints. Allopenendsandintersectingjointsshallbemiteredandsealedwithsiliconecaulk. AllexteriorFtypeconnectors,splicesandsplittersshouldbeoftheoutdoortypeand properlyweathersealed. Alldropsaretobetaggedinlockboxes,pedestals,andTelecomRooms. Eachtimeastructureispenetrated,afeedthoughbushingmustbeusedinconjunction withasiliconesealant. Whencablesareinstalledthroughfirewalls,thewallsmustbesleevedwithEMT conduitinaccordancewithNEC.DropsaretheninstalledthroughtheEMTandsealed withanappropriatefirestop. Wallplatesarerequiredforeveryoutletinstallation.WallplateswithanF81connector aretobemountedatthesameheightastheelectricoutletor14"fromthefloortothe bottomoftheplate. Wheninstallingoutletsonanadjacentwallastudmustseparateallbackoutlets. Ifdrillingthroughacarpetedfloorbecomesnecessary,cutasmall(1/2")"X"inthe carpetbeforedrilling.Thiswillallowthedrilltopassthroughthecarpetwithout unraveling.Afeedthroughbushingwillsealtheholeandholddownthecarpet. Ifawallfishisnecessary,contacttheTuftsProjectManager.Donotcommencework withoutwrittenpermission. Iftheprojecthasabulkcontract,theunitisvacant,ornotelevisionexists,asixfoot jumpermustbeleft.

58

Alltestswillbeperformedusingthefulldropwhichistapthroughwallplateincluding thejumper. AllconnectionsmustbemadefromthewallplatetoeachTVandthepicturequality mustbeacceptabletotheTuftsProjectManageraswellasallchannelsmustbe present.IfthesubscriberispresentaskthattheyturnontheTVbeforehookingupthe jumpertoverifythattheTVisoperational. InstallFconnectorsoninteriorcablecarefullyandcorrectly,accordingtoDrop ConnectorSpecifications. Alloldwires,moldingclips,screwsandtiewrapsmustberemovedfromthestructure. Theholesmustbepatchedandsealed. 75Ohmportterminatorswillbeinstalledonallunusedtapports. Everylocationwillbeinstalledonallunusedtapports. Allequipmentincludingactivesandpassivesmustbemountedtoplywoodbacking wheninsidelockbox. AllknockoutsonlockboxesmustbesealedwithRTV. Dropswillbetiewrappedtogetherinthepedestalandlockboxinaneatandinorderly fashion. Cleanupanyparts,toolsordebrisbeforeleavingtheunit/structure.Alwaysleavethe areayouworkinascleanasitwasbeforeyouarrived. 30.4 LOCKBOXLOCATIONS AlllockboxesaretobeinstalledaccordingtothedesignprovidedbyTufts.Anychanges willnotbemadewithoutthewrittenpermissionoftheTuftsProjectManager. Alllockboxesshouldbemounted14'fromgroundleveltothebottomofthebox. ExceptionsmustbeapprovedinwritingbyTuftspriortoplacement. Whenmountingthelockbox,careshouldbetakennottoobstructanyoftheexisting facilities.Minimumdistancefromexistingboxesis2". EachboxmustbesecurelyfastenedwithananchoringsystemapprovedbytheTufts ProjectManager. Allequipment,includingactives,passives,deletionfilters,signalprocessors,etc.,must bemountedtotheplywoodbacking. Toaccommodatefutureequipmentchanges,anexcessof12"shallbeleftoneachdrop.
59

Ifalockboxisbeingremovedfromthestructure,thebuildingmustbepatchedand paintedtomatchexistingconditionsasmuchaspossible. Ifalockboxisbeingreplaced,installthenewlockboxinthesamelocationasthe previousbox.Anypenetrationorcrackscausedbytheboxremovalmustbepatched andsealedpriortoinstallingthenewbox. TheTuftsProjectManagermustbecontactedpriortoremovingalockboxwithanAC electricaloutlet. AlllockboxeswillhaveabeadofRTVaroundittosealittothewall.Allknockoutswill haveRTV. 30.5 WIRINGSTRUCTUREANDTOPOLOGY WiringtopologywillbeHomeRuncablesfromthetaptothewallplates. TuftspremiseswiringmustconformtoorexceedFCCPart76,Title29CFRParts1901.1 to1910.441GeneralIndustry,(OSHA),OrderNo.869019001115Excavations(OSHA 2226),OrderNo.029016001255UndergroundConstruction(Tunneling)(OSHA3115) StairwaysandLadders(OSHA3124),theappropriateULstandardrequirementforeach category,aswellascomplywiththe2002NationalElectricalCode,articles820&830, NESCTable2321andallapplicablestatecodesandlocalbuildingcodes.Inaddition: AllcablemustbeULlistedfortheintendedpurpose. AllcablingtypesinstalledbytheContractormustbeoneoftheapprovedtypes,as listedintheseSpecificationsortheSOW. TheContractorshallmakenosubstitutionsincabletypesunlesswrittenapprovalis receivedfromTuftspriortotheinstallationofanysubstitutecable.Cabletypesshall beconsistentthroughouttheprojectandinstalledaccordingtotheManufacturers specifications. ForallCommScopecables,refertotheCommScopeTrunkandDistributionCable ApplicationsandConstructionManual,aswellastheCommScopeBroadband ApplicationsandConstructionManual/DropCable. Contractormayberequiredtomovefurnitureandotheritemsfortheinstallationof cablesandoutlets.Whenfurnitureismoved,itwillbeimmediatelyreturnedtoits originallocationwhenthatparticularoperationiscompleted.Furniturewillnotbe leftfromitsoriginallocationforanyextendedlengthoftime,especiallyovernight.

30.6 ATTHETAP Thefollowingtaskswillbeperformedateachtap: Tagthenewdropandwritetheroomnumberonitusingapermanentmarker.


60

Connectorsshouldbetightenedto20inchpoundsusinga7/16"openendtorque wrench. Checkandtightenanylooseconnectors. Terminateorcapandproperlysealallunusedspigotsonthetap.

30.7 AERIALINSTALLATIONFROMPOLETOBUILDING Thefollowingareasarenottobecrossedwhenplacinganaerialdrop: PropertiesotherthanTufts. Swimmingpools. Adjoiningroofs,unlessproperclearanceismaintained. Electricortelephoneservicelines.

Doorsorwindows. *Inordertoavoidtheseproblems,sometimesamidspanattachmentwillbenecessary. AttachmenttothestructureshouldbemadeonthesamesideasthePowerService. Appropriateconsiderationshouldbegiventopossibleobstructions.Structure attachmentmusthaveaonefootclearancefrompowerattachmentonbuilding. Structureattachmentshouldbeofsufficientheighttoensurepropersagclearancefrom theground. Donotlayoutthecablewhereanyvehiclescouldrunoverit.Thiswilldamagethe dielectricandcausesignalproblems. 30.8 APPROVEDCATVCABLETYPES Drop(IndoortoTVOutlet): CommScopeF6SSVR(RG6SuperShield)forRiser,orCommScope2227K (RG6SuperShield)forPlenum Drop(OutdoorPoletoBuilding): CommScopeF6SSVM(RG6SuperShieldMessenger) RoomtoRoomFeeder: CommScopeF11SSVR(RG11SuperShield)forRiserorCommScope 2287K(RG11SuperShield)forPlenum AerialDistribution/PoletoPole:
61

CommScopeP3500JCA(LashedtoStrand)

AerialDistribution/PoletoBuilding: CommScopeP3500JCAM109(SelfSupportingMessenger) UndergroundDistribution: CommScopeP3500JCASS Indoor/RiserDistribution: CommScopeP3500JCAR AerialTrunk: CommScopeP3750JCA(LashedtoStrand) Headend: 30.9 OUTLETS CATVOutletSYSTIMAXM81C75ohmthreadedbarrelconnector 30.10 CATVCABLETERMINATIONS AllCATVterminationsattheTelecomRoomendandattheWallPlatewillbemade usingThomas&BettsSnapnSealFConnectors.IntheTelecomRoomtheterminated dropswillbeconnectedtoanavailabletapport.Iftherearenotanyavailabletapports, theContractorisresponsibletonotifyTuftsProjectManagersothataredesignmaybe done. AllFConnectorswillbehandtightenedattheTapandtheWallPlateandthentorqued to20lb.in.usinga7/16torquewrench.Noconnectorswillbewrenchtightenedtoany equipmentotherthantheTaps,Splitters,andWallPlates.NeverwrenchtightenF connectorstoTVs,VCRsoranyothersubscriberequipment. AllcoaxialcableshallbepreparedforFConnectorswithanapprovedCablePreptool designedforthesizecablethatwasinstalled.Noothermethodisacceptable. AlloutdoorconnectionsshallbeweathersealedusingamethodapprovedbyTufts. 30.11 CABLEROUTING DonotleaveextracableforTuftswithoutpermissionfromTuftsProjectManager. Anyturnsorbendsinthecable,otherthandriploops,shouldbeaminimumofthree inchesindiameter.Don'tdrapethecableormakediagonalruns.Donotruncablein frontofdoorwaysorwindows. CommScopeF59HEC2

62

Thecableshouldbeconcealedwhereverpossible.Thegoalistomaketheinstallas pleasingtotheeyeaspossible,butalsoeasilyservicedbyourtechnicians. Ifthestructurehasanunfinishedbasement,useitforcableroutingwhenyoucan. Whenrunningadropinanunfinishedbasement,attempttofollowthebeamsorjoists. Donotrunthecablediagonallyorattachittothebottomofthebeamsorjoistinthe eventthataceilingisputinatalaterdate. Donotrunthecablethroughthesameholesastheelectricalwiring. StaplesMUSTNOTbeusedtosupportthecable.Staplescanriporcutintothejacket, allowingmoisturetopenetrate,aswellascausingshorts,signalleakage,andchangesto theelectricalcharacteristicsofthecable. Useonlyapprovedcableclipstosupportthecable. Avoidroutingcablenearbaseboardheaters,hotwaterpipes,andhotairducts.Over time,theheatwilldryoutthedielectric. TiewrapsusedtobundlecablesshallbeVELCROandpulledsnugbutnotcinchedso thatthecablesinthebundlearenotcompressed.ThelengthoftheVELCROtiewrap shouldoverlapthesizeofthecablebundlebeingwrappedby8toallowforgrowth. Contractorwillendeavortokeepcablesinbundlesovertheentirerun.Thisisextremely importantwhenenteringorleavingRooms. Cablebundlesshallbewrappedatintervalsof18in.Allcablerunsshallbeparallelor perpendiculartowallsandfloors.Whencrossingcorridors,cablesshallbetiedina bundleandsupportedoverthecorridorcrossing,sothatremovalofanytilewillnot causethebundletodrapebelowtheceilingline.Noloosecablesshallbelaidonthe dropceilings.CablesMUSTBEATLEAST4aboveremovableceilingtiles. Atnotime,exceptduringactualcablepullingoperations,willcablesbelefthanging outofceilingsorcoiledinhallways,officesetc.Ifrequired,Contractorwillleave slack/coilsaboveceilings,properlymaintainingtheirbendradius.Interminalrooms, IDFs/MDFs,Contractorwillnotleavecablesonfloororallowcablestohangincoils.All slackincableswillbecoiledandleftaboveceiling.Donotlaycablesdirectlyacross ceilingtiles,grids,orfixtures.Usecabletrayorothermethodstosupportthecablesand keepthematleast6inchesawayfromfluorescentorHIDlightfixtures.Donotallow cablestocrosspowercablesatrightangles. Duringinstallation,Contractorwillprotectcablesfrombeingsteppedon.Thisappliesto allareas,includinghallwayandTelcoRooms. Allwiringrunningalongthewallshallbesecuredtothewallsofthetelephone rooms/hallways,etc.,usingamethodtobeapprovedbyTufts.Cablesupportsshallbe

63

usedtopreventstrainontheconductors,supplementedbystrainreliefatconnector terminationpoints.SupporthorizontalcablebundlesusingbroadsupportslikeJhooks orcabletrays.Avoidusingnarrow"bridlerings"sincetheytendtocrushthecables. AllcableendsattheWallPlateshallhaveatleast6"ofslackcoiledupandstowedinside thewallbox,and12ofslacklocatedattheTelecomRoom. Toavoidstressingconductors,limitpullingtensionto120poundsmaximumasspecified bythemanufacturer.Inaddition,pullcablesgraduallyandwithconstanttension,taking carenottocrushorpinchbundles.Beparticularlycarefulwhenpullingcablesaround corners,watchingoutfornailsandsharpedgesthatcoulddamagetheinsulation. TheContractorshallmarkeachcablesheathwiththeroom,plateletter,andcabletype attheendofeachcable(e.g.101AV1signifiesRoom101,plateA,Voice1cable).Only indelible,clearlyprintedlabelsormarkingsshallbeacceptable. Whencablelubricantisused,readinstructionstobesureitiscompatiblewiththe cablesjacketmaterial(PVCorFEP). DonotspliceorrepairdamagedcablesbetweenthetelecomRoomandoutletlocations. Youmustpullanewcable. Usegrommetstoprotectthecablewherepassingthroughmetalstudsoranythingthat canpossiblycausedamagetothecables. 30.12 TESTINGCATVCABLES 30.12.1 MinimumSpecificationsContractorshallperformtestingtoinsureallcablesmeetor exceedthefollowing: VisualSignalLevel Visualsignallevel,acrossterminatingimpedancewhichcorrectlymatchesthe internalimpedanceofthecablesystemasviewedfromthesubscriberterminal, shallnotbelessthan1millivoltacrossaninternalimpedanceof75ohms(0dBmV) atthehighestfrequencyusedinthesystem. SystemNoise TheratioofRFvisualsignalleveltosystemnoiseshallnotbelessthan43decibelsat thewallplate. LowFrequencyDisturbances(HumorRepetitivetransients) LowFrequencyDisturbances,generatedwithinthesystem,orbyinadequatelow frequencyresponse,shallnotexceed3%ofthevisualsignallevel.Measurements madeonasinglechannelusingasingleunmodulatedcarriermaybeusedto demonstratecompliancewiththisparameterateachwallplate. SignalLeakage

64

SignalLeakagefromacabletelevisionsystemshallbemeasuredinaccordancewith theproceduresoutlinedin76.609(h)andshallbelimitedasfollows: o Lessthanandincluding54MHz,andover216MHz15microvoltpermeter@ 30meters. Over54uptoandincluding216MHz20microvoltspermeter@3meters. ContractorwillprovidetestresultsperFCCPart76.605TechnicalStandards.

o o

30.13 GROUNDINGANDBONDING AllgroundingandbondingshallcomplywithNECarticle820. 30.14 DOCUMENTATION TheContractorshallfurnishasetofasbuiltpremisewiringdrawings,showingthe actualcablepathsandoutletlocations.Asbuiltinformationshallbecompletedpriorto systemacceptancetesting. 30.15 ACCEPTANCETESTCATVPREMISECABLING Theacceptancetestincludesthefollowingthreeparts: Verificationofasbuiltinformation Workmanshipinspection Electricaltests

30.15.1 Verificationofasbuiltinformation Theacceptancetestwillincludeverificationoftheasbuiltinformationredmarkedby theContractorondrawingssuppliedbyTuftsforthatpurpose. 30.15.2 Workmanshipinspection Allcableruns,wallplatesanddistributionframesshallbeinspected.Theworkmanship partoftheAcceptanceTestincludesinspectionofwiresformechanicaldamage(cuts andabrasions,rushedsegments,crushedorcrackedconnectors),spacing,androuting. 30.15.3 ElectricalTests Electricaltestswillidentifyshortedcables,opencables,highresistance,faulty connections,andincorrectlylabeledconnections,aswellasverifyingthatthewiring installationhasbeenperformedasspecified.Inaddition,allcircuitsshallbetestedwith acabletestercapableofverifyingthecircuitundertest.Theminimumparameterstobe reportedare:

65

Signalstrengthatoutlet(notlessthan0dBmV@55MHz,301MHz,and499MHz). CLInotmorethan20microvoltspermeterbetween54MHzand216MHz measured@3meters. C/Nnotlessthan43dB@thehighestchannel. Humnotmorethan3%. Attenuation(notmorethan5.65dBper100feet@750MHzforRG6andnotmore than3.65dBper100feet@750MHzforRG11). CharacteristicImpedancemustbe75ohms.

Intheinstancewhereanyjack(s)failstheappropriatetest,theContractorshallrepair thefaultycircuitandretest.TheContractorshallprovidethetestequipmentand performthesetests.Theformatofthesetestresultsshallincludethecompletejacki.d. (buildingnumber,outletnumberandjacknumber)associatedwiththeabove parameters.Thisdocumentation(diskette)shallbeprovidedtoTuftsaspartoftheas builtinformation. InordertosavetimeitisexpectedthattheContractorwillhavecheckedthe workmanshipandcompletelycheckedallconnectionspriortotheacceptancetest. Tuftsshallapprovetheacceptancetestmethodbeforetestingbegins.TheContractor mayberequiredtorepeatanytestswhichwereperformedwithouttheapprovalofthe TuftsProjectManager.Thetestshallbedividedintodiscreteareascorrespondingtothe floors,andcanbeperformedinanyconvenientorder. Inanyareawheretheproportionofsuccessfultestsfallsbelow90%theacceptancetest willbesuspendedandtheContractorwillberequiredtocorrectthedeficiencyandto retesttheremainderofthearea.Thetestwillberepeatedfromitsbeginning,inorder toensurethatnocircuitsweredamagedintherepairprocess.

66

Appendix1 TypicalAlarmConfigurationwithIntegratedAccessControl(i.e.JumboFob) Notethatthisisaforwardmovingconfiguration.Existinginstallationsfeatureastandalone duallinecommunicatorfortheFACP.

67

AlarmConfigurationVariations Thevariouspermutationsofalarmpanelsaredepictedwiththeirmeansof communication.Thesepanelsmaybemixed,makingcommunicationsrequirementsdynamic basedonconfiguration.

68

También podría gustarte