GUtech GERMAN UNIVERSITY OF TECHNOLOGY IN OMAN - PHASE 1 MAIN WORKS PACKAGE BILL No.

3 : Main Building SECTION G : THERMAL & MOISTURE PROTECTION Unit Rate Amount R.O Bz

Item

Description

Quantity

Unit

SECTION G : THERMAL & MOISTURE PROTECTION

The Contractor is referred to the Specifications and Drawings for all details related to this Section of the works and he is to include for complying with all the requirements contained therein

Roof Covering Roofing system consists of screed laid to falls with 4 mm torch applied membrane water proofing and 100 mm thick insulation finished with white cement tiles on cement mortar bedding over terram sheet

A B C

Screed laid to falls Water proofing system Vertically, along roof slab / parapet junction including corner fillet Edge flashing all as shown on External wall details drg. no. AR.4.D34.003.020.05.00.A.1 Terrace paved area as shown in Roof Plan Allow for water proofing around drainage out lets, pipes and the like

4350 4350

m2 m2

681

681 805

m m
2

E F

Item

To Collection

GU tech - Main Contract Works Bill 3: Section G: Thermal and Moisture Protection Date: August 2010

73

Majan Engineering (QS Division)

GUtech GERMAN UNIVERSITY OF TECHNOLOGY IN OMAN - PHASE 1 MAIN WORKS PACKAGE BILL No. 3 : Main Building SECTION G : THERMAL & MOISTURE PROTECTION Unit Rate Amount R.O Bz

Item

Description

Quantity

Unit

SECTION G : THERMAL & MOISTURE PROTECTION

Sub-structure waterproofing Approved type waterproofing to concrete surfaces A Laid horizontally and vertically Polythene sheet damp proof membrane B 1000 gauge Wet area waterproofing Floor Slab Water proofing system C D E F Screed in bath room, toilet and Kitchen areas Screed in second floor court yard Screed in amphiteatre area Water proofing laid horizontally to wet floor areas 1,708 G Water proofing laid vertically, along floor / wall junction including cement sand fillet m
2

22,004

10,212

m2

753 416 539

m2 m2 m2

1,175

To Collection

GU tech - Main Contract Works Bill 3: Section G: Thermal and Moisture Protection Date: August 2010

74

Majan Engineering (QS Division)

GUtech GERMAN UNIVERSITY OF TECHNOLOGY IN OMAN - PHASE 1 MAIN WORKS PACKAGE BILL No. 3 : Main Building SECTION G : THERMAL & MOISTURE PROTECTION Unit Rate Amount R.O Bz

Item

Description

Quantity

Unit

SECTION G : THERMAL & MOISTURE PROTECTION

Sundries A Allow for water proofing to under ground water tanks with plaster and fibre glass lining to internal and approved water proofing to external face 1 B Allow for water proofing to roof -top water tanks with plaster and fibre glass lining to internal Item

Item

To Collection

GU tech - Main Contract Works Bill 3: Section G: Thermal and Moisture Protection Date: August 2010

75

Majan Engineering (QS Division)

GUtech GERMAN UNIVERSITY OF TECHNOLOGY IN OMAN - PHASE 1 MAIN WORKS PACKAGE BILL No. 3 : Main Building SECTION G : THERMAL & MOISTURE PROTECTION Unit Rate Amount R.O Bz

Item

Description

Quantity

Unit

SECTION G : THERMAL & MOISTURE PROTECTION

Other Items Contractor shall list here other items not included above but included in the specifications and drawings and necessary for the complete and satisfactory completion of this section of the works. Such items shall be deemed to be included unless specifically listed here

To Collection

GU tech - Main Contract Works Bill 3: Section G: Thermal and Moisture Protection Date: August 2010

76

Majan Engineering (QS Division)

GUtech GERMAN UNIVERSITY OF TECHNOLOGY IN OMAN - PHASE 1 MAIN WORKS PACKAGE BILL No. 3 : Main Building SECTION G : THERMAL & MOISTURE PROTECTION Unit Rate Amount R.O Bz

Item

Description

Quantity

Unit

SECTION G : THERMAL & MOISTURE PROTECTION

Collection Page 73 74 75 76

BILL NO 3 SECTION G - THERMAL & MOISTURE PROTECTION CARRIED TO BILL NO. 3 SUMMARY

GU tech - Main Contract Works Bill 3: Section G: Thermal and Moisture Protection Date: August 2010

77

Majan Engineering (QS Division)