Descripcin
REPARACIONES:
FACHADA
Paete
Muros elevados
Recubrimiento
Losa de entrada
Colocacin de fino
Zabaleta
Paete de losa
Hierros en huecos de ventanas
Revestimiento de placas de vinil
en muros
Demolicin y bote de piso
existente
Torta de piso
Suministro y colocacin piso de
alto trnsito
Cant.
Ud.
Precio
49.83
25.00
49.83
1.58
13.12
10.50
13.12
155.52
M2
M2
M2
M3
M2
ML
M2
M2
246.86
955.70
1,074.60
14,327.43
295.22
99.95
286.47
3,277.04
144.52
M2
1,080.99
5.80
M2
3,439.09
1.58
M3
6,407.55
17.40
M2
1,155.31
7.00
75.00
101.88
4.50
3.00
12.10
55.12
6.61
Uds
Uds
M2
M3
Uds
M2
M2
M3
328.12
103.54
62.12
367.98
560.40
46.59
46.59
367.98
1.00
P.A.
124.25
5.10
8.50
ML
ML
84.90
84.90
20.00
20.00
Uds
Uds
103.54
103.54
20.00
Uds
5,698.00
20.00
Uds
4,440.00
Sub total
A
1
2
3
4
5
6
7
8
9
10
11
Desmontes y Demoliciones:
Desmonte puertas de cristal
Desmonte puertas de madera
Demolicin cermica en baos
Bote material demolido
Desmonte puerta de tola
Demolicin meseta de marmolito
Demolicin piso de granito
Bote material demolido
Desmonte de ventanas (sala de
partos) (1.15 M2)
Desmonte de gabinetes de pared
Desmonte de gabinetes de piso
Subtotal:
B
1
2
3
4
Instalaciones Sanitarias:
Desmonte de inodoros
Desmonte de lavamanos
Suministro y colocacin inodoros
taino
Suministro
y
colocacin
lavamanos Lucerna
5
6
7
8
20.00
Uds
2,545.38
20.00
Uds
457.45
20.00
Uds
140.30
2.00
Uds
5,154.53
73.00
Uds
6,194.38
2.00
Uds
12,801.73
22.60
P2
248.50
3.96
M2
7,429.75
6.29
M2
7,429.75
5.00
Uds
4,460.73
15.44
M2
7,429.75
3.48
M2
7,542.32
Subtotal:
C
1
2
3
4
6
7
9
10
Portage:
Suministro y colocacin puerta
sencilla de polimetal.
Suministro y colocacin puerta
doble de polimetal.
Colocacin
cristal
fijo
en
laboratorio
Suministro y colocacin puerta de
aluminio y vidrio con boomper
(en rea de emergencia) (1uds).
Suministro y colocacin puerta de
aluminio y vidrio con boomper
(en rea de ciruga) (2uds).
Suministro y colocacin puerta
sencilla de polimetal en baos
Suministro y colocacin puerta de
aluminio y vidrio (en rea de
ciruga) (3uds).
Suministro y colocacin puerta de
aluminio y vidrio con boomper
(en rea de quirfano) (1uds).
Suministro y colocacin puerta de
tola
Suministro y colocacin puerta de
hierro
Subtotal:
3.36
3.36
M2
M2
3,613.39
3,573.26
D
1
2
3
4
5
Instalacin Elctrica:
Suministro y colocacin lmparas
fluorescente de 3x32w T8 con
balastro electrnico
Globos de 8" completos con
bombillo de bajo consumo.
Salida tomacorriente 110v
Salida interruptor sencillo
Salida interruptor doble
70.00
Uds
2,764.02
25.00
Uds
644.25
40.00
20.00
10.00
Uds
Uds
Uds
1,176.05
1,143.18
1,322.97
9.00
Uds
#########
2.00
Uds
#########
2.00
Uds
#########
305.00
M2
619.44
93.47
M2
5,451.06
12.00
Ud
#########
1.00
Uds
#########
Subtotal.
E
1
Climatizacin:
Suministro y colocacin A/A Split
de 24000 BTU marca Lennox
(quirfano
y
oficina
administrativa).
Suministro y colocacin A/A Split
de 24000 BTU marca Lennox (en
emergencias)
Suministro y colocacin A/A Split
de 36000 BTU marca Lennox
(quirfano y sala de partos).
Subtotal:
F
1
2
3
Plafn.
Suministro y colocacin plafn
PVC en (consultorios, reas
administrativas).
Falso cielo (plafon aseptico tipo
clean room liso o similar)
Suministro y colocacin de
Cortinas
Antibacteriales,
resistentes al fuego y resistentes a
las manchas
Subtotal:
G
1
rea de Ciruga:
Suministro
y
colocacin
lavamanos quirrgico doble con
accionador.
3
4
5
6
6
Revestimiento en muros de
material vinilico aseptico, con
juntas sanitarias y electrosoldado.
(incluye todo lo necesario para su
correcta instalacin)
Aplicacin pintura acrilica en
techos
Falso cielo (plafon aseptico tipo
clean room liso o similar)
Piso de vinyl aseptico, incluye
juntas sanitarias y electrosoldado
(incluye todo lo necesario para su
correcta instalacin)
Auto nivelante para pisos
Redondeo de esquinas
146.25
M2
4,955.51
55.12
M2
110.52
55.12
M2
5,451.06
55.12
M2
5,574.95
55.12
42.20
M2
ML
1,486.65
103.54
1.13
2.00
M2
Uds
2,543.68
309.72
82.17
M2
881.64
5.10
PL
2,374.51
8.50
PL
2,374.51
1.00
Uds
4,824.48
1.00
Uds
5,154.53
5.00
90.72
57.04
57.04
91.80
Uds
M2
M2
M2
M2
155.03
881.64
110.52
164.94
142.95
Subtotal:
H
1
2
Sala de Partos:
Vidrio fijo
Tapa caja de breaker
Subtotal:
I
1
2
6
7
8
9
10
Cocina:
Colocacin cermica en muros
Suministro y colocacin gabinete
de pared en roble tintado color
caoba
Suministro y colocacin gabinete
de piso en roble tintado color
caoba
Suministro y colocacin fregadero
sencillo de acero inoxidable
Suministro y colocacin fregadero
doble de acero inoxidable
Parrilla para desages
Cermica de muros
Pintura acrlica de techo
Pulido de piso
Pintura semigloss
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
3.00
1.00
Uds
Uds
6,194.38
#########
3.87
P2
246.31
24.96
1.00
6.00
3.00
1.00
1.00
7.00
23.29
13.12
6.63
5.00
P2
P.A.
Uds
Uds
Uds
Uds
Uds
PL
PL
M2
Uds
215.52
517.70
3,013.87
219.50
79.92
644.25
65.22
2,374.51
2,374.51
309.72
3,500.00
4.62
M2
117.35
3.00
2.00
0.36
0.60
2.40
Uds
Uds
M2
M2
ML
235.32
#########
56.48
246.86
82.68
34.20
M2
1,103.43
24.80
M2
891.86
15.00
280.00
81.00
5.00
59.25
18.50
5.05
Uds
M2
M2
Uds
M2
M2
M3
155.03
110.52
619.44
407.80
62.12
62.12
367.98
62.40
M2
1,103.43
18.50
M2
891.86
5.00
5.00
Uds
Uds
219.50
79.92
Subtotal:
J
1
2
3
4
5
6
7
8
9
10
11
12
13
Habitaciones
Mdicos
Residentes:
Suministro y colocacin cermica
en muros de baos.
Suministro y colocacin cermica
en pisos
Parrilla para desages
Pintura acrlica de muros
Plafn en PVC
Rotulacin
Demolicin cermica de muros
Demolicin cermica de piso
Bote de material
Suministro y colocacin cermica
de muros
Suministro y colocacin cermica
de pisos
Interruptores dobles
Interruptores sencillos
14
15
16
17
18
19
20
21
22
Globos
Lmparas 2 x4
Tomacorriente 110 V
Salida de data
Suministro y colocacin puerta
sencilla de polimetal
Suministro y colocacin puerta
doble de polimetal
Pintura de mantenimiento en
hierro
Suministro y colocacin ventanas
de celosas de cristal
Pulido de piso
10.00
5.00
15.00
5.00
Uds
Uds
Uds
Uds
644.25
2,822.03
65.22
678.63
15.00
Uds
6,194.38
5.00
Uds
#########
29.40
M2
117.35
316.34
P2
236.40
81.00
M2
164.94
M3
M3
414.16
103.54
M3
9,657.14
M3
#########
M3
#########
M3
#########
M2
M2
897.06
722.74
ML
222.70
M2
3,573.26
M2
1,013.15
M2
M2
M2
117.35
246.86
82.68
M2
110.52
M2
512.60
Subtotal:
K
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
Reparacin de Verja:
Excavacin a mano
187.30
Relleno de reposicin
100.96
Hormign armado zapata de
37.86
muros
Hormign armado viga NP
9.46
(0.15x0.20)m
Hormign armado viga de amarre
9.46
(0.15 x 0.20)m
Hormign
en
columnas
5.76
(0.13x0.20x0.20)m
Colocacin bloques de 6" BNP
249.20
Colocacin bloques de 6" SNP
1,104.25
Suministro y colocacin alambre
315.50
trinchera
Puerta de hierro con rieles
21.00
Suministro y colocacin puerta
2.50
peatonal en malla ciclnica.
Pintura mantenimiento en hierro
13.10
Paete en muros
2,203.50
Cantos en verja
650.00
Aplicacin pintura acrlica en
2,203.50
muros
Reparacin de aceras interiores
50.00
Subtotal:
Revestimiento:
1
2
Paete en muros
Cermica en muros
101.88
106.32
M2
M2
246.86
1,103.43
2,911.64
5,540.25
1,757.00
M2
M2
M2
110.52
110.52
110.52
Subtotal:
M
1
2
3
Pintura:
Acrlica en muros exteriores
Acrlica en muros interiores
Acrlica en techos
Subtotal:
II
I
A
1
2
3
B
1
2
3
4
Movimiento de tierras:
Excavacin a mano
Relleno material de mina
Relleno de reposicin
Bote
408.53
117.50
6.47
31.35
M3
M3
M3
M3
414.16
1,085.65
103.54
367.98
20.44
35.96
15.17
M3
M3
M3
9,657.14
9,657.14
#########
28.78
M3
5,361.60
1.75
20.99
28.78
M3
M3
M3
#########
#########
#########
Subtotal:
C
1
2
3
4
5
6
7
Hormign Armado:
Zapata de muros
Zapata de columnas
Columnas
Losa de piso con
electrosoldada
Dinteles
Vigas
Losa
Subtotal:
malla
D
1
2
Colocacin de bloques:
De 6" BNP
De 6" SNP
267.83
377.39
M2
M2
897.06
722.74
825.28
475.91
349.57
239.88
58.40
434.94
199.81
M2
M2
M2
M2
ML
ML
M2
67.03
246.86
246.86
246.86
326.15
82.68
1,103.43
239.83
M2
1,085.27
275.69
38.18
ML
M2
123.04
1,103.43
475.71
239.83
349.57
M2
M2
M2
142.95
110.52
110.52
9.00
2.00
4.00
Uds.
Uds.
Uds.
6,194.38
7,659.99
4,296.91
Subtotal:
E
1
2
3
4
5
6
7
Terminacin de superficie:
Fraguache
Paete de muros interiores
Paete de muros exteriores
Paete de techo
Alto relieve en ventanas
Cantos
Revestimiento de cermica
Subtotal:
F
1
2
3
Colocacin de piso:
Suministro y colocacin de pisos
de granito fondo blanco (incluye
pulido y brillado)
Zcalos
Cermica en baos
Subtotal:
G
1
2
3
Pintura:
Semigloss interior
Acrlica de techo
Acrlica exterior
Subtotal:
H
1
2
3
Puertas:
De polimetal sencilla
De tola
Polimetal en baos
Subtotal:
I
1
Ventanas:
Suministro y colocacin
ventanas aluminio
de
222.30
P2
215.52
Subtotal:
K
1
2
3
4
5
6
7
8
9
10
11
Instalacin Sanitaria:
Suministro e instalacin de
inodoros
Suministro e instalacin de
lavamanos
Suministro e instalacin de ducha
Desage de piso
Suministro e instalacin de
orinales
Caja de inspeccin
Tubera de arrastre de 4" PVC
Tubera de agua potable de 3/4"
PVC
Pileta
Ventilacin de 3"
Drenaje empotrado para unidades
de aire acondicionado en tubera
3/4" PVC
7.00
Ud
5,698.00
10.00
Ud
4,440.00
1.00
5.00
Ud
Ud
2,545.38
140.30
2.00
Ud
4,736.00
8.00
175.13
Ud
PL
5,489.50
52.35
172.13
PL
44.47
1.00
5.00
Ud
Ud
4,196.45
1,499.11
6.00
Ud
259.61
31.00
Ud
977.48
31.00
Ud
2,677.28
4.00
14.00
2.00
1.00
1.00
1.00
23.00
6.00
Ud
Ud
Ud
Ud
Ud
Ud
Ud
Ud
1,621.73
1,143.18
1,215.05
657.33
678.63
657.33
1,176.05
1,896.50
1.00
Ud
4,603.75
1.00
Ud
1,081.62
1.00
Ud
#########
Subtotal:
L
1
2
3
4
5
6
7
8
9
10
11
12
13
Instalacin Elctrica
Salida de techo
Suministro e instalacin de
lmpara de 4x32W T8, balastro
electrnico
Salida cenitales con globo
Salida para interruptor simple
Salida interruptor tres vas
Salida de telfono
Salida de data
Salida de tv
Salida tomacorriente 120V
Salida tomacorriente 220V
Suministro e instalacin de
abanico de techo KDK
Salida para control de abanico
Panel de distribucin de 30
circuitos
14
Alimentadores de panel de
distribucin con: 2#4THW para
fase 1#6 para neutro 1#10THW
para tierra en PVC 1 1/2" SDR-26
@ 100PL
100.00
PL
203.62
85.00
3.33
7.40
16.00
239.83
P2
M3
M2
Uds.
M2
309.72
22,091.46
1,119.06
1,462.42
619.44
20.66
M2
3,277.04
Ud
#########
Subtotal:
M
1
2
3
4
5
6
Miscelneos:
Tope de marmolito
Hormign rampa de escalera
Descanso de escalera
Escalones
Plafn PVC
Protectores de hierro en ventanas
Suministro y colocacin de
Cortinas
Antibacteriales,
resistentes al fuego y resistentes a
las manchas
Counter de granito en informacin
8
9
10
11
12
13
Acera perimetral
Pasamanos de escalera
Meseta de marmolito
Letrero identificativo
Suministro y colocacin Letrero
c/letras colgante c/luces Led
10.00
68.86
P2
361.34
40.05
28.00
72.95
1.00
M2
ML
P2
PA
512.60
3,066.60
309.72
15,485.96
1.00
P.A
55,749.46
10.31
25.10
0.14
49.00
M3
M3
M3
M3
22,099.51
22,099.51
22,266.38
14,327.43
62.16
274.54
M2
M2
746.15
722.74
Subtotal:
II
A
1
2
3
4
Segundo Nivel
Hormign Armado
Columnas
Vigas
Dinteles
Losa
Subtotal:
B
1
2
Colocacin de bloques:
De 4" SNP
De 6" SNP
Subtotal:
C
1
2
3
4
b
1
2
Terminacin de superficie:
Fraguache
Paete de muros interiores
Paete de muros exteriores
Paete de techo
Alto relieve en ventanas
Cantos
Revestimiento de cermica
626.65
290.73
306.60
201.50
30.00
50.00
45.60
M2
M2
M2
M2
ML
ML
M2
67.03
246.86
246.86
246.86
326.15
82.68
1,103.43
170.80
M2
1,085.27
10.51
52.90
12.20
ML
M2
ML
123.04
833.98
126.72
223.70
52.90
M2
ML
295.22
99.95
231.86
M2
412.96
6.00
Ud
140.30
290.73
430.92
201.50
M2
M2
M2
Subtotal:
D
1
2
3
4
Colocacin de piso:
Suministro y colocacin de pisos
de granito fondo blanco (incluye
pulido y brillado)
Zcalos de granito
Adoquines
Zcalos de adoquines
Subtotal:
E
1
2
3
Terminacin de techo:
Fino de techo
Zabaleta
Impermeabilizante
tipo
lona
asfltica de 4.50 mm con refuerzo
de
polister
libre
de
mantenimiento
(sujeto
a
presentacin de factura y garanta)
Desage de techo de 3"
Subtotal:
F
1
2
3
Pintura:
Semigloss interior
Acrlica exterior
Acrlica techo
Subtotal :
Puertas y ventanas:
142.95
110.52
110.52
2
3
Puerta Polimetal
Ventanas correderas de cristal
(1.40 x 1.10)
Protectores en ventanas
1.00
Ud
12,555.00
3.00
Ud
6,194.38
165.70
P2
246.31
165.70
P2
294.23
64.78
223.70
1.00
M2
M2
Ud
512.60
619.44
3,174.20
1.00
2.00
2.00
3.00
22.30
22.30
2.00
Ud
Ud
Ud
Ud
PL
ML
Ud
4,196.45
4,440.00
5,698.00
140.30
52.35
44.47
1,499.11
18.00
Ud
2,677.28
19.00
3.00
2.00
2.00
7.00
Ud
Ud
Ud
Ud
Ud
977.48
977.48
1,322.97
1,215.05
1,185.49
2.00
Ud
2,024.71
1.00
Ud
678.63
1.00
Ud
4,969.42
Subtotal :
H
1
2
3
Miscelneos:
Acera perimetral
Plafn PVC
Podio (roble)
Subtotal :
I
1
2
3
4
5
6
7
Instalacin sanitaria:
Pileta
Lavamanos
Inodoros
Desage de piso
Tubera de 4" drenaje
Tubera de 3/4" presin
Ventilacin 3"
Subtotal :
J
1
2
3
4
5
6
7
8
9
Instalacin Elctrica:
Lmpara de 4x32W T8 balastro
electrnico
Salida de luz cenital
Salida de pared luz cenital
Salida interruptor doble
Salida interruptor tres vas
Salida tomacorriente 120V
Salida tomacorriente 220V para
aire acondicionado
Salida de data
Panel de distribucin de 16
circuitos
10
11
100.00
PL
90.18
2.00
Ud
91,002.66
Subtotal :
III
A
1
2
3
4
5
6
7
8
109.42
6.84
24.00
18.00
Mts2
Mts3
Uds
Uds
62.12
367.98
103.54
103.54
76.00
Uds
103.54
11.00
Uds
103.54
4.00
Uds
200.00
154.64
mt2
56.48
4.00
2.00
Uds
Uds
5,698.00
4,440.00
1.00
ud
4,440.00
9.93
1.00
1.00
Mts2
ud
ud
1,098.01
5,698.00
66.71
Subtotal:
B
1
2
Sala de Internamiento de
Mujeres.
Inodoro
Lavamanos
Subtotal:
C
1
Incubadora
Lavamanos.
Subtotal:
D
1
2
3
Subtotal:
E
1
2
3
4
5
6
Baos de Servicios:
Cermica
Lavamanos
Inodoro
Orinales
Rejilla desage de piso
Rejilla en ducha
49.52
4.00
5.00
1.00
2.00
2.00
Mts2
Uds
Uds
Uds
Uds
Uds
1,098.01
4,440.00
5,698.00
4,736.00
66.71
45.00
1.00
1.00
Uds
Uds
5,698.00
45.00
1.00
1.00
1.00
1.00
Uds
Uds
Uds
Uds
5,698.00
4,440.00
66.71
2,545.38
1.00
1.00
Uds
Uds
5,698.00
4,440.00
1.00
1.00
2.00
1.00
1.00
Uds
Uds
Uds
Uds
Uds
5,698.00
4,440.00
66.71
2,545.38
1,500.00
Subtotal:
F
1
2
Dormitorio de Enfermera
Inodoro
Rejilla en ducha
Subtotal:
1
2
3
4
Inodoro
Lavamanos
Rejilla de piso
Ducha con mezcladora
Subtotal:
H
1
2
Vestidor de Enfermeras:
Inodoro
Lavamanos
Subtotal:
I
1
2
3
4
5
1
2
3
4
5
Inodoro
Lavamanos
Duchas
Mezcladoras
Rejillas
1.00
1.00
1.00
1.00
2.00
Uds
Uds
Uds
Uds
Uds
5,698.00
4,440.00
2,545.38
1,500.00
66.71
3.00
3.00
3.00
2.00
2.00
0.90
2.81
Uds
Uds
Uds
Uds
Uds
Mts2
Mts2
5,698.00
4,440.00
66.71
2,545.38
1,500.00
881.64
881.64
1.00
1.00
1.00
Uds
Uds
Uds
5,698.00
4,440.00
66.71
Uds
Uds
Uds
Uds
5,698.00
4,440.00
66.71
2,545.38
1.00
1.00
2.00
Uds
Uds
Uds
5,698.00
4,440.00
66.71
1.00
Uds
5,698.00
Subtotal:
K
1
2
3
4
5
6
7
Sala
de
Internamiento
Hombres:
Inodoro
Lavamanos
Rejillas
Duchas
Mezcladoras
Cermica en pared
Cermica en piso de pileta
Subtotal:
L
1
2
3
Estacin Enfermera:
Inodoro
Lavamanos
Rejilla de piso
Subtotal:
M
1
2
3
4
Subtotal:
N
1
2
3
Pre-Parto:
Inodoro
Lavamanos
Rejillas
Subtotal:
Rayos X
Inodoro
2
3
Lavamanos
Colocar desage de piso (incluye
cermica, piezas y M. O.)
1.00
Uds
4,440.00
1.00
P.A
1,000.00
1.00
Uds
4,440.00
71.00
11.00
1,663.93
8.00
Uds
Uds
P2
Uds
6,194.38
12,801.73
215.52
6,194.38
10.76
P2
246.31
1.00
Uds
25,520.00
0.84
Uds
25,520.00
9.04
P2
246.31
1.00
Uds
6,194.38
3.56
Mts2
246.31
1.00
Uds
25,520.00
Subtotal:
O
1
Vacuna:
Lavamanos.
Subtotal:
P
1
2
3
4
5
6
7
8
Portage General:
De polimetal sencilla
Doble de polimetal
Ventanas salomnicas
Puerta en bao servicios
Ventana interior en cristal
corredera
Puerta doble de aluminio y vidrio
con
compres
en
pasillo
mayordoma
Puerta doble de aluminio y vidrio
con compres en pasillo cocina
Ventana corredera en cristal rea
vacuna
Subtotal:
Q
1
Sala de Incubadoras:
Puerta sencilla en polimetal con
hueco en cristal
Subtotal:
R
1
Personal y Farmacia:
Ventana en cristal
Subtotal:
S
1
Almacn de Medicamento:
Puerta dobles en cristal y aluminio
con compres
Subtotal:
T
1
2
3
Sala de Ciruga:
Puerta doble en cristal y aluminio
con compres
Puerta sencillo en polimetal
Puerta sencilla polimetal con
hueco en cristal (0.30 x 0.40)
4.00
Uds
25,520.00
7.00
Uds
6,194.38
1.00
Uds
6,194.38
7.40
P.L
2,374.51
3.05
Mts2
367.98
1.04
Mts2
897.06
4.84
Mts2
817.33
1.52
Mts2
155.31
1.00
Uds
5,313.00
26.67
4.00
6.00
44.32
3.00
mt2
Uds
Uds
Mts2
Uds
1,098.01
5,698.00
4,440.00
1,053.53
3,928.18
0.63
0.23
4.88
6.18
6.18
9.20
0.55
9.20
Mts3
Mts3
Mts2
Mts2
Mts2
Mts2
Mts3
Mts2
414.16
9,657.14
897.06
67.03
246.86
286.47
14,327.43
295.22
Subtotal:
U
1
2
3
4
5
rea de Recepcin:
Gabinete de piso de roble
Demolicin y bote pandereta
playwood en rea servicio social
Cerrar hueco rea vacuna (block
6")
Cerrar hueco pasillo medico
servicio (block 4")
Abrir hueco salida al patio pasillo
medico servicio (block6") (1.32 x
1.15)
Puerta en tola (1.32 x 1.15)
Subtotal:
V
1
2
3
4
5
rea de Consulta
Cermica en Bao de Consulta
Inodoro en Bao de Consulta
Lavamanos en bao de consulta
Divisin sheetrock rea consulta
Extractores 10'' X 10''
Subtotal:
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
Zabaleta
Pintura acrlica muros y losa
Impermeabilizante acrlico
Puerta polimetal (1.00 x 2.10)
Ventana (1.00 x 1.02)
Hormign armado columna
Hormign armado en dintel
Cantos
Luces cenitales
Interruptor simple
cerrar hueco en cocina block 6"
Abrir hueco en cocina block 6"
Revestimiento cermica en cocina
22
23
13.20
10.78
9.20
1.00
1.02
0.21
0.09
16.20
1.00
1.00
3.78
3.78
ML
Mts2
Mts2
Uds
Mts2
Mts3
Mts3
ML
Uds
Uds
Mts2
Mts2
99.95
110.52
191.10
6,194.38
246.31
22,099.51
30,329.47
82.68
977.48
1,143.18
897.06
155.31
9.10
Mts2
1,098.01
7.50
5.00
PL
PL
2,374.51
2,374.51
1.00
Uds
5,289.07
1.08
Mts3
4,186.30
34.22
P2
309.72
25.82
P2
309.72
6.40
1.00
1.00
1.00
ML
Uds
Uds
Uds
82.68
14,906.66
9,565.00
34,000.00
1.00
Uds
111,171.96
Subtotal:
X
1
2
3
rea de Lavado:
Lavado doble de granito
Base
de
hormign
incineradora
Meseta en marmolito
para
Subtotal:
Y
1
Almacn:
Meseta marmolite
Subtotal:
Z
1
2
3
4
5
Miscelneos:
Cantos
Bomba para cisterna 3HP
Tanque de 120gls
Bomba sumergible 3HP
Inversor en rea administracin
5kw
12
bateras
(Incluye
Instalacin)
Subtotal:
A-1
Sealizacin Exterior:
1
2
3
4
5
6
Emergencia
Parqueo
Parqueo mdicos
Morgue
rea servicios
Rotulacin Interior 4" x 14"
1.00
1.00
1.00
1.00
1.00
49.00
Uds
P.A.
P.A.
Uds
Uds
Uds
950.00
5,000.00
3,000.00
325.00
325.00
407.80
574.51
Mts2
3,869.00
919.71
Pl
115.00
Mts3
414.16
Mts3
9,657.14
Mts3
Mts3
Mts3
Mts2
Mts2
Mts2
ML
Uds
Mts2
Mts2
ML
Uds
22,099.51
22,099.51
14,327.43
67.03
286.47
295.22
99.95
140.30
155.31
2,582.40
82.68
12,801.73
Mts2
620.46
Mts2
920.33
ML
Mts2
Mts2
Mts2
Mts2
Uds
123.04
110.52
110.52
110.52
722.74
977.48
Subtotal:
B-2
1
rea de Quirfano:
Recubrimiento asptico en vinil
en muros (el acrobin incluye
recubrimiento de sheetrock)
Zcalos en vinil
Subtotal:
D-2
A
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
Parte Exterior
rea para Mayordoma Patio Exterior:
Excavacin zapata de columna
6.90
Hormign armado zapata de
2.16
columna
Hormign armado columnas
0.82
Hormign armado vigas
1.76
Hormign armado losa
4.29
Fraguache
42.97
Paete en losa y columnas
42.97
Fino
35.77
Zabaleta
24.12
Desage de 3"
2.00
Abrir hueco ventana
3.60
Ventanas salomnica
3.60
Cantos
62.52
Puerta polimetal doble
1.00
Losa de piso con malla
35.70
electrosoldada
Piso de granito fdo gris incluye
35.70
pulido y brillado
Zcalos
22.35
Pintura acrlica interior
63.45
Pintura acrlica exterior
57.62
Pintura acrlica losa
35.75
Antepecho
4.82
Salida luces cenitales
1.00
23
24
25
Toma corriente
Interruptor sencillo
Mano de Obra Elctrica
3.00
1.00
1.00
Uds
Uds
P.A.
1,185.49
1,143.18
1,000.00
Subtotal:
E-2
I
1
2
3
414.16
367.98
103.54
Subtotal:
II
1
2
3
4
Hormign Armado:
Zapata muros
Zapata columnas
Columnas de amarre
Viga amarre
9.99
1.15
3.07
5.57
Mts3
Mts3
Mts3
Mts3
9,657.14
9,657.14
22,099.51
22,099.51
434.68
Mts2
897.06
408.54
408.54
200.90
Mts2
Mts2
ML
67.03
246.86
82.68
408.54
Mts2
110.52
397.70
ML
222.70
1.00
P.A
5,000.00
1.00
P.A
3,000.00
Subtotal:
III
1
Colocacin de block:
Bloques de 6"
Subtotal:
IV
1
2
3
Terminacin Superficie:
Fragua che
Paete
Cantos
Subtotal:
V
1
Pintura:
Acrlica en muros
Subtotal:
VI
1
2
3
Varios:
Alambre trinchera incluyendo
paete a reparar
Reparacin de verja con malla
(381,63mt)
Verja con malla
4
5
1.00
P.A
16,875.00
1.00
P.A
3,240.00
3.32
2.88
1.48
5.66
Mts3
Mts3
Mts2
Mts3
414.16
367.98
103.54
1,085.65
1.11
0.30
0.35
0.67
37.70
Mts3
Mts3
Mts3
Mts3
Mts2
9,657.14
9,657.14
22,099.51
22,099.51
623.52
49.20
49.20
12.30
Mts2
Mts2
ML
67.03
246.86
82.68
44.80
18.20
Mts2
Mts2
142.95
110.52
32.00
Mts2
897.06
Subtotal:
C
I
1
2
3
4
Movimiento de Tierra:
Excavacin a mano
Bote material sobrante
Relleno de reposicin
Relleno compactado
Subtotal:
II
1
2
3
4
5
III
1
2
3
Terminacin Superficie:
Fragua che
Paete
Cantos
Subtotal:
IV
1
2
Pintura:
Semigloss interior
Acrlica exterior
Subtotal:
V
1
Muros de Block:
Colocacin de bloques de 6"
Subtotal:
VI
1
2
Portaje:
De tola (1.20x 2.00)
De tola (1.00x 2.00)
1.00
1.00
Uds
Uds
8,400.00
7,000.00
54.30
Mts2
512.60
4.83
4.83
4.83
8.28
1.68
1.00
49.70
Mts2
Mts2
Mts2
Mts2
Mts2
Uds
ML
897.06
246.86
110.52
620.46
155.31
7,000.00
100.00
1.00
1.00
1.00
P.A
P.A
P.A
3,000.00
3,613.39
10,000.00
231.47
125.64
112.34
198.92
537.99
Mts3
Mts3
Mts3
Mts3
Mts3
414.16
103.54
1,085.65
82.83
367.98
Subtotal:
VII
1
Rampa:
Acera
perimetral
gazebo
incluyendo parte exterior existente
Subtotal:
VIII
1
2
3
4
5
6
7
XXXII
A
1
2
3
Construccin
Emergencia
Peditrica:
Preliminares
Limpieza del solar
Replanteo con terrancha
Caseta de materiales
Subtotal:
B
1
2
3
4
5
Movimiento de Tierra:
Excavacin a mano
Relleno de reposicin
Relleno compactado
Extraccin capa vegetal
Bote de material inservible
Subtotal:
Hormign Armado:
1
2
3
4
5
6
7
8
9
Zapata de muro
Zapata de columna
Columnas BNP
Losa de piso con
electrosoldada e=0.10
Viga de amarre BNP
Columnas SNP
Dinteles
Vigas SNP
Losa SNP
malla
22.81
48.32
2.07
Mts3
Mts3
Mts3
9,657.14
9,657.14
22,099.51
322.35
Mts3
620.46
5.07
12.73
0.50
30.64
43.23
Mts3
Mts3
Mts3
Mts3
Mts3
22,099.51
22,099.51
30,329.47
22,099.51
14,327.43
118.27
407.59
Mts2
Mts2
817.33
746.15
827.96
654.41
Mts2
Mts2
67.03
246.86
289.83
Mts2
246.86
322.55
M2
619.44
726.16
40.20
ML
Mts2
Subtotal:
D
1
2
Colocacin de Block:
De 0.15 BNP
De 0.15 SNP
Subtotal:
E
1
2
3
4
5
6
Terminacin de Superficie:
Fraguache
Paete interior en muros
Paete exterior en muros, incluye
vuelos y antepecho
Falso cielo (plafon aseptico tipo
clean room liso o similar)
Cantos
Revestimiento cermica en baos
82.68
1,103.43
Subtotal:
F
1
Terminacin de Pisos:
Piso de vinyl aseptico, incluye
juntas sanitarias y electrosoldado
(incluye todo lo necesario para su
correcta instalacin)
Auto nivelante para pisos
322.35
M2
4,955.51
322.35
M2
1,486.65
Subtotal:
G
1
2
3
Terminacin de Techo:
Fino
Zabaleta
Impermeabilizante acrlico
332.12
92.20
413.11
Mts2
ML
Mts2
295.22
99.95
191.10
4
5
Desages de 3"
Gotero colgante
11.00
92.80
Uds
ML
140.30
148.36
Subtotal:
H
1
2
3
Pintura:
Pintura wall flex en interior
(revestimiento formulado a base
de copolmeros acrlicos en
emulsin, aditivos, pigmentos y
cargas minerales que al secar
forma
una
membrana
impermeable o texturada elstica)
Acrlica
exterior
incluyendo
antepecho
Mantenimiento en hierro
654.41
M2
1,100.00
289.83
Mts2
113.94
40.60
Mts2
134.08
1.00
Uds
22,680.00
13.00
Uds
6,194.38
4.00
Uds
6,194.38
385.85
P2
210.00
1.00
3.00
13.00
2.00
13.78
Uds
Uds
Uds
Uds
PL
4,736.00
5,698.00
4,440.00
140.30
1,499.11
9.00
Uds
5,489.50
295.86
172.04
PL
PL
62.62
50.00
1.00
Uds
53,579.59
1.00
Uds
60,000.00
Subtotal:
I
1
2
3
4
Portaje:
Doble de aluminio y vidrio (2.40 x
2.10)
De polimetal
De polimetal en baos (1.20 x
0.70)
Ventana en Celosas de aluminio
Subtotal:
J
1
2
3
4
5
6
7
8
9
10
Instalacin Sanitaria:
Orinales
Inodoros
Lavamanos
Desages de piso
Ventilacin 3" PVC
Cmara de inspeccin (0.70 x
0.70)
Tubera de drenaje 4" pvc
Tubera de drenaje 2" pvc
Cmara sptica (2.50 x 1.50 x
2.00)
Filtrante 8" pvc (sujeto a
presentacin de factura)
11
12
13
14
15
Tuberas y piezas
Papelera
Mano de obra plomero
Tubera "
Tubera "
1.00
3.00
1.00
273.88
129.89
P.A
Uds
P.A
PL
PL
3,000.00
850.00
15,000.00
97.37
66.10
26.00
34.00
14.00
3.00
3.00
3.00
Uds
Uds
Uds
Uds
Uds
Uds
2,677.28
1,185.49
1,143.18
4,603.75
927.21
657.33
1.00
Uds
5,231.39
11.00
Uds
678.63
1.00
P.A
3,678.00
1.00
P.A
4,000.00
86.50
40.60
Mts2
Mts2
512.60
3,277.04
Subtotal:
K
1
2
3
4
5
6
7
Instalacin Elctrica:
lmparas fluorescentes 4 x 40w
Salida TC-110v
Salida Interruptor simple
Abanicos sala de espera
Salida control para abanicos
Salida para antena TV
Panel de distribucin de 6/12 circ.
10
Subtotal:
L
1
2
3
Miscelneos:
Acera perimetral
Protectores en hierro
Revestimiento en muros de
material vinilico aseptico, con
juntas sanitarias y electrosoldado.
(incluye todo lo necesario para su
correcta instalacin)
Limpieza final
377.41
M2
4,955.51
1.00
P.A
10,000.00
2.00
Uds
30,798.00
Subtotal:
XXXIII
1
rea de Administracin
Counter de 87'' tope color marrn
oscuro y base de metal
2.00
Uds
22,295.20
Subtotal:
XXXV
A
1
2
Caseta Para Manifold, Bomba de Vacio y Compresor de Aire (4,60x3,0Mts, h=2,80 Mts)
Preliminares:
Limpieza del solar (30 Mts29
1.00
P.A.
1,000.00
Replanteo con charrancha (13,80
1.00
P.A.
1,032.40
mts2)
Subtotal:
B
1
2
3
4
Movimiento de Tierra:
Excavacin a mano
Relleno de reposicin
Relleno compactado
Bote de material sobrante
6.07
3.65
3.45
4.56
Mts3
Mts3
Mts3
Mts3
414.16
103.54
1,085.65
367.98
2.28
0.60
0.04
1.66
Mts3
Mts3
Mts3
Mts3
9,611.32
9,657.14
22,099.51
5,361.60
0.50
0.17
0.30
2.04
0.68
Mts3
Mts3
Mts3
Mts3
Mts3
22,099.51
30,329.47
22,099.51
14,327.43
22,099.51
9.12
37.06
4.00
6.08
Mts2
Mts2
Mts2
Mts2
1,016.64
918.88
1,158.91
722.74
Subtotal:
C
1
2
3
4
D
1
2
3
4
5
E
1
2
3
4
Colocacin de Block:
De 8" BNP
De 8" SNP
Calados
De 6" en antepecho
Subtotal:
F
1
2
3
4
5
6
7
Terminacin de Superficie:
Fraguache en muros y losa
Paete interior en muros
Paete exterior en muros
Paete en antepecho
Paete en losa
Cantos
Paete en antepecho
95.92
41.06
41.06
12.06
13.80
50.60
30.40
Mts2
Mts2
Mts2
Mts2
Mts2
Mts2
Mts2
67.03
246.86
246.86
246.86
286.47
82.68
246.86
13.80
Mts2
164.94
13.80
15.20
19.88
3.00
Mts2
ML
Mt2
Uds
295.22
99.95
191.10
140.30
41.06
53.12
13.80
3.15
Mts2
Mts2
Mts2
Mts2
142.95
110.52
110.52
117.35
3.15
Mts2
117.35
3.15
Mts2
3,613.39
3.15
Mts2
3,277.04
Subtotal:
G
1
Terminacin de Pisos:
Pulido y Brillado
Subtotal:
H
1
2
3
4
Terminacin de Techo:
Fino
Zabaleta
Impermeabilizante acrlico
Desage de 3" PVC
Subtotal:
I
1
2
3
4
5
Pintura:
Semigloss en muros interiores
Acrlica exterior
Acrlica en techo
mantenimiento en puerta de tola
Mantenimiento en puerta de hierro
Subtotal:
J
1
2
Portage:
De tola (1.50 x 2.10)
De hierro con barras de " (1.50 x
2.10)
Subtotal:
K
1
2
3
Instalacin Elctrica:
Salidas de techo con lmparas 2 x
4w
Interruptor doble
Lmparas tipo secador en reas
exteriores
2.00
Uds
977.48
1.00
Uds
1,322.97
2.00
Uds
5,158.71
4.00
p2
3,277.04
15.20
15.00
1.00
Mts2
Mts2
P.A
512.60
512.60
2,000.00
Subtotal:
L
1
2
3
4
Miscelneos:
Protectores de hierro en ventanas
de block colados.
Acera perimetral
Acera de acceso a caseta
Limpieza final
Subtotal:
XXXVI
A
1
2
Construccin Morgue:
Preliminares:
Limpieza del solar
Replanteo
1.00
1.00
P.A
P.A
800.00
1,500.00
12.33
1.44
10.40
Mts3
Mts3
Mts3
414.16
414.16
103.54
2.47
0.43
0.82
0.82
0.32
3.56
Mts3
Mts3
Mts3
Mts3
Mts3
Mts3
9,657.14
9,657.14
22,099.51
22,099.51
30,329.47
14,327.43
0.34
Mts3
22,099.51
Subtotal
B
1
2
3
Excavaciones:
Excavacin zapata de muros
Excavacin zapata de columna
Relleno de reposicin
Subtotal
C
1
2
3
4
5
6
7
D
1
2
Colocacin de Block:
Muros de 6" BNP
Muros de 6" SNP
21.91
61.10
ML
M2
897.06
722.74
122.20
122.20
122.20
42.92
26.16
Mts2
Mts2
Mts2
Mts2
Mts2
246.86
246.86
67.03
82.68
246.86
14.32
28.63
28.63
47.72
29.65
23.65
33.32
4.00
Mts2
Mts2
ML
ML
Mts2
ML
Mts2
Uds
722.74
246.86
67.03
82.68
295.22
99.95
191.10
140.30
27.89
26.32
Mts2
ML
920.33
123.04
Ventanas y Puertas:
Ventanas salomnica aluminio
AA
Puerta de polimetal (2.10 x 1.00)
11.81
P2
282.20
2.00
Uds
6,194.38
7.80
Mts2
3,277.04
Subtotal
E
1
2
2
3
4
Terminacin de Superficie:
Paete liso en muros exteriores
Paete liso en muros interiores
Fraguache
Cantos
Paete liso en techo
Subtotal:
F
1
2
3
4
5
6
7
8
Terminacin de Techos:
Muros de antepechos 6"
Paete en antepecho
Fraguache en antepecho
Cantos en antepecho
Fino de techo
Zabaleta
Impermeabilizante acrlico
Desages de techo
Subtotal:
G
1
2
Pisos:
Pisos de granito 0.30 x 0.30mts
Zcalos
Subtotal:
H
1
2
3
Subtotal.
I
Instalacin Sanitaria:
2.00
Uds
4,440.00
2.00
Uds
140.30
2.00
Uds
2,771.67
3.00
Uds
567.82
1.00
P.A
1,000.00
63.36
64.50
26.16
Mts2
Mts2
Mts2
110.52
142.95
110.52
2.00
3.00
2.00
Uds
Uds
Uds
2,677.28
1,185.49
1,322.97
3.00
Uds
5,158.71
L
1
2
3
4
Mts2
Mts2
Mts3
645.51
897.06
5,361.60
Mts2
67.03
24.99
Mts2
246.86
2
3
4
5
Subtotal:
J
1
2
3
Pintura:
Exterior acrlica
Interior semi gloss
Acrlica en techo
Subtotal:
K
1
2
3
4
Instalacin Elctrica:
Lmpara 2 x 40
Tomacorriente 110v
Interruptor dobles
Lmpara tipo secador (para el rea
exterior)
Subtotal:
6
7
Cantos
Revestimiento de cermica en losa
16.80
ML
82.68
9.48
Mts2
1,103.43
8
9
Pintura acrlica
Desage de 2" PVC en meseta
17.46
6.00
Mts2
Uds
110.52
962.39
Subtotal:
M
1
2
Miscelneos:
Acera perimetral
Limpieza final
23.86
1.00
Mts
PA
512.60
1,100.00
7.00
7.00
7.00
7.00
7.00
14.00
Uds.
Uds.
Uds.
Uds.
Uds.
Uds.
5,063.00
5,063.00
3,640.00
5,900.00
22,600.00
2,145.00
1.00
Uds.
34,450.00
4.00
2.00
2.00
Uds.
Uds.
Uds.
5,063.00
5,063.00
3,640.00
2.00
Uds.
5,900.00
2.00
4.00
Uds.
Uds.
22,600.00
2,145.00
2.00
Uds.
34,450.00
1.00
Uds.
139,750.00
1.00
1.00
1.00
UD
UD
UD
5,063.00
5,063.00
3,640.00
1.00
UD
5,900.00
1.00
2.00
UD
UD
22,600.00
2,145.00
1.00
UD
34,450.00
Subtotal:
Sistema Central De Gases Medicinales
1.00
1.01
1.02
1.03
1.04
1.05
1.06
1.07
Salas de Pediatra
Salida de pared Oxigeno
Salida de pared Vaco
Slide bracket
Flowmeter 0-8 P.T.O. Diss 02
Regulador de Vacio
Adaptadores
Caja de vlvula de dos gases
(O2/Vac)
2.00
2.01
2.02
2.03
2.04
Quirfanos
Salida de pared Oxigeno
Salida de pared Vaco
Slide bracket
Flowmeter 0-15 P.T.O. Diss 02
2.05
2.06
2.07
2.08
Regulador de Vacio
Adaptadores
Caja de vlvula de dos gases
(O2/Vac)
Alarma de dos gases
3.00
3.01
3.02
3.03
3.04
Salas de Parto
Salida de pared Oxigeno
Salida de pared Vaco
Slide bracket
Flowmeter 0-15 P.T.O. Diss 02
3.05
3.06
3.04
Regulador de Vacio
Adaptadores
Caja de vlvula de dos gases
(O2/Vac)
4.00
Sala de Pre-Parto
4.01
4.02
3.00
UD
5,063.00
3.00
Uds.
5,900.00
4.03
4.04
Adaptadores
Caja de vlvula de un gas (O2)
3.00
1.00
Uds.
UD
2,145.00
27,500.00
5.00
5.01
5.02
5.03
5.04
Sala Post-Quirrgica
Salida de pared Oxigeno
Salida de pared Vaco
Slide bracket
Flowmeter 0-15 P.T.O. Diss 02
4.00
4.00
4.00
UD
UD
UD
5,063.00
5,063.00
3,640.00
4.00
UD
5,900.00
5.05
5.06
5.07
Regulador de Vacio
Adaptadores
Caja de vlvula de dos gases
(O2/Vac)
4.00
8.00
UD
UD
22,600.00
2,145.00
1.00
UD
34,450.00
6.00
6.01
6.02
Nebulizacin
Salida de pared Oxigeno
Flowmeter 0-15 P.T.O. Diss 02
2.00
UD
5,063.00
2.00
Uds.
4,705.40
6.03
Adaptadores
4.00
Uds.
2,145.00
7.00
7.01
7.02
7.03
7.04
Emergencia
Salida de pared Oxigeno
Salida de pared Vaco
Slide bracket
Flowmeter 0-15 P.T.O. Diss 02
7.00
7.00
7.00
UD
UD
UD
5,063.00
5,063.00
3,640.00
7.00
Uds.
5,900.00
7.05
7.06
7.07
Regulador de Vacio
Adaptadores
Caja de vlvula de dos gases
(O2/Vac)
Alarma de dos gases (O2/Vac)
7.00
14.00
Uds.
Uds.
22,600.00
2,145.00
1.00
UD
34,450.00
1.00
UD
139,750.00
1.00
UD
360,000.00
1.00
UD
#########
7.08
8.00
8.01
8.02
10.00
Equipos
Manifol de oxigeno, header bar,
6x6 (sujeto a presentacin de
factura)
Bomba de vacio 3 HP dplex,
220 V, 3 Ph, 60 Hz, Modelo
D500BT2V (sujeto a presentacin
de factura)
Miscelneos de Instalacin
10.01
10.02
10.03
10.04
10.05
10.06
10.07
10.08
10.09
10.10
10.11
10.12
Suministro
de
Sistema
de
soportera
Suministro de Sealizacin
Suministro de otros accesorios e
insumos (plata, tubos pvc, O2,
etc.)
Ejecucin de Prueba
Mano de Obra de Instalacin
Limpieza continua y final
200.00
P.L.
370.00
240.00
320.00
280.00
400.00
P.L.
P.L.
P.L.
P.L.
260.00
205.00
170.00
125.00
1.00
PA
179,760.00
1.00
PA
120,000.00
1.00
PA
30,000.00
1.00
PA
65,000.00
1.00
1.00
1.00
PA
PA
PA
45,000.00
#########
75,000.00
Uds.
15,599.58
Uds.
5,310.00
Subtotal:
1.00
2.00
1.00
2.00
3.00
4.00
3.00
Uds.
18,242.87
10.00
Uds.
1,576.75
1,640.00
PL
26.89
1.00
P.A.
35,920.10
30.00
Uds.
5,086.29
30.00
30.00
Uds.
Uds.
302.76
1,816.53
102.00
Uds.
7,298.35
102.00
Uds.
1,054.20
15.00
Uds.
7,703.80
1.00
P.A
290,255.19
1.00
2.00
3.00
4.00
6.00
7.00
8.00
Sistema
Contra
II
A
1
Preliminares:
Replanteo con hilo y cal
Subtotal:
1.00
P.A
3,078.87
B
1
Movimiento de Tierra:
Excavacin zapata de muros de 6"
2
3
33.08
M3
414.16
46.31
16.54
M3
M3
367.98
103.54
8.27
22.05
M3
M3
9,657.14
22,099.51
1.46
M3
22,099.51
1.10
M3
5,361.60
5.85
M3
22,099.51
22.05
M3
22,099.51
0.99
M3
30,329.47
1.31
M3
14,327.43
73.50
207.91
M2
M2
897.06
722.74
7.44
M2
722.74
412.82
M2
67.03
412.82
M2
246.86
78.91
M2
1,103.43
263.88
7.07
ML
M2
82.68
246.86
Subtotal:
C
1
2
3
4
5
6
7
8
Hormign Armado
Zapata de muros
Viga de amarre (0.15x0.20)mt
Pichones de columnas de amarre
(0.15x00.20)mt BNP
Losa de piso con malla e=0.10mt
(baos)
Columnas
de
amarre
(0.15x0.20)MT SNP
Viga de amarre (0.15x0.20)mt
SNP
Dinteles (0.15x0.20)mt
Losa de techo e=0.12mt baos
nuevos
Subtotal:
D
1
2
3
Construccin de Muros:
Colocacin block de 6" BNP
Colocacin block de 6" SNP
Colocacin block de 6" SNP en
antepecho
Subtotal:
E
1
2
3
4
5
Terminacin de Superficie:
Fraguache en muros nuevos y
losas
Paete en muro y techos
Revestimiento de cermica en
muros
Construccin cantos
Paete en antepecho
Subtotal:
F
1
Terminacin de Pisos:
Suministro y colocacin piso de
granito fondo blanco (0.50x0.50)
alto transito
Suministro y colocacin cermica
de piso antirresbaladiza en baos
Suministro y colocacin zcalos
de granito
29.40
M2
920.33
57.84
M2
891.86
79.20
ML
123.04
10.95
18.60
M2
ML
295.22
99.95
2.00
Uds
1,120.15
21.18
M2
412.96
161.51
10.95
M2
M2
142.95
110.52
10.00
Uds
12,801.73
12.00
Uds
6,194.38
34.43
P2
215.52
11.00
Uds
5,698.00
11.00
Uds
5,180.00
Subtotal:
G
1
2
3
4
Terminacin de Superficie:
Fino de techo plano
Zabaleta
Desage 3" PVC con bajante
h=3.00mt
Aplicacin impermeabilizante tipo
lona asfltica granulada de
4.00kg/m con refuerzo de
polister.
Subtotal:
Aplicacin de Pintura:
Semigloss en muros
Acrlica en techos
Subtotal:
I
1
2
3
Puertas y Ventanas:
Suministro y colocacin puerta de
polimetal doble
Suministro y colocacin puerta de
polimetal sencilla
Suministro y colocacin ventana
salomnica de aluminio doble A
Subtotal:
J
1
2
Instalacin Sanitaria:
Suministro y colocacin inodoros
Suministro
y
colocacin
lavamanos con pedestal
3
4
5
6
7
8
9
10
11
12
13
14
15
16
11.00
Uds
4,673.60
11.00
Uds
4,196.45
23.00
Uds
962.39
1.00
Uds
567.82
11.00
Uds
1,850.00
11.00
Uds
412.96
7.00
Uds
5,489.50
109.55
PL
52.35
54.78
PL
71.47
76.00
PL
41.28
102.00
PL
55.59
51.00
PL
47.65
57.00
PL
44.47
1.00
P.A
3,500.00
27.00
Uds
977.48
13.00
Uds
2,764.02
14.00
Uds
644.25
22.00
Uds
927.21
34.00
Uds
1,176.05
Subtotal:
X
1
2
3
4
5
INSTALACIONES
ELECTRICAS:
Salida de techos
Suministro y colocacin lmparas
fluorescente 3x32w T8 con
balastro elctrico
Suministro y colocacin globos 8"
Salidas interruptor simple
Salidas
tomacorriente
aterrizados
120v
6
7
10
11
12
13
14
Salidas
tomacorriente
220v
aterrizados para A/A
Drenajes empotrados con tubo
PVC-3/4"-SDR-26 para unidades
de aires acondicionados.
Ductos de PVC-2" empotrados
para paso de tuberas de cobre de
unidades de A/C
Suministro y colocacin A/A Split
de 12000 BTU marca Lennox.
Panel de 24 circuitos de
distribucin para iluminacin y
tomacorriente 120v
Panel de 24 circuitos de
distribucin para A/C
Alimentadores elctricos de panel
de distribucin de iluminacin y
tomacorrientes con 2#4 THHN
para fase, 1#6 THHN para neutro,
1#10 THHN para tierra en PVC
1"-SDR-26
Alimentadores elctricos de panel
de distribucin de A/C con 2#2
THHN para fase, 1#4 THHN para
neutro, 1#10 THHN para tierra en
PVC 1"-SDR-26
Registros
10x10x4
comunicacin elctrica
para
14.00
Uds
1,896.50
14.00
Uds
266.43
14.00
Uds
217.31
14.00
Uds
23,690.09
1.00
Uds
8,233.81
1.00
Uds
7,975.43
100.00
PL
244.56
100.00
PL
308.14
4.00
Uds
350.00
Subtotal:
COUNTER:
Counter (3.04 x 0.80 x 1.20)mt en
melanina, perfil de aluminio en
"U" y rodapi en aluminio, tope en
silestone (sujeto a presentacin de
factura)
Subtotal:
2.00
Uds
#########
Uds
Uds
Uds
Uds
Uds
Uds
Uds
Uds
Uds
Uds
Uds
3,342.39
1,400.19
1,174.35
8,130.13
9,033.48
271.00
#########
4,516.74
1,174.35
451.67
3,252.05
Uds
1,264.69
Uds
Uds
4,336.07
1,147.73
Subtotal:
RUTA DE EVACUACION
Diseo y rotulacin de las rutas de
evacuacin (sujeto a presentacin
de factura)
Subtotal:
1.00 P.A.
#########
SISTEMA ENFRIAMIENTO Y
DESHUMIDIFICACION POR
DESECANTE LIQUIDO DE
PAQUETE TIPO TECHO , 3500
CFM 100% AIRE FRESCO, 15
HP HVOLTAJE 460/3/60,
REFRIGERANTE 410a, NIVEL
DE FILTRACION 60/95%.
PANEL DESCONECTIVO
ELECTRICO NEMA 3R
INSTALADOS. PANEL DE
CONTROL DE
TEMPRATURA Y HUMEDAD
DIGITAL. AMBOS
INSTALADOS EN FABRICA.
SET DE COMPRESORES
SCROLL DE CAPACIDAD
VARIABLE. VARIADOR DE
FRECUENCIA PARA MOTOR
VENTILADOR AIRE DE
SUMINISTRO. CURVA DE
INSTALACION EN TECHO DE
ZINC GALVANIZADO Y
DESCARGA AJUSTAGLE EN
EN OBRA HACIA ABAJO Y-O
HORIZONTAL.ESTA PARTIDA
INCLUYE LOS CHILLED
UD
1,350,133.81
SISTEMA DE DISTRIBUCION
CHILLED BEAMS ACTIVO
(A BASE DE VIGAS FRIAS),
SUSPENDIDAS EN PLAFON
UNIVERSAL, DIFUSOR DE
AIRE LINEAL DE DOS VIAS
PARA PROVEER 75 F/ 55% HR
Y 4 CAH, 25 DB, EN 40
HABITACIONES Y SUS
AREAS DE APOYO, CONTROL
INDIVIDUAL DE
TEMPERATURA Y HUMEDAD
ZONAL, CONTROL
TEMPERATURA DE ROCIO
PARA EVITAR
CONDENSACION EN EN
CUARTO. TODO EL SISTEMA
INSTALADO DE ACUERDO A
LOS PLANOS Y
ESPECIFICACIONES ANEXOS.
ESTA PARTIDA INCLUYE LOS
CHILLED BEAMS, SU
UBICACION (MANO DE OBRA
Y MATERIALES)
1.00
PA
36,031.96
1.00
UD
1,235,138.19
1.00
UD
76,663.75
INSTALACIONES MECANICAS
SISTEMA DE CONDUCTOS
DE AIRE PARA SUMINISTRO
Y EXTRACCION
CONSTRUIDOS EN ZINC
GALVANIDADO, AISLADOS
CON FIBRA DE VIDRIO, Y
DUCTOS FLEXIBLES
TERMINALES DE ALUMINIO
CON BRIDAS DE SEGURIDAD
PARA EVITAR FUGAS Y
CONDENSACION EN
PLENUM, SEGUN PLANOS Y
ESPECIFICACIONES DE
CONSTRUCCION ANEXOS.
ESTA PARTIDA INCLUYE EL
SUMINISTRO DE TODOS LOS
MATERIALES Y MANO DE
OBRA PARA SU
INSTALACION.
1.00
PA
140,550.21
SISTEMA DE TUBERIAS Y
ACCESORIOS DE SERVICIO
Y CONTROL DE FLUJO,
INDICADORES DE
TEMPERATURAS Y PRESION,
PARA CONDUCCION DE
AGUA HELADA,
CONSTRUIDAS EN TUBERIAS
DE COBRE Y AISLADAS
TERMICAMENTE CON
CANALETAS DE
POLIURETANO EXPANDIDO
CON CUBIERTAS DE
ALUMINIO EN EL AMBIENTE
EXTERIOR E
INTERIORMENTE CUBIERTAS
CON MASTICO Y MALLA DE
FIBRA DE VIDRIO, SEGUN
PLANOS Y
ESPECIFICACIONES DE
CONSTRUCCION ANEXOS
SISTEMA DIGITAL
DIRECTO (DDC) PARA
CONTROL DE
TEMPERATURA, HUMEDAD
DENTRO DE LAS SALAS DE
CIRUGIA DE ACUERDO A
LAS ESPECIFICACIONES Y
PLANOS ANEXOS. ESTA
PARTIDA INCLUYE EL
SUMINISTRO DE TODOS LOS
MATERIALES Y MANO DE
OBRA PARA SU
INSTALACION.
1.00
PA
140,550.21
1.00
PA
340,727.78
10
SUMINISTRO DE ENERGIA A
EQUPOS MAYORES ( DRYCOOL, CWP, VE, PANELES
DDC) ESTA PARTIDA
INCLUYE EL SUMINISTRO DE
TODOS LOS MATERIALES Y
MANO DE OBRA PARA SU
INSTALACION.
OBRAS CIVILES MENORES
PARA UBICACION DE
EQUIPOS IN SITU E
INSTALACION DE SISTEMAS
MECANICOS DE ACUERDO A
ESPECIFICACIONES Y
PLANOS ANEXOS. ESTA
PARTIDA INCLUYE EL
SUMINISTRO DE TODOS LOS
MATERIALES Y MANO DE
OBRA PARA SU
INSTALACION
TRANSPORTE PESADO,
IZADO Y MONTACARGA
PARA UBICACION DE
EQUIPOS MAYORES EN
OBRA Y/O IN SITU
MISCELANEOS PARA
MATERIALES Y SERVICIOS
EN OBRA
1.00
PA
85,181.94
1.00
PA
51,109.17
1.00
PA
42,590.97
1.00
PA
46,850.07
PA
34,072.78
11
12
LIMPIEZA,
DESCONTAMINACION
BLOQUE HABITACIONES
PARA PUESTA EN
OPERACION. INCLUYE
EVACUACION DURANTE 72
HRS DE LA EDIFICACION A
PRESION, HEPA-VACUUM Y
LIMPIEZA HUMED DE
SUPERFICIES Y CONTENIDO,
DESCONTAMINACION TOTAL
A BASE DE PEROXIDO DE
HIDROGENO. lIMPIEZA
DESCONTAMINACION DE
TODO EL SISTEMA HVAC
(DUCTOS, DRY-COOL)
COMISIONAMIENTO DEL
SISTEMA HVAC DE
ACUERDO A NORMAS DE
CONSTRUCCION Y
ESPECIFICACIONES.
1.00
PA
34,072.78
1.00
PA
34,072.78
UD
1.00
UD
1.00
UD
1.00
UD
1.00
UD
1.00
UD
100.00
UD
INSTALACIONES ELECTRICAS
7
10
11
12
50.00
Pie
15.00
PIE
180.00
PIE
20.00
1.00
PA
13
14
15
16
17
18
1.00
UD
1.00
PA
1.00
PA
TRANSPORTE PESADO,
IZADO Y MONTACARGA
PARA UBICACION DE
EQUIPOS MAYORES EN
OBRA Y/O IN SITU
1.00
PA
MISCELANEOS PARA
MATERIALES Y SERVICIOS
EN OBRA
1.00
PA
1.00
PA
19
20
PRUEBAS AJUSTES Y
BALANCE DEL SISTEMA.
INCLUYE EQUIPOS
MAYORES Y TODAS LAS
INSTALACIONES PARA
PUESTA EN OPERACION DE
ACUERDO A
ESPECIFICACIONES ANEXAS
COMISIONAMIENTO DEL
SISTEMA ELECTRICO DE
ACUERDO A NORMAS DE
CONSTRUCCION Y
ESPECIFICACIONES.
APLICACION: DRY-COOL /
FLUJO LAMINAR / CWP
(PLANTA AGUA HELADA)
PARA SUITE OPERACIONES
& UCI
EQUIPOS MAYORES
1.00
PA
1.00
PA
SISTEMA ENFRIAMIENTO Y
DESHUMIDIFICACION POR
DESECANTE LIQUIDO DE
PAQUETE TIPO TECHO , 3500
CFM 100% AIRE FRESCO, 15
HP HVOLTAJE 460/3/60,
REFRIGERANTE 410a, NIVEL
DE FILTRACION 60/95%.
PANEL DESCONECTIVO
ELECTRICO NEMA 3R
INSTALADOS. PANEL DE
CONTROL DE
TEMPRATURA Y HUMEDAD
DIGITAL. AMBOS
INSTALADOS EN FABRICA.
SET DE COMPRESORES
SCROLL DE CAPACIDAD
VARIABLE. VARIADOR DE
FRECUENCIA PARA MOTOR
VENTILADOR AIRE DE
SUMINISTRO. CURVA DE
INSTALACION EN TECHO DE
ZINC GALVANIZADO Y
DESCARGA AJUSTAGLE EN
EN OBRA HACIA ABAJO Y-O
HORIZONTAL.
1.00
UD
#########
SISTEMA DE FLUJO
LAMINAR (> 100 FPM) PARA
PRODUCIR 15 CAMBIOS POR
HORA EN SALA DE
OPERACIONES, MONTADO
SOBRE TB UNIVERSAL DE
ESTRUCTURA DE ALUMINIO
ELECTROSOLDADO EN
FABRICA. CON UN AREA DE
2.80 X 2.80 M. SET DE
DIFUSORES DE SUMINISTRO
DE 24" X 24" TBAR CON
FILTRO HEPA 99.9997%.
DAMPER DE MARIPOSA Y
PLATO DE DIFUSION
INTEGRADOS. CUELLO DE
SUMINISTRO DE INCLUYE
ADEMAS SET DE REJILLAS
DE RETORNO CONSTRUIDAS
EN SS, CON FILTRO 60% Y
DAMPER DE HOJAS
OPUESRAS INCLUIDO
SET VENTILADOR DE
EXTRACCION DUAL TIPO
CENTRIFUGO Y
CONFIGURACION DE DOMO
DE TIRO VERTICAL
MONTADO SOBRE FRAME
COMUN CON CURVA DE
INATALACION EN TECHO.
CADA VENTILADOR 3000
CFM @ 1 PULG DE H20.
480/3/60 INCLUYE
DESCONETIVO NEMA 3R.
UNO STAND-BY
1.00
UD
298,136.80
1.00
UD
85,181.94
MANEJADORA DE AIRE DE
TECHO DE 1500 CFM @ 2"
H2O, VENTILADOR
CENTRIFUGO , DOBLE
PARED, FILTRACION 60/95%,
COIL AGUA HELADA,
DESCONECTIVO Y PANEL DE
CONTROL DIGITAL STAND
ALONE. VOLTAJE 460/3/60
MANEJADORA DE AIRE DE
TECHO DE 1000 CFM @ 2"
H2O, VENTILADOR
CENTRIFUGO , DOBLE
PARED, FILTRACION 60/95%,
COIL AGUA HELADA,
DESCONECTIVO Y PANEL DE
CONTROL DIGITAL STAND
ALONE. VOLTAJE 460/3/60
1.00
UD
259,166.06
1.00
UD
352,227.34
1.00
PA
157,700.00
INSTALACIONES IEM
4
SISTEMA DE CONDUCTOS
DE AIRE PARA SUMINISTRO
Y EXTRACCION
CONSTRUIDOS EN ZINC
GALVANIDADO, AISLADOS
CON FIBRA DE VIDRIO, Y
DUCTOS FLEXIBLES
TERMINALES SEGUN
PLANOS Y
ESPECIFICACIONES DE
CONSTRUCCION ANEXOS.
ESTA PARTIDA INCLUYE EL
SUMINISTRO DE TODOS LOS
MATERIALES Y MANO DE
OBRA PARA SU
INSTALACION.
SISTEMA DE TUBERIAS Y
ACCESORIOS DE SERVICIO
Y CONTROL DE FLUJO,
INDICADORES DE
TEMPERATURAS Y PRESION,
PARA CONDUCCION DE
AGUA HELADA,
CONSTRUIDAS EN TUBERIAS
DE COBRE Y AISLADAS
TERMICAMENTE CON
CANALETAS DE
POLIURETANO EXPANDIDO
CON CUBIERTAS DE
ALUMINIO EN EL AMBIENTE
EXTERIOR E
INTERIORMENTE CUBIERTAS
CON MASTICO Y MALLA DE
FIBRA DE VIDRIO, SEGUN
PLANOS Y
ESPECIFICACIONES DE
CONSTRUCCION ANEXOS
SISTEMA DE CONTROLES
DIGITALES PARA
MONITOREO Y CONTROL
INDIVIDUAL DE
TEMPERATURA, HUMEDAD,
CAMBIOS DE AIRE,
PRESSURIZACION Y NIVEL
DE POLUCION DENTRO DE
LAS SALAS DE CIRUGIA, UCI
Y DIFERENTES ZONAS DEL
AREA COMUN DE APOYO DE
LA SUIT, DE ACUERDO A
LAS ESPECIFICACIONES Y
PLANOS ANEXOS. ESTA
PARTIDA INCLUYE EL
SUMINISTRO DE TODOS LOS
MATERIALES Y MANO DE
OBRA PARA SU
INSTALACION.
1.00
PA
136,291.11
1.00
PA
373,500.00
SUMINISTRO DE ENERGIA A
EQUPOS MAYORES ( DRYCOOL, VE, AHU`S, PANELES
DDC) ESTA PARTIDA
INCLUYE EL SUMINISTRO DE
TODOS LOS MATERIALES Y
MANO DE OBRA PARA SU
INSTALACION.
1.00
PA
83,000.00
1.00
PA
49,800.00
TRANSPORTE PESADO
PARA IZADO Y
MONTACARGA PARA
UBICACION DE EQUIPOS
MAYORES EN OBRA Y/O IN
SITU
1.00
PA
45,650.00
MISCELANEOS PARA
MATERIALES Y SERVICIOS
EN OBRA
1.00
PA
37,350.00
10
11
12
PRUEBAS AJUSTES Y
BALANCE DEL SISTEMA.
INCLUYE EQUIPOS
MAYORES, SISTEMA DE
CONDUCCION DE AIRE,
SISTEMA HIDRONICO Y
SISTEMA DDC, SEGUN
ESPECIFICACIONES ANEXAS
LIMPIEZA,
DESCONTAMINACION SUIT
OPERACIONES Y UCI PARA
PUESTA EN OPERACION.
INCLUYE EVACUACION
DURANTE 72 HRS DE LA
EDIFICACION A PRESION,
HEPA-VACUUM Y LIMPIEZA
HUMED DE SUPERFICIES Y
CONTENIDO,
DESCONTAMINACION TOTAL
A BASE DE PEROXIDO DE
HIDROGENO. lIMPIEZA
DESCONTAMINACION DE
TODO EL SISTEMA HVAC
(DUCTOS, AHU, DRY-COOL)
COMISIONAMIENTO DEL
SISTEMA HVAC DE
ACUERDO A NORMAS DE
CONSTRUCCION Y
ESPECIFICACIONES.
Subtotal:
1.00
PA
41,500.00
1.00
PA
46,850.07
1.00
PA
34,072.78
TOTAL
12,301.07
23,892.51
53,547.11
22,637.34
3,873.35
1,049.44
3,758.43
509,644.58
156,225.00
19,946.73
10,123.93
20,102.47
837,101.98
2,296.83
7,765.50
6,329.19
1,655.92
1,681.20
563.78
2,568.21
2,432.36
124.25
433.00
721.67
26,571.90
2,070.80
2,070.80
113,960.00
88,800.00
50,907.51
9,149.07
2,806.06
10,309.07
280,073.31
452,190.03
25,603.45
5,616.01
29,421.82
46,733.14
22,303.67
114,715.37
26,247.29
12,140.99
12,006.16
746,977.93
193,481.17
16,106.17
47,042.04
22,863.52
13,229.69
292,722.59
352,506.14
78,334.70
117,502.06
548,342.89
188,928.71
509,510.39
198,220.29
896,659.39
101,174.94
724,742.93
6,092.13
300,462.31
307,291.00
81,944.27
4,369.39
1,526,076.97
2,874.35
619.44
3,493.79
72,444.61
12,110.02
20,183.37
4,824.48
5,154.53
775.13
79,982.66
6,304.34
9,408.13
13,122.56
18,583.15
12,801.73
954.10
5,379.39
517.70
18,083.21
658.50
79.92
644.25
456.54
55,297.68
31,153.62
2,053.44
17,500.00
542.14
705.96
30,900.00
20.33
148.12
198.42
420,988.03
37,737.16
22,118.08
2,325.38
30,946.96
50,174.51
2,038.98
3,680.85
1,149.29
1,858.30
68,853.77
16,499.38
1,097.49
399.60
6,442.47
14,110.17
978.31
3,393.13
92,915.76
64,008.64
3,449.95
74,784.10
13,360.08
512,322.35
77,572.17
10,453.40
365,619.37
209,061.35
209,061.35
127,293.17
223,546.26
798,080.72
70,263.30
75,038.47
2,532.87
1,537.22
543,957.55
53,739.45
243,541.49
25,630.21
3,036,928.35
25,150.17
117,316.23
142,466.40
321,808.55
612,335.25
194,192.15
1,128,335.95
2,588.50
5,736.12
11,257.20
19,581.82
169,196.78
127,563.69
669.90
11,536.21
308,966.58
197,391.97
347,270.80
335,249.55
154,306.85
53,076.57
463,868.68
412,343.47
1,963,507.88
240,258.41
272,753.17
513,011.58
55,322.40
117,483.47
86,295.09
59,216.94
19,047.22
35,959.13
220,475.51
593,799.76
260,280.51
33,921.86
42,128.80
336,331.17
68,001.47
26,507.17
38,636.17
133,144.81
55,749.46
15,319.99
17,187.64
88,257.08
47,910.23
47,910.23
39,886.00
44,400.00
2,545.38
701.51
9,472.00
43,916.03
9,167.36
7,655.05
4,196.45
7,495.57
1,557.66
170,993.00
30,301.93
82,995.68
6,486.91
16,004.46
2,430.10
657.33
678.63
657.33
27,049.17
11,379.02
4,603.75
1,081.62
13,466.71
20,362.00
218,154.64
26,327.37
73,564.56
8,281.04
23,398.72
148,559.91
67,703.56
160,000.00
24,883.25
20,529.80
85,864.80
22,594.02
15,485.96
55,749.46
732,942.45
227,845.93
554,697.67
3,117.29
702,044.13
1,487,705.02
46,380.44
198,419.82
244,800.26
42,007.29
71,769.81
75,687.49
49,742.43
9,784.53
4,133.80
50,316.22
303,441.57
185,364.26
1,293.19
44,117.59
1,545.98
232,321.02
66,041.78
5,287.19
95,748.66
841.82
167,919.45
41,559.08
47,627.36
22,270.76
111,457.20
12,555.00
18,583.15
40,814.43
48,754.45
120,707.03
33,206.50
138,568.37
3,174.20
174,949.07
4,196.45
8,880.00
11,396.00
420.91
1,167.32
991.74
2,998.23
30,050.64
48,191.04
18,572.15
2,932.44
2,645.94
2,430.10
8,298.45
4,049.42
678.63
4,969.42
9,018.00
182,005.33
283,790.91
6,797.61
2,516.99
2,484.96
1,863.72
7,869.04
1,138.94
800.00
8,733.50
32,204.76
22,792.00
8,880.00
31,672.00
4,440.00
4,440.00
10,903.20
5,698.00
66.71
16,667.91
54,373.27
17,760.00
28,490.00
4,736.00
133.42
90.00
105,582.69
5,698.00
45.00
5,743.00
5,698.00
4,440.00
66.71
2,545.38
12,750.08
5,698.00
4,440.00
10,138.00
5,698.00
4,440.00
133.42
2,545.38
1,500.00
14,316.79
5,698.00
4,440.00
2,545.38
1,500.00
133.42
14,316.79
17,094.00
13,320.00
200.13
5,090.75
3,000.00
793.48
2,477.42
41,975.77
5,698.00
4,440.00
66.71
10,204.71
5,698.00
4,440.00
66.71
2,545.38
12,750.08
5,698.00
4,440.00
133.42
10,271.42
5,698.00
4,440.00
1,000.00
11,138.00
4,440.00
4,440.00
439,801.27
140,819.00
358,611.16
49,555.07
2,650.29
25,520.00
21,436.80
2,226.64
1,040,620.22
6,194.38
6,194.38
876.86
876.86
25,520.00
25,520.00
102,080.00
43,360.69
6,194.38
151,635.07
17,571.40
1,122.34
932.94
3,955.88
236.07
5,313.00
29,131.63
29,283.83
22,792.00
26,640.00
46,692.44
11,784.54
137,192.81
260.92
2,221.14
4,377.63
414.27
1,525.60
2,635.48
7,880.09
2,716.07
1,319.30
1,191.46
1,758.16
6,194.38
251.24
4,640.90
2,729.65
1,339.35
977.48
1,143.18
3,390.87
587.07
9,991.86
17,808.85
11,872.57
87,227.52
5,289.07
4,521.20
10,598.59
20,408.86
7,996.95
7,996.95
529.13
14,906.66
9,565.00
34,000.00
111,171.96
170,172.75
950.00
5,000.00
3,000.00
325.00
325.00
19,982.05
29,582.05
2,222,779.19
105,766.65
2,328,545.84
2,857.70
20,859.43
18,121.60
38,895.14
61,464.68
2,880.48
12,309.42
10,560.19
2,410.72
280.61
559.12
9,296.64
5,168.91
12,801.73
22,150.36
32,855.84
2,750.02
7,012.80
6,368.44
3,951.26
3,483.59
977.48
3,556.48
1,143.18
1,000.00
283,715.79
10,345.72
15,260.18
1,379.15
26,985.05
96,474.84
11,105.71
67,845.49
123,094.26
298,520.31
389,932.14
389,932.14
27,386.36
100,852.47
16,609.62
144,848.45
45,153.82
45,153.82
88,569.62
5,000.00
3,000.00
16,875.00
3,240.00
116,684.62
1,375.84
1,059.79
153.24
6,144.77
8,733.63
10,719.43
2,897.14
7,734.83
14,806.67
23,506.70
59,664.77
3,298.11
12,145.55
1,016.92
16,460.57
6,404.04
2,011.55
8,415.59
28,705.78
28,705.78
8,400.00
7,000.00
15,400.00
27,834.41
27,834.41
4,332.78
1,192.34
533.83
5,137.40
260.92
7,000.00
4,970.00
23,427.27
3,000.00
3,613.39
10,000.00
16,613.39
95,865.62
13,008.77
121,961.74
16,476.94
197,970.18
445,283.25
220,279.39
466,633.07
45,745.98
200,004.75
112,044.51
281,326.74
15,164.73
677,128.94
619,374.85
2,637,702.97
96,665.60
304,121.68
400,787.28
55,502.05
161,548.11
71,547.64
199,799.86
60,036.06
44,357.72
592,791.42
1,597,407.76
479,222.33
2,076,630.08
98,050.05
9,215.10
78,947.21
1,543.33
13,767.46
201,523.15
719,851.00
33,023.23
5,443.82
758,318.05
22,680.00
80,526.99
24,777.54
81,028.50
209,013.03
4,736.00
17,094.00
57,720.00
280.61
20,657.79
49,405.53
18,526.35
8,602.00
53,579.59
60,000.00
3,000.00
2,550.00
15,000.00
26,668.48
8,585.95
346,406.30
69,609.28
40,306.75
16,004.46
13,811.25
2,781.63
1,971.99
5,231.39
7,464.88
3,678.00
4,000.00
164,859.63
44,340.26
133,047.65
1,870,257.98
10,000.00
2,057,645.89
61,596.00
44,590.40
106,186.40
2,513.95
377.92
3,745.49
1,677.99
8,315.35
21,913.80
5,794.28
883.98
8,900.26
37,492.33
11,049.75
5,156.01
6,629.85
29,227.96
15,027.67
67,091.24
9,271.80
34,053.87
4,635.64
4,394.23
52,355.54
6,429.97
10,136.10
10,136.10
2,977.14
3,953.22
4,183.41
7,504.57
45,320.51
2,276.16
2,276.16
4,074.10
1,519.19
3,799.16
420.91
9,813.36
5,869.42
5,871.08
1,525.24
369.64
369.64
14,005.02
11,382.18
10,322.66
21,704.84
1,954.96
1,322.97
10,317.42
13,595.35
13,108.14
7,791.58
7,689.06
2,000.00
30,588.79
800.00
1,500.00
2,300.00
5,106.59
596.39
1,076.82
6,779.80
23,853.14
4,152.57
18,121.60
18,121.60
9,705.43
51,005.65
7,513.83
132,473.82
19,654.49
44,159.14
63,813.63
30,166.38
30,166.38
8,191.64
3,548.46
6,457.88
78,530.73
10,349.57
7,067.62
1,919.20
3,945.30
8,753.41
2,363.74
6,367.60
561.21
41,327.67
25,668.05
3,238.51
28,906.55
3,332.82
12,388.77
25,560.88
41,282.47
8,880.00
280.61
5,543.34
1,703.46
1,000.00
17,407.40
7,002.85
9,220.10
2,891.33
19,114.29
5,354.56
3,556.48
2,645.94
15,476.13
27,033.10
910.17
10,199.52
4,021.20
1,675.20
6,169.05
1,388.96
10,460.48
1,929.76
5,774.34
42,528.68
12,230.74
1,100.00
13,330.74
35,441.00
35,441.00
25,480.00
41,300.00
158,200.00
30,030.00
34,450.00
20,252.00
10,126.00
7,280.00
11,800.00
45,200.00
8,580.00
68,900.00
139,750.00
5,063.00
5,063.00
3,640.00
5,900.00
22,600.00
4,290.00
34,450.00
15,189.00
17,700.00
6,435.00
27,500.00
20,252.00
20,252.00
14,560.00
23,600.00
90,400.00
17,160.00
34,450.00
10,126.00
9,410.80
8,580.00
35,441.00
35,441.00
25,480.00
41,300.00
158,200.00
30,030.00
34,450.00
139,750.00
360,000.00
1,190,875.00
74,000.00
62,400.00
65,600.00
47,600.00
50,000.00
179,760.00
120,000.00
30,000.00
65,000.00
45,000.00
1,317,000.00
75,000.00
5,251,177.80
15,599.58
5,310.00
20,909.58
54,728.62
15,767.49
44,097.56
35,920.10
150,513.76
152,588.57
9,082.65
54,495.92
744,431.49
107,528.76
115,557.06
290,255.19
1,473,939.63
3,078.87
3,078.87
13,700.41
17,041.21
1,712.55
32,454.17
79,864.56
487,294.16
32,265.28
5,897.76
129,282.13
487,294.16
30,026.17
18,768.93
1,270,693.16
65,933.59
150,263.95
5,377.15
221,574.69
27,673.26
101,909.03
87,071.33
21,816.56
1,745.31
240,215.49
27,057.75
51,585.07
9,745.05
88,387.87
3,232.71
1,859.01
2,240.30
8,746.47
16,078.50
23,087.42
1,210.25
24,297.67
128,017.27
74,332.61
7,420.37
209,770.25
62,678.00
56,980.00
51,409.61
46,160.92
22,134.98
567.82
20,350.00
4,542.55
38,426.52
5,734.51
3,915.33
3,137.28
5,670.24
2,430.10
2,534.93
3,500.00
330,172.79
26,392.00
35,932.22
9,019.46
20,398.62
39,985.73
26,551.05
3,730.09
3,042.29
331,661.28
8,233.81
7,975.43
24,456.00
30,814.00
1,400.00
569,591.98
369,086.32
369,086.32
15,355.84
21,731.66
60,615.16
47,459.43
25,144.07
12,572.03
182,878.19
3,342.39
4,200.57
2,348.70
16,260.26
18,066.95
3,252.05
29,986.87
27,100.43
8,220.46
5,420.09
3,252.05
7,588.12
4,336.07
1,147.73
134,522.74
153,943.27
153,943.27
1,350,133.81
36,031.96
1,235,138.19
76,663.75
140,550.21
140,550.21
340,727.78
85,181.94
51,109.17
42,590.97
46,850.07
34,072.78
34,072.78
34,072.78
924,224.09
298,136.80
85,181.94
259,166.06
352,227.34
157,700.00
136,291.11
373,500.00
83,000.00
49,800.00
45,650.00
37,350.00
41,500.00
46,850.07
34,072.78
6,572,396.58
No
I
A
1
2
3
4
5
6
7
8
9
10
11
12
Descripcion
Area Exterior:
FACHADA
Paete
Muros elevados
Recubrimiento
Losa de entrada
Colocain de fino
Zabaleta
Paete de losa
Hierros en huecos de ventanas
Revestimiento de placas de vinil en
muros
Demolicin y bote de piso existente
Torta de piso
Suministro y colocacin piso de alto
trnsito
Cantidades
Und
Precios
49.83
25.00
49.83
1.58
13.12
10.50
13.12
155.52
M2
M2
M2
M3
M2
ML
M2
M2
246.86
955.70
1,074.60
14,327.43
295.22
99.95
286.47
3,066.60
144.52
5.80
1.58
M2
M2
M3
1,080.99
3,439.09
5,361.60
M2
1,119.06
17.40
Sub total
A
1
1.1
1.2
1
1.4
1.5
Construccin Estacionamiento:
Movimiento de tierra:
Corte de material e = 0.20 m
Bote de material
Relleno de mina compactado
Excavacin para construccin de
canaleta (20 ML)
Bote de escombros demolicin de
acera
313.79
440.81
470.69
M3
M3
M3
128.29
367.98
1,085.65
4.80
M3
326.97
18.15
M3
367.98
1,568.96
1,568.96
M2
M2
96.85
488.29
118.90
ML
615.62
32.00
M2
6,604.27
449.10
ML
191.10
Subtotal
2
2.1
2.2
Asfalto:
Imprimacin del area
Carpeta asfaltica 2"
Subtotal:
3
3.1
3.2
3.3
Acera y Contenes
Reparacin de contenes
Encache de canaleta para desague de
parqueos
Pintura amarrillo trafico en contenes
y lineas del parqueo
3.4
3.5
3.6
3.7
3.8
129.63
M2
77.66
129.63
1.00
M2
P.A.
620.46
15,000.00
21.76
230.20
M2
ML
833.98
599.85
83.30
33.32
66.64
ML
M2
M2
299.81
897.06
246.86
83.30
166.60
ML
ML
1,100.00
99.95
66.64
M2
74.46
94.50
ML
222.70
2.00
Uds
9,549.68
1.00
Uds
1,951.23
120.00
48.00
96.00
ML
M2
M2
24.85
897.06
246.86
120.00
240.00
ML
ML
1,100.00
99.95
96.00
M2
74.46
120.00
ML
222.70
Subtotal:
B
B-1
1
2
3
4
5
6
7
8
9
B-2
1
2
3
4
5
6
7
Subtotal:
B-3
1
2
3
4
5
6
7
Trasero
Desmonte y bote de malla ciclonica
en mal estado
Muro de bloques de 6"
Paete en muro
Suministro y colocacin malla
ciclonica de 6'
Zabaleta en malla
Pintura acrilica en muro de verja
(muro de malla)
Suministro y colocacin alambre
trinchera
94.50
37.80
75.60
ML
M2
M2
24.85
897.06
246.86
94.50
189.00
ML
ML
1,100.00
99.95
75.60
M2
74.46
94.50
ML
222.70
72.90
486.05
1.00
1.00
4.00
M3
M2
P.A.
P.A.
P.A.
307.89
102.63
5,161.99
15,000.00
325.21
119.00
PL
44.47
10.00
Ud
5,325.84
3,500.00
PL
31.63
2.00
Ud
3,592.01
51.29
6.67
M2
M3
77.66
367.98
Subtotal:
C
1
2
3
4
3
4
Jardineria:
Suministro y colocacin tierra negra
Suministro y colocacin grama
Siembra de arboles
Limpieza y bote en patios interiores
Llave chorro para jardineras
Tubos de 3/4" de presin PVC para
llaves chorro, jardineras (incluye
excavacin y tapado)
Subtotal:
D
1
2
Iluminacin Exterior:
Suministro y colocacin lmpara tipo
secador (incluy. tubo en hierro 4" x
4" de 20')
Alambre vinyl para tubos de lmparas
Subtotal:
E
1
2
3
Tendedero:
Soporte para tendedero
Demolicin piso en mal estado en
area de tendedero
Bote de material demolido
5.13
M3
6,435.10
163.55
P2
285.00
2.00
1.00
1.00
Ud
Ud
Ud
5,000.00
32,167.02
5,161.99
1.00
P.A
55,749.46
1.00
1.00
Ud
PA
17,241.04
15,485.96
1.00
Uds
1,035.40
1.00
Uds
1,035.40
1.00
Uds
877.54
1.00
549.77
Uds
M2
877.54
5.32
549.77
M2
412.96
549.77
M2
65.39
Subtotal:
F
1
Pasarela:
Baranda de hierro en pasarela en
barras de 1/2" con pasamanos
Subtotal:
G
1
2
3
4
5
6
Rotulacin
Asta para bandera
Tarja de bronce
Base para tarja
Suministro y colc. Letrero c/letras
colgante c/luces Led (sujeto a
presentacion de factura)
Letrero en bronce (EMERGENCIA
12")
Letrero identificativo en obra
Subtotal:
II
Cuerpo I
A
1
Reparaciones de techo:
Desmonte y reinstalacin de tinaco
Desmonte
y
reinstalacin
de
compresores A/C
Suministro y colocacion base para
tinaco
Suministro y colocacion base para
A/C
Limpieza del area a tratar
Suministro
y
colocacin
de
impermeabilizante tipo lona asfaltica
de 4.00 KG/M granulada con
refuerzo de poliester.
Desmonte aluzinc en antepecho
(incluye el bote)
2
3
4
5
6
Subtotal:
B
1
2
3
4
6
7
8
10
11
13
14
15
16
17
18
19
20
56.48
246.31
294.23
304.56
232.97
25.00
14,525.83
20,419.17
19,249.17
17,431.00
6,194.38
24,777.54
361.34
215.52
2,374.51
2,374.51
2,374.51
2,374.51
21
26.90
PL
2,374.51
15.00
Ud
407.80
8.50
M2
619.44
1.50
M2
1,474.63
15.49
P2
307.89
15.06
P2
307.89
80.92
P2
307.89
4.00
8.00
1.00
4.00
8.00
Ud
Ud
Ud
Ud
Ud
103.54
103.54
232.97
5,698.00
4,440.00
2.00
Ud
4,824.48
1.00
3.00
Ud
Ud
46,307.09
962.39
2.00
1.00
Ud
Ud
1,909.94
66.71
Subtotal:
C
1
Rotulacin
Letreros en acrilico para sealizacin
Subtotal:
D
2
3
4
5
6
Instalacin Varias:
Suministro e instalacin plafond PVC
en direccin
Suministro e instalacin plycem en
direccin
Suministro e instalacin meseta de
marmolite en odontologa
Suministro e instalacin meseta de
marmolite en vacunas
Suministro e instalacin meseta de
marmolite en laboratorio
Subtotal:
E
1
2
3
4
5
6
7
8
9
10
Instalacin Sanitaria:
Desmonte de inodoros
Desmonte de lavamanos
Desmonte de fregadero
Suministro e instalacin inodoro
Suministro e instalacin lavamanos
Suministro e instalacin fregadero
sencillo
Suministro e instalacin lavamanos
quirurgico pequeo en area de
emergencia
Desague de piso de 2"
Suministro y colocacin accesorios
de baos
Rejilla de piso
Subtotal:
Instalacin Electrica:
1
2
3
4
5
6
7
9
10
11
12
13
7.00
21.00
3.00
Ud
Ud
Ud
644.25
102.00
148.31
27.00
Ud
36.34
2.00
3.00
Ud
Ud
85.41
55.59
3.00
Ud
23,690.09
1.00
Ud
29,303.66
3.00
1.00
Ud
Ud
39,167.35
3,599.97
7.00
5.00
Ud
Ud
4,603.75
678.63
1.00
P.A.
4,576.51
2.86
M2
897.06
17.05
2.95
M2
M2
246.86
134.08
68.92
1.00
M2
P.A.
881.64
5,161.99
25.00
M2
1,148.48
G
1
Muros de Bloques
De 6" para cerrar hueco
Subtotal:
H
1
2
3
4
Terminacin de superficie:
Paete
Pintura mantenimiento en hierros
Suministro y colocacin ceramica de
muros
Reparacin general paete muros
Subtotal:
I
1
Terminacin de pisos:
Suministro y colocacin pisos de
granito (incluye pulido y brillado)
Subtotal:
III
Cuerpo II
A
1
Reparaciones de techo:
Desmonte y reinstalacin de tinaco
Suministro y colocacion base para
tinaco
Limpieza del area a tratar
Suministro
y
colocacin
de
impermeabilizante tipo lona asfaltica
de 4.00 KG/M granulada con
refuerzo de poliester.
2
3
4
2.00
Uds
1,035.40
2.00
275.28
Uds
M2
877.54
5.32
275.28
M2
412.96
48.92
M2
56.48
526.38
25.00
1.00
P2
Ud
P.A.
246.31
103.54
232.97
2.00
Ud
25,912.35
2.00
Ud
17,431.00
4.00
Ud
17,431.00
2.00
Ud
13,073.25
1.00
Ud
13,073.25
Subtotal:
B
1
2
4
5
6
10
Reparaciones y suministro de
ventanas y puertas:
Desmonte de ventanas de aluminio
Suministro y colocacin de ventanas
correderas de aluminio y vidrio
Desmonte de puerta madera y vidrio
Desmonte de gabinetes
Suministro y colocacin de puerta de
aluminio y vidrio martillado claro
doble con bumper (1.8 x 2.10)
entrada zona quirurgica.
Suministro y colocacin de puerta de
aluminio y vidrio martillado claro
doble con bumper (1.2 x 2.10) en sala
de partos
Suministro y colocacin de puerta de
aluminio y vidrio martillado claro
sencilla con bumper (1.2 x 2.10)
salida medico a quirofano
Suministro y colocacin de puerta de
aluminio y vidrio martillado claro
sencilla con bumper (0.90 x 2.10)
Suministro y colocacin de puerta de
aluminio y vidrio martillado claro
sencilla (0.90 x 2.10)
11
12
13
14
15
16
17
85.76
12.00
3.00
P2
Ud
Ud
215.52
6,194.38
24,777.54
6.72
PL
2,374.51
8.60
PL
2,374.51
6.72
PL
2,374.51
8.60
PL
2,374.51
6.00
5.00
Ud
Ud
103.54
103.54
1.00
Ud
4,824.48
1.00
5.00
4.00
Ud
Ud
Ud
5,154.53
5,698.00
4,440.00
2.00
Ud
2,545.38
2.00
Ud
101,174.94
5.00
Ud
1,909.94
4.00
5.00
1.00
Ud
Ud
P.A.
361.34
66.71
5,643.17
20.00
19.00
3.00
Ud
Ud
Ud
644.25
102.00
148.31
7.00
Ud
36.34
Subtotal:
E
1
2
3
4
5
6
7
8
10
11
12
13
Instalacin Sanitaria:
Desmonte de inodoros
Desmonte de lavamanos
Suministro e instalacin fregadero
sencillo
Suministro e instalacin fregadero
doble
Suministro e instalacin inodoro
Suministro e instalacin lavamanos
Suministro e instalacin ducha
completa
Suministro e instalacin lavamanos
quirurgico doble en acero inoxidable
con accionador de rodilla
Suministro y colocacin accesorios
de baos
Suministro y colocacin tubo para
cortina
Rejilla de piso
Acometida de agua para autoclave
Subtotal:
F
1
2
3
4
Instalacin Electrica:
Suministro e instalacin globo
Accesorio para interruptor sencillo
Accesorio para interruptor doble
Accesorio para tomacorriente 110 V
5
6
7
8
1.00
Ud
85.41
2.00
2.00
3.00
Ud
Ud
Ud
309.72
27.58
6.56
3.74
M2
M2
155.31
897.06
137.09
10.28
18.77
3.68
M2
M3
M2
M2
62.12
367.98
246.86
134.08
137.09
1.00
M2
P.A.
881.64
5,000.00
12.00
100.80
M2
ML
920.33
103.54
5.80
M3
367.98
27.11
15.00
P2
Ud
309.72
407.80
Subtotal:
G
1
2
Muros de Bloques
Demolicin muro en quirofano
De 6" para cerrar hueco
Subtotal:
H
1
2
3
4
5
6
Terminacin de superficie:
Demolicin ceramica de pared en
baos
Bote material demolido
Paete
Pintura mantenimiento en hierros
Suministro y colocacin ceramica de
muros
Reparacin general paete muros
Subtotal:
I
1
2
Terminacin de pisos:
Suministro y colocacin pisos de
granito
Redondeo de esquinas
Subtotal:
D
1
2
3
Miscelaneos
Bote de material escombros
Suministro e instalacin meseta de
marmolite en esterilizacin
Rotulos
Subtotal:
IV
Cuerpo III
A
1
2
3
Reparaciones de techo:
Desmonte y reinstalacin de tinaco
Suministro y colocacion base para
tinaco
Suministro
y
aplicacin
de
impermeabiliazante acrilico
Suministro
y
colocacin
de
impermeabilizante tipo lona asfaltica
de 4.00 KG/M granulada con
refuerzo de poliester.
2.00
Uds
1,035.40
1.00
Uds
877.54
63.64
M2
191.10
378.73
M2
412.96
M2
M2
3,277.04
56.48
P2
Ud
P.A.
Ud
Ud
246.31
103.54
232.97
6,194.38
24,777.54
Ud
11,430.00
Ud
17,274.90
M2
2,580.99
Pl
2,374.51
Pl
Ud
2,374.51
407.80
M2
77.66
Subtotal:
B
1
2
3
4
5
6
7
8
9
10
11
12
13
C
1
Demoliciones:
Demolicin de piso pulido en mal
estado en area de imgenes, farmacia,
administracin y lavanderia
211.20
2
2
123.44
27.46
M2
M3
62.12
367.98
241.20
179.50
M2
ML
920.33
123.04
34.10
M2
643.51
9.00
9.00
1.00
9.00
9.00
Ud
Ud
Ud
Ud
Ud
103.54
103.54
232.97
5,698.00
4,440.00
2.00
9.00
9.00
9.00
Ud
Ud
Ud
Ud
5,154.53
2,545.38
1,909.94
361.34
9.00
11.00
Ud
Ud
412.96
66.71
10.00
28.00
2.00
Ud
Ud
Ud
644.25
102.00
148.31
30.00
Ud
36.34
2.00
3.00
Ud
Ud
85.41
27.58
Subtotal:
D
1
2
3
Terminacin de pisos:
Suministro y colocacin piso de
granito fondo blanco alto transito de
0.40 x 0.40 (incluye pulido y brillado)
Zocalos de granito
Construccin piso pulido e=0.10 m
en terraza interior
Subtotal:
E
1
2
3
4
5
6
7
8
9
10
11
Instalacin Sanitaria:
Desmonte de inodoros
Desmonte de lavamanos
Desmonte de fregadero
Suministro e instalacin inodoro
Suministro e instalacin lavamanos
Suministro e instalacin fregadero
doble
Ducha
Juego de accesorios de baos
Cortina
Suministro y colocacin tubo para
cortina
Rejilla de piso
Subtotal:
F
1
2
3
4
5
6
Instalacin Electrica:
Suministro e instalacin globo
Accesorio para interruptor sencillo
Accesorio para interruptor doble
Accesorio para tomacorriente 110 V
Accesorio para tomacorriente 220 V
Accesorio para salida de tapa ciega
8
9
10
11
Suministro
e
instalacin
aire
acondicionado 12,000 BTU farmacia
y administracin
Suministro
e
instalacin
aire
acondicionado 18,000 BTU en rayos
x
Tapa para caja de breaker
Suministro e instalacin abanico de
techo
Suministro e instalacin lmparas
3x32W
2.00
Ud
23,690.09
1.00
1.00
Ud
Ud
29,303.66
309.72
8.00
Ud
4,603.75
32.00
Ud
2,677.28
3.00
M2
897.06
6.00
1.00
M2
P.A.
246.86
5,000.00
196.60
M2
881.64
72.31
7.58
10.43
11.63
P2
M2
P2
M2
361.34
69.03
309.72
62.12
11.63
M2
881.64
72.64
P2
215.52
1.00
Uds
4,824.48
1.00
P.A
1,500.00
Subtotal:
G
1
Muros de Bloques
De 6" para cerrar hueco
Subtotal:
H
1
2
3
Terminacin de superficie:
Paete
Reparacin general de muros paete
Suministro y colocacin ceramica de
muros
Subtotal:
I
1
2
3
4
5
6
7
8
Cocina
Suministro y colocacin de tope de
granito en cocina
Demolicion meseta de ceramica
Construccion meseta de marmolite
Demolicion ceramica de muros
Suministro y colocacion ceramica de
muros
Suministro y colocacion ventana
salomonica de aluminio AA
Suministro y colocacion fregadero
sencillo de acero inoxidable (incluye
mezcladora)
Cierre de hueco en muros de block 6"
Subtotal:
1.a)
PRELIMINARES:
Replanteo
1.00
P.A.
1,032.40
13.50
17.55
4.20
9.86
M3
M3
M3
M3
326.97
367.98
209.48
1,085.65
3.50
M3
9,657.14
4.46
1.08
0.80
3.65
3.15
M3
M3
M3
M3
M3
14,327.43
22,099.51
22,266.38
22,099.51
9,657.14
20.32
M2
897.06
77.62
M2
722.74
41.62
M2
286.47
155.24
113.70
M2
ML
246.86
82.68
41.62
M2
67.03
Subtotal :
1.a)
b)
c)
d)
MOVIMIENTO DE TIERRA:
Excavacin
Bote Material
Relleno de Reposicin
Relleno Prov. de Mina
Subtotal :
2.a)
b)
c)
e)
f)
g)
3.a)
b)
MUROS DE BLOQUES:
De 0.15 Mts BNP con 3/8" a
0.80Mts
De 0.15 Mts SNP con 3/8" a
0.80Mts
Subtotal :
4.a)
b)
c)
d)
TERMINACION DE SUPERFICIE:
Paete de Mezcla Liso en Techo,
vuelos, vigas y columnas
Paete de Mezcla Liso en Muros
exteriores e interiores
Cantos
Fraguache de techo, vuelos
columnas
Subtotal :
5.a)
PISOS:
Piso de H.A. pulido con malla
electrosoldada e=0.10m
2.88
M3
6,435.10
37.44
M2
295.22
51.92
21.60
2.00
M2
ML
ud
412.96
99.95
1,622.34
199.68
M2
142.95
28.80
M2
176.97
2.60
M2
3,613.39
2.00
1.00
2.00
UD
UD
UD
977.48
1,143.18
36.34
21.60
mt2
512.60
Subtotal :
6.a)
b)
c)
d)
TERMINACION DE TECHOS:
Fino de Mezcla en Techo plano
Suministro
y
colocacin
de
impermeabilizante tipo lona asfaltica
de 4.00 KG/M granulada con
refuerzo de poliester.
Zabaleta de Mezcla
Desague de techo 4"
Subtotal :
7.a)
b)
PINTURA:
Semigloss en Muros y techos
Mantenimiento (color gris perla) en
piso
Subtotal :
8.a)
PORTAJE:
Puerta acustica confeccionada en
Tola (2.40 x 2,00) Mts.
Subtotal :
9.-
INSTALACION ELECTRICA:
a) Salida de Luz Cenital con bombillo
bajo consumo
b) Salida de Interruptor Sencillo
c) Tomacoriente 110v
Subtotal :
10.a)
VARIOS
Acera perimetral (ancho=1.00m)
b)
c)
93.60
1.00
M2
P.A.
3,757.76
2,588.50
1.00
1.00
P.A
P.A
1,522.04
3,613.39
28.12
M3
326.97
12.96
28.25
22.08
61.62
M3
M3
M3
M3
326.97
103.54
1,085.65
367.98
4.69
3.46
0.81
M3
M3
M3
9,657.14
9,657.14
22,099.51
7.36
2.25
M3
M3
5,361.60
22,099.51
1.82
2.85
1.43
5.29
M3
M3
M3
M3
22,099.51
22,099.51
22,099.51
22,099.51
Subtotal :
VI
Construccion de Morgue:
A
1.00
2.00
Preliminares
Limpieza del solar
Replanteo con charrancha.
Subtotal
B
1.00
2.00
3.00
4.00
5.00
Movimiento de tierra
Excavacion a mano zapata de muros
de 6"
Excavacion a mano zapata de
columnas C1
Relleno de reposicion
Relleno compactado e=0.30mt
Bote de material excavado.
Subtotal
C
1.00
2.00
3.00
4.00
5.00
D
1.00
2.00
3.00
4.00
5.00
6.00
7.00
8.00
Dintel
Hormigon en rampa de acceso
e=0.15m
Losa e=0.14 y vuelos
Hormigon simple para soporte de
meseta de fregadero e=0.10m
0.44
M3
22,266.38
10.13
12.89
M3
M3
5,002.59
14,327.43
3.10
M2
951.99
65.49
126.98
M2
M2
897.06
722.74
92.07
M2
67.03
253.96
92.07
M2
M2
67.03
286.47
253.96
165.80
M2
ML
246.86
82.68
73.58
M2
920.33
48.88
ML
123.04
92.07
17.80
M2
ML
295.22
99.95
103.64
M2
412.96
6.00
Uds
1,674.90
Subtotal
E
1.00
2.00
Construccion de Muros
Colocacion bloques de 6" BNP
Colocacion bloques de 6" SNP
Subtotal
F
1.00
2.00
3.00
4.00
5.00
Terminacin de Superficie
Fragucahe en losa y vuelos
Fraguache en muros interiores y
exteriores
Paete en losa y vuelos
Paete en muros interiores y
exteriores
Cantos
Subtotal
G
1.00
2.00
Terminacion de Pisos:
Suministro y colocacion de pisos de
granito fondo blanco de (0.40x0.40)m
Suministro y colocacion zocalos de
granito fondo blanco (0.07x0.40)ml
Subtotal:
H
1.00
2.00
3.00
4.00
Terminacion de Techos:
Fino de techos
Zabaletas
Suministro
y
colocacin
de
impermeabilizante tipo lona asfaltica
de 4.00 KG/M granulada con
refuerzo de poliester.
Desague 4" PVC con bajante
h=3.00m
5.00
6.00
7.00
8.00
Goteros colgantes
Antepecho en block de 6"
Paete en antepecho
Cantos en antepecho
17.80
7.12
16.91
35.60
ML
M2
M2
ML
148.36
722.74
246.86
82.68
92.07
106.32
126.48
M2
M2
M2
74.46
74.46
142.95
1.00
Uds
24,777.54
1.00
Uds
12,878.12
1.00
Uds
134,467.69
103.30
P2
215.52
57.00
PL
49.32
19.00
4.00
PL
Uds
47.65
567.82
57.00
PL
71.47
2.00
3.00
Uds
Uds
5,489.50
1,674.90
Subtotal:
I
1.00
2.00
3.00
Pintura:
Acrilica en techos y vuelos
Acrilica en muros exteriores
Semigloss en muros interiores
Subtotal:
J
1.00
2.00
3.00
4.00
Portage:
Suministro y colocacion puerta de
polimetal doble
Suministro y colocacion puerta
enrrollable de (1.62x2.20)m
Suministro y colocacin puerta doble
en acero inoxidable (batiente)
Suministro y colocacion ventana
salomonica de aluminio AA
Subtotal:
K
1.00
2.00
3.00
4.00
5.00
6.00
Instalacion Sanitaria:
Suministro y colocacion tuberia PVC
de 1" presion para agua potable
(inclye excavacion, asiento de arena y
tapado)
Suministro y colocacion tuberia PVC
de " presion (inclye excavacion,
asiento de arena y tapado)
Llave de paso de " de bola
Suministro y colocacion tuberia 3"
PVC drenaje para aguas negras
(incluye excavacion, asiento de arena
y tapado).
Construccion camara de inspeccion
(registros)
Desagues 4" PVC
1.00
Uds
5,154.53
3.00
1.00
1.00
Uds
P.A
P.A
5,161.99
4,645.79
6,710.58
14.00
Uds
977.48
12.00
2.00
2.00
1.00
2.00
Uds
Uds
Uds
Uds
Uds
2,764.02
977.48
1,143.18
4,969.42
2,507.01
1.00
7.00
1.00
3.00
1.00
1.00
Uds
Uds
Uds
Uds
Uds
Uds
8,775.38
1,176.05
1,176.05
1,836.99
5,161.99
5,177.00
35.44
M2
512.60
9.60
44.76
1.00
M2
P2
P.A
3,277.04
309.72
1,035.40
Subtotal:
L
1.00
Instalacion Electrica:
Salida de techos
Lampara 3x32w T8 con balastro
2.00
electronico
3.00 Salida luz de pared (aplique)
4.00 Salida interruptor simple
5.00 Panel de distribucion de 16 circuitos
6.00 Registros electricos
Conexin de panel con planta
7.00
electrica
8.00 Salida TC-110v
9.00 Salida TC-110v doble altura
10.00 Salida TC-220v
11.00 Miscelaneos electricos
12.00 Mano de obra electricista
Subtotal:
M
1.00
2.00
3.00
4.00
Miscelaneos:
Construccion
acera
perimetral
e=0.10mt
Protectores de hierro en ventanas en
barras cuadradas de "
Tope de marmolite
Limpieza continua y final
Subtotal:
VII
A
1.00
Preliminares:
Limpieza del solar
1.00
P.A
507.35
2.00
1.00
P.A
1,032.40
21.90
16.43
32.85
9.90
M3
M3
M3
M3
326.97
103.54
367.98
1,085.65
5.48
0.40
1.46
3.30
M3
M3
M3
M3
9,657.14
22,099.51
22,099.51
6,435.10
0.80
1.46
M3
M3
22,099.51
22,099.51
4.96
M3
17,653.93
54.75
54.48
18.52
M2
M2
M2
1,016.64
918.88
1,268.48
41.33
146.00
41.33
146.00
113.54
M2
M2
M2
M2
ML
67.03
67.03
286.47
246.86
82.68
Subtotal:
B
1.00
2.00
3.00
4.00
Movimiento de Tierra:
Excavacion a mano zapata de muros
de 8"
Relleno de reposicion
Bote material excavado
Relleno compactado e=0.30mt
Subtotal:
C
1.00
2.00
3.00
4.00
D
1.00
2.00
3.00
E
1.00
2.00
3.00
Construccion de Muros
Colocacion bloques de 8" BNP
Colocacion bloques de 8" SNP
Colcoacion bloques calados SNP
Subtotal:
F
1.00
2.00
3.00
4.00
5.00
Terminacion de Superficie:
Fraguache en losas y vuelos
Fraguache en muros
Paete en losa y vuelos
Paete en muros
Cantos
Subtotal:
G
1.00
2.00
3.00
Terminacion de Techos:
Fino de techo
Suministro
y
colocacin
de
impermeabilizante tipo lona asfaltica
de 4.00 KG/M granulada con
refuerzo de poliester.
Goteros colgantes
41.34
M2
295.22
41.34
29.00
M2
ML
412.96
148.36
66.50
92.80
41.34
M2
M2
M2
74.46
176.97
176.97
4.00
Uds
14,670.37
4.00
1.00
Uds
P.A
516.20
528.05
Subtotal:
I
1.00
2.00
3.00
Pintura:
Acrilica exterior en muros
Mantenimiento en muros interiores
Mantenimiento en techo
Subtotal:
J
1.00
Portaje:
Suministro y colocacion puerta de
tola (2.03x 2.00)mt (4 uds).
Subtotal:
K
1.00
2.00
Miscelaneos:
Letrero identificativo (clasificacion
de basura).
Limpieza continua y final
Subtotal:
VIII
1
2
3
4
5
Cisterna:
Suministro e instalacin bomba para
cisterna marca mayer o red jacket de
2 HP
Suministro y colocacin tapa de
aluminio para cisterna
Tuberias y piezas
Sustitucin de tuberas agua potable
desde cisterna a la edificacin
(cuerpos I, II y III)
Reparaciones menores en cisterna
(resane, zabaleta, entre otros)
1.00
Uds
14,918.76
1.00
1.00
Uds
P.A.
3,613.39
191.10
1.00
P.A.
10,323.97
1.00
P.A.
5,161.99
Subtotal:
IX
1
2
6
7
8
9
10
11
Alta tensin:
Traslado de planta (uso de grua)
Suministro y colocacin de caja de
breaker trifasica de 30 circuitos
(cuerpos I, II y III)
Suministro y colocacin cablera a
caja de breaker cuerpo I de 3 lineas
(#2 THW, 1linea # 4 THW, 1 Linea
#10 THW)
Suministro y colocacin cablera a
caja de breaker cuerpo II de 3 lineas
(#2 THW, 1linea # 4 THW, 1 Linea
#10 THW)
Suministro y colocacin cablera a
caja de breaker cuerpo III de 3 lineas
(#2 THW, 1linea # 4 THW, 1 Linea
#10 THW)
Movilizacin de transformadores
desde caseta vieja a caseta nueva (3
Ud)
Portico estructura metalica en angular
2"x2"x1/4"
Estructura para interconexion alta
tension MT-316
Alambre THHN #3/0 (para vigote
del banco)
Soporte para cut-Out y apartarrayos
1.00
P.A.
14,927.72
3.00
Uds
13,903.00
1.00
P.A.
28,146.25
1.00
P.A.
26,473.76
1.00
P.A.
25,049.06
1.00
p.a.
10,599.57
1.00
P.A.
12,698.49
1.00
Uds
32,004.32
120.00
pl
58.77
1.00
Uds
1,445.36
45.00
PL
1,507.13
ALIMENTADORES:
a) Alimetadores desde transformador
a Main breakers de 800 amp. 3 en
caseta de planta compuesto por:
3 # 2/0 THHN por fase
2 # 2/0 THHN por neutro
1 # 2 THHN por tierra, en tuberia
pvc3" SDR-26
12
PL
1,513.56
30.00
PL
1,269.42
30.00
PL
1,269.42
30.00
PL
1,269.42
288.80
PL
439.99
13
14
15
16
17
18
19
20
21
22
23
306.84
PL
439.99
186.30
PL
461.62
186.30
PL
461.62
328.00
PL
41.61
2.00
Uds
95,251.75
1.00
Uds
456,038.81
1.00
P.A
200,066.85
Subtotal:
X
1
2
3
APLICACIN PINTURA:
Semigloss en muros interiores
Acrilica en muros exteriores
Acrilica en techos
2,983.03
1,364.99
902.33
M3
M3
M3
142.95
74.46
74.46
902.33
M2
164.94
20.17
P2
309.72
440.17
PL
136.68
1.00
Uds
15,485.96
13.94
PL
2,374.51
15.41
PL
2,300.00
31.16
Pl
136.68
1.00
Uds
6,194.38
5.90
PL
2,300.00
5.40
0.44
M2
M3
62.12
367.98
3.60
M2
246.86
1.00
Uds
5,154.53
Subtotal:
XI
1
MISCELANEOS:
Pulido y brillado de pisos
Suministro y colocacion tope de
marmolite en archivo e informacion
Suministro y colocacion trameria de
roble en archivo (11 tramos).
Suministro y colocacion counters en
informacion
Suministro y colocacion gabinete de
piso en roble color caoba en area de
esterilizacion
Suministro y colocacion gabinete de
pared en roble color caoba en area de
esterilizacion
Suministro y colocacion divisiones en
roble en despensa de esterilizacion
2
3
4
5
9
10
11
12
13
14
15
16
17
18
19
2.00
Uds
12,878.12
15.36
P2
309.72
13.38
PL
2,374.51
1.00
Uds
58,751.03
1.00
1.00
Uds
P.A
39,167.35
25,626.15
38.84
M2
15,343.01
2.24
M2
854.63
1.00
uds
43,104.12
7.80
M2
872.35
38.84
M2
872.35
1.00
uds
91,852.82
19.20
M2
176.97
4.00
4.00
4.00
12.00
Uds
Uds
Uds
Uds
103.54
103.54
51.77
103.54
Subtotal:
XII
1
2
3
4
5
6
7
RAYOS X
Emplomado en muros
Construccion de muros para cristal
plomado (bloques de 6")
Suministro y colocacion cristal
plomado 1`x 1`
Suministro y colocacion muro de
sheeterock area plomada
Sheetrock para division area plomada
Suministro y colocacion puerta
plomada (1.00x2.10).
Aplicacin pintura mate en cuarto
oscuro
Subtotal:
VIII
I
1
2
3
4
DIVISIONES
HABITACIONES:
DESMONTES
DEMOLICIONES:
Desmonte de inodoros
Desmonte de lavamanos
Desmonte de duchas
Desmonte de puertas
EN
Y
5
6
Demolicion de muros
Bote material demolido
103.45
21.72
M2
M3
56.48
367.98
1.00
P.A
3,078.87
33.08
46.31
16.54
M3
M3
M3
326.97
367.98
103.54
8.27
22.05
M3
M3
9,657.14
22,099.51
1.46
M3
22,099.51
1.10
M3
5,361.60
5.85
22.05
0.99
M3
M3
M3
22,099.51
22,099.51
22,266.38
1.31
M3
14,327.43
73.50
207.91
M2
M2
897.06
722.74
7.44
M2
722.74
Subtotal:
II
A
1
Preliminares:
Replanteo con hilo y cal
Subtotal:
B
1
2
3
Movimiento de Tierra:
Excavacion zapata de muros de 6"
Bote material excavado
Relleno de reposicion
Subtotal:
C
1
2
3
4
5
6
7
8
Hormigon Armado
Zapata de muros
Viga de amarre (0.15x0.20)mt
Pichones de columnas de amarre
(0.15x00.20)mt BNP
Losa de piso con malla e=0.10mt
(baos)
Columnas de amarre (0.15x0.20)MT
SNP
Viga de amarre (0.15x0.20)mt SNP
Dinteles (0.15x0.20)mt
Losa de techo e=0.12mt baos nuevos
Subtotal:
D
1
2
3
Construccion de Muros:
Colocacion block de 6" BNP
Colocacion block de 6" SNP
Colocacion block de 6" SNP en
antepecho
Subtotal:
Terminacion de Superficie:
1
2
3
4
5
412.82
412.82
78.91
263.88
7.07
M2
M2
M2
ML
M2
67.03
246.86
881.64
82.68
246.86
29.40
M2
920.33
57.84
M2
891.86
79.20
ML
123.04
10.95
18.60
M2
ML
430.31
99.95
2.00
Uds
1,120.15
21.18
M2
412.96
161.51
10.95
M2
M2
142.95
74.46
10.00
Uds
24,777.54
12.00
Uds
6,194.38
34.43
P2
215.52
Subtotal:
F
1
2
3
Terminacion de Pisos:
Suministro y colocacion piso de
granito fondo blanco (0.50x0.50) alto
transito
Suministro y colocacion ceramica de
piso antiresvaladiza en baos
Suministro y colocacion zocalos de
granito
Subtotal:
G
1
2
3
4
Terminacion de Superficie:
Fino de techo plano
Zabaleta
Desague 3" PVC con bajante
h=3.00mt
Aplicacin impermeabilizante tipo
lona asfaltica granulada de 4.00kg/m
con refuerzo de poliester.
Subtotal:
Aplicacin de Pintura:
Semigloss en muros
Acrilica en techos
Subtotal:
I
1
2
3
Puertas y Ventanas:
Suministro y colocacion puerta de
polimetal doble
Suministro y colocacion puerta de
polimetal sencilla
Suministro y colocacion ventana
salomonica de aluminio doble A
Subtotal:
J
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
Instalacion Sanitaria:
Suministro y colocacion inodoros
Suministro y colocacion lavamanos
con pedestal
Suministro y colocacion duchas
Suministro y colocacion piletas
revestida de ceramica (incluye
desague y llave chorro)
Suministro y colocacion desagues de
pisos 2"
Suministro y colocacion llave chorro
Suministro y colocacion juego de
accesorios porcelana
Suministro y colocacion tubos para
cortinas
Construccion camara de inspeccion
Suministro y colocacion tuberia para
drenaje 4" PVC
Suministro y colocacion tuberia para
drenaje 3" PVC
Suministro y colocacion tuberia para
drenaje 2" PVC
Suministro y colocacion tuberia de
presion para agua potable 1" PVC
Suministro y colocacion tuberia de
presion para agua potable 1" PVC
Suministro y colocacion tuberia de
presion para agua potable 3/4"
PVC
Piezas y tuberias especiales
11.00
Uds
5,698.00
11.00
11.00
Uds
Uds
4,673.60
11.00
Uds
4,196.45
23.00
1.00
Uds
Uds
962.39
567.82
11.00
Uds
1,850.00
11.00
7.00
Uds
Uds
361.34
5,489.50
109.55
PL
52.35
54.78
PL
48.90
76.00
PL
55.59
102.00
PL
55.59
51.00
PL
47.65
57.00
1.00
PL
P.A
44.47
3,613.39
27.00
Uds
977.48
13.00
14.00
22.00
Uds
Uds
Uds
2,764.02
644.25
1,143.18
Subtotal:
X
1
2
3
4
INSTALACIONES
ELECTRICAS:
Salida de techos
Suministro y colocacion lamparas
fluorescente 3x32w T8 con balstro
electrico
Suministro y colocacion globos 8"
Salidas interruptor simple
5
6
7
8
9
10
11
12
13
14
Salidas
tomacorriente
120v
aterrizados
Salidas
tomacorriente
220v
aterrizados para A/A
Drenajes empotrados con tubo PVC3/4"-SDR-26 para unidades de aires
acondicionados.
Ductos de PVC-2" empotrados para
paso de tuberias de cobre de unidades
de A/C
Suministro y colocacion A/A split de
12000 BTU marca Lennox.
Panel de 24 circuitos de distribucion
para iluminacion y tomacorriente
120v
Panel de 24 circuitos de distribucion
para A/C
Alimentadores electricos de panel de
distribucion de iluminacion y
tomacorrientes con 2#4 THHN para
fase, 1#6 THHN para neutro, 1#10
THHN para tierra en PVC 1"-SDR26
Alimentadores electricos de panel de
distribucion de A/C con 2#2 THHN
para fase, 1#4 THHN para neutro,
1#10 THHN para tierra en PVC 1"SDR-26
Registros
10x10x4
para
comunicacin electrica
34.00
Uds
1,236.00
14.00
Uds
2,024.71
14.00
Uds
266.43
14.00
Uds
217.31
14.00
Uds
23,690.09
1.00
Uds
8,233.81
1.00
Uds
8,233.81
100.00
PL
250.99
100.00
PL
316.24
4.00
Uds
359.20
5,196.10
5,227.03
5,227.03
3,757.93
2,214.49
6,091.14
6,091.14
23,332.18
Subtotal:
1.00
1.01
1.02
1.03
1.04
1.05
1.06
1.07
1.08
38.00
2.00
6.00
5.00
5.00
1.09
1.10
1.11
1.12
1.13
2.00
2.01
2.02
Equipos
1.00
Manifold de Oxigeno header 10x10
Manifold de Aire Medicinal M2-HBTC-12S-AIR1.00
6x6
Bomba de vaco 5 HP Dplex, 3 Ph,
60 Hz, Modelo S500B-T2
1.00
2.03
3.00
3.01
3.02
3.03
3.04
3.05
3.06
3.07
3.08
3.09
3.10
3.11
1.00
2.00
Miscelneos de Instalacin
Tubera rgida de cobre de 1 5/8"
Tubera rgida de cobre de 1 1/8"
Tubera rgida de cobre de 7/8"
Tubera rgida de cobre de 3/4"
Tubera rgida de cobre de 5/8"
Tubera rgida de cobre de 1/2"
Miscelneos de Instalacin (tee,
codos, niples, coupling, etc.)(Sujeto a
desglose en cubicaciones)
Suministro de Sistema de soportara
Suministro de Sealizacin
Suministro de otros accesorios e
insumos (plata, tubos pvc, O2, etc.)
Ejecucin de Prueba
Mano de Obra de Instalacin
Limpieza continua y final
Uds.
Uds.
Uds.
Uds.
Uds.
14,453.56
28,390.93
49,389.89
87,237.58
193,264.78
Ud.
Ud.
700,316.41
371,663.04
Ud.
############
600.00
1,120.00
440.00
880.00
300.00
600.00
P.L.
P.L.
P.L.
P.L.
P.L.
P.L.
569.88
381.99
268.42
211.64
175.51
129.05
1.00
1.00
1.00
PA
PA
PA
180,669.53
123,887.68
30,971.92
1.00
1.00
1.00
1.00
PA
PA
PA
PA
123,887.68
92,915.76
############
15,220.38
Subtotal
Sistema de Control de Acceso Empleados
1.00
Uds.
15,561.01
Sistema de Control de Acceso Empleados, Incluye:
Reloj Biometrico
Nueva generacin de sensor: totalmente sellado, aprueba de polvo, agua y rayones
Pantalla LCD 128x64
Formas de identificacin: Id, Clave ID + Huella digital
Capacidad de registro: 50000
USB + Puerto USB (memorias USB)
Bateria recargable para emergencias o portabilidad
Hasta 2000 huellas digitales
Idiomas: Ingles, Espaol, Portugues y Frnces
1.00
Uds.
5,449.59
Instalacin, configuracin y entrenamiento
1.00
2.00
3.00
4.00
3.00
Uds.
18,242.87
10.00
Uds.
1,576.75
1,640.00
PL
26.89
1.00
P.A.
35,920.10
30.00
30.00
30.00
Uds.
Uds.
Uds.
5,086.29
302.76
1,816.53
102.00
Uds.
7,298.35
102.00
Uds.
1,054.20
15.00
1.00
Uds.
P.A
7,703.80
290,255.19
1.00
2.00
3.00
4.00
6.00
7.00
8.00
COUNTER:
2.00
Uds
184,543.16
Subtotal:
2,493.75
4,346.33
6,735.02
9,491.89
25,144.07
12,572.03
Subtotal:
Jardineria (Sujeto a Presentacion de Factura):
1.00
Reflexa
3.00
Palo de brazil
2.00
Trepadoras
2.00
Palma rafia
2.00
Arallanes
12.00
Plantas pequeas
2.00
Tarros de fibra de vidrio 37,5"
6.00
Tarros de fibra de vidrio 20"
7.00
Maceteros rectangulares
12.00
Maceteros pequeos
1.00
Arreglo floral orquideas
Arreglo floral con anturios y bromelia
6.00
1.00
Saco de guajaca
1.00
Spray para plantas
Subtotal:
Uds
Uds
Uds
Uds
Uds
Uds
Uds
Uds
Uds
Uds
Uds
3,342.39
1,400.19
1,174.35
8,130.13
9,033.48
271.00
14,993.43
4,516.74
1,174.35
451.67
3,252.05
Uds
Uds
Uds
1,264.69
4,336.07
1,147.73
208.00
Uds
758.81
447.75
PL
1,102.60
96.00
Uds
1,620.00
100.26
M2
4,955.51
51.20
M2
5,451.06
100.26
M2
5,574.95
100.26
M2
1,486.65
1.00
Ud
273,585.30
5.00
Ud
16,518.36
Subtotal:
RUTA DE EVACUACION
Diseo y rotulacin de las rutas de
evacuacin (sujeto a presentacin de
factura)
1.00
P.A.
153,943.27
Subtotal:
APLICACION: DRY-COOL / CHILLED BEAMS / CWP (PLANTA AGUA HELADA)
EQUIPOS MAYORES
SISTEMA ENFRIAMIENTO Y
DESHUMIDIFICACION POR
DESECANTE LIQUIDO DE
PAQUETE TIPO TECHO , 3500
CFM 100% AIRE FRESCO, 15 HP
HVOLTAJE 460/3/60,
REFRIGERANTE 410a, NIVEL DE
FILTRACION 60/95%. PANEL
DESCONECTIVO ELECTRICO
NEMA 3R INSTALADOS. PANEL
DE CONTROL DE
TEMPRATURA Y HUMEDAD
DIGITAL. AMBOS INSTALADOS
EN FABRICA. SET DE
COMPRESORES SCROLL DE
CAPACIDAD VARIABLE.
VARIADOR DE FRECUENCIA
PARA MOTOR VENTILADOR
AIRE DE SUMINISTRO. CURVA
DE INSTALACION EN TECHO DE
ZINC GALVANIZADO Y
DESCARGA AJUSTAGLE EN EN
OBRA HACIA ABAJO Y-O
HORIZONTAL.ESTA PARTIDA
INCLUYE LOS CHILLED BEAMS,
SU UBICACION (MANO DE OBRA
Y MATERIALES)
1.00
UD
1,350,133.81
SISTEMA DE DISTRIBUCION
CHILLED BEAMS ACTIVO (A
BASE DE VIGAS FRIAS),
SUSPENDIDAS EN PLAFON
UNIVERSAL, DIFUSOR DE AIRE
LINEAL DE DOS VIAS PARA
PROVEER 75 F/ 55% HR Y 4 CAH,
25 DB, EN 40 HABITACIONES Y
SUS AREAS DE APOYO,
CONTROL INDIVIDUAL DE
TEMPERATURA Y HUMEDAD
ZONAL, CONTROL
TEMPERATURA DE ROCIO PARA
EVITAR CONDENSACION EN EN
CUARTO. TODO EL SISTEMA
INSTALADO DE ACUERDO A
LOS PLANOS Y
ESPECIFICACIONES ANEXOS.
ESTA PARTIDA INCLUYE LOS
CHILLED BEAMS, SU
UBICACION (MANO DE OBRA Y
MATERIALES)
1.00
PA
36,031.96
UD
1,235,138.19
1.00
UD
76,663.75
SET VENTILADOR DE
EXTRACCION DUAL MONTADO
SOBRE FRAME COMUN, TIPO
CENTRIFUGO Y
CONFIGURACION DE DOMO DE
TIRO VERTICAL CON CURVA DE
INSTALACION EN TECHO. CADA
VENTILADOR 2880 CFM @ 1
PULG DE H20. 480/3/60 ,
DESCONETIVO NEMA 3R. UNO
STAND-BY. ESTA PARTIDA
INCLUYE LA MANO DE OBRA Y
MATERIALES PARA SU
UBICACION.
INSTALACIONES MECANICAS
SISTEMA DE CONDUCTOS DE
AIRE PARA SUMINISTRO Y
EXTRACCION CONSTRUIDOS EN
ZINC GALVANIDADO,
AISLADOS CON FIBRA DE
VIDRIO, Y DUCTOS FLEXIBLES
TERMINALES DE ALUMINIO
CON BRIDAS DE SEGURIDAD
PARA EVITAR FUGAS Y
CONDENSACION EN PLENUM,
SEGUN PLANOS Y
ESPECIFICACIONES DE
CONSTRUCCION ANEXOS. ESTA
PARTIDA INCLUYE EL
SUMINISTRO DE TODOS LOS
MATERIALES Y MANO DE OBRA
PARA SU INSTALACION.
1.00
PA
140,550.21
1.00
PA
140,550.21
SISTEMA DE TUBERIAS Y
ACCESORIOS DE SERVICIO Y
CONTROL DE FLUJO,
INDICADORES DE
TEMPERATURAS Y PRESION,
PARA CONDUCCION DE AGUA
HELADA, CONSTRUIDAS EN
TUBERIAS DE COBRE Y
AISLADAS TERMICAMENTE
CON CANALETAS DE
POLIURETANO EXPANDIDO
CON CUBIERTAS DE ALUMINIO
EN EL AMBIENTE EXTERIOR E
INTERIORMENTE CUBIERTAS
CON MASTICO Y MALLA DE
FIBRA DE VIDRIO, SEGUN
PLANOS Y ESPECIFICACIONES
DE CONSTRUCCION ANEXOS
PA
340,727.78
1.00
PA
85,181.94
1.00
PA
51,109.17
1.00
PA
42,590.97
1.00
PA
46,850.07
SUMINISTRO DE ENERGIA A
EQUPOS MAYORES ( DRY-COOL,
CWP, VE, PANELES DDC) ESTA
PARTIDA INCLUYE EL
SUMINISTRO DE TODOS LOS
MATERIALES Y MANO DE OBRA
PARA SU INSTALACION.
OBRAS CIVILES MENORES
PARA UBICACION DE EQUIPOS
IN SITU E INSTALACION DE
SISTEMAS MECANICOS DE
ACUERDO A ESPECIFICACIONES
Y PLANOS ANEXOS. ESTA
PARTIDA INCLUYE EL
SUMINISTRO DE TODOS LOS
MATERIALES Y MANO DE OBRA
PARA SU INSTALACION
10
11
12
PRUEBAS AJUSTES Y
BALANCE DEL SISTEMA.
INCLUYE EQUIPOS MAYORES,
SISTEMA DE CONDUCCION DE
AIRE, SISTEMA HIDRONICO Y
SISTEMA DDC.
1.00
PA
34,072.78
1.00
PA
34,072.78
1.00
PA
34,072.78
LIMPIEZA,
DESCONTAMINACION BLOQUE
HABITACIONES PARA PUESTA
EN OPERACION. INCLUYE
EVACUACION DURANTE 72 HRS
DE LA EDIFICACION A PRESION,
HEPA-VACUUM Y LIMPIEZA
HUMED DE SUPERFICIES Y
CONTENIDO,
DESCONTAMINACION TOTAL A
BASE DE PEROXIDO DE
HIDROGENO. lIMPIEZA
DESCONTAMINACION DE TODO
EL SISTEMA HVAC (DUCTOS,
DRY-COOL)
COMISIONAMIENTO DEL
SISTEMA HVAC DE ACUERDO A
NORMAS DE CONSTRUCCION Y
ESPECIFICACIONES.
1.00
UD
1.00
UD
1.00
UD
1.00
UD
1.00
UD
1.00
UD
100.00
UD
50.00
Pie
INSTALACIONES ELECTRICAS
10
11
12
13
15.00
PIE
180.00
PIE
20.00
PA
1.00
UD
14
15
16
17
18
1.00
PA
1.00
PA
1.00
PA
1.00
PA
1.00
PA
MISCELANEOS PARA
MATERIALES Y SERVICIOS EN
OBRA
Mano de obra Instalacin equipos
mayores e
instalaciones electricas relacionadas
de acuerdo aespecificaciones y planos
19
20
PRUEBAS AJUSTES Y
BALANCE DEL SISTEMA.
INCLUYE EQUIPOS MAYORES Y
TODAS LAS INSTALACIONES
PARA PUESTA EN OPERACION
DE ACUERDO A
ESPECIFICACIONES ANEXAS
COMISIONAMIENTO DEL
SISTEMA ELECTRICO DE
ACUERDO A NORMAS DE
CONSTRUCCION Y
ESPECIFICACIONES.
APLICACION: DRY-COOL /
FLUJO LAMINAR / CWP
(PLANTA AGUA HELADA)
PARA SUITE OPERACIONES &
UCI
EQUIPOS MAYORES
1.00
PA
1.00
PA
SISTEMA ENFRIAMIENTO Y
DESHUMIDIFICACION POR
DESECANTE LIQUIDO DE
PAQUETE TIPO TECHO , 3500
CFM 100% AIRE FRESCO, 15 HP
HVOLTAJE 460/3/60,
REFRIGERANTE 410a, NIVEL DE
FILTRACION 60/95%. PANEL
DESCONECTIVO ELECTRICO
NEMA 3R INSTALADOS. PANEL
DE CONTROL DE
TEMPRATURA Y HUMEDAD
DIGITAL. AMBOS INSTALADOS
EN FABRICA. SET DE
COMPRESORES SCROLL DE
CAPACIDAD VARIABLE.
VARIADOR DE FRECUENCIA
PARA MOTOR VENTILADOR
AIRE DE SUMINISTRO. CURVA
DE INSTALACION EN TECHO DE
ZINC GALVANIZADO Y
DESCARGA AJUSTAGLE EN EN
OBRA HACIA ABAJO Y-O
HORIZONTAL.
1.00
UD
924,224.09
1.00
UD
298,136.80
1.00
UD
85,181.94
SET VENTILADOR DE
EXTRACCION DUAL TIPO
CENTRIFUGO Y
CONFIGURACION DE DOMO DE
TIRO VERTICAL MONTADO
SOBRE FRAME COMUN CON
CURVA DE INATALACION EN
TECHO. CADA VENTILADOR
3000 CFM @ 1 PULG DE H20.
480/3/60 INCLUYE
DESCONETIVO NEMA 3R. UNO
STAND-BY
MANEJADORA DE AIRE DE
TECHO DE 1500 CFM @ 2" H2O,
VENTILADOR CENTRIFUGO ,
DOBLE PARED, FILTRACION
60/95%, COIL AGUA HELADA,
DESCONECTIVO Y PANEL DE
CONTROL DIGITAL STAND
ALONE. VOLTAJE 460/3/60
1.00
UD
259,166.06
1.00
UD
352,227.34
1.00
PA
161,845.69
MANEJADORA DE AIRE DE
TECHO DE 1000 CFM @ 2" H2O,
VENTILADOR CENTRIFUGO ,
DOBLE PARED, FILTRACION
60/95%, COIL AGUA HELADA,
DESCONECTIVO Y PANEL DE
CONTROL DIGITAL STAND
ALONE. VOLTAJE 460/3/60
INSTALACIONES IEM
SISTEMA DE CONDUCTOS DE
AIRE PARA SUMINISTRO Y
EXTRACCION CONSTRUIDOS EN
ZINC GALVANIDADO,
AISLADOS CON FIBRA DE
VIDRIO, Y DUCTOS FLEXIBLES
TERMINALES SEGUN PLANOS Y
ESPECIFICACIONES DE
CONSTRUCCION ANEXOS. ESTA
PARTIDA INCLUYE EL
SUMINISTRO DE TODOS LOS
MATERIALES Y MANO DE OBRA
PARA SU INSTALACION.
SISTEMA DE TUBERIAS Y
ACCESORIOS DE SERVICIO Y
CONTROL DE FLUJO,
INDICADORES DE
TEMPERATURAS Y PRESION,
PARA CONDUCCION DE AGUA
HELADA, CONSTRUIDAS EN
TUBERIAS DE COBRE Y
AISLADAS TERMICAMENTE
CON CANALETAS DE
POLIURETANO EXPANDIDO
CON CUBIERTAS DE ALUMINIO
EN EL AMBIENTE EXTERIOR E
INTERIORMENTE CUBIERTAS
CON MASTICO Y MALLA DE
FIBRA DE VIDRIO, SEGUN
PLANOS Y ESPECIFICACIONES
DE CONSTRUCCION ANEXOS
1.00
PA
140,550.21
1.00
PA
383,318.75
SISTEMA DE CONTROLES
DIGITALES PARA MONITOREO
Y CONTROL INDIVIDUAL DE
TEMPERATURA, HUMEDAD,
CAMBIOS DE AIRE,
PRESSURIZACION Y NIVEL DE
POLUCION DENTRO DE LAS
SALAS DE CIRUGIA, UCI Y
DIFERENTES ZONAS DEL AREA
COMUN DE APOYO DE LA SUIT,
DE ACUERDO A LAS
ESPECIFICACIONES Y PLANOS
ANEXOS. ESTA PARTIDA
INCLUYE EL SUMINISTRO DE
TODOS LOS MATERIALES Y
MANO DE OBRA PARA SU
INSTALACION.
SUMINISTRO DE ENERGIA A
EQUPOS MAYORES ( DRY-COOL,
VE, AHU`S, PANELES DDC) ESTA
PARTIDA INCLUYE EL
SUMINISTRO DE TODOS LOS
MATERIALES Y MANO DE OBRA
PARA SU INSTALACION.
1.00
PA
85,181.94
1.00
PA
51,109.17
1.00
PA
46,850.07
1.00
PA
38,331.87
1.00
PA
42,590.97
MISCELANEOS PARA
MATERIALES Y SERVICIOS EN
OBRA
ENTREGA Y PUESTA EN OPERACION
10
PRUEBAS AJUSTES Y
BALANCE DEL SISTEMA.
INCLUYE EQUIPOS MAYORES,
SISTEMA DE CONDUCCION DE
AIRE, SISTEMA HIDRONICO Y
SISTEMA DDC, SEGUN
ESPECIFICACIONES ANEXAS
11
12
LIMPIEZA,
DESCONTAMINACION SUIT
OPERACIONES Y UCI PARA
PUESTA EN OPERACION.
INCLUYE EVACUACION
DURANTE 72 HRS DE LA
EDIFICACION A PRESION, HEPAVACUUM Y LIMPIEZA HUMED
DE SUPERFICIES Y CONTENIDO,
DESCONTAMINACION TOTAL A
BASE DE PEROXIDO DE
HIDROGENO. lIMPIEZA
DESCONTAMINACION DE TODO
EL SISTEMA HVAC (DUCTOS,
AHU, DRY-COOL)
1.00
PA
46,850.07
1.00
PA
34,072.78
COMISIONAMIENTO DEL
SISTEMA HVAC DE ACUERDO A
NORMAS DE CONSTRUCCION Y
ESPECIFICACIONES.
Totales
11,534.15
23,006.75
52,175.50
19,139.00
5,648.29
1,078.77
3,512.22
476,917.63
151,322.56
261.00
8,471.33
19,471.64
772,538.84
40,254.88
162,209.78
511,003.84
1,569.45
6,678.86
721,716.81
151,955.10
766,103.61
918,058.71
73,197.12
211,336.61
85,823.26
10,066.42
80,430.01
15,000.00
18,147.42
138,085.47
632,086.31
24,974.21
29,889.89
16,450.80
91,630.00
16,651.15
4,962.18
21,045.58
19,099.35
1,951.23
226,654.40
2,981.95
43,058.67
23,698.63
132,000.00
23,987.25
7,148.40
26,724.55
259,599.45
2,348.29
33,908.70
18,662.67
103,950.00
18,889.96
5,629.37
21,045.58
204,434.57
22,444.93
49,882.75
5,161.99
15,000.00
1,300.82
5,292.23
99,082.72
53,258.38
110,721.82
163,980.20
7,184.02
3,982.92
2,454.43
33,012.06
46,633.44
46,612.32
46,612.32
10,000.00
32,167.02
5,161.99
55,749.46
17,241.04
15,485.96
135,805.46
1,035.40
1,035.40
877.54
877.54
2,927.48
227,032.43
35,951.49
269,737.27
1,907.77
89,513.70
125,831.79
9,831.11
232.97
214.50
14,525.83
20,419.17
19,249.17
17,431.00
55,749.46
24,777.54
1,084.02
10,133.78
16,360.40
13,629.71
59,196.63
13,629.71
63,874.42
557,592.66
6,116.95
6,116.95
5,265.23
2,211.95
4,769.16
4,636.77
24,914.18
41,797.29
414.16
828.32
232.97
22,792.00
35,520.00
9,648.95
46,307.09
2,887.17
3,819.87
66.71
122,517.23
4,509.73
2,142.00
444.92
981.18
170.82
166.77
71,070.26
29,303.66
117,502.05
3,599.97
32,226.24
3,393.13
4,576.51
270,087.23
2,565.58
2,565.58
4,208.97
395.55
60,762.84
5,161.99
70,529.35
28,711.96
28,711.96
2,070.80
1,755.08
1,465.84
113,679.34
118,971.05
2,762.82
129,652.26
2,588.50
232.97
51,824.69
34,861.99
69,723.99
26,146.50
13,073.25
18,483.05
74,332.61
74,332.61
15,956.73
20,420.82
15,956.73
20,420.82
570,770.33
621.24
517.70
4,824.48
5,154.53
28,490.00
17,760.00
5,090.75
202,349.88
9,549.68
1,445.36
333.54
5,643.17
281,780.32
12,884.94
1,938.00
444.92
254.38
85.41
619.44
82.75
16,309.83
1,018.83
3,354.99
4,373.82
8,516.58
3,782.85
4,633.58
493.43
120,864.45
5,000.00
143,290.88
11,043.98
10,436.83
21,480.81
2,134.29
8,396.49
6,116.95
16,647.73
2,070.80
877.54
12,161.89
156,399.94
171,510.17
117,481.73
2,141.58
100,486.78
2,174.34
232.97
99,110.14
99,110.14
34,290.00
17,274.90
38,714.90
50,624.64
50,624.64
4,893.56
617,160.32
16,400.74
7,668.59
10,104.76
34,174.09
221,983.99
22,086.31
21,943.69
266,013.99
931.86
931.86
232.97
51,282.00
39,960.00
10,309.07
22,908.38
17,189.42
3,252.05
3,716.63
733.80
151,448.03
6,442.47
2,856.00
296.61
1,090.20
170.82
82.75
47,380.17
29,303.66
309.72
36,829.99
85,672.96
210,435.35
2,691.17
2,691.17
1,481.16
5,000.00
173,331.03
179,812.20
26,128.43
523.22
3,230.37
722.50
10,253.51
15,655.41
4,824.48
1,500.00
62,837.92
1,032.40
1,032.40
4,414.07
6,458.07
879.82
10,704.49
22,456.45
33,799.99
63,900.34
23,867.47
17,813.10
80,663.21
30,420.00
250,464.11
18,228.17
56,098.73
74,326.90
11,922.69
38,322.65
9,400.27
2,789.98
62,435.60
18,533.09
18,533.09
11,053.22
21,440.83
2,158.85
3,244.68
37,897.58
28,543.72
5,096.78
33,640.51
9,394.82
9,394.82
1,954.96
1,143.18
72.68
3,170.82
11,072.25
351,726.44
2,588.50
365,387.19
1,522.04
3,613.39
5,135.43
9,194.35
4,237.51
2,925.01
23,971.12
22,675.00
63,002.98
45,291.99
33,413.71
17,900.60
39,461.38
49,723.89
185,791.57
40,221.11
62,983.60
31,602.30
116,906.40
9,797.21
50,676.24
184,680.59
2,951.17
499,818.60
58,748.17
91,772.96
150,521.13
6,171.88
17,024.13
26,374.87
62,692.74
13,707.69
125,971.32
67,718.00
6,014.37
73,732.37
27,181.35
1,779.05
42,799.06
10,049.40
2,640.74
5,145.88
4,174.41
2,943.27
96,713.16
6,855.76
7,916.85
18,079.98
32,852.60
24,777.54
12,878.12
134,467.69
22,263.28
194,386.63
2,811.30
905.33
2,271.27
4,074.00
10,979.01
5,024.70
5,154.53
15,485.96
4,645.79
6,710.58
58,062.47
13,684.74
33,168.20
1,954.96
2,286.35
4,969.42
5,014.02
8,775.38
8,232.36
1,176.05
5,510.97
5,161.99
5,177.00
95,111.44
18,166.69
31,459.54
13,863.03
1,035.40
64,524.67
507.35
1,032.40
1,539.74
7,160.61
1,701.16
12,088.18
10,747.92
31,697.87
52,921.13
8,839.80
32,265.28
21,235.83
115,262.05
17,679.61
32,265.28
87,563.50
137,508.39
55,661.28
50,060.84
23,492.25
129,214.37
2,770.54
9,787.07
11,839.61
36,041.66
9,387.04
69,825.93
12,204.59
17,071.72
4,302.33
33,578.65
4,951.76
16,422.97
7,316.01
28,690.73
58,681.46
58,681.46
2,064.79
528.05
2,592.85
14,918.76
3,613.39
191.10
10,323.97
5,161.99
34,209.21
14,927.72
41,708.99
28,146.25
26,473.76
25,049.06
10,599.57
12,698.49
32,004.32
7,052.07
1,445.36
67,820.63
37,839.00
-
38,082.49
38,082.49
38,082.49
127,069.23
135,006.65
86,000.66
86,000.66
13,646.68
190,503.51
456,038.81
200,066.85
1,714,345.71
426,416.16
101,640.59
67,189.76
595,246.51
148,829.61
6,247.04
60,162.03
15,485.96
33,100.72
35,443.00
4,258.92
6,194.38
13,570.00
335.47
161.91
888.70
5,154.53
25,756.25
4,757.29
31,771.00
58,751.03
39,167.35
25,626.15
515,661.33
595,922.62
1,914.37
43,104.12
6,804.29
33,881.89
91,852.82
3,397.86
776,877.96
414.16
414.16
207.08
1,242.48
5,842.48
7,992.55
16,112.91
3,078.87
3,078.87
10,816.12
17,041.21
1,712.55
29,569.87
79,864.56
487,294.16
32,265.28
5,897.76
129,282.13
487,294.16
22,043.71
18,768.93
1,262,710.70
65,933.59
150,263.95
5,377.15
221,574.69
27,673.26
101,909.03
69,570.46
21,816.56
1,745.31
222,714.62
27,057.75
51,585.07
9,745.05
88,387.87
4,711.89
1,859.01
2,240.30
8,746.47
17,557.68
23,087.42
815.36
23,902.79
247,775.36
74,332.61
7,420.37
329,528.34
62,678.00
51,409.61
46,160.92
22,134.98
567.82
20,350.00
3,974.73
38,426.52
5,734.51
2,678.91
4,224.89
5,670.24
2,430.10
2,534.93
3,613.39
272,589.55
26,392.00
35,932.22
9,019.46
25,149.87
42,024.11
28,345.94
3,730.09
3,042.29
331,661.28
8,233.81
8,233.81
25,098.91
31,624.05
1,436.80
579,924.64
301,373.72
198,627.05
88,859.47
217,959.73
212,591.26
353,286.37
103,549.45
886,622.84
549,235.38
56,781.85
296,339.33
436,187.88
966,323.91
700,316.41
371,663.04
1,884,269.68
341,930.00
427,825.46
118,106.26
186,244.48
52,652.26
77,429.80
180,669.53
123,887.68
30,971.92
123,887.68
92,915.76
2,833,039.33
15,220.38
12,228,767.93
15,561.01
5,449.59
21,010.60
54,728.62
15,767.49
44,097.56
35,920.10
150,513.76
152,588.57
9,082.65
54,495.92
744,431.49
107,528.76
115,557.06
290,255.19
1,473,939.63
369,086.32
369,086.32
14,962.50
21,731.66
60,615.16
47,459.43
25,144.07
12,572.03
182,484.85
3,342.39
4,200.57
2,348.70
16,260.26
18,066.95
3,252.05
29,986.87
27,100.43
8,220.46
5,420.09
3,252.05
7,588.12
4,336.07
1,147.73
134,522.74
157,832.91
493,689.31
155,520.00
496,839.16
279,094.17
558,944.05
149,051.75
273,585.30
82,591.79
2,647,148.42
153,943.27
153,943.27
AGUA HELADA)
1,350,133.81
36,031.96
1,235,138.19
76,663.75
140,550.21
140,550.21
340,727.78
85,181.94
51,109.17
42,590.97
46,850.07
34,072.78
34,072.78
34,072.78
-
924,224.09
298,136.80
85,181.94
259,166.06
352,227.34
161,845.69
140,550.21
383,318.75
85,181.94
51,109.17
46,850.07
38,331.87
42,590.97
46,850.07
34,072.78